Loading...
HomeMy WebLinkAbout9/4/2002 - STAFF REPORTS (4) DATE: September 4, 2002 TO: City Council FROM: Executive Director-Airports NORTHERLY AIRPORT TERMINAL ACCESS ROADWAYSECURITY RECONFIGURATION CONTRACT AWARD RECOMMENDATION: It is recommended thatthe City Council award a contractto Matich Corporation forthe Northerly Airport Terminal Access Roadway Security Reconfiguration at the Palm Springs International Airport(AIP 3-06-0181-35,City Project 2002-06),subject to FAA approval, in the amount of$1,667,627. SUMMARY: In response to the events of September 11 and the subsequent airport security regulations mandated by the Transportation Security Administration(TSA),this project will modify the existing rental car return area, including the access roadway. Included with this improvement are landscaping, fencing, overhead signage and shade protection. BACKGROUND: In response to the events of September 11 and the subsequent security regulations mandated by the federal government,a blast analysis of the main passenger terminal at the Airport was completed. The blast analysis which, due to the extreme confidentiality of the information contained in the report, was shared with the City Council in Closed Session, identified several mitigation measures which would improve the level of blast protection for the Airport. One of these mitigation measures was the construction of a blast wall on the north end of the terminal. During the design process for the blast wall, staff received information from the Transportation Security Administration (TSA), the federal agency responsible for aviation security, that they were discouraging the construction of blast walls. A blast wall is expensive to construct and can impact the blast protection for a structure in other ways. TSA recommended developing a method of separating the "dirty" vehicles(cars being returned by the customer),from the"clean"cars(cars which have been inspected and cleaned by the rental agency). As a result of this dialogue, the existing rental car ready/return lot is proposed to be rec,pnfigured such that "dirty" vehicles will be physically separated from the"clean" cars. By separating the lot and keeping the"dirty"vehicles fartherfrom the passenger terminal,the recommendations contained within the blast analysis will be met. In developing the design for this project, progress meetings were held with the rental car companies,the Airport Commission and the City Council. Based on direction from the Council,a subcommittee was established to participate in the design of this project and provide input throughout the process. This subcommittee consisted of the Airport Commission Landside Subcommittee, two (2) representatives from the Planning Commission and one(1)City Council Member. This subcommittee proved invaluable in moving the design along quickly and being able to address the numerous design CqA September 4, 2002 Page Two elements and user concerns. Approval from the Planning Commission was received on July 10, 2002. Section 7.03.040 of the newly enacted Procurement and Contracting Code requires that for public projects in excess of$100,000,the City Council approve and adopt the plans, specifications and working details, and authorize staff to advertise for construction bids. This action was taken by the Council on July 17, 2002. The bids were opened at 2:00 p.m. on August 27, 2002, with the following results: Bidder Base Bid DBE Alternate#1 Alternate#2 Participation Matich Corp $1,627,627 1.4% $140,000 $5,400 Granite Const. $2,215,930 0.8% $160,000 $5,280 Alternate#1 is for an Electro Hydraulic Retractable Barrier System. Alternate#2 is painting and refurbishing of existing light poles. Alternate#1, the "Electro-Hydraulic Retractable Barrier System" is being recommended due to thedesert climate of the Airport. These type of barricades are anticipated to have a longer life than hydraulic units. The bid on the hydraulic units was $100,000 and will be dropped from the contract (bid item #11150(a)). Alternate #2 is not being recommended for acceptance. After reviewing all of the bids and the DBE (Disadvantaged Business Enterprise) commitment,the lowest responsive,responsible bidder is Matich Corporation at a total bid price of$1,667,627 and a DBE commitment of 1.4% The bid price is base bid plus Alternative #1 and deletion of bid item 11150(a). The base bid price of $1,627,627 exceeds the engineer's estimate by $146,297; however, the engineer's estimate did not build in provisions for the extremely accelerated schedule of 75 days to complete. Attached is the complete unit cost bid tabulation as well as a Resolution for City Council consideration. The Resolution awards the contract to Matich Corporation and appoints the Executive Director-Airports as the Project Administrator and authorizes the Project Administrator, subject to City Manager approval, to approve Change Orders up to 5% of the total base bid. �,4 a Palm Springs International Airport Project AIP 3-06-0181-35 Construction Bid Tabulation - Northerly Terminal Access SCHEDULE I-Northerly Terminal Access Roadway Security Reconfiguration Item No. Description Quantity UOM Unit Cost Engineer's Unit Cost MATICH GRANITE P-100 Mobilization 1 LS 70,000.00 70,00000 281,000.00 281,000.00 65,000.00 P-101 Traffic Control 1 LS 35,000 00 35,000.00 25,000.00 25,000.00 40,000.00 P-102 Construction Area Security 1 LS 20,000.00 20,000.00 10,000.00 10,000.00 15,000.00 P-140a Asphalt Pavement Removal Complete 3,600 BY 6.00 21,600.00 5.00 18,000.00 54,000.00 P-140b Asphalt Pavement Removal Partial 500 BY 5.00 2,500.00 4.00 2,00000 10,000.00 P-140c Curb,Curb/Gutter, Plant Mow Strip Removal 1,800 LF 10.00 18,000.00 6.50 11,700.00 18,000.00 P-140d Concrete Spandrels/Drainpan Removal 50 BY 50.00 2,500.00 42.00 2,100.00 3,000.00 P-140e Concrete Sidewalk/Ramp/Slab Removal 200 BY 30.00 6,000.00 2700 5,400.00 8,000.00 P-151 Clearing and Grubbing 1 LS 100,000.00 100,000.00 45,000.00 45,000.00 380,000.00 P-152 Unclassified Excavation 1,500 CY 35.00 52,500.00 19.75 29,625.00 30,000.00 P-199 Excavation,Trenches, Earthwork Protection 1 LS 10,000.00 10,000.00 1 00 1.00 10,000m P-209 Crushed Aggregate Base Course 300 CY 50.00 15,000 00 60.00 18,000 00 42,000.00 P-217 Soil Sterilization 2,700 SY 0.15 405.00 0.15 405.00 2,700.00 P401a Plant Mix Bituminous Pavement 600 Ton 50.00 30,00000 53.00 31,800.00 24,000.00 P401b Bituminous Material-AR8000 40 Ton 300.00 12,00000 255.00 10,20000 12,000.00 P-603 Bituminous Tack Coat-SS1H 900 Gal 1.00 900.00 1.00 900.00 9,000.00 P-610a Install A1-6 Vertical Curb 250 LF 30.00 7,500.00 26.00 6,500.00 6,250.00 P-610b Install A2-6 Curb and Gutter 1,600 LF 25.00 40,000 00 20.00 32,000 00 67,200.00 P-610c Install Al-24 Vertical Curb 30 LF 90.00 2,700.00 75.00 2,250.00 2,100.00 P-610d Install A2-24 Curb and Gutter 250 LF 9000 22,500.00 50.00 12,500.00 20,000.00 P-61 Be Install At 48 Vertical Curb 20 LF 150.00 3,000.00 12500 2,500.00 2,400.00 P-610f Install PCC Drainpan,Gutter/Spandrel(incl C 900 SF 800 7,200.00 625 5,625.00 11,700 00 P-61 Big Install PCC Sidewalk w/Handicap Ramp 650 SF 6.00 3,900.00 5.00 3,250.00 5,200.00 P-610h Install PCC Sidewalk along Wrought Iron Fen 1,900 SF 6.00 11,400.00 7.25 13,775.00 17,100.00 P-610i Install PCC Pedestal and Footing at T.M S. 10 Ea. 3,500.00 35,000 00 3,000.00 30,000 00 50,000.00 P-613a Remove Existing Signage 20 Ea 30,00 600.00 25.00 50000 600.00 P-613b Install and Remove Temp.Car Rental Signag 45 Ea. 60.00 2,700.00 70.00 3,150.00 4,500.00 P-613c Install Permanent Car Rental Sign Posts 65 Ea. 100.00 6,500.00 80.00 5,200 00 6,500.00 P-620a Remove Existing Pavement Markings 600 SF 2.00 1,200.00 1.00 600.00 600.00 P-6201b Install New Pavement Markings 1,800 SF 2.50 4,500.00 2.50 4,500.00 5,400.00 T-902 Dust Palliative 2 Ac 500.00 1,000.00 1,000.00 2,00000 2,000.00 F-162a Install Temporary Chain-Link Fence(cored) 600 LF 30.00 18,000 00 42.00 25,200.00 27,000.00 F-162b Remove Chain-Link Fence 50 LF 10.00 500.00 36.00 1,800.00 2,000.00 F-162c Install Chain-Link Fence(cored) 50 LF 40.00 2,000.00 6800 3,400.00 3,750.00 F-162d Remove Existing Electric Gate/Operators 1 LS 1,50000 1,500.00 3,10000 3,100.00 3,500.00 F-162e Modify Existing Gate, Install as Slide Gate 1 LS 5,000.00 5,000.00 9,000.00 9,000.00 7,000.00 F-162f Remove Existing Wrought Iron Fence 475 LF 15.00 7,125.00 15.00 7,12500 9,50000 F-162g Install Existing Wrought Iron Fence(cored) 475 LF 40.00 19,000.00 95.00 45,125.00 47,500.00 F-162h Install New 6-Foot Wide Wrought Iron Swing 1 Ea 5,000.00 5,000.00 6,000.00 6,000.00 7,000.00 F-162i Install New 6-Inch PCC Filled Bollard 15 Ea. 500.00 7,500.00 700.00 10,500.00 12,000.00 11150a Automatic Road Blockers/Barriers 2 Ea. 55,000.00 110,000.00 50,000.00 100,000.00 100,000 00 11150b Vehicle Loop Detectors 4 Ea 1,00000 4,000.00 550.00 2,200.00 20,000.00 11150c Automatic Barrier Gates 2 Ea. 8,000.00 16,000.00 5,000.00 10,000.00 20,000.00 11150d Digital Key Pads 2 Ea. 4,000.00 8,000.00 3,500.00 7,000.00 15,000.00 13000 Item Deleted 10436a Past and Panel Signs-(Type C-1) 2 Ea. 1,000.00 2,000.00 975.00 1,950.00 4,000.00 10436b Past and Panel Signs-(Type C-2) 4 Ea. 1,000.00 4,000.00 975.00 3,900.00 8,000.00 10436c Post and Panel Signs-(Type C-3) 4 Ea. 1,200.00 4,800.00 800.00 3,200.00 8,000.00 10436d Post and Panel Signs-(Type A-1) 1 Ea. 1,200.00 1,200.00 800.00 800.00 16,000.00 10436e Post and Panel Signs-(Type A-3) 1 Ea. 25,000.00 25,000.00 21,500.00 21,500.00 22,000.00 10436f Post and Panel Signs-(Type A-4) 3 Ea. 15,000.00 45,000.00 12,000.00 36,000.00 39,000.00 10436g Post and Panel Signs-(Type A-5) 3 Ea. 12,000.00 36,000.00 9,50000 28,500.00 30,000 00 10436h Post and Panel Signs-(Type A-7) 6 Ea. 1,00000 6,000.00 1,000.00 6,000.00 6,000.00 A35PS,PL,BidTab2 dated:August 27,2002 Page No. 1 Q A-3 Palm Springs International Airport Project AIP 3-06-0181-35 Construction Bid Tabulation - Northerly Terminal Access SCHEDULE I-Northerly Terminal Access Roadway Security Reconfiguration Item No. Description Quantity UOM Unit Cost Engineer's Unit Cost MATICH GRANITE 10437a Post and Panel Signs-(Type B-2) 3 Ea. 1,000.00 3,000.00 1,000.00 3,000.00 2,400.00 10437b Pylon Signs-(Type A-2) 1 Ea. 1,000.00 1,000.00 1,000.00 1,000.00 6,000.00 10437c Pylon Signs-(Type A-6) 1 Ea. 1,000.00 1,00000 1,000.00 1,000.00 5,000.00 10437d Pylon Signs-(Type B-1) 2 Ea. 1,000.00 2,000.00 1,000.00 2,000.00 10,000.00 L-101a Saw Cut, Rmvl,Replace Concrete Walk 20 LF 60.00 1,200.00 82.00 1,640.00 1,500.00 L-1011b Saw Cut,Rmvl, Replace A/C Pavement 900 LF 10.00 9,000.00 6.00 5,400.00 31,500.00 L-101c Saw Cut,Rmvl, Replace A/C over PCC Aproi 260 LF 20.00 5,200.00 10.00 2,600.00 20,800.00 LA 02 Removal PCC Light Bases,Replace A/C Pam 12 Ea. 400.00 4,800.00 325.00 3,900.00 3,600.00 L-103a Trench for Conduit wl P-153 Backfill to FSG 2,500 LF 6.00 15,000.00 5.50 13,750.00 50000.00 L-103b Trench for Conduit w/6-inch P-153 Backfill 2,000 LF 5.00 10,000.00 5.50 11,000.00 36,000.00 L-104a Install New 2'-6"x 4'x 3'D Pre-Cast Pullbox 13 Ea. 3,000.00 39,000.00 2,200.00 28,600.00 27,300.00 L-1041b Install New 12"x 22"x 24"D Pre-Cast Pullbox 13 Ea. 400.00 5,200.00 110.00 1,430.00 1,560.00 L-105a Install one 3/4-inch PVC conduit 500 LF 10.00 5,00000 1100 5,500.00 5,500.00 L-105b Install one 1-inch PVC conduit 200 LF 12.00 2,40000 13.00 2,60000 2,60000 L-105c Install one 1-1/2-inch PVC conduit 60 LF 1500 900.00 16.00 960.00 96000 L-105d Install one 2-inch PVC conduit 100 LF 1800 1,800.00 17.00 1,70000 1,700.00 L-105e Install three 4-inch PVC conduit 2,000 LF 4000 80,000.00 33.00 66,000.00 64,000 00 L-106a Install 2#12 wires 500 LF 0.75 37500 0.80 400.00 400.00 L-106b Install 3#12 wires 500 LF 075 37500 090 450.00 45000 L-106c Install 4#12 wires 200 LF 1.00 200.00 1.00 200.00 200.00 L-106d Install 3#10 wires 200 LF 1.00 200.00 0.95 190.00 220.00 L-106e Install 2#6 wires 600 LF 1.50 900.00 1.00 60000 720.00 L-106f Install 3#6 wires 600 LF 1.50 900.00 1.25 750.00 780.00 L-106g Install 446 wires 500 LF 2.00 1,000.00 1.60 800.00 850.00 L-106h Install 5#6 wires 300 LF 2.00 600.00 '1 90 570.00 54000 L-106i Install 6#6 wires 200 LF 2.25 450.00 2A0 420.00 440.00 L-106j Install 7#6 wires 100 LF 2.50 250.00 2.40 240.00 250.00 L-106k Install 8#6 wires 100 LF 3.00 300.00 270 270.00 280.00 L-1061 Install 9#6 wires 100 LF 3.00 30000 3.00 300.00 300.00 L-106m Install 10#6 wires 100 LF 3.50 350.00 3.25 325.00 400.00 L-106n Install 3#6 and 3#4 wires 2,000 LF 3.00 6,000.00 2.50 5,000.00 4,600.00 L-1060 Remove Existing 3#6 wires 1,200 LF 1 00 1,200.00 0.50 600.00 720.00 L-106p Remove Existing 3#4 wires 1,200 LF 1.00 1,200.00 0.50 600.00 720.00 L-107a Install Concrete Base Flush with Grade 7 Ea. B00.00 5,600.00 700.00 4,900.00 4,900.00 L-107b Install Concrete Base Extending 30-inches 14 Ea. 1,000.00 14,000.00 1,000.00 14,000.00 14,000.00 L-108a Install Pole,Light Fixture Type 3,2-Fixture 90 1 Ea. 5,000.00 5,000.00 4,500.00 4,500.00 5,000.00 L-108b Install Pole,Light Fixture Type 4, 1-Fixture 1 Ea. 4,500.00 4,500.00 4,000.00 4,000.00 5,000.00 L-108c Install Pole,Light Fixture Type 5,2-Fixture 18 1 Ea. 5,000.00 5,000.00 5,000.00 5,000,00 5,000.00 L-109 Install Type 2 Fixture-Ballard Lighting Units 11 Ea. 1,600.00 19,800.00 2,200.00 24,200.00 24,200.00 L-110 Install Type 6-Fixture Floodlight 22 Ea 900.00 19,800.00 1,100.00 24,200.00 24,200.00 L-111 Install Type 1-Flrsnt Sign Light Fixture/Pede 4 Ea. 900.00 3,600.00 1,200.00 4,800.00 4,800.00 L-112 Relocate Existing Parking Lot Pole and Fixture 15 Ea. 700.00 10,500.00 1,100.00 16,500.00 16,500.00 L-113 Change-out Parking Light Ballast to 460 Volt 9 Ea. 500.00 4,500.00 425.00 3,825.00 4,500.00 L-114 Cln Lens and Re-Lamp Parking Light Fixture 42 Ea. 100.00 4,200 00 105.00 4,410.00 5,040.00 L-115 See Alternate No.2 L-116 Install Overheight Vehicle Detection/Warning 1 LS 35,000.00 35,000.00 28,000.00 28,000.00 35,000.00 L-117 Connection of Vehicle Barricade Equipment 1 LS 7,000.00 7,000.00 6,000.00 6,000.00 5,000.00 L-118 Install Power Center 1 LS 8,000.00 8,000.00 6,000.00 6,000.00 6,000.00 L-119 Install Lighting Control Cabinet"LCP" 1 LS 10,000.00 10,000.00 8,000.00 8,000.00 7,000.00 L-120 Install SACS Terminal Cabinet"STC" 1 LS 10,000.00 10,000.00 10,000.00 10,00000 11,00000 L-121 Miscellaneous Electrical Work 1 LS 20,000.00 20,000.00 87,000.00 87,000.00 150,000 00 A-100 Landscape and Irrigation 1 LS 220,000.00 220,000.00 260,716.00 260,716.00 275,000.00 Schedule I Total/ Total Project 1,481,330.00 1,627,627.00 2,215,930.00 01030 ALTERNATES Engineer's MATICH GRANITE No. 1 Electro Hydraulic Retractable Barrier System 2 Ea. 65,000.00 130,000.00 70,000.00 140,000.00 160,000.00 No.2 Painting and Refurbishing Existing Light Pole: 24 Ea. 250.00 6,000.00 225.00 5,400.00 5,280.00 A35PS,PL,BidTab2 dated:August 27,2002 Page No.2 I I q September 4, 2002 Page Two This item is on the agenda for the Airport Commission at its regularly scheduled meeting of September 4, 2002. Aa�: MIKE N. WILLIAMS, AAE ALLEN F. SMOOT, AAE Deputy Director- Operations Executive Director-Airports APPROVED>✓�� � � �t�.�----�,,/ City Manager ATTACHMENTS: 1. Resolution 2. Bid Tabulation HAUSERS\PamS\data\WP\Northerly access reconfiguration.ccr.wpd aA �' RESOLUTION NO. OF THE CITY COUNCIL OF THE CITY OF PALM SPRINGS, CALIFORNIA, AWARDING CONTRACT, SUBJECT TO FEDERAL AVIATION ADMINISTRATION(FAA)APPROVAL, FOR THE NORTHERLY AIRPORT TERMINAL ACCESS ROADWAY SECURITY RECONFIGURATION(AIP 3-06-0181- 35, CITY PROJECT 2002-06) TO MATICH CORPORATION IN THE AMOUNTOF$1,667,627AND ESTABLISHING CITY PROJECT ADMINISTRATOR AND ADMINISTRATION PARAMETERS. WHEREAS the events of September 1 V and the security requirements mandated by the Transportation Security Administration (TSA) have greatly impacted the Palm Springs International Airport; and WHEREAS the project had a pre-bid engineer's estimate of$1,481,330; and WHEREAS the project plans and specifications were approved and adopted by the City Council on July 17, 2002, and the project has been advertised for a period of thirty(30) days for bid with bids being received on August 27,2002,from Granite Construction Company and Matich Corporation; and WHEREAS following review of the bids,the lowest, responsive, responsible bidder has been determined to be Matich Corporation, NOW THEREFORE BE IT RESOLVED by the City Council of the City of Palm Springs as follows: Section1. Thatthe Northerly Airport Terminal Access RoadwaySecurity reconfiguration project (AIP 3-06-0181-35, City Project 2002-06) adding Alternate #1 and deleting bid item #11150(a) is awarded, subject to approval by the Federal Aviation Administration (FAA), to Matich Corporation in the amount of $1,667,627. Section 2. That the Executive Director-Airports is hereby authorized to administer the contract and is authorized to approve Change Orders up to 5% of the total contract price subject to City Manager approval. ADOPTED this day of 2002. AYES: NOES: ABSENT: ATTEST: CITY OF PALM SPRINGS, CALIFORNIA By City Clerk City Manager REVIEWED & APPROVED AS TO FORM ae