Loading...
HomeMy WebLinkAbout11/6/2002 - STAFF REPORTS (5) DATE: November 6, 2002 TO: City Council FROM: Executive Director—Airports RECOMMENDATION: It is recommended that City Council approve Amendment #2 to the Airport Engineering Services Agreement#4487 with VSA Airports for design work related to the Airport Loop Road Reconfiguration. SUMMARY: This action will allow for the design work to proceed on the Loop Road Reconfiguration Project which includes the westbound connection to El Cielo closure of Mid-Valley Parkway. BACKGROUND: In the aftermath of"9/11;the Airport contracted for a Blast Analysis of the terminal facility in an effort to mitigate the "300 foot rule" security zone established by the federal government. One of the outcomes of that analysis was the determination that the loop road should be reconfigured to allow for centralized inspection of oversize vehicles. For several months, the design team has worked with a subcommittee of the Airport Commission/Planning Commission/City Council to develop a suitable reconfiguration plan. The proposed alignment is attached. The attached Amendment#2 to the VSA Airports Agreement would allocate dollars for the design/bidding/construction administration for the loop road reconfiguration project. This Amendment would add fees of$956,100 to the Agreement. This item will be discussed by the Airport Commission on its November 6, 2002 Agenda. Funds are available in Account 415-6600-56052, a 100% federal grant. ALLEN F. SMOOT, AAE Executive Director—Airports y_ APPROVED—,_.. City ty Manager ATTACHMENTS: 1. Minute Order 2. Roadway Alignment Drawing 3. Amendment#2 REVIEWED BY DEPT.OF FINANCE `��i� S L �^��' ❑ ��I Ili ��_s.�J ��� LL z I I r, S I �-mss mea.ao I I -- ---------- 06. 11 L--J 1�1 l o; I I - � II I I I I� II AMENDMENT NO. 2 AGREEMENT NO. 4487, AIRPORT ENGINEERING SERVICES THIS SECOND AMENDMENT to Agreement No 4487 for Contract Services, (herein "Agreement") made and entered into on the day of 2002, by and between the CITY OF PALM SPRINGS (herein "City") and VSA Airports, Inc (herein "Contractor"), (The term Contractor includes professionals performing in a consulting capacity.), is hereby effective November 6, 2002, as follows: Section 1 Exhibit "A" Scope of Services, Part I - Task Assignments, is hereby amended by adding item 'U': TASK TITLE/DESCRIPTION ASSIGNMENT L Schematic Special Study(Passenger Terminal Central Core Plaza Only) - Develop and submit for City review and approval schematics and budget estimates utilizing existing terminal drawings to incorporate with sketches and 3D drawings for two(2)modification scenarios to the Passenger Terminal Central Core Plaza.Scenario#1: Enclose the terminal main entry to the outside column lines and install a fabric roof structure extending into the plaza design area. Scenario#2: Install a fabric roof structure at the terminal entry, including eliminating the existing exterior columns and modifying the roof-line.DELIVERABLES:Preparation of an 11"x 17"booklet(6 copies)indicating the proposed design for the two (2)scenarios. The booklet will be in sketch form and outline key design issues, including sketch plans, elevations, sections, 3D drawings and other sketches determined by the Engineer to define the design concept. Included in the booklet will be recommendations for structural modifications,wind loading and/or strengthening of existing columns for scenario#1.Scenario#2 will incorporate lateral bracing and foundation requirements for a fabric roof structure.All structural information for each scenario will be shown in the deliverable booklet. Included in the booklet will be two(2)3D computer drawings to depict the final design.Additional 3D drawings, if requested by the City are available for an additional fee of$4,000 each. Included in the booklet will be a written preliminary budget of architectural, mechanical and structural items for magnitude of construction cost for each scenario by construction discipline. Section 2 Exhibit "A" Scope of Services, Part V - Project Specific Scopes, is hereby amended by adding Task Assignments to projects #2, #3 and #4 as follows: PROJECT# PROJECT TITLE/DESCRIPTION TASK ASSIGNMENTS 2 Airport Roadway System Revisions (300' Rule Mitigation) A, B, C, D, G, 1, K 3 Passenger Terminal Central Core Plaza A, B, E, F, L 4 Remote Vehicle Inspection Facility- (300' Rule Mitigation) A, B, C, D, E, F, I VSA Airpoits Amendment#2 Page I of 5 Section 3 Exhibit"C"Schedule of Compensation, Part 11 - Project Specific Compensation is hereby replaced with the following: PROJECT SPECIFIC COMPENSATION PROJECT# PROJECT TITLE/DESCRIPTION COMPENSATION(NOT TO EXCEED) 1 Access Control System Replacement $126,000 2 Airport Roadway System Revisions (300' Rule Mitigation) $1,161,000 3 Passenger Terminal Central Core Plaza $213,500 4 Remote Vehicle Inspection Facility- (300' Rule Mitigation) $290,100 5 Terminal Building Hardening/Blast Protection $26,000 6 Relocation/reconstruction of airport perimeter fencing $0 7 Relocation of the segmented circle and/or Automated $0 Surface Observation System (ASOS) 8 Vehicle Size Limitation Frames (300' Rule Mitigation) 9 Construct high-speed taxiways and other miscellaneous $0 taxiway improvements 10 Rehabilitation/expansion of aircraft parking aprons $0 11 Miscellaneous airfield lighting, marking and signage $0 improvements 12 Modification/Expansion of security screening and/or $15,000 monitoring areas. A. For each project that is issued a "Notice to Proceed", the actual compensation shall be based on hours worked multiplied by the hourly rate (Exhibit "C",), but not exceeding the maximum amount of the allocation. Payments will be made monthly based on the percentage of work completed in each area of work defined above. Original Total Agreement Amount - $763,500 Fees added with this Amendment - $956,100 Revised Total Agreement Amount (per this Amendment) - $1,831,600 ,5?: hq VSA Airports Amendment#2 Page 2 of 5 Section 4 Exhibit "D" Schedule of Performance is hereby replaced with the following: The services contemplated in this Agreement and assigned to the Engineer to complete shall commence within 10 days from the "Notice to Proceed" date and shall be completed based upon the time lines mutually agreed upon between the City and the Engineer. Each enumerated project identified in Exhibit "A" shall have a separate Schedule of Performance as listed below or as shall be mutually agreed upon at a future date by the City and the Engineer. Time lines are subject to adjustment based on receipt of Federal Aviation Administration (FAA) funds. Delays in receipt of FAA funds will result in a day for day extension of time on each work item. PROJECT# PROJECT TITLE/DESCRIPTION COMMENCE COMPLETE 1 Access Control System Replacement Task Assignment"A" January 1, 2003 March 30, 2003 Task Assignment'B" January 1, 2003 March 30, 2003 Task Assignment"E" March 30, 2002 June 30, 2003 2 Airport Roadway System Revisions (300' Rule Mitigation) Task Assignment"A" May 1, 2002 May 15, 2002 Task Assignment'B" May 1, 2002 June 1, 2002 Task Assignment"C" May 15, 2002 June 15, 2002 Task Assignment"D" May 15, 2002 June 15, 2002 Task Assignment"G" July 1, 2002 December 15, 2002 Task Assignment"I" July 1, 2002 January 1, 2002 Task Assignment"K" April 1, 2003 December 15, 2003 3 Passenger Terminal Central Core Plaza Task Assignment"A" December 1, 2002 January 30, 2003 Task Assignment"B" January 15, 2003 February 15, 2003 Task Assignment"E" February 15, 2003 May 30, 2003 Task Assignment"F" April 1, 2003 May 30, 2003 Task Assignment'U' November 6, 2002 December 30, 2002 4 Remote Vehicle Inspection Facility - (300' Rule Mitigation) Task Assignment"A" July 1, 2002 August 30, 2002 Task Assignment"B" July 1, 2002 August 30, 2002 Task Assignment"C" July 15, 2002 August 15, 2002 Task Assignment"D" July 15, 2002 August 15, 2002 VSA Airports Amendment#2 CRA O Page 3 of 5 PROJECT# PROJECT TITLE/DESCRIPTION COMMENCE COMPLETE Task Assignment"E" September 1, 2002 November 15, 2002 Task Assignment"F" December 1, 2002 January 1, 2003 Task Assignment"I" November 6, 2002 January 1, 2003 5 Terminal Building Hardening/Blast Protection Task Assignment"A" January 1, 2003 March 30, 2003 Task Assignment"B" January 1, 2003 March 30, 2003 Task Assignment"E" March 30, 2003 June 30, 2003 6 Relocation/reconstruction of airport perimeter fencing 7 Relocation of the segmented circle and/or Automated Surface Observation System (ASOS) 8 Vehicle Size Limitation Frames (300' Rule Mitigation) 9 Construct high-speed taxiways and other miscellaneous taxiway improvements 10 Rehabilitation/expansion of aircraft parking aprons 11 Miscellaneous airfield lighting, marking and signage improvements 12 Modification/Expansion of security screening and/or monitoring areas. Task Assignment"A" August 1, 2002 September 1, 2002 Task Assignment"B" October 1, 2002 November 1, 2002 N:\Agreements\Engineering\VSA_Airports\VSA_Amendment 2—November 2002.wpd VSA Airports Amendment#2 Page 4 of 5 IN WITNESS WHEREOF, the parties have executed and entered into this Amendment zts of date first written below. CITY OF PALM SPRINGS ATTEST: a municipal corporation By: By: City Clerk City Manager APPROVED AS TO FORM: By: City Attorney CONTRACTOR: Check one:_Individual_Partnership_Corporation Corporations require two notarized signatures: One from each of the following: A. Chairman of Board,President,or any Vice President;AND B. Secretary,Assistant Secretary,Treasurer,Assistant Treasurer,or Chief Financial Officer). By: By: Signature (notarized) Signature(notarized) Name: Name: Title: Title: State of I State of I County of Iss _ County of Iss On before me, On " `before me, personally appeared personallyzippeareh personally known to me (or proved to me on the basis of personally-khown to me (or proved to me on the basis of satisfactory evidence)to be the person(s)whose name(s)Is/are satisfactory evidence)to be the person(s)whose name(s)Ware subscribed to the within instrument and acknowledged to me that subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized he/she/they executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the capaoity(les), and that by hWhar/their signature(s) on the instrument the pemon(s), or the entity upon behalf of which the Instrument the person(s),or the entity upon behalf of which the person(s)acted,executed the instrument. person(s)acted,executed the Instrument WITNESS my hand and official seal. WITNESS my hand and official seal. Notary Signature: Notary Signature: Notary Seal: Notary Seal: a ff7 MINUTE ORDER NO. APPROVING AMENDMENT#2 TO AIRPORT ENGINEERING SERVICES AGREEMENT #4487 WITH VSA AIRPORTS FOR DESIGN/CONSTRUCTION/ADMINISTRATION SERVICES RELATED TO THE LOOP ROAD RECONFIGURATION PROJECT. I HEREBY CERTIFY that this Minute Order, approving Amendment #2 to Airport Engineering Services Agreement #4487 with VSA Airports for design/construction/administration services related to the Loop Road Reconfiguration Project, was adopted by the City Council of the City of Palm Springs,California, in a meeting thereof held on the 61h day of November2002. PATRICIA A. SANDERS City Clerk