Loading...
HomeMy WebLinkAbout4/3/2002 - STAFF REPORTS DATE: April 3, 2002 TO: Community Redevelopment Agency FROM: Director of Public Works/City Engineer TAHQUITZ CANYON WAY LIGHTING SYSTEM RECOMMENDATION: It is recommended thatthe Community Redevelopment Agency approve and adopt the plans, specifications and working details, and authorize advertisement for construction bids forthe Tahquitz Canyon Way Lighting System, City Project 00-36. SUMMARY: Section 7.03.040 of the Procurement and Contracting Ordinance requires that the Community Redevelopment .Agency approve and adopt plans, specifications and working details, and authorize the bid request for all public projects in excess of $100,000. Approval of this item will allow staff to proceed with this public project, with an estimated total cost of$231,000. BACKGROUND: Last year, the Downtown Development Director proposed a street and pedestrian walkway lighting beautification project for Tahquitz Canyon Way. The concept involves installation of an underground electrical system to service decorative lights along both sides of Tahquitz Canyon Way between Indian Canyon Drive and Avenida Caballeros. With the Community Redevelopment Agency's approval on May 16, 2001, staff obtained professional engineering design services from Dahl, Taylor and Associates, to prepare plans and specifications for construction of the "backbone" system to service; future installation of the decorative lights by others. Section 7.03.040 of the newly enacted Procurement and Contracting Ordinance requires that for public projects in excess of $100,000 the Community Redevelopment Agency approve and adopt the plans, specifications and working details, and authorize staff to advertise for construction bids. The preliminary estimate shows that construction of this project will exceed its original budget. Therefore, the project is broken into two separate phases, to allow for construction of at least one phase of the project in the event the preliminary estimate accurately reflects the construction bids. The project includes the following improvements: Phase 1: Tahquitz Canyon Way (Indian Canyon Drive to Calle El Segundo) Installation of underground electrical system (backbone) for street and pedestrian walkway lighting, including: varying size conduit and conductors, 31 concrete foundations with temporary covers forfuture light poles and fixtures, and 1 electrical meter and pedestal Phase 2: Tahquitz Canyon U lay (Calle El Segundo to Avenida Caballeros) Installation of underground electrical system (backbone) for street and pedestrian walkway lighting, including: varying size conduit and conductors, 26 concrete foundations with temporary covers for future light poles and fixtures, and 1 electrical meter and pedestal C. a a.. Tahquitz Canyon Way Lighting System April 3, 2002 Page 2 Complete plans and specifications for this project are on file in the City Clerk's office for review and detailed information. The Engineer's estimate for this project is $109,000 for Phase 1 and $122,000 for Phase 2. This action is being brought before the Community Redevelopment Agency to be in compliance with the Procurement and Contracting Ordinance. Following the Agency's approval of the plans and specifications,and authorization to advertise for construction bids, staff will schedule bid advertisements with a bid opening date of April 30, 2002. DAVID J. BARAKIAN Director of Public Works/City Engineer OH RAY A ND I� D ctor of Cc munity & Economic Development APPROVED:— Ex ecutive Director— ATTACHMENTS: 1. Resolution C �� - � Resolution No. OF THE COMMUNITY REDEVELOPMENT AGENCY OF THE CITY OF PALM SPRINGS APPROVING AND ADOPTING THE PLANS, SPECIFICATIONS AND WORKING DETAILS,AND AUTHORIZE ADVERTISEMENT FOR CONSTRUCTION BIDS FOR THE TAHQUITZ CANYON WAY LIGHTING SYSTEM,CITY PROJECT00-36 BE IT RESOLVED BY THE COMMUNITY REDEVELOPMENT AGENCY of the City of Palm Springs, that the plans, specifications and working details for the Tahquitz Canyon Way Lighting System, City Project 00-36, are hereby approved and adopted; and, that advertisement for construction bids is hereby approved. ADOPTED this day of , 2002. AYES: NOES: ABSENT: ATTEST: COMMUNITY REDEVELOPMENTAGENCY OF THE CITY OF PALM SPRINGS, CALIFORNIA By: Assistant Secretary Executive Director REVIEWED AND APPROVED AS TO FORM: cra. - a -- 6