DATE: May 15, 2002
TO: City Council
FROM: Director of Public Works/City Engineer
1999/2000 PM-10 CONTROL MEASURE PAVING PROJECT
RECOMMENDATION:
It is recommended that the City Council award contract to Contreras Construction
Co., for Bid Schedules A and B, in the amount of $162,730.00, for the 1999/2000
PM-10 Control Measure Paving Project, City Project 99-21.
SUMMARY:
Award of this contract will provide for the construction of interim street improvements
on Indian Canyon Drive from San Marco Way to San Rafael Drive, including 4 foot
pavement widening with asphalt berm on the adjacent dirt shoulder; and
construction of ultimate street improvements, including pavement widening,
construction of curb, gutter, sidewalk, and a concrete bus turn-out on Vista Chino
adjacent to the vacant City-owned parcel north of the Vista Serena senior housing
project.
BACKGROUND:
The City of Palm Springs received a Congestion Management Air Quality (CMAQ)
TEA21 grant forstreet improvements along Indian Canyon Drive and Vista Chino to
improve those portions of streets that lack full improvements and cause dust control
(PM-10)problems with vehicles leaving the paved roadway. Staff has identified that
segment of Indian Canyon Drive, between San Marco Way and San Rafael Drive,
and that portion of Vista Chino just west of Sunrise Way, as problem areas where
full street improvements do not exist and where traffic can cause PM-10 problems.
Additionally,the City received an SB 821 sidewalk safety grant through the Riverside
County Transportation Commission for construction of sidewalk improvements at the
Vista Chino project location. The SB 821 grant will pay for the construction of an 8
to 10 foot wide concrete sidewalk and bikeway along Vista Chino and the proposed
bus turnout.
Plans and specifications forthis projectwere prepared by staff from the Engineering
Department. On April 3, 2002, the Council approved and adopted the plans and
specifications for this project, and authorized advertisement for construction bids.
II
1999/2000 PM-10 Control Measure Paving Project
May 15, 2002
Page 2
The project consisted of two Bid Schedules. Bid Schedule A represents the
construction of improvements on Indian Canyon Drive, while Bid Schedule B
represents the construction of improvements on Vista Chino. On April 12 and 19,
2002, the project was advertised for bids, and at 2:00 P.M. on April 30, 2002, the
Department of Procurement: and Contracting received bids from the following
contractors:
Contractor Schedule A Schedule B Total
1. Contreras Construction Co.; $44,300.00 $118,430.00 $162,730.00
Indio, CA
2. J.D. Stine Constructors, Inc.; $48,170.00 $116,488.00 $164.658.00
San Bernardino, CA
3. Cora Constructors; $68,210.00 $136,385.00 $204,595.00
The Engineer's estimate was $49,900 for Bid Schedule A, and $154,250 for Bid
Schedule B, for a total estimate of $204,150. The low bidder is Contreras
Construction Co., from Indio, California. The company is a partnership and its
partners are Enrique Contreras and Ruben Contreras.
A majority of the costs of this project are covered by CMAQ and SB 821 funds, with
the grant matches covered by local Measure A funds. Sufficient funds are available
in and costs associated with this contract will be divided into account 134-4498-
50168 (SB 821 Sidewalk), $4,140.00; account 134-4498-50180 (PM 10 Paving
Match),$17,082.27;account 261-4490-50118(PM 10 Mitigation), $131,847.73; and
account 261-449 1-501 68 (SB 821 Sidewalk), $9,660.00.
/7,�Cw gam_
DAVID J. BARAKIAN
-/ "/Director of Public Works/City Engineer F
OFF��Q�G
Leo
APPROVED:---
City Manager
ATTACHMENTS:
1. Minute Order
MINUTE ORDER NO.
AWARDING CONTRACT TO CONTRERAS
CONSTRUCTION CO., FORBID SCHEDULES AAND B, IN
THE AMOUNT OF $162,730.00, FOR THE 1999/2000 PM-
10 CONTROL MEASURE PAVING PROJECT, CITY
PROJECT 99-21
I HEREBY CERTIFY that this Minute Order, awarding contract to Contreras Construction Co., for
Bid Schedules A and B, in the amount of$162,730.00,for the 1999/2000 PM-10 Control Measure
Paving Project, City Project 99-21, was adopted by the City Council of the City of Palm Springs,
California, in a meeting thereof held on the 151" day of May, 2002.
PATRICIA A. SANDERS
City Clerk