HomeMy WebLinkAbout11/6/2002 - STAFF REPORTS (5) DATE: November 6, 2002
TO: City Council
FROM: Executive Director—Airports
RECOMMENDATION:
It is recommended that City Council approve Amendment #2 to the Airport
Engineering Services Agreement#4487 with VSA Airports for design work related to
the Airport Loop Road Reconfiguration.
SUMMARY:
This action will allow for the design work to proceed on the Loop Road
Reconfiguration Project which includes the westbound connection to El Cielo closure
of Mid-Valley Parkway.
BACKGROUND:
In the aftermath of"9/11;the Airport contracted for a Blast Analysis of the terminal
facility in an effort to mitigate the "300 foot rule" security zone established by the
federal government. One of the outcomes of that analysis was the determination that
the loop road should be reconfigured to allow for centralized inspection of oversize
vehicles.
For several months, the design team has worked with a subcommittee of the Airport
Commission/Planning Commission/City Council to develop a suitable reconfiguration
plan. The proposed alignment is attached.
The attached Amendment#2 to the VSA Airports Agreement would allocate dollars
for the design/bidding/construction administration for the loop road reconfiguration
project. This Amendment would add fees of$956,100 to the Agreement.
This item will be discussed by the Airport Commission on its November 6, 2002
Agenda. Funds are available in Account 415-6600-56052, a 100% federal grant.
ALLEN F. SMOOT, AAE
Executive Director—Airports
y_
APPROVED—,_..
City
ty Manager
ATTACHMENTS:
1. Minute Order
2. Roadway Alignment Drawing
3. Amendment#2 REVIEWED BY DEPT.OF FINANCE
`��i�
S
L
�^��' ❑ ��I Ili ��_s.�J ���
LL z
I
I
r,
S I �-mss mea.ao
I
I
-- ----------
06.
11 L--J 1�1
l
o;
I I
-
�
II I I I
I� II
AMENDMENT NO. 2
AGREEMENT NO. 4487, AIRPORT ENGINEERING SERVICES
THIS SECOND AMENDMENT to Agreement No 4487 for Contract Services, (herein "Agreement") made
and entered into on the day of 2002, by and between the CITY OF PALM
SPRINGS (herein "City") and VSA Airports, Inc (herein "Contractor"), (The term Contractor includes
professionals performing in a consulting capacity.), is hereby effective November 6, 2002, as follows:
Section 1
Exhibit "A" Scope of Services, Part I - Task Assignments, is hereby amended by adding item 'U':
TASK TITLE/DESCRIPTION
ASSIGNMENT
L Schematic Special Study(Passenger Terminal Central Core Plaza Only) - Develop and submit
for City review and approval schematics and budget estimates utilizing existing terminal drawings
to incorporate with sketches and 3D drawings for two(2)modification scenarios to the Passenger
Terminal Central Core Plaza.Scenario#1: Enclose the terminal main entry to the outside column
lines and install a fabric roof structure extending into the plaza design area. Scenario#2: Install
a fabric roof structure at the terminal entry, including eliminating the existing exterior columns and
modifying the roof-line.DELIVERABLES:Preparation of an 11"x 17"booklet(6 copies)indicating
the proposed design for the two (2)scenarios. The booklet will be in sketch form and outline key
design issues, including sketch plans, elevations, sections, 3D drawings and other sketches
determined by the Engineer to define the design concept.
Included in the booklet will be recommendations for structural modifications,wind loading and/or
strengthening of existing columns for scenario#1.Scenario#2 will incorporate lateral bracing and
foundation requirements for a fabric roof structure.All structural information for each scenario will
be shown in the deliverable booklet.
Included in the booklet will be two(2)3D computer drawings to depict the final design.Additional
3D drawings, if requested by the City are available for an additional fee of$4,000 each.
Included in the booklet will be a written preliminary budget of architectural, mechanical and
structural items for magnitude of construction cost for each scenario by construction discipline.
Section 2
Exhibit "A" Scope of Services, Part V - Project Specific Scopes, is hereby amended by adding Task
Assignments to projects #2, #3 and #4 as follows:
PROJECT# PROJECT TITLE/DESCRIPTION TASK ASSIGNMENTS
2 Airport Roadway System Revisions (300' Rule Mitigation) A, B, C, D, G, 1, K
3 Passenger Terminal Central Core Plaza A, B, E, F, L
4 Remote Vehicle Inspection Facility- (300' Rule Mitigation) A, B, C, D, E, F, I
VSA Airpoits Amendment#2 Page I of 5
Section 3
Exhibit"C"Schedule of Compensation, Part 11 - Project Specific Compensation is hereby replaced with the
following:
PROJECT SPECIFIC COMPENSATION
PROJECT# PROJECT TITLE/DESCRIPTION COMPENSATION(NOT TO
EXCEED)
1 Access Control System Replacement $126,000
2 Airport Roadway System Revisions (300' Rule Mitigation) $1,161,000
3 Passenger Terminal Central Core Plaza $213,500
4 Remote Vehicle Inspection Facility- (300' Rule Mitigation) $290,100
5 Terminal Building Hardening/Blast Protection $26,000
6 Relocation/reconstruction of airport perimeter fencing $0
7 Relocation of the segmented circle and/or Automated $0
Surface Observation System (ASOS)
8 Vehicle Size Limitation Frames (300' Rule Mitigation)
9 Construct high-speed taxiways and other miscellaneous $0
taxiway improvements
10 Rehabilitation/expansion of aircraft parking aprons $0
11 Miscellaneous airfield lighting, marking and signage $0
improvements
12 Modification/Expansion of security screening and/or $15,000
monitoring areas.
A. For each project that is issued a "Notice to Proceed", the actual compensation shall be
based on hours worked multiplied by the hourly rate (Exhibit "C",), but not exceeding the
maximum amount of the allocation. Payments will be made monthly based on the
percentage of work completed in each area of work defined above.
Original Total Agreement Amount - $763,500
Fees added with this Amendment - $956,100
Revised Total Agreement Amount (per this Amendment) - $1,831,600
,5?: hq
VSA Airports Amendment#2 Page 2 of 5
Section 4
Exhibit "D" Schedule of Performance is hereby replaced with the following:
The services contemplated in this Agreement and assigned to the Engineer to complete shall commence
within 10 days from the "Notice to Proceed" date and shall be completed based upon the time lines
mutually agreed upon between the City and the Engineer. Each enumerated project identified in Exhibit
"A" shall have a separate Schedule of Performance as listed below or as shall be mutually agreed upon
at a future date by the City and the Engineer. Time lines are subject to adjustment based on receipt of
Federal Aviation Administration (FAA) funds. Delays in receipt of FAA funds will result in a day for day
extension of time on each work item.
PROJECT# PROJECT TITLE/DESCRIPTION COMMENCE COMPLETE
1 Access Control System Replacement
Task Assignment"A" January 1, 2003 March 30, 2003
Task Assignment'B" January 1, 2003 March 30, 2003
Task Assignment"E" March 30, 2002 June 30, 2003
2 Airport Roadway System Revisions (300' Rule
Mitigation)
Task Assignment"A" May 1, 2002 May 15, 2002
Task Assignment'B" May 1, 2002 June 1, 2002
Task Assignment"C" May 15, 2002 June 15, 2002
Task Assignment"D" May 15, 2002 June 15, 2002
Task Assignment"G" July 1, 2002 December 15, 2002
Task Assignment"I" July 1, 2002 January 1, 2002
Task Assignment"K" April 1, 2003 December 15, 2003
3 Passenger Terminal Central Core Plaza
Task Assignment"A" December 1, 2002 January 30, 2003
Task Assignment"B" January 15, 2003 February 15, 2003
Task Assignment"E" February 15, 2003 May 30, 2003
Task Assignment"F" April 1, 2003 May 30, 2003
Task Assignment'U' November 6, 2002 December 30, 2002
4 Remote Vehicle Inspection Facility - (300' Rule
Mitigation)
Task Assignment"A" July 1, 2002 August 30, 2002
Task Assignment"B" July 1, 2002 August 30, 2002
Task Assignment"C" July 15, 2002 August 15, 2002
Task Assignment"D" July 15, 2002 August 15, 2002
VSA Airports Amendment#2 CRA O Page 3 of 5
PROJECT# PROJECT TITLE/DESCRIPTION COMMENCE COMPLETE
Task Assignment"E" September 1, 2002 November 15, 2002
Task Assignment"F" December 1, 2002 January 1, 2003
Task Assignment"I" November 6, 2002 January 1, 2003
5 Terminal Building Hardening/Blast Protection
Task Assignment"A" January 1, 2003 March 30, 2003
Task Assignment"B" January 1, 2003 March 30, 2003
Task Assignment"E" March 30, 2003 June 30, 2003
6 Relocation/reconstruction of airport perimeter
fencing
7 Relocation of the segmented circle and/or
Automated Surface Observation System (ASOS)
8 Vehicle Size Limitation Frames (300' Rule
Mitigation)
9 Construct high-speed taxiways and other
miscellaneous taxiway improvements
10 Rehabilitation/expansion of aircraft parking aprons
11 Miscellaneous airfield lighting, marking and signage
improvements
12 Modification/Expansion of security screening and/or
monitoring areas.
Task Assignment"A" August 1, 2002 September 1, 2002
Task Assignment"B" October 1, 2002 November 1, 2002
N:\Agreements\Engineering\VSA_Airports\VSA_Amendment 2—November 2002.wpd
VSA Airports Amendment#2 Page 4 of 5
IN WITNESS WHEREOF, the parties have executed and entered into this Amendment zts of
date first written below.
CITY OF PALM SPRINGS
ATTEST: a municipal corporation
By: By:
City Clerk City Manager
APPROVED AS TO FORM:
By:
City Attorney
CONTRACTOR: Check one:_Individual_Partnership_Corporation
Corporations require two notarized signatures: One from each of the following: A. Chairman of Board,President,or any Vice
President;AND B. Secretary,Assistant Secretary,Treasurer,Assistant Treasurer,or Chief Financial Officer).
By: By:
Signature (notarized) Signature(notarized)
Name: Name:
Title: Title:
State of I State of I
County of Iss _ County of Iss
On before me, On " `before me,
personally appeared personallyzippeareh
personally known to me (or proved to me on the basis of personally-khown to me (or proved to me on the basis of
satisfactory evidence)to be the person(s)whose name(s)Is/are satisfactory evidence)to be the person(s)whose name(s)Ware
subscribed to the within instrument and acknowledged to me that subscribed to the within instrument and acknowledged to me that
he/she/they executed the same in his/her/their authorized he/she/they executed the same in his/her/their authorized
capacity(ies), and that by his/her/their signature(s) on the capaoity(les), and that by hWhar/their signature(s) on the
instrument the pemon(s), or the entity upon behalf of which the Instrument the person(s),or the entity upon behalf of which the
person(s)acted,executed the instrument. person(s)acted,executed the Instrument
WITNESS my hand and official seal. WITNESS my hand and official seal.
Notary Signature: Notary Signature:
Notary Seal: Notary Seal:
a ff7
MINUTE ORDER NO.
APPROVING AMENDMENT#2 TO AIRPORT
ENGINEERING SERVICES AGREEMENT
#4487 WITH VSA AIRPORTS FOR
DESIGN/CONSTRUCTION/ADMINISTRATION
SERVICES RELATED TO THE LOOP ROAD
RECONFIGURATION PROJECT.
I HEREBY CERTIFY that this Minute Order, approving Amendment #2 to
Airport Engineering Services Agreement #4487 with VSA Airports for
design/construction/administration services related to the Loop Road
Reconfiguration Project, was adopted by the City Council of the City of Palm
Springs,California, in a meeting thereof held on the 61h day of November2002.