HomeMy WebLinkAboutA3288 - CVAG VISTA CHINO WHITEWATER CHANNEL CV Assoc of Govnments (CVAG)
Add'l Paving Width Vista Chino
Across Whitewater Channel
AGREEMENT #3288
CM Signed, 9-27-93
CITY OF PALM SPRINGS - CVAG AGREEMENT- --
FOR MEASURE "An/TUMF FUNDED PROJECTS:
SMALL PROJECTS FUND - "ADD ADDITIONAL PAVING WIDTH TO VISTA
CHINO, ACROSS THE WHITEWATER CHANNEL'
This agreement is made: and entered into this 27TH day
Of SEPTEMRF.R __, 1993 , by and between the Coachella Valley
Association of Governments, hereinafter IICVAGvg, and between the
City of Palm Springs, a municipal corporation, hereinafter
"AGENCY".
WITNESSETH
WHEREAS, the "Coachella Valley Area Transportation Study" , a
valley-wide study prepared under the auspices of CVAG has
identified various transportation and highway projects throughout
the Coachella Valley to be projects of regional importance; and
WHEREAS, approval of a highway financing measure by the
voters of Riverside County in November of 1988 has created a
source of funds with which to construct such projects; and
WHEREAS, CVAG and its member agencies have adopted a
Transportation Uniform Mitigation Fee (TUMF) , the proceeds from
which are also intended to fund the construction of such regional
projects; and
WHEREAS, CVAG by agreement with its member agencies and with
the Riverside County Transportation Commission (Y.CTC) , has been
designated as the agency through which such funds are to be
conveyed and disbursed for the purpose of completing said
regional transportation projects; and
WHEREAS , there exists a compelling need to design and
construct such regional facilities, some of which are planned or
exist within the boundaries of Agency; and
WHEREAS, CVAG and Agency are desirous of making use of such
funds within the jurisdictional boundaries of Agency for the
purpose of construction of :such project, generally described as:
The widening of Vista Chino across the Whitewater Channel
from three lanes to four lanes (7 feet added on each side
of pavement) for 1/2 mile, and restriping for four lanes.
1
• i
NOW THEREFORE, in consideration of the mutual promise(s)
contained herein, the parties hereto agree as follows:
1. Agency is hereby designated as the lead agency for the
above projects.
2 . Agency shall prepare or cause to be prepared all
necessary plans, specifications, estimates, plats, and
other documents as required for the project, and is
hereby designated as the contracting and design agent
and will perform all acts necessary or required in
order to design and construct said project in
accordance with the plans, specifications, and
construction documents.
3 . The total cost for the project is estimated as
$57,575.00 A description of the design and
construction activity being funded, pursuant to this
Agreement is summarized and set forth in the "Scope
of Work" (Exhibit "A") attached hereto and made a part
hereof. This project is more particularly described
and summarized in the "Cost Estimate" (Exhibit "B")
which is attached hereto and made a part hereof.
4. CVAG will provide funds to Agency for such
construction in an amount not to exceed 50% of actual
construction project costs or a maximum of $50,000
whichever is the lesser.
5. Such funds shall be paid to Agency, by CVAG, to
reimburse Agency for expenses incurred by Agency for
work or services on said project.
6. Such reimbursements shall be made upon presentation
to CVAG of a statement from Agency certifying its
costs and enclosing therewith copies of contractor's
invoices, evidence of payment, and other such
information and records as may be required by CVAG to
verify costs.
7. Prior to payment of Agency by CVAG, a final report of
each project shall be submitted to CVAG by Agency
containing a record of all payments made for said
construction, design engineering, construction
engineering and other costs connected with this
project, and the: source of funding of such payments.
Final payment shall be paid by CVAG in accordance with
its rules and regulations and policies concerning
project cost determination and expense eligibility.
2
8 . Agency agrees to include in contract specifications
and bid documents a requirement that all prime
contractors shall name CVAG and all its member
agencies as "also insured" on all liability insurance
coverages required by Agency on each contract. Agency
will provide a copy of the Insurance Certificate to
CVAG depicting CVAG and its member agencies within 30
days of signing a contract with the prime contractors.
9. Agency agrees to keep all project contracts and
records for a period of not less than three (3) years
from the date a Notice of Completion is filed by the
Agency on each :such project, and further agrees that
all such files and records shall be made available to
CVAG upon its request for the purpose of checking
costs or auditing for compliance with this agreement.
10. Any dispute concerning a question of fact arising
under this contract that is not disposed of by
agreement shall first be decided by the CVAG Executive
Director or designee, who may consider written or
verbal evidence submitted by Agency. This decision
shall be issued in writing. However, no action in
accordance with this Section shall in any way limit
either party's rights and remedies through actions in
a Court of Law with appropriate jurisdiction. Neither
the pendency of a dispute nor its consideration by
CVAG will excuse Agency from full and timely
performance in accordance with the terms of this
contract.
11. Agency agrees to provide at least one "Project Sign"
to be placed in a safe and visible location near the
site of construction so that all travelers passing the
location have the opportunity to observe who the
Agencies are that are providing funds for the
construction of the project. "Exhibit C" provides
guidance for the "Project Sign".
12 . This agreement is for funding purposes only and the
Agency agrees to indemnify and hold CVAG and all its
member agencies harmless from any damages, claims,
costs, or liabilities occurring from any action done
or omitted by Agency which may arise as a result of
the design, construction, or administration of the
project described herein by Agency.
3
IN WITNESS WHEREOF, the parties hereto have caused this agreement
to be executed by their duly authorized representatives on the
above date.
ATTEST: AGENCY:
CI Y OF PALM SPRI
By
--1/1A... Judith Sumich, City Clerk Ro ert Parkins, ity Manager
CVAG
By; By:._
Tester Cleveland--- Tom Hunt Chairman
Executive Director
6-8-93
APPROVED AS TO FORE?
, r r
Date _� � ti.� 6'�-��: ���� ti;".°)��
4
EXHIBIT A
SCOPE OF SERVICES - SUMMARIZED
DESIGN - Excluded from CVAG funding.
CONSTRUCTION - CVAG funding participation.
1. Obtain permits and approvals. Schedule and conduct the
preconstruction conference. Review and, when appropriate,
approve contractor's construction schedule and sequencing.
2. Review and, when appropriate, approve contractor's shop
drawings. Review proposed work hours, waste sites and
construction vehicle routing. Conduct all necessary
notifications in advance of contractor occupation of the
project vicinity. Provide all necessary survey and staking
work.
3 . Perform roadway construction.
4. Provide on-site inspection services. Provide sampling,
testing, measuring, and other quality services.
CONTINGENCIES - CVAG funding applied to construction.
5
EXHIBIT B
COST ESTIMATE
SMALL PROJECTS FUND - "WI.DENING OF VISTA CHINO TO FOUR LANES
ACROSS THE WHITEWATER CHANNEL"
City Project No. 93-24
Item# Ouantity , Description Unit Cost Total
1. Lump Sum Mobilization Cost $4320. 00 $ 4,320.00
2 . Lump Sump Traffic Control $1400. 00 $ 1,400. 00
3 . Lump Sump Clearing and Grubbing $2900. 00 $ 2,900.00
4. 37,000 Construct 6" thick class $ 0. 50 $18, 500. 00
s. f. 2 aggregate base, 3/4"
max. , per typical
section in appendix "A",
complete in place, at_
5. 37, 000 Construct 2" asphalt $ 0.40 $14,800. 00
s. f. concrete pavement, per
typical section in
Appendix "A", complete in
place at_
6. 45, 000 Construct 1" asphalt $ 0. 18 $ 8, 100. 00
concrete cap course tie-in
pavement, 3/8" aggregate,
feathered to match, per
typical section in Apendix
"A", complete in place,at_
7. 12, 000 Pavement markings removed $ 0.25 $ 3 , 000. 00
s. f. by application of type I
slurry, at_
8. 2 ,800 Paint double yellow $ 0.35 $ 980. 00
lin. f. centerline with reflectors
per Caltrans Traffic
Manual Detail No. 22,
complete in place, at_
9. 5,500 Paint 4" solid white line $ 0.35 $ 1,925. 00
Lin. f. with reflectors per Caltrans
Traffic Manual Detail No. 12 ,
complete in place, at_
10. 5, 500 Paint 4" skip white line $ 0. 30 1, 650. 00
with reflectors per
6
EXHIBIT C
"'PROJECT SIGN"
(Construction Phase)
The "Project Sign" shall consist of the following information:
VIS`.CA CHINO WIDENING
FUNDS FOR THIS PROJECT
PROVIDED BY
CITY OF PALM SPRINGS $ XXX,XX.XX
RIVERSIDE COUNTY TRANSPORTATION COMMISSION 14, 393 .75
MEASURE "A" 1/2 CENT SALES TAX
COACHELLA VALLEY ASSOCIATION OF GOVERNMENTS 14, 393.75
TRANSPORTATION UNIFORM MITIGATION FEE
Total $57,575.00
Other information such as City Logo and/or Measure "A" Logo is
encouraged.
8