Loading...
HomeMy WebLinkAbout01569 - FAIRPORT CONSTRUCTION SEWER TACHEVAH SEWER MSTRUCTION REFUND AGREEMEN3ETLIEEIQ THE CITY OF PALM SPRINGS , CALIF` Fairport, Inc. - Sewer Refund Agr for por of Tachevah Dr. AND AGREEMENT #1569 (Orig 2-7-80) Res 13250, 2-6-80 FAIRPORT, INC, SEWER AGREEMENT NO, /6 " —. THIS AGREEMENT made and entered into this 1 '` day of 19ya between the CITY OF PALM SPRINGS CALIFORNIA a municipal corporation, hereinafter called the CITY and FAIRPORT, INC. , Hereinafter called the DEVELOPER. WHEREAS, the DEVELOPER. is, at the time of this agreement, the owner of Lots 14,15,1.6 and 18 inclusive of Tract No. 12182 and Lots 1 ,627 , 12,13,14.,2nd 15 of Tract 9780 delineated on THE PLAT "Sewer Construc- tion Refund Agreement" attached hereto, marked. Exhibit "A", and hereby made a part of this agreement; and WHEREAS, the CITY has established a policy for sewer refund agree- ments and contributions for oversize sewer by City Council Resolution No . 9388 dated Jan. 13, 1969, which by reference is hereby made a part of this agreement; and WHEREAS, said sanitary sewers have been dedicated to public use by the DEVELOPER, and have been acceptedby the CITY; and WHEREAS, the DEVELOPER has submitted a financial statement of construction costs for said sewer from: 1., Philip Abrams Consulting Engineers , Inc. for the period of September, 1977 through September, 1979 inclusive 2 . P and J Utility Company, dated November 16 , 1,978 3 . P and J Utility Company, dated November 16, 1978 copies of which are attached hereto , marked "Exhibit B", and made a part of this agreement; and Page 1. of 3 WHEREAS, the DEVELOPER, in accordance with the before mentioned Council Resolution has requested that the CITY AND THE DEVELOPER enter into a Sewer Refund Agreement to reimburse the DEVELOPER for the cost of off-site sewer which benefits other properties; and WHEREAS the CITY has determined that benefit from the construction off-site sewer will accrue to properties connecting to the off-site sewer; and WHEREAS., the CITY has determined that said benefit will be in direct proportion to the frontage of that portion of Section 7 , Township 4 South, Range 5 - East, shown as Assessors Lot No ' s . 677-452-003 677-461-008 677-452-004 677-241-021, 677-453-003 677-260-020 1 677-453-004 677- 250-005 677-453-005 677-250-004 677-453-006 677-250-003 677-461.-012 677-250-002 677-461.-01.0 677-220-011 WHEREAS, the CITY has determined, and DEVELOPER agrees , that the total assessable frontage of lots which can connect to the sanitary sewer by use of sewer laterals is 501.7 .1,3 feet-; NOW, THEREFORE, THIS AGREEMENT WITNESSETH that for and in consid- eration of the mutual covenants indicated between the CITY and the DEVELOPER, it is hereby agreed that developers , owners , or lessees of lots shown on Exhibit 1°A`B abutting said sewer shall pay to the CITY the amount shown herein, plus sewer connection charges in effect at such time, prior to a permit being issued for connec- tion to said sewer,. Upon receipt of such payment CITY shall pay Page 2 of 3 0 to DEVELOPER the amount shown herein. The Assessment for said Lot is hereby established : $7 .63372 per front foot (root including laterals) Assessor ' s # Fronta e Cost per Lot 677-452•-003* 233 .90 ' 1785 .53 677- zi-52-004* 233 .90 ' 1785 .53 677-453-003* 233 -90 ' 1-785 .53 677-453-004* 433 .91 ` 3312 .34 677 -453-005* 200 .02 ' 1526 .90 677-453-006* 200 . 01 ' 1526 . 82 677-461-012* 200 .00 ' 1526 .74 677-461-010%', 200 .02 ' 1526 .90 677-461-008J, 251.26 ' 1918 . 04 677--241-021* 239 .68 ' 1829 . 65 677•-250-005 330.48 ' 2522 .79 677-250-004 330.48 ' 2522 .79 677-250-003 330 .48 ' 2522 .79 677 -250-002 330.48 ' 2522 .79 677-250-011 243 ,00 ' 1854.99 677-260-020 1025 .61' 7829 .22 *Not- eligible `Total=5017 . 13 38299 .35 IN WITNESS WHEREOF, the CITY and the DEVELOPER have hereunto caused these pre day and year first above mentioned . orrmn; Sral_ ATTEST : LTA:=P1'. `.. t"J%',Lh:[ (NAME) FAIRPORT CONSTRUCTION d 'eir I ca nri c.O :TY i� ,My Com ml slon EKpi s F hruari 1, 15`JQ ✓fed ATTEST : / CITY OF PALM SPRINGS , CALIFORNIA a f' �' 19 City Manager REVIEWED AND APPROVED Lg Page 3 of 3 �75YP-G-1-- it C')/Z + V 17 J�IZ K7 c �•ti. ._ � ;tr ,.ter �D2 E- L U1•„� a �� - - - -- - GZ .:`' S •. 1 If III WORK SHEET F and J Utility Co . 16 November 1978 ($24,731.50) P and J Utility Co . 16 November 1978 ( 9 , 686 ,75) Philip Abrams Consulting Engineers , Inc . 9/77 thru 9 /79 inclusive 11 ,626 .96) TOTAL Sewer Costs ($46,045 .21) LESS Oversize Sewer Refund 7y745 . 86) ADJUSTED SEWER MAIN COSTS ($38,299 .35) 38299 .35 5017 . 13 L.Fo 7.663372 Reim. sewer cost Reim. cost per L.F . Assessor ' s Frontage LF . _ Cost per Lot 677-452-003* 233 .90 ' 1785 .53 677-452-004* 233 .90' 1785 .53 677-453-003* 233 .90 ' 1785 .53 677-453-004* 433 .91 ' 3312 .34 677-453-005* 200.02 ` 1526 .90 677-453-.006* 200.01 ' 1526 . 82 677--461-012* 200 .00 ' 1526 .74 677-461-010* 200 .02 ' 1526 .90 677-461-008* 251 .26 ' 1918 .04 677-241-021* 239 . 68 ' 1829 . 65 677-250-005 330 .48 ' 2522 ,79 677-250-004 330 .48 ' 2522 .79 677-250-003 330.48 ' 2522 .79 677--250-002. 330.48 ' 2522 .79 677-250-011 243 .00 ' 1854 .99 677-260-020 1025 . 61 ' 7829 .22 11Dot eligible Total 5017 . 13 ' Tota1 .38299 .35 Fairport 9/11/79 • EXHIBIT "B" This is additional work that has been done on the sewer zefund agreement as of 9/10/79 , that is not yet on our computer billing run. 9 /10/79 Administrative 2 hrs , $ 86 . 00 Designer/Draftsman 2 hrs . 54 . 00 " Project Engineer 1 hr . 43 .00 9 /7 /79 Draftsman z hr . 11 .00 it Designer/Draftsman 4 hrs , 108 . 00 9/6/79 Project Engineer 5 hrs . 215 .00 9 /5/79 Project Engineer 2zhrs . 107 ,50 9/4/79 Project Engineer 1 hr . 43 ,00 Total - $667 ,50 EXHIBIT "B" PROJECT BILLING REPORT PAGE N .O . NO 945 .C'iDD00 PvA .C .E. JULIAN DATE 77273 TITLE PERIOD ENDING 9 30 77 PRGJ. TYPE RE-E FUN DESCRIPTION EMPLOYEE HOURS SALARY BILLING MISC . TOTAL NO NO NAME COST RATE COST PILLING 1200 PROPOSALS 05 MEETI146S 09 To ESSEN 1 . 00 21 . 03 35. 00 35. 00 21903 000 35. 00 1300 PROJECT PLANNING ii' RESEARCH 35 P. LEJA i. o0 6 .49 26.50 26.50 1900 6049 . 00 26.50 1700 PROJECT CO-ORD 05 MEETINGS _ D9 T. ESSEN 1 . 50 3i .55 35. 00 52.50 1 .50 31 . 55 000 52.50 2100 PRELIM STUDIES 01 DES IGN 35 P. LEJA .50 3 .25 26 .50 13.25 03 PROCESSING 23 M . SALES 2 .00 28.86 31.00 62. 00 04 CALCULATIONS 23 M• SALES 2*00 2E.86 31.00 62.00 05 MEETINGS" 09 T. ESSEN 2.00 42 .0E 35.00 70 .00 23 M. SALES i.5o 21 .65 31.00 46. 50 08 SUPERVISION 35 P. LEJA .50 3 .25 26.50 13. 25 ii RESEARCH 23 M. SALES i .00 i4 .43 31.00 31. 00 9 .50 142 .36 . 00 298 .00 2500 TENTATIVE MAP 09 SITE VISIT 09 T. ESSEN i.00 21 .03 35.00 35000 1. 00 21.03 . 00 35.o0 280E PLOT PLAN 01 DES IGN 23 M. SALES 2. 00 28. 86 31 .00 62 .00 02 DRAFTING C3 A. REYES 2 . 50 13 .53 10 .00 25. 00 4 . 50 42 .39 . Oo 87 . 00 3300 SEWERS -i3------RESEARCH CONT • • %77 � l 9A5 .010000 CONTINUED PAGE 35 P• LEJA . 50 3.25 26 .50 -4-3-e?S •50 3.25 0001 13 . 25 4100 RECORD MAPS' If RESEARCH 03 A . REYES .50 2 .71 iC. 00 5. 00 .50 2 .71 .00 5r00 4200 LEGAL DESCRIPTION 02 DRAFTING- 03 As REYES 4 . 00 21 . 64 10. 00 40. 00 4 .00 21 . 64 . 00 - 40 . 00 44C0 BOUNDARY SURVEY 02 DRAFTING' 49 H. GILMORE 7. 00 65.66 23 .00 161 . 00 04 CALCULATIONS 23 M . SALES 2 .50 36 .08 31.00 77.50 35 P. LEJA 17..5D 1i3 . 58 26.50 463.75 05 MEETINGS 09 T. ESSEN 2.5.0 52 .58 35.00 87. 50 35 P. LEJA . 50 3 .25 26.50 13. 25 08 SUPFRVISI'ON 09 T. ESEEN 1 .00 21 . 03 35.00 35. 00 23 M. SALES 5.00 72si5 3i.DO 155. 00 10 EXHI8ITS T7 E• PLANEY 1400 17 .74 30. 00 30 .00 16- HM IZ. CONTROL T6 V. BARKER 11000 178*97 30 .00 330. 00 7-7 Ea PLANEY 11s00 195 .14 30 .00 330. 00 78 L . VERA 11 .00 175 . 67 30.00 330* 00 70 . 00 931 .85 .00 2013900 4500 AERIAL SURVEY 13 TRAV. 8 DELIV. 35 P. LEJA .50 3. 25 26 *50 13 . 25 16 HORIZ. CONTROL 76 V . BARKER 12. 50 203 *38 30.00 375 . 00 77 E. PLANEY 12 .50 221 .75 30 .00 375. 00 78 L . VERA 12.50 195 .63 30 .00 375. 00 17 VERTICAL CONTROL 76 V. BARKER 3. 50 56 .95 30.00 105. 00 77 E . PLANEY 3050 62 .09 30 . 00 iC5. 00 78 Le VERA 3.50 55 .90 30.00 105. 00 46 GROUND CONTROL 35 P . LEJA 1 . 00 6 .49 26.5C 26 .50 76 V. PARKER 6. 00 97 .62 30.00 180. 00 77 E . PLANEY 6 . 00 106 .44 30 .00 180. On 78 L. VERA 6. 00 95 .8.2 30 .00 160. 00 ` 67 .50 1109832 . 00 2019 . 7C 4800 TOPOGRAPHY 17 VERTICAL CONTROL CONT • • ' 1- -77 EXHIBIT "B" PROJECT BILLING REPORT PAGE . . O .NO 945 .010000 GHOR.MLEY ENGINEERING- INDIO JULIAN DATE 77334 TITLE PERIOD ENDING i1. 30 77 PROJ. TYPE REEL FUN DESCRIFTION EMPLOYEE HOURS SALARY BILLING RISC . TOTAL NO NO NAME COST RATE COST BILLING 2200 EARTHWOFK 02 CRAFTING 82 P . EOLSTAD 2 .25 21 .11 23 .00 Ei.75 04 CALCULATIONS 82 P. EOLSTAD 11 .25 iO5 .53 2".00 258 .7' 13 . 50 -126 .6P .00 310.50 27CO CRA.OING PLAN C2 DRAFTING 82 P. E. OLSTAC 3.00 , 2£ .14 23 .00 65 . 00 04 CALCULATIONS 82 P. EOLSTAG 4 .00 37 .52 23 . 00 52.00 7 . 00 6`- .66 . 00 16i.00 31CO STREETS C2 DRAFTING 82 P. EOLSTAD 6.50 6C . 57 23 . CO i45 .50 ( 6.50 6C .97 .00 149 .50 3C0 ;EWERS 2 DRAFTING 82 P. EOLSTAD 4 . 50 _ 42 .21- 23 .00- - 103.50 4 .50 4'c .2i .00 103. 50 TOTAL WORK ORDER 31 . 50 29z .48 .00 7G9 .5O i • ' -7 ; • EXHIBIT "B" 045.010000 CONTINUED PAGE 23 M• SALES 1 . 501n 21665 3i . 00 46 . 50 46 Pe LEJA y . DO 3c .16 2C. 00 80 .00 08 SUPERVISION �/ 46 P. LEJA 3. 00✓� 24 .87 20. OD 60 . 00 20 MAF PRINTING 96 CONSULT 46 P. LFJA 1 . 00�-r E . 29 20 .00 20. 00 20 T. E SEE N i . 001)( 21 . 03 35.00 35. 00 E1 .GO 50 . 46 400 1072 . 00 29CO ARCHITECTURAL Ci DESIGN 46 P. LEJA . 50V( 4 .15 20 .0 0 i0. 00 08 SUPERVISION 46 P. LEJA .5Oy- 4 .15 20.00 S0. 00 1900 8 . 30 .00 20. 00 3100 STREETS 01 DESIGN 23 M . °ALES 2 .OG�. 2E .E6 3i .00 62. 00 24 R. TRACY 8 .0O{w 51 .52 16.00 128 . 00 02 DRAFTING 46 P. LEJA .50LY 4 .15 20 .00 10 . 00 ( ( " 'v 395.D 0 03 A. REYES �� 1 2.00v 11 . 52 iO• DO 20 .00 07 G. HOE 1 . 50 E .12 i0.00 15. 00 16 G. REYNOLDS , 30. 001z 162 .30 50 .00 3G0. CC 03 PROCESSING l 16 G. REYNOLDS 2 .71. 10600 5. 00 04 CALCULATIONS 23 M. .ALES 1 . 00 � 14 .43 31. 00 31 . 00 46 P. LEJA C7 REVISIONS . 50 - 4 .15 2C. 00 10. 00 24 R. TRACY 25: 25 1671@67 i6 . 00 404 .00 46 P. LEJA 7 50 � 62 .19 20 .00 SSO . 00 O8 SUPEPVISION 23 M . SALES A 1 . 00> iy . 43 31 .00 Z1 . 00 46 P. LEJA 2 . 501A� 2C .73 20 .00 50. 00 13 TRAV, S DELIV. 21 T. LUPPI 3 . 251y 12 . 87 10.00 32 .50 2D MAP PRINTINC 21 T. LUPPI 4.00TK 15 . 84 1C.00 40 . 00 96 CONSULT 46 P. LEJA .50it- 4 .i5 20. 00 10 . 00 10 T• ESSEN 1 .001� 21 . C3 40 . 00 40. 00 91 . OD 60 .2E �95.OD 1338 . 50 31-00 STORM DRAINS Ci DESIGN y 23 M . SALES .50y� 7 .22 31 . 00 15.50 C8 SUPEPVISIOK 23 M . SALES 050kv 7 .22 31 .CIO 15. 50 �� 1 . 00 14 .44 . 00 71 .00 3300 SELLERS r 12 - 77 945.010000 CGP.TIr;UE0 PAGE 01 DESIGN 02 DRAFTI146 46 P. LEJA 1 .00 E .29 2C. 00 20. 00 07 G. M 0 E 10 . 50 � 56 .81 10 . 00 105. 00 16 G. REYNOLDS 6 . 50 35 .17 10. 00 65. 00 24 R . TRACY 1 . 50 5 .74 16 . 00 2u. 00 07 REVISIONS 24 R. TRACY 17 . 50 112a50 16 . 00 280. 00 46 P. LEJA 2. 00 16 . 58 2C . 00 40. 00 08 SUPEP.VISIDN 46 P. LEJA 2. 50YY 2C .73 20000 41 . 50- 26C . 90_ - eD0_ 58y .00 34CO WATER C2 DRAFTING 03 A . REYEv 07 G . MOE 3500 EROSION CCNTROL 05 MEETINGS �G 20 T. ESSEN ! 36CO UTILITIES ' f2- C8 SUPERVISION 23 M . SALES �2 4100 PECORD NAPS C7 REVISIONS 23 M . SALES �i 3'' S• �S 20 MA.P PRINTING ; =100 RCUGH G7ACE •�,r�' C1 DESIGN 23 M . SALES 2e00If 8E .86 2.00 2E .86 . 00 62CO CLERICAL 13 TRAV. d DELIV. 21 T . LUPPI . CO .00 10 .00 . OG . 00 . 00 .OG . 00 TOTAL '+'GRK ORDER 2nO. 00 1721a21 404s81 75 62 . 00 EXHIBIT "B" 945 . Di0DOC CONTINUED PAGE 2 03 A. FEY ES i0 , 0O" . LO iL . DC SCO, DC 07 G. MDE 23 . 5C f . 00 1C . 00 235. 0G 16 G. FEYNOLLS 2 . 50.k r . CO 1C . 00 25, 00 27 J, FACH 17 . 00✓ .CO 1C . 00 170 , 00 C3 FROCESSING 20 T . ESSEN 2 . 00-1'1' . DD 3° . o0 70. 00 C7 REVISIONS 16 G, FEYNILCS 4 . DO +4-' , 00 iC . 00 nO. 00 23 M . SALES iO , 5C✓✓ . CO 31 . 00 325. 5G 24 R , TRACY 16 . 0C , C0 16 . 00 256 , 00 46 P. LEJA 9 . 5C.Y v . 00 2C , 00 190.1)0 CB SUPERVISION 46 P, LEJA 11 RESEARCH 3. 50 jr . [ p 2[ , 00 70.0D 56 CONSULT 23 M , `ALES 2 , 0Cq-/ .00 31 .00 62. 00 10 T , ESSEN , 00 , DC 4C . 00 , DC 20 T, ESSEN 2 , 0C-X✓ . CC 35 , 00 70, 00 104 , 5C , CD , 00 1653,50 ` 3310 F-EJLR4&�' - - �C2 CRAFTING 03 A. REYES 9 , DCrY . Cn 1C . 00 50000 C 07 G. M' OE 10 , OG/ . CO 1C . 00 1C0 . 0C i6 G. FEYNDLCS 1 , OC✓- . CO 1C . CO 10 . 00 CS MEETINGS 27 J. FACH 7 . 00 , CD iC . 00 70.0C 46 P, LEJA 1 . 00 Cn 2C . L0 20, OC C7 REVISIONS 46 P , LEJA 3 . 5CX . 00 2C . 00 70 .00 CB SUFERVISION 44 SCRIBING 23 M. SALES 1 , SC CO 31 .00 c6.50 16 G , FEYNCL'LS 3 . 50 . 00 1C . 00 36 . 50 . CO . 00 �4ti 24CO VPTEP, C2 CRAFTING C7 G. VOE 2, 0C ✓ , CC iC , CO 20. 00 C4 CALCUL'ATIONS 46 P, LEJA , 5G Y , Cr 2 C . C 0 10 . 00 2 . 5G , CO . OD 30. 00 41CO RECORD MAPS 13 TRAV . A DEL IV . - 2i T , LUPPI . 5C ✓ . CO iC . CD 5. 0C , 50 .CD .OD S . OD "D FOUNDS P.Y SURVEY ! i RESEARCH 23 M . SALES . 5C ,I-- . CO 31 , C0 15. 50 16 F;OSI7 . CONTROL 72 F . RAINEY 4 . 0C ..t' . 00 2B . 00 112. 0C • EXHIBIT "B" • 945. 010000 CCNTInUCC: PACE 2 co DRAFTING 27 Jc rACH 4 .50 22 .73 ?.0 .00 45. 00 43 E • EOc,CHI7SCii 91c50 x 5E • 08 1C .00 1.15• CO C4 CALCULATIONS 07 G. MOE •50fi� 2 . 71. 1C . 00 5000 20 To ?ScEN 1. 00r 21 . 03 35sG0 35.00 C7 REVISIONS 24 Re TRACY 21. 001< 1 .3 6 .2 9 16000 336. U0 46 Pe LEJA 3. 00 ,� 24 . 87 2Cs00 60sO0 13 TRAVo P. DELIV• 21 xERGx 2S J . VALKER .50N\ Eo00 3 .96 1.9E 16 Ge EEYNOLDS •50K 2 .7.1 10e00 5o00 42e5G 27� 042 •OU 602098 3200 STORM DRAINS 01 D E S I C N 23 M . SALES 1. 00 1L! .c43 31 .00 31e00 C7 REVISIONS 24 R• TRACY ue50 / 25 .21 16 .00 72e00 5 .50 4= .64 000 J.03. 00 3300 SEWERS -01. GESICN 23 Me SALES 3. 001 42 .29 31s00 93 . 00 C2 DRAFTING 46 Ps LEJA 2. ODA 16s58 2 C s 0 0 40 . 00 43 E . COSCHITSCH 15050v 7Es28 1C . 00 1E5.0C 48 A • VATKINS 26o751,( 135e09 10000 267 .50 04 CALCULATIONS c 43 Es F. OSCHITSCi•I 1 .50-V ? s58 10s00 15.00 05 ME _cTINCS 20 To ESSEN 3 . 00 63o09 35s00 105900 07 REVISIONS 24 Re TRACY 6e00 3fe54 16. 00 96 . 00 46 P. LEJA 5.5OY}- 4E .60 20 . 00 110e00 13 TRAV. S DELIVo 26 Js VA.LKER 1 . 00 Y 1C .D0 3e96 3.96 2O MAP FPINTING 21 xERO X 43 Eo FOSCHITSCH 1 . SC X 7 •E8 10 .00 15 . 00 i6 G• FEYN0LCS e50 'a' 2 .71 10600 5 . 00 S6 CONSULT 20 To '=ScEN 3s OG✓ 63 .09 35.00 S.G�sO.O 69s25 52f •g3 .0-0 4010e46 34CO biATER 02 DRAFTING 16 Go REYNOLDS L' s06 10c00 7o50 43 Ee EOSCHITSCH B . SCiy 4< s9 ; tes00 P5. 00 04 CALCULATIONS 24 Re TRACY 1 .50i1' So74 16.00 24 . 00 46 Po LEJA .5011 1 . 5 2C .00 10. 00 r CONT EXHIBIT 5L: 5 . 0I000C CDNTIPuED PACE 27 J . EACH 9 . 5G .CC IC .00 55, 00 34 Ca h AC,HE . 50 .CC 1E .G0 3 , C0 C7 REVIEICNl 24 R . TRACY 1v . 5C . 00 16 .G0 2' 2, GG 43 E . ECSCF, ITSCH 3a0G . C ^_ 1C . 60 46 P . LCJA 60 5 G ,CC ^_C .GO 120 . 0C _ 0 M A F FPINTING 43 A . 4:ATKINS . 56 .CC 1G +Cc 55, 0C 92rOO _ eCC a0C- 1193, SC 34CO HATER Ci D F S I C N 23 M , SALES 2. 00 .00 3i .00 E2. 0C 46 P . L F J A ia5C. 10C 2CeO0 30. 0G C2 CRAFTING 27 Je f-ACP. 1 . 50 . CO 1Ctoo 15. 00 43 E . EOSCHITSCH 18 . 0C aC0 1C .CC iCJ, OO C4 CAL CULATIOVS 46 Pa LEJA 1aOG . CD 2 C a C 0 20 . 0C C7 REVISIONS 24 R. TRACY ia00 . 00 16000 16 . 00 20 MAP PRINTIN 46 Pa I E J A 050 .0 2Ca00 1. 0+ 00 l 25150 a 0 0 .00 333. 00 36C0 UT IL ITIcS C8 SUPERVISI0N 23 Ma SALES 2 . 00 .03 3i .00 E 2s00 2. 0C . CO . u0 6 0C 38C0 DUAN d CCST EFTe C7 REVISIONS 27 J+ hACH 2 ,50 , C0 iC . 00 5.0C 2 ,50 . CC 500 25800 41CO .-UCCRD MAPS C2 DRAFTIr:G C3 At REYES 3e0C . GO ic .GC 0. 00 i3 TRA. V. ? DELIV . qE A . 6ATKIhb 1 . 0C .00 1.C . 00 10+ 00 20 MAF FRINTIP'G 48 A. I+ATKIN£ eS0 .c0 iC .00 3. 00 _` 4 F I L I K G 07 A . FEYES . 50 . CO i.C .CG 5. 0G 5, 00 . CO 9O . 00 42C0 LEGAL. DESCRI °TION, C2 DP.AFTIt-G 48 As HATKINE 16. 0G .CO 1C .0c IE0 . 00 16 . CC .CC .00 1E0. 00 98CO TGPDGRAF4Y 545 . OID000 CCNTII,UFD FACE CB SUFEFVISI0N 46 P . LEJA 1 . 00 . CO 2C000 ' G, OO 13 TRA. V. L DELIV . 26 Ja 4ALKER r50 so 13a50 6. 75 i . 5C , CC . 00 26 . 75 21CO S7REETS C1 DECICN 23 M . SALES 4 . 00 . CC 31 . GO 124. 0C C2 CRAFTIP'G 46 Pa LEJA 5,OC . 00 2C . G0 iC0a00 03 A . FEY ES 22 , 50 • CO 1 C a 0 0 22510C 217 Jr EACH 2r0C 800 1.Ca00 20. 00 34 C . FACHE 5. 06 .CO 1E200 £ Oa0C 43 E . "E0SCh' IISCH 1 . 0C a0C I C a 0 0 i06OC 48 A 6ATKINS i`a50 a C 0 iC .00 A 5 5. 0 C C4 CALCLLATIONS 46 P• LEJA. i . OG . CO 2Ca00 OG C7 F.'EVIS'IONS 24 R. TRACY Zia 00 aC0 1E . GC 176 . 0C 46 P. LEJA 3, 00 a00 2C' a"G0 606C0 C8 SUPEFVISION % 46 Pa LEJA r50 .CO 2C ,00 "_ G. 00 J2 SN ECULING 3Ll C, FACHE 3a0 .00 16a0C L3aC0 20 0 MAP FRINTIN0 56 24 R• TRACY i .00 a C 0 1E .00 16, OC COPSULT 20 Ta ES6EK 1400 . CC :5 • CIO 25. 0C 75. 5G . 00 .CC iC79. CC 32CO £TORM DRAINS C2 DRAFTING 43 E. EOSCFITSCH 3. 0C aC0 iCaG0 76. 0C C4 CALCULATION'S 24 C . FACHE o5L . C ^ 1E . 00 46 P. LEJA . 5C . CC 2C . GC 10. 0C 13 TPAV. P DELIV . t8 A ATKINE . 5G . CO ' C .GO 5. CC 5. 50 aC0 a0C 69 , OC 3 C G--c-E-W F G 5 - - - \'�1 CEEIFN 23 M . £ ALES 2 , 5C . Cu '1rG0 77 .50 C2 DR�rTIN'G 4E P , LEJA. 2. 0C. _ • CC 2C .00 L' J. 0C _ 03 A . FEYES ' . 0 .00 1Ca0C p, OC 17 Ja EACH E . 00 a ^ 7 c 1 ^G. L_ 24 Ra TRACY 30CG aCC 1E . 00 40 . DC 27 J, EACH 19 . 0G .C _0 1C .00 15C. 00 43 E. FCSCFIISCH E. 00 . CO '_ C , GC fa. 00 4E A. IAlKINS i4 . GC . CO 1C . 00 140 . 0C C4 CAI_ CI-LATIOPS C G N T 0 EXTIIBIT "B" ( - 945 .('�I00CIO 00 ':TINUEC PAGE 24 R . T ;A.CY 13. 00 E9a37 i6 . vD 20CaG0 27 J• P-4CH 20a50 1C2 .57 1 C a 0 0 2C5. GC 34 Ca HACHE 5. 50 Ea70 A6 . 00 °8a -�C 03 PROCESSING 46 Pa L E J A r D 4 .5i 2C . 00 10 . D0 C7 PEVIS10N5 24 Ca TRA0Y 3. :0 2ia72 16 .00 E6a00 46 P• LSJA � rDO 4* 05 2 0 a 0 0 100. 00 Cf3 SUFERvIs10N 23 Ma SALES 1 . 0G i5 .43 31a00 21 . 0C 46 Pa LSJA .5G 4a51 2 C a 0 G aD. 00 12 SCH5-CULING 34 Ca HACHE 8. 0G 51 .92 16. 00 125a00 46 CONSULT 23 Ha SALES is 00 i4a43 31 .00 7y . 00 q E .55 .00 1i15. ;;v 33c tF 2- 9RAFTINlu- 01 A . REYES isco Ea49 16a00 16. 00 24 R. TGACY 9aOD 5E .a1 16 .00 144a00 27 Ja KACH 1 . 00 E a 0 5 10 . 00 1Ga00 04 CALCULATIONS 27 Ja HACH i . 5o 7 . 58 10a00 IV,aDO C5 MEETINCS 48 A . PAT KINS 1 .=0 7.58 iC000 i5.Oc 07 REVISIONS 24 Ra TRFCY 2 . 00 12 .5P. A6aof) 3 2 a 0 0 46 Pa LSJA 1 . 00 SaOi 20 .00 20. 00 48 Aa VATKINE 5. 00 ?5a25 ic *00 50400 i3 TRAVr S DELIVe 31 S . P;:YNE a:C i a17 1: .50 . 7 5- 22 .50 1Z4a51 a0C C85 .400 VATER G2 1) AFTIN,G 01 A FEY ES is 0 E . 49 16. 400 15.DO 24 Re TRA.CY 1a5C q . 74 16a00 24a00 27 Ja EACH 5 . G0 2° a 2 5 1 C a 0 C 5 0 a C 0 C4 CALCULA.TIONS 46 Pa LSJA 1650 1Za52 "Coco 30a0(` C7 FEVISIDNS 46 Pr L-7JA 1a5C i: a52 2 C a 0 0 30a00 1oa50 6Eo52 . DQ 150 . 00 Z 6 C 0 UTILITIES C7 PEVISIOMS 2Z Me SALEP 1 . 0C ' Q . 43 Zi . CG 'la0G la0G 14 .4 ' . CG 31a00 4'iCO RECORG MAPS C; CRAFTING 24 Re TRACY 4a0G 2° a F 6 16 . 00 64a0C C(1NT EXHIBIT "B" PROJECT BILLING REPORT PfGE ! .ORVO 945 .C± 0000 P . A .C .E • JULIAI4 DATE 7Ei51 TITLE PERIOD ENDING 5 31 7 PROD. TYPE REEL FUN DE£CPIPTION EMPLOYEE HOURS SALARY BILLING MISC . TOTAL NO NO NAME COST RATE COST FILLING 1700 PROJECT CO-ORD C5 MEETINGS 23 M . SALES 1 . 00 14 . 43 31. 000 31. 00 1 .00 14 . 43 000 3is00 18CO CLIENT CO-CRD 96 CONSULT 23 H. SALES . 50 7 .22 31 .00 15.50 050 7 .22 000 15.50 2500 TENTATIVE MAP - 05 MEETINCS 46 P. LEJA 1850 12 . 52 20.00 30.00 i. 5Q 13@52 . 00 30.00 27CO GRADING PLAN G5 MEETINGS 46 Ps LEJA 1.00 5 . Ci 20. 00 20.00 1 . 00 5 . 01 000 20@00 3100 STREETS 13 TRAY. S DELIV• 31 S. PAYNE .50 2 .17 13 .50 6.75 20 MAP PRINTING 46 P. LEJA . 50 4 .Ei 20. 00 i0.00 i. DO 6 .66 .00 16.75 < 300 SEVE,RS'� - Z-•-CTf REVISIDNS 96 P. LEJA - i. 5D 13 . 52 20. 00 3D. 00 20 MAP PRINTING q5 P. LEJA 950 4 .55, 20*00 10. 00 56 CONSULT 23 M . SALES i . DO 14 .43 31 .00 -Z-1-t-oo 3 .00 32 .46 . 00 71 . 00 34C0 WATER 02 DRAFTING 41 A. URAUIDEZ 3. 00 22 .68 20 .00 - 60.00 07 REVISIONS 4i A . UPCUIDEZ 2 .5G 1E990 20 .00 50. 00 46 P. LEJA 050 4 . 5i 20 .00 10. 00 13 TRAY. A DELIV . 31 S . FATNE •50 : .17 13 .50 6.75 6.50 48.26 . 00 126.75 4iCO RECORD MAPS COHT r • 7 7 945. 010000 CONTINUED PAGE 86 Co NORDSTPOM 8. 00 132 .32 32 . 00 256. 00 16.50 274 . 43 .00 530. 00 55CO` SEWER STAKPS 05_- MEETINGS - 8 0 D. GAGE 975 12 .90 33 .00 24. 75 C6 REPORTS 80 D . GAGE .75 12 .90 33 . 00 24 . 75 14 STAKING 70 D. GAGE 12 .50 21E .00 28 . 00 350 .00 76 C. NORDSTROM 12. 50 206 .75 26.00 325. 00 77 R . LY0NS 12 .50 15" v00 26 .00 325. 00 80 D. GAGE 5. 00 86 . 00 33. 00 165.00 67 R. LYONS 5. 00 61 .20 32 . 00 !_iF�.-0-0- 49 . 00 747 .75 .00 i374 .50 TOTAL WORK ORDER 172 .50 263C .65 110 .75 4698.50 l_ • EXHIBIT "B" / � n L PROJECT FILLING REPORT PAGE I, 09NO 91,5 .Ci0000 PaA .C: .E9 JULIAN DATE 78iP.i TITLE PERIOD ENDING 6 30 78 PPOJ. TYPE REEL FUN DE9CPIPTIoN' EMPLOYEE HOUPS SALARY DDILLING MISC. TOTAL NO NO NAME CCST PATE COST E I L L I N C ] 7CO PROJECT CO-CRC C5 MEETINL-'S 23 Me SALE£ 1% 00 i4 .43 31 . 00 31 . D0 56 C0N^ULT 23 Me SALES i b 0 0 i4 .43 31 . C'0 Zi . 00 2000 2EaE6 .00 62.00 1E00 CLIENT CO-ORO 96 CONSULT 22 M• SALES * 50 7 *22 32 .00 16. 00 23 M. SALEF i . 50 2i . 65 31 . C•0 46 .50 2oO0 2t . E7 . 00 62.50 27CO GP.AOING PLAN C2 CRAFTINC 34 C. HA.CHE 2o50 16 .23 16 . 00 40.00 07 PEVISIONS 46 P , LEJA • 50 4051 20.00 i0. 00 3000 20 .74 . 00 50. 00 3100 STREETS 13 TRAV. a DELIV• 31 S. FAYNE o50 2 .i7 i3.50 6.75 •50 2 .17 .00 6 .75 33C0 SE EP o DRAFTINC 27 J . HACH 20 .00 1. 4-E .20 10.00 2CD. 00 34 C. RACHE 7 a 5 Cl t'P . 65 16. 00 120 . 0C C3 NEE T1NCE 46 P. LEJA i. 5C i'. .52 2C .00 30. 00 C7 REVISION£ 23 M . TALES 050 7 .22 31 . 00 i5. 5C 24 R . 1:,ACY 8450 61 .20 16 .00 i.�6. 00 46 P. LEJA 7v50 67 . 5E 20. 00 i50. 00 4 5 a 50 31: .40 000 65i . 5C z400 WATER C2 CRAFTING - 34 Co hACHE 5t50 o70 -16 .00 8690 i3 TRAV . 8 CELIV . 31 S. PAYNE 050 2 .17 13 . 50 6.7 6 . (`0 .'17an7 •CD 94. 7 - 4iCO RECORD MAPS C 0141 Y-_ 94 -ISO I.OGDo' CCNTINUED PAGE C2 OR AFT IN-V 48 At WATK1N£ erSG 11E .53 SC . GD 65r00 13 TRAV. d DELIVr 31 S . PAYNE e50 Pe17 1'450 6. 75 '0 rA.P FEINTING 71 .01 9000 45r10 71r01 91 .75 F100 FOUCH GP.A.CE 17 VEETICAL CONTROL 7D De CAGE 2. 00 34e40 28 . 00 56. 00 73 V. PARKER 2e00 322e54 2E.00 52. 00 76 S. GROHER 2. 00 27 .34 26 . 00 52. 00 6. 00 94 .28 . 00 160 . O0 54CO LOT STAKES 12 £CHEDULING 46 P. LEJA .50 Ll . 51 2C. O0 10. 00 Zy STAt:INC E2 De hILLEE. 3e00 1 .60 33e00 99 .00 86 C. NORDSTROM. 3. 00 45 . 62 32e00 96 . 00 15 FE- STAKING 72 D. MILLER 2rDO 34 .40 28 .00 56. 00 76 Ce KriP,D5TF.."Or,, 2. 00 3.' 008 26 .D0 52e00 77 R. LYONS 2.00 24 .48 26e00 52. 00 82 L'. MILLER 3e50 6Cr20 33e00 115r50 86 C. F+ORDSTROM 3.50 57 .89 32r00 112e00 19 .50 315 .78 . 00 592050 � ��OC GP'zFP STAKES__= C. SUP2RVISION 46 P. LEJA . 50 4r51 20 .00 10eDD 12 SCHEDULING 46 Pe LEJA . 50 4e51 ='O .00 10. 0C 1y STA,XING 70 D . GAGE 10 .00 172eC0 2Ee50 2280600 72 D . f, ILLER 2e50 48 .00 2 A 0 C 70. 00 73 Vr =AP.KER 1Ce00 1u2 .7C 26 . 0C 260e00 76 Ce N0R0STFOf! 2950 4je35 26. 00 65eCO 77 R . LYONS 2950 3C .60 26900 6 5 a 0 C 78 Se GRCPER 4.0100 l36e70 26eOO 260. DC 15 Rom-STAKING 72 D. !' ILLER 2 . 0C 3C' e40 28 . 00 56. 00 76 C . K0RDSTP0M 2.00 3- eC8 26e00 52. 0'= 77 R . LYONS 2. 00 2ye48 1-6e00 5 2 a 0 C 44e50 687 .3 ' •0O�'1 06 Di 0 TOTAL I'ORV ORDER i3Ee00 1574r40 71 .01 295ie75 • ! - 7� EXHIBIT "B" PROJECT PILLING REPERT PAFE 'J . G . NO :45 . 01C000 P .A •C .E . JULIAN DATE 7E212 TITLE FE6IC�) Et.DING 7 Z1 7 PROJ• TYPE FEEL FUN DESCRIPTION EMPLOYEE HDUR = SALARY 6ILLIPG MIFCO TOTAL NO NO NAME v CCET RATE COST PILLING 17C0 PROJECT CC-ORD 56 CONSULT 23 M . SALES 1 . 50 21 .65 31 .DG e6 1 . 5C 21 C 5 . 0D 46. 50 i E 0 0 CLIENT CO-CFD 05 MEETINGS 96 CONSULT 23 M . SALES . 50 7 .22 31. 900 i5.50 23 M • SALES 1 . 00 14 . 43 31 . 00 31. 00 i . 50 21 .65 .CO L'6a50 3100 STREETS 07 REVISIUNS 4E A . V.ATKINF 4 . 00 2C •20 i0 . 00 4D. 00 13 TCAV. cc DELIV. 31 S . PAYNE . 50 2 .17 13 . 50 6. 75 55 MAP FILING 48 A V.ATKIN6 . 50 2 .53 1C .U0 5. 00 5. 00 2u . 9D . DO 51 . 7: -3300 SEVERS - PFTING 27 J• HACH 7 . OD 4C •32 10 . 00 70 . OU 07 PEVISICNS 24 R . T. ACY 8 . DO 57 .60 1E .00 12_8. 00 15 . 00 97 . 92 ♦00 �198 . G0 4100 RECOri= `LAPS - - - -- 20 MAP -PRINTING 107 .2 . 00 , C0 i07 .22 . 0C L3CO ENCUMFRt-NCF MAP - - ii RESEAr;OH 23 M . SALES i .5C 21 . 6 31 . 0C L6 .=0 i . 5D 21 . 65 . 0C 46 3 5600 CUPP STAKES i4 STAKINC 7 <' D. MILLER 22. 50 387 . 00 2F . 00 67D. �0 76 Co hCPDSTFCM 22 . =0 37 .15 26 . 00 5F5. 00 77 P • IYGNL 22 . SC 27_ .40 26. 0 5E5 . 0C 67 . 50 iC3L . � c .CC 1800 . 00 TOTAL PORi' ORC'ER 92 . 00 1222 .32 107a222 218i . 25 EXHIBIT "B" PFOJECT BILLING REPORT PIGE P . O . NO 945 . 010000 P. A .C .E. JULIAN DATE 78243 TITLE PERIOD ENDING 8 31 7 PROJ. TYPE REEL FUN OESCPIPTION EMPLOYEE HOURS SALARY BILLING MISC . TOTAL NO NO NAME COST RATE COST BILLING 1600 PROJECT SCHEDULING 14 STAKING 23 M . SALE . 50 ✓ 7 .22 34 .00 17. 0C . 50 7 .22 . 00 17 . GO 1700 PROJECT CO-ORD 96 CONSULTING 23 M. SALE . 50✓ 7 .22 3U . 00 17 . 00 . 50 7 .22 .00 17 . 00 i8C0 CLIENT CO-ORD 05 MEETINGS 23 M . SALE 5.00✓ 72 .15 34 . 00 170. 00 96 CONSULTING 23 M . SALE 3 .50✓ 5C.5i 34 . 00 i19.00 8. 50 122 .66 .00 2E9 . 00 f`•- 2700 GRADING PLAN 02 DRAFTING 24 R. TRACY 1 .50 Y 10 .80 22.00 33. 00 1 . 50 iC .80 .00 33.0C 3100 STREETS 02 ' DRAFTING 01 A . REYES 3. 00✓ 15 .47 22 . 00 66 .00 07 REVISIONS 24 R. TRACY 1 .50✓ 10 .80 22.00 33. 00 13 TRAY. 8 CELIV. 31 S. PAYNE . 50v 2 .17 i5.50 7. 75 5. 00- 32 .44- _ . 00- 106s75 33C0 S�kERS `- 0�--tYPAFTING c 27 J. HdCH 5. 5Cv .00 00 $� :�0 07 REVISIONS 23 M . SALE i .ODv 14 .43 34 . 00 34 . OD 24 R. TRACY LOON 7 .20 22 . 00 22 . 00 C8 SUPEP.VISION 23 M . SALE _ 1 . 00� 14 .43 34 . 00 34800 11 RESEARCH 23 M . SALE 1 . CC✓ 14 .43 34 . 00 34. 0C 9 .50 50 .49 . DO �124 . 00 3400 WATER 02 DRAFTING CONT 945. 010000 CON7INULD PAGE 47 J . HACH 4 . 00✓ 23 . 04 15. 00 60aDO � y8 A . WATKINS 1 .00 ✓ . 00 /j-. 00 15'. 00 13 TRAY. d DELIV. 31 S . PAYNE . 50 ✓ 2 .17 15. 50 7 .75 20 MAP PRINTING �8 A . WATKINS 1000f- . 00 /S•GO !1. DO 6. 50 25 . 21 900 67 . 75 4100 RECORD YAPS 02 CP.AFTING 27 J. HACH 3 . 00 " . 00 ]-,)-. Co Y-5- •00 C7 PEVISIONS 23 M. SALE i . 00, iq .43 34 . 00 3q .00 24 R . TRACY 8 . 50i✓ 61 .20 22. DD 187 .00 06 SUPERVISION 23 M . SALE i. 00 ✓ 14 .43 3q . 00 34 . 00 13 TRAV. 8 D.ELIV. 7-1 S . FAYNE 1 . Q0✓ q .34 15.50 15 .SD 20 MAP PRINTING * 323.39 14 . 50 9q .40 323 .39 270.:0 5100 RCUPH GRADE Oq CALCULATIONS 7 -92 D . MILLER i . 00✓ . 00 - 600 j�. 00 14 STAKING 72 D. HILLER 18 . 50 32L .42 32. 00 592 . 00 73 V. BARKER i8. 50 325 .79 30000 555. 00 77 R. LYONS 18 . 50 .00 .00 j}3-. 00 82 D . MILLER 8. 00- 146 .24 36.50 308. 00 67 R . LYONS 8 . 00✓ .OD .00 3cg. 00 15 RE-STAKING 72 D . MILLER 6 . 00-, 103 .92 32. 00 192 . 00 73 V. SAP.KER 6 .00� 105 .66 3C. 00 i8D. 00 77 R. LYONS 6 . 00� . 00 r00 /a"c% OC 82 D . MILLER 2 . 00 36 . 56 3665D 77 . 00 63 V. EARKER 2 . 00 35 . 22 37 .00 74 . 00 94 . 50 i073 . 6i .00 1978aG0 5200 DLUF TOP STAKES iu STAKING 72 D . MILLER . 5O/ E . E6 32. 00 16. Gr 73 V. BARKER . 5O✓ E .81 30 . 00 i5.0 76 T. _PAFR . 5O✓ 5 .66 30. 00 15. 0 1 . 50 - 23 .13 . 00 46 .01 51400 LOT STAKES 14 STAKING 72 D. YiILLER 2 . 0C' 34 . 64 32 . D0 6400 73 V. EARKER 2 . 00/ 3� .22 30 . OD 60 .0 77 R . LYONS 2 . 00/ so . 00 �C. o 6 . 00 65 . E6 . 00 i24 . 0 5500 SEWPR STAKFS 94 `. aU10000 C0NTINUFD PI E 04 CALCULATIONS r,'92 Da MILLER 2. 00 00 000 [./ . GO 14 FTAKIN0 70 D• CAGE 4 . 50'/, E 2 a 2 6 3 2 a 0 0 i44 . 00 72 D . KILLER 1a5D� 2`_ a98 32a0D 46 . 00 73 V. EA.RKER 1 .5l 26 . 42 30 .00 45. 00 74 J • MAT HEWS 4 . 50✓ 5C .90 3 0 a 0 G 135. CD 75 T. FOLBERT 4a50- 71a `-'4 30 . 00 1;5* GO 77 Ra LYDNS 1a50� . 00 . 00 . CO 15 FE-STAKING 72 Da MILLER 7a5O� 125 . 90 32 . 00 240a0C 73 Va PARKER 7a50/- 132a08 30000 225. GCG 76 Ta PARR 3. 50- 39 . 59 30000 105a0D 77 Ra LYDNS 4. 0C-� a00 Oa00 [ a0C 16 HORIZ. CONTROL 70 Da GAGE 1 . 00✓ 18a28 32 .00 32a00 72 0.. MILLER i . CC/ 17a32 32a00 32a0C 73 V. BARKER 1 9 0 V 17o6i 30a00 30000 74 Ja hATHENS 100C✓ 11 * 31 30. 00 30600 75 T. F0L6ERT i . 00/ 17 , 32 30900 30a 00 76 Ta PARR ia00 11 .31 30aD0 30 . 00 17 VERTICAL CONTROL 72 Da hILLEF 2aD0 34064 32. 00 64. 0C 7'3 Va BARKER 2 . CC' 35a 22 30 .D0 6 0 v 00 76 T . FARR i . 00 11a31 30600 3C. 00 77 R. LYDNS 1000 a00 .00 5c. 00 19 INSPECTION 70 Da GAGE 2a5CV 45 .70 32.G0 E0 . 00 74 Ja M:ATHEWS 2a50 28 .28 30. 00 75. 00 75 Ta }"DLBERT 2a50'' 43930 3Ga00 7_5. 0G 62a00 856 .67 .00, 1645. CG 5600 CURF STAKES SL £TAKING 70 Da GAGE 6. 00 105a66 32 .00 192 . 00 72 D . MILLER 279 476a30 32 . 00 8F0 . 00 73 Va EALKER 27 . E0� 484 .28 3 C a 1 0 825a0C 74 Ja hATHEWS 6 . OD� 67aE6 30. 00 1E0 . DC 75 Ta hC'LBERT 6. 00- 1C3a92 30 .00 1 E 0. C 0 76 T. PARR ?7 . 50r 31i . 03 30 .00 E256D0 100.5C i553a07 a00 3OB2 . 0C 5603 UTILITY STAK�C 20 Ta ESSEN iaDD 27 .14 38050 8a C I . 00 2'c . 4 . CU 38 . 5C TOTAL WORK ORDER. 312. 00 395Ca1.2 323 .' 9 7638a C ����- EXHIBIT "B" 9450010000 I'ONTINUED PAGE 08 SUPER.VISION 23 Mr SALE 1 . 00 15r86 34r00 31L,0 12 SCHEDULING 23 Mr SALE 1 . D0 15 . 86 34r00 34 . U0 20 MAP PRINTING - 94 .83 196FO 152 .11 94 .83 482. 00 5gCO LOT STAKES i4 STA.KING 70 0 . GAGE 10r50 19i .94 32 . 00 336 . 00 72 D . MILLER 6. 00 i02r92 32r00 192. 00 73 Vr BARKER 2000 3E .22 30000 60. 00 74 J. MATHEWS 1.0 . 50 118 .76 30800 315. 00 75 Tr HOLBERT 10. 50 i81 . P. 6 30600 315r00 76 T . PARR 6r00 67r86 30000 iE0. 00 82 D . MILLER 34r50 63C . 66 38r50 1328r25 86 T . PARR 24r50 39C . 20 37 .00 i276 .5C i14 . 50- 1720942- - . 00- 4002 . 75 550C SEWER STAKES - STAKING 72 D . MILLER 6r50 112058 32. 00 208 . 00 73 Vr EARKER 6 . FC 114 .47 30. 00 195000 76 Tr PAPR 6 . 5C 73 . 52 30000 °s+-0�_ 19650- 30Cr57 - r00-C 598.00 56CO CURB STAKES 14 STAKING 7.2 Dr MILLER 8 . 00 138r56 32000 2� 6. 00 73 V. EARKER 8600 14C088 30000 240r00 76 T. PARR B . OD 9Cr48 30000 240r00 24r00 365692 000 736. 00 58CC UTILITY STAKES 62 D . MILLER 2 . 5C' 45 .70 3f . 50 96r25 2r50 45 .7C . 00 �90 .25- TOTAL WORK ORDER 199 . 25 2797r36 94083 6332. 50 • •/ L' EXHIBIT "B" 945a010( C0 CCNTINUED PAGE ii RESEARCH 23 11a GALE 655 7a93 34atO 17a0L 05t 7a93 $ ED 17a60 54CO LOT CORNER STAKES 52 FROPO°ALS 29 Ja CICCHIKI 2s00 21062 27at0 5400t 2 0 C 0 21a62 *C6 54a0C `5500� SEWER STAKES 2 L: OFFICE/FIELD CC—ORCINAT 29 J• CICCNIWI 2600 21 #62 27atO 540b0 2800 21aE2 a00 ---`4aC-0" TOTAL WORK ORDER 1960t 233a54 • T— r:.r °L7 .25 tt. �. . % - 7 ` . EXHIBIT "B" PF' CJECT 71LLIGG REPORT PAGE l: .C ,N0 9S5 . Di00C'0 P • ArC . E • JULIA.N LATE 7F339 TITLE FE2ICD Er:011.6 1-1 30 73 FRCJ• TYFE REFL FUN DESCRIPTION EMPLOYEE HOURS SALARY BILLING MISC . TOTAL N0 NO NAME COST RATE COFT FILLING 3100 STREETS it E.ESEARCH 24 R . TF.ACY . 50 4 .14 22. 00 11 . 00 95 CONSULTING 23 M . SALE . 50 7 . 93 34 .00 17 . 00 i • DO 12 .G7 .00 28- D0 3300 'EVERS` - �___- -PESEARCH. 29 J . CICCHINI 2 . 00 21 . 62 27 .00 54r00 i8 CERTIFICATION `29 J . CICCHINI 2 . 00 21 . 62 27 .00 54 ._GO_ 4 . 00 43 . 24 . OD �DF . 00 3900 PLOT PLANS 11 F:ESEARCH F- 29 J . CICCHINI i . 00 iC . ci 27 .00 27. 00 1 . 00 1C . 81 .00 27 . 00 41GO RECORD MAPS 08 SUPERYISION 24 R . TRACY . 25 2 . 07 22 . 00 5. 5D 20 MAP PRINTING 46.16 . 25 2 . D7 46.16 5. 50 43C0 EN'CUMCRANCE MAP C6 CLIE14T CO -ORDINATION 23 M . SALE .=0 7 . 93 34 . G0 17 . 0G . 50 7 . 53 .00 17 . 00 47C0 CCNC011If:IUM MAPS - - - 12 SCHEDULING 29 J. CICCHINI 650 ° .41 27 . 00 i3. 5C' . 50 5 .4i r0D 13 0 5 3 C 0 BLDG. CONST . STAKES 12 SCHEDULING 29 it CICCHINI .50 5 .41 27. 00 � _ 650 •4_ . OG 13. �G 54C0 LOT CGRNER STAKES 12 SCHEDULING i 2F J. CICCHINI 1 . 00 1C .51 27rD0 27 . 00 14 STAKING CON'T PICJECT CILLING RE FORT PAGE +' . G .NO 545 . G20000 P .A .C .Ea JULIAN DATE 7E334 TITLE FEI: IGC ENDING 11 3O 7F PRCJ . TYPE pccL FUN CESCP. IPTION EMPLOYEE HOURS SALARY U ILL ING MISC . TOTAL NO NO NAME COST RATE COST FILLINC 23CO PFELIMv COST 8 QUAN EST 94 MARKETING 29 J. CICCHINI 13 . 0C 14C . C3 27 . 00 3E1 . 00 i3 . 0C. 14C .53 .00 35i . 00 2500 TENTATIVE MAP D1 DESIGN 45 W. SCHALPER 3. 0C 41 .10 35 . 00 iC5 . CO C2 DRAFTING 54 T . DAVALL i . 00 5 .78 i5. 00 15. 00 05 CLIEET CO -ORDINATION 22 M . SALE . 50 7 . 93 35 .00 17 . 50 45 W. SCHAL5EF: 1 . 50 2C .55 35 .00 52 .50 13 TRAV. d DELIV. 54 T. DAVALL 1 . 00 5 .7E 15 .00 15 . 00 - ---___ 7 .00 81 .14 . CD 205 . 00 3 2 C 0 STORM DRAIN=�', C7 yC0-ORDINATION 45 W. SCHALBER i.00 13 .70 35. 00 35 90 i . OD 13 .70 .00 35. 00 4100 RECORD MAPS C8 SUPERVISION 24 R . TRACY . 25 2 .07 22 .00 5 .50 20 MAP PRINTING >. CO . 25 2 . 07 9 . 00 5.5C TOTAL WORK ORCEP 21 .25 2 7 .Lf4 9 .0C 595 . 5C • % *7 PFGJFCT BILLING P.EPCRT PIGS 4 •0aN0 945 • D1D001 P •A •C •[ • JULILN DATE 7E334 TITLE FERIOD Eft DIhG 11 3C' 7 PBOJ• TYPE REEL FUN DEECRIPTI0F EMPLOYEE HOURS SfLARY FILLING MISC • TOTAL 140 NO NAME COST RATE COST nILLING -' z3C0 SEWERS NT CC —ORDIt:AT ION 29 J• CICCHINI 2.00 21 .62 27 • CO G7 AGENCY CO —ORDINATION 29 J• CICCHINI 5. 00 54 • C5 27.00 1Z5 .0C 7. 00 75 . 67 • 00� iG 4100 RECORD MAPS 62 CRAFTING 09 R• MC CONAGHY 4. 00 2C •20 15. 00 60 . 00 05 SUPERVISION 24 R• TRACY 1 . 00 E •28 22. 00 22. 00 5. 00 2E •46 * Co E2. 00 TOTAL VORY, ORDER 12. 00 iO4 .15 600 271#OC �r EXHIBIT 11B" 945a019000 CONTINUED PAGE 21, 50 15C . 40 600 281s0 2500 ARCHITECTURAL CS DESIGN 46 Ps LEJA . .50 4 .15 20a00 10. 0- 08 SUPERVISION 46 Pa LEJA . 50 Y 4a15 20aC0 ioa00 1400 E a 3 000 20a00 3100 STREETS Ci DESIGN 23 Ma SALES 1000 ✓ i4 .43 31 .00 31sD0 C2 DRAFTING * ✓ 395e00 ' 03 A. REYES 2600 i1s52 10a00 20a00 D7 Go HOE 1.50 ✓ Et12 10. 00 15,00 16 Ga P,EYNOLGS 27a50V 14Ea78 10s00 275a00 04 CAL CULATIDNS 23 Ma SALES if CO 19s43 31900 31a00 46 P. LCJA a50 ✓ 4a15 20s0D 10000 07 REVISIONS 24 Ra TRACY 17a2=1'� ii1a95 16s00 276aDO 46 Pa LEJA 3.00 24987 2C* 00 60000 j C6 SUPERVISION -f 23 Ma SALES 1 . 00 'l� i4a43 31, 00 3i.00 46 Pa LEJA 1.50 ' 4-2a44 20s00 30a00 13 TRAY@ 8 DFLIV. l �� 21 T. LUPPI ' •50 1a98 10.00 5. 00 20 MAP PRINTING 46 Pa LEJA •5CP' 4a15 20900 10. 00 57a25 371a25 395. OD 754sOO 3300 SEWERS e„�IGN. 46 Pa LEJA iaOC / Ea29 2Cao0 20. 00 C2 DRAFTING 07 Gs Yi0'c 10 . 50 56 . 81 1Cs00 105s00 16 Ga REYNOLCS 6 . 50p/ 35 .17 1C . 00 65sOC 24 Rs TRACY 1a50k/ Ss74 i6so0 24 .00 07 REVISIONE 24 R . TRACY 17a50 ✓ 1 ill a58 16a00 280000 46 Pa LEJA 2a0O✓ 1£ a58 20aoO 40000 C6 SUPERVISION u6 Pa LEJA 2a50✓ 2C .73 20a0C 50o0C 41a50 26C .90 000 584 .0 0 ; 3400 WATER — C2 DRAFTING 03 As REYES 30Do ✓ 17a28 10 . 00 30000 07 G. MOE 4 . 50✓ 24a35 10. 00 45.00 7 . 50 41a63 000 75sOO 3600 UTILITIES b FVOJECT 2ILLING REPORT FACE � . C .NO P45 . 02G000 P .A .C .E • JULIAN 5PTE 75363 TITLE PERIOD K01NG 12. 2'' 7 PROJa TYPE FEEL FUN D,-�CRIFTION EMPLOYEE HDUPS SALARY EILLING MISC . TOTAL NO NO NAME CC„T RATE COST E ILL ING 25C6 TENTATIVE MAP 02 CRAFTING 04 L . KAP.AK 3 . 00 1 E a 39 15 . 00 05 M E E T I H C 5 45 b'. SCHALPER i . 00 i3 . 70 35. 00 Z5 . 00 C7 AGENCY CO-ORDINATION 45 We SCHALGER 650 6 . 85 35 . 00 13 TRAV. d OELIV. 54 To GAVALL 1 . 00 E .78 15 . 00 15. 00 20 MAP PRINTING 34 C . HACHE . 50 3 . 60 22.00 14 . 00 6aO0 4E .32 000 123. 50 7100 STREETS - - - - 06 CLIENT CC -ORDINATION 22 M . SALE 1 . 00 1 ° .86 3: .00 35. 00 1. 00 15 .E6 a00 35a0G' t;2CO T01'M DRAINS �4vr 45 Wo SCHALDER S . 00 13 .70 35. 00 35. 00 53 TYPING 12 La WALKER, • 50 .60 15.50 7 1 . 5C ' 7a30 • 00 42 .7` TOTAL WCRK ORDER 8 .50 81 . 4E a0 ,' r 7 L ,� EXHIBIT "B" F'FOJECT - ILL I ',C RCP( FcT PACE 1 . 0 N0 ^45 . ( 1CDO0 P .AaC .E • JULIAN DATE 79E12 TITLE FEF: IOD Ef,DIhC 7 3i 79 PROD• TYFE G17L 5 FUR, DEPCPIPTIDN EMPLOYEE HCORS EFLA ='Y LILLIKG Y.IFC . TOTAL N0 NO NAME CCET RATE COST EILLIKC 1200 SPECIAL REPORTS Si PESEl :'.CH 22 Ms SALE 1sGO 150E6 3£ .50 38s50 Z1 Ss PAYNE . SD 2 . E9 15 .50 7, 75 i • SD iF . 75 .00 46.25 3300 SEWERS C2 -DRA"=TING 05 R. INGRAM s50 2 .53 15 .00 7 . 50 Si RESEARCH 29 J. CICCHIVI 1s00 i1s54 30000 1 . 50 14 .C7 .00 37. 50 35CO GEADING PLAN (2 DRAFTING 24 R. TRACY 2. 00 1E . C2 22 .D0 44. 00 2. 00 1E .G2 .OD 44 . 00 41C0 RECORD MAPS - - - - 12 6CHEDULIN'G 29 J. CICCHINI 3450 4C939. 30.G0 105s00 20 MAP PRINTING * cs75 42 V,0N'U DENTING 72 D . MILLER 3. 00 56 .C7 32 . 00 56s00 76 T . PARR 3.00 74 . 65 30 .00 90000 77 CAP,OLE PRICHT 3, 00 3E .67 30 .00 50. 0D i2s50 1E5 .78 9 .75 38is00 44CO 5CUNDA .'Y SURVEY 14 STAKIN4 62 D• MILLER 8. 00 19S .52 3 E 6 5 0 3 C 5 9 C 0 87 CAROLE VRIGHT 8 a 0 C 107 .12 37 . 00 2 9 6 s 0 0 16 Y.ORIis CONTROL 72 D. MILLER i . 00 1F .6 32sCO 2. 0C 76 To FAR= 1 . 00 11 . 5 30 .0G 30. 00 77 CARCLE WRIGHT i• OD 1'< 0E9 30 .00 D• OO 82 Ds MILLER 4 . 5E 8. s11 38.50 173925 E6 T. PARR 4 . 50 51 . 98 37 .00 166. 5C 28 .00 431 . E6 .0G. 1035.7 TOTAL '-C_PK ORDER 45. f0 652 . AP 9 .75 1-3 v� Ft' CJECT 3 ILL IfiG REPCHT PAGE � .C .N' 0 °4° . .ICOC1 F . A .C .E . JUL IAt! LATE 73212 TITLE PERIOD ENDING 7 31 79 PROJ• TYPE REEL FUN DESCRIPTION EMPLOYEE HOURS SALARY BILLING MISCr TOTAL N0 NO NAME CCST RATE COST FILLING 12CO SFECIA. L REPORTS I PES =! ?CH 22 11r SALE ir00 15 .06 3Lr50 3Br50 i000 15 . 86 . CO "Be50 33C0 SEWERS '—CZ DRAFTING 05 Re INGRAM 3800 15r15 15000 45. 00 29 Re TRACT 2r00 1E . C2 22r00 44r00 5r00— 33917— — 000— TOTAL WORK ORDER 6r00 45r03 200 127650 3-) ,s- q,2-r 3E, b �l 9. 7s 3 2 8 ..� i FIROJ_CT FILLING icEP( PT FACE � C .t:G 545 .C± COGS PrArCeEr JULIA !i LATE 7?212 ITLF PEFIQD ENDINC 7 31. 79 PRCJ, TYFE FEEL FUh DEFCPIPTION EMPLOYEE HOURS EILARY SILLINC r. ISCr TOTAL ND NO NAME COST GATE CDST E I L L I N G "'CO STO,-N. D:4RINS 22 He :ALc 1r .0 1° r26 ' F 0 a r 0 i . 00 ,E 6 TOTAL WCPK DP.DEP, ir00 i`_ sb6 r00 . S . EC l ( FFOJECT 3ILLIr:G i'FCRT PACE .C .KO 945 . L1 GC07 F .A .C . . JUL I GATE 73212 TITLE PEE IC'D ENDING 7 °1 79 PROJ. TYPE RCCL 5 FCA. DESCRIFTION EC!FL0YEE HOURS SbLARY BILLING 1lISC . TOTAL NC NO NAME CCST FATE COST E I L L 1 N G 33C0 J E6'EF ' EESIOx 22 M. GALE 2. 00 :!1 .72 3F . 0 77 . 00 C2 DRAFTING 05 R. INGRAM 1 . 00 ` .OS 15 . 0D i5. 00 C4 CALCULATIONS :58 A . VATKIUS .50 .3 .43 17 .0D 8. 50 CB SUPEFY1310N 24 P.. TRACY .50 4 . 51 22 .00 11. 00 iD EY.HIE.ITS - 22 f1. SALE a 0 7 . 53 3A .50 19 .25 20 MAP PRINTING 22 M. SALE . 50 7 . 93 38.50 19.25 5. OD 6C .�7 . 0D -"150 . 00 4iCO RECORD MAPS 55 MAP FILI14C 05 R. INGRA.M . 0 2 .53 15 . 00 7.50 -� . 50 2 . 53 .00 7.50 TOTAL WORK ORDER 5.50 6: .10 .00 157. 50 l 1 (213) 680-1716 EXHIBIT B License No. 335885 SEWER, STORMDRAIN & WATERLINE CONTRACTORS Mailing Address November 16, 1978 P-0. Box 54426 L.A., Calif. 90054 Invoice No. 354 Lloyd Campbell Re: Request for Payment 1319 Via Monte Vista Tract 9780 - Sewer Palm Springs, California 92262 (Techevah) ------------------------------------------------------------------------------------------------- Install sewer line on Techevah Street: 1005' x 8" VCP @ $7.35 If 7,386.75, 4 ea Manholes @ $575.00 ea 2, 300.00 Total . Amount Due This Request $9,686.75 Please make check payable to P 8 J Utility Company and Allied Pipe and Supply (213) 680-1716 EXHIBIT B License No. 335885 SEWER, STORMDRAIN & WATERLINE CONTRACTORS Mailing Address November 16, 1978 P.O. Box 54426 L.A., Calif. 90054 Invoice No. 353 Lloyd Campbell Re: Request for Payment 1319 Via Monte Vista Tract 9780 Palm Springs, California 92262 Sewer ------------------------------------------------------------------------------------------------ Install sewer line on Bogie Road: 1560' x 12" VCP @ $12.90 If 20, 124.00 6 ea Manholes @ $600-00 ea 3,600.00 1 ea Drop Manhole @ $850.00 ea 850.00 21 ' x 8" VCP @ $7.50 If 157.50 Total Amount Due This Request $24,731 .50 Please make check payable to P & J Utility Company and Allied Pipe and Supply Yr^nT FAIRPORT CONSTRUCTION INC. _ 153 - �UIZYL..I i 97Q PAY TOE }�. x ✓ -2i ORDEROF r .SUM OF ���/_Fit / r� Y - �'G��(� U•$• DOLLARS 100 U.S Funds _ — �- �--r� - - - Fairport Construction (nc - v -Bankof 21 Lonsdale _North 000400000081' CDMCIM • - `-yam � - -`W _, � �P���W� �s� � Al .R _ • EXHIBIT IIBII FAIRPORT CONSTRUCUO , IIQC. 051 1 1390 VIA MONTE IRSTA 325-2866 • • . • , PALM SPRMGS, CALIF. 92262 • ' < < � . c ` ` R • 16-66 I9� 1220 PAY c . , - 6L/ TO THE ,�� y/-� /� 7RDEROF / 'b6( �/7 / �rJ/.(/lpAL (QiJi /JOP/��1J �"YL �c • R ''o.'f as� 00 .Q n �DG?� n ? 9 ---d�/J/u (�iQJ� �L � �� -/Jm� �1'�� ` (L/O OS� /tea DOLLARS BANKOFAMERICA PALM SPRINGS MAIN OFFICE ' 101 NORTH PALM CANYON DRIVE PALM SPRINGS,CALIF.92262 9Ys� aye-�- 95's-i-/ � 9ys•�• G a 1110000 S in•e 1: i 2 20-00EE': 09 SO S-O i 2 3 2a, .1'0000 38 S iO4,I' ` � O ar to m 4] CDP ON n Cn y I G v Cp cD v J C O Ir 950 Ply whe n;rler of 95a C7 IJA'IIO�tAL�(iUSi AY?:SWNGS ASSOCIATIO 00 > p FOR DEPOSIT ONLY p Philip Abrams Consulting 3a O En I ers,.1Inc. \ o 095 � 00005 7 1 3� 9 AL C � 14Y fiPli pri<F, P,E�i. o , - t � Ci,1fJi: C! hA.1cRICf, C*� \1\� C..tr+1 I 1l sMAIN A77 tyI VAI ,hr1RpA C9 a `220 +.9117 '7? co .y I Zf ; c. v Ow Cj Co I - . 4_. i - .� _ 1 W I � • �� [ m�. c: I �_ Z a f-w O O .. MS, -00 FAIRPORT CON*UCTION INC. 022 EXHIBIT "B" January 3rd 19L PAY TO ORDEROFE Philip Abrams Consulting Engineers Inc. $ 6951 .97 SUM OF --Six Thousand Nine Hundred and Fifty-One--- 97/10 Qj'S' DOLLARS 100 Fairport Construction Inc. U.S. Funds Bankof Montreal 21 Lonsdale Ave. North Vancouver, B.C. V7L 4K3 Inv.#f945-) _ '2 7686 '110000695197.11 1!1 ''_ - P4 Lb L L r r I i DATE: September 5, 1979 ! TO: City Council FROM: Engineering Office Supervisor via Director of Community Development APPROVAL OF REIMBURSEMENT FOR OVERSIZE TRUNK SEWER MAIN RECOMMENDATION: It is recommended that the City Council approve authoriziation to reimburse Fairport Construction, Inc. , the sum of $7,745.86 for oversize trunk sewer main. BACKGROUND: On September 3, 1975, the City Council adopted the Master Plan of Sewers which calls for a twelve inch trunk sewer main on Bogie Road from Tachevah Drive to Vista ,Chino, therefore this developer was required to install a twelve inch trunk sewer main on Bogie Road. Inasmuch as this trunk sewer main is in excess of the standard eight (8) inches, the developer should be reimbursed the cost difference as per Resolution 9388, adopted by the City Council on January 13, 1969, which authorizes the refund of the incremental cost of trunk sewer main greater than eight (8) inches. --.. Sufficient funds are budgeted in Account 22-453-4410 for this reimbursement ✓0 APPROVED J S H. DREWS .�A�. J HN A. MA G ONE ngineering rsb� - Director of Community Development APPROVED City Manager ATTACHMENTS: 1 . Map 2. Resolution 7 i 24 a I