HomeMy WebLinkAbout6/19/2002 - STAFF REPORTS (14) DATE: June 19, 2002 TO: City Council FROM: Director of Public Works/City Engineer TAHQUITZ CANYON WAY TRAFFIC SIGNAL INTERCONNECT PROJECT RECOMMENDATION: It is recommended that the City Council award contract to DBX, Inc., in the amount of$755,303.00 for Bid Schedule A (Bid Total#2) and Additive Bid Schedule E only, for the Tahquitz Canyon Way Traffic Signal Interconnect Project, City Project 00-05. SUMMARY: Award of this contract will install traffic signal improvements along Tahquitz Canyon Way, from Palm Canyon Drive to El Cielo Road, including interconnect and signal timing coordination. These improvements will help improve traffic circulation within Palm Springs, and will install the City's fifth interconnect system. The majority of this project ($599,000) is funded through a Federally reimbursable Surface Transportation Program (STP) grant. The remaining $156,303 is funded from local Measure A funds. BACKGROUND: The City of Palm Springs received a $1.2 million Surface Transportation Program (STP) grant in 1995 to construct traffic signal interconnect improvements along Indian Canyon Drive and Tahquitz Canyon Way. The Indian Canyon Drive traffic signal interconnect improvements were combined and constructed with the CVAG's valley-wide traffic signal interconnect project, and are nearly complete. The Tahquitz Canyon Way traffic signal interconnect improvements have been designed by the City's consultant,Albert Grover&Associates, and on April24,2002, Council approved and adopted the plans and specifications for this project, and authorized advertisement for construction bids. The project consisted of various Bid Schedules. Bid Schedule A represents the "Base Bid" and includes the necessary traffic signal upgrades and interconnect system needed to operate the coordinated signal timing on Tahquitz Canyon Way, between Palm Canyon Drive and El Cielo Road. Other Additive Bid Schedules were included that would have allowed for optional traffic signal upgrades, such as replacement of the older marbelite traffic signal poles, at Calle Encilia and Avenida Caballeros; the complete replacement of the old traffic signal system at Sunset Way; and interconnect system extension to Baristo Road at El Cielo Road (thereby allowing the interconnect of the Baristo Road traffic signal and the new Tahquitz Canyon Way traffic signal on El Cielo Road). Tahquitz Canyon Way Traffic Signal Interconnect Project June 19, 2002 Page 2 On May 3 and 10, 2002, the project was advertised for bids, and at 2:00 P.M. on May 28, 2002, the Department of Procurement and Contracting received bids from the following contractors: Contractor Bid Schedule Bid Amount 1. DBX, Inc.; Temecula, CA A (Bid Total #1) $662,063.00 A (Bid Total #2) $669,702.00 B $84,000.00 C $56,460.00 D $40,997.00 E $85,601.00 F $23,240.00 Basis of Award: A (Bid Total #2) + B thru F $960,000.00 2. Pete & Sons Construction, Inc.; A (Bid Total #1) $666,355.00 Riverside, CA A (Bid Total #2) $672,555.00 B $1105,000.00 C $69,600.00 D $53,600.00 E $63,700.00 F $17,268.00 Basis of Award: A (Bid Total #2) + B thru F $981,723.00 Of special note is that Bid Total #1 of Bid Schedule A included standard Caltrans type traffic signal poles and mastarms (galvanized steel) at Tahquitz Canyon Way and El Cielo Road. Knowing the importance of having a different, more architecturally pleasing traffic signal at the entrance to the Airport, staff included an option of installing "Ameron" decorative traffic signal poles and mastarms as an alternative to the standard traffic signal poles. Ameron manufactures a type of signal that is more distinctive, and is specified to be painted white. Bid Total #2 of Bid Schedule A includes the cost of installing the Ameron decorative type traffic signal at the Airport entrance as an alternative to the standard traffic signal. A photo of this type of traffic signal is included as Attachment 1. Of additional importance is the option to install an empty 2" conduit within the same trench as the traffic signal interconnect system, along Tahquitz Canyon Way, extending from Palm Canyon Drive to the Police Department Communications Center. This conduit would be used in the future to install a fiber optic communication system from the Downtown area to the Police Department. Bid Schedule B includes the cost of installing the conduit for a future fiber optic communication system. The Engineer's estimate was$524,450 for Bid Total#1 of Bid Schedule A; $537,950 for Bid Total #2 of Bid Schedule A; $63,000 for Bid Schedule B; $62,900 for Bid Schedule C; $46,000 for Bid Schedule D; $86,500 for Bid Schedule E; and $16,240 for Bid Schedule F; with a total of$812,590 for the basis of award (Bid Total #2 of Bid Schedule A and Bid Schedules B through F). Tahquitz Canyon Way Traffic Signal Interconnect Project June 19, 2002 Page 3 In light of the fact that the optional items included in the various Bid Schedules exceeded the Engineer's estimate, as well as the total available Federal grant funds for this project, it is necessary to limit the award of this project to what the Engineering Department currently has available within its budget to supplement the Federal grant funds. In consulting with the Director of Information Technology, it was determined that the cost to install the conduit for a future fiber optic communication system exceeded budgeted funds. The Director of Information Technology will assist Engineering staff in coordinating with the City's contractor for a possible change order to install a fiber optic communication line within the interconnect conduit. Of the other optional items included in this project, staff determined that of most importance is replacing the existing traffic signal at Sunset Way. This traffic signal is among the oldest in the City, and it is advantageous to use this project as a means of its replacement. Therefore, staff is recommending that only award of the Base Bid (Bid Schedule A) with the alternative Ameron decorative traffic signal poles at the Airport entrance, and Additive Bid Schedule E to replace the Sunset Way traffic signal. Sufficient funds are available in account261-4491-50173(Tahquitz Canyon Signal Interconnect)and in 134-4498-50173(Tahquitz Canyon Signal Interconnect). al ---" DAVID J. BARAKIAN Director of Public Works/City Engineer APPROVED: v�' y s.� City Manager REVIEWED BY DK OF FINANCE ATTACHMENTS: 1. Ameron Traffic Signal Exhibit 2. Minute Order �I . r p. ? �,\ 11 MINUTE ORDER NO. AWARDING CONTRACT TO DBX, INC., IN THE AMOUNT OF $755,303.00 FOR BID SCHEDULE A (BID TOTAL #2) AND ADDITIVE BID SCHEDULE E ONLY, FOR THE TAHQUITZ CANYON WAY TRAFFIC SIGNAL INTERCONNECT PROJECT, CITY PROJECT 00-05 I HEREBY CERTIFY that this Minute Order, awarding contract to DBX, Inc., in the amount of $755,303.00 for Bid Schedule A(Bid Total#2)and Additive Bid Schedule E only, for the Tahquitz Canyon Way Traffic Signal Interconnect Project, City Project 00-05, was adopted by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 191h day of June, 2002. PATRICIA A. SANDERS City Clerk /3 �