HomeMy WebLinkAbout5/15/2002 - STAFF REPORTS (3) DATE: May 15, 2002
TO: Community Redevelopment Agency
FROM: Director of Public Works/City Engineer
TAHQUITZ CANYON WAY LIGHTING SYSTEM
RECOMMENDATION:
It is recommended that the Community Redevelopment Agency approve one of two
options:
Option One: Award contract to Cora Constructors, for Bid Schedule A only, in the
amount of$101,249.00,forthe Tahquitz Canyon Way Lighting System, City Project
00-36.
Option Two: Approve a budget amendment transferring agency fund reserves into
a capital project account; and, award contract to Cora Constructors, for Bid
Schedules A and B, in the amount of $188,512.00, for the Tahquitz Canyon Way
Lighting System, City Project 00-36.
SUMMARY:
Award of this contract will construct an underground electrical system for street and
pedestrian walkway lighting along both sides of Tahquitz Canyon Way. If Option
One is approved, only the first phase of the electrical system will be installed from
Indian Canyon Drive to Calle El Segundo. If Option Two is approved, the entire
system will be installed from Indian Canyon Drive to Avenida Caballeros. This
project is a budgeted Community Redevelopment Agency capital project.
BACKGROUND:
Last year, the Downtown Development Director proposed a street and pedestrian
walkway lighting beautification project for Tahquitz Canyon Way. The concept
involves installation of an underground electrical system to service decorative lights
along both sides of Tahquitz: Canyon Way between Indian Canyon Drive and
Avenida Caballeros. The actual decorative pedestrian and street lights will be
installed at a future date as adjacent property owners contribute and participate in
the program. With the Community Redevelopment Agency's approval on May 16,
2001,staff obtained professional engineering design services from Dahl,Taylor and
Associates, to prepare plans and specifications for construction of the "backbone"
system to service future installation of the decorative lights by others.
On April 3, 2002,the Agency approved and adopted the plans and specifications for
this project, and authorized advertisement for construction bids. The project
consisted of two Bid Schedules, Bid Schedule A represents the installation of the
electrical system from Indian Canyon Drive to Calle El Segundo, and Bid Schedule
B represents the installation of the electrical system from Calle El Segundo to
Avenida Caballeros.
elk �.
Tahquitz Canyon Way Lighting System
May 15, 2002
Page 2
The Agency has been given two recommendations. Because the use of this
electrical system is dependent upon the participation of the adjacent property
owners, it may be some time before the Agency sees decorative pedestrian and
street lights installed onto the foundations constructed with this project. In the
meantime, and for safety purposes, this project will install 30" high aluminum
bollards. These will be removed at the time the lights are installed in the future.
At this time, the Downtown Development Director has commitments from a majority
of the adjacent property owners in Phase One of this project (Indian Canyon Drive
to Calle El Segundo) to purchase and install the decorative lights. However, there
is little commitment from property owners in Phase Two. The decision to make at
this time is whetherto construct the entire system,thereby potentially saving Agency
funds by avoiding higher construction costs in the future when Phase Two of the
project is re-bid; or, to only construct Phase One of the system to avoid having a
majority of the system installed, but unused to its full advantage.
On April 12 and 19, 2002, the project was advertised for bids, and at 3:00 P.M. on
April 30, 2002, the Department of Procurement and Contracting received bids from
the following contractors:
Contractor Schedule A Schedule B Total
1. Cora Constructors; $101,249.00 $87,263.00 $188,512.00
Palm Desert, CA
2. DBX, Inc.; $103,950.00 $93,800.00 $197,750.00
Temecula, CA
3. HMS Construction, Inc.; $106,029.50 $97,437.50 $203,467.00
San Marcos, CA
The Engineer's estimate was $106,825 for Bid Schedule A; and $97,100 for Bid
Schedule B,for a total estimate of$203,925. The low bidder is Cora Constructors, from
Palm Desert, California. The company is an individual (sole proprietor) and its owner
is Dennis Stockton.
If Option Two is approved by the Agency, it will be necessary to approve a budget
amendment to transfer$90,000from Agency fund reserves into a capital project account
for this project. Upon approval of the Budget Resolution, sufficient funds will be
available in 812-8192-65130 (E Tahquitz Light Fixtures).
DAVID J. BARAKIAN JO S. RPY , OND
Director of Public Works/City Engineer �Dijr2cior of C�dmmunity & Economic
Development
APPROVED:
Executive Director
REVIEWED BY DEPT. OF FINANCE
ATTACHMENTS:
1. Resolution (Option One); Budget Resolution; Resolution (Option Two)
ew& 42s
RESOLUTION NO.
OF THE COMMUNITY REDEVELOPMENT AGENCY OF
THE CITY OF PALM SPRINGS AWARDING CONTRACT TO
CORA CONSTRUCTORS, FOR BID SCHEDULE A ONLY,
IN THE AMOUNT OF $101,249.00, FOR THE TAHQUITZ
CANYON WAY LIGHTING SYSTEM,CITY PROJECT 00-36
BE IT RESOLVED BY THE COMMUNITY REDEVELOPMENTAGENCY of the City of Palm
Springs,that a construction contract with Cora Constructors,for Bid Schedule A only, in the
amount of$101,249.00, for the Tahquitz Canyon Way Lighting System, City Project 00-36,
is hereby awarded.
ADOPTED this day of , 2002.
AYES:
NOES:
ABSENT:
ATTEST: COMMUNITY REDEVELOPMENT
AGENCY OF THE CITY OF PALM
SPRINGS, CALIFORNIA
By:
Assistant Secretary Executive Director
REVIEWED AND APPROVED AS TO FORM:
CQA C -- �-
RESOLUTION NO.
OF THE COMMUNITY REDEVELOPMENT AGENCY OF
THE CITY OF PALM SPRINGSAWARDING CONTRACTTO
CORA CONSTRUCTORS,FOR BID SCHEDULES AAND B,
IN THE AMOUNT OF: $188,512.00, FOR THE TAHQUITZ
CANYON WAY LIGHTING SYSTEM,CITY PROJECT 00-36
BE IT RESOLVED BY THE COMMUNITY REDEVELOPMENT AGENCY of the City of Palm
Springs, that a construction contract with Cora Constructors, for Bid Schedules A and B, in the
amount of $188,512.00, for the Tahquitz Canyon Way Lighting System, City Project 00-36, is
hereby awarded.
ADOPTED this day of 2002.
AYES:
NOES:
ABSENT:
ATTEST: COMMUNITY REDEVELOPMENTAGENCY
OF THE CITY OF PALM SPRINGS,
CALIFORNIA
By:
Assistant Secretary Executive Director
REVIEWED AND APPROVED AS TO FORM:
RESOLUTION NO.
OF THE CITY COUNCIL OF THE CITY OF PALM SPRINGS,
CALIFORNIA,AMENDING THE BUDGET FOR THE 2001-02
FISCAL YEAR.
WHEREAS Resolution 20062 approving the budget for the fiscal year2001-02 was adopted
on June 6, 2001; and
WHEREAS the City Manager has recommended, and the City Council desires to approve,
certain amendments to said budget;
NOW THEREFORE BE IT RESOLVED that the Director of Finance is authorized to record
inter-fund cash transfers as required in accordance with this Resolution, and that Resolution
20062, adopting the budget for the 2001-02 fiscal year is hereby amended as follows:
SECTION 1. ADDITIONS
Fund Activity Account Amount
812 8192 65130 $90,000
Merged Area #2 Capital &Admin E Tahquitz Light
Area #2 Fixtures
Purpose The Agency fund reserves will be allocated into a capital project account thatwill be
used to fund the construction of an electrical system for pedestrian and street lights along
Tahquitz Canyon Way, from Indian Canyon Drive to Avenida Caballeros.
SECTION 2. SOURCE
FUND Activity Account Amount
812 29301 $90,000
Fund Balance
Adopted this day of , 2001.
AYES:
NOES:
ABSENT:
ATTEST: CITY OF PALM SPRINGS, CALIFORNIA
By _
City Clerk City Manager
REVIEWED AND APPROVED
CkA & go d