AGREEMENT FOR ENGINEERING DESIGN SERVICES
FOR THE CITY OF PALM SPRINGS STREET IMPROVEMENT PROJECTS CDo� cc m
1 N @ J
lU N � • —I
�tp SL
This agreement is made and entered into this day of _ N (D
v � o
l J 1995, between County of Riverside, Transportation �.=
(6 h
+ @ O
Department, referred to herein as ' COUNTY" and City of Palm
Springs, referred to herein as "CITY" .
RECITALS
1. CITY has a need for engineering design and related services,
referred to herein as "ENGINEERING SERVICES" for various
street improvements within its jurisdiction, which are
detailed in Attachment "A", and are referred to herein as the
"PROJECT" . The PROJECT consists of various subprojects
detailed in Attachment "A" and referred to herein as
"SUBPROJECTS" .
2 . COUNTY has the expertise, special skills, knowledge,
experience, and managerial ability to perform the functions
and services needed by the CITY.
3 . CITY and COUNTY desire to specify the terms and conditions of
the services required.
Section I
CITY AGREES:
1. To pay design engineering costs for project, including all
COUNTY costs for wages , benefits, transportation materials,
coord-nation and administrative accounting, as detailed ___
Attachment "B" , for all the CITY location irnrovemencs
FEB 1 1996' .3. 2
e
serviced by the COUNTY, in accordance with the hourly rate
schedule set forth on Attachment "C", which is attached hereto
and incorporated herein by this reference, for such work.
2. To provide COUNTY with necessary ordinances, policies,
practices, procedures, specifications, standards "As Built
Plans" , survey data, right-of-way plats required for the
preparation of Plans, Specifications and Estimates, referred
to herein as "PS&E" , for PROJECT.
3 . To provide prompt reviews and approval of submittals by COUNTY
and to cooperate in timely processing of PS&E .
4 . To identify and relocate all above ground and underground
facilities , mains , vaults and service connections and
utilities which conflict with construction of the planned
work.
5 . To certify that all necessary rights-of-way have been obtained
for the PROJECT before advertising.
6. To fund and pay in full for all right-of-way acquisition costs
for PROJECT.
7. To advertise, award and administer a public works contract for
the construction of PROJECT.
8 . To provide inspection of PROJECT during construction and upon
completion of all work.
9 . To assign a staff engineer to coordinate with COUNTY staff in
connec a on with the work of th_s Agreement.
Section II
COUNTY AGREES:
1. To provide engineering design services .
2 . To avoid relocation of city owned facilities or any utilities
unless necessary, and if necessary, to so inform CITY giving
CITY adequate notice to provide for relocation. The cost for
relocation shall be a PROJECT cost.
3 . To prepare PS&E for PROJECT, employing COUNTY forces , in
accordance with the Standard Plans and Specifications of
STATE, the standards and practices of CITY and all applicable
Federal laws and regulations .
4. To assure that final design documents and drawings for project
are prepared by or under the direction of a Civil Engineer
registered and licensed in the State of California, and that
the specifications, each set of plans and any reports shall
bear the seal, certificate and signature of the Professional
Engineer responsible for their preparation.
5. To submit PS&E to CITY for review and final approval .
6 . To keep accurate records regarding hours worked, equipment
used, vehicle unit mileage recorded and administrative charges
incurred, and said PROJECT records shall be available for
review by CITY.
7 . To submit monthly progress billings in accordance with
acci-,ricies completed.
S . To retain or cause to be retained for audit by CITY or other
i �►
governmental auditors for a period of five (5) years from the
date of final payment, all records and accounts relating to
PROJECT.
9 . Assign a Project Manager approved by CITY to coordinate with
CITY in connection with the work of this Agreement .
Section III
IT IS MUTUALLY AGREED AS FOLLOWS:
1. For the basis of this Agreement, the total cost of the
ENGINEERING SERVICES for the PROJECT to be paid by the CITY
is estimated to be $ 120 , 000 , as shown in Attachment "B" .
2 . The basis of payment for the work authorized under this
agreement shall be made at a billing rate set forth in
Attachment "C" of this Agreement . Payment shall not exceed the
percentage of completion of the work for the budget
established for each SUBPROJECT shown in Attachment "B" ,
provided that with approval of City, funds can be shifted from
one SUBPROJECT to another .
3 . Return of COUNTY prepared plans signed by CITY shall
constitute CITY acceptance and official approval of said
plans .
4 . The work for each SUBPROJECT shall be accomplished in
accordance with the scheduie sec forth in Attachment "D" .
5 . COUNTY shall meet at mucually agreeable times with CITY tc
1
review , progress of work, adherence to time schedule,
coordination of work and to resolve any work or scheduling
problems that may develop.
6. This Agreement shall be effective upon approval by the City
Council of the CITY and the Board of Supervisors of the COUNTY
and shall remain in effect for a period of 14 months. The
COUNTYI,will provide the CITY notice of the official Board
action ino later than two weeks after Board of Supervisors
approval date . The CITY will provide the COUNTY notice of the
official City Council action no later than two weeks after the
City Council approval date.
7. If either CITY or COUNTY is of the opinion that any work that
the other agency has requested is beyond the scope of this
Agreement and constitutes Extra Work, Notice shall be promptly
made in writing of that opinion. CITY and COUNTY shall meet,
confer and agree as to whether or not such work is in fact
beyond the scope of this Agreement and constitutes Extra Work.
Additional work shall not be performed without the written
consent of both CITY and COUNTY.
S. This Agreement may be terminated by either COUNTY or CITY upon
ten ( lb) days written notice to the other party. The
Riverside County Director of Transportation, or his authorized
representative, shall have the authority to terminate this
Agreement as provided herein. COUNTY shall be entitled to
paymentfor all services provided prior to receipt of the
written, Notice of Termination, unless COUNTY shall have
exercised the right to terminate.
9. a. Neither COUNTY nor any officer or employee of COUNTY
shall be responsible for any damage or liability
occurring by reason of any acts or omissions on the part
of CITY under or in conjunction with any work, authority,
or jurisdiction delegated to CITY under this Agreement .
It is also understood and agreed that pursuant to
Government Code Section 895 . 4, CITY shall fully
indemnify, defend, and hold COUNTY harmless from any
liability imposed for injury (as defined by Government
Code Section 810 . 8) occurring by reason of any acts or
omissions on the part of CITY under or in connection with
any work, authority, or jurisdiction delegated to CITY
under this Agreement .
b. Neither CITY nor any officer or employee of CITY shall
be responsible for any damage or liability occurring by
reason of any acts or omissions on the part of COUNTY
under or in conjunction with any work, authority, or
jurisdiction delegated to COUNTY under this Agreement .
It is also understood and agreed that pursuant to
Government Code Section 895 . 4, COUNTY shall fully
indemnify, defend, and hold CITY harmless from any
liability imposed for injury (as defined by Government
Code Section 810 . 8) occurring by reason of any acts or
omissions on the part of COUNTY under or in connection
with any work, aurnoricy, or jurisdiction delegated zo
COUNTY under this Acreemenz .
Notices:
Any notice required or permitted to be sent to either
party shall be sent by regular mail, addressed as follows :
County of Riverside City of Palm Springs
Transportation and Land 3200 Tahquitz Canyon Way
Management Agency Palm Springs, CA 92262
Transportation Department
P. O. Box 1090 Attention: Edward L. Fisk,
Riverside, CA 92502-1090 City Engineer
Attention: David E. Barnhart,
Director of Transportation
i •
IN WITNESS WHEREOF, the parties hereto have caused this Agreement
to be executed by their duly authorized representatives on
FEB 1 3 1996 1995 . A
�o
COY OF RIVERSIDE �lkS��+
'af�'o coo. C� CI,T1Y- OF PALM SPRINGS
11
Ch man,' r �1`j O9t rre By
Mayor
Board of Supervisors or/4
FEB 1 3 1996
ATTEST: Gerald A. Money, ATTEST:
Clerk of tY�e Board
B�f 1"/w i C a f,�''/C/i 2 � By�( �
"Depu /tier oft the Board City Clerk
APPRO D S TO FORM: APPROVED AS TO FORM:
By yt
William C . Katzenstein, Ci�At_tiorney' s
B
ACounty Counsel Office
RECOMMENDED FOR APPROVAL : RECOMMENDED FOR APPROVAL :
David E. Barnhart, Edward FiS
Director of Transportation City Enginee
revised 9/l/95
File : MOA. PS ;�F _.•.r r ,.
f't9/
FEB 1 3 1996
�Of^lv COUNTY OF
ram'' RIVE�IDE
TRANSPORTATION AN
4
�
LAND AMNAGEMENT AGENCY
••.LINO Transportation Department David E. Barnhart
Director of Transportation
ATTACHMENT A
May 9 , 1995
Mr. Edward Fisk
City of Palm Springs
P.O. Box 2743
Palm Springs, CA. 92263
Dear Mr. Fisk, RE: PM 10 Program
On April 26, 1995 we field reviewed the City of Palm Springs
PM 10 projects . The following is a brief description of the
project limits and our understanding of the scope of work required:
21 - Indian Canyon Drive (San Rafael to San Marcos) . Widen
the existing pavement on the west side (approximately
1, 43511ong, 10 ' wide) . Construct curb and gutter on the
west side.
P2 - Indian Canyon Drive (Racquet Club to Rochelle) . Widen the
existing pavement on the west side (approximately 260 '
long, 10 ' wide) . Construct curb and gutter on the west
side .
P3 - Indian Canyon Drive (San Rafael to Tramview) . Widen the
existing pavement on the east side (approximately 2 , 820 '
long, 5 ' wide) . Construct curb and gutter on the east
side .
P4 - Francis Street (Starr to exist . Impv. to east) . Widen
the existing pavement on the north side (approximately
800 ' long, 20 ' wide) . construct curb and gutter on the
north side.
P5 - Francis Street (Sunrise to Paseo De Anza) Widen the
existing pavement on the south side (approximately 700 ,
long, 16 ' wide) . Construct curb and gutter on the south
side .
P6 - Racquet Club Drive (Sunrise to Paseo De Anza) . Widen the
existing pavement on the north side (approximately 650 '
long, 16 , wide) . Construct curb and gutter on the north
side .
P7 - Vista Chino Rd. (1111 Vista Chino to 1695 Vista Chino) .
Widen the existing pavement on the south side
(approximately 670 , long, 8 ' wide) . Construct curb and
gutter on the south side.
4080 Lemon Street, 8th Floor • Riverside, California 92501 • (909) 275.6740
P.O. Box 1090 • Riverside, California 92502-1090 • FAX (909) 275.6721
PM10 Program
May 9 , 1995
Page 2
P8 - Sunrise Way (Francis to Desert Park) . Widen the existing
pavement on the west side (approximately 3 , 750 , long, 32 '
wide) . Construct curb and gutter ont the west side .
P9 - Golf Club Drive (Mesquite to Skypoint Dr. ) . Widen the
existing pavement on the east side (approximately 1, 936 ,
long, 19 ' wide) . Construct curb and gutter on the east
side.
P10 - Golf Club Drive (Mesquite to Ave. 34) Widen the existing
pavement on the west side (approximately 1, 530 , long, 30 '
wide) . Construct curb and gutter on the west side.
P11 - Indian Canyon Drive (6950 Indian Canyon Dr, to 1, 000 ,
south) . Widen the existing pavement on the east side
(approximately 1, 000 ' long, 22 , wide) . Construct curb
and gutter on the east side . Construct driveway
approach.
P12 - Ramon Rd. (Golf Club easterly to bridge) . Widen the
existing pavement on the south side (approximately 2 , 215 '
long, 12 ' wide) . Construct curb and gutter on the south
side.
P13 -' Miraleste St . (South of Francis St . ) Widen the existing
pavement on the west side (approximately 500 , long, .3 '
wide) . Construct curb and gutter on the west side .
The structural section of all widening projects shall be 3 "
A.C . over 6" A.B. Class 2
Attached for your approval are the construction and design
cost estimates for each project .
If any additional information is required, please call me at
(909) 275-6787 .
Sincerely, ? /
Atef Zaki
AZ :dl Senior Civil Engineer
Attachments
CC : Tek Tanaka
John Ristow
Jeff Tustin
ATTACHMENT B CC` TY OF RIVERSIDE
Page 1 of 14 T SPORTATION DEPARTMENT
PRELIMINARY ESTIMATE OF COST
SHEET 1 of 1
PROJECT: INDIAN CANYON AVE'. (P1) W.O. # AS-7046
FROM SAN RAFAEL,
TO SAN MARCOS
CITY OF PALM SPRINGS
DATE MAY 8 , 1995
----------------------------------------------------------------------------
NO. QUANTITY UNIT PRICE AMOUNT
----------------------------------------------------------------------------
1 ! 1 ! L.S. !CLEARING AND GRUBBING ! 30 , 000 . 00 ! 30 , 000 . 00
2 ! 1 ! L.S . ! FURNISHING & APPLYING WATER ! 1, 000 . 00 ! 1, 000 . 00
3 ! 585 ! C.Y. !ROADWAY EXCAVATION ! 15 . 00 ! 8 , 775 . 00
4 ! 1 ! L.S . !FINISHING ROADWAY ! 1, 000 . 00 ! 1, 000 . 00
5 ! 288 ! TON !ASPHALT CONCRETE TYPE B ! 40 . 00 !
6 ! 292 ! C.Y. !AGGREGATE 'BASE CLASS 2 1 , 0 . 00
25 . 00 ! 7, 30
0 . 00
7 ! 1, 435 ! L.F. !CURB AND GUTTER ! 10 . 00 ! 14 , 350 . 00
-------------------------- ---- ---- -- --------------- ------- ----- l -- --- -- - -- - -
SUB-TOTAL ! 73 , 945 . 00
CONTINGENCIES ! 4 , 055 . 00
TOTAL CONSTRUCTION COST ! 78 , 000 . 00
------ --- ------ - ---------- - -- - -- - ------ ------ ------- ---- ------- -- -- --------
8 ! ! !DESIGN
! 96 ! HRS . !ASSISTANT ENGINEER ! 70 . 62 ! 6, 779 . 52
! 10 ! HRS . !SENIOR ENGINEER . ! 92 . 00 ! 920 . 00
! 1 ! L. S . !MISC. ! 300 . 48 ! 300 . 48
--- ! ----------------------- ---- -- --
------------------ --- -------- ----------- -
TOTAL DESIGN COST ! 8 , 000 . 00
----------------------------------•------------------------------------------
TOTAL DESIGN AND CONSTRUCTION COST ! $86, 000 . 00
r
BY A. E .
COWTY OF RIVERSIDE
NT B TIVISPORTATION DEPARTMENT
ATACHME
Page 2 NT 14 PRELIMINARY ESTIMATE OF COST
SHEET 1 of 1
PROJECT: INDIAN CANYON AVE. (P2) W.O. # A5-7046
FROM RACQUET CLUB
TO ROCHELLE
CITY OF PALM SPRINGS
DATE MAY 8, 1995
-------------------------------------------------------------------------- --
NO. QUANTITY UNIT PRICE AMOUNT
----------------------------------------------------------------------------
1 ! 1 ! L.S . ! CLEARING AND GRUBBING ! 500 . 00 ! 500 . 00
2 ! 1 ! L.S . !FURNISHING & APPLYING WATER ! 200 . 00 ! 200 . 00
3 ! 106 ! C.Y. !ROADWAY EXCAVATION ! 15 . 00 ! 1, 590 . 00
4 ! 1 ! L.S. ! FINISHING ROADWAY ! 200 . 00 ! 200 . 00
5 ! 52 ! TON !ASPHALT CONCRETE TYPE B ! 40 . 00 ! 2, 080 . 00
6 ! 53 ! C.Y. !AGGREGATE BASE CLASS 2 ! 25 . 00 ! 1, 325 . 00
7 ! 260 ! L.F. !CURB AND GUTTER ! 10 . 00 ! 2 , 600 . 00
---------------------------------- - ---------------------------- ! ----- -------
SUB-TOTAL ! 8, 495 . 00
CONTINGENCIES ! 505 . 00
TOTAL CONSTRUCTION COST ! 9, 000 . 00
i
------------------------------- -- ------------------ ------ ------ ----- -------
8 !• ! !DESIGN
! 24 ! HRS . !ASSISTANT ENGINEER ! 70 . 62 ! 1, 694 . 88
! 2 ! HRS . !SENIOR ENGINEER ! 92 . 00 ! 184 . 00
! 1 ! L. S . !MISC. ! 121 . 12 ! 121 . 12
--- ! ----------------------------- ------------------------------ ------------
TOTAL DESIGN COST ! 2 , 000 . 00
--------------------------------- -------------------------------------------
TOTAL DESIGN AND CONSTRUCTION COST ! $11, 000 . 00
.r
BY A. E .
C TY OF RIVERSIDE
ATTACHMENT B TlW3PORTATION DEPARTMENT
Page 3 of 14 PRELIMINARY ESTIMATE OF COST
SHEET 1 of 1
W.O. # A5-7046
PROJECT: INDIAN CANYON AVE.. (P3)
FROM SAN RAFAEL
TO TRAMVIEW
CITY OF PALM SPRINGS
DATE MAY 8, 1995
--------------------------------- --------------------------------------- ----
NO. QUANTITY UNIT PRICE AMOUNT
--------------------------- --------------------------------------------------
1 ! 1 ! L.S. !CLEARING AND GRUBBING !
3 , 000 . 00 !
3 , 000 . 00
2 ! 1 ! L.S . ! FURNISHING & APPLYING WATER ! 1, 000 . 00 ! 1, 000 . 00
3 ! 836 ! C.Y. !ROADWAY EXCAVATION ! 15 . 00 ! 12, 540 . 00
4 ! 1 ! L.S . ! FINISHING ROADWAY ! 1, 000 . 00 ! 1, 000 . 00
5 ! 310 ! TON !ASPHALT CONCRETE TYPE B ! 40 . 00 ! 12 , 400 . 00
6 ! 314 ! C.Y. !AGGREGATE BASE CLASS 2 ! 25 . 00 ! 7, 850 . 00
7 ! 2, 820 ! L.F. !CURB AND GUTTER ! 10 . 00 ! 28 , 200 . 00
------------------------------------------ ----- ------ ---------- ! ------ ------
SUB-TOTAL ! 65, 990 . 00
CONTINGENCIES ! 3 , 010 . 00
TOTAL CONSTRUCTION COST ! 69 , 000 . 00
i
---- ---- ----------- ---- -- ------------------------- ------------- --- -- - ----- -
t! ! !DESIGN
! 172 ! HRS . !ASSISTANT ENGINEER ! 70 . 62 ! 12 , 146 . 64
! 18 ! HRS. !SENIOR ENGINEER ! 92 . 00 ! 1, 6S6 . 00
! 1 ! L. S . !MISC. ! 197 . 36 ! 197 . 36
--- ! ------ ------------------------------------- ----- ----------- ' ----------- -
TOTAL DESIGN COST ! 14 , 000 . 00
----------------------------------------------------------------------------
TOTAL DESIGN AND CONSTRUCTION COST ! $83 , 000 . 00
BY A. E .
1NTY OF RIVERSIDE
ATTACHMENT B * 7SPORTATION DEPARTMENT •
Page 4 of 14 PRELIMINARY ESTIMATE OF COST
SHEET 1 of 1
W.O. # AS-7046
PROJECT: FRANCIS STREET (P4)
FROM STARR STREET
TO EXISTING IMPROVEMENT TO EAST
CITY OF PALM SPRINGS
DATE MAY 8 , 1995
----------------------------------------------------------------------------
NO. QUANTITY UNIT PRICE AMOUNT
-----------------------------------------------------------------------------
1 ! 1 ! L.S . !CLEARING AND GRUBBING ! 2, 000 . 00 ! 2 , 000 . 00
2 ! 1 ! L.S . !FURNISHING & APPLYING WATER ! 500 . 00 ! 500 . 00
3 ! 652 ! C.Y. !ROADWAY EXCAVATION ! 15 . 00 ! 9 , 780 . 00
4 ! 1 ! L.S . ! FINISHING ROADWAY ! 500 . 00 ! 500 . 00
5 ! 292 ! TON !ASPHALT CONCRETE TYPE B ! 40 . 00 ! 11, 680 . 00
6 ! 296 ! C.Y. !AGGREGATE BASE CLASS 2 ! 25 . 00 ! 7, 400 . 00
7 ! 800 ! L.F. !CURB AND GUTTER ! !
10 . 00 8 , 000 . 00
-- ------
SUB-TOTAL ! 39, 860 . 00
CONTINGENCIES ! 2 , 140 . 00
TOTAL CONSTRUCTION COST ! 42, 000 . 00
--------------------- --------- - -- -- ---- - ---- ------------------- ------------
8 ! ! !DESIGN
! 80 ! HRS . !ASSISTANT ENGINEER ! 70 . 62 ! 5 , 649 . 60
! 8 ! HRS .. !SENIOR ENGINEER ! 92 . 00 ! 736 . 00
! 1 ! L. S . !MISC. ! 114 . 40 ! 114 . 40
--- ! ----------------------------------------------------------- ! -------- ----
TOTAL DESIGN COST ! 6, 500 . 00
------------------------------------------------------------------------- ---
TOTAL DESIGN AND CONSTRUCTION COST ! $48 , 500 . 00
BY A. E .
C TY OF RIVERSIDE
ATTACHMENT B TWSPORTATION DEPARTMENT
Page 5 of 14 PRELIMINAR.Y ESTIMATE OF COST
SHEET , 1 of 1
W,O. # A5-7046
PROJECT: FRANCIS STREET (PS)
FROM SUNRISE STREET
TO PASEO DE ANZA
CITY OF PALM SPRINGS
DATE MAY 8 , 1995
----------------------------------------------------------------------------
NO. QUANTITY UNIT PRICE AMOUNT
----------------------------------------------------------------------------
1 ! 1 ! L.S. !CLEARING AND GRUBBING ! 1, 500 . 00 ! 1, 500 . 00
2 ! 1 ! L.S. ! FURNISHING & APPLYING WATER ! 500 . 00 ! 500 . 00
3 ! 467 ! C.Y. !ROADWAY EXCAVATION ! 15 . 00 ! 7, 005 . 00
4 ! 1 ! L.S . !FINISHING ROADWAY ! 500 . 00 ! 500 . 00
5 ! 205 ! TON !ASPHALT CONCRETE TYPE B ! 40 . 00 ! 8 , 200 . 00
6 ! 208 ! C.Y. !AGGREGATE BASE CLASS 2 ! 25 . 00 ! 5 , 200 . 00
7 ! 700 ! L. F. !CURB AND GUTTER ! 10 . 00 ! 7, 000 . 00
------------------------------------------------------------ --- ' ------------
SUB-TOTAL ! 29 , ?05 . 00
CONTINGENCIES ! 1, 595 . 00
TOTAL CONSTRUCTION COST ! 31, 500 . 00
--- --------- --- ------------ ------------- ------ ------ -- --------- ------- -----
8 ! ! !DESIGN
! 80 ! HRS . !ASSISTANT ENGINEER ! 70 . 62 ! 5 , 649 . 60
! 8 ! HRS . ! SENIOR ENGINEER ! 92 . 00 ! 7.36 . 00
! 1 ! L.S . !MISC. ! 114 . 401 114 .40
--- ! ------ --- -------------------------------------------------- ' ----- --------
TOT.AL DESIGN COST ! 6 , 500 . 00
----------------------- -----------------------------------------------------
TOTAL DESIGN AND CONSTRUCTION COST ! $38 , 000 . 00
BY A.E .
COUNTY OF RIVERSIDE
TIOTSPORTATION DEPARTMENT
ATTACHMENT B P ,ijIMINARY ESTIMATE OF COST
•
Page 6 of 14 SHEET 1 of 1
PROJECT: RACQUET CLUB DRIVE (P6) W.O. # A5-7046
FROM SUNRISE STREET
TO PASEO DE ANZA
CITY OF PALM SPRINGS
DATE MAY 8 , 1995
----------------------------------------------------------------------------
NO. QUANTITY UNIT PRICE AMOUNT
----------------------------------------------------------------------------
1 ! 1 ! L.S. !CLEARING AND GRUBBING ! 1, 500 . 00 ! 1, 500 . 00
2 ! 1 ! L.S . !FURNISHING & APPLYING WATER ! 500 . 00 ! 500 . 00
3 ! 433 ! C.Y. !ROADWAY EXCAVATION ! 15 . 00 ! 6, 495 . 00
4 ! 1 ! L.S . !FINISHING ROADWAY ! 500 . 00 ! 500 . 00
5 ! 202 ! TON !ASPHALT CONCRETE TYPE B ! 40 . 00 ! 8 , 080 . 00
6 ! 205 ! C.Y. !AGGREGATE BASE CLASS 2 ! 25 . 00 ! 5 , 125 . 00
7 ! 650 ! L. F. !CURB AND GUTTER ! 10 . 00 ! 6, 500 . 00
--------------------------------------------------------------- ! ----- -------
SUB-TOTAL ! 28 , 700 . 00
CONTINGENCIES ! 1, 300 . 00
TOTAL CONSTRUCTION COST ! 30 , 000 . 00
i
--------- ------ --- --------------- ------------ ------------- - ---- ------------
8 ! ! !DESIGN i
! 80 ! HRS . !ASSISTANT ENGINEER ! 70 . 62 ! 5 , 649 . 60
! . 8 ! HRS. !SENIOR ENGINEER . ! 92 . 00 ! 736 . 00
! 1 ! L.S . !MISC. ! 114 . 401 114 . 40
' --- ! - - -- -------------------- -------------------- --------------- ------------
TOTAL DESIGN COST ! 6, 500 . 00
----------------------------------------------------------------------------
TOTAL DESIGN AND CONSTRUCTION COST ! $36, 500 . 00
BY A. E.
CO TY OF RIVERSIDE
ATTACHMENT B TIWSPORTATION DEPARTMENT •
PRELIMINARY ESTIMATE OF COST
Page 7 of 14 SHEET 1 of 1
PROJECT: VISTA CHINO ROAD (P7) W.O. # A5-7046
FROM 1111 VISTA CHINO
TO 1695 DE AN.ZA
CITY OF PALM SPRINGS
DATE MAY 8 , 1993
----------------------------------------------------------------------------
NO. QUANTITY UNIT PRICE AMOUNT
----------------------------------------------------------------------------
1 ! 1 ! L.S . !CLEARING AND GRUBBING ! !
1, 000 . 00 1, 000 . 00
2 ! 1 ! L.S . !FURNISHING & APPLYING WATER ! 500 . 00 ! 500 . 00
3 ! 248 ! C.Y. !ROADWAY EXCAVATION ! 15 . 00 ! 3 , 720 . 00
4 ! 1 ! L.S . !FINISHING ROADWAY ! 500 . 00 ! 500 . 00
5 ! 110 ! TON !ASPHALT CONCRETE TYPE B ! 40 . 00 ! 4 , 400 . 00
6 ! 112 ! C.Y. !AGGREGATE BASE CLASS 2 ! 25 . 00 ! 2, 800 . 00
7 ! 670 ! L. F. !CURB AND GUTTER ! 10 . 00 ! 6, 700 . 00
----------------------------------------------------- ---------- - ------ ------
SUB-TOTAL ! 19, 620 . 00
CONTINGENCIES ! 880 . 00
TOTAL CONSTRUCTION COST ! 20 , 500 . 00
------ ------- ---- - ----------------------------- ------ ----------- -------- ----
8 ! ! !DESIGN
! 48 ! HRS . !ASSISTANT ENGINEER ! 70 . 62 ! 3 , 389 . 76
! 4 ! HRS . !SENIOR ENGINEER ! 92 . 00 ! 368 . 00
! 1 ! L. S . !MISC. ! 242 . 241 242 . 24
--- ------ ----- - ------------------ -------------------------- --- ' --- - --------
TOTAL DESIGN COST ! 4 , 000 . 00
----------------------------------•------------------------------------------
TOTAL DESIGN AND CONSTRUCTION COST ! $24 , 500 . 00
BY A. E .
C TY OF RIVERSIDE
ATTACHMENT B TRWSPORTATION DEPARTMENT to
Page 8 of 14 PRELIMINARY ESTIMATE OF COST
SHEET 1 of 1
W.O. # AS-7046
PROJECT: SUNRISE WAY (P8)
FROM FRANCIS
TO DESERT PARK EAST
CITY OF PALM SPRINGS
DATE MAY 8 , 1995
----------------------------------------------------------------------------
NO. QUANTITY UNIT PRICE AMOUNT
--------------------------------- -------------------------------------------
1 ! 1 ! L.S . !CLEARING AND GRUBBING ! 8 , 000 . 00 ! 8 , 000 . 00
2 ! 1 ! L.S . !FURNISHING & APPLYING WATER ! 5, 000 . 00 ! 5 , 000 . 00
3 ! 4, 722 ! C.Y. !ROADWAY EXCAVATION ! 15 . 00 ! 70 , 830 . 00
4 ! 1 ! L.S . ! FINISHING ROADWAY ! 5,.000 . 00 ! 5, 000 . 00
5 ! 2, 190 ! TON !ASPHALT CONCRETE TYPE B ! 40 . 00 ! 87, 600 . 00
6 ! 2, 222 ! C.Y. !AGGREGATE BASE CLASS 2 ! 25 . 00 ! 55, 550 . 00
7 ! 3 , 750 ! L. F. !CURB AND GUTTER ! 10 . 00 ! 37 , 500 . 00
------------------------------------------------ ---------------- ' ------------
SUB-TOTAL ! 269 , 480 . 00
CONTINGENCIES ! 12 , 520 . 00
TOTAL CONSTRUCTION COST ! 282 , 000 . 00
-------- - ------- --- --- ----- - ---- ---------- ----- ----- ------------ ' ------------
8 ! ! !DESIGN
! 240 ! HRS . !ASSOCIATE ENGINEER ! 81 . 00 ! 19, 440 . 00
! 24 ! HRS . ! SENIOR ENGINEER ! 92 . 00 ! 2 , 208 . 00
! 1 ! L.S . !MISC. ! 352 . 00 ! 352 . 00
--- ! ------------------------------------------------------------ ' ------------
TOTAL DESIGN COST ! 22, 000 . 00
-----------------------------------------------------------------------------
TOTAL DESIGN AND CONSTRUCTION COST ! $304 , 000 . 00
BY A.E .
COUNTY OF .RIVERSIDE
T'99PORTATION DEPARTMENT 0
ATTACHMENT Z. IMINARY ESTIMATE OF COST
Page 9 of 14 PR SHEET 1 of 1
W.O. # AS-7046
PROJECT: GOLF CLUB DRIVE (:P9)
FROM MESQUITE
TO SKY POINT DRIVE
CITY OF PALM SPRINGS
DATE MAY 8, 1995
--------------------------------- -------------------------------------------
NO. QUANTITY UNIT PRICE AMOUNT
--------------------------------- -------- -----------------------------------
1 ! 1 ! L.S . !CLEARING AND GRUBBING ! 4, 000 . 00 ! 4, 000 . 00
2 ! 1 ! L.S. !FURNISHING & APPLYING WATER ! 1, 500 . 00 ! 1, 500 . 00
3 ! 1, 505 ! C.Y. !ROADWAY EXCAVATION ! 15 . 00 ! 22 , 575 . 00
4 ! 1 ! L.S . ! FINISHING ROADWAY ! 1, 000 . 00 ! 1, 000 . 00
5 ! 671 ! TON !ASPHALT CONCRETE TYPE B ! 40 . 00 ! 26 , 840 . 00
6 ! 681 ! C.Y. !AGGREGATE 13ASE CLASS 2 ! 25 . 00 ! 17, 025 . 00
7 ! 1, 936 ! L. F. ! CURB AND GUTTER ! 10 . 00 ! 19 , 360 . 00
---------------------------------------------------------------- --- -- -------
SUB-TOTAL ! 92 , 300 . 00
CONTINGENCIES ! 4, 700 . 00
TOTAL CONSTRUCTION COST ! 97, 000 . 00
i
----------- ------ ----- ------ ------•------------------- ----- ----- ------------
8 ! ! !DESIGN
! 164 ! HRS . !ASSOCIATE ENGINEER ! 81 . 00 ! 13 , 284 . 00
! 16 ! HRS . !SENIOR ENGINEER ! 92 . 00 ! 1, 472 . 00
! 1 ! L. S . !MISC. ! 244 . 00 ! 244 . 00
-
-- ! ---- -------------------- ---- -- ----------------------------- I --- ---------
TOTAL DESIGN COST ! 15 , 000 . 00
---------------------------------- ---------------------------------- --------
TOTAL DESIGN AND CONSTRUCTION COST ! $112 , 000 .
BY A.E .
q@kWTY OF RIVERSIDE
ATTACHMENT B TW ISPORTATION DEPARTMENT •
Page 10 of 14 PRELIMINARY ESTIMATE OF COST
SHEET 1 of 1
PROJECT: GOLF CLUB DRIVE (P10) W.O. # AS-7046
FROM MESQUITE
TO AVE. 34
CITY OF PALM SPRINGS
DATE MAY 8, 1995
----------------------------------------------------------------------------
NO. QUANTITY UNIT PRICE AMOUNT
----------------------------------------------------------------------------
1 ! 1 ! L.S . !CLEARING AND GRUBBING ! 3 , 500 . 00 ! 3 , 500 . 00
2 ! 1 ! L.S . !FURNISHING & APPLYING WATER ! 1, 500 . 00 ! 1, 500 . 00
3 ! 1, 814 ! C.Y. !ROADWAY EXCAVATION ! 15 . 00 ! 27, 210 . 00
4 ! 1 ! L.S . !FINISHING ROADWAY
1, 000 . 00 1, 000 . 00
5 ! 838 ! TON !ASPHALT CONCRETE TYPE B ! 40 . 00 ! 33 , 520 . 00
6 ! 850 ! C.Y. !AGGREGATE BASE CLASS 2 ! 25 . 00 !
7 ! 1, 530 ! L. F. !CURB AND GUTTER 10 . 00 ! 15, 300 . 00
0 . 00
---------
SUB-TOTAL ! 103 , 280 . 00
CONTINGENCIES ! 5, 220 . 00
TOTAL CONSTRUCTION COST ! 108 , 500 . 00
i
------ - --- - -- ----------- ----------------------- --- ------------- --- - ------ - -
8 ! ! !DESIGN ! !
! 128 ! HRS . !ASSOCIATE ENGINEER ! 81 . 001 10, 368 . 00
! 12 ! HRS . !SENIOR ENGINEER ! 92 . 00 ! 1, 104 . 00
! 1 ! L. S . !MISC. ! 528 . 00 ! 528 . 00
--- ' -- ------------- --- ------ ------------ ---------- ---- - -------- ------- -----
TOT.AL DESIGN COST ! 12, 000 . 00
----------------------------------------------------------------------------
TOTAL DESIGN AND CONSTRUCTION COST ! $120 , 500 . 00
BY A. E .
CWTY OF RIVERSIDE
ATTACHMENT B Tl! 'SPORTATION DEPARTMENT •
Page 11 of 14 PRELIMINAR,Y ESTIMATE OF COST
SHEET 1 of 1
PROJECT: INDIAN CANYON AVE. (P11) W.O.# AS-7046
FROM 6950 N. INDIAN DR.
TO 1000, SOUTH
CITY OF PALM SPRINGS
DATE MAY 8 , 1995
----------------------------------------------------------------------------
NO. QUANTITY UNIT PRICE AMOUNT
----------------------------------------------------------------------------
1 ! 1 ! L.S . !CLEARING AND GRUBBING ! 2 , 000 . 00 ! 2 , 000 . 00
2 ! 1 ! L.S . !FURNISHING & APPLYING WATER ! 11000 . 00 ! 1, 000 . 00
3 ! 889 ! C.Y. !ROADWAY EXCAVATION ! 15 . 00 ! 13 , 335 . 00
4 ! 1 ! L.S . !FINISHING ROADWAY ! 11000 . 00 ! 1, 000 . 00
5 ! 417 ! TON !ASPHALT CONCRETE TYPE B ! !
40 . 00 16, 680 . 00
6 ! 408 ! C.Y. !AGGREGATE BASE CLASS 2 ! 25 . 00 !
7 ! 1, 000 ! L. F. !CURB AND GUTTER 10 . 00 ! 10 , 000 . 00
10 , 000 . 00
8 ! 1 ! EA. !DRIVEWAY APPROACH ! 350 . 00 ! 350 . 00
--------------------------------------------------------------- ! -------- -- --
SUB-TOTAL ! 54 , 565 . 00
CONTINGENCIES ! 2 , 935 . 00
TOTAL CONSTRUCTION COST ! 57, 500 . 00
i
--------------------------------------------------------------- ------ ------
3 ! ! !DESIGN ! !
! 80 ! HRS . !ASSISTANT ENGINEER ! 70 . 62 ! 5 , 649 . 60
! 8 ! HRS . !SENIOR ENGINEER ! 92 . 00 ! 736 . 00
! 1 ! L.S . !MISC. ! 114 . 40 ! 114 . 40
--- ! ------------------------ ----------------------------------- ' ------------
TOTAL DESIGN COST ! 6 , 500 . 00
--------------------------------- ---------------- --------------- -----------
TOTAL DESIGN AND CONSTRUCTION COST ! $64 , 000 . 00
BY A.E.
ATTACHMtNT B C TNTY OF RIVERSIDE
Page 12 of 14 T SPORTATION DEPARTMENT .
PRELIMINARY ESTIMATE OF COST
SHEET 1 of 1
PROJECT: RAMON ROAD (P12) W.O.# AS-7046
FROM GOLF CLUB DRIVE
TO EASTERLY TO BRIDGE
CITY OF PALM SPRINGS
DATE MAY 8 , 1995
----------------------------------------------------------------------------
NO. QUANTITY UNIT PRICE AMOUNT
----------------------------------------------------------------------------
1 ! 1 ! L.S. !CLEARING AND GRUBBING ! 3, 000 . 00 ! 3 , 000 . 00
2 ! 1 ! L.S . !FURNISHING & APPLYING WATER ! 1, 500 . 00 ! 1, 500 . 00
3 ! 1, 149 ! C.Y. !ROADWAY EXCAVATION ! 15 . 00 ! 17, 235 . 00
4 ! 1 ! L.S . !FINISHING ROADWAY ! 1, 000 . 00 ! 1, 000 . 00
5 ! 526 ! TON !ASPHALT CONCRETE TYPE B ! 40 . 00 ! 21, 040 . 00
6 ! 534 ! C.Y. !AGGREGATE BASE CLASS 2 ! 25 . 00 ! 13 , 350 . 00
7 ! 2, 215 ! L. F. !CURB AND GUTTER ! 10 . 00 ! 22 , 150 . 00
----------------------------- ---------------------------------- ' --------- ---
SUB-TOTAL ! 79 , 275 . 00
CONTINGENCIES ! 3 , 725 . 00
TOTAL CONSTRUCTION COST ! 83 , 000 . 00
i
------- ----------------------- ------------ -------- -------- -- - -- ------------
8 ! ! !DESIGN i
! 160 ! HRS . !ASSOCIATE ENGINEER ! 81 . 00 ! 12 , 960 . 00
! 16 ! HRS . !SENIOR ENGINEER ! 92 . 00 ! 1, 472 . 00
! 1 ! L.S . !MISC. ! 568 . 00 ! 568 . 00
--- ! ----------------------------------------------------------- ! - -- ---------
TOTAL DESIGN COST ! 15 , 000 . 00
------------------------------------------------------------------- ---------
TOTAL DESIGN AND CONSTRUCTION COST ! $98 , 000 . 00
BY A.E.
ATTACHNiENT B CO TY OF RIVERSIDE
T3PORTATION DEPARTMENT
Page 13 of 14 PR .I IMINARY ESTIMATE OF COST•
SHEET 1 of 1
PROJECT: MIRALESTE STREET (P13 ) W.O. # A5-7046
SOUTH OF FRANCIS STREET
CITY OF PALM SPRINGS
DATE MAY 8, 1995
----------------------------------------------------------------------------
NO. QUANTITY UNIT PRICE AMOUNT
----------------------------------------------------------------------------
1 ! 1 ! L.S. !CLEARING AND GRUBBING ! 600 . 00 ! 600 . 00
2 ! 1 ! L.S . !FURNISHING & APPLYING WATER ! 300 . 00 ! 300 . 00
3 ! ill ! C.Y. !ROADWAY EXCAVATION ! 15 . 00 ! 1, 665 . 00
4 ! 1 ! L.S . ! FINISHING ROADWAY ! 300 . 00 ! 300 . 00
5 ! 42 ! TON !ASPHALT CONCRETE TYPE B ! 40 . 00 ! 1, 680 . 00
6 ! 42 ! C.Y. !AGGREGATE BASE CLASS 2 ! !25 . 00 1, 050 . 00
7 ! 500 ! L.F. ! CURB AND GUTTER ! 10 . 00 ! 5 , 000 . 00
- --------------------------------- ------------------------------ ! --------- ---
SUB-TOTAL ! 10, 595 . 00
CONTINGENCIES ! 405 . 00
TOTAL CONSTRUCTION COST ! 11, 000 . 00
i
------------------------------- - - ------------------------------ ! -- ---- ---- --
8 ! ! !DESIGN i
! 24 ! HRS . !ASSISTANT !'ENGINEER ! 70 . 62 ! 1, 694 . 88
! 2 ! HRS . !SENIOR ENGINEER ! 92 . 00 ! 184 . 00
! 1 ! L.S . !MISC. ! 121 . 12 ! 121 . 12
-
-- ! ----------------------------- ------------------ ----------- --------- ---
TOTAL DESIGN COST ! 2 , 000 . 00
---------------------------------••------------------------------------------
TOTAL DESIGN AND CONSTRUCTION COST ! $13 , 000 . 00
BY A.E .
CO Y OF RIVERSIDE
ATTACHMENT B TR�PORTATION DEPARTMENT
PRELIMINARY• ESTIMATE OF COST
Page 14 of 14 SHEET 1 of 1
W.O.# A5-7046
PROJECT: BUS TURNOUT
CITY OF PALM SPRINGS
DATE MAY 8, 1995
----------------------------------------------------------------------------
NO. QUANTITY UNIT PRICE AMOUNT
----------------------------------------------------------------------------
1 ! 1 ! L.S. !CLEARING AND GRUBBING ! $400 . 00 ! 400 . 00
2 ! 1, 200 ! S.F. !PCC PAVEMENT ! 6 . 00 ! 7, 200 . 00
3 ! 45 ! C.Y. !ROADWAY EXCAVATION ! 15 . 00 ! 675 . 00
4 ! 1, 700 ! S .F. !SIDEWALK ! 4 . 00 ! 6, 800 . 00
5 ! 170 ! L.F. !CURB AND GUTTER ! 10 . 00 ! 1, 700 . 00
--------------------------------------------------------------- ! ------------
SUB TOTAL ! 16, 775 . 00
CONTINGENCIES ! 225 . 00
TOTAL CONSTRUCTION COST ! $17, 000 . 00
FOR EACH BUS TURNOUT !
------------------------------------------------------------------------
BY A.E.
Attachment C
RIVERSIDE COUNTY TRANSPORTATION DEPARTMENT
1995/1996 RATE SCHED +
POSITION LEVEL HOURLY RATE
Senior Civil Engineer 85.08
Associate Civil Engineer 74.42
Assistant Engineer 63 .38
Chief of Construction Inspection 74.82
Principal Construction Inspector 65.09
Senior Transportation Planner 63 .38
Associate Transportation Planner 55.14
Supervising Land Surveyor 80.94
Senior Land Surveyor 70.80
Survey Party Chief 56.56
Principal Survey Technician 47.38
Survey Instrument Technician 45.16
Survey Technician 38.25
j
• 1
CITY OF PALM SPRINGS
PM_10 PROJECTS SCHEDULE
Survey Campleled=->
NUMBER OF MONTHS
1 2 3 4 5 6 7 8 9 10 1 11 1 12 1 13 14 15 1 16 17 18
NO. ITEMS
1 Prelimina Plans
2 City Review
3 Final Plans "
'OR NOTICE TO PROCEED WHICHEVER COMES LAST ATTACHMENT"D"