HomeMy WebLinkAbout10/2/2002 - STAFF REPORTS (8) DATE: October 2, 2002 TO: City Council FROM: Director of Public Works/City Engineer SUNRISE WAY TRAFFIC SIGNAL INTERCONNECT RECOMMENDATION: It is recommended that the City Council approve and adopt the plans, specifications and working details, and authorize advertisement for construction bids for the Sunrise Way Traffic Signal Interconnect Project, City Project 01-14. SUMMARY: Section 7.03.040 of the Procurement and Contracting Code requires that Council approve and adopt plans, specifications and working details, and authorize the bid request for all public projects in excess of$100,000. Approval of the project will allow staff to proceed with this public project, with an estimated cost of$136,000. BACKGROUND: The City of Palm Springs applied for and received a $120,000 Surface Transportation Improvement Program (STIP) grant to construct traffic signal interconnect improvements along Sunrise Way. Sunrise Way is the last remaining major arterial corridor to have its traffic signals interconnected, with signal interconnect projects having been or nearly completed along North, South and East Palm Canyon Drives, Indian Canyon Drive, Ramon Road, and Tahquitz Canyon Way. The Sunrise Way traffic signal interconnect improvements have been designed by the City's consultant, Albert Grover & Associates, and the plans and specifications for its construction are ready for Council approval and the subsequent advertisement for construction bids. Section 7.03.040 of the newly enacted Procurement and Contracting Code requires that for public projects in excess of$100,000 Council approve and adopt the plans, specifications and working details, and authorize staff to advertise for construction bids. This project has an overall cost of approximately$136,000. The project includes installation of traffic signal interconnect equipment and modifications or replacement of existing traffic signal controllers at the following locations: Sunrise Way at Tachevah Road Sunrise Way at Alejo Road Sunrise Way at Amado Road Sunrise Way at Tahquitz Canyon Way Sunrise Way at Baristo Road Sunrise Way at Ramon Road Sunrise Way at Mesquite Avenue Sunrise Way at East Palm Canyon Drive The proposed interconnect system will allow for more efficient movement of traffic along this major arterial corridor, as the traffic signal controllers at each intersection along the corridor are timed and coordinated to provide a better opportunity for continuous movement of traffic in one direction or the other. 914 Sunrise Way Traffic Signal Interconnect October 2, 2002 Page 2 This action is being brought before Council to be in compliance with the Procurement and Contracting Code. Following Council's approval of the plans and specifications, and authorization to advertise for construction bids, staff will schedule bid advertisements with a bid opening date of October 29, 2002. SUBMITTED: DAVID J. BARAKIAN Director of Public Works/City Engineer APPROVED: DAVID H. READY City Manager ATTACHMENTS: 1. Minute Order REVIEWED BY DEPI OF FINANCE �� 02 MINUTE ORDER NO. APPROVING AND ADOPTING THE PLANS, SPECIFICATIONS AND WORKING DETAILS, AND AUTHORIZING ADVERTISEMENT FOR CONSTRUCTION BIDS FOR THE SUNRISE WAY TRAFFIC SIGNAL INTERCONNECT PROJECT, CITY PROJECT 01-14 I HEREBY CERTIFY that this Minute Order, approving and adopting the plans, specifications and working details, and authorizing advertisement for construction bids for the Sunrise Way Traffic Signal Interconnect Project, City Project 01-14,was adopted by the City Council ofthe City of Palm Springs, California, in a meeting thereof held on the 2°d day of October, 2002. PATRICIA A. SANDERS City Clerk 9,