Loading...
HomeMy WebLinkAbout04611 - TRIMARK RAYGAL CONVENTION CENTER KITCHEN CP02-19-28 DOC " 20103—G30G91 08/18/2003 08:00R Fee:NC Page 1 of 1 Recorded in Official Records County of Riverside Gary L. Orso Assessor, County Clerk & Recorder IIEI 111EIIRIIIIIt111131111I1I013111 Return To: City Clerk City of Palm Springs P.O. Box 2743 Palm Springs, CA 92263-2743 NOTICE OF COMPLETION NOTICE IS HEREBY given that: 1. The City of Palm Springs, California is a municipal corporation, organized and incorporated pursuant to the laws of the State of California. RyN 2. The City Clerk of the City of Palm Springs is authorized and directed to execute, on behalf of said City, any and all Notices of Completion. 3. The address of the City of Palm Springs is City Hall, 3200 E Tahquitz Canyon Way, Palm Springs, California (P.O, Box 2743, Palm Springs, CA 92263-2743), 4. The public work of improvement on the hereinafter referred to real property within the city was COMPLETED on the 4"day of June,2003. 5. The name of the contractor(if named)for such work of improvement was: TriMark Raygal, Inc.. 6. The public work improvement, which was completed in the City of Palm Springs, County of Riverside, State of California, is described as follows: Palm Springs Convention Center Expansion—Phase I, City Project#02A9. 7. The property address or location of said property is,797 E.Andreas, Palm Springs, CA 92262. City Project No: Agreement No. 4to' t Minute Order No: .7 -L" 02-19 02-19-028 DATED: '� ✓` I� CITY OF PALM SPRINGS By: f � Executive Director-Airports PATRICIA A. SANDERS, being duly sworn, says: That she is the City Clerk of aforesaid City of Palm Springs, California, the corporation that executed the foregoing notice; that she makes this verification on behalf of said corporation; that she has read the foregoing Notice of Completion, and knows the contents thereof, and that the facts stated therein are true; that as said City Clerk, she makes this verification on behalf of sa unici a�r�I�L:U�s"�' City Clerk Index No. c. Trimark Raygal, Inc. Convention Ctr CP02-19-28 AGREEMENT #4611 MO7224, 12-18-02 AGREEMENT THIS AGREEMENT made this �(a day of -,., in the year 2002, by and between the City of Palm Springs, a charter city, organized and existing in the County of Riverside, under and by virtue of the laws of the State of California, hereinafter designated as the City, and, Trimark Raygal, Inc. hereinafter designated as the Contractor. The City and the Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1 --THE WORK The Contractor shall complete the Work as specified or indicated under the Bid Schedule(s) of the City's Contract Documents entitled: Palm Springs Phase 1 Convention Center Expansion Kitchen Equipment City Project No. 02-19-28 The Work is generally described as follows: provide all necessary labor, materials, equipment, hoisting, scaffolding, tools, rigging and anything else necessary to complete the work for the Palm Springs Phase I Convention Center Expansion. ARTICLE 2 -- COMMENCEMENT AND COMPLETION The Work to be performed under this Contract shall commence on the date specified in the Notice to Proceed by the City, and the Work shall be fully completed within the time specified in the Notice to Proceed. The City and the Contractor recognize that time is of the essence of this Agreement, and that the City will suffer considerable financial loss if the Work is not completed within the time specified in said Notice to Proceed, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. The damages suffered by the City would be extremely difficult or impractical to determine in the event of a Breach by the Contractor. Accordingly, the City and Contractor agree that the Contractor shall pay the amount provided below, as liquidated damages, for each calendar day that the Work is not completed in the time set forth above: $2,000.00 ARTICLE 3 -- CONTRACT PRICE The City shall pay the Contractor for the completion of the Work, in accordance with the Contract Documents, in current funds the Contract Price(s) named in the Contractor's Bid and Bid Schedule(s). ARTICLE 4 --THE CONTRACT DOCUMENTS The Contract Documents consist of the Notice Inviting Bids, Instructions to Bidders, the accepted Trade Bid and trade Bid Schedule(s), List of Subcontractors, Non-collusion Affidavit, Bidder's General Information, Bid Security or Bid Bond, this Agreement, Worker's Compensation Certificate, Performance Bond, Payment Bond, Notice of Award, Notice to Proceed, Notice of Completion, General Conditions of the Contract, Supplementary General Conditions, Exhibits A through G, Construction Drawings and Specifications, Addenda numbers 1 to 3, inclusive, and all Change Orders and Work Change Directives which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto. ARTICLE 5 -- PAYMENT PROCEDURES The Contractor shall submit Applications for Payment in accordance with provisions of the Standard Specifications as amended by the Special Provisions. Applications for Payment will be processed by the City as provided in the Contract Documents. ARTICLE 6 -- NOTICES Whenever any provision of the Contract Documents requires the giving of a written Notice, it shall be deemed to have been validly given if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the Notice. ARTICLE 7 -- MISCELLANEOUS Terms used in this Agreement which are defined in the Standard Specifications as amended by the Special Provisions will have the meanings indicated in said Standard Specifications and Special Provisions. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically, but without limitation, monies that may become due and monies that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. The City and the Contractor each binds itself, its partners, successors, assigns, and legal representatives, to the other party hereto, its partners, successors, assigns, and legal representatives in respect of all covenants, agreements, and obligations contained in the Contract Documents. (Signatures on Next Page) - IN WITNESS WHEREOF, the parties have executed and entered into this Agreement as of the date first written above. CITY OF PALM SPRINGS TEST: ^ a municipal corporation By: City Clerk gnager eat u� 34" v �tll c1u° 1 `t ' rs°u Agreement overAmAer $25,000 APPROVED AS To FORM:f %) IVZ�g Reviewed and approved by d 9 Procurement & Contracting B : v �;� Initials= --Date � ��E� City Attorney P.O. Number CONTRACTOR: Check one:_Individual_Partnership Corporation Corporations require two notar' d signatures: One from each of the fallowing: A. Chairman of Board,President,or any Vice President:AND B.Se ry ssistant Secretary,Treasurer,Assistant Treasurer,or Chief Financial Officer). By: By: Y 1 Signature otarized) // Pgnature (notariz d) Name,.�Ae4tf •�L� Name:�i�i Title: TWJ�aIAC—Al / Title: State of C�'kvPoLi:li !, 1 State of 6�1 i-� -'�� 1 County of U r y%/\ - ss County of _ .+ �i= 7ss OnG i"aSbefore me, I-�a 0 Iahz On f i3 k)S before me, �a�lrcna.: personally appeared 5.�-ck l�. 2'tE"is personally appeared bi ol, iik we l personally known to me (or proved to me on the basis of personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(sr whose nameM' satisfactory evidence) to be the person(a')'whose name(57,- is/are'subscribed to the within instrument and acknowledged is(zre-subscribed to the within instrument and acknowledged to me that he/siz/,they executed the same in his/hedlheir to me that he/sh€Aey executed the same In hiss/thelf• authorized capacityhW, and that by his/herPoaeir signature(' authorized capacityAtes), and that by his/ftsethelr signaturew on the instrument the person(sir; or the entity upon behalf of on the instrument the persorjW,, or the entity upon behalf of which the person(s7 acted,executed the instrument which the person,(s f'acted, executed the instrument. WITNESS my hand and official seal. WITNESS my hand and official seal. 7 �/ Notary Signature: �i '�zP � Notary Signature:�1nu'7''—'4 Notary Seal: Notary Seal: KATARI H.LOPEZ KATARI H. LOPEZ��( oic . Commission# 1387467 z QiMyCornm. Commission# 1387467 Notary Public-California n ` Notary Public-California Orange County Orange County MyCor'im.Expires Nov 26,2006 Expires Nov 26,200e f' Bond No. F14416 PAYM9NT BOND KNOW AIL A41iN BY Tl1l?Sll PRESLNTS, Trimark Rayggal Inc. as Principal That and nd ACStAR_I s Surety,are held firmly bound unto the UPI of Palna Sp4rg..5,a Charter City,organised and cs isihtg in the County of Riverside,Slate of California,hereinafitr calldd the"City,"in pia sets of; (i11:"c u drall.fifiJ lslgllt k11913�4 58.000.G0 deltms,for the payment of which srui Wcll and truly to be ruble,we bind ourscivos,our hcira,executors,administrators, euccasSors,and assigns, jointly andsev rally,Fundy bythescprerents. WT-lr,R1r,A S,said Contactor has been awarded and is about to enter into the anaexed agreement with slid Cily to pal Cerra*ta Work as s,,oclGod or iodinated in tho Contract Documents entitled! PALM SPRINGS P114se I Convention Center Erponsion C1Tk PBOACT 02-19-28 NOW TfTii,P F.•FORY, it&n!d Contractor,ifs subco,atractorl,its heirs,executors,administrators,successors,or a76igL.s$!'tall fell to pay for ally ltulterlale,provisions,ptovondor, equipment or other supplies need in,Upon,for or about the ptrforrnanre of the Work cone acted to be,done,or for any work or It-bor thereon of any kind,or for anvcun.s dUa uncl,t the Um.mployanent lnsinarcr Codc, or for any amounts required to be deducted,withheld,and paid ovr.t to the Xalnl lopnarnt Development bepartment Nin the Wages of nunploytes of the Gmtractor and its mbcontraciois pttmmit to Suction 13020 of the Unamployrncnt fnsurtmet Coda with respect to Such labor,all as re,gnirul by rho yrai aloes of Title Xv,Chapter 7 Seadons 3247-3252,inclusive,of the Civil Code of the Stata of Califix'trla qY4 acts amendatory attr3of,attd sections of other codos of the Stan:of California referred to therein and nets amendatory thereof,and provided dolt the porsons,companies,or eorpotariom so furnishing said materials, pravie,iars,'provm0tr,egaiptitont or other supplies,appliances or power used in,upon,for or about performance,of 1114 avork corers;led to La oxtruttd or porformod,or any person,company or corporation renting or hiring in rltmant3 cr rnacltlnory ar power for or conurbming to said work to be done,or any person who performs work or Mot upon dte sane*,or any person An supplies both wort[and materials tberofor,shall have complied with the pi ovisions of said laws,tiwn said surely will pay the soma in an amount not tx-,eeding the Sunibereinbefore set forth aqd also will pay,in case silit is WouBht upon this band,a reasonable attorneys fee,as shall be fixed by the Court. This bolts€boll _nitre W die benOI of any and all persoru named In Section 3181 of the Civil Code of the State of California so Ira io egivo a rlght of action to them c•r their assigiu in any suit brought upon this bond. p:COV tDED,that aay altcratious in ale Work to ba done or the materials to be furnished,or changes in the time of cntlnit lino,which tr6oybe.rrctdt puratlattt to die lot=of Laid Contract Documents,shall not in any way release said Contractor or said Statty Ihereuttier,not shall any micasions oftime granted under the provisions of said Contract TJncuwnt;rtlt.asc Bill.;tyld Coah'actor or said maory,and notice of said alterations or extensions of the AFftxrutM is heleby waived by said Snrery, SIGNATURES ON NF XT PAGE Bond No. F14416 SlCit3 I)AND SMED. Qds_Z3r(L_ day of December ._ ..�_ .���Q2,• Surety ACSTAR lnsura_rica-Cpmpan_y.— C,A,,AC.lOr„Trim k Ray ag 1, Inc�_�,_ Ey_, . -. Ay/ J TitlW_Nozko, Jr. . President (SEAL AND Ni)TAlLiAL ACKNOWLEDGMENT Of SMZETY) go vCh—C 1-0 (13 /` TI Corporations rpyiiire ttvo ncstarizerS slgnaturceo: One ftOm each of tho following: 1, Qhalrman of BO&4, president, or any Vice Pracld�nf:AND 2, S"retary,Assistant Secwetaty,Treeisilrer,As,clstant Treanurer, or Giiief Financial WOW). CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT Cr� i State of California )� C ss. it County of C_1 g-(IANrn a G :11 (h On �leeeMly 2L aLi 2-1 beforeme, (�acr z� i� . y�sz P`�cs.-r-tiw ibi,fii , ill Data Name and Title of Ofllcer(e 9,"Jane Doe,Nolary Public personally appeared ..a a.rii10✓)i - k1 Nandi of 619neQs) ' x c tt'1 ersonally known to me >� i� ❑ proved to me on the basis of satisfactory �I evidence IC1i i)I to be the person(Wwhose name(sy Ware- subscribed to the within instrument and ((jl '- acknowledged to me that he/she/they executed I:l !> the same in his/her/i authorized l _ capacity(ps•); and that by his/herr/therr n signature(sy on the Instrument the persorl or bit t; KATARI H LOPEZ _ the entity upon behalf of which the person(sj• f ••� on(s)- Commission# 1387467 •-a Notary Public -California acted, executed the instrument. ill Orange County My Comm.Expires Nov 2b,20r WITNESS my hand and official seal ail Signature of Notary PGbllo d �c OPTIONAL ? Though the information below is not required by law,it may prove valuable to persons relying on the document and could prevent Ic fraudulent removal and reattachment of tale farm to another document. o)J Description of Attached Document 0> <�' �n JG { Title or Type of Document: 7rul �T 130NI D C:-1+,n n-7 01 b_k sti S )J 1 Document Date: a,A:o-i-Clii -2 2 oce2 Number of Pages: I °o CQ, Signer(s)Other Than Named Above: �'rz rc O�z.�Ae,`�L� ��P�1ev1 Ca kr k, a; v n Capacity(ies) Claimed by Signer > 10 Signer's Name: :SP,c.Lq.M PLw�S le- b5 here Ta humb 'J r' ❑ Individual p of t c S; 0,torporate Officer—Title(s): pre srr�e1, qj ❑ Partner—❑ Limited ❑General j) [' ❑ Attorney-in-Fact Jl v. ro ❑ Trustee �(( ❑ Guardian or Conservator ❑ Other: r, Signer Is Representing: n "r1� n P . r :S� 1 L,•.e- ,a iL <i,„V,=�r�jsU�✓.�✓✓d-moo.—.,' v✓v,•,.-,-..••.:,.,.,T_ _„cam—,�_,.,,,,,,,— _ _ _ .,�> ©1999 National NolaryAddrdallon•9350 De Solo Ave,PO Box 2402•Chelovrodh,CA91313-2402•vAawnallonalnolaryorgv� Prod No 59in Reorder Call Toll-Free 1-800-876-6827 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT tl State of California ss. b71 ft l County of 01? ev(;, S tr it 'Ri ri A�fl I ,h� before me,1)crr ,< Oaie Name and The of eficer(6.g.,'Jane Doe,Nolary Publ, ( personally appeared �t k ktil mac ❑ <� , Narru.)of 3, mui,) personally known to met <j ❑ proved to me on the basis of satisfactory )j evidence '01 fk i )I �'i to be the person(sr whose name(.$)- Is/are ?j ill subscribed to the within instrument and -?i acknowledged to me that he/sWthey executed bii t,1 the same in his/heT/the#r authorized .ail capacity(jes), and that by his/bier/theif )j J KATAkl H toaez signature(s)-on the instrument the person(s)•, or t,„� ] ; Commission a 1387467 the entity upon behalf of which the perso*)r j r"ee Notary Public CCIIIIOrnld n acted, executed fhb instrument. _ `(fe Orange County �,71 My Comm.Expires Nov 26,2006 WITNESS/my hand and official seal. 3 ci �/� ,�/�r ii 8,gneWre of Nolary Publ,o �7 l( �I f(i T OPTIONAL too Though the information below is not required by law,it may prove valuable to persons relying on the document and could prevent IN fraudulent removal and reattachment of this form to another document •��t„C, J? Description of Attached Document Ir l=� Title or Type of Document: PrLLA fh_oNr E30n ). 'I"F W yA to Grrun CDC- Q Ak � SM, � )1 Document Date: 2 a, `Zova, Number of Pages: 1 ) Signer(s)Other Than Named Above. n�Jc-. Capacity(ies) Claimed by Signer Signer's Name: ❑ jpdividual 9 7 Top of thumb here GiS i Corporate Officer—Title(s): 1]o-'c�2G T Z_ ❑ Partner—❑ Limited ❑General 01 ❑ Attorney-in-Fact )? ❑ Trustee it [� ❑ Guardian or Conservator ?pl ❑ Other: I Signer Is Representing: ���� AA/,p hl 3� 01999Nal,onal Nolary Assomelion•9350 Da Solo Ave,P.O.5me2402•Ch,owarh,CA91313-2402-mvwnalionalhvmr,org Pad No 5907 Reorder Call Toll-Free 1-800-876-6827 Bond No. F14416 PF-RFORMANCE BOND Ilclwi)W A,L,1,MUN BY TJW16 I'R::S7i;NTS, That . . and„ ACSTAR Insurance Company ,as sure.', are bold Surely botmd unto die City of palm Springs,a Charter City,organized and existing is;he County of Itivtt'sJde,t;:eli`.'ornii,hertinofter called Ile;"CityP'in the stun of,TIVOB d fifty eiehttimuaand(S35g,0P_QjQM doll:as,,for tUo paynta A ON)dcli strut wall and truly io be made,we bind ourselves,our heirs,executor., adlfllnl3h'at6rs,allCCe9SatF,and assigns,jointly and severally,firmly bythcec presears. 4°J1 iFtl;AS Eaid Cr nU5Gt6s has been aw3tdul sac'is about to enter into the amioxed Ageement with said City to perlbnuihe Worlc IIs 5irecificd or indicated in the Contract Documents entitled. pALN[SpMNGS phase 1 Convantion Center Ezpikpslon CITY PROJECT 02"19.28 Nt)W T11.ERITORE,if said Contractor slant perfortn all the requirements of said Contract Documents required to be F:tifo=d an its putt,at the tiros,atld iiN die manner specified herein,0icu Ihis obligation sztt be=11 and void, othi rmicz it shall rcimIn in fell force and effect. 1>T:ov).1)F�n,that any ait,;r Liotw in rho Work to be done or dic materials to be fnmisbed,of cl=? s in Nhc time Of Mtupletloa,u,bich n;ay b':rnndc pursuant to Ure teens of said Contract Documents, shall not in any Way MOW said Cfzhactot or:aid Surety tluarctut trr,nor shall any ometuiDns of time granted under the provi:.•ioiu of said Contract 1lottm 6MA,raleosa oiibeg,mid Ca avaetor or said Surety,and notice of such alterations or extensions of the Agreerne+it is hovel-ly,valved by said Sorely. SIGNA"CC US ON NEXT PAGE Bond No. F14416 SFGN151)AND SHALM, tids 23rd day of December 6"Ini, s tar �u fd Contmcto Raygal, Inc. cort+amfions requiro two notarized signatures: One from each of the following: 1. Cbirman of Board, Vresitlent, of any tlice President: AND 2, Secretary,Assistant $�xxotary,Treasurer, Assistaant Treasurer, or Chief Financial Officer). Ct:Aa.AND NOTARIAL MCKNQWl.rill YMI:NA'OrSURETY Stray _ACSTARTInsurance Company Yiae Henry W. Nozko,_Jr,,•_Pr,esident ---_--_ 233 MAIN STREET P O BOX 2350 - ACS�R NEW BRITAIN,CT06050-2350 POWER OF ATTORNEY INSURANCE COMPANY (660)224-2000 �13) 13Lr26 This Power of Attorney must have original corporate seal, and red and blue ACSTAR logo to be valid. Know all men by these presents: That ACSTAR Insurance Company, a corporation of the State of Illinois, having Its principal office in the City of New Britain, Connecticut,pursuant to the following Resolution,which was adopted by the Board of Directors of the said Company on June 22,2000,to wit. thereof: RESOLVED,That the following Rules shall govern the execution for the Company of bonds, undertakings, recogn¢ances,contracts and other writings in the nature (1) That the Chauman,the President,any Vice President and General Counsel,or any Attorney-in-fact,may execute for and on behalf of the Company any and all bonds,under- takings,recognaances,contracts and other writings in the nature thereof,the same to be attested when necessary by the Corporate Secretary,or any Assistant Corporate Secretary,and the seal of the Company affixed thereto,and that the Chairman or President may appoint and authorize any other Officer(elected or appointed)of the Company and Attorneys-in-Fact to so execute or attest to the execution of all such writings on behalf of the Company and to affix the seal of the Company thereto. (2) Any such writing executed in accordance with these Rules shall be as binding upon the Company in any case as though signed by the President and attested to by the Corporate Secretary (3) The signature of the Chairman,the President,or a Vice President of the Company may be affixed by facsimile on any power of attorney granted pursuant to this Resolution and the signature of a facsimile to any certificate of any such power,and any such power or certificate bearing such facsimile signature and seal shall be valid and binding on the Company (4) Such other Officers of[he Company,and Attorneys-in-Fact shall have authority to certify or verify copies of this Resolution,the By-Laws of the Company,and any affidavit or record of the Company necessary to the discharge of[heir duties does hereby nominate,constitute and appoint O 0 HENRY W. NOZKO, BE, HENRY W. NOZKO,JR., ROBERT H. FRAZER, DAVID A. PRICE, MICHAEL P. CIFONE, JOAN C FORTIER, -O HENRY W. NOZKO III each Individually, Its true and lawful Attorney-m-fact,to make, execute, seal and deliver on its behalf,and as Its act and deed Y N any and all bonds, undertakings, recognizances, contracts and other writings in the nature thereof in penalties not exceeding TWENTY MILLION C DOLLARS (S20,000,000 00) each, and the execution of such writings in pursuance of these presents, shall be as binding upon said Company, as fully and amply,as if they had been duly executed and acknowledged by the regularly elected officers of the Company at its principal office. 05 ,-P = 0) IN WITNESS WHEREOF, Henry W Nozko, Jr., President, has hereunto subscribed his name and affixed the corporate seal of ACSTAR U O Insurance Company this 15th day of September 2000. 0 O > L ACSTAR Insurance Company O 7 — _0 co CD .CD A��1�1 ,.. \ ,• by Henry W.NoZkVjJr,Presidl 1 O STATE OF CONNECTICUT J O N )as NEW BRITAIN O COUNTY OF HARTFORD ) O � to N ;v On this 15th day of September 2000, before me, a Notary Public of the State of Connecticut came, Henry W. Nozko, Jr., President of O c ACSTAR Insurance Company, to me personally known to be the individual and officer who executed the preceding instrument, and he LE acknowledged that he executed the same, and the seal affixed to the preceding instrument is the corporate seal of said Company, that the said L N corporate seal and his signatures were duly affixed by the authority and direction of the said corporation, and the Resolution adopted by the Board " of Directors of said Company, referred to in the preceding instrument, is now in force U j IN TESTIMONY WHEREOF, I unto set my hand and affixed my official seal at the City of New Britain the day and year first above Z Z3 written. \ pAARTN E pTA1a� �Os BL1� * q 'YEC,\OJT Notary Public-Lour Martinche/ I, the undersigned, Secretary or Assistant Secretary of ACSTAR Insurance Company, do hereby certify that the original POWER OF ATTORNEY of which the foregoing is a full, true and correct copy, is in full force and effect. In witness whereof, I have hereunto subscribed my name as Secretary or Assistant Secretary, and affixed the corporate seal of the Corporation, this ��°A— day of ��On m � an 'a.. Robert H U�t�t_— 1 P.CO Secretary /Assistant Secretary R=^sACSTAR INSURANCE COMPANY 233 MAIN STREET-PO BOX 2350-NEW BRITAIN,CT06050-2350•(860)224-2000 NOTARY ACKNOWLEDGEMENT FOR CORPORATE SURETY State of Connecticut ss: New Britain County of Hartford I, Andrea M. Pappalardo, a Notary Public in and for the county and state aforesaid, do hereby certify that Henry W. Nozko Jr. who, as President, signed the foregoing instrument for ACSTAR Insurance Company, a corporation, bearing date the 23_ d day of December, 2002, has this day, in my said county, before me acknowledged the said instrument to be the act and deed of the said corporation. Given under my hand this 23_d daY of December, 2002. Notary Public My commission expires: 8/31/06 ANDREA M. PAP R,'U.PiRCOO NO3'PxRY $?3r"zrl MYCOMUSSIONE%PfRE3A'*, CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT [(li State of California �l p ss. <; County of �2n.v� c i15 Ir �> On 26.2.Qo2­ before me, 1L-m P <� Data Neme antl illle of dffioor(a Jone Due,NoraryrPobllo I@) 11 c, personally appeared TA, V �/��/, Names)ol9lgner(n) � 2 F� personally known to me =>� ?! ❑ proved to me on the basis of satisfactory 71 evidence ; I(! r I to be the personK whose name(s) Is/are' JI G; subscribed to the within instrument and �.�; acknowledged to me that he/she/they executed (< the same in his/her/their authorized i I�•1 capacity(ies), and that by his/her/their 3 KATARI H LOPEZ > k� signature(ayon the instrument the person(.&), or _OlMyConnign. Commission# 1387467 , (,5 the entity upon behalf of which the person(s� 5H Notary Public-California n acted, executed the instrument `'l,> Orange County 'tIh Expires Nov 26,2b16 l�J < WITNESS m hand and official seal. �n <i x be,z ub� Cy�i Signature of Nola Publm Q Cy. Q S) �l OPTIONAL Though the information below is not required by law,it may prove valuable to persons relying on the document and could prevent y� ( fraudulent removal and reattachment of this form to another document. Of Description of Attached Document � l nn Title or Type of Document: P'0;;� 1(, Document Date: Number of Pages: 's tC Signer(s)Other Than Named Above: al aV._ 11��-iC' •4�P.,r�c�n 1A) F,B0 l,0 l( oJl °I Capacity(les) Claimed by Signer ' o„ s Signer's Name: 0,-Hery IS- { b)I ❑ Individual Tep of mime here t" 4?r�corporate Officer—Title(s). NmStoe_•,'c"' ?1 ❑ Partner—❑ Limited ❑ General )l [ ❑ Attorney-in-Fact 1z I(' ❑ Trustee �n ❑ Guardian or Conservator gt� ❑ Other: ,i Signer Is Representing: Kam._ (ai 9 p 9 �F.>��_ ��_-%<:✓-�.�.�.v2 5�!3`�=���=J✓a��J✓9 v�s✓,:�....���_�a��::",c:�-vim -s-.�_-_.,.._�`;..(�`'a✓:--.,.�'-�3 01999 Natural Notary Assuolehon•9350 Do Solo Ave.,PO Box 2402•Chatsworth,CA 913132402•wownationalnoraryoM Prod No.5907v v aeordor Coll TDII-Free 1-900-B70-BB27 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT State of California lull ss. )1 Count J Y o f f' On J7ee�rti.hnr ?(z . 2I before me, koarra2l i Rab11a , Data Name and Tllle of Mai,,(e.g,"Jane'Doe,Nolary Public') z �(C( personally appeared �bi L t\e:'A� F_ C �\ Nenle(e)of Slgner(e) iJ ❑personally known to me %d1 << El proved to me on the basis of satisfactory ' (� evidence �)I <C' to be the persorI whose name(I is/are- °I subscribed to the within instrument and I'fl acknowledged to me that he/she/thee executed oil the same in his/ber/their authorized a) capacity(iesy, and that by his/ber</their �J'3 KATARI H. LOPEZ signature(s)-on the instrument the person(s), or h > _r..r Commission# 1387467 the entity upon behalf of which the person-I )i IGi, ,-fr Notary Public-California n acted, executed the instrument. "1 Orange County )I li MyCorpm.Expires Nov 26,2006 WITNESS my hand and official seal. it Signature of Nclaly Public y7I I� j c: icjl t" OPTIONAL rpl Though the Information below 1s not required bylaw,it may prove valuable to persons relying on the document and could prevent f q) fraudulent removal and reattachment of this form to another document >�1 S' R Description of Attached Document14, i I�I Title or Type of Document:��etc u».,nc_� 4�N a 114��tta x C.i r,n cF �rn�2•r �ou-i��;� i; Document Date: Number of Pages: IC' II )I Signer(s) Other Than Named Above: w) Kin q1e:" If Capacity(ies) Claimed by Signer l iI ire Signer's Name: hoL'L I t r-- � t0 ❑ I dlvidual Top of thumb here o]j c, I �? © Corporate Officer—Title(s): r+i �crno,,,f --�- t�'� ❑ ParCner—❑ Limited El General )1 V� ❑ Attorney-in-Fact {S ❑ Trustee j ❑ Guardian or Conservator � 0 u El Other: Signer Is Representing: V\,Lc-Ic bi l va 01999 Nalmnal NI Asmagrto,-0350 Ce Soto Ave,PO Be.2402•Chalswedh,CA 913132402•www notwiralnolery.org Prod No 5907 Reordor Call TdI Free 1-800-8766827 • TRADE BID TRADE BID PACKAGE# 28 TRADE DESCRIPTION Kitchen Eguioment BID TO: CITY OF PALM SPRINGS, CALIFORNIA The undersigned Bidder proposes and agrees,if this Bid is accepted,to enter into an Agreement with the City of Palm Springs in the form included in the Contract Documents (as defined in Article 4 of the Agreement) to perform the Work as specified or indicated in said Contract Documents entitled, TRADE BID FOR: PALM SPRINGS CONVENTION CENTER EXPANSION PHASE 1 PROJECT NO. 02-19 Bidder accepts all of the terms and conditions of the Contract Documents,including without limitation those in the Notice Inviting Bids and Instructions to Bidders, dealing with the disposition of the Bid Security. This Bid will remain open for the period stated in the Notice Inviting Bids unless otherwise required by law. Bidder will enter into an Agreement within the time and in the manner required in the Instructions to Bidders,and will furnish the insurance certificates, Payment Bond, Performance Bond, and Permits required by the Contract Documents Bidder has examined copies of all the Contract Documents including the following Addenda (receipt of which is hereby acknowledged): Number 1 Date 12/5/02 Number 2 Date 12/6/02 Number 3 Date 12/12/02 Number Date Bidder has familiarized itself with the nature and extent of the Contract Documents, the Work, the site,the locality where the Work is to be performed, the legal requirements (federal, state, and local laws, ordinances, rules, and regulations), and the conditions affecting cost,progress or performance of the Work and has made such independent investigations as Bidder deems necessary. In conformance with current statutory requirements of California Labor Code Section 1860,at seq.,the undersigned confirm the following as its certification: I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake self insurance in accordance with the provisions before commencing the performance of the Work of this Contract. To all the foregoing,and including all Bid schedule(s),List of Subcontractors,Non-collusion Affidavit,Bidder's General Information, and Bid Bond contained in these Bid Forms, said Bidder further agrees to complete the Work required under the Contract Documents within the Contract Time stipulated in said Contract Documents,and to accept in full payment therefore the Contract Price based on the Lump Sum or Unit Bid Price(s) named in the aforementioned Bidding Schedule(s). Date: 12/17/02 Bidder: TriMark Raygal, Inc. By, Jack Me Tine: President STRADE BID TRADE BID FORMS - 2 • TRADE BID SCHEDULE Lump Sum Price for Construction of The Palm Springs Convention Center Expansion Phase Project No. 02-19 in the City of Palm Springs, California TRADE BID PACKAGE NO.: 28 TRADE BID PACKAGE DESCRIPTION: Kitchen Equipment TOTAL BID PRICE - (INCLUDING PERFORMANCE AND PAYMENT BOND PREMIUM) - $ 358,000 Price in figures THREE HUNDRED FIFTY EIGHT THOUSAND DOLLARS Price m words Price in words BIDDER: TR RAYGAL, INC. BY: Signs e TITLE: PRESIDENT DATE: 12/17/02 s City of Palm Springs TRADE BID SCHEDULE - LUMP SUM PRICE TRADE BID FORMS - 3 INFORMATION REQUIRED OF BIDDER • LIST OF SUBCONTRACTORS As required under Section 4100, at. seq., of the Public Contract Code, the Bidder shall list below the names and business address of each subcontractor who will perform Work under this Bid in excess of one-half of one percent of the Contractor's Total Bid Price, and shall also list the portion of the Work which will be done by such subcontractor. After the opening of bids, no changes or substitutions will be allowed except as otherwise provided by law. The listing of more than one subcontractor for each item of Work to be performed with the words "and/or" will not be permitted. Failure to comply with this requirement will render the Bid as non-responsive and may cause its rejection. Contractor Percent License Of Total Work to be Performed Number Contract Subcontractor's Name & address 1. refrigeration 568269 67 OMNI TEMP 92nn A211 Rd- Tkmxme T. CA 90241 2, walk—ins 249493 107 R_M_T- 7421 R. Slauson C'=er .e. CA 90040 3, custom fab/install 782622 137 K.F.T. 2711 Main St. _Santa Ana. CA 92707 4. 5. 6. 7. 8. City of Palm Springs LIST OF SUBCONTRACTORS TRADE BID FORMS -4 • NON-COLLUSION AFFIDAVIT TO BE EXECUTED BY OFFEROR AND SUBMITTED WITH PROPOSAL State of California 1 ss. County of ORANGE 1 I, GARY WAHLSPROM being first duly sworn, deposes and says that he or she is Director of Purch.of TriMark Raygal, Inc. the party making the foregoing bid that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. • BIDDER TgTMAgK gAyGAT,, INC. ='2zu BY (;ARy R. WAHLSPROM f - r TITLE DIRECTOR OF PURCHASING/ESTIMATING ORGANIZATION TRIMARK RAYGAL, INC. ADDRESS 2719 WHITE ROAD, IRUINE CA 92614 SUBSCRIBED AND SWORN TO BEFORE ME THIS 16DAY OF December, 2002 NO'f�C IN AND FOR SAID COUN'YAND STATE MY COMMISSION EXPIRES: � _?�1- `_,- •2J) t� KRISTIN K. TOTH Commission#1257958 < gg BIDDER'S GENERAL INFORMATION City of Palm SpringsQMyComm.Bq*L,s Notary Public-Callfomla q Orange County BID TRADE FORMS - 5 Iv1ta24 M SCOPE OF WORK TRADE CONTRACT NO. 28 KITCHEN EQUIPMENT PALM SPRINGS CONVENTION CENTER EXPANSION PHASE I CITY OF PALM SPRINGS, CALIFORNIA Provide all necessary labor, materials, equipment, hoisting, scaffolding, tools, rigging and anything else necessary to complete the Kitchen Equipment for the Palm Springs Convention Center Expansion Phase I Project. I. GENERAL: A. All conditions as set forth in the Safety Program, as adopted by the City of Palm Springs, (Exhibit A), Master Construction Schedule for Bidding Information (Exhibit B), General Liability and Automobile Insurance Limits (Exhibit C), Document List dated November 1, 2002 (Exhibit D), Construction Manager's Standard Provisions (Exhibit E) and Temporary Utilities for Construction Purposes (Exhibit F) are to be considered as part of the work. B. The Drawings and Specifications dated October 30, 2002 (Exhibit D), indicate the General Scope of Work. C. Trade Contractors shall carefully examine this Scope of Work to be performed and the relationship of this work to the work being performed by other Trade Contractors. D. Where a Specification Section is specifically included in the scope of this Trade Contract, it is intended that all work covered by that Specification Section will be included except as otherwise specifically noted. Other specification sections referred to either in these specifications or on the Drawings are included by reference. E. The word "provide" when used herein shall mean furnish and install completely, including all costs of labor, materials, equipment, hoisting, layout, scaffolding, tools, rigging and any other facilities necessary to complete the Work. II. SCOPE OF WORK A. All work defined in the Specification Sections listed below is specifically included, but not limited to, in the Scope of Work of this Trade Contractor, unless specifically excluded in Paragraph C below. 11400— Food Service Equipment B_ As further clarification, Trade Contractor shall: 1. Remove existing to onsite storage, protect, and reinstall specified equipment as indicated. Page 1 12/7/02 Palm Springs Convention Center Expansion Phase I Scope of Work Trade Page 2 2. Inventory equipment already removed by Owner and report any damaged items to Construction Manager. Reinstall equipment removed by Owner which is specified as reused. 3. Provide troughs and grates as shown on Drawings and Specifications. Coordinate layout of depressions and setting of angles with Concrete Contractor, 4. Provide and install all new Kitchen Equipment including, but not limited to, ovens, ventilators and all Cold Storage Units , including cold prep and beer storage, complete. 5. Protect floor during installation. 6. Allow for out-of-sequence work at the discretion of the Construction Manager. 7. Verify lead times and delivery schedule with construction schedule. Trade Contractor will be responsible for any necessary expediting to meet schedule. 8. Coordinate receiving of new equipment with Construction Manager. 9. Coordinate scheduling and sequencing of all disconnects, reconnects, new locations for hook-ups with Construction Manager, Electrical Contractor, Plumbing Contractor, 11VAC Contractor, or any other affected Trades. 10. Remove haul-off and discard of equipment not to be reused or salvaged in compliance with the state and local codes. 11. Review all Mechanical, Electrical and Plumbing Drawings and Specifications to verify that all systems are adequate and properly located for all new and reused equipment. 12. Trade Contractor is responsible to protect wall, ceiling and floor finishes and will be financially responsible to replace and/or repair any areas damaged during transport/installation. 13. All new and reused equipment shall be tested and final cleaned and ready for operation prior to Owner's acceptance of work. 14. All exposed areas, including, but not limited to, ceiling penetrations, wall penetrations, and open areas between equipment shall be finished with the proper escutcheons, covers, guards or similar for finished appearance. 15. Verify that all specified system are in compliance with local codes and scheduled for installant per manufacturers recommendations prior to installation, and report to Construction Manager any discrepancies within (5) days of award of contract. 16. Include all modifications to existing refrigerator unit(s) as indicated on drawings and specifications. Page 2 12/7102 Palm Springs Convention Center Expansion Phase I Scope of Work Trade Page 3 17. Modify existing "ansul" or automic fire suppression system. Provide shop drawings for City approval prior to modifications. 18. Provide all stainless steel cornerguards, coordinating installation with Construction Manager. 19. Include all structural supports in accordance with drawings and specifications. This includes providing braces/bracketing and coordinating with framing/drywall contractor. 20. Provide necessary instruction to Owner for proper and safe use of all equipment. Provide owner with operating and maintenance manuals for all equipment items. 21. Verify wall framing layout with Construction Manager and framing contractor to insure proper fitting, clearance, and operating space for all equipment. 22. Provide the following insurance for Combined Single Limit or Aggregate, in the amounts described: A. Comprehensive General Liability, in the amount of 3,000,000., including: a. Premises and Operation b. Elevators C. Independent Contractors d. Blanket Contractual Including Liability Assumed by Insured Under the Subcontract. B. Comprehensive Automobile Liability in the amount of 1,000,000., including: a. Owned b. Non-owned C. Hired Automobile Exposures. C. WORK EXCLUDED: 1. The following items are specifically excluded from the Work: 1. Plumbing 2. Electrical 3. HVAC 4. Removal of existing trash compactor 5. New Trash Compactor. D. LABOR RATES: 1. To determine the sum to be paid for labor and materials for change order work performed on a time and material basis, the following hourly rates shall be multiplied by the number of approved hours for each classification of labor. These hourly rates represent full and Page 3 12/7/02 Palm Springs Convention Center Expansion Phase I Scope of Work Trade Page 4 complete compensation (including overhead and profit) for providing labor. In addition, these rates represent full and complete compensation for the cost of incidental items including but not limited to such things as small tools and equipment (valued at less than $250), travel expense, fuel, employee parking, etc. E. ALLOWANCES: None F. ALTERNATES: None G. GENERAL INFORMATION: 1. In addition, the Work will include the requirements of General Conditions, Supplementary Conditions, and Division 1, General Requirements. 2. The drawings, specifications, and other information listed as Contract Documents indicate the general scope of Work, and do not necessarily indicate or describe everything required for the full performance and completion of the Work. Trade Contractor shall be solely responsible for completing the Work in accordance with code requirements and the reasonable intent of the Contract Documents. 3. Trade Contractor shall visit the site and become familiar with the existing conditions and the physical condition of the site. Trade Contractor shall examine and fully understand the Contract Documents and all other exhibits, attachments, engineering reports, soils reports, special studies, and existing conditions to the extent necessary to perform the Work. 4. Trade Contractor acknowledges that he will be working in an existing, fully functionally facility. As such, Trade Contractor will allow for the Owner's needs for security and cleanliness and will perform this Work without disruption of the Owner's day-to-day operation. 5. Trade Contractor acknowledges that Turner is the Construction :Manager and as such has no field forces or material handling capability to assist Trade Contractor. Page 4 12/7/02 Activity Aglgiry Ode Early Early ID .Description Dur start Finish Mobilization Mobilization 1000 mows 0 274aM h1obllize 1040 SdtpTrda 2 24Ja,C 2END.M Set up Trailer imo WTarpaWFbauRb 1 Z/NOA2 27N7.02 0 !Set Temporary F ower Pole 1033 trspaimdTarppx 0 2/NU.02 *Inspecdonof Te p.Power 1040 alagmTarp FUner 3 03:ECM (ADECO2 Energize Te_ .Power IM FIdal Corshxson al Feng 2 © Install C, uct(on Fencing 1097 CtUh CgrnPond 0 107E(A2 Obtain De o Pennit 1010 Otlah Kirllm&ifgFkrrri 0 12 ♦Obtain KI then Bulldin P rmit 12yJ Octal Sprigs McN1g R(Xm Perri 0 1 41m Bides 0 17CEOY' ObtainBid Sp togs Meeting R'om Permit *Bld Otte 4160 AvedTra�CaearYrs 6 1tLFf@' 0ai*W Award Tra aContractors 1000 StaddCa WKichal 0 CHW`A3 Start of C nstruction � Kitchen ' I Phase I-Kktwn Expansion Demolition&Grading 1100 Safe Olfgxhdw@FxtiimCa W&Trolls 1 cawE3 am*= a Safe Off Sprinkler@ Ext dor Canopy 6 T ellls 1110 SafaOlfElaad 2 03Wy3 101*M © Safe Off Electrical I ! 1W Instal SIB CaWActonF 1130 Rck�d Q CdiBax 2 1014NM 1316M ® Oemo a Construction Fencing i Ex4rg Laed'g ® Protect�,,Exlcting Loadl I g Dock Cold Bo : �� 0 Install Sit 116) ShoreTmis 1 10W U3 10WJC0 0 Shore-Trellis 11B0 DamoE)&eaVVal Frill Teh Lorkzs 3 iawm 14ytd03 — _ -- - - € arlor Wall F(rish Q Tle-In Lo ations --- --- tiro TerrporWV6WwX1P oIaokn)atE3davWaG 4 1016D3 1SW433 ® Temporary Vlsqueen(Protectlon)at Exi orlor Walls 1140 F1zHdGai Nrtr 1 1014r13 10W03 U Protect Gas Meter 112) Ra Timhanpady 1 101*0 101 Om 0 Remove Trash Compact r I 1170 OarnTteF3 1 13Wy73 1316M _ 0 Demo Trellis 11B) Damon dLcadrg RldrRodSMre 3 14J*M 16W013 ® Demolition of Loadln Dock Roof Stricture 120 Darn-CandeStabsLmdg DockWabSFlg; 3 15wo 17467'YB © DemQ-Concrete SI s,Loading Dock Walls d Ftgs 1Z30 St6fda (3adaNav&kigPaea 2 1746t33 2116133 ® Ste e 6 Rough Grade Now Building rea 19M SolCnwft BPadC&*afian 0 Mi6m Sol(.Com action d sad Certlficatlo Structure 1930 floe/&La�nt 1 21,WD3 21,41I3 0 Su ey&Layout 12i0 F_xaebBdtg 30cdcWa Fora>� 2 2216M 23W B m E cavate Bulldin ti Dock Wall F dings 120 SdCarpa/inTaa 0 216M -�S it Compaction esfa 'I" Istal Rebaa&iiigSLtxkWalFbaigs 2 zuVa 27d*M ® nstall Reber a Building R Doc Wall Footings ttm UGMBP 5 2SNN33 3aAlD3 _ ® U/G MEP 1270 RtaFxyedion 0 27.WD3 T abar lnspecti n 12D Po Di:lrgB DockWal Footigs 1 2U*03 2BPM 3.1 Pour Building II�6 Dock Wall Foe Inge 1911 FamComlRasBRaryWats 3 23WD3 31,W�173 Form Colum Plans d Ramp lryails 1111 14A '� 0 31W'ixi U/G MEP Ina dlon Start Dale 25WVM PSC2 Sheen o(I 1 Flnlsh Data 13M Y03 Dale ReWsbn Chedied Dam0.1e 2sNovoz P,oansaBar Turner Construction Company Run Dal. 05DE921"657 Cdtkal AcWty P.S.Convention Center Expansion 0 Primavera Systems,Inc. Activity Activity Orlg Early Early 10 Description Dur Start Flnlsh 1430 Baddl t.LG kEP 2 M_IAM 31.1*M _ Backfill D/G MEP 1310 tsfalFk6a&CdrmPrr}vBrrFsQ°Pies 2 31.16NO3 03�Em Install Rabi r&Column Anc ior Bolts @ Piers 1310 Pabattpedal 0 039mm ��Rebar Insp ctlon 1W Sol n 0 03F8 . Soil Inspect on 1321 Fbr m CoIrFhs&Ramp Was 1 04FEBM 04F®O3 1 Pour Colu Irrn Flare&Ramp Walla 1330 WPEr rr&Wa1Fas 1 �03 0`.F®03 B Stri Pier Wall Forma 1340 BadAWa1s&DardWFcoegs 2 O7FEBM --~ ® Backgll ails&Demo'ed�ootings 1383 GataSa5m Grada 1 O7FFB03 07F®O3 Grade SI 6 on Grade 135) Sol Comparlon 0 WF®U3 SoFI Come tj on 1393 Sa56bF &LtdcPrgis 2 10:B303 11FEB03 0 Set Slap Edge&Dock Angles 1380 EpoyConrhatBa*gSbb 2 I(FEB 3 11FEEM _ 0 E Dowels at Exlstin Slab 4170 Va4marardSad 2 12�1I 133EB03 it Vlsq i an and Sand 1410 �kcJ@Comc 1 12�03 laiBm Y Block ut@Columns 14'D F�iReta 2 13IZBM 149mm 1451 Pduiepecin 0 14�03 8 Instal'Reber UM RxrB�gSI3bChGada 1 17FF33)3 17FEBM Rebaf Inspection I i ___. _ __1__Po_r Building Slab n Grade 1430 SYp5�6Wa1 Fiarrs 1 17FEBM 17FEBW 1 Stri Slab&Wall Fo s AD Sol Sal LIN SeaCdrrns 1 iffEf 3 18�73 B Be StructuralSteal olumna 18M tffiIShilid Sled Beene 3 ITEEM 21FEBM ® I stall Structural S sal Beams 1510 W&VCarad<xsb E%frg ShrYre&G� 3 21FEEM 2ff EBM Weld Connectio a to Existing Structure&Gussets W lsldSrontadc&Kress@EsstEd:We[ 3 24f®03 2FEB0i Install Stron ba k&Kickers @ Exist EzV.Wall 1M Wild Fmlecl n 0 25FIM Wald Inspection 1940 DaroEgairRa rg 2 23TEEM 27FEEM ® Demo Exterior raming 19ED "EoImTrak@fQrgParapd 3 ZIFEB03 OINAAAF 3 Install Bette Track @ Existing Parapet 15M ysla WWDKkrg&Cbarus 4 03v1NIIi 0346M Install Meta Decking&Closures 198g Insall plala 3 03vK4i73 CBvhldD ® Install Bent Plate 1540 Madah5ltdrdSbd 2 0NAF03 1aAAR03 ® Monokoh Structural Steel'___ Exterior 1{gg La'ai4ExlarrorWals 1 24FEEM 29FEBM I g ayout Exterior ells 193) InaWTS.@RokWDons 1 � �6 I Install T.S.@ R 11-up Doors 2D0 FrariaE'bsaWab 2 2B�W WFiEB03 ®Frame Eztsrlor Walla 2B0 PirrtrgWdFtou�ri 4 2iF®D3 fHvWi]3 Plumbing all Rough-in 2310 EahlmlWal Rrxgti-h 3 2�Ri 111MNiT; ElecMcal W II Rough-In 232) NawGsPprg FYdr 2 2f�O3 OGNNiD ----- ----------- ---- New Gas Pip ng Rough-in � - 1840 EknorFrang Yrptdn 0 NiM I Ezterlor Frami g Inspection 1fl47 Fsbl Fir v5r�6Hrg �) 1 �06 2t3 Install Exterior Scaffolding(toefboards) 163D SetEdanDoaFranas 1 2FEBM Set Exterior rFrames 18M tda1F_+ei°rDa*Ga 2 0346M OWAR[3 _ ■ Install Exte or Dens-Gies in B*X"shaoiig hpachn 0 07Ma1>Oi 7t3BD EIFS is"M&Rmeah 3 OAvt4FII3 11tv1NiD Exterior Sh sting Inspection E.I.F.S 1 sulatlon&Reve Is IB00 EIFS MadrBasaCod 4 iavvfm 13JA933 ® E.I.F.S esh Base Coat i7Eh 19M EIFS F Curt 3 14AWM 18MARM ® E.I.F� Finish Coat 19M Iia Suaiddng 1 1945F 3 IRAAR3 1 Remove Scaffolding 21370 Msbl RokV Doors 2 2tvWii3 — -- --- -- ----- p Inat II Roll.uoors 210 ir;ml Duos&Fladnae 2 2TvY+FiT3 21MAM o Ins all Doerps&DHardware 23R1 F UIVEPTrin 3 2NARI3 24MAP403 ® 1 stal MEP Trim 21� fakBiera 2 2tAWO 2M40 0 aulk Exterior Sheet 2 of 11 Activity Activity Orlg Early Early ID Descdptlon Dur Start Finish APR MY 1910 Path EIFS@RodTicits 3 21A1�R13 23/pM 2TN �Doors 2 27rNQ _____ �_ hatch E.LF.S Roof Tie-in's ® aint Exterior Doors Fsw DoorS@a6@RckpD=s 1 7ffv1^A03 0 Install Door Seals @Roll-up Do ra 3l1] ill Dock RYW 1 2IvNf� 0 Install Dock Bum r Interior 15D Layottleraw H 1 WM^F3C0 O7A1W713 A Layout Interior Walls VI) FrarektavWals 2 07MARB tOW1713 ® Frame Interior Walls 1010 Srtl1arr0ccr&WndoNRerna3 1 iam;iM 1QvWVl 1 Set Intad r Door&WlndaIw Frames 4090 Set Fan Coss 2 11hgo 12 RM m Sat Fan Its 2190 FLrtigWal Fi,ugfh&Ras3zeTe4 5 11NOM 17vA9D3 ® Plum In Wall Rou him&Pressure Toot 2180 Banal WalRx#M&Sd NaNPBr)8k 4 11f wM 14Akq ; IM _ 1�Mqm Electrl 1 Wall Rough•Iri&Set New Pan Is ?dJD tcPedion 0 17M^IiD I Interior F aming Inspection 2� PlrrtiigWaitsPe� 0 IaVAR03 �Electr cal Wall lnapectlon Plum ing Well Inapedtlon 2233 pY+d 3 M41903 MA*M _ _ _ __ m D all 1590 talek DtdasdadFiudDedc 3 19VA91i 2IMN373 ® Ins ilate Underside of Root Dock 2250 TapaFhat&Fneh Sore Inspection 7 vo I ape,Float&Finish 1590 lrsb1 TZOm eed 5 ® Install HVAC Overhead 1610 ts131OsImdRntig&FlasreTe3 5 2YvWYD 3TvWZB _ ® Install Overhead Plumbing&Pressure Test 1610 Fdal Fre —1--- . ___— _.___._._._ Sprilda(OH Ppg,Urys&P.T. 5 211vyFd10 37vVJ3I3 ® Install Fireler. OlH plping,;Drops&P.T. 1tB0 Instal O.al>mi Elriiral 5 MARM M*M ® Install Overhea�Electrical 4100 Incial WM and CHAMRPkig&ResmurTest 3 201WYD 29JN733 2270 PantWats&Dryoal Ceings 3 24NA933 2 vA9)3 Install H &R and CHWS&R Piping&Pra�ssure Test 2310 insialOco &Hardhare 2 ® Paint Walls&Dr all Callings 11B0 hWWC&HAS&RC1-MS&RRoU O,ehoad 0 31NtNiB - - � -- -- --- — ------ Install Doorad Hardware Inspect HVAC&HWS&R/CHWS&R PI Ing Overhead It 1f3D YWecIOmhwdRmJrg 0 31NOMi It Inspect Overhead Plumbing 41W FaIaUQHFiJPC 0.ri4kap&FuT6rg PGng 2 3IM6M 01APR03 Insu ate OIH HVAC Duct/Piping&PI mbing Piping 'IBrD t�edFre` O�ed�aal 0 31NAF03 Inspect Fire Sprinkler Overhea 1Q0 ��� 0 31MN�6 L_ Inspect Overhead Electrical 210 Install Glass 1 31MW3D3 i— r1nass 2353 Patl3oos&fra us 2 Ot4FfC3 CPMZD ors Frames ?3D Ceig Wrre 2 � ca4PF03 WlreA 72M Aoxsdral Ceig CaU 2 036PFKB 0� tical Calling Grid 2130 T"New Bow 0 03*FQ3 ___ _ Tie-inNow Boller Zi70 F�IL�iFolaes 3 WFFi� 173N'HRi ll Light Fixtures Z3f0 4ctalCeig Diffusers 3 00FRD O3OPFC3 ll Ceiling Diffusers 2'i'd) hsml SpnlJrFiee� 3 0VfFV3 O56PR13 ll Sprinkler Heads 23D Y�edOmhwcllo-Co -p 0 0`*fw 2M Bta� Fodr� 1 096PEC3 09sf-Firo Inspect Orarhead for Cove-up _ 0 Ener Ize Light Fixtures 2L30 �I�aT+e 2 034PRD 10413f3 m Install Ceiling The 2391) PleP&(aulkFl 2 11PF173 144FFO ® Prep Caulk Floor 10D 2 R � 9 5 17PFT300 15FliD ® Resinous Flooring SealCaroae Flw@DyShg7e 1 lwfu 15KiYB 0 Seal goncrote Floor @Dry Storage tutalVCfal Ol0ee 1 ISAM 15WFE33 0 InstallNCTat Otgce 2410 1n"RrtbaBare@D1yScmgc 2 16^PFn3 17PFR13 0 Install Rubber Base Dry Storage BMInstall FFP 4 1t3�FR13 23sPR¢3 111111111 Install FRP Sheet 3 of 11 Activity AWII#y Orig Early Early Ip Description Dur Start Finish 2510 linseiPpaBolards 1 18eFPo3 13°R703 0 Install Pipe Bollards 257D jPaatFlpeBoI,3d5 i 21APFU3 2tWFO E Paint Pipe Bollards am lBecticaiTfirn 2 23OFF03 2Wii3 _ 0 Electrical Trim 20 Run-tongTrtn 2 2YPF433 236FFC3 ! 0 Plumbing Trim 25M ksialCrniaClerds 1 2VFF403 21APfYII 0 Install Comer Gui rds 217D SdWdsrrE"out 3 M6PFM 2PFR33 0®i Set Kitchen Eq Ipment - 2480 FAafD'dmEs1- r&HxktV 2 23%9;03 2 V'FC3 Ili Install Diahwaa ter&Hook-up 2790 HrkapKIdw VTOt 3 3YFF03 Oamt m _ M Hook-up Kitcl an Equipment ZCO a"Kp&Pudtd 3 3]aM OzmW m 00 Clean-up&P nchllot 2540 Otyi-g-kon 0 0%%Y 0 City Inspectipn FIo3M3 Depahstltspesn 0 WMNM Health Dope ant Inspection 24'D CtyFrdtgadin 0 Owym City Final Inc`pectlon a70 CadualadQnpary 0 Oa mm Certificate of Occupancy Roof 1830 lirsalRodDrans 3 031A40 1M440 ® Install Roof Drains lao Ysfal Brier&co darsg LktpbtbT s 2 O&AARM 07NPFO i El Install Bollrr&Condensinq Unit Platforms W jInaa1En&dFartCjbs 1 ORMFO 0%iWO 0 Install Exhaust Fan Curbs 170D SelMEPRxfJads 1 07NIA 13 07M^A01 0 Sat MEP Rrf Jacks 1710 1720 Instal RodFIlsgs 3 IZ44 8 141vW70i __— _ IS Install Roof Flashings 1 s haaTa(ssd Pudtslalon&Cdws 4 t01vvgm 13AAF4)3 m Install a Bred Roof insulation&Cricket 1730 Roofir"cln 0 AAOM Roof In 3pection 1740 kX"ME1dr8a Ro*V 3 14NPRM 10vWO3 ® Insta I Membrane Roofing 2120 Ydal PzdBab9&WakPads 3 19VkR03 21MW ®N3 Insl all Roof Ballast¢Walk Pads 2140 Trip@RodLYas 2 19VOAM 27AAF03 D TrIm@Roof Dralnsi 17150 SatBokr&TadsardCcrden gW 3 24 AAF03 23vWA03 ® at Boiler&Tan a and Condansing Unit 2110 Instal CouraOastkg; 2 24&4vO3 2746Fim D It stall Counterfiapings 1751 Sd5t"Fas 1 2YvWO3 27146FYB 0 S, tExhaust Fans 1770 IstalBdaP{kg@Rod 5 2%SVM 01PR03 30 Install Boller�Iping @ Roof 11 3740 RaateRafyarietkes 2 27M^RD WJAR33 _ _ m Reroute Refri elate Lines 1780 Bv:kW@Bol8r&C3-d3 r&Otd*@R,)i 3 31M4F03 07PFtd73 Electrical @ Boller Condenser& utlets@Roof 3710 Test Plang 1 =Oa56FFU3OMa:N-qF:W 0 Test Piping 1790 Irxpd Brier&Ca�saPpig&Eladiai 0 Inspect Boller Condenser Piping&Electrical 1BT7 fatale&label BoilrP{ag 3 00 Insulate&Label Boller Pip ng 215) PaitFodFLa<7ig&Iv�Eq.q&PlX ms 2 Paint Roof Fashing&Mlsc.E ulp&PlaHo a IBMC�Rod&PUlch" 1 0 Clean Roof&Punchllst 2170 FrslRcdh*eJn 0 Final Roof Inspection 30e 1231 lRolocaleltoodngDockAreaDran 3 2aWO 2ZW403 M Relocate Loading Dock Area Drain i 41DO LarWf,6.vM?mryWd 1 2 9MM 29EBtD 1 Layout New Mao Dnry Wall 4010 trial MasenryWals 2 2Fffi3 ?/FM 0 Install Masonry Walls 4OM GdMaeroWal 1 23:EE03 23fY3 I Grout Masonry Wall 4070 BwnMatxryVM 2 03AARM OIA6r4373 _______ _ 0 Brown Maso Wall 4090 EIFSFrfhCca HWO3 2 09 0%16 3 r 0 E.I.F.S Fini h Coat 40M Baba&CargidTra9hCarpedrWaM 3 21VM 2#44FM I, BE B ckfill&Comapct Trash Compac r Walls 4010 GadeS6hmSbbmOada 2 73A6RM 2%VRM 0 rade Site Area Slab on Grade 4000 Sol Cm adm 0 1 oil Compaction' Jill 40S) I hslel C-creb REifadg 3 Z1fMR13 31MM313 I Install Concrete Relnforeln Sheet 4 of 11 Activity Activity Ong Early Eady ID Description Dur Start Finish 4140 RdgF -n 0 01A9;C3 Rebar Inspection Phase 2-EXWM lObgiehs� Interior 2210 Oxs1UJTarp0rayPiobdn@N0NtndsrRnn i ITE923 0 Const ct Temporary Protection @ New Locker Room 2MO Wien Back 0 2PN W ttchen Black ' 273D try Sale8a5ral Plrrthg&Spbi 03 das 1 2 %R 23&FM 1 Make Safe Electrical,Plumbing A Sprinklers 2740 RdedH30i;&6�iigGod Room EgSrne t 1 2%%1``0 2%44FC3 1 Protect Hoods&Existing Cold R win Equipment 2770 Tarp LVing 1 MVW0 3 mfw 1 Tema.LI htin ZED DaroCeig 2 3IN44RM OLaPFC3 Demo Ceiling 23M Rax na tWw EgJipmat 2 31k0FII3 OIPAi08 Disconnect Kitchen Equlpmen 280 Da iiCdng'Wab@Clloe 2 31NWi3 01ARfU3 Demo CellinglWalis @ Ofte 2310 1 31MORM 311VAim Layout Underground Plumbin 230 IPaboak3K&ienEqupmwt 2 31NVgO OWiiD _ _ Relocate Equipment 2C0 Ra aLoduFbxrn&CoURq1WaI 1 OAFFM OWFFU3 Frame Lockeri Room&Cold Prep.Wall 2iM SwWRoa@UGPtrntig 1 01P W{PFU O373 Sawcut Floor]@U/G Plumbing!, 2MD Da oCnncH@UGRntig i OVAn3 OIi Demo ConcreRe @ U/G Plumbing MM SelBrddbavDame 1 ONAiT3 OIAPRM Set Backgow p'vice : 41M ImIFNvS&RadOtA58R Ppig&Pr®reTed 6 07NT133 014PF103 _ Insta I HWS&R and CHWSdR_Plpingd Pressure Test M 2890 Install New Electrical Panels 3 02rFf03 ONF1i¢3 ® Install New Electrical Panels' 27EO O obaa hVAC 3 MAPFC3 04NPR93 ® Overhead HVAC 2MD Fdal DocrFmmes 1 OZAPFM 02*FC3 0 Install Door Frames 2131 l7atnFIRP 2 OZPffill 03AFF03M Demo FRP 2790 OMbEaJ FreSpridas 3 O?PFFn3 W—F _ _ ® Overhead_Fire Sprinklers 20 OartmdF3rrixg 3 Dtl'PrU 00FFn3 ® Overhead P'umbing I 25?0 BcaedUGRu tru 2 07K-FU3 Q3P 01 Excavate U/Cf Plumbing 30) Fstd NavRa®r0oa&ClaePad 2 ONRQ 034Aim 11 Install Now Freezer Door&Clpsure Panel 280 Feral li(i Rrrtig'SdFbarSii¢.9rais 2 033ePR73 ONAi¢i ® Install U/G PlumbinglSet Floor Slnka/Drsina 2M iq�adgl-ISpiidas 0 01sM Inspect O/HlSprinklers 285t1 inedOHRntbg 0 044PFU3 _-- �- Inspect OIHIPIumbing 200 ixpatll3GRnhbg D OVr-T;03 Inspect U/G Flumbing 2/O3 Baddl3Confedn 2 O4wfa 07PPFC3 ® Backfill 8 Compaction 2310 GH Rrrtag Inspeclim 0 04APF03 - O/H Plumbing Inspection 2970 Ra#mF ac"@Wal 2 07APFC3 0a4PFU3 _ ■ Rough—inlElectrical Wal 2f7D O.aheai Ehdical 3 O7APFM OYF911 i © Overhead Electrical 3W Insulate R.nt rig&Wr-ZR t1O VrARPpng 3 WPFF03 OB'WRTi nsulate Plumbin &HWS&R anp CHWS&RPIpInj N 2710 Sol Compaction 0 07PIfi73I Soil Comp ctlon 29M BadkiriWalkspacn 0 OBeRC3 Electrical Wall Inspection 3000 Dry,"Weis 2 OYPRM CgoHiD _ _ ■ Drywall Zia U= Pa"WaK ttic"A 1 09r'PR03 0341313 0 Patch Dryltvall Caneb@UGRrrtxUTmhas 1 OB^Pr7D 0� B Pour Confreto@UIG Pio bing Trenches CN-IbNPG&FNvSNif}f/vSBtt F}igO.a}taad 0 OgNiiDIns ct OtH HVAC&HWS&R/CHWS R Plping Overh ad adQH 9asial 0 Inspect OJH Electrical re&Dry,AHALik@Resiaars 2 IGOPF 3 11APFC3 ■ Frame&D all Hard LI s Restrooms p%Fbst&Fhsh 3 VAPFO0 16^Ffl73 ■ Tape;Float&Flnlsh nCedEabVWab 3 14FJ� 'Ifiaf ® Skim boat Existing W Its dWah 2 16^PF[8 17PFTn3SaalWalls "Wab,Sdit&Had LU Ceigs 2 170R;C3 18APR03 Paint Walls Sc,lts&Hard Lid allings 3 Sheet 5 of 11 Activity Activity Orlg Early Early ID Description Our Start Finish ?90 CaarcTb Fkmp@Paiours 2 17ARn3 itY4Fft13 0 Ceramic Tile FloorInE A Restrpoms 93D 4sWCeig Grd$CekVWres 2 %APRD3 2tAFFO3 MIN Install Ceiling Grid Coiling Wires Z� k UTcWFDMms 3 2WFFD3 23PPR03 ® Install Toilet Fixtures 29M Instal Ceing Ddhrssas 2 MAPFO3 21*FC3 ■ In stall Ceiling Dlff isaers 910 Instal Lgtt Flt&F 2 9PFF403 M*RM IN Install Light Phd. s 20 Fsbl SpntdaFle� 2 27PPrtR 23 ■ IristallSprinkler Hi 3183 h"Ceirg0mpCO3ds 1 22APF 3 ZleFTQ3 ! 0 Install Ceiling Droi Cords 9M kspedOA&eadfcrCoe p 0 Z'PAF403 ! 910 Eragm toF oral 1 2>PFTCB 2Wi7B Inspect hb t r Cover-up 0 Energizea Light F tuns 295D jIaWCeiangTiie 2 24APiTf MAPF03 ! IN IIpstall Calling TillI3 23EO lsWToletA svrs 1 24AM 2APFC3 I 0 Install Toilet Accessories WED BeedB&Far 2 25AA0 '234FfdI3 ■ Bead Blast Flo r 3M RepBCakFW 1 2APFU 2aAFFM i Prep d Caulk Floor 3080 Resrgts Fivarg 5 9WFC3 03MM Resinous Flooring 3070 kmU FRP 2 camlew M AYO3 ■ Install FRPI 312D ketal Canegrr[b 1 07MA)D 97AMY03 _ _ 0 Install Corner uards 313D SAKU mE"we t 3 03AYM lzm1 03 _ 0� Set Kitchen Equipment 3100 Electrical Trim 2 0tMMY03 09vl4Y03 01 Electrical Trim 3110 RurbM Tnn 2 offAM i BMM IN PlumbingiTrim 3101 HookipKtlai EN:m3t 3 0 MAYR3 13MYW Hook-up Kitchen Equipment 3170 Cla kW& nchisl 2 12VA)M 13V M _ 'i.____■ Clean-u dPunchlist 3180 Cly m 0 14M4M City Inspection 3190 HaaIhDWaIrwtkgsain 0 1A+ M Health Department Inspection ! 33D CtyFrdinspeclon 0 WMNM Ihl 3210 CaIT�dOm*arW 0 VhIk)W City Final Inspection G Dcate of Occupancy � Phase 3-Cold Prep Interior 3M Fhr Dsrmaeha6 K dw EWxwt 2 2ffA6M 31NPRM IN Remove Dishwasher d Kitchen Equipment 3310 M"Sda Eleo"RrdigBFwSpktder 1 31MgM 31bWFD I Make Safe Elsi cal,Plumbingl6 Fire Sprinkler 32ta (`pPlrrhgQa 1 31M40 _ 3lM4FM Cap Plumbing @Dishwasher 3;50 WO Da oWaI& 1 01PFF03 GJAMM;9;C3 — — Demo CeilWall gs 32A DaroWalBRoorTb 2 01M'F773 I Demo WallBFloor Tile 33M Dano OyrslWalsirIVEP 1 02APFEB OW3:ifA � 0 Demo Drywall Walls for MEP 3430 Rargvn Elec4ralWal 2 l LI Rough-In Electrical Wall 3M RaOm PlntrgWal 2 MAPFU3 0t°FFM IN Rough-in Plumbing Wall 3BO Lara[Ur43goxdPUrbM 1 03aFF03 03APFCB 0 Layout Underground Plumbing MO Sa AFbx@LIGPIrrtig6Srrp 1 036PFC3 03MF193 — ._I. 0_Sawcul Floo U/G Plumbing&Sum 330D DarnC3 MEIBQ LIG.PlrrtYgdSrrp 1 03^PRT3 03APR13 f 0 Demo Contras C UIG Plumb ng 6 Sump ME OAftadWAC&FIuMg3a63nUnea 2 034PRM OVIIRM IN Overhead HYAC d Refrigerat on lines MM Galsed FreSpdidas 2 (BAFFai OVPFO3 ■ Overhead F,re Sprinklers 31D1 Omhmdf Yvl 2 Q3 04AFFC3 IN Overhead Electrical 3410 Omhead Flrrtrg 1 03eFfi13 QWiYD 0 Overhead Plumbin 3310 5 aKi9UGFlrrhg6Srrp 1 046FFM Dom 0 Excavate U/G Plumbing 6 Sui np 39m 1115130dwantra 1 O1.4m 0 Inspect OlH!Plumbing 35M ElerSidWalkWedon 0 Wf i . �Electrical Wall Inspection 3390 lFlumixeWallrWeclion 0 O7APFQ3 359D JRepevRepacekLJ3ecn&Drywd 1 I 07A F03 07AFFIE �Plumbing Wall Inspection 0 Re air Re lace Insulation i D all Sheet 6 of 11 Activity Activity Orig Early Early ID Descdptlon Dur Start Finish A 16MM,6- Soewhspadari 0 07PFf3'0 Screw Inspection 3520 Tapa Rod&Frsh 3 07AFFM OGNTM al Tape,Float&Finish 33M hstalUG RrttigSelFbaSitrsTkas 1 07APR03 07C9R73 Install UIG PlumbinglSet Ioor Sinks/Drain 0 3133 hsdlSnpTnad1Af* 1 (fl (AF9RJ3 0 Install Sump Trench Angle MYepedOH FNFG 0 Ina OIH HVAC 3500 YsTadOHSprttlas 0 O7MIM 3510 Yzper3QHEledcal 0 WPFFIM Inspect OIH Sprinklers �Inspect OIH Electrical 3530 3 036FFC3 laNm M Install Cold Room Panels&Equipment 3330 Yq>aYL3GPtrrtlg 0 084P7m Inspect U/�Plumbing 3310 Beddl&Oarrrutt3GFIl 1 0&AP 03 06� _ _ g Backfill&.Com act UIG PI mbin 33M Sol Cnrpxfrt 0 09NA703 Soil Corm action 3330 PuBackCavcb@ Ur.Rn rii idss&Snp 1 034FM 0B6PRO3 p ur Back Concre e @ UIG Phrl 1 Trenches&Sur p 0 3810 Instal Evapaakr&RaFgaartPki6 2 C+FH03 10sPFQ 3 Install Evaporator&paid Brant Piping 3030 SdPrya;@Trarh Oas i 10^FFC3 10OFF03 9 Set AnglOs@Trench Drelme 3®0 tddCd3R=TcpprQShb 2 10efiT10i IVFFEB _ _ _ Install Cllold Room Topping Slab 39M It7al Ceing Gdd&CeigWres i IVFR93 11AM 0 Install Clalling Grld&Calling Wires 3MT�Re6pa-dkxP{tN 1 11N9T33 iVFR73 0 Test Refrigerator Piping M Bead ael 1 11PPfU 11APR(2 0 Bead Brat Floor 3M Irsial CekQ DtOsers 1 146PFCB 14AFFdl3 g Install Ceiling Diffuaeri 3M FsbJUghtFb"es 1 '14Y3� 144PFEB _ _ _ _ 0 Install LI ht Fixtures 37ID IstaI&MiderHeads 1 14NPRM 14NPFC30 Install Sprinkler Heads; 37M Irdal Ceig DmpCads i 1M1fffi4i WFR.S 0 Install-Coiling Drop Coids 3790 Hxko p03URunLpb 1 I VAPFD3 4NPFC3 0 Hook•Yp Cold Room Lights 3BD IreWSprkas@QJdRoam 1 14e197D3 14AFf03 Ig Install lSprinklers @ Cold Room 35M FcgectRrf'gaAmPpig 0 14APFCS ______________ CInspect Refrigeration Piping 3® hpadOmhoalkrO er+p 0 156PFm 3w Instal CaligTk 1 15AM 15APR93 I ♦inspall Overhead for Cbvar-up I 0 instal'Coiling Tile3930 Figagm UgtFoArus 1 154FFC3 1541FC3 0 Enger jlze Light Fixtur 18 t330 F1ep&CahFha' 1 164FFO3 10�i g Prep I Caulk Floor I I7�as Fbmg 3 164M 1a4m I ® Real ous Flooring rstal FRP 1 21PFFC3 2t4PFG3 0 Install FRP SdPWME4VTut 2 � 234M 13 Sl't Kitchen Equip ant ��T� 1 �m 0 Electrical Trim RrrhrigTan 1 71PF'FQ3 4APFM 0 Plumbing Trlm in"Carml 1 27PFf303 22AM 0 Install Comar usr sHoclRpladm E�}¢ 2 23*803 ZVFFC3 —T 0 F{cok-up Kitchen Equipment 39M ClaaRpilipal 2 244AY3 0 glean-up&Punch list 3B® Ob t>wedal 0 City Inspection 3370 Heath Depatret hpacln 0 Health Department Inspection M C1yFrolhsped'cn 0 City Final Inspection W CslErandooa{srH 0 2]PAiD ,Certificate of O upanav Roof 3M LepLLWdCarpa9sv&GadasFg l3dErrn 1 0VM 0t PR03 La lout Roof Comp easor&Cond nsing Platform 39A DerroRcdt@Tlah 1 ONAYA 07PPFY13 0 Demo Roof(0 Tie-in 3637 FatalCarpravcr&Car�sig Link FlsYcrtn 2 03�PRD0 install Ill Unit Platform u 3fi10 SdMEPRodJa3s 1 07PFf�3 WAFRM 0 Set MEP Rbof Jacks 2 C OBrP(�i ® Patch Roof Sheet 7 of 11 Activity Activity Orig Early Early ID Description Our Start Finish 3MD 1 106FFM 104DFU 0 Set Compressor&Conde ising Units MD ReIrg3ahm&Ca4unAa Dan Ppg 2 ItAFA i 14MRD3 Refr geration&Co(denote Drain Pir ing 5M TatFprg 1 154PF03 15APF03 0 Test Piping atio kgiadPPN 0 15^9333 i Inspect Piping 3E00 Islas&Label Plag 2 16*M 17A9333 _ [d Insulate&Label Piping 3723 PaitP4ffons 1 ifyPRI 3 16aFRM Pain;Platforms 37M CFanRof&Puri" 1 21NiO3 21*FQ 0 Clean Roof&Punchliat Springs Meeting Rooms j Boone Demolition&Grading 419D IsialCari1crBa 'r des 2 OaW493 1GAM © InatalI C rrldor Barricades 42M Safe0fspriidas 2 O914B 1O140 0 Safe Off�prtnklers 4210 ln"SieCaiaOlfa 2 0aW433 10WID3433 01 Safe Off Electrical 4181 Fs1a1S6 Corslurtix3Farig 1 09WJ13 03WhCD 0 Install Sit Construction Fencing 4Z0 Darn TlsaraArea 10 13.1AM 21.Wf[6 4253 DarsQHWJPC@�t3skeAw Tha 2 2&W403 2Td*M_ ® mo Spdnga eatre Area 0 Derno O/H HVA�@ Springs The ire Area `� I DrrsWACed@C�d 2iT 3 MM MWM3 HE Demo HVAC D ct @ CoMdor 4290 1 2LIAM 21W403 0 Remove Steel Beaame @ Stage CuI an 461D ki"Tarpowi-g Fg&Pons 1 0 1 2u*w Install Temporary Lighting&Pow WO Rama&&*Qgs NIUS@MleareAm 1 27AM 9.WJ03 0 Remove&Sal va s AHU's @ Th _ Ire Area .. .. _.. ._ _ .._ 4M �� 1 2&YV433 �14�113 0 �Sawcut Floor 4310 P� cao[U@Pba 2 M.WM 24W1y13 ©'Remove Cone ate @ Floor 4323 OeatTh�aAm 1 Mom 33W4J3 0''� Clean Theatre Area Structure 433D Irpot,BadACaTpW&Gr&SardMabd 5 31,14M 0ff�13 ® Import,Backfill,Compact Grads Sand Material Soil Comiiaction j 4370 I's4l RehaDavak 2 077303 1 ® Install ebar Dowels 435) Instal UG Elah'ral 2 07FE3O3 10=EB03 �, ® Install IG Electrical 4380 IspedUG Ela#Yzl 0 1(FE13 Inspect U/G Electrical 430D Ie6I Reber2 11FEEKS 12aam M Install ebar 4390 Pebar gem 0 12I3373 Reber nspection 44M PwSabm(ra�a 1 13:EBM 13FEEM Y Pour$lab on Grade I 4410 isfalCpadblaWalSbd Bears&Bacig 10 14F®S3 MEBM ® Install Operobl Wall Steel Seams&Bracing 4421 SetOperatlaWaiTrak 3 O4N0FI)3 J Seto rabl Wall Tra 0 44� Mamk*ShEw Sind 2 M;03 Mwt 0 Monokote tructurol Steel Interior 4440 L7MhariaWals&Cekv 1 07K46f 0 0ftAAFM g Layout Int nor Walls&Cai1rings 4510 hddt0.stsad dial 5 WAMFIIi 13viNF403 M Install OverheadElectridal 4470 rsfa 0mhwdWAC&CadYrerirak 7 01M 9M 17M4m ® Instal Overhead HVAC&Corridor Due ork 45M nsMFwSpinldar0HPlDFQDMpe&P.T. 5 MOM 13VAI0 ® Install F Ire Sprinkler Olti Piping,Drops P.T. 4450 BahgpaabeVAASbdvalh MaWSldFmxy 3 (IMMM 11MOORM ® Box-in O arable Wa It Frm . 45EO Hama Ahic Par elaWals&CaddorWaks 4 10VIA9M 13MM ® Frame l Isc.Perimeter Walla&Corridor ails 45530 tpedQH Fre Spiidas 0 13MM Inpect /H Fire Sprinklers 45C I speYQHEledtial 0 MOM i Inspect O/H Electrical , 4eCO Wal&CmkrTurd Rain WpeDT 0 12AARM Wall& ooridor Tunnel''Framing Inspec on 4723 fSetDoxFramas 3 13vWO 17MARD ® Set0 or Frames Sheet 8 of 11 MAY Activity Activity Orlg Early Early ID Description Dur Start Finish o 4621 PreIm OrywalatC radcr&Elad!d Rmn 4 i*AWM 19M M3 ® Pro]' .Drywall at COMdor 3 Electric 11 Room, 4570 ElacacalWal Ftoughn 4 14M6RB 19NAR8 0® Elec rical Wail Rough-in 48M FepedChiFNAC 0 17MaFi[B Ins OM HVAC 46M Framing CeiliWaal Ins 7 13vW18 2AM19VIA 3 ® raming Ceilings 4tE0 FJaY1mI Wd Inspection 0 1:MaFD3 Ela rical Wall Inspection 4010 lixi Weis 4 27vA933 23AWM _- — -- ® h sulate Walla 450 Se(Eledral Dov4gItCam 3 23MM 271VAR03 et Electrical Downllght Cana 460 Dryrsl Wals,CarldXPath 6TumaiCaddr 5 ZMARM GwRm Dryw ill Walla,CorrId4 r Patch 3 Tani at Coffidor M I i 48M Sp"daDmps@Hmids 2 9MafD3 j � prinkler Drops;@HartlLlds AMCaigFratig Fepemxt 0 21MAM 41370 Dryvel Ceiga 5 2mSAFU3 MAFlQ3 -_ - ailing Framin Ina action -- ------- -- �- Drywall Callings 46D VMSa lnspeor'n 0 OIPF7iO3 Wall Screw In I 1paction frg 46M Ce SaexInspection 0 07PF1ie Calling Scro Inspection 4N0 Tap%Fbet3Rlsh 7 D3aRTL3 11PPR8 ® Tape,Float&Finish 4710 Pant Ceirgs 5 054M 155PR06 ._fl Paint ellln a 4730 Foal Dona,Frames BHardnee 3 Q)^RD.3 11!•Ffl0i IS Install Doors,Frames d Hardware 4740 FshlWlsd Bale&PnsataFn Rai 4 10tPRM 156FFO ® Install;Wood Base 6PY;eaenfatlon Rall 9)10 RcpaEasedFtrrig@CariinDcas 3 'IMPR03 166FRM Re air Base d Floo n p g @Corridor oora 4790 Aonsid Ceig Grid 3 16AFRM laaPRL3 © Aco4atical Calling Grid 4730 Wainarg 3 16WiYTi 16MR03 ! M Wallcoverin 9___--i 4010 FSDI LitFom>as@Serves CSrWr 1 164fi0 166Ai0i Install Light Fixtu es @ Service C4 rrldor 0 I 4WD FshlSprider1-19ak 2 1fiaR7D 17AFK3 © Install Sprinkler Heads 4GM lr6W Going Dtlheas 1 1(1440 154TOS 0 Install Ceiling Diffuser 4780 PaiiWals,Dons,L3te6F2an 3 17AAi3 21PPR8 try Pant Walls,Doors,Base 6 Rails 48M F 40stalL�iFi4uw@Pmiatal 3 21PR78 ZjMfm ©Install L.Wht Flxturya 0 Acoustical 476D FdalSoudWal Paeb 5 2IPR713 25a9FD3 ® Install Sound Wall Panels 43f0 Fsfal Ceig Diirs<as@A-sld Ceigs 3 2LAPRM 2YFFO3 install Cell(ng Diffuse ra@ Acoustical Ceilings MI 48M Feld SpFk8lIlmds@Amus"Cdrg; 3 2WFTS3 Z3aRZII Install Sprinkler Hai ds@ Acoustical Ceilings 49CO Sad Caaele 1 2YM 226PFC3 0 tl Concrete 48D Eregaa UljltFA us 2 23AF� 2NAi0i _ _ _ 0 Ener Ize Light Fixtures 490 Irk"Rubber 9ase@Sffxo Carldi 1 ZAPfu 23FFIM Install Rub Base @Seriv Corridor fl 46D NxdG"hwdbrCaa41p 0 A&M I Inspect Overhead lfor Cover-Up 48M Instal Ceiii ie 3 2rAK03 MipF CA ®i Install Ceiling TlIs 4770 EledricalTrin 2 ZAPR T3 2 APFC3 © Electrical Trim 4BM iroblCarpebrg 5 ZAPF8 0MD3 _ _ _ WE Install Car it 4580 is tla uolwWel Pareb 3 Odv44Y03 oev m I Install Opera Is Wall Panels i® 4870 Cleenapd Rndist 2 OtUMM 071MY03 0 Cleanup 3 Punchllat 49M Cly Fill Ypsdn 0 O7M41Q3 40M Ca m6dOmpany g NiA41tB I City Final I spectlon Certificate of Occu an Roof 4400 lapiPodFtrtlr#rsBTenlor6ors 1 IM R B 1Uviiiia I Layout R mf Penetratians;a,TIe-In Locatlia s 48D DarnFtxig@SIEdPOCSTeis 3 11MAR3 13vWd3 ® Demo F oofing @Steel POC's Tla•(ns 4970 DsmoEIF.S@TanLoca6xa 2 11MaFi8 lZ46R8 j B Demo E I.F.S @ Tie-in Locations 49M C"Rd0peraKytzmxbak 1 14NPFO 14WO ! 0 Cut-In toof Openings Tpr Ductwork M700 Stbtpoj*ak 1 17MaF03 1NARM1 0 Stub jo Ductwork MM FdalMahSoeat8Ml1&CadaaaPFYfnrte 7 1RAgM Install Mach Screen d AHU Condenser PI Items 5IM C✓aaRtxReAmare 0 15vMFIIi Clear Pu611c Restrooms Sheet 9 of 11 Activity Actift Orlg Early Early, ID Description Dur Stan Flolsh 5130 Wddrg Yqpadin 0 29vWYD am Shcr�RdJa l% 1 27M4RM z7m4F D aiding Inspection 0 t MEP Roof Jacks SM SEl",15t gFat&Games 1 ONW03 27M 5170 CffirRtCPeaYarrs 0 ZMW�T3 0 et AHU Exhaust Fan d—Conden TTTr 5170 Cl"Pmf Reskoo tntrg PpFg&Vet; 5 27MRMFCB 03�Ra13 _ -- - --_—— _ -- —-- ---� Iear Public Reskrooma Install Roof HVAC&Plumbin Piping d Vents 9300 Frdal RdQaart Lines 2 3M4Rl3 31AW;3 Install Refrigerant Lines 5110 Fare lad,Soear 2 3748RM 3INIOR3 'i, Frame Mech.Screen MM k-EW Rcofadwk&xsd Traps&Fare D npae 5 iBk ww 03APFC3 Install oaf Ductwork, ound Traps&Fire Dampers 5123 Prang hTedon 0 31MDM -_ _ -- _ .__ _ 5140 Fatal CerrrtBoad Mach Saear 2 gW 3 07PA7Uf — —_ Framing inspection Install Cement Board @ Mech.Screen 515D 5 036PFU3 OWFU ® Install Plaster System @ MPch.Screen UD TedwUWAC&Rrrtig Ppig 3 OOFFU3 ORAPFC3 MR Testing HYAC&Plumbing iping 5JB0 FatalBedFal@ Egixnet&Seste Orkk 3 OQFFM O _ Install Electrical a EqulpmentB Service Outlets 5100 Pakh Rig 3 OPM 034M ® Patch RoOng 5160 PathEIFS Tenbabos 2 01T WAS Patch E.I.Fj.S @ Tle-In locations SIM InpadRcofFpig 0 b S?tD FrpedFmal 0 ON-FM Inspect R of Plying dF3eUi Inspect Root Electrical 6210 FsAe19 abd RodPprg 2 ORAM iG*F;03 _ ® Insulate&Label Roof Plping _ SO Part RdSddFlUt a ray&P�Ons 3 11APFC3 1� Paint Rqof Stesl,Flsh'fl&Equip&Platfoprla ® r r MM cie po I&Rrd" 2 164PRM VARC3 0 Cie Roof&Punchllit 50 Fred RodFq)edn 0 18W�1 � FInal�Roof ins actlon! Pantry Panbry Demolition&Grading 90 Rsixaia len EWmt 3 09,PM 13WU3 ® Reloeatp Kitchen Equil ment 4480 Safe OfSpinkkva 2 14.RM 15WIM 0 Safe Off Sprinklers 449D Safe OfElsolal 2 44.NO 1514M 0 Safe lecurical SM Sab&CEPRrrtig 2 14NO 151AM 0 Safe&i Cap Plumbing i 4220 DMAdri,AM 5 18WJTi 2ZWJ03 ® Demo Admin.Are 42U D=OHW AC@AdmArea 2 22WM 23AM - - _---�- - -- D Demo O/H HVAC Admin.Area 4253 Rama&SalageA"A@AdinAne 1 23NO 231M 1 Remove&SaN AHU's@Admin 4290 OSMAdmWss 1 24AM 2U*M g Clean Admin.Area i Interior wo tamwah 1 07NOM CA44FM 0 Layout We Is MM FwneWak&CeLgs 5 1Uv1eM 1 A4M ® Frame Malls&Callings: SZD tawd"09ardRntrg 1 1MORM 1Uv1WiT3 1 Layout U derground Plumbing 00 GmhwdWAC&Raigaeicn Urea 5 1M4AFM 14MR03 ® Overlie ad HVAC&Reid eration Lines 532) Ovelead Fie Sptideie 4 1UM900 13dMi03 ® Overhsid-Firs Sprinklers _ 5MO Oslead9ao" 4 tU.Wg3 13AAR)4 ® Overhs d Electrical 5110 OtdeelPlrnirg 4 1UAVO 13AAAM ® Overhei id Plumbing MM Saratfter@UGRrrbrg&Sump 1 11NAR33 Maio j g Sawcut loor @ U/G Plumbing&Sump MW I)ffwCUUUbQuGRrrtTg&Snp 2 11AWm 12Arv3Ui 9 Demo C ncrote @ U/G Plumbing&Sump SDO 6MAaq LIGRrrtrg&9rr{a 1 13MM3 13vpfw g Excava U/G Plumbina&Sumps 5900 Fa l Inspect FieSprfdes 0 13AAEO — Inspect O/H Fire Sprinklers 5410 F pEdO E18da 0 130OFM Yq�edQHFlrrLrg 0 13WRM Inspect OM Electrical Inspect O/H Plumbing Sheet 10 of 11 Activity Activity Ong Early EarlyAPR ID I Description Dur Start Finish 53ED Ro4M88*CEl@Wad 3 14NM 1BVW703 ® Rough-In Electrical @ Wall ^' 53?U Ragm Pl-tig@Was 3 14NPM I&AWQ3 ON Rau h-In Plumbing Walls r/ 5430 Fda1 LIG Plrmtig'SdFkxrSit¢dais 2 WMiM 17AMA11 ® Instal UIG PIumbingl5e[Floor Sinks/ rains 5300 irpectOHFMAC 0 14 440 1 Inspect OM HVAC SM Framing iepedm 0 17MARM Framing Inspection tip SdEbd maI i 17A6RM 17&VRM 0 Sat E ectrical Downlight Cana 54d0 tga1&npTadmA+gs 1 IMNM 17MORM Y Instal Sump Trench An le Sul i pedUG Flntig 0 17NA9M — ! Inspa t UIG Plumbing, 545) Elac"Walisper5cp O 1&AFC3 Electrical Wall Inspection 5E0 purribir igWd IrWedm &W 0 1M Plumbing Wall Inspection 5110 BaddI&CamWUGRmbM 1 18AAAM 1aVPR33 0 Baclrrill&Compact USG Plumbing M30 SolCarpaln 0 iaMAM _ _ Sou om action 51e0 ialaleWals 2 1&t^FQ7 2 AN;C3 ! 0 Ina late Walla wo Dyrsd 3 27AgM 21N4R03 ® Dywall RM Spantq>a- m 0 ZMMH73 5finew Inspection 554O ToMFimt&Frah 5 ZMAFM 31M^RD C� Tape,Float&Finish 5W i"Bampc Pam&Eq lxrxrt 5 aM&F i fIIgM r"'�'" Install Beer Room Panels&Ern Yip PaintCeirgs 2 OU6hIIi OWiiUi Paint Ceiling 563D istl Dxxs,Famas&liadnae 1 OtAPR)i GOPFC3 Install Doors,Frames&Hardware 5MO idzl Pcdlalla 1 OIAPR)3 OIAPFU3 I Install Roof Lpdder 55BO 2 D7i6✓T3T3 034PFC3 0 Install Evap9rator&Refrigerant Piping R Acoustical Celig Cyd 1 Dl^R�3 pNA7A 0 Acoustical Ceiling Grid kWACcdRaomTWprg Shb 1 OPPI'M 0 Install Cold Room Topping Slab i"Lig aMues 1 WAFHB WA9U 0 Install Light Fixtures Instal Ong Mssas 2 07A9Y3 05*FM m Install Ceiling Diffussers isalSpiWHeads 2 07APR0d 004PFC3 © Install Spunkier Heads HookypBoyRrrnl� 1 WA-R)3 WAFFE3Hook-u Beer Room LI htsIralSpWidas@BesrFbm n 1 07APRB 07A FdI30 Install Sprnklems @Beer Ruom izpedOmheadlorCoer-Up 0 O5�! Inspect O}erhead for Cove F-Up �D ��Foeres 1 03WF03 03A313 0 Energize Light Fixtures i 5730 Irslal CalrgTie 1 03APFIM 03ePFM 0 Install Calling Tile 5710 PartWaIs&Dxrs 4 ZVIRM 15NPRIS ® Paint Walla&Doors 5700 Seal Cuxrub FI= 1 iGAM 164M a Seal Foncrete Floor 57p IsetmMEWiert 3 17A9;i 21AFFU3 ® Set Kitchen Equipment 5740 Fledrirai Trim 2 17A9Ll3 166M D Electrical Trim 57W RrrbvTrin 2 17APFO1 1&WRm D Plumbing Trim SM Hzdo-tplat-Squprmat 35a : � M ook-u Kitchen Equipment SO Cluen-W&Prd" 2 ® Clean•up&Pun hlist SM Cly Inpe�0 0 Ity Inspection 5190 HeelnDpeirati�edn 0 ��Health Departm nt Inspection 30N Cky� p City Final Inspelon SM CadcabdOm�q, 0li .CertlOcate of Omxu incy Sheet 11 of 11 PALM a -SIC City of Palm Springs _ rA Department of Procurement and Contracting NF 3200 Tahquitz Canyon Way • Palm Springs,California 92262 i FO R TEL: (760) 323-8239 • FAX(760) 322-8372 • TDD(760)864-9527 CITY OF PALM SPRINGS 3200 East Tahquitz Canyon Way Palm Springs, CA 92262 NOTICE TO ALL TRADE CONTRACTORS PHASE I EXPANSION OF THE PALM SPRINGS CONVENTION CENTER CITY PROJECT#02-19 ADDENDUM NO. 1 This Addendum is being issued for the following changes and informational items: SUMMARY OF CHANGES: This Addendum includes: 1. Change: (All Trades) Change bid date from December 10, 2002 to December 17, 2002. 2. Add: (All Trades) Section 19 to Instructions to Bidders - Construction Manager's Administration. 3. Add to Supplemental General Conditions (All Trades) Item 2A. 4. Add Exhibit"H" OSHA 30 Hour Policy (designated Trades). 5. Chancre Instructions to Bidders Section 8 Bid Form. (All Trades) 6. Informational: Scopes to be provided Monday, December 9, 2002. (All Trades) 7. Informational: Anticipated Project Schedule is available on the City's web site. 8. Informational Lists: (A) List of Pre-qualified Trade Contractors for those trades requiring pre-qualification and attendance at the mandatory pre-bid conference Post Office Box 2743 0 Palm Springs, California 92263-2743 (B) List of Trade Contractors who attended a Mandatory Pre-Bid Conference for applicable trades which did not require pre-qualification. 9. Delete Bid Package 16 - Fabric Sound Panels from the Notice Inviting Bids. DESCRIPTION OF CHANGES 1. Change Bid Date: A. Change Notice to Pre-Qualified Trade Contractors for the following trades: Trade Bid #1 Selective Demolition, Trade Bid #6 Structural Steel, Metal Decking & Miscellaneous Metals, Trade Bid #13 Metal Stud Framing & Drywall, EIFS, Insulation & Fireproofing, Trade Bid #28 Kitchen Equipment, Trade Bid#29 Plumbing,Trade Bid#30 HVAC,Trade Bid#31 Fire Protection and Trade Bid #32 Electrical, published in the Desert Sun on November 11 and November 16, 2002: Change Date and Time of Opening Bids from 2:00 p.m., local time, December 10, 2002 to 2:00 p.m., local time, December 17, 2002. B. Change Notice to Trade Contractors for the following trades: Trade Bid #4 Concrete & Reinforcing, Trade Bid #8 Roofing & Sheet Metal, Trade Bid #9 Doors, Frames& Hardware, Trade Bid#15 Acoustical Ceiling,Trade Bid#16 Fabric So&Wallcovering and Trade Bid#21 FRP,published in the Desert Sun on November 11 and November 16, 2002: Change Date and Time of Opening Bids from 3:00 p.m., local time, December 10, 2002 to 3:00 p.m., local time, December 17, 2002. C. Change Notice to Trade Contractors for the following trades: Trade Bid #5 Masonry,Trade Bid#10 Overhead Coiling Doors,Trade Bid#14 Ceramic Tile, Trade Bid #25 Dock Equipment: Change Date and Time of Opening Bids from 4:00 p.m., local time, December 10, 2002 to 4:00 p.m., local time, December 17, 2002, 2. Add Article 19 to Instructions to Bidders - Administration of Trade Contracts under Construction Manager as follows: Article 19.0 Administration of Trade Contracts under Construction Manager. 19.a. Work is to be performed in accordance with the Construction Manager's Project Construction schedule. A detailed schedule and corresponding Schedule of Values will be required from all Contractors within 10 days from award of Contract, and will be used in developing, updating and modifying the Construction Manager's Project Construction schedule. Trade Contractor's will acknowledge that the Project Construction Schedule will include "out of sequence," and "phasing" of the work. Trade Contractor shall provide a three (3) week look ahead schedule of its work on a weekly basis. 19.b. Complete submittal log and packages including fabrication and delivery lead times shall be submitted to Construction Managerwithin 10 days of award of the Contract. 19.c. MSDS sheets shall be provided the Construction Manager and maintained on site for the duration of the Project. All trade contractors shall include handling material in accordance with the MSDS. 19.d. Trade Contractor acknowledges that he has visited the site and familiarized itself with theexisting conditions, including phasing ofwork,which may influence the Work.Trade Contractor also warrants that he has reviewed the Contract Documents prior to execution of the Contract and has notified the Construction Manager of all conflicts contained therein that could affect cost, schedule or quality. If conflicts are found after the execution of the Contract, Contractor shall perform the Work in accordance with the Construction Manager's direction for no change in Contract Price or Time. 19.e. Trade Contractors shall be responsible for coordinating their work with other Trade Contractors scopes of work. Trade Contractors shall review and study the Drawings and Specifications, submittals, and shop drawings of the Work of other Trade Contractors with respect to the coordination of their work t with these other Trade Contractors. 19.f. Trade Contractor shall schedule the work and the presence of it's employees at the job site and any deliveries of supplies or materials by it's material men and suppliers to the job site on such days and at such times and during such hours, as may be required by the Construction Manager. Trade Contractor shall assume responsibility for such schedule compliance not only for it's employees, but also for its material men,suppliers and subcontractors. 19.g. Trade Contractor shall be responsible for the cost of expediting all deliveries of his materials to meet the requirements of the Construction Manager's progress schedule. Should it become necessary, in order to maintain job progress, for the Construction Manager to augment the Trade Contractor's expediting efforts, all such costs incurred by the Construction Manager shall be borne by the Trade Contractor. 19.h. Trade Contractor agrees that it will notify its employees and related personnel, via written handouts, that the use of illegal drugs, intoxicating beverages, and firearms or other weapons on the site is prohibited. 19.i. Strikes (including sympathy strikes)or any other stoppage of work by employees performing the work on, or delivering supplies or materials to, the Project shall not excuse any delay of the Trade Contractor in the proper performance of its work, regardless of whether the strike or other stoppage of work is attributed to union action or the decision of an individual employee. 19.j. No publicity releases (newspaper, radio, TV, advertisements, etc.) shall be issued without the prior review of the Owner and of the Construction Manager. No signs, other than field office identification signs, will be permitted. 19.k. Trade Contractor shall be responsible to continually update sepia drawings (with draftsman quality)of the working Drawings, large scale detail drawings,and specifications to show any and all field changes thereon. Sepia drawings shall be maintained in the Construction Manager's field office. Plumbing, Fire Protection, Mechanical,and Electrical Trade Contractors shall provide copies of the current as built drawings with their monthly payment requests. Payment requests will not be processed without these updated drawings. 19.1. Final Payment will not be processed by Construction Manager unless all required Record Drawings, As-Built Drawings, Operations and Maintenance Manuals, Guarantee/Warranty Letters, Care and Maintenance information, and all other Close-Out Documents are inventoried, approved, transmitted to and received by the Construction Manager. 19.m. The Trade Contractor shall furnish to Construction Manager,on a daily basis, a report of the total number of his workers employed on the job, hours worked, and a detailed description of the work performed by his own forces or that of his subcontractors. Contractor shall include copies of their job site toolbox meeting minutes, including participants sign in sheet. I 19.n. Trade Contractor shall be responsible for providing off-site storage facilities for his own materials at its cost. The storage of materials and equipment at the site shall be permitted only to the extent approved by the Construction Manager in advance. Location of Trade Contractor's items of storage, plant and tools requires approval from Construction Manager. 19.o. Electrical power will be provided on the site for the use of the Trade Contractors for the operation of small tools. Trade Contractors shall provide extension cords from distribution points.Temporary power will be provided by the electrical Trade Contractor. 19.p. Minimum temporary lighting will be provided to maintain the foot candle coverage required by law. Contractors are each required to provide their own necessary task lighting. Temporary lighting will be provided by the Electrical Trade Contractor. 19.q. Trade Contractor will be responsible for ventilating any hazardous, combustion, or other pollutant causing equipment or material, within the area(s) of Work, including all ventilation required by the MSDS. 19.r. Trade Contractorshall give the Work constant attention,management, and supervision through an authorized Superintendent and all necessary assistants. Such Superintendent shall be authorized to act for the Contractor in all matters relating to the Work, and all directions given him shall be binding.Trade Contractor must provide Contact name and emergency phone number to Construction Manager prior to commencement of work. 19.s. Trade Contractor shall be responsible to provide all scaffolding, toe boards, temporary shoring (engineered if required), ladders, scissor lifts, or any other equipment, including hoists, necessary to complete their work. Trade contractor shall ensure that all its employees,and subcontractor's shall be OSHA trained in the use of the equipment. 19.t. All equipment to be used indoors must be approved by the Construction Manager prior to the commencement of work. 19.u. Movement of all vehicles and equipment into and on the site,including unloading, shall be subject to the control of the Construction Manager (including the flow of traffic patterns). Individual Contractors shall be responsible for observing established traffic regulations and for providing flagmen, as required, to prevent disruption to general traffic by his vehicle, equipment or operations. Trade Contractor is responsible for clearing all debris from streets, parking lots, or public areas resulting from its operations. 19.v. Temporary toilets will be provided for use of all workers. The restrooms within the Convention Center and adjoining Hotel are not to be used by Construction Personnel. Temporary toilets shall be provided by the Plumbing Trade Contractor. 19.w. Temporary safety fencing and barricades may not be moved and/or altered without the prior consent of the Construction Manager. 19.x. Parking will only be allowed in designated areas. There will be NO Construction parking in the general lots forthe Convention Centeror adjoining Hotel. Those vehicles found in violation of this policy, will be immediately towed from site,with the Owner of the vehicle held responsible for towing and storage costs. 19.y. Radios, tape recorders, cameras, video cameras, or any other audio or visual equipment are not permitted on the job site. 19.z. The display of any offensive pictures,words(including foul language), etc, on the job site is strictly prohibited and will be grounds for removal of the responsible personnel from the job site. 19.aa. Smoking, or smokeless tobacco, are not permitted on the job site (inside or out). Smoking will only be allowed in a designated area to be determined by the Construction Manager. Violation of this item may result in expulsion of individual(s)from the Project and/or monetary fines. 19.bb. Consumption of food and beverage on the Project will be limited to areas as designated by Construction Manager. There will be absolutely no food or drink allowed within the building. 19.cc. There will be no Communications with Conventioneers, Hotel guests, staff or Convention Center personnel, unless a safety item is at issue. 19.dd. Trade Contractors shall be responsible to protect all existing, or completed finishes. Trade Contractor will bear the costs for restoration, disinfection, cleaning,and/or replacement anyareas damaged bytheirWork. 19.ee. Neither the Owner, nor the Construction Manager will be providing Guard Service for the job site. The Trade Contractor has the liability for any loss or damage to their tools, equipment or materials as a result of vandalism and/or theft. 19.ff. Trade Contractor shall directly arrange and call for all inspections required by the City, or other municipal agencies, as required, but will inform the Construction Manager in advance of said inspections.All permit plans and permits will be delivered to the Construction Manager. 19.gg. Trade Contractor's Foreman/Superintendentwill be required to attend weekly Safety/Coordination Meetings at a location on the site designated by the Construction Manager. 19.hh. Appropriate clothing and accessories shall be worn at all times. This includes, but is not limited to, work boots, eye protection, hard hats, etc. Shorts, sleeveless shirts or tank tops are not allowed. 19.1i. Positioning devices (body belts), used as a sole means or method of tie-off for fall protection compliance, without the use of an approved full body harness will not be permitted at any time. 19.jj. Only the use of approved lanyards having an approved deceleration device which complies with OSHA Standard: Fall Protection, 29 CFR 1926, in conjunction with an approved full body harness with D-ring at shoulder level, will be permitted as approved fall arrest system at any time. 19.kk. Use of roll-out, non-locking connector type snap hooks is prohibited for use at any time. 19.11. Construction Manager has developed a Project Construction Schedule that shows contract duration and approximate phasing, sequencing and relationships of the Work. This schedule is based on the Construction Manager's Schedule concepts developed prior to the start of Construction. The Project Construction Schedule is subject to change and update pending discussion, modifications, acceleration after receipt of each Trade Contractor's schedule, weekly schedule updates, and its submittal, material and equipment fabrication and delivery lead times following the award of the Contract and commencement of the Work. 19.mm It shall be the responsibility of the Trade Contractorto become familiar with the updated Schedule(s) and shall, at all times, cooperate with the Construction Manager to keep on the premises sufficient material, supervision, and manpower to perform the Work of their Contract in keeping with the Project Construction Schedule. 3 Add to Article 2 of Instructions to Bidders the following: 2.a. Bidders are assumed to be knowledgeable of their respective Trades of work and shall include all requirements to complete a complete, fully functional,code complying system ready for its intended use as described by the Construction Documents 4. Add Exhibit"H" OSHA 30 Hour Policy, for trades designated in the exhibit, attached. 5. Change Instructions to Bidders, Section 8, Bid Form. Replace existing second paragraph with the following: The envelope enclosing the Bid shall be sealed and addressed to the City of Palm Springs. The envelope shall be plainly marked in the upper left hand corner with the name and address of the Bidder and shall bear the words "Trade Bid for Palm Springs Convention Center Phase I Expansion" and the date and hour of opening bids. The name of the Trade and the Trade Bid Package Number shall also be clearly marked on the outside of the envelope. Each trade bid shall be enclosed in a separate envelope. 6. Informational: Scopes will be provided via Federal Express delivery Monday, December 9, 2002 to plan holders of record. 7. Informational The Anticipated Project Schedule is available at the City's web site. Go to www.ci.palm-springs.ca.us. Go to Departments. Go to Procurement . Select appropriate document. 8. Informational: For your information the following lists are attached: A. A list of pre-qualified trade contractors for those trades requiring pre- qualification and attendance at the mandatory pre-bid conference. B. A list of Trade Contractors who attended a Mandatory Pre-Bid Conference for applicable trades which did not require pre-qualification. 9. Delete Bid Package 16- Fabric Sound Panels. This work is being deferred to Phase II of the expansion of the convention center. END OF ADDENDA NO. 1 BY ORDER OF THE CITY OF PALM SPRINGS City of Palm Springs Harold E. Good, CPPO Director of Procurement & Contracting Dated: December 5, 2002 Receipt of this addenda must be acknowledged on the Trade Bid Forms submitted with the bid package. Attachments: Exhibit "H" OSHA 30 Hour Policy List of Pre-Qualified Trade Contractors for Trades Requiring Pre-qualification and and Attendance at the Mandatory Pre-Bid Conference List of Trade Contractors who Attended the Mandatory Pre-Bid Conference Which Did Not Require Pre-Qualification EXHIBIT H OSHA 30-HOUR POLICY Palm Springs Convention Center Expansion Phase I Palm Springs, CA 12/4/02 Trade Contractorand all lower tier sub-subcontractors shall complywith the requirements of OSHA 30-hour Training.All Trade Contractor's supervisory staff must be OSHA certified.Supervisory staff with written evidence of OSHA 30-hour certification within the last 3 years will be acceptable. Training for Trade Contractor's staff not currently certified, can be certified through Turner Knowledge Network (TKN). The web site address is www.turneruniversity.com and must be completed within 3 month from the date of its Trade Contract Agreement or no less than 30 days from start of work. Monthly Payment is contingent upon evidence of current certification or enrollment in the OSHA 30-hour training within the period specified above. Within 5 days of the date of Award of Contract, provide the following information: Project Name Certified Subcontractor Supervisor's Name Y/N Sub-subcontractor(s) Supervisor's Name Y/N Supervisor's Name Y/N Supervisor's Name Y/N Supervisor's Name Y/N Note: Attach a copy of the certificate for Supervisors already certified. Please return this form to the attention of: TURNER CONSTRUCTION COMPANY David Livingston @ FAX: (760) 323-4918 PRE-QUALIFIED TRADE CONTRACTORS FOR TRADES REQUIRING PRE-QUALIFICATION i AND ATTENDANT AT MANDATORY PRE-BID CONFERENCE. Trade Bid Name/Number Contractor 1 Selective Demolition Penhall Company Clauss Construction Forward Services, Inc. 6 Structural Steel, Metal Decking & Miscellaneous Metals Orange County Erectors, Inc. ACSS Law Steel 13 Metal Stud Framing & Drywall, EIFS, Insulation & Fireproofing Anning-Johnson Company Raymond Interior Systems Berger Bros Inc. Martin Bros 28 Kitchen Equipment TriMark Raygal, Inc. Kamran & Co. Duray/JF Duncan AM Fab 29 Plumbing SSW Mechanical Murray Company D/K Mechanical Kincaid Plumbing Co Pan Pacific Plumbing 30 HVAC SSW Mechanical ACCO Engineered Systems Cal-Air Inc. Couts Heating & Cooling Los Angeles Air Conditioning 31 Fire Protection Daart Engineering Shasta Fire Protection 32 Electrical SASCO Cove Electric System Electric Brudvik Inc. LIST OF ATTENDEES FOR THOSE TRADE BIDS REQUIRING ATTENDANCE AT THE PRE- BID MEETING BUT DID NOT HAVE TO PRE-QUALIFY 4 Concrete & Reinforcing Precision Concrete Forward Services, Inc. 8 Roofing & Sheet Metal Al Miller & Sons Roofing, Inc. AAA Roofing Service First Single Ply Roofing 18 Resinous Flooring Allied Industrial Coatings, Inc. Floor Seal Technology AcgvkB Activity Orlp Early Early ID Description Dur Start Finish Mobilization I I Mobilization 100D t br.. 0 Mobilize 1010 S LpTraier 2 274C'k 2 BJaA2 �et up Trellor 10a'1 3dTartzrayRxaFtis 1 27IJ7VfP 27tJ7vtP 0 !Set Temporary F Dwer Pole 1030 FepafmdTemppPlom D Inspection or Tel p.Power 27rJ7.O2 I ��� �� 3 D� P�DD� _ M Energize Terp.Power I 1® FMa1CaNu�n Foxing2 OiFl7Y © Install Conaf action Fencing 1Rb Obbh DaroPornt 0 iaunam Obtain Demo Permit 1070 Ct6rtltrilrn Briig Pant 0 12 Obtain Kil chen Building Permit 1210 CbFar Springs Iriedrg l§xrn Pemt 0 1QEOY Obtain Springs Meeting Room Permit j 419] SU Dole 0 17rB_02' Bld D to 4160 AmdTadoCatadxs 8 ffEECWmay, Award T, a Contractors 7CB0 StatdCaahidm D GAYv40 31 Kitchen art of C netructlon ! — � -Phase 1•Kitchen E - Demolition d Grading1100 j 1110 Sara ORE�ri�l®F�hstrCaigy6 Taia U1 1 y0J0) TuWi5 0 Safe ON Sprinkler(M Ext rior Canopy 6 Timills 2 011* 10WU3 13 Safe Off Elech-I 1030 IstalSiB CaNt�al Fang 1 03W� 0 Install Site con strucllonlI Lacing j � R�dSafrglmirgDodcG3lBoc 2 10WJ;D 131MD3 11 © Protect Existing Loadihp Dock Cold Be 111D ShaeTm[s 1 101MN iQWrA 0 Share Tryllla 119D Dane E+tratrWal Frill@Ten Logs 3 iD1MlIp 14YNCLt ® Demo kxterlor Well FI dah 1@ Tle4n Lo allons 11R7 Telp Cr Wc}ea�(p¢laden)dE+haLTyVaLs 4 1QW A0 15W�3 0!s Temporary Vlsqueen( rotectlon)at Ex dor Walls 114] Rckx1C>;sFAtla 1 10lMW 1QW403 112) P� Tradt If Protect Gas Meter j 1 10ym 10W 0 Remove Trash Compactc r 1170 jDarnoTrofis 1 t3WJA 131M03 113) DemollnorLooing Dodct3rdShttre 0 Demo trellis 3 14YM IRYM M Demolition ofLoadIn3 Dock Roof Structure =0 Darn-CaoemaSab-, Da3g DodcWbil 3 15WR3 17WJA IM Sal®BRrzJr( rbv9i3gNas 2 17.W4.0 a3ynfy M DomeI•Concrete SinII s,Loading Doc Wells 6 Figs 1810 Sd CxrrRedrl3PadC� 0 21 Stage 8 Rough G,tla New Building rea ! Structure So11II:Com action&1PAd CertlBcallo Erar� & 1 21J'1•G3 �'Wb3 0 Su ey 3 LaI ! 9i5y Faizy 2 7LFQ�m Ml 0 E cavatm BDock Wail Footings 12A Sol Carpacli sk g 2UVM 1� t�IRe!�rd S II Compaa y� �� BuNr9&Dedd alF � 2 2 IZi Z73 FII3 nataH Rlding&Doe Wall Footings S 31WD) 30W� _ U/G ME 1= f7�i>� 0 ZA^7JR mbar lmI 723 Par&iirgd DJdcWal Froriys i � Pmur Buock Wall Fa Inge 4T3! lVGfv� FSasBRarpWak 3 23W� 31dMD3 Form ,R Ramp all$ °r0 MW433U/G MEon Start Dab 13WY03 FlSC2 FWah Oale 1JANVa3 ® Fs'b ONin171 Data Dele 25NOW2 � PaV-1a em Turner Construction Company 0n1i n^'�+^ QwJ"I _A011w1 Run Del. m5DECO216o57 11010� Cdnrnl Adl, P.S.Convention Center Expansion m Primavera Systems,Inc. Activity Activity Orig Early Early ID Description Cur Start Finish In 19R 19 Crk I ';U k 31.W Y13 fI Fi hl'glxa'rER f.nlunm Anrhnr Rnlle®PIerF 2 3]W,133 31JAiM OL B 1;dT) ktslH RnhxW rm NrlrrfVYt C(r]I'rrs 7 1.11n ftaa lq..en n utrnn iMU Sal Me(srhn_ 11 Ul I17D 1:G1 flarflkurlf4rBAfeagi Wde - - - - - - - 1 IW fir❑ IW I'17I1 1 Pour Colin in Piero R Hplllh WYIIx 1331 Sd'p PhSWalF 1 OTEBM OTEDW ail 0 Strip Pier Well Forms 13110 BeddIWa68Dertlded EovC<DS 2 OB1BO3 O7F®Cl3 19 Backgll V falls&Demoed ootings 1300 Cia sSbbm Gads 1 O/FEB03 On13303 0 Grade Slab on Grade 13`A SolCarpacian O O1F733b Soil Corr paction t3O0 SotStlr EdgaRDod Arden 2 1DFED¢3 11FEDD3 0 Set Sla Edge R Dock A glee 139C) EporytbrrkatExz*g Sbb 2 1OFEEM 11FEBM - _ `--_ Epoxy owels at Exlstin�g Slab _ 4170 UcaTealadSad 2 12�03 13Ff33O3 � 0 Vlaqu�an and Sand i 1410 tixdcad Cd+as 1 13=8303 123331X5 0 Block-put @ Columns EBO3 13 Instal Reber 14'.0 FffiIFdebn 2 1�CD 14 --- - -_ Rabb B Inspection Slab n Grade___ M RrhainepBdhl 0 UM RUBIifgSlabOnGrdda 1 17E®03 148D — �—_ �___- - __�.nir g_— �____- -_. ____ ._- SrpSbb6Wal Eons 1 17Ff3303 1 Sid¢Slab 3 Wall Forma 1� 1 1B�i a So G Structural Steel olumns 3 79�73 9=1 ® I stall Structural Sold Beams 1510 Weld Correri .lo EmftSd rim BCis?B5 3 21F�iLi ®IrIIII Weld Cocturalo ld eamsExisting St+IIuclure 3 Guaealf 1930 FsfalRKxdms@ BiA�"Wal 3 `AFEBM - - © Install Strongba k R Kickers @ Exist Extr.Wall 13-D W�Ispecion 0 - - _ Weld Inspection - 1910 DenoEldaQEranig 2 B Demo Exterior raming 19M kdABotreTrack@5xliV Paii 3 ZAffil3 8 Install Betto Track @ Existing Parapet 1530 h9�I tvidal0eda9&Cksrm 4 li ® Install Meta Decking R Cloaurcs 1900 Instal Bent Pbk3 3 03VJJ3D BvW7D e Install Beet late _ 1590 monictdSludralS6d 2 O71v1AIM 10A*M ® Monokoti Structural Steel Exterior 1980 LarcxiE#rcrWak 1 2413303 24Fi EM 9 Layout Exterior I Valls ism ksRITS.9 Ri Cools 1 2TEBM 2YEB03MM 1 Install T.S.@ Roll-up Doors Frare FQWa� 2 TJF 9 Frame Exterior Walls2130 RrrtkgWal Raxftn 4 ZFEEM Bvy4�03 2Y10 EleltiralWal Rax}rii 3 2+� 04fvfA03 j .0 Plumbing all Rough-in M Electric all Rough 2127 14avC� Lion 1 - ._ -_- - -- - - _ _ _ Install Exterior Fr P Scaffolding Ispeantoabaarda .._ - 9�hn 2 2i (XirM1WYTf - 18d0 F�ixFiarix3kcyafiol 0 � it � 1BD tslaIEdaQ ( ) t EO Fffi1�XDor Frani 2 20� Set Exterior D Ior Frames O3vNFM ■ Install Exterlor Dens-Glas - _ - ____- _ __. . '�0 �a5ha�>d kt 0 07MNi03 l Exterior Sh rating Inspection- - _ 1®D EIFS IngAakin&Pe.olk 3 On WO 111i I E.I.F.S I sulatlon 4 Reve`sls lam EJFStv4mh Base Co# 4 19AAFE3 1341'dI3 E.I.F.S Mash Base Coat; 19W FJFS Fish Cos[ 3 1M'WiD 13JN�A E.I.F Finish Coat 19M ��` r9 i 1 1gvAHM _ 1 Remove Scaffolding 0 Ins all Doors 8 Her' 2W1 kWA RoWp Dons 2 1g✓AF1U 27VY4iOi A Install Roll-up Doon 2ID lsml DooaRHarlrem 2 2NrY343 iiwero 263 istaINEPTrin 3 2riWa3 2NAMiT.3 �� � I nisi MEP Ti... 2 27A4Wd'S 2?vWM 0 sulk Exterior i __ Sheet 2 of 11 -- Adlvity Activity Ong Early Early ID Description Dur Start Finish 1910 Pddi E1FS@RDo Tens 3 2YJNO3 23vyJi13 3R0 F'MF�Q�s 2 23vyV3D T/t.Aym _ _,___ ____-_ _ _ ________ __ _____® �alch Et Roof Tfo-ln'a ® alnl Exxterierior Doors 29l hs�DoczSaak@RapDoas 1 23vWF�i 0 Install Door Seals @ Roll-up Do rs 27W F�ILlrlt.9rrpa 1 2%&N;01 2MIAM 0 Install Dock Bum r Interior ', � �YY�V� 1 WNilP'i 9INVIRm I Layout Interior Walls 1010 SetF6'vDoQdVJrtrwfrmss 2 WIvY+f�3 1U�W7gi Frame In erlor Walls Pan _ _ ____ - —__.-._- __ •Plum Inge Wall 9h'w Frames 10vWUi 7GvWiLD Set Interl)r 4000 �Fa^� 2 11WM 12rWU 219DM Plx"Wadfdx hrh&FtN,,Pa e 5 111vWTD 17f.W2Ii IIn d Pressure Test 1631 hfairFrarag Yq�er�r �� 0 11NME3 1 Eleclri at Wall Rough-irl d Set Now Penile 7AD PgJIo3l lNall�evbn 0 17bWa3 Interior F ominp Inapectlon 22iD Plartig VM lam g 1B Elutr cal Wall Inspectors 3 1Bvl^FiA 2:IvWII3 Plumbing Wall Inspection Il Drywall 7ft30 Ins tld"dadRodDack 3 i%VM 21MARD3 - 0 Ina late Underside f Roof Deck v dF�l �t 0 � Scre clon Inspection Q Tom 4 2iv 23vtN�i ® pe,Float d Finish 5 ® Install HVAC Overhead 1fi4f1 tffiIOaatxudRnlhrgdR®reTed 5 2N4Ni1D ® Install Overirea Plumbing d Pnisuro Tut laD Instal Fre SryHdlocircipng,LSrTad P.T. 5 2YvW� 2NJhiD ® Install Fire Sprinkler O/H PIping,;Drops d P.T. 1�D Yz�l�ix��d 5 2M�K ® Install Overhead Electrical 410D hats HJJFNterd CJfA56FtPjig6FlaaeraTOY 3 2NM1M 23MM Install H S&R and CHWS$.R Piping d Pr sure Tut m 71/0 PaitWakd QyvdCeirgs 3 2FAAM B4416 � aint Walla d D `_`' 11 Ceilings Z�0 h�l Doors d Hadvrae 2 27?v%VM eIIIa 13 Install Doora d ryardware_ _ . . _—__ _I _—___ ____ _____ ____1— __-.- 19D IgiedFNPCdFfJJ58R17-lA5 dRF�i�g Ostxud 0 31rvWID Inspect HVAC d HWS d RfCHWS d R P1 Ang Overhead hep4 lsed0v lreadC�ig d 0 31M^fm j♦Inspect Overhead Plumbing _ Qz g Hn6gF'!rg 2 O1Pf'� Ineu ate OIH HVAC Duct/Plping d PI mbing Piping �Y 16M hSpedO.ehmd Bqd" 0 31M4FM Inspect Fire Sprinkler Overhead _ _ -__ __ Inspect Overhead Electrical 2� i 31NAFYD 31tAN3 - - - - - -- -- _Inatell Glass 1 239D ParlD=&Frares 2 OtAPR i 01APFU1 Palnt Doors d Frames 7® CeigWrrs 2 lYlF{D 03N'Fn3 � 0 Calling Wire 22M AcousticalCeig Grid 2 Q3� OV lK CI Acoustical Ceiling Grid �� l7ah New Bow 0 Tie-in New B I liar DO b 23ast L'gltFoda� 3 DS^f4373 OB^lTd13 i• Install Light Fixtures 2310 4stACArg OiM1 3 04_1 O3 9 Install Ceiling Diffusers 232D Irelalt>led�OrefzrHeads e 3 OB�T7o3 l� Install Sprinkler Hands Z� tP Inspect O erhead for Cover-up 1�0 EragmLVtFoizes 1 Y MVFIB EnergizerLight Fixtures 21M ltal s Ceig Tile 2 t>� I PiC t ® Install Calling Tile ZED Prop d Ca*Floor 2 11PFR01 14eFTil3 IIIIIII Prep d Caulk Floor 21m �BFmIg 5 11lVTiN 17tW313 111110 Resinous Flooring 24W Seel CornelBFlw@DryS,Ilor e 1 15N9 0 154PFQ i1 Seal Concrete Floor @Dry Storage 29M IFEUVCTatCR® 1 15eFM 1w _ I Install VCT at OBlco RtbaBse@QYStT4a 2 16'Wi0i 17A'TiD 01 Install Rubber Baee Dry Storage 2M InsWFRP 4 6P­JU 23^AiD Install FRP Sheep 2.of I I AdIWty AdMty Orlp Early Early ID I DeacdptIon Dur start Finish 250 YffiIPpaBdark i 'I(1^Flife 18OHm '' 1 Install Pipe Bollards 2523 PatPlkMaArds 1 21/FR03 21,N401 B Pant Pipe Bollards 29D ElecLirdl Trim 2 23^FFC3 24PPF03 M Electrical Trim 2ED PintroTrtn 2 23NPF03 wan —r.__ — — -- -- R Plumbing Trim 2M Yelal Caner Gads 1 2YWm 2vpfm 0 Install Comer Go rds 217D Shct mFilimat 3 2WPH03 21OFfm ®, Set Kitchen Eq Ipment 2M YdJ[kivalv6ltdtlp 2 25OFFCB 2a�M III! Install Dlshwas or B Hook-up 2180 FhdapKMarEllprat 3 "FM WA)U3 _ �_ _ _ _ _ _ 01 Hook-up Kitchen Equipment Z21D tiaxnpSPud" 3 3YPR13 113v341U3 Cleanup 6 Punchllst 2540 LYyY�edm 0 08vt41U3 ! City Inspection 25`D FIaeF Dr}gYnaiYq�ecin 0 ORAM Health Depa ant lnspectlog ! 0 03*M City Final In'pectlon 2570 CuW(JudOmWvj 0 0%,tkm _ Cartlflcaleo Occu en Roof 1630 YdalFdooffiras 3 03,44"m lavWm W Install R of Drains !� 1(D) Yrhd-t lBd CarlalH degPYIIorns 2 ORvW303 011vWm El Install Bohr d,Condensing Unit Platforms i 1890 Fa6154aNFal OrFs 1 11RvWII3 09JNm 1 Install Exhaust Fan Curbs ! 17M SdMlFRxiJads 1 07MN193 ORvW473 �i a Set MEP R Igof Jacks � 1740 hddTapeed Podirs"nd OYiuis 4 lav1^im 13vNFm _ ® Install TLLIapered Roof Insulait d Cricketa 1723 Ycial RoolRantipy 3 124WFm IgAgm © Install lsoof Fleshings 1730 RodYcWYan 0 141JNm Q Roof In ll pectlon 1740 YNdAlarhale Flurk'U 3 14Mfi73 1RvWiT1 ® Instal Membrane Roofing 20 h"PLdBJ1as&WakPads 3 l9vt&F03 21NPFM ® Ina II Roof Ballast IL Walk Pads 2W0 Tin@RodOae 2 1JMAP63 2%41FM _ B Td Roof Drains:_ 1781 Set BderflTarks"Cmdardg li4 3 2W1AF133 21vWFIIi ® r&Tanks and Condensing Unit 2110 Fast Cm+ka�alis 2 2WAFO 2NWm 0jet stall Counterfiaphings 175D SdEdarlPac 1 ym%m NAgM 0t Exhaust Fans 1770 tbal BoarPOng@Rod 5 2dvA9W 01fV{m OW I Install Boller Piping @Roof 3740 Remha R<ipardalnea 2 27M^F03 23AVO _ _ 13 Reroute_Refrigerate Lines 1780 Bx"@Bdr&ConJasar&OAEEis@Rod 3 31MARB3 MAPFC3 1 Ela trical@Boller&lCondenser3 Outlets@Roof 11 3710 TedFfilg 1 07*910 0341'Ful 0 Test Piping 179] YepWBot Flptg tdConJoWdFlairal 0 1 Q34Ffm I Inspect Boller Condenser Pil Ing E Electrical 1870 Yea "Bo�Pprg 3 RARU U7APFM ld6l ® Insulate S,Label Boller Pip ng 21:D PaitRorf bstn3 Vasa Egv&Phlbrrs 2 (]AP1;U3 a Pfm _ __ __ _ __ Paint Roof F shing 6 Misc.Equip 3 Platfo_s_ li 21® Cl"RodBPudkt 1 15^FTm lWfm 0 Clean Roof 3 Punchllat Final Roof Inspection site QD RiocAjimigDockAma Drah 3 21l°I433 2L40 i Re ocals Loading Dock Area Drain 40m LaMNanMaemyWbl 1- 25FI33M 25FEBCB 1 Layout New Masonry Wall 4010 Isbl MascWWaks 2 27FEB03 O Install Masonry Walls 43M GcullfvtavryWal 1 2iFEBM 2f Grout Masonry Wall 40M 6aarMasaryWd 2 014k903 09VA9m _ _ _ _ _ _ __ __ _.__ _ _ 2—Brown Maso iry,Wall__ _ 4080 EIF.S Friah Coat 2 (WJPFM OR/Am R E.I.F.S Flnl It Coat 4030 Bada&C"napcaradr CmpackorWais 3 2A4FC0 2WPfm ® B ckfill 6 Comapct Trash Comps rWalls 4040 GaidaSlaAmSlabmGado 2 2 4*03 2%VRM m rode Site Area Slab on Grade 4� Sri Canadm 0 27tvWm oil Compaction' 40® Yslal Carom Rar"ag 3 27tJNm 31MWO Install Concrete Reinforcing -`gel 4 of 11 Activity Activity Ong Early Early 2002 ID Description Dur Start Finish CEO -� En— 11 4140 Fathahrferlon --- - 0 01A9313 Rob ins ectlon Phase 2-UsN Mchen Interior 2210 co-dwTergxray Pa -bm� @Nola LDkerRom 1 1CFEBM 1Uffi3 0 Construct Temporary Protection @New Locker Room 2i10 �Back 0 B Kitchen Black 2731 Make Safe Ban",,PYrrbrg&Sprkas 1 23VIA d HSAA^FM 0 Make Safe Electrical,Plumbing$Sprinklers TIRO Rtddd Hood.&E 4gCud RanEq{xrrai 1 214RB 2%4N;03 Ili 0 Protect Hoods&Existing Cold Room Equipment 2770 Tam.Lxj" 1 23vl4Fffi 23MCS O Temp.Lighting 2/® CbroCe" 2 31M-M 01A4b3 11 Demo Ceiling 2623 panned Kidw Eg pmert 2 31tr1Nd 3 01NTd13 6 0 Disconnect Kitchen Equipment 2590 Darn C<iglNak@glra 2 311,46ZD 01NTifl 0 Demo CeilinglYJalls@Office 2Fi10 lar'olUhx9n+dRxrtixJ 1 31NPM 31NIVO 0 Lay-out Underground Plumbing 2330 PEix bMon Eq{nmai 2 31Mu M OIAPFC3 D Relocate Kitchen Equipment 26M RarelcdaP3 &Cdd Fqv Wal 1 01 WM WAPF D 0 Frame Locker Room&Cold Pre Wall 3"� SWo1R a@UGR+�g 1 01PFFC3 01PFFU32560 Sawcut Floor@ U!G Plumbing p DaroCaerds@UG Fixr/>-q 1 01PFfiB 07pd6 0 Demo Concrete @ U/G Plumbing 37d1 S3Baldow Des 1 01/FFdD JIAPM p Set Backfiow Device 4120 Y�IPk,,E6ad 17.,ab &f xaTe� 6 MAPPU3 0GVFM Install HWS&R and CHWS&R Piping&Pressure Test ® 299D6t�INav ElectralPa 3 02APFC3 OWib➢ !i0 Install New Electrical Panels 2M Oshmd M/PC 3 OafFFm3 O1A�➢ ❑ Overhead HVAC 299) Yfflal Door Frames 1 07A9 M M4PR73 10 Install Door Frames 27U) DrropicP 2 04eTd13 QiNPFM I❑ Demo FRP ZlUI Oaatmaxl FireS{xrldas 3 lYfTfYTi 07A4dD �❑ Overhead Fire Sprinklers 2700 Omhued Rn"-g 3 IYPPr703 01�RdD ',❑ Overhead Plumbing 26M E de UG RntrU 2 07ff D3� ❑ Excavate WG Plumbing 3731 Ydal NewFrom3rDaz8 Cksxe Pamd 2 WM O349d3 ❑ Install New Freezer Door&Closure Panel 2630 InstInspect LVG uTbu Set Floor SrizCa 0 034PIM OVFRM ❑ Install U/G Plumbing/Set Floor Sinks/Drains 2310 ©Inspect O/H Sprinklers 2fl`D Ygod trg 0 0b143D ®Inspoct O/H Plumbing - - - 2CD0 YgsdUGUG Rnttg -------- p 0 -- 4�Inspect U/G Plumbing TIUI Bads&Carowrri 2 016FFd03 07APRD3 O Backfi118 Compaction M10 CNi Plrrihrg YgxrNm 0 O4PR[E QQ O/H Plumbing Inspection ;10 Pa4m E1ec"@Waf 2 071PFU3 DINT13 ❑ Rou h m Electncal Wall 2Bm Omvfeal F3erdd 3 OIN�3 03xPF3X3 - - -_ rhea_ -.cal __._ 3140 tslAB Rxrfrg&HAS&Rad CI-INS&R prg 3 07APRM _ Insulate Plumbing&HWS&R and CHWS&R Piping Overhead Electrical am ❑oAkv Wal4guikn 0 ®Soil Compaction — Drywal Walls 2 ®Electrical Wall Inspection ❑ Drywall Walls ME PathDywal 1 tBNridD 0 Patch Drywall Zlifl FbaCmnrde@UGRJn gT ItoS 1 � 0 Pour Concrete @ U/G Plumbing Trenches 2030 Y6pe1OHWX'&HPVS&R.CHAS&RPliUO, tl 0 Q3NTd13 Inspect O/H HVAC&HWS&R/CHWS�R Piping Overhel'ad 2BM Yweci O11 FYd 0 03A42D ©Inspect O/H Electrical 413] Fmre&Uynd Hadlffi@Rzimrc 2 1OAFR(6 11A� 0 Frame&Drywall Hard Lids Rest__ooms 371Wild) Tape,F� Fr A9ZT3 1& Nm _____ 3 14 _ 1fiePfdb_ 0 Tape,Float&Finish �° rooms 2870 Skim Coal Exsrg Wals 3 1M� 16A9dTi ❑ Skim Coat Existing Walls 3610 sedwas 2 16NIFM 17A91Ti 0 Seal Walls 11 3050 Pa"Wals,S.lfis&Had Ld Cr3gs 2 17A9d13 18APM Paint Walls,Soffits&Hard Lid Ceilings 0 Sh--5of11 Acdvity Activity Orlg Early Early ID Description Dur Start Flnlsh 750 Caarcl"kr Flooring QRz,Yoars 2 17PR7b 1 _ __ ■ Ceramic Tile Flocdn Reatrooma 2� FctalToi2ET Instal ingMsCein9Wres 2 MPM 2VFfL6 Install Ceiling Grid CallingWlres 3 ZW"fTD 23lAF103 i Iriabll Toilet Flxtu 2JIp Instal LigiFAnm 2 Zj 2y, ■ Install Celling DIH seers 21m frelaISM-iderHoodi 2 ■ Install Light Flxtu e 77AJ� 23AJ 3150 ■ Install S dnkler H ads 23M hpedO.atmdtrCo rip 0 71N'fm 1 Install Ceiling Drop ZPPRM p Cords1 290 Retie LUNFDJ> 1 2t^fFiU 31^lF7� I Impact Overhead for Cover-up 2� Istal CoigTta 1 �nerplu Light Fl fume 23M i sb!TcidAwsmf� 2 'MN'Rm 2VPF03 I I ■ Install Calling U 1 2 4 31^ifm ____ __ _ 1 I Is1.11 Toilet Accessories 3037 Baxlt�tWa 2 �i13 --____ __ __ __...__ n RainsEtni ■ Bead Blast Floor 3 3A0 Re Fb6a 1 � � 11 Pre d Caulk F oor 187 g 5 19YiTD OBv1A`r00 P 3M0 ysg Fpp Ruinous Flooring 2 0%141i0 alw)03 ■ Install FRPI 131 f�3EgVmt 3 OUMNM 12JAY�ID ________ _ 1 Install Co erguards 3W0 Eleddcal Trim Sat Kltc en Equipment 2 01M) 1 YID G ElecMcal4dm 31®3110 Ptsttrg lrf 2 OUJ M �YCD - -Hook-up Nltchen Equlpme ■ Plumbing Trim Hr3c+plQi�arf prei 3 621 13M�W nt 3�iBA0 "'PBPi 2 12aMYtb 13✓AY1D _ _ _ __. ___ - -__ __ __ I____� Clean-up d Punchlist �"1� 0 kW1AYO3 31GO Health Dopeiert trpadm 0 1"YO3 l { +Clty Inspection 30 ClyFrdycpe6on 0 t tiffi Health partment lnspeIclion + 3210 Caaraisdompaq 0 ,k4Wyil3 City Final inspection Certificate of Occupancy Phase 3-Cold Prop Interior 320 tia%el7ttt;afer8 lQhatFsf4rei 2 71FvNFi00 31HWTSi Tyve Dbhr�uhor 8 Kllcha Equipment kUmSafaBetlt®tlFsrtrgdFiaSptldi 1 3 WAM 31MM MakeSafe Ell hlcel,Plumbing&Fire Sprinkler 3231 C�PVrt+UQ i 31kMHD3 2WMWO lumbing�(d Dlehwasher P00 Darn�� 1 �� OO�AfiD � o Calling# 3370 Demo Wall Floor Tile � �� 02*f u 1 Damo 0 a,l Walls for MEP 3430 RongtMEletl�miWal 2 Ol^hT� ■ Rou h 34C �aln PtndhgWJ 2 D'N-Fm p In Elpctrical Well 6VPFC3 ■ Rough-In Plumbing Wall 3290 S&p JF�QI.IGRrri3rQbhg Srrp 1 � M 1 Layout Underground Plumbing 323D �lFmub@ A+�rgA 3Snp 1 U AFF03 03NFC3 1 Sewcut Flooyl U/G Plumbin d 3ump 33B0 Oadeed H✓AC6 1 Demo ConoTr, O�ele�Rrrizg 0 UfG Plumb ng R Sump�� 203^PFiID 01^Pf� ■ Overhead HC d Refdgerst n Lines 3410 3900 Gal�iF Z ■ Overhead Sprinklers 2 03^IPoO 01N'fZD ■ Overhead Electrical 1 03^fF770 � 1 Overhead Plumbing alp fmrlaUGRrrltg68rrp 1 DWfm Dt*FU3 0 Exuvab Plu Plumbingd Su 3® t OH Rrrb g 1 0VPH13 Ol^iTiD 1 Ins set OIH Plumbin P 3530 Eleri�lWal hpaclion 0 OVAPA 3 P 9 Electrical Wall Inspection 3510 RrriigWat teperJin 0 WPA3D P Plumbingall Inspection 3931 R�aiAettaosYstalaa6Oynal 1 WAfFO3 07AWO 0 air w P I Sheets of 11 -- ANY Activity Orlg Early Early ID Description Dur Start Finish 35M Saavttspeclion 0 5iAPF03 Screw Insplecllon 3570 Tape 9h,Fb@I&F 3 Q/P913 Cfl^!jE_ 0 Tape,Float 8 Finish 3M Yzfa1 UC'F7rrt1rg5d F1-uSriaflr°ts 1 O/N"fm Inatall UIGPlumbing1sat loor SlnkalDraln 1 D IrfWSur4TtachN0e CiA 1 Install Sump Trench Angle 3401 ke+edO wAc 3EM IspedOHSpuiks 0 MPM — In OM HVAC Yaped 0 Inspect O/H Sprinklers No ouncom�l Inspect O Electrical 3930 hddCdl itmlPar�d6}{zrlai 3 (BAM 10YTZIi M30 IrlwllOPlni ft 0 � Install C Id Room Panels d Equipment 3M a%:1JdCanpdllGP1-bM 1 tH^fi370 04^PRdi Inspect UM Plumbing 3351) _____ __ __..__ __ ___,_______0 Beckflll 6•Com act UIO PI mb� Cmparfm 0 Soil Compaction 3M IrXWE pcmkjr eRAUx}rtyTn3rt�dSrtp 1 �fi�i W^Am P ur Back Concre+e Q UIG Pimb' Trenches d Su p 1 3310 Ftgel Dbs@T nh DmnrartPQrg ; 10 10 0 Install E�aporstcr d Rafri Brant Piping �� �T 8`hb 2 1ONTO 10VIRM 0 Set Angl}s®Trench Dral s 399D hsWC-HF-cmT -_0 Install CIPId Room To In Slab 3100 T� 9g-�RR9 1 11lPFm 1 LMFII3 - - - - ---- ---- --_- -- --�- - ---- - 1 Install Coiling Grid d Ceiling Wires 1 Teat Refrigerator Piping � � 3M BOW Bbdng DiM1saa 1 17NiIIi 1iNT103 j 1 BeBeer]Bl�sl Floor IQPM '14 11 0 Install iiCelling Diffusers 3770 FN� Fod+m _ _ ___ _ _ ti Install Light Fixtures WA70.7 _ . - _ _ __-_ - . _ _ _ _ ..._�_3770 �C i-� 1 1M7iri7 m upccij Hxkp 0 Install Sprinkler Heads nLjf� ; 14� 1 I 0 Install Calling Drop CoFde a79D sj @ 1 iMFFiI1 11 U Hook-up Cold Room Lights 3800 t>sped � 0 $g7j D g Install�Sprinklers @ Cold Room 3l�3M Fped �� iP 0 15PR +In_s e_clI Refrigerati_on Piping ! InapacII Overhead for Cbver-up 0STo 1 15MFiT1 156TYT3 1 Install Ceiling Tile i 383D EtBn-LillMim 1 15N w 154ffm 1 EngerI Ize Light Fixtures 3M RMmots f- a13 3 16^� ��� g Prep�,Caulk Floor 3BM IsmIFRP _ _� Real nousFlooring- 30M Shc�farEgX-1 2 � � 23efSi� g Install FRP--- — 30A E3erLfdTrin 1 al9fl3 ZLY{i3 0 Spt Kitchen Equip eat 3g P�#8T� 1 � 1 El IIclricai Trim 3� FstaIComoUjads 1 M*903 1 Plumbing Trim 3310 F:dnpla}arEgjzrat 2 ZieFRD 21^Pr70i - - ----- - -- --- -- - - -- Install Come us s 7 F�ook-up Kitchen qulPmsnl pdPud�6l 2 23 2VFR03 0 Clean-up d Punch ist �g Fimlt D�aheiYaPerBt Q City Inspection 30M ai'FrolFipadicrI 0 Health Departmi nl Inspection City Flnd In■pe lion_ Roo( -- --- ---- ---- - �Cartifluts of0 u ■n ----- 3310 L2plRc7CmpeeaidCaJYdp PL3lmn 1 OW'HLD OI,W}i43 La out Roof Comp esaor d Cond using Platform 3M DenoRold"[aln 1 �� f03 g Demo Roof Tle-In 3t30 k'tlal CarpesosdCvdersglki Plal&rn 2 O3^FF� p1lPF�p natal)Compras ord Cond■nsl gUnil Platform 0 3W sdHi3ppwA ks 1 EATTO (IMM j I Sat MEP Roof Jacks � PA:hRdd 2 (>3F Patch Roof Shp='.7 of 11 Activity Activity Orlg Early Early ID Description Dur Start Finish 35® Sot Oonp�&Caderdng Rib 1 10^HiD 1lWin3 36i0 RftT.&n&Ca&rsh DmP0V 2 --TtAPFM Re ti Set Compressor d Conde sing Unita h geratlon&Co donate Drain PI ing Em TeEtFtig 1 15Mim 1569dD 1 Test PI In 54iD r�dF�*g 0 i5eFH0d Pip in 39M ra1ak0&abdP{ig 2 1GNT�i 17PFTIIi �Inapett Piping 1 laWfu 1WR703 1 Paln—_ � — -. 3M p�p�ya - - _—_ . _ __ .. ___.____ __ __ .__ __ ___ _ late&Label Piping_ __ _ _ Insul am Claw Rod&Prd{y Pi.Norms 1 21NTiBT 21AA703 —_ Springs Meeting Rooms g CI sn Roof&Punc list Roams Demolition&Grading 41W IrWACarldarBerrades 2 03W4.73 101*111 ■ Install C rrldor Barrlca ' e 42M Safe OffSpridoa 2 CF4 10W433 A Safe On pdnklen 4210 ��� 2 � 1QW 3 ® Safe ON Mctrlul 4160 Fatal Sin CorafiAonFedrg 1 OByArSd OBiMIA S Install Sit Consirudlon sndng 4290 DunoQh1 TC@Sp® 13y4�Ii W _ D me Springs T eabe Area 4233 ���W�®�rFgalheeraMae 2 2U*M 27W433 emo OM WA ®Springs The tre Area 49A DarnWACDaMDCcktt 3 2LW2n 2&Wd'n � ,Dema HVAC D jet®Corridor K FAIT StdBmrs(�SlyaOr� a 2M1W433 211 0 Remove Steel Be ms Q Stage Cu Ian erpoayl *U&Pa R &SAV9BA"&@TlraneAm 1 27,lgm Z7,1MYB Install Tampere Lighting&Pow+r _ Remove&SaW1 geAHU's@ThreatreAnaSanatF� 1 2flW O 2BPM 0tSawcut Floor F�Ca�@� 2WW1 `9WM19 Remove Con,ate 0 Floor Ct>nTheerehea 1 30NhLB 301MN 0 Clean Theatre Area Structure 4330 rrPot Bad0.Gartped6OadqSardM 5 31fflM offiTlm 43C SolCarpa*n 0 Import,B ckflll,Compact Grade Sand MatedH 4370 Fcfal ReberDamis Soli Coneaction 2 07P7� 10T33D Install ebar Dowels 43EB Fatal tiG BacHral 2 07f�B3 10�OD 4100 r'�t/,GElgc" 0 Install 70 Electrical 0 1UT3303 Ins ect U _ 4�D Instal Rat" 2 11FEBM 1a1�3 - _ _- — In p__ IG Electrical 4330 RderFcpecirn 0 130313 0 Install ebar --- 44m PwSlabmGade 1 13�tTi 13�13 Reber nspection 4410 FffiIOPerahbWal5Nd0�s&fig 10 1N�0T 2h1$73 1 Pour lab on Grade t� Install O erabl Well Steel Beams&Bracing 430 SelOpxableWalTrack 3 2 DaM"nN ___Set Operabl Wall Track 2 fH.MARi OGvNA¢i __ . __ _ ._ _ _ _.__ .. _._ — Interior ■ Monokote tructural SWl I 4440 Lap1F�trWa6&Cerrgs 1 071AW O GIMV4D 1T lls&Cel'Ings 4510 FI1 O.ahaad�di� 5 07MNn3 134afm Elactrldal 4470 FMalO.ehaadHJAC&Cmrkr7 07mbm 17MAEM ad HVA &Corridor Duc ork 4IID Fatal FreSprridar0hi PprU Dops&PT 5 07N.N�0 73Mf6U34433 BorhOpeabbWalSbdv.FhiWSIdFirng 3 07hWitD 11A,Y•Fm kler OlH Piping,Drops P.T. 45M Frarna Mec Perta�rWaC&Cn3,t Box-In parable Well S-I with Metal Stu Frrng. 4 1GvWR1 13�WII3 IS 4530 DHFn Spridas Frame Rise.Perimeter Walls&Corridar ells Fped p 4510 rg�adDH F3eriF-el 13AVU Inpact /H Fir,SprinklIrs 0 13vWiD Inspect OtH Electrical 4M Wal&CaaidiTurd Ftarr6 tq;edat 0 13Jl4al 47d7 �DorrFrmg Wall& aorldor Tunnel Framing Inspecton 3 13J,N'dD 17kWi0T ® Sat D or Frames She,—B,of 11 ActivHy -- --- Activity Orlg Early Early -- ID Ducdptlon Dur Start Finish 4623 Loin Dryvsl elCmliodt-7ai®IPmm 4 I'VA40 1MIAR 3 ® Prell� .Drywall at Corridor a Electric l Room 4570 ElemdWal Rajjhn 4 14MM713 19AN;03 Elec rival Well Rough-In 45M napedChIMAC 0 17WFO Ins OM HVAC �0 ar F4gC kU5 7 117N+m _27NW;U3 � taming Cellinpf 46D0 F7od"Water 0 IMW;m Elec rival Wall Inspection 4W Y�Wad 4 3TArf703 I suleb Wdlsp - -- 4640 Sd�dDwxijtCere 3 21MViD3 Z7MJ47U 0 d Electrical Downllpht Cens 48D DydWalk Crnld�Pakh a TumalCmlio 5 2B�AN700 OW{703 Oryw II Walls,Corrld r Patch a Tun at Corridor 49M S4Vdi&oOcpe 2 2@,Wui ZM,MYA 40) erg Ra*@Yzpodn 0 2mWm pdnkler Drops@Hard Lids �, ,� 5 Z1A4^F� 117 ._—____ _ _ ____�_ ellin_g Framing Inspection ._ 46A Drywall Ceilings 4680 WaI SoeNF�olm 0 OIF4T; _�_ __.-__ _ MR Wall Screw Inspection 470) Tape, Soaves 0 OY,FFN � Calling Scre*Inspection 4,[D FWaFlish Tape,Float at a Finish 4710 F'a-4 Ceigs 5 03eFF3D 15�Aim _ __—___.__�_._ .__ - _ ...__ _ ___ __ —Mnslail t- _ Paint Collings _- 4730 FinalOoas,Frarea8l-13daae 4 ,� 1 - - - - -- oom,Frames�� F�IVaaod Baia Rena rF?af ® Install Woad Base a Presentation Rail �D d Fbotp@Crnidrpms 3 14^FfiO3 1fiYi703 Repelr Base a Floo ng@Corridor Doom ■ 4790 Acas"Cekg Grid 3 iC-OFFm 10AFR13 M AcoUztical Callin Grid 4010 Foam Sevi>3 Carrio 3 1G^FTiTi 18i _ ® Wallcovering _ G L�'t @ i 16NTdB iCiPR03 Install Light Flxlu�ea @ Service C rridor 0 4WD tdal5pridolkuds 2 16APF03 17l4{03 0 Install Sprinkler Hands 4® kdA Ceang Ulu,= 1 1GePR06 16N P g Install Ceiling Diffusers 4M PartWal%Dcoy Bwe&RaH 3 17ATM 2UYP00 li Pe nt Walla,Doors,Base a Rails 476D Fsia nsUSoul derc@Amy 3 Zi^A1D _ .■ Infstall Light Fixtures @ Acoustical ,M In"�LtiGuzas@/'=�I 5 2u�FFdi Z PRE Install Sound Well Panels Ceigs 3 ZLM{yp ZW-FCD Install Celling Diffuse o @ Acoustical Collings 4® Fiebl SpFbkrFleade@AmsadCeigs 3 ZWFR73 2YPFC3 Ins 'It Sprinkler Ho do @ Acoustical Cellings ■ 48M Fi�9®�Rtms 2 27M733 2WTi10 _ G Seat Concrete 234 FiT1 21r4i1l0 _ __nergize Light FI u_res _______ 0 46M F�IRtbaBasa@SeneCrmlo 1 ZiNTiD 73^! Install Rub r Base @Seriv Corridor ti 4533 krgedOslmdbrCns1¢ 0 2VPR03 ,� Instal Cel4g lie Inspect Overhead or Cover-Up 3 25^PF7U 2 F{ni =I Install Coiling Ile 4770 EladmalTrtn 2 25NTO m Electrical Trim 4970 � 6 5 BJA}Lp _ _ _ __________� Install Ca it 4BB0 FdalOpaableWal Pareb 3 � � 1� — - - -- --- -Install Operable Walt Panda ---- 4B1Dip8 � 2 � OMA7Qi 0 Clean-up a Punchllat 48M CkyFid Irpeolor 0 O]AM14\1D 40M CailiraUdomparty 0 �,yym City Find I spectlon Roof Certificate f Oocu en 49® LaWRodPedafa a&TenLoofos 1 1tNNiD 117AARM 1 LayoutR fPanetntiona,a TH-In Locallo a 4990 Dare PbD"@SkdPOCaTsis 3 11AWm 13VAIM 4970 Qzrn FJF'S@Ts Lomiors 2 11M^FOO 12.W0 IN Demo Footing a Steel OOC's The-Ins ■ Demo E I.F.S @ Tie-In Locations 4693 CLL-h RodgmwUsfr4ul,� 1 14AAFC3 74A4NX3 1 Cut-In loof Openings(or Ductwork `` 516tpOs2wk 1 17LOFM 17A46FIM 1 Stub- p Ductwork 5320 Mark SuearaPtlJa Cahrsal'kf6nm 7 184A79i 2ivy4TD Install Mee. Screen aAHU Condenser PI Horma � 5180 Ca3Rt ReSk ms 0 1R.W;U3 Clear Public Restrooma -- She 9 of 11 Acgviry Activity Orlg Early Early ID Description Dur Start Finish 5130 WangFgiafon 1 23JNiU slding Inspection S0 `��'� 1 ZIh1YU7 27W03 1 t MEP Roof Jack& 5110 SdP}IJ,6Casbaaom CaxFrar 1 Z7fiWTB Z>Mrym _ 0 al AMU,Exhaust Fan a Condensir 5170 (ffipt3cF3z9nuns 0 Z7FMIYD - .. — - � FffiIRudH,%Ca QY•FT113 leaf Public Res' -Drus Rni6FgFfigaVaiS 5 2BJAi-i Install Roof HVAC a Plumbin Piping a Vents bro � Fatal PMuch Scraprani 2 311AWW Install Refrlerant Linea P g 5110 Frure P/edt Smtat D 2 iBvV 31hNFII) Frame Mach.Screen 3ta Fga1F?SIGa+okSa&d Tmpea Fie DarPe& 5 21� PF133 I3 Install oof Ductwork,E ound Traps a Ilre Dampers 5120 Fearft Fq�erim 0 31MN;03 54M FsfalCemoiBmd@P.�dl Soeat 2 01/y}� EiiiD Framing lnap;cllon 51M Ira" 9ys p� 5 WWTZD Install Cement Board Q.Mach.Screen fan@Merit ScreenQi^fTAi �10 Te:fgM/ACBRirtigP�iig 3 �^J{i¢3 CBNli73 � � � Install Plaster System @ Mach.Screen I18 Testing H AC a Plumbing I In�0 FNJ E1edral@EQipriuia SettsOi 3 171AA;D tEN{@ I D Y D P D 51m Path @ 2 0W1� D/FPFi� Equipment Service Outlets �g 3 01/Flm OBNT�i natal)Eledrlcall_-_- - — Patch Ro On 5187 PathEIFS Tenlr�rrc Q D I ® Patch EJ.F.S Tie-In locations 51N FFmdFf-Tg 0 0 @ SdTI 0 08NrtU Inspect RPof Piping I 1210 FaibataWRWPptg 2 Inspect Roof Elechicat II pi Pad FLodSieelFdlga6}lp6Rurre 3 11PP1� 15eFiiD Paint RoofSbel,Flah'g Equip d Platfc • m Insulate A Label Roof Pi ng 5R C1mnRadaPud4j 2 1C>nFF¢3 imprim © Clean Roof a Punchust 53F9 Frd Rod t 0 1 8sA�i Pantry Flnal�Rooffns action Demolition a Grading 9D RrbduP3JMEgppnai 3 OlYPII3 1awm i ® Relocatir Kitchen Equl men) 443D Safe OlSpri�s 2 14WI.0 15WVD B Safe Off Sprinklers 4400 Sala CQElerlral 2 14pm 1516M ■ Safe Olf Electrical&so �la&QPF"Ttig 2 14y4d70 I&W,103 la Safe 6I Cap Plumbing 4Ti0 eMrt rr° thae 5 1SYM TLNN13 ® _pslrq Admin.Are - _ _ 4g10 IamoOHWAC@bdrnA� 2 2ZW4)Td 23NND _ - - - —. - -i— - - - _ _ l_--__— 0 Demo OM HVAC AdmlrL Area 4� P� &SdcgeAFUs@Ad nAa3 1 Z1W1IB ZiW3Ti 0 R ve d Sah, AHU'a@Admin 4� CleatAdrrtArea 1 2,16M 21W*D3 D Ccan Admin.Arn Interior i MM Lamwais 1 WlvtNi03 97MAI703 D Layout We Is MM FrarnoWeG&Ceitp 5 WhWiCD; 14Wf� i Frame allsa Cellln a 9 0 �Rl +dl'Iadsg 1 i9 N0 1UM;03 1 Layout U IdeTground Plumbing 5310 Omf udFNAC&FAgwalcanLltm 5 1M AFW 14fWO ® Overhe d HVAC a Rem eragen Linea SM OsheedEbAW �s 4 1U i 13VWm _- __� Overhe d Fln Spdnkla d�� 4 TM-4 13vWm Ovarhs Iii..dul S31D O�uiadFF+rt+'g 4 1nvt%iM 13.Wn3 i Overlie dPiumhing 5i1D OaroCaPuabU&UrrP I 11MNTB 11RMFiD D Sawcut loor@ U/G Plumbing a Sump @ Ft+rAEa9rrP 2 11tvW913 13M''a3 9BD F�.oBUG(itrtiga9np ■ Demo C ncrete @ U/G Plumbing a Sump 1 13JN70i 1344FCB 5400 FtpedOHFm SptAlers 0 138^Fr0 D Excavape UIG Plumbing 6 Sumps 5/10 inspect O-iBad" 0 13eWYq Inspect O/H Fire Sprinklers 5W FpEdOHPIir"F 0 13 Inspect O/H Electrical Inspect O/H Plumbing -- Shegt 10 of i t - AActivityF �y Activity Orig Early Early ID Description I Well APR -MY JIIN Dur Start Finish MID PaihnL9aYd@ wall3 14VA9M 1f AhFM Rou Mn Electrical @ Wall 5310 �h�A+nbrg@wak. 3 iMiV; 3 1FtMAOi _ ® Rou h-In Plumbin Walla -- - --- - -- - ---- e - -- - 54D FzialliG Rrrbrg'FdHUSd�ac 2 iMMFM 17kNV30i 50 Instal UIG PlumbinglSat Floor SlnkslOrains S� Y�dOHHJAC o iMWiU Inspect OM WAG 510 F+a'r*Bt� 0 i7AM1Nil3 � *Fram g Inspection � SM Set�dtalDumVtCarg 1 17M4118 17LOR13 1 Set E ecWcal Downlight Cans 5M h"sumTlerchAde 1 17M4FO IA4N. 3 _ 1 Instal SumpTrench Angle_ 5460 tzT9dLIGRXrug 0 — — 59® Elac"WalYgper>on 0 1BoY�Fffi t— Inspe UIG Plumbing' 5*0 PtrrtigwalYgpahr 0 Elec eat Wall Impaction 1BNJi70 Plu bing Well Inspection 5l �A�R��Ft+r�9 1 1BNJTA IU A33 0 Back II 3 Compact USG Plumbing M30 SOICvtpMn o I&AN" Soil Compaction WaH �2 1 3AMf7f3 0 Ina leh Wdl■ 5510 Dival 3 2M_K 24&VfU ® Dywall TOT vftoat a Frsh o e raw Inspection � In"Bael�an Parks 5 036PRA -- Tape,Float 6Finish 9310 Part 5 _ - ___ _ Install Beer Room Panda&Epulpment 1 OV�FFT33 OIA4dU Paint Calling �D Fdal LUas,Frara:8t3arMaa Install Doors,Frames 3 Hardware RM3 F"Ple(I 1a 1 OVA ONAU3 Install Roof Ladder � �&RAgerat ouxaU o3N�n3 8U Ams ICeiO Cxid 0 Install Evaporator S Refrigerant Piping 1 OV4FROi OVFM _ _ _ _ _ ____ _ B_Acoustical Calling Grid MO IffiICd1RvnTaUt'g Stb 1 ONA'm ONFTiU 0 Install Cold Room Topping lab Instal Light FDtaes 1 O7APRM 07� 1 Install Light Fixtures 5H) 4tsW Cairg Dfissars 2 07APRM 056PRM 0 Install Calling DlHuaaers 563DFtrle3pBaeRvnLUG 1 WPF1iA o7P ¢3 D Install Spilnkler Heads Hook. Beer Room Lights_. TV tstal Sprihis@Bea Room 1 MAPFU3 WI+FFi¢3 1 Install 3pr nklers@Baer Room EEO 4q�edOulzud6Cnu L¢ 0 !B Inspect Oyerhead for Cove•Up IErxxgceQ � Yslal Ceii Ti� 1 Q3+F17U 0 Energize Ight Fixtures 5710 PalrtWa63Doos - 1 Install Celling The 4 76^Ff� 15M47ll3 _ ___ _ ___ M_Paint Walis d_Doara_ 57l10 ���� 1 76�0 iGAPRm 1 Seal oncnte Floor 57d1 SalKidm Equnat 3 17� 2t � Set Kitchen Equip nl 5740 E6diaal Tan B ElecMcal Trim 5M PtrrbU Tin 2 17A9zCG 10sAdD B Plumbing Trim - 57111 Hods-tplQialFsf4rrsl 3 22APPo3 2WTu3 - _ __.__ __,___-_l! _ook•up Kitchen ui ment 57tD ctvdm 0 T^ 13 Clean-up 8 Pun hllat Ity5M tia- Da{atrsiFcpe6m - 0 27rtiYB Health Inspection SBU Health Departm at Inspection �70 Ca f�d0 l 0 ��City Final Inspe Own Certificats of upancy en Sheet 11 of 11 A VALM City of Palm Springs Department of Procurement and Contracting C CRRCR 1fC P " 3200 Tahquaz Canyon Way • Palm Springs, California 92262 q(/FO RN\ TEL:(760)323-8239 • FAX(760) 322-8372 • TDD(760)864-9527 CITY OF PALM SPRINGS 3200 East Tahquitz Canyon Way Palm Springs, CA 92262 NOTICE TO ALL TRADE CONTRACTORS PHASE I EXPANSION OF THE PALM SPRINGS CONVENTION CENTER CITY PROJECT#02-19 ADDENDUM NO. 2 This Addendum is being issued for the following changes and informational items: 1. Add Part V Scopes of Work (All Trades): 2. Provided for your convenience: Hard copy of Addendum #1 issued December 5, 2002, and transmitted electronically to all plan holders. Note: Includes anticipated master construction schedule, (All Trades) which is also available on the city's web site. Go to www.ci-palm-springs.ca.us. Go to Departments. Go to Procurement. END OF ADDENDA NO. 2 BY ORDER OF THE CITY OF PALM SPRINGS City doff Palm Springs Harold E. Good, CPPO Director of Procurement& Contracting Dated: December 6, 2002 Receipt of this addenda must be acknowledged on the Trade Bid Forms submitted with the bid package. Attachments: Scopes of Work (All Trades) Courtesy hard copy of Addendum#1 previously issued. Courtesy hard copy of Anticipated Master Construction Schedule(All Trades) Post Office Box 2743 • Palm Springs, California 92263-2743 OF PALM SA . Pti City of Palm Springs ' Department of Procurement and Contracting °R"Oq"QED,•'m + 3200 E.Tabquitz Canyon Way • Palm Springs, California 92262 IZ/Fov, Tel: (760)323-8239 • Fax:(760)322-8372 • Web:www.ci.palm-springs.ta.us CITY OF PALM SPRINGS 3200 East Tahquitz Canyon Way Palm Springs, CA 92262 NOTICE TO TRADE CONTRACTORS (ALL TRADES) PHASE I EXPANSION OF THE PALM SPRINGS CONVENTION CENTER CITY PROJECT#02-19 ADDENDUM NO. 3 This Addendum is being issued for the following changes and informational items: 1. Replace Table of Contents (3 pages)with revised Table of Contents, pages 1, 2 and 3. 2. Add: To bid Package#32 - Electrical and Fire Life Safety Il. SCOPE OF WORK F. ALLOWANCES Trade Contractor shall build an allowance of$5,000 (five thousand dollars) into the bid for exterior lighting to be specified at a later date. 3. Add to bid Package #01 - Selective Demolition ll. SCOPE OF WORK B.As further clarification, Trade Contractor shall: 58. After their salvage of AHU#3 and AHU#6 (by other trade contractor) remove steel platforms, their attachments and supports. Post Office Box 2743 0 Palm Springs, California 92263-2743 4. Add: to bid Package#28 - Kitchen Equipment II. SCOPE OF WORK A. Add to "A" §10265 -Wall Surface Protection Systems. 5. Replace: Exhibit"D", Document List, pages 1 through 6 with revised Exhibit"D", pages 1 through 6. 6. Replace: Exhibit "F", Temporary Utilities for Construction Purposes, pages 1 through 3, with revised Exhibit "F', pages 1 through 3. 7. Add: to Qualified Bidders List A. Add to attachment to Addendum #1 entitled 'Pre-Qualified Trade Contractors for Trades Requiring Pre-qualification and Attendance at Mandatory Pre-Bid Conference" Janikowski Plumbing, Inc. to Trade Bid Package #29 (Plumbing). B. Add to attachment to Addendum#1 entitled "List of Attendees for Those Trade Bids Requiring Attendance at the Pre-Bid Meeting But Did Not Have to Pre-Qualify" B E Mc Murray Construction, Inc. to Trade Bid Package #4 (Concrete & Reinforcing) 8. Add: To PART IV- CONSTRUCTION DRAWINGS AND SPECIFICATIONS as attached. Section 08110 Steel Doors and Frames Section 08211 Flush Wood Doors Section 08305 Access Doors Section 08331 Overhead Coiling Doors Section 08710 Finish Hardware Section 09512 Acoustical Tile Ceiling Section 09651 Resilient Tile Flooring Section 09900 Painting Section 09775 Fibreglass Reinforced Panels Section 10660 Operable Walls Section 10265 Impact- Resistant Wall Protection 9. Informational: Attached Requests for Information with responses by Architect and Engineer. Numbers PB#01 - PB #22 10. Delete Bid Package#9 Doors, Frames & Hardware from the Notice Inviting Bids dated November 11, 2002. Perspective bidders for Bid Package #9 should contact Director of Procurement & Contracting 760-323-8239 for additional information. i END OF ADDENDA NO. 3 BY ORDER OF THE CITY OF PALM SPRINGS City of Palm Springs - Harold E. Good, CPPO Director of Procurement & Contracting Dated: December 12, 2002 Receipt of this addenda must be acknowledged on the Trade Bid Forms submitted with the bid package. Attachments: Revised Table of Contents (3 pages) Revised Exhibit "D" (6 pages) Revised Exhibit "F" (3 pages) SK-1 (2 pages) Additional Specifications as referenced in Item 8 above Pre-Bid RFI Log (2 pages) i HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theatre Reconfiguration 10/30/02 TABLE OF CONTENTS DIVISION 0 - BIDDING REQUIREMENTS To be provided by the City of Palm Springs DIVISION I - GENERAL REQUIREMENTS Section 01010 - Summary of the Work Section 01040 - Coordination Section 01045 - Cutting and Patching Section 01050 - Field Engineering Section 01200 - Project Meetings Section 01300 - Submittals Shop Drawings Product Data and Samples Section 01400 - Quality Control Section 01421 - Reference Standards and Definitions Section 01631 - Substitutions Section 01700 - Contract Closeout Section 01720 - Project Record Documents Section 01730 - Operation and Maintenance Data Section 01740 - Warranties DIVISION 2 - SITE CONSTRUCTION Section 02060 - Building Demolition Section 02222 - Excavation Section 02300 - Earthwork DIVISION 3 - CONCRETE Section 03100 — Concrete Formwork Section 03300 - Cast-In-Place Concrete DIVISION 4 - MASONRY Section 04200 - Unit Masonry DIVISION 5 - METALS Section 05120 - Structural Steel Section 05210 —Steel Joists Section 05310 - Steel Deck Section 05400 - Cold-Formed Metal Framing Section 05500 - Metal Fabrications Section 05810 - Expansion Joint Cover Assemblies Table of Contents Page 1 Revised 12/12/02 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theatre Reconfiguration 10/30/02 DI VISION 6 -WOOD AND PLASTICS Section 06100 - Rough Carpentry DIVISION 7 -THERMAL AND MOISTURE PROTECTION Section 07210 - Building Insulation Section 07241 — Exterior Insulation and Finish Systems — Class PB Section 07533 —Single-Ply Membrane Roofing Section 07716— Roof Expansion Assemblies Section 07720 — Roof Accessories Section 07811 — Sprayed Fire Resistive Materials DIVISION 8 - DOORS AND WINDOWS Section 08110 - Steel Doors and Frames Section 08211 - Flush Wood Doors Section 08305 -Access Doors Section 08331 - Overhead Coiling Doors Section 08710 - Finish Hardware DIVISION 9 - FINISHES Section 09253 - Gypsum Sheathing Section 09255 — Gypsum Board Assemblies Section 09310 - Ceramic Tile Section 09571 - Acoustical Tile Ceilings Section 09651 — Resilient Tile Flooring Section 09671 — Resinous Flooring Section 09680 - Carpet (Owner Supplied and Installed) Section 09775 — Fiberglass Reinforced Panels Section 09900 - Painting Section 09841 —Acoustical Wall Panels DIVISION 10 - SPECIALTIES Section 10265 - Wall Surface Protection Systems Section 10660 — Operable Walls DIVISION 11 - EQUIPMENT Section 11400— Food Service Equipment DIVISION 12 - FURNISHINGS - Not Used DIVISION 13 - SPECIAL CONSTRUCTION - Not Used Table of Contents Page 2 Revised 12/12/02 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theatre Reconfiguration 10/30/02 DIVISION 14 - CONVEYING SYSTEMS - Not Used DIVISION 15 - MECHANICAL Section 15000 — Mechanical Specification Section 15300 — Fire Protection Specification Section 15400 — Plumbing Specification Section 15855 —Air Handling Units DIVISION 16 - ELECTRICAL Section 16010 — Electrical — General Provisions Section 16110 — Raceways Section 16120 —Wire and Cable Section 16140 - Devices Section 16170 — Low Voltage Disconnect Switches Section 16181 — Low Voltage Fuses Section 16182 — Low Voltage Circuit Breaker Section 16450— Grounding System Section 16460 — Low Voltage Transformers Section 16471 — Branch Circuit Panelboards Section 16472 — Distribution Panelboards Section 16485 — Motor Controllers Section 16500 — Lighting Fixtures Section 16520 — Lighting Control System Table of Contents Page 3 Revised 12/12/02 EXHIBIT D PALM SPRINGS CONVENTION CENTER DOCUMENT LIST November 1, 2002 Architectural Architect/ Description Date Drawinq No. Engineer ARCHITECTURAL A0.01 HNTB Sheet Index, Directory 10/30/02 A0.02 HNTB General Notes and Abbreviations 10/30/02 A0.03 HNTB Partition Types 10/30/02 A0.05 HNTB Accessibility Details 10/30/02 AD0.01 HNTB Demolition Plan and Section-Kitchen 10/30/02 AD0.02 HNTB Demolition Plan and Section-Springs Theater 10/30/02 A1.00 HNTB Overall Site Plan 10/30/02 A1.01 HNTB Overall Floor Plan 10/30/02 A1.02 HNTB Overall Existing First Floor Plan 10/30/02 A1.10 HNTB Enlarged Plan-Kitchen Area 10/30/02 A1.11 HNTB Enlarged Plan-Meeting Rooms 10/30/02 A1.20 HNTB Enlarged Roof Plans-Kitchen and Meeting Rooms 10/30/02 A1.21 HNTB Enlarged Restroom: Stairs and Ramp 10/30/02 A2.01 HNTB Exterior Elevations 10/30/02 A2.10 HNTB Building Sections 10/30/02 A3.01 HNTB Wall Sections 10/30/02 A3.02 HNTB Wall Sections 10/30/02 A4.01 HNTB Roof Details 10/30/02 A4.02 HNTB Miscellaneous Details 10/30/02 A6.01 HNTB Interior Elevations-Kitchen 10/30/02 A6.02 HNTB Interior Elevations 10/30/02 A7.01 HNTB Room Finish Schedule 10/30/02 A8.01 HNTB Overall Reflected Ceiling Plan 10/30/02 A8.10 HNTB Enlarged Reflected Ceiling Plan- Kitchen Area 10/30/02 A8.11 HNTB Enlarged Reflected Ceiling Plan-Meeting Rooms 10/30/02 A8.20 HNTB Ceiling Details 10/30/02 A9.01 HNTB Door Schedule and Details 10/30/02 STRUCTURAL S1.01 HNTB General Notes 10/30/02 S1.02 HNTB Typical Concrete Details 10/30/02 S1.03 HNTB Typical Steel Details 10/30/02 S1.04 HNTB Typical Steel Deck Details 10/30/02 S2.01 HNTB Enlarged Floor Plan-Meeting Rooms 10/30/02 S2.02 HNTB Enlarged Roof Plan-Meeting Rooms 10/30/02 S2.11 HNTB Enlarged Floor and Foundation Plan- Kitchen 10/30/02 S2.12 HNTB Enlarged Roof Framing Plan-Kitchen 10/30/02 S3.01 HNTB Sections and Details 10/30/02 S3.02 HNTB Sections and Details 10/30/02 S3.03 HNTB Sections and Details 10/30/02 Page 1 of 6 Revised 12/12/02 EXHIBIT D j PALM SPRINGS CONVENTION CENTER DOCUMENT LIST November 1, 2002 Architectural Architect/ Description Date Drawing No. Engineer MECHANICAL MO.01 HNTB Symbols, Abbreviations, and Notes 10/30/02 MO.02 HNTB Mechanical Requirements 10/30/02 MO.03 HNTB Mechanical Schedules 10/30/02 M1.10 HNTB Enlarged Kitchen HVAC Floor Plan 10/30/02 M1.11 HNTB Enlarged Meeting Rooms HVAC Floor Plan 10/30/02 M1.12 HNTB Enlarged Kitchen HVAC Roof Plan 10/30/02 M1.13 HNTB Enlarged Meeting Rooms HVAC Roof Plans 10/30/02 M2.01 HNTB Mechanical Details 10/30/02 M2.02 HNTB Mechanical Details 10/30/02 M2.03 HNTB Mechanical Control Diagrams 10/30/02 ELECTRICAL EO.01 HNTB Symbols List,Abbreviations, and Notes 10/30/02 EO.02 HNTB Partial Single Line Diagram, Light Fixture Schedule and Title 24 10/30/02 EO.03 HNTB Panel Schedule & Load Calculation 10/30/02 EO.04 HNTB Dimming System Riser Diagram 10/30/02 E1.10 HNTB Enlarged Kitchen Power Plan 10/30/02 E1.11 HNTB Enlarged Meeting Rooms Power Plan 10/30/02 E1.14 HNTB Enlarged Kitchen Electrical Roof Plan 10/30/02 E1.15 HNTB Enlarged Meeting Room Electrical Roof Plan 10/30/02 E8.10 HNTB Enlarged Kitchen Lighting Plan 10/30/02 E8.11 HNTB Enlarged Meeting Room Lighting Plan 10/30/02 E9.10 HNTB Special Outlet Details 10/30/02 PLUMBING P0.01 HNTB Symbol List,Abbreviations and Notes 10/30/02 PO.02 HNTB Plumbing Schedules 10/30/02 P1.10 HNTB Enlarged Kitchen Plumbing Plan 10/30/02 P1.11 HNTB Enlarged Pantry Plumbing Plan 10/30/02 P1.12 HNTB Enlarged Kitchen Plumbing Roof Plan 10/30/02 FOOD SERVICES KO-1 HNTB Notes and Symbols 10/30/02 KO-2 HNTB Construction and Installation Details KA-1 HNTB Equipment Plan 10/30/02 KA-2 HNTB Building Conditions Plan 10/30/02 KA-3 HNTB Plumbing Plan 10/30/02 Page 2 of 6 Revised 12/12/02 EXHIBIT D PALM SPRINGS CONVENTION CENTER DOCUMENT LIST November 1, 2002 Architectural Architect/ Description Date Drawinq No. Engineer FOOD SERVICES (con't) KA-4 HNTB Electrical Plan 10/30/02 KA-5 HNTB Refrig/Ventilation Plan 10/30/02 KA-6 HNTB Equipment Elevations 10/30/02 KB-1 HNTB Equipment Plan 10/30/02 KB-2 HNTB Building Conditions Plan 10/30/02 KB-3 HNTB Plumbing/Ventilation Plan 10/30/02 KB-4 HNTB Electrical Plan 10/30/02 KB-5 HNTB Refrig/Ventilation 10/30/02 Exhibit D Continued on next page Page 3 of 6 Revised 12/12/02 EXHIBIT D PALM SPRINGS CONVENTION CENTER DOCUMENT LIST November 1, 2002 Specification Architect/ Description Date Number Engineer DIVISION 1 —GENERAL REQUIREMENTS 01010 HNTB Summary of the Work 10/30/02 01040 HNTB Coordination 10/30/02 01045 HNTB Cutting and Patching 10/30/02 01050 HNTB Field Engineering 10/30/02 01200 HNTB Project Meetings 10/30/02 01300 HNTB Submittals Shop Drawings Product Data and Samples 10/30/02 01400 HNTB Quality Control 10/30/02 01421 HNTB Reference Standards and Definitions 10/30/02 01631 HNTB Substitutions 10/30/02 01700 HNTB Contract Closeout 10/30/02 01720 HNTB Project Record Documents 10/30/02 01730 HNTB Operation and Maintenance Data 10/30/02 01740 HNTB Warranties 10/30/02 DIVISION 2—SITE CONSTRUCTION 02060 HNTB Building Demolition 10/30/02 02222 HNTB Excavation 10/30/02 02300 HNTB Earthwork DIVISION 3—CONCRETE 03100 HNTB Concrete Formwork 10/30/02 03300 HNTB Cast-In-Place Concrete 10/30/02 DIVISION 4—MASONRY 04200 HNTB Unit Masonry 10/30/02 DIVISION 5—METALS 05120 HNTB Structural Steel 10/30/02 05210 HNTB Steel Joists 10/30/02 05310 HNTB Steel Deck 10/30/02 05400 HNTB Cold-Formed Metal Framing 10/30/02 05500 HNTB Metal Fabrications 10/30/02 05810 HNTB Expansion Joint Cover Assemblies 10/30/02 DIVISION 6—WOOD AND PLASTICS 06100 HNTB Rough Carpentry 10/30/02 Page 4 of 6 Revised 12/12/02 EXHIBIT D i PALM SPRINGS CONVENTION CENTER DOCUMENT LIST November 1, 2002 Specification Architect/ Description Date Number Engineer DIVISION 7—THERMAL AND MOISTURE PROTECTION 07210 HNTB Building Insulation 10/30/02 07241 HNTB Exterior Insulation and Finish Systems—Class PB 10/30/02 07533 HNTB Single-Ply Membrane Roofing 10/30/02 07716 HNTB Roof Expansion Assemblies 10/30/02 07720 HNTB Roof Accessories 10/30/02 07811 HNTB Sprayed Fire Resistive Materials 10/30/02 DIVISION 8—DOORS AND WINDOWS 08110 HNTB Steel Doors and Frames 10/30/02 08211 HNTB Flush Wood Doors 10/30/02 08305 HNTB Access Doors 10/30/02 08331 HNTB Overhead Coiling Doors 10/30/02 08710 HNTB Finish Hardware 10/30/02 DIVISION 9—FINISHES 09253 HNTB Gypsum Sheathing 10/30/02 09255 HNTB Gypsum Board Assemblies 10/30/02 09310 HNTB Ceramic Tile 10/30/02 09512 HNTB Acoustical Tile Ceilings 10/30/02 09651 HNTB Resilient Tile Flooring 10/30/02 09680 HNTB Carpet 10/30/02 09775 HNTB Fiberglass Reinforced Panels 10/30/02 09900 HNTB Painting 10/30/02 09841 HNTB Acoustical Wall Panels 10/30/02 DIVISION 10—SPECIALTIES 10265 HNTB Wall Surface Protection Systems 10/30/02 10660 HNTB Operable Walls 10/30/02 DIVISION 11 —EQUIPMENT 11400 HNTB Food Service Equipment 10/30/02 DIVISION 12—FURNISHINGS Not Used Page 5 of 6 Revised 12/12/02 EXHIBIT D PALM SPRINGS CONVENTION CENTER DOCUMENT LIST November 1, 2002 Specification Architect/ Description Date Number Engineer DIVISION 13—SPECIAL CONSTRUCTION Not Used DIVISION 14—CONVEYING SYSTEMS Not Used DIVISION 15—MECHANICAL 15000 HNTB Mechanical Specification 10/30/02 15300 HNTB Fire Protection Specification 10/30/02 15400 HNTB Plumbing Specification 10/30/02 15855 HNTB Air Handling Units 10/30/02 DIVISION 16—ELECTRICAL 16010 HNTB Electrical—General Provisions 10/30/02 16110 HNTB Raceways 10/30/02 16120 HNTB Wire and Cable 10/30/02 16140 HNTB Devices 10/30/02 16170 HNTB Low Voltage Disconnect Switches 10/30/02 16181 HNTB Low Voltage Fuses 10/30/02 16182 HNTB Low Voltage Circuit Breaker 10/30/02 16450 HNTB Grounding System 10/30/02 16460 HNTB Low Voltage Transformers 10/30/02 16471 HNTB Branch Circuit Panelboards 10/30/02 16485 HNTB Motor Controllers 10/30/02 16500 HNTB Lighting Fixtures 10/30/02 16520 HNTB Lighting Control System 10/30/02 i Page 6 of 6 Revised 12/12/02 EXHIBIT F TEMPORARY UTILITIES FOR CONSTRUCTION PURPOSES I. Temporary Plumbing A. Scope of work provided by the Plumbing Trade Contractor. The temporary Plumbing, and monthly rental, to be provided, will include, but are not limited to, the following: 1. Temporary water from domestic water. • Water service and hook-up at CM's jobsite trailer for the duration of the project. CM, City, DWA and Convention Center/Hotel shall approve all water service tie-in locations. • Water service with % " hose bib at areas of expansion and renovation for the duration of the project. CM, City, and Convention Center/Hotel shall approve all water service tie-in locations. • Temporary Construction water meter to be utilized by all required Trade Contractor's for the duration of the project. • (1) %" hose bib at 48"AFF at exterior of CM's jobsite trailer. • System will be sanitized for drinking purposes. • Cost of water to be paid by the City of Palm Springs. 2. Temporary Holding Tank and Toilets. • Holding tank and connection to CM's jobsite trailer restroom, including twice weekly pump-outs for the duration of project. • Four (4) portable toilets with hand-wash stations, including twice weekly pump-outs and water service for duration of project. Locations to be determined by the CM's Project Superintendent. Page 1 of 3 Revised 12/12/02 EXHIBIT F TEMPORARY UTILITIES FOR CONSTRUCTION PURPOSES II. Temporary Electrical and Telephone A. Scope of work provided by the Electrical Trade Contractor. The temporary power, and monthly rental, to be provided, will include, but are not limited to, the following: 1. Temporary Power • Provide temporary power poles, service and hook-up of CM's jobsite trailer from approved designated location (i.e. the Convention Center, Hotel, or other) with pole-mounted metering device for the duration of the project. Service will be 100 amp, 3 phase 240 volts. • Provide temporary power poles and service to the kitchen expansion/renovation area from approved designated location (i.e. the Convention Center, Hotel, or other) with pole-mounted metering device for the duration of the project. Service will be 200 amp, 3 phase 240 volts. • Power temporary power and service to the Springs Theatre/ new meeting room and dry storage renovation area from approved designated location (i.e. the Convention Center, Hotel, or other). Utilize an existing panel for the duration of the project. Service will be 200 amp, 3 phase 240 volts. • Provide up to (6) spider boxes at the areas of expansion/renovation as directed by jobsite Superintendent. • Cost of power will be paid by The City of Palm Springs. Page 2 of 3 Revised 12/12/02 EXHIBIT F TEMPORARY UTILITIES FOR CONSTRUCTION PURPOSES 2. Temporary Lighting • Provide and install (3) temporary power poles with (2) top-mounted security lights at far corners of construction fencing at CM's jobsite trailer compound area. • Provide temporary overhead lighting within the areas of expansion/renovation of not less than one foot-candle power square foot or as required by CAL-OSHA as need for the duration of the project. Task lighting will be by the respective trade contractors. 3. Temporary Telephone • Provide and install telephone lines and hook-up at CM's jobsite trailer from an approved designated location (i.e. the Convention Center, Hotel, or other)for the duration of the project. Provide a minimum of 4 phone lines. III. Temporary Trash Dumpsters A. Scope of work provided by the Demolition Trade Contractor. The temporary trash dumpster, monthly rental, and disposal fees to be provided, will include, but are not limited to, the following: 1. Temporary Trash Dumpsters • Provide two (2) 40-cuyd temporary trash dumpsters with weekly dump service at each area of the expansion/renovation area for construction trash debris for the duration of the project. These dumpsters are above and beyond the necessary "low-boys" and "other" 40-cuyd dumpsters that will be required for demolition, removal and disposal under the selective demolition scope of work. • Provide one (1) 4 cuyd temporary trash dumpster with weekly dump service at the CM's jobsite trailer for the duration of the project. Page 3 of 3 Revised 12/12/02 I7j ` ol -AA 14 1 i -- =- acre , ..M i5,., I Rr-'4 `�_ P_7'9 poi Caw. '(1L 24JX4 Af3 '0- _LZ 25411MI-1111111M. �NOS N 90 71 EF I KMOVE dcw�tl;o AAW- AT' E x _x WIR W67 MOM, /t Ole = D t f*osie Lrr A70- LV 3 C-AILC 1/i PRE-BID RFI LOG j RFI# DATE RFI DETAIL RESPONSE RESPONSE DATE PB-1 11/23/02 There is an area(receiving)in the kitchen which she 12f5/2002 The Health Department has reviewed the exposed ceiling open to structure.This area will be used to ceiling in the Receiving Area and they have not take transport food items from loading to the kitchen.We issue. Provide the diffuser indicated in the sketch don't believe that this will be acceptable to the Dept,c f provided by Syska&Hennessey. Health.Please advise. PB-2 11/25/2002 Drawings show condensers for kitchen above ceiling, 12/5/2002 The new condenser for this project are indicated to b but CC personal indicate they are on roof. located on the roof. Relocation of existing condense was not included in the scope of the project. The design work required to accomplish this would involy all of the consultants and require input from the original manufacturers relative to the configuration o the condensers and compressors,their weights and centers of gravity and their utility requirements. Siru these units were not intended for an exterior application,some kind of weatherproof enclosure will need to be designed. This is more work than can be accomplished during the bid process. HNTB concur that relocating the condensers will benefit the project and will perform the design tasks necessary to accomplish this if authorized to do so by the City. PB-3 11/25/2002 Is it acceptable to use native sand for fill? 12/5/2002 Per item 5 Appendix C of the soils report. PB-4 1112512002 The drawings show 4"crushed gravel as base,but 12/5/2002 Provide base under interior slabs in accordance with spec's indicate vapor barrier w/2"of native sand. the soils report. Please advise if vapor barter/sand alternative is acceptable. PB-5 11/25/2002 Currently there is exterior lighting at the dock area,thim 12/5/2002 This will be addressed in an addendum prior to bid. new plans have no provisions for any.Is it an oversigl t or have all exterior lights been eliminated? P11-6 11/25/2002 The HVAC ducts at the S.&E.Corridors of the 12/5/2002 This is a contractor's mean and methods. Springs Theater havehard lid under them.What is the intended method for replacement? P13-7 11/25/200 Still need final specs on the carpet/flooring.Please 12/5/2002 Carpet will be purchased and installed by the City to advise. allow them to take advantage of pricing arrangement PB-8 11/25/2002 What is to become of the existing camera at the 12/5/2002 This will be addressed in an addendum prior to bid. loading dock area?Does there need to be power and backing for a new one? PB-9 11/2512002 KA.2 shows flooring to be quarry tile in Cold Prep Rm 12/5/2002 Resinous flooring. 111,however,the finish schedules list it as resinous. Please clarify PB-10 11/25/2002 Duplicate of P13-1 12/5/2002 Duplicate of PDA PB-11 11/25/2002 Roof stairs show on the Roof plan drawing,but not or 12/5/2002 The roof ladder comes down in the Telephone Room the floor plan drawing.Please clarify where the locati of the roof stairs will be. PB-12 11/25/200 The Convention Center indicates that they want the 12/5/2002 Delete all reference to vinyl wall covering in the wall covering to be removed from the S.&E.corridor project. Where vinyl wall covering was previously (only the side abutting the Springs Theater)and to be specified,provided painted drywall finished with naint to match.Please advise PB-13 11/25/2002 It is not clear if any communication/data wiring is 12/5/2002 The scope of communications wiring is limited to included in the scope of work.Please clarify if this conduit,which is show on the drawings. needs to be included. PB-14 11/27/200 A note on drawing M1.10 states to remove and replac 12/5/2002 The Diffusers and air quantities were indicated on the existing air diffusers and grilles with new,these new latest drawings that were issued on November 21, are to have the same air quality as existing.Nothing c 2002. M1.11 will be reissued. the existing is shown on the drawing to determine this scope of work. PB-15 11/27I200 The scope of work note of drawing M1.11 states to 12/5/2002 The Contractor shall field verify the AHU's and remove AHU-6 and AHU-3 and all associated duct ductwork to be removed and needs to refer to the work and in Nothingof existingis shown. available As-Buills drawings PB-16 11/27/200 The scope of work note on drawing MIll states to 12/5/2002 Same as PB-15 above. remove the duct work in the hallway and leae existing duffusers.The diffsers aer shown but not the duct work. PB-17 11/27/2002 There is no condensate drain piping shown on the 12/5/2002 Condensate drain is under the HVAC scope not the plumbing drawings for any of the fan coils,split Plumbing and should be routed to the nearest recept systems or the new Air Handler Unit. as noted on Mechanical drawings and per specs. Regarding item PB-17,the condensate drain for the new AHU can be routed to the existing hub drain serving existing AHU-4 As to the fan coil units,the condensate drain can be routed to nearest floor sink within the Kitchen Area.The split type indoor evaporated can be routed to the adjacent existing Janitor sink. PB-18 12/2/2002 Per details 1&2/S3.03,closure plate is required on 12/11/2002 Detail 2/53.03 shall apply along deck edge along lines B.6,21.9&21.2 sheet S2 12?What is required Column line 21.9 with 3/8" on the balance of this roof area and what is the bent plate as reference on detail 6/Sl.04,however,if material? "L"exceed 6 inches, then the stiffener plate should be in triangular shape as called out in detail 6/S1.04. Detail l/53.03 shall apply to column lines B6 and 21.2 Detail 1/S1.04 shall apply to all other edges of deck Dimension"L'shall be provided by Architect for all conditions. P13-19 12/2/2002 On the finish schedule,room 101,dry storage shows 12/5/2002 ACT-1 GWB.On reflective ceiling print shows Act-l? PB-20 12/212002 Are we to replace all of the T-bar or just what is on th 12/5/2002 Pending finish schedule?—sent request for what areas.MS PB-21 12/9/21302 Drawings state that the acoustical ceiling tile is 2'x2', but the detail shows 2'x4',plus here is not a specification for type of tile PB-22 12/10/2002 Electrical&fire Life Safety specifications,Para.11,B, 12/11/2002 There is no public address system. line item 72;"Provide conduit,boxes and pull string only for public address systems."A public address system is not defined on the drawings,please clarify. HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 SECTION 08110- STEEL DOORS AND FRAMES PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes steel doors and frames. 1.3 SUBMITTALS A. General: Submit each item in this Article according to the Conditions of the Contract and Division 1 Specification Sections. B. Product Data for each type of door and frame specified, including details of construction, materials, dimensions, hardware preparation, core, label compliance, sound ratings, profiles, and finishes. C. Shop Drawings showing fabrication and installation of steel doors and frames. Include details of each frame type, elevations of door design types, conditions at openings, details of construction, location and installation requirements of door and frame hardware and reinforcements, and details of joints and connections. Show anchorage and accessory items. D. Door Schedule: Submit schedule of doors and frames using same reference numbers for details and openings as those on Contract Drawings. 1. Indicate coordination of glazing frames and stops with glass and glazing requirements. E. Samples for initial selection in the form of manufacturer's color charts showing the full range of colors available for factory-finished doors and frames. F. Samples for verification of each type of exposed finish required, prepared on Samples not less than 3 by 5 inches (75 by 125 mm)and of same thickness and material indicated for final unit of Work. Where finishes involve normal color and texture variations, include Sample sets showing the full range of variations expected. G. Oversize Construction Certification: For door assemblies required to be fire rated and exceeding limitations of labeled assemblies, submit certification of a testing agency acceptable to authorities having jurisdiction that each door and frame assembly has been constructed to conform to design, materials, and construction equivalent to requirements for labeled construction. 1.4 QUALITY ASSURANCE STEEL DOORS AND FRAMES 08110- 1 HNTB #36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Provide doors and frames complying with ANSI/SDI 100 'Recommended Specifications for Standard Steel Doors and Frames"and as specified. B. Fire-Rated Door Assemblies: Units that comply with NFPA 80, are identical to door and frame assemblies tested for fire-test-response characteristics per ASTM E 152, and are labeled and listed by UL, Warnock Hersey, or another testing and inspecting agency acceptable to authorities having jurisdiction. 1. Oversize Fire-Rated Door Assemblies: For units exceeding sizes of tested assemblies, provide certification by a testing agency acceptable to authorities having jurisdiction that doors conform to all standard construction requirements of tested and labeled fire-rated door assemblies except for size. 2. Temperature-Rise Rating: Where indicated, provide doors that have a temperature-rise rating of 450 deg F (250 deg C) maximum in 30 minutes of fire exposure. 1.5 DELIVERY, STORAGE, AND HANDLING A. Deliver doors and frames cardboard-wrapped or crated to provide protection during transit and job storage. Provide additional protection to prevent damage to finish of factory-finished doors and frames. B. Inspect doors and frames on delivery for damage. Minor damages may be repaired provided refinished items match new work and are acceptable to Architect; otherwise, remove and replace damaged items as directed. C. Store doors and frames at building site under cover. Place units on minimum 4-inch- (100-mm- ) high wood blocking. Avoid using nonvented plastic or canvas shelters that could create a humidity chamber. If cardboard wrappers on doors become wet, remove cartons immediately. Provide minimum 1/4-inch (6-mm)spaces between stacked doors to promote air circulation. PART2-PRODUCTS 2.1 MANUFACTURERS A. Manufacturers: Subject to compliance with requirements, provide products by one of the fallowing: 1. Steel Doors and Frames: a. Amweld Building Products, Inc. b. Benchmark Commercial Doors. C. Ceco Door Products. d. Copco Door Co. e. Curries Co. f. Deansteel Manufacturing Co. g. Fenestra Corp. h. Kewanee Corp. i. Masker Door, Inc. j. Pioneer Industries. k. Republic Builders Products. STEEL DOORS AND FRAMES 08110-2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 I. Steelcraft. 2. Prefinished Interior Steel Frames: a. Dunbarton Corp. (Rediframe Products). b. Timely Industries. 2.2 MATERIALS A. Hot-Rolled Steel Sheets and Strip: Commercial-quality carbon steel, pickled and oiled, complying with ASTM A 569 (ASTM A 569M). B. Cold-Rolled Steel Sheets: Carbon steel complying with ASTM A 366 (ASTM A 366M), commercial quality, or ASTM A 620 (ASTM A 620M), drawing quality, special killed. C. Galvanized Steel Sheets: Zinc-coated carbon steel complying with ASTM A 526 (ASTM A 526M), commercial quality, or ASTM A 642 (ASTM A 642M), drawing quality, hot-dip galvanized according to ASTM A 525, with A 60 or G 60 (ASTM A 525M, with Z 180 or ZF 180) coating designation, mill phosphatized. D. Supports and Anchors: Fabricated from not less than 0.0478-inch- (1.2-mm-)thick steel sheet; 0.0516-inch- (1.3-mm-)thick galvanized steel where used with galvanized steel frames. E. Inserts, Bolts, and Fasteners: Manufacturer's standard units. Where items are to be built into exterior walls, hot-dip galvanize complying with ASTM A 153, Class C or D as applicable. 2.3 DOORS A. Steel Doors: Provide 1-3/4-inch- (44-mm-) thick doors of materials and ANSI/SDI 100 grades and models specified below, or as indicated on Drawings or schedules: 1. Interior Doors: Grade 11, heavy-duty, Model 1, full flush design, minimum 0.0478-inch- (1.2-mm-)thick cold-rolled steel sheet faces. 2. Exterior Doors: Grade 11, heavy-duty, Model 1, full flush design, minimum 0.0516-inch- (1.3-mm-)thick galvanized steel sheet faces. B. Door Louvers: Provide louvers according to SDI 111C for interior doors where indicated, with blades or baffles formed of 0.0239-inch- (0.6-mm-) thick cold-rolled steel sheet set into minimum 0.0359-inch- (0.9-mm-)thick steel frame. 1. Sight-Proof Louvers: Stationary louvers constructed with inverted V-shaped or Y-shaped blades. 2. Lightproof Louvers: Stationary louvers constructed with baffles to prevent light from passing from one side to the other, any angle. 3. Fire-Rated Automatic Louvers: Louvers constructed with movable blades closed by actuating fusible links at 150 deg F (65 deg C) and labeled and listed for use in fire-rated door assemblies of type and fire-resistance rating indicated by the same inspecting and testing agency who established fire-resistance rating of door assembly. 2.4 FRAMES STEEL DOORS AND FRAMES 08110-3 HNTB #36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Provide metal frames for doors, transoms, sidelights, borrowed lights, and other openings, according to ANSI/SDI 100, and of types and styles as shown on Drawings and schedules. Conceal fastenings, unless otherwise indicated. Fabricate frames of minimum 0.0478-inch- (1.2-mm-)thick cold-rolled steel sheet. 1. Fabricate frames with mitered or coped and continuously welded corners. Fabricate frames for interior openings over 48 inches (1220 mm) wide from 0.0598-inch- (1.5-mm-)thick steel sheet. 5. Fabricate exterior frames for openings over 48 inches (1220 mm)wide from 0.0635-inch- (1.6-mm-)thick galvanized steel sheet. 6. Form exterior frames from 0.0635-inch- (1.6-mm-)thick galvanized steel sheet. B. Door Silencers: Except on weatherstripped frames, drill stops to receive 3 silencers on strike jambs of single-door frames and 2 silencers on heads of double-door frames. C. Plaster Guards: Provide minimum 0.0179-inch- (0.45-mm-)thick steel plaster guards or mortar boxes at back of hardware cutouts where mortar or other materials might obstruct hardware operation and to close off interior of openings. D. Grout: When required in masonry construction, as specified in Division 4 Section "Unit Masonry." 2.5 FABRICATION A. Fabricate steel door and frame units to be rigid, neat in appearance, and free from defects, warp, or buckle. Where practical, fit and assemble units in manufacturer's plant. Clearly identify work that cannot be permanently factory assembled before shipment, to assure proper assembly at Project site. Comply with ANSI/SDI 100 requirements. 1. Internal Construction: One of the following manufacturer's standard core materials according to SDI standards: a. Resin-impregnated paper honeycomb. b. Rigid polyurethane conforming to ASTM C 591. C. Rigid polystyrene conforming to ASTM C 578. d. Unitized steel grid. e. Vertical steel stiffeners. f. Rigid mineral fiber with internal sound deadener on inside of face sheets. 2. Clearances: Not more than 1/8 inch (3.2 mm) at jambs and heads, except not more than 1/4 inch (6.4 mm) between non-fire-rated pairs of doors. Not more than 314 inch (19 mm) at bottom. a. Fire Doors: Provide clearances according to NFPA 80. B. Fabricate exposed faces of doors and panels, including stiles and rails of nonflush units, from only cold-rolled steel sheet. C. Tolerances: Comply with SDI 117 "Manufacturing Tolerances Standard Steel Doors and Frames." D. Fabricate concealed stiffeners, reinforcement, edge channels, louvers, and moldings from either cold-or hot-rolled steel sheet. STEEL DOORS AND FRAMES 08110-4 HNTB #36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 E. Galvanized Steel Doors, Panels, and Frames: For the following locations, fabricate doors, panels, and frames from galvanized steel sheet according to SDI 112, Close top and bottom edges of doors flush as an integral part of door construction or by addition of minimum 0.0635- inch- (1.6-mm-) thick galvanized steel channels, with channel webs placed even with top and bottom edges. Seal joints in top edges of doors against water penetration. 1. At exterior locations. 2. At exterior locations and where indicated. 3. Where indicated. F. Exposed Fasteners: Unless otherwise indicated, provide countersunk flat or oval heads for exposed screws and bolts. G. Thermal-Rated (Insulating) Assemblies: At exterior locations and elsewhere as shown or scheduled, provide doors fabricated as thermal-insulating door and frame assemblies and tested according to ASTM C 236 or ASTM C 976 on fully operable door assemblies. 1. Unless otherwise indicated, provide thermal-rated assemblies with U-value rating of 0.41 Btu/sq.ft. x h x deg F (2.33 W/sq. m x K) or better. H. Sound-Rated (Acoustical) Assemblies: Where shown or scheduled, provide door and frame assemblies fabricated as sound-reducing type, tested according to ASTM E 1408, and classified according to ASTM E 413. 1. Unless otherwise indicated, provide acoustical assemblies with STC sound ratings of 33 or better. I. Hardware Preparation: Prepare doors and frames to receive mortised and concealed hardware according to final door hardware schedule and templates provided by hardware supplier. Comply with applicable requirements of SDI 107 and ANSI Al15 Series specifications for door and frame preparation for hardware. 1. For concealed overhead door closers, provide space, cutouts, reinforcing, and provisions for fastening in top rail of doors or head of frames, as applicable. J. Reinforce doors and frames to receive surface-applied hardware. Drilling and tapping for surface-applied hardware may be done at Project site. K. Locate hardware as indicated on Shop Drawings or, if not indicated, according to the Door and Hardware Institute's (DHI) "Recommended Locations for Architectural Hardware for Standard Steel Doors and Frames." L. Glazing Stops: Minimum 0.0359-inch- (0.9-mm-) thick steel or 0.040-inch- (1-mm-) thick aluminum. 1. Provide nonremovable stops on outside of exterior doors and on secure side of interior doors for glass, louvers, and other panels in doors. 2. Provide screw-applied, removable, glazing beads on inside of glass, louvers, and other panels in doors. 2.6 FINISHES, GENERAL STEEL DOORS AND FRAMES 08110-5 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Comply with NAAMM's "Metal Finishes Manual" for recommendations relative to applying and designating finishes. B. Comply with SSPC-PA 1, "Paint Application Specification No. 1,"for steel sheet finishes. C. Apply primers and organic finishes to doors and frames after fabrication. 2.7 GALVANIZED STEEL SHEET FINISHES A. Surface Preparation: Clean surfaces with nonpetroleum solvent so that surfaces are free of oil or other contaminants. After cleaning, apply a conversion coating of the type suited to the organic coating applied over it. Clean welds, mechanical connections, and abraded areas, and apply galvanizing repair paint specified below to comply with ASTM A 780. 1. Galvanizing Repair Paint: High-zinc-dust-content paint for regalvanizing welds in galvanized steel, with dry film containing not less than 94 percent zinc dust by weight, and complying with DOD-P-21035 or SSPC-Paint 20. B. Factory Priming for Field-Painted Finish: Where field painting after installation is indicated, apply air-dried primer specified below immediately after cleaning and pretreatment. 1. Shop Primer: Zinc-dust, zinc-oxide primer paint complying with performance requirements of FS TT-P-641, Type II. C. Baked-Enamel Finish: Immediately after cleaning and pretreating, apply manufacturer's standard 2-coat, baked-enamel finish consisting of prime coat and thermosetting topcoat,with a minimum dry film thickness of 1 mil (0.0254 mm)for topcoat. Comply with paint manufacturer's instructions for applying and baking to achieve a minimum dry film thickness of 2 mils (0.0508 mm). 1. Color and Gloss: As indicated by manufacturer's color and gloss designations. 2. Color and Gloss: Match Architect's sample. 3. Color and Gloss: As selected by Architect from manufacturer's full range of choices for color and gloss. 2.8 STEEL SHEET FINISHES A. Surface Preparation: Solvent-clean surfaces to comply with SSPC-SP 1 to remove dirt, oil, grease, and other contaminants that could impair paint bond. Remove mill scale and rust, if present, from uncoated steel to comply with SSPC-SP 5 (White Metal Blast Cleaning)or SSPC- SP 8(Pickling). B. Pretreatment: Immediately after surface preparation, apply a conversion coating of type suited to organic coating applied over it. C. Factory Priming for Field-Painted Finish: Apply shop primer that complies with ANSI A224.1 acceptance criteria, is compatible with finish paint systems indicated, and has capability to provide a sound foundation for field-applied topcoats. Apply primer immediately after surface preparation and pretreatment. D. Baked-Enamel Finish: Immediately after cleaning and pretreating, apply manufacturer's standard 2-coat, baked-enamel finish consisting of prime coat and thermosetting topcoat that STEEL DOORS AND FRAMES 08110-6 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 complies with ANSI A250.3. Comply with paint manufacturer's instructions for applying and baking to achieve a minimum dry film thickness of 2 mils (0.0508 mm). 1. Color and Gloss: As indicated by manufacturer's color and gloss designations. 2. Color and Gloss: Match Architect's sample. 3. Color and Gloss: As selected by Architect from manufacturer's full range of choices for color and gloss. PART 3- EXECUTION 3.1 INSTALLATION A. General: Install steel doors, frames, and accessories according to Shop Drawings, manufacturer's data, and as specified. B. Placing Frames: Comply with provisions of SDI 105, unless otherwise indicated. Set frames accurately in position, plumbed, aligned, and braced securely until permanent anchors are set. After wall construction is completed, remove temporary braces and spreaders, leaving surfaces smooth and undamaged. 1. Except for frames located in existing concrete, masonry, or gypsum board assembly construction, place frames before constructing enclosing walls and ceilings. 2. In masonry construction, install at least 3 wall anchors per jamb adjacent to hinge location on hinge jamb and at corresponding heights on strike jamb. Acceptable anchors include masonry wire anchors and masonry T-shaped anchors. 3. At existing concrete or masonry construction, install at least 3 completed opening anchors per jamb adjacent to hinge location on hinge jamb and at corresponding heights on strike jamb. Set frames and secure to adjacent construction with bolts and masonry anchorage devices. 4. In metal-stud partitions, install at least 3 wall anchors per jamb at hinge and strike levels. In steel-stud partitions, attach wall anchors to studs with screws. 5. In in-place gypsum board partitions, install knock-down, slip-on, drywall frames. 6. Install fire-rated frames according to NFPA 80. C. Door Installation: Fit hollow-metal doors accurately in frames, within clearances specified in ANSI/SDI 100. 1. Fire-Rated Doors: Install with clearances specified in NFPA 80. 2. Smoke-Control Doors: Comply with NFPA 105. 3.2 ADJUSTING AND CLEANING A. Prime Coat Touchup: Immediately after erection, sand smooth any rusted or damaged areas of prime coat and apply touchup of compatible air-drying primer. B. Protection Removal: Immediately before final inspection, remove protective wrappings from doors and frames. END OF SECTION 08110 STEEL DOORS AND FRAMES 08110- 7 HNTB #36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 SECTION 08211 - FLUSH WOOD DOORS PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1. Solid-core doors with wood-veneer faces. 1.3 SUBMITTALS A. Product Data: For each type of door. Include details of core and edge construction, trim for openings, and louvers. 1. Include factory-finishing specifications. B. Shop Drawings: Indicate location, size, and hand of each door; elevation of each kind of door; construction details not covered in Product Data; location and extent of hardware blocking; and other pertinent data. 1. Indicate dimensions and locations of mortises and holes for hardware. 2. Indicate dimensions and locations of cutouts. 3. Indicate requirements for veneer matching. 4. Indicate doors to be factory finished and finish requirements. 5. Indicate fire ratings for fire doors. C. Samples for Initial Selection: Color charts consisting of actual materials in small sections for finish showing that it matches that of the existing doors in the same area. D. Samples for Verification: As follows: 1. Corner sections of doors approximately 8 by 10 inches (200 by 250 mm)with door faces and edgings representing the typical range of color and grain for each species of veneer and solid lumber required. Finish sample with same materials proposed for factory- finished doors. 1.4 QUALITY ASSURANCE A. Source Limitations: Obtain flush wood doors through one source from a single manufacturer. B. Quality Standard: Comply with the following standard: 1. NWWDA Quality Standard: NWWDA I.S.1-A, "Architectural Wood Flush Doors." FLUSH WOOD DOORS 08211 - 1 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 2. AWI Quality Standard: AWI's "Architectural Woodwork Quality Standards" for grade of door, core, construction,finish, and other requirements. C. Fire-Rated Wood Doors: Doors complying with NFPA 80 that are listed and labeled by a testing and inspecting agency acceptable to authorities having jurisdiction, for fire ratings indicated, based on testing according to NFPA 252. 1. Test Pressure: Test at atmospheric pressure. 2. Oversized, Fire-Rated Wood Doors: For door assemblies exceeding sizes of tested assemblies, provide manufacturer's certificate stating that doors comply with all standard construction requirements of tested and labeled fire-door assemblies except for size. 3. Temperature-Rise Rating: At stairwell enclosures, provide doors that have a temperature-rise rating of 450 deg F (250 deg C) maximum in 30 minutes of fire exposure. 4. Temperature-Rise Rating: At stairwell enclosures, provide doors that have a temperature-rise rating of 250 deg F (139 deg C) maximum in 30 minutes of fire exposure. 1.5 DELIVERY, STORAGE, AND HANDLING A. Protect doors during transit, storage, and handling to prevent damage, soiling, and deterioration. Comply with requirements of referenced standard and manufacturer's written instructions. 1. Individually package doors in plastic bags or cardboard cartons. 2. Individually package doors in cardboard cartons and wrap bundles of doors in plastic sheeting. 3. Comply with WIC's Technical Bulletin 420-R for delivery, storage, and handling of doors. B. Mark each door with individual opening numbers used on Shop Drawings. Use removable tags or concealed markings. 1.6 PROJECT CONDITIONS A. Environmental Limitations: Do not deliver or install doors until conditions for temperature and relative humidity have been stabilized and will be maintained in storage and installation areas during the remainder of the construction period to comply with requirements of the referenced quality standard for Project's geographical location. 1.7 WARRANTY A. General Warranty: Door manufacturer's warranty specified in this Article shall not deprive the Owner of other rights the Owner may have under other provisions of the Contract Documents and shall be in addition to, and run concurrent with, other warranties made by the Contractor under requirements of the Contract Documents. B. Door Manufacturer's Warranty: Submit written agreement on door manufacturer's standard form, signed by manufacturer, Installer, and Contractor, agreeing to repair or replace defective doors that have warped (bow, cup, or twist) more than 1/4 inch (6.35 mm) in a 42-by-84-inch (1067-by-2134-mm) section or that show telegraphing of core construction in face veneers FLUSH WOOD DOORS 08211 -2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 exceeding 0.01 inch in a 3-inch (0.25 mm in a 75-mm) span, or do not comply with tolerances in referenced quality standard. 1. Warranty shall also include installation and finishing that may be required due to repair or replacement of defective doors. 2. Warranty shall be in effect during the following period of time after the date of Substantial Completion: a. Hollow-Core Interior Doors: Two years. PART2-PRODUCTS 2.1 MANUFACTURERS A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. Flush Wood Doors: a. Algoma Hardwoods Inc. b. Ampco Products, Inc. C. Buell Door Co. d. Chappell Door Co. e. Eagle Plywood &Door Manufacturing, Inc. f. Eggers Industries;Architectural Door Division. g. Graham Manufacturing Corp. h. Haley Brothers, Inc. i. Ideal Wood Products, Inc. j. IPIK Door Co., Inc. k. Marlite. L Mohawk Flush Doors, Inc. M. Oshkosh Architectural Door Co. n. Poncraft Door Co. o. Vancouver Door Company, Inc. p. V-T Industries Inc. q. Weyerhaeuser Co. 2. Metal Louvers for Doors: a. Air Louvers, Inc. b. Anemostat Door Products. C. Construction Specialties, Inc. d. Leslie-Locke, Inc. 2.2 DOOR CONSTRUCTION, GENERAL A. Doors for Transparent Finish (door type D): Match existing doors in the same area. 2.3 SOLID-CORE DOORS FLUSH WOOD DOORS 08211 -3 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Particleboard Cores: Comply with the following requirements: 1. Particleboard: ANSI A208.1, Grade LD-1. 2. Blocking: Provide wood blocking at particleboard-core doors as follows: a. 5-inch (125-mm)top-rail blocking, at doors indicated to have closers. b. 5-inch (125-mm)bottom-rail blocking, at exterior doors and doors indicated to have kick, mop, or armor plates. C. 5-inch (125-mm) midrail blocking, at doors indicated to have exit devices. B. Fire-Rated Doors: Comply with the following requirements: 1. Construction: Construction and core specified above for type of face indicated or manufacturer's standard mineral-core construction as required to provide fire rating indicated. 2. Blocking: For mineral-core doors, provide composite blocking with improved screw- holding capability approved for use in doors of fire ratings indicated and as follows: a. 5-inch (125-mm)top-rail blocking. b. 5-inch (125-mm) bottom-rail blocking, at doors indicated to have kick, mop, or armor plates. C. 4-1/2-by-1 0-inch (114-by-250-mm)lock blocks. d. 5-inch (125-mm) midrail blocking, at doors indicated to have exit devices. e. As necessary to eliminate need for through-bolting hardware. 3. Edge Construction: At hinge stiles, provide manufacturer's standard laminated-edge construction with improved screw-holding capability and split resistance and with outer stile matching face veneer. 4. Pairs: Provide fire-rated pairs with fire-retardant stiles that are labeled and listed for kinds of applications indicated without formed-steel edges and astragals. 2.4 FABRICATION A. Fabricate flush wood doors in sizes indicated for Project site fitting. B. Factory fit doors to suit frame-opening sizes indicated, with the following uniform clearances and bevels, unless otherwise indicated: 1. Comply with clearance requirements of referenced quality standard for fitting. Comply with requirements of NFPA 80 for fire-rated doors. C. Factory machine doors for hardware that is not surface applied. Locate hardware to comply with DHI-WDHS-3. Comply with final hardware schedules, door frame Shop Drawings, DHI A115-W series standards, and hardware templates. 1. Coordinate measurements of hardware mortises in metal frames to verify dimensions and alignment before factory machining. D. Openings: Cut and trim openings through doors to comply with applicable requirements of referenced standards for kind(s)of door(s) required. 1. Light Openings: Trim openings with moldings of material and profile indicated. FLUSH WOOD DOORS 08211 -4 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 2. Louvers: Factory install louvers in prepared openings. 2.5 FACTORY FINISHING A. General: Comply with referenced quality standard's requirements for factory finishing. B. Finish wood doors at factory to match the existing doors. PART 3- EXECUTION 3.1 EXAMINATION A. Examine installed door frames before hanging doors. 1. Verify that frames comply with indicated requirements for type, size, location, and swing characteristics and have been installed with plumb jambs and level heads. 2. Reject doors with defects. B. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 INSTALLATION A. Hardware: For installation, see Division 8 Section "Finish Hardware." B. Manufacturer's Written Instructions: Install wood doors to comply with manufacturer's written instructions, referenced quality standard, and as indicated. 1. Install fire-rated doors in corresponding fire-rated frames according to NFPA 80. C. Job-Fit Doors: Align and fit doors in frames with uniform clearances and bevels as indicated below; do not trim stiles and rails in excess of limits set by manufacturer or permitted with fire- rated doors. Machine doors for hardware. Seal cut surfaces after fitting and machining. 1. Clearances: Provide 1/8 inch (3.2 mm) at heads, jambs, and between pairs of doors. Provide 1/8 inch (3.2 mm) from bottom of door to top of decorative floor finish or covering. Where threshold is shown or scheduled, provide 1/4 inch (6.4 mm) from bottom of door to top of threshold. a. Comply with NFPA 80 for fire-rated doors. 2. Bevel non-fire-rated doors 1/8 inch in 2 inches (3-1/2 degrees) at lock and hinge edges. 3. Bevel fire-rated doors 1/8 inch in 2 inches (3-1/2 degrees) on lock edge; trim stiles and rails only to extent permitted by labeling agency. D. Factory-Finished Doors: Restore finish before installation, if fitting or machining is required at Project site. 3.3 ADJUSTING AND PROTECTING A. Operation: Rehang or replace doors that do not swing or operate freely. FLUSH WOOD DOORS 08211 - 5 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration i 10/30/02 B. Finished Doors: Refinish or replace doors damaged during installation. C. Protect doors as recommended by door manufacturer to ensure that wood doors are without damage or deterioration at the time of Substantial Completion. END OF SECTION 08211 I FLUSH WOOD DOORS 08211 -6 HNTB #36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30102 SECTION 08305-ACCESS DOORS PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following types of access doors: 1. Wall access doors. 2. Fire-rated wall access doors. 3. Ceiling access doors. 4. Fire-rated ceiling access doors. B. Related Sections: The following Sections contain requirements that relate to this Section: 1. Division 4 Sections for building in anchors and grouting frames set in masonry construction. 2. Division 7 Section 'Roof Accessories"for roof hatches. 3. Division 8 Section "Door Hardware"for mortise or rim cylinder locks. 4. Division 9 Section "Gypsum Board Assemblies"for gypsum board walls and ceilings. 5. Division 9 Section "Tile"for ceramic tile walls. 6. Division 9 Section "Acoustical Tile Ceilings" for access tile in suspended or furred acoustical tile ceilings. 7. Division 15 Section "Duct Accessories"for duct access doors. 1.3 SUBMITTALS A. General: Submit each item in this Article according to the Conditions of Contract and Division 1 Specification Sections. B. Product data for each type of access door assembly specified, including details of construction relative to materials, individual components, profiles, finishes, and fire-protection ratings (if required). 1. Include complete schedule, including types, general locations, sizes, wall and ceiling construction details, latching or locking provisions, and other data pertinent to installation. C. Shop drawings showing fabrication and installation of customized access doors and frames, including details of each frame type, elevations of door design types, anchorage, and accessory items. D. Samples, 3-inch (75-mm) by 5-inch (125-mm) minimum size, of each panel face material showing factory-finished color and texture. ACCESS DOORS 08305 - 1 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 1.4 QUALITY ASSURANCE A. Single-Source Responsibility: Obtain access doors for entire Project from one source and by a single manufacturer. B. Fire-Rated Door Assemblies: Units that comply with NFPA 80, are identical to door and frame assemblies tested for fire-test-response characteristics per test method as indicated below, and are labeled and listed by UL, Warnock Hersey, or another testing and inspecting agency acceptable to authorities having jurisdiction. 1. Test Method for Vertical Installations: ASTM E 152. 2. Test Method for Horizontal Installations: ASTM E 119. C. Size Variations: Obtain Architect's acceptance of manufacturer's standard size units, which may vary slightly from sizes indicated. 1.5 COORDINATION A. Verification: Determine specific locations and sizes for access doors needed to gain access to concealed equipment, and indicate on schedule specified under"Submittals"Article. PART2-PRODUCTS 2.1 MANUFACTURERS A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated in the Work include, but are not limited to, the following: B. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. Acudor Products Inc. 2. Bar-Co, Inc. Div.,Alfab, Inc. 3. Cesco Products. 4. Elmdor Manufacturing Co. 5. J.L. Industries. 6. Karp Associates, Inc. 7. Larsen's Manufacturing Co. 8. Milcor, Inc. 9. Nystrom, Inc. 10. The Williams Bros. Corporation of America. 2.2 MATERIALS A. Steel Sheet: ASTM A 366 (ASTM A 366M) commercial-quality, cold-rolled steel sheet with baked-on, rust-inhibitive primer. B. Zinc-Coated Steel Sheet: ASTM A 591 (ASTM A 591 M), Electrolytic zinc-coated steel sheet with Class C coating and phosphate treatment to prepare surface for painting. ACCESS DOORS 08305-2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 C. Stainless-Steel Sheet: ASTM A 167, Type 304 with No. 4 finish according to ASTM A 480 (ASTM A 480M). 2.3 ACCESS DOORS A. Insulated, Fire-Rated Access Doors: Self-latching units consisting of frame, trim, door, insulation, and hardware, including automatic closer, interior latch release, and complying with the following requirements: 1. Frame with Exposed Trim: Perimeter frame with integral exposed trim complying with the following requirements: a. Metal: 0.0598-inch- (1.52-mm-)thick steel sheet. b. Metal: 0.0598-inch- (1.52-mm-)thick zinc-coated steel sheet. C. Metal: 0.0625-inch-(1.59-mm-)thick stainless-steel sheet. d. Trim: 1-inch (25.4-mm)flange overlapping surfaces surrounding door frame. e. Trim: 1-1/4-inch (31.75-mm)flange overlapping surfaces surrounding door frame. 2. Trimless Frame: Perimeter frame complying with the following requirements: a. Metal: 0.0598-inch- (1.52-mm-)thick steel sheet. b. Metal: 0.0598-inch- (1.52-mm-)thick zinc-coated steel sheet. C. Metal: 0.0625-inch- (1.59-mm-)thick stainless-steel sheet. d. Frame Configuration: Flange integral with frame and overlapping face of adjoining gypsum board,with surface formed to receive joint compound. e. Frame Configuration: Zinc-coated steel sheet edge trim with both face and back flanges;face flange formed to receive joint compound,with thickness required to fit over edges of adjoining gypsum board panels. 3. Door: 0.0359-inch- (0.91-mm-)thick steel sheet, welded pan type. 4. Door: 0.0359-inch-(0.91-mm-)thick zinc-coated steel sheet, welded pan type. 5. Door: 0.0375-inch-(0.95-mm-)thick stainless-steel sheet, welded pan type. 6. Hinges: Continuous type. 7. Latches: Bolt type, operated by either a ring turn or flush key device (keyed alike). 8. Insulation: 2-inch- (50.8-mm-)thick mineral-fiber insulation. 9. Fire-Protection Rating for Walls: 1-1/2 hours. 10. Fire-Protection Rating for Walls: 1-1/2 hours with a temperature rise not exceeding 250 deg F(139 deg C) at the end of 30 minutes. 11. Fire-Protection Rating for Ceilings: 1 hour for wood-framed walls and other combustible wall assemblies. 12. Fire-Protection Rating for Ceilings: 3 hours for combustible assemblies. B. Noninsulated, Fire-Rated Doors for Walls: Self-latching units consisting of frame, trim, door, and hardware, including automatic closer, interior latch release, and complying with the following requirements: 1. Frame: 0.0598-inch- (1.52-mm-)thick steel sheet. 2. Frame: 0.0598-inch- (1.52-mrn-)thick zinc-coated steel sheet. 3. Frame: 0.0625-inch-(1.59-mm-)thick stainless-steel sheet. 4. Door: 0.0598-inch-(1.52-mm-)thick steel sheet. 5. Door: 0.0598-inch- (1.52-mm-)thick zinc-coated steel sheet. 6. Door: 0.0625-inch-(1.59-mm-)thick stainless-steel sheet. ACCESS DOORS 08305- 3 HNTB #36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 i 7. Hinge: Continuous type. 8. Latches: Bolt type, operated by either a ring turn or flush key device (keyed alike). 9. Fire-Protection Rating for Walls: 1-1/2 hours. C. Flush Access Doors with Exposed Trim: Units consisting of frame with exposed trim, door, hardware, and complying with the following requirements: 1. Frame: 0.0598-inch-(1.52-mm-)thick steel sheet. 2. Frame: 0.0598-inch-(1.52-mrn-)thick zinc-coated steel sheet. 3. Frame: 0.0625-inch-(1.59-mm-)thick stainless-steel sheet. 4. Door: 0.0747-inch-(1.90-mm-)thick steel sheet. 5. Door: 0.0747-inch-(1.90-mm-)thick zinc-coated steel sheet. 6. Door: 0.0781-inch- (1.98-mm-)thick stainless-steel sheet. 7. Trim: Flange integral with frame, 3/4 inch (19 mm) wide, overlapping surrounding finished surface. 8. Hinge: Continuous type. 9. Locks: Flush, screwdriver-operated cam. 10. Locks: Key-operated cylinder lock. D. Trimless, Flush Access Doors for Gypsum Board: Units consisting of frame, concealed edge trim, door, hardware, and complying with the following requirements: 1. Frame: 0.0598-inch-(1.52-mm-)thick steel sheet. 2. Frame: 0.0598-inch-(1.52-mm-)thick zinc-coated steel sheet. 3. Frame: 0.0625-inch- (1.59-mm-)thick stainless-steel sheet. 4. Door: 0.0747-inch-(1.90-mm-)thick steel sheet. 5. Door: 0.0747-inch-(1.90-mm-)thick zinc-coated steel sheet. 6. Door: 0.0781-inch-(1.98-mm-)thick stainless-steel sheet. 7. Concealed, Gypsum Board Edge Trim: 0.0299-inch (0.76-mm) zinc-coated or galvanized-steel sheet with face flange formed to receive joint compound. 8. Hinge: Concealed spring pin or continuous type. 9. Locks: Screwdriver-operated cam. 10. Locks: Key-operated cylinder lock. E. Trimless, Flush Access Doors for Plaster: Units consisting of frame, casing bead, door, hardware, and complying with the following requirements: 1. Frame: 0.0598-inch- (1.52-mm-)thick steel sheet. 2. Frame: 0.0598-inch- (1.52-mm-)thick zinc-coated steel sheet. 3. Frame: 0.0625-inch- (1.59-mm-)thick stainless-steel sheet. 4. Door: 0.0747-inch-(1.90-mm-)thick steel sheet. 5. Door: 0.0747-inch-(1.90-mm-)thick zinc-coated steel sheet. 6. Door: 0.0781-inch- (1.98-mm-)thick stainless-steel sheet. 7. Plaster Casing Bead: 0.0299-inch (0.76-mm) zinc-coated-steel casing bead with flange formed out of expanded metal lath. 8. Hinge: Concealed spring pin or continuous type. 9. Locks: Screwdriver-operated cam. 10. Locks: Key-operated cylinder lock. F. Trimless, Recessed Doors for Gypsum Board Assemblies: Units consisting of frame with concealed edge trim, door, hardware, and complying with the following requirements: 1. Frame: 0.0897-inch-(2.30-mm-)thick steel sheet. 2. Frame: 0.0897-inch- (2.30-mm-)thick zinc-coated steel sheet. ACCESS DOORS 08305-4 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 3. Frame: 0.0938-inch- (2.40-mm-)thick stainless-steel sheet. 4. Door: 0.0598-inch- (1.52-mm-)thick steel sheet, recessed 1 inch (25.4 mm). 5. Door: 0.0598-inch- (1.52-mm-)thick zinc-coated steel sheet, recessed 1 inch (25.4 mm). 6. Door: 0.0625-inch- (1.59-mm-)thick stainless-steel sheet, recessed 1 inch (25.4 mm). 7. Concealed, Gypsum Board Edge Trim: 0.298-inch (0.76-mm) zinc-coated steel sheet gypsum board edge trim formed to receive joint compound. 8. Hinge: Concealed, pivoting-rod type. 9. Locks: Flush to finished surface, screwdriver-operated cam. 10. Locks: Flush to finished surface, key-operated cylinder lock. G. Recessed Door for Plaster: Units consisting of frame with concealed edge trim, recessed door, hardware, and complying with the following requirements: 1. Frame: 0.0897-inch- (2.30-mm-)thick steel sheet. 2. Frame: 0.0897-inch- (2.30-mm-)thick zinc-coated steel sheet. 3. Frame: 0.0938-inch- (2.40-mm-)thick stainless-steel sheet. 4. Door: 0.0598-inch- (1.52-mm-) thick steel sheet, recessed 112 inch (12.7 mm) and lined with self-furring 3.4 lb./sq. yd. (1.8 kg/sq. m)flat-rib, galvanized-steel lath. 5. Door: 0.0598-inch- (1.52-mm-) thick zinc-coated steel sheet, recessed 1/2 inch (12.7 mm)and lined with self-furring 3.4 lb./sq. yd. (1.8 kg/sq. m)flat-rib, galvanized-steel lath. 6. Door: 0.0625-inch- (1.59-mm-) thick stainless-steel sheet, recessed 112 inch (12.7 mm) and lined with self-furring 3.4 lb./sq. yd. (1.8 kg/sq. m)flat-rib, galvanized-steel lath. 7. Plaster Casing Bead: 0.0299-inch (0.76-mm) zinc-coated-steel casing bead with flange formed out of expanded metal lath. 8. Hinge: Concealed, pivoting-rod type. 9. Locks: Flush to finished surface, screwdriver-operated cam. 10. Locks: Flush to finished surface, key-operated cylinder lock. H. Recessed Doors for Acoustical Tile Ceilings: Units consisting of frame with no exposed trim, recessed door to receive tile, hardware, and complying with the following requirements: 1. Frame: 0.0897-inch- (2.30-mm-)thick steel sheet. 2. Frame: 0.0897-inch- (2.30-mm-)thick zinc-coated steel sheet. 3. Frame: 0.0938-inch- (2.40-mm-)thick stainless-steel sheet. 4. Door: 0.0598-inch-(1.52-mm-)thick steel sheet, recessed 1 inch (25.4 mm). 5. Door: 0.0598-inch-(1.52-mm-)thick zinc-coated steel sheet, recessed 1 inch (25.4 mm). 6. Door: 0.0625-inch-(1.59-mm-)thick stainless-steel sheet, recessed 1 inch (25.4 mm). 7. Hinge: Concealed, pivoting-rod type. 8. Locks: Flush to finished surface, screwdriver-operated cam. 9. Locks: Flush to finished surface, key-operated cylinder lock. I. High-Security Access Doors: For maximum security in areas where access is required. 1. Frames: 3/16-inch (4.76-mm) by 2-inch (50.8-mm) by 2-inch (50.8-mm) angle welded with joints ground smooth. 2. Door: 0.1345-inch-(3,40-mm-)thick steel sheet. 3. Hinges: Heavy-duty steel welded to door and frame. 4. Locks: Heavy-duty, detention-type lock. 5. Locks: Doors prepared for mortise (or rim cylinder) lock furnished in Division 8 Section "Door Hardware." 2.4 FABRICATION ACCESS DOORS 08305-5 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. General: Manufacture each access door assembly as an integral unit ready for installation. B. Steel Access Doors and Frames: Continuous welded construction. Grind welds smooth and flush with adjacent surfaces. Furnish attachment devices and fasteners of type required to secure access panels to types of supports indicated. 1. Exposed Flange: Nominal 1 to 1-1/2 inches (25.4 to 38.1 mm) wide around perimeter of frame. 2. For gypsum board assemblies or gypsum veneer plaster, furnish frames with edge trim for gypsum board or gypsum base. 3. For full-bed plaster applications, furnish frames with galvanized expanded metal lath and exposed casing bead, welded to perimeter of frame. 4. For installation in masonry construction, furnish frames with adjustable metal masonry anchors. C. Recessed Panel Doors: Form face of panel to provide recess for application of applied finish. Reinforce panel as required to prevent buckling. 1. Furnish recessed panel doors for concealed installation in acoustic tile ceiling systems. 2. Furnish recessed panel doors and frames with expanded metal lath for concealed installation in plaster. D. Locking Devices: Furnish number required to hold door in flush, smooth plane when closed. 1. For cylinder lock,furnish 2 keys per lock and key all locks alike. 2. For recessed panel doors, provide access sleeves for each locking device. Furnish plastic grommets and install in holes cut through finish. PART 3-EXECUTION 3.1 PREPARATION A. Advise Installers of other work about specific requirements relating to access door installation, including sizes of openings to receive access door and frame, as well as locations of supports, inserts, and anchoring devices. Furnish inserts and anchoring devices for access doors that must be built into other construction. Coordinate delivery with other work to avoid delay. 3.2 INSTALLATION A. Comply with manufacturer's instructions for installing access doors. B. Set frames accurately in position and attach securely to supports with plane of face panels aligned with adjacent finished surfaces. C. Install concealed-frame access doors flush with adjacent finish surfaces. 3.3 ADJUST AND CLEAN A. Adjust hardware and panels after installation for proper operation. ACCESS DOORS 08305- 6 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 B. Remove and replace panels or frames that are warped, bowed, or otherwise damaged. END OF SECTION 08305 ACCESS DOORS 08305-7 HNTB #36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 SECTION 08331 - OVERHEAD COILING DOORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following types of overhead coiling doors: 1. Service doors. B. Related Sections include the following: 1. Division 8 Section "Door Hardware"for lock cylinders and keying. 2. Division 9 Section "Painting"for field-applied paint finish. 3. Division 16 Section "Conductors and Cables" for electrical service and connections for powered operators, and accessories. 4. Division 16 Section "Disconnect Switches and Circuit Breakers" for disconnect switches and circuit breakers for powered operators. 1.3 DEFINITIONS A. Operation Cycle: One complete cycle of a door begins with the door in the closed position. The door is then moved to the open position and back to the closed position. 1.4 PERFORMANCE REQUIREMENTS A. Structural Performance: Provide overhead coiling doors capable of withstanding the effects of gravity loads and the following loads and stresses without evidencing permanent deformation of door components: 1. Wind Load: Uniform pressure (velocity pressure) of 20 Ibf/sq. ft. (960 Pa), acting inward and outward. B. Operation-Cycle Requirements: Design overhead coiling door components and operator to operate for not less than 10,000 cycles. C. Operation-Cycle Requirements: Design overhead coiling door components and operator to operate for not less than 20,000 cycles. D. Operation-Cycle Requirements: Design overhead coiling door components and operator to operate for not less than 20,000 cycles and for 10 cycles per day. 1. Include tamperproof cycle counter. OVERHEAD COILING DOORS 08331 - 1 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 1.5 SUBMITTALS A. Product Data: For each type and size of overhead coiling door and accessory. Include details of construction relative to materials, dimensions of individual components, profiles, and finishes. Provide roughing-in diagrams, operating instructions, and maintenance information. Include the following: 1. Setting drawings, templates, and installation instructions for built-in or embedded anchor devices. 2. Summary of forces and loads on walls and jambs. 3. Motors: Show nameplate data and ratings; characteristics; mounting arrangements; size and location of winding termination lugs, conduit entry, and grounding lug; and coatings. 4. Fire-Rated Doors: Information describing fire-release system, including testing and resetting instructions. B. Shop Drawings: For special components and installations not dimensioned or detailed in manufacturer's data sheets. 1. Wiring Diagrams: Detail wiring for power, signal, and control systems. Differentiate between manufacturer-installed and field-installed wiring and between components provided by door manufacturer and those provided by others. C. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available for units with factory-applied finishes. D. Samples for Verification: Of each type of exposed finish required, prepared on Samples of size indicated below and of same thickness and material indicated for Work. Where finishes involve normal color and texture variations, include Sample sets showing the full range of variations expected. 1. Curtain Slats: 12-inch (300-mm)length. 2. Bottom Bar: 6-inch (150-mm) length. 3. Guides: 6-inch (150-mm) length. 4. Brackets: 6 inches (150 mm) square. 5. Hood: 6 inches (150 mm)square. 6. Laminate-Clad Counter Panel Product: 6 inches (150 mm) square, for each type, color, pattern, and surface finish, laminated to core. E. Installer Certificates: Signed by manufacturer certifying that installers comply with specified requirements. F. Oversize Construction Certification: For door assemblies required to be fire-rated and exceeding limitations of labeled assemblies, submit certification of a testing agency acceptable to authorities having jurisdiction that each door and frame assembly has been constructed to comply with design, materials, and construction equivalent to requirements for labeled construction. 1.6 QUALITY ASSURANCE OVERHEAD COILING DOORS 08331 -2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Installer Qualifications: Engage an experienced installer who is an authorized representative of the overhead coiling door manufacturer for both installation and maintenance of units required for this Project. B. Source Limitations: Obtain overhead coiling doors through one source from a single manufacturer. 1. Obtain operators and controls from the overhead coiling door manufacturer. C. Fire-Rated Door Assemblies: Provide assemblies complying with NFPA 80 that are identical to door and frame assemblies tested for fire-test-response characteristics per UL 10b, and that are labeled and listed for fire ratings indicated by UL, FM, ITS/Warnock Hersey, or another testing and inspecting agency acceptable to authorities having jurisdiction. D. Oversize Fire-Rated Door Assemblies: For units exceeding sizes of tested assemblies, provide certification by a testing agency acceptable to authorities having jurisdiction that doors comply with all standard construction requirements of tested and labeled fire-rated door assemblies, except for size. E. Listing and Labeling: Provide electrically operated fixtures specified in this Section that are listed and labeled. 1. The Terms"Listed"and "Labeled": As defined in NFPA 70,Article 100. 2. Listing and Labeling Agency Qualifications: A "Nationally Recognized Testing Laboratory"as defined in OSHA Regulation 1910.7. PART2- PRODUCTS 2.1 MANUFACTURERS A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to,the following: B. Manufacturer: Subject to compliance with requirements, provide products by one of the following: 1. Alpine Overhead Doors, Inc. 2. Atlas Door Corp.; Div. of Clopay Building Products Co. 3. The Cookson Company. 4. Cornell Iron Works Inc. 5. Dynamic Closures (1995) LTD. 6. Mahon Door Corp. 7. McKeon Rolling Steel Door Company, Inc. 8. Overhead Door Corporation. 9. Pacific Rolling Door Co. 10. Raynor Garage Doors. 11. Roll-Lite Door Corp.; Div. of Clopay Building Products Co. 12. Southwestern Steel Rolling Door Co. 13. Wayne-Dalton Corp. 14. Windsor Door;A United Dominion Company. OVERHEAD COILING DOORS 08331 -3 HNTB #36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 2.2 DOOR CURTAIN MATERIALS AND CONSTRUCTION A. Door Curtain: Fabricate overhead coiling door curtain of interlocking slats, designed to withstand wind loading indicated, in a continuous length for width of door without splices. Unless otherwise indicated, provide slats of material thickness recommended by door manufacturer for performance, size, and type of door indicated, and as follows: 1. Steel Door Curtain Slats: Structural-quality, cold-rolled galvanized steel sheets complying with ASTM A 653,with G90 (ASTM A 653M,with Z275)zinc coating. 2. Stainless-Steel Door Curtain Slats: Type 300 series, ASTM A 240 (ASTM A 240M) or ASTM A 666. 3. Aluminum Door Curtain Slats. ASTM B 209 (ASTM B 209M) or ASTM B 221 (ASTM B 221M), alloy and temper recommended by aluminum producer and finisher for type of use and finish indicated. a. Provide manufacturer's standard S-configuration slats. b. Provide manufacturer's standard flat-profile slats. 4. Insulation: Fill slat with manufacturer's standard rigid cellular polystyrene or polyurethane-foam-type thermal insulation complying with maximum flame-spread and smoke-developed indices of 75 and 450, respectively, according to ASTM E 84. Enclose insulation completely within metal slat faces. 5. Inside Curtain Slat Face: To match material of outside metal curtain slat and as follows: a. Galvanized Steel Sheet Thickness: Not less than 0.028 inch (0.7 mm). b. Stainless-Steel Sheet Thickness: Not less than 0.025 inch (0,65 mm). G. Aluminum Sheet Thickness: Same thickness as outside aluminum curtain face slat. B. Endlocks: Malleable-iron castings galvanized after fabrication, secured to curtain slats with galvanized rivets, or high-strength nylon. Provide locks on not less than alternate curtain slats for curtain alignment and resistance against lateral movement. C. Endlocks: Manufacturer's standard locks on not less than alternate curtain slats for curtain alignment and resistance against lateral movement. D. Windlocks: Malleable-iron castings secured to curtain slats with galvanized rivets or high- strength nylon, as required to comply with wind load. E. Bottom Bar: Consisting of 2 angles, each not less than 1-1/2 by 1-1/2 by 118 inch (38 by 38 by 3 mm) thick, either galvanized or stainless-steel or aluminum extrusions to suit type of curtain slats. F. Bottom Bar: Manufacturer's standard continuous channel or tubular shape, either stainless- steel or aluminum extrusions to suit type of curtain slats. 1. Astragal: Provide a replaceable, adjustable, continuous, compressible gasket of flexible vinyl, rubber, or neoprene, between angles or fitted to shape, as a cushion bumper for interior door. 2. Provide motor-operated doors with combination bottom astragal and sensor edge. G. Curtain Jamb Guides: Fabricate curtain jamb guides of steel angles, or channels and angles, with sufficient depth and strength to retain curtain, to allow curtain to operate smoothly, and to withstand loading. Build up units with not less than 3/16-inch- (5-mm-) thick, galvanized steel OVERHEAD COILING DOORS 08331 -4 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration i 10/30/02 sections complying with ASTM A 36 (ASTM A 36M), and ASTM A 123. Slot bolt holes for guide adjustment. Provide removable stops on guides to prevent overtravel of curtain and a continuous bar for holding windlocks. H. Curtain Jamb Guides: Fabricate curtain jamb guides of angles, or channels and angles of material and finish to match curtain slats, with sufficient depth and strength to retain curtain, to allow curtain to operate smoothly, and to withstand loading. Provide continuous integral wear strips to prevent metal-to-metal contact and minimize noise of travel and removable stops on guides to prevent overtravel of curtain. 2.3 HOODS AND ACCESSORIES A. Hood: Form to entirely enclose coiled curtain and operating mechanism at opening head and act as weatherseal. Contour to suit end brackets to which hood is attached. Roll and reinforce top and bottom edges for stiffness. Provide closed ends for surface-mounted hoods and fascia for any portion of between-jamb mounting projecting beyond wall face. Provide intermediate support brackets as required to prevent sag. 1. Fabricate steel hoods, for steel doors, of not less than 0.028-inch (0.7-mm)thick, hot-dip galvanized steel sheet with G90 (Z275) zinc coating, complying with ASTM A 653 (ASTM A 653M). 2. Fabricate hoods of stainless-steel sheet, Type 300 series, complying with ASTM A 240 (ASTM A 240M) or ASTM A 666, and not less than 0.025-inch (0.65-mm) thick, for stainless-steel doors. 3. Include automatic drop baffle to guard against passage of smoke or flame. 4. Fabricate aluminum hoods, complying with ASTM B 209 (ASTM B 209M), alloy and temper recommended by aluminum producer and finisher for type of use and finish indicated, and not less than 0.032 inch (0.8 mm)thick,for aluminum doors. 5. Shape: Round. 6. Shape: Square. 7. Exterior Mounted Door: Fabricate hood with sealant-joint bead profile for applying joint sealant. B. Integral Frame, Hood, and Fascia: Provide welded assemblies of the following sheet metal: 1. Fabricate of not less than 0.064-inch- (1.6-mm-)thick, hot-dip galvanized steel sheet with G90 (Z275)zinc coating, complying with ASTM A 653 (ASTM A 653M). 2. Fabricate of not less than 0.0625-inch- (1.6-mm-) thick, stainless-steel sheet, Type 300 series, complying with ASTM A 240 (ASTM A 240M)or ASTM A 666. C. Integral Sills: Fabricate sills as integral part of frame assembly of same sheet metal, but not less than 0,078 inch (2.0 mm)thick. D. Fire-Rated Counter: Provide fire-door manufacturer's high-pressure decorative laminate covered countertop, UL tested and labeled for 1-1/2-hour fire rating for approved use with fire- door assembly. 1. High-Pressure Decorative Laminate: Match color, pattern, and finish indicated by reference to manufacturer's standard designations for these characteristics. 2. High-Pressure Decorative Laminate: Provide Architect's selections from manufacturer's full range of colors, patterns, and finishes of type used in fire-door assembly tested by UL. OVERHEAD COILING DOORS 08331 -5 HNTB #36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 E. Smoke Seals: Provide UL-listed and-tested smoke-seal perimeter gaskets. F. Weatherseals: Provide replaceable, adjustable, continuous, compressible weather-stripping gaskets fitted to bottom and at top of exterior doors, unless otherwise indicated. At door head, use 1/8-inch- (3-mm-) thick, replaceable, continuous sheet secured to inside of curtain coil hood. 1. Provide motor-operated doors with combination bottom weatherseal and sensor edge. 2. In addition, provide replaceable, adjustable, continuous, flexible, 1/8-inch- (3-mm-) thick seals of flexible vinyl, rubber, or neoprene at doorjambs for a weathertight installation. G. Windows: Provide windows of 1/4-inch (6-mm) clear, transparent acrylic sheet, of size and in arrangement shown. Set glazing in vinyl, rubber or neoprene glazing channel secured to curtain slats. H. Push/Pull Handles: For push-up-operated or emergency-operated doors, provide galvanized steel lifting handles on each side of door. 1. Provide pull-down straps or pole hooks for doors more than 84 inches (2130 mm) high. I. Slide Bolt: Fabricate with side locking bolts to engage through slots in tracks for locking by padlock, located on both left and right jamb sides, operable from coil side. J. Fabricate locking device assembly with lock, spring-loaded dead bolt, operating handle, cam plate, and adjustable locking bar to engage through slots in tracks. 1. Locking Bars: Single-jamb side, operable from inside only. 2. Locking Bars: Single-jamb side, operable from outside only. 3. Locking Bars: Single-jamb side, operable from inside and outside. 4. Locking Bars: Full-disc Cremona type, both jamb sides, operable from inside and outside. 5. Lock cylinder is specified in another Division 8 Section. K. Chain Lock Keeper: Suitable for padlock. L. Where door unit is power operated, provide safety interlock switch to disengage power supply when door is locked. M. Provide automatic-closing device inoperative during normal door operations, with governor unit complying with requirements of NFPA 80, with easily tested and reset release mechanism, and designed to be activated by the following: 1. Governor: Oscillating type. 2. Governor: Viscous-speed type. 3. Temperature rise and melting point of 165 deg F (74 deg C) replaceable fusible links, interconnected and on both sides of wall of door opening. 4. Manufacturer's standard UL-labeled smoke detector and door-holder-release devices. 5. Manufacturer's standard UL-labeled heat detector and door-holder-release devices. 6. Building fire alarm and detection system and door-holder-release devices. 2.4 COUNTERBALANCING MECHANISM OVERHEAD COILING DOORS 08331 -6 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. General: Counterbalance doors by means of adjustable-tension steel helical torsion spring, mounted around a steel shaft and contained in a spring barrel connected to door curtain with required barrel rings. Use grease-sealed bearings or self-lubricating graphite bearings for rotating members. B. Counterbalance Barrel: Fabricate spring barrel of hot-formed, structural-quality, welded or seamless carbon-steel pipe, of sufficient diameter and wall thickness to support rolled-up curtain without distortion of slats and to limit barrel deflection to not more than 0.03 in./ft. (2.5 mm/m)of span under full load. C. Provide spring balance of one or more oil-tempered, heat-treated steel helical torsion springs. Size springs to counterbalance weight of curtain, with uniform adjustment accessible from outside barrel. Provide cast-steel barrel plugs to secure ends of springs to barrel and shaft. D. Fabricate torsion rod for counterbalance shaft of cold-rolled steel, sized to hold fixed spring ends and carry torsional load. E. Brackets: Provide mounting brackets of manufacturer's standard design, either cast-iron or cold-rolled steel plate with bell-mouth guide groove for curtain. 2.5 FINISHES, GENERAL A. General: Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes. B. Appearance of Finished Work: Variations in appearance of abutting or adjacent pieces are acceptable if they are within one-half of the range of approved Samples. Noticeable variations in the same piece are not acceptable. Variations in appearance of other components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast. 2.6 ALUMINUM FINISHES A. Finish designations prefixed by AA conform to the system established by the Aluminum Association for designating aluminum finishes. B. Manufacturer's standard mill finish. C. Class II, Clear Anodic Finish: AA-M12C22A31 (Mechanical Finish: nonspecular as fabricated; Chemical Finish: etched, medium matte; Anodic Coating: Architectural Class ll, clear coating 0.010 mm or thicker)complying with AAMA 607.1. D. Powder-Coat-Applied Finish: Apply manufacturer's standard powder-coat-applied finish consisting of primer and topcoat(s) according to coating manufacturer's written instructions for cleaning, pretreatment, application,thermosetting, and minimum dry film thickness. 1. Color and Gloss: As indicated by manufacturer's color and gloss designations. 2. Color and Gloss: Match Architect's sample. 3. Color and Gloss: As selected by Architect from manufacturer's full range of colors and glosses. OVERHEAD COILING DOORS 08331 -7 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 2.7 STEEL AND GALVANIZED STEEL FINISHES A. Factory Primer for Field Finish: Apply manufacturer's standard primer, compatible with field- applied finish according to coating manufacturer's written instructions for cleaning, pretreatment, application, and minimum dry film thickness. 1. Apply to ferrous surfaces except zinc-coated metal. B. Thermoset Finish: Apply manufacturer's standard baked finish consisting of primer and thermosetting topcoat according to coating manufacturer's written instructions for cleaning, pretreatment, application,thermosetting, and minimum dry film thickness. C. Powder-Coat-Applied Finish: Apply manufacturer's standard powder-coat-applied finish consisting of primer and topcoat(s) according to coating manufacturer's written instructions for cleaning, pretreatment, application, thermosetting, and minimum dry film thickness. 1. Color and Gloss: As indicated by manufacturer's color and gloss designations. 2. Color and Gloss: Match Architect's sample. 3. Color and Gloss: As selected by Architect from manufacturer's full range of colors and glosses. 2.8 STAINLESS-STEEL FINISHES A. General: Remove or blend tool and die marks and stretch lines into finish. 1. Grind and polish surfaces to produce uniform, directional textured, polished finish indicated,free of cross scratches. Run grain with long dimension of each piece. B. Bright, Cold-Rolled, Unpolished Finish: No.2B finish. C. Bright, Directional Polish: No.4 finish. D. When polishing is completed, passivate and rinse surfaces. Remove embedded foreign matter and leave surfaces chemically clean. 2.9 MANUAL DOOR OPERATORS A. Provide manual operators, unless electric door operators are indicated. When not shown, provide chain-hoist operator unit. B. Push-up Operation: Design counterbalance mechanism so required lift or pull for door operation does not exceed 25 Ibf(111 N). C. Chain-Hoist Operator: Provide manual chain-hoist operator consisting of endless steel hand chain, chain pocket wheel and guard, and gear-reduction unit with a maximum 35-Ibf (155-N) effort for door operation. Provide alloy steel hand chain with chain holder secured to operator guide. D. Crank-Hoist Operator: Provide crank-hoist operator consisting of crank and crank gearbox, steel crank drive shaft, and gear-reduction unit. Size gears to require no more than 35-Ibf(155- N) effort to turn crank. Fabricate gearbox to completely enclose operating mechanism and be oil tight. Provide manufacturer's standard crank-locking device. OVERHEAD COILING DOORS 08331 -8 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 1. Provide manufacturer's standard removable operating arm for each crank-gear unit. 2.10 ELECTRIC DOOR OPERATORS A. General: Provide electric door operator assembly of size and capacity recommended and provided by door manufacturer for door and operational life specified, with electric motor and factory-prewired motor controls, starter, gear-reduction unit, solenoid-operated brake, clutch, remote-control stations, control devices, integral gearing for locking door, and accessories required for proper operation. B. Comply with NFPA 70. C. Disconnect Device: Provide hand-operated disconnect or mechanism for automatically engaging sprocket-chain operator and releasing brake for emergency manual operation while disconnecting motor, without affecting timing of limit switch. Mount disconnect and operator so they are accessible from floor level. Include interlock device to automatically prevent motor from operating when emergency operator is engaged. D. Design operator so motor may be removed without disturbing limit-switch adjustment and without affecting emergency auxiliary operator. E. Provide control equipment complying with NEMA ICS 1, NEMA ICS 2, and NEMA ICS 6, with NFPA 70 Class 2 control circuit, maximum 24-V, ac or dc. F. Door-Operator Type: Provide wall-, hood-, or bracket-mounted,jackshaft, gear-head-type door operator unit consisting of electric motor, enclosed worm-gear running-in-oil primary drive, chain and sprocket secondary drive, and quick disconnect-release for manual operation. G. Door-Operator Type: Provide wall-, hood-, or bracket-mounted,jackshaft, gear-head hoist-type door operator unit consisting of electric motor, enclosed worm-gear running-in-oil primary drive, chain and sprocket secondary drive, and auxiliary chain-hoist and floor level disconnect. H. Electric Motors: Provide high-starting torque, reversible, continuous-duty, Class A insulated, electric motors, complying with NEMA MG 1,with overload protection, sized to start, accelerate, and operate door in either direction, from any position, at not less than 2/3 fps (0.2 m/s)or more than 1 fps (0.3 m/s),without exceeding nameplate ratings or considering service factor. 1_ Type: Polyphase, medium-induction type. 2. Service Factor: According to NEMA MG 1, unless otherwise indicated. 3. Coordinate wiring requirements and electric characteristics of motors with building electrical system. 4. Provide open dripproof-type motor, and controller with NEMA ICS 6, Type 1 enclosure. 5. Provide totally enclosed, nonventilated or fan-cooled motors, fitted with plugged drain, and controller with NEMA ICS 6,Type 4 enclosure where indicated. I. Remote-Control Station: Provide momentary-contact, 3-button control station with push-button controls labeled "Open," "Close,"and "Stop." 1. Provide interior units, full-guarded, surface-mounted, heavy-duty type, with general- purpose NEMA ICS 6, Type 1 enclosure. 2. Provide exterior units, full-guarded, standard-duty, surface-mounted, weatherproof type, NEMA ICS 6, Type 4 enclosure, key operated. OVERHEAD COILING DOORS 08331 -9 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10130/02 J. Obstruction Detection Device: Provide each motorized door with indicated external automatic safety sensor able to protect full width of door opening. Activation of sensor immediately stops and reverses downward door travel. 1. Photoelectric Sensor: Manufacturer's standard system designed to detect an obstruction in door opening without contact between door and obstruction. a. Self-Monitoring Type: Provide self-monitoring sensor designed to interface with door operator control circuit to detect damage to or disconnection of sensing device. When self-monitoring feature is activated, door operates to close only with constant pressure on close button. 2. Sensor Edge: Provide each motorized door with an automatic safety sensor edge, located within astragal or weather stripping mounted to bottom bar. Contact with sensor immediately stops and reverses downward door travel. Connect to control circuit using manufacturer's standard take-up reel or self-coiling cable. a. Provide pneumatically actuated automatic bottom bar. b. Provide electrically actuated automatic bottom bar. 1) Self-Monitoring Type: Provide self-monitoring, 4-wire configured device. K. Limit Switches: Provide adjustable switches, interlocked with motor controls and set to automatically stop door at fully opened and fully closed positions. L. Provide electric operators with ADA-compliant audible alarm and visual indicator lights. M. Radio Control: Provide radio control system consisting of the following: 1. 3-channel universal coaxial receiver to open, close, and stop door, 1 per operator. 2. Multifunction remote control. 3. Remote antenna mounting kit. PART 3-EXECUTION 3.1 INSTALLATION A. General: Install door and operating equipment complete with necessary hardware, jamb and head mold strips, anchors, inserts, hangers, and equipment supports according to Shop Drawings, manufacturer's written instructions, and as specified. 1. Install fire-rated doors to comply with NFPA 80. 3.2 ADJUSTING A. Lubricate bearings and sliding parts; adjust doors to operate easily, free from warp, twist, or distortion and fitting weathertight for entire perimeter. 3.3 DEMONSTRATION OVERHEAD COILING DOORS 08331 - 10 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Startup Services: Engage a factory-authorized service representative to perform startup services and to train Owner's maintenance personnel as specified below: 1. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment. a. Test door closing when activated by detector or alarm connected fire-release system. Reset door-closing mechanism after successful test. 2. Train Owner's maintenance personnel on procedures and schedules related to startup and shutdown, troubleshooting, servicing, preventive maintenance, and procedures for testing and resetting release devices. 3. Review data in the maintenance manuals. Refer to Division 1 Section "Contract Closeout." 4. Review data in the maintenance manuals. Refer to Division 1 Section "Operation and Maintenance Data." 5. Schedule training with Owner with at least 7 days'advance notice. END OF SECTION 08331 OVERHEAD COILING DOORS 08331 - 11 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 SECTION 08710 FINISH HARDWARE Part 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Door Hardware B. Specific Omissions: Hardware for the following is specified or indicated elsewhere. 1. Windows. 2. Cabinets, including open wall shelving and locks. 3. Signs, except where scheduled. 4. Toilet accessories, including grab bars. 5. Installation. 6. Rough hardware. 1.2 REFERENCES: A. Use date of standard in effect as of Bid date. B. American National Standards Institute—ANSI 156.18—Materials and Finishes. C. ANSI A117.1 —Specifications for making buildings and facilities usable by physically handicapped people. D. ADA—Americans with Disabilities Act of 1990 E. BHMA—Builders Hardware Manufacturers Association F. DHI —Door and Hardware Institute G. NFPA—National Fire Protection Association 1. NFPA 80—Fire Doors and Windows 2. N FPA 101 —Life Safety Code 3. NFPA 105—Smoke and Draft Control Door Assemblies 4. NFPA 252—Fire Tests of Door Assemblies H. UL—UnderwritersLaboratories 1. UL10C—Fire Tests of Door Assemblies(Positive Pressure) 2. UL 305—Panic Hardware I. WHI—Warnock Hersey Incorporated J. State of California Building Code K. Local Applicable Codes L. SDI—Steel Door Institute M. WDI—Wood Door Institute N. AWI—Architectural Woodwork Institute O. NAAM—National Association of Architectural Metal Manufacturers 1.3 SUBMITTALS & SUBSTITUTIONS FINISH HARDWARE 08710-1 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. SUBMITTALS: Submit six copies of schedule per Division 1. Organize vertically formatted schedule into "Hardware Sets'with index of doors and headings, indicating complete designations of every item required for each door or opening. Include following information: 1. Type, style,function, size, quantity and finish of hardware items. Use BHMA Finish codes per ANSI A156.18. 2. Name, part number and manufacturer of each item. 3. Fastenings and other pertinent information. 4. Location of hardware set coordinated with floor plans and door schedule. 5. Explanation of abbreviations, symbols, and codes contained in schedule. 6. Mounting locations for hardware. 7. Door and frame sizes, materials and degrees of swing. 8. List of manufacturers used and their nearest representative with address and phone number. 9. Catalog cuts. 10, Manufacturer's technical data and installation instructions for electronic hardware. 11. Date of jobsite visit. B. Bid and submit manufacturer's updated/improved item if scheduled item is discontinued. C. Make substitution requests in accordance with Division 1. Include product data and indicate benefit to the Project. Furnish operating samples on request. D. Furnish as-built/as-installed schedule with closeout documents, including keying schedule,wiring/riser diagrams, manufacturers' installation, adjustment and maintenance information, and supplier's final inspection report. 1.4 QUALITY ASSURANCE: A. Qualifications: 1. Hardware supplier: direct factory contract supplier who employs a certified architectural hardware consultant(AHC), available at reasonable times during course Work for project hardware consultation to Owner,Architect and Contractor. (1) Responsible for detailing, scheduling and ordering of finish hardware. B. Hardware: New, free of defects, blemishes and excessive play. Obtain each kind of hardware (latch and locksets, exit devices, hinges and closers)from one manufacturer. C. Exit Doors: Operable from inside with single motion without the use of a key or special knowledge or effort. D. Fire-Rated Openings: In compliance with NFPA 80. Hardware UL10C/UBC-7-2 (positive pressure)compliant for given type/size opening and degree of label. Provide proper latching hardware, non-flaming door closers, approved-bearing hinges, plus resilient and required intumescent seals. Furnish openings complete. FINISH HARDWARE 08710-2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 1. Note: scheduled seals may exceed selected door manufacturer's requirements. See 2.6.E for clarification. E. Pre-Installation Meetings: Initiate and conduct with supplier, installer and related trades, coordinate materials and techniques, and sequence complex hardware items and systems installation. Convene at least one week prior to commencement of related work. 1.5 DELIVERY, STORAGE AND HANDLING: A. Delivery: coordinate delivery to appropriate locations (shop or field). 1. Permanent keys and cores: secured delivery direct to Owner's representative. B. Acceptance at Site: Items individually packaged in manufacturers' original containers, complete with proper fasteners and related pieces. Clearly mark packages to indicate contents, locations in hardware schedule and door numbers. C. Storage: Provide locked storage area for hardware, protect from moisture,sunlight, paint, chemicals, etc... 1.6 PROJECT CONDITIONS: A. Where exact types of hardware specified are not adaptable to finished shape or size of members requiring hardware, provide suitable types having as nearly as practical as the same operation and quality as type specified, subject to Architect's approval. B. Prior to submittal, carefully inspect existing conditions to verify finish hardware required to complete Work, including sized,quantities, and sill conditions material. If conflict between the scheduled material and existing conditions, submit request for directions from Architect. Include date ofjobsite visit in the submittal. 1.7 SEQUENCING AND COORDINATION: A. Coordinate with concrete. B. Reinforce walls. C. Coordinate finish floor materials and floor-mounted hardware. D. Conduit and raceways as needed for electrical, electronic and electro-pneumatic hardware items. Fire/life-safety system interfacing. Paint-to-point wiring diagrams plus riser diagrams to related trades. E. Furnish manufacturer templates to door and frame fabricators. F. Use hardware consultant to check Shop Drawings for doors and entrances to confirm that adequate provisions will be made for proper hardware installation. 1. Confirm that door manufacturers furnish necessary UBC-7-2 compliant seal packages. FINISH HARDWARE 08710-3 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 1.8 WARRANTY: A. Part of respective manufacturers' regular terms of sale. Provide manufacturers' warranties: 1. Closers: Ten years mechanical, 1 2. Exit Devices: Three years. 3. Hinges: Life of Building. 4. Other Hardware: Two years. 1.9 COMMISSIONING: A. Test door hardware operation with climate control system and stairwell pressurization system both at rest and while in full operation. B. Test electrical, electronic and electro-pneumatic hardware systems for satisfactory operation. C. Test hardware interfaced with fire/life-safety system for proper operation and release. 1.10 MAINTENANCE: I A Extra Materials: Provide 5%or a minimum of one,whichever is greater, additional hardware items: locksets, exit devices, closers and electronic hardware. See schedule under"Miscellaneous Material". PART 2- PRODUCTS 2.1 MANUFACTURERS: A. Listed acceptable alternate manufacturers: submit for review products with equivalent function and features of scheduled products. ITEM: MANUFACTURER: Hinges (HAG) Hager Key System (SCH) Schlage Locks (SCH) Schlage Exit Devices (VON)Von Duprin Closers (LCN) LCN Auto Flush Bolts (IVE) Ives Coordinators (IVE) Ives Silencers (IVE) Ives Kickplates (IVE) Ives Stops& Holders-exterior (IVEO Ives Stops & Holders—interior (iVE) Ives FINISH HARDWARE 08710-4 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 Overhead Stops (GLY)Glynn-Johnson Thresholds (PEM) Pemko Seals& Bottoms (PEM) Pemko Signs (HAG) Hager B. Provide hardware items required to complete the work in accordance with these specifications and manufacturers' instructions. 1. Include items inadvertently omitted from this specification. Note these items in submittal for review. 2. Where scheduled item is now obsolete, bid and furnish manufacturers updated item at no additional cost to the project. 2.2 HANGING MEANS: A. Conventional Hinges: Hinge open widths minimum, but, of sufficient throw to permit maximum door swing. Steel or stainless steel pins and concealed bearings. 1. Three hinges per leaf to 7 foot, 6 inch height. Add one for each additional 30 inches in height, or any fraction thereof. 2. Extra heavy weight hinges on doors over 3 foot, 5 inches in width. 3. Outswinging exterior doors: non-ferrous with non-removable (NRP)pins. 4. Non-ferrous material exteriors and at doors subject to corrosive atmospheric conditions. 5. Provide shims and shimming instructions for proper door adjustment. 2.3 LOCKSETS, LATCHSETS, DEADBOLTS: A. Mortise Locksets and Latchsets: as scheduled. 1. Chassis: cold-rolled steel, handing Feld-changeable without disassembly. 2. Latchbolts:3/,inch throw stainless steel anti-friction type. 3. Lever Trim:through-bolted, accessible design, cast lever or solid extruded bar type levers as scheduled. Filled hollow tube design unacceptable. a. Spindles: security design independent break-away. Breakage of outside lever does not allow access to inside lever's hubworks to gain wrongful entry. 4. Thumbturns: accessible design not requiring pinching or twisting motions to operate. 5. Deadbolts: stainless steel 1-inch throw. 6. Electric operation: Manufacturer-installed continuous duty solenoid. 7. Strikes: 16 gage curved steel, bronze or brass with 1 inch deep box construction, lips of sufficient length to clear trim and protect clothing. 8. Scheduled Lock Series and Design: Schlage L9000 series, 17 9. A design 10. Certifications: a. ANSI Al56.13, 1994, Grade 1 Operational, Grade 1 Security. b. ANSI/ASTM F476-84 Grade 31 UL Listed.: FINISH HARDWARE 08710-5 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10130102 B. Extra Heavy Duty Cylindrical Locks and Latches: as scheduled. 1. Chassis: cylindrical design,corrosion-resistant plated cold-rolled steel,through- bolted. 2. Locking Spindle: stainless steel, interlocking design. 3. Latch Retractors: forged steel. Balance of inner parts: corrosion-resistant plated steel, or stainless steel. 4. Lever Trim: accessible design, independent operation, spring-cage supported, minimum 2"clearance from lever mid-point to door face. 5. Electric operation: Manufacturer-installed continuous duty solenoid. 6. Strikes: 16 gage curved steel, bronze or brass with 1"deep box construction, lips of sufficient length to clear trim and protect clothing. 7. Lock Series and Design: Schlage D series Sparta design.. 8. Certifications: a. ANSI Al56.2, 1994, Series 4000, Grade 1. b. UL listed for A label and lesser class single doors up to 4ft x 8ft. 2.4 EXIT DEVICES/PANIC HARDWARE A. General features: 1. Independent lab-tested 1,000,000 cycles. 2. Push-through touch pad design. No exposed touch bar fasteners, no exposed cavities when operated. Return stroke fluid dampeners and rubber bottoming dampeners, plus anti-rattle devices. 3. 3/4"throw deadlocking Iatchbolts. 4. No exposed screws to show through glass doors. 5. Non-handed basic device design with center case interchangeable with all functions, no extra parts required to effect change of function. 6. Releasable with 32 lb. maximum pressure under 250 lb. load to the door. B. Specific features: 1. Non-Fire Rated Devices: cylinder dogging. 2. Lever Trim: Breakaway type,forged brass or bronze escutcheon min .130" thickness, match lockset lever design. 3. Rod and latch guards with surface vertical rod devices. 4. Fire-Labeled Devices: UL label indicating "Fire Exit Hardware".Vertical rod devices less bottom rod (LBR)unless otherwise scheduled. 5. Electrically Operated Devices: Single manufacturer source for electric latch retraction devices, electrically controlled trim, power transfers, power supplies, monitoring switches and controls. 2.5 CLOSERS 401114111 A. General: One manufacturer for closer units throughout the Work, including surface closers, high security closers, overhead concealed closers,floor closers, low-energy door operators and electromagnetic hold-open closers. FINISH HARDWARE 08710-6 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10130/02 B. Surface Closers: Full rack-and-pinion type cylinder with removable non-ferrous cover and cast iron body. Double heat-treated pinion shaft, single piece forged piston, chrome- silicon steel spring. 1. ISO 2000 certified. Units stamped with date-of-manufacture code. 2. Independent lab-tested 10,000,000 cycles. 3. Thru-bolts and wood doors unless doors are provided with closer blocking. Non- sized and adjustable. Place closers inside building, stairs and rooms. 4. Plates, brackets and special templating when needed for interface with particular header, door and wall conditions and neighboring hardware. 5. Opening pressure: Exterior doors 8.5 lb., interior doors 5 lb., labeled fire doors 15 lb. 6. Separate adjusting valves for closing speed, latching speed and backcheck, fourth valve for delayed action where scheduled. 7. Extra-duty arms (EDA) at exterior doors scheduled with parallel arm units. 8. Exterior door closers: tested to 100 hours of ASTM B117 salt spray test,furnish data on request. 9. Exterior doors do not require seasonal adjustments in temperatures from 120 degrees F to—30 degrees F, furnish data on request. 10. Non-flaming fluid will not fuel door or floor covering fires.. 2.6 OTHER HARDWARE A. Automatic Flush Bolts: Low operating force design, "LBR"type. B. Overhead Stops: Stainless steel (300 series). Non-plastic mechanisms and finished metal end caps. Field-changeable hold-open, friction and stop-only functions. C. Kick Plates: Four beveled edges, .050 inches minimum thickness, height and width as scheduled. Sheet-metal screws of bronze or stainless steel to match other hardware. D. Door Stops: Provide stops to protect walls, casework or other hardware. 1. Unless otherwise noted in Hardware Sets, provide wall type with appropriate fasteners. Where wall type cannot be used, provide floor type. If neither can be used, provide overhead type.. E. Seals: Finished to match adjacent frame color. Resilient seal material: solid high-grade neoprene. UL label applied to seals on rated doors. Substitute products: certify that the products equal or exceed specified material's thickness and durability. Proposed substitutions: submit for approval. 1. Solid neoprene: MIL Spec. R6855-CL III, Grade 40. 2. Non-corroding fasteners at in-swinging exterior doors. 3. Sound control openings: Use components tested as a system using nationally accepted standards by independent laboratories. Ensure that the door leafs have the necessary sealed-in-place STC ratings. Adhesive mounted components not acceptable. Fasten applies seals over bead of sealant. 4. Fire-rated Doors, Resilient Seals: UL10C/UBC-7-2 compliant. Coordinate with selected door manufacturers and selected frame manufacturer's requirements. Where rigid housed resilient seals are scheduled in this section and the selected door manufacturer only requires an adhesive mounted resilient seal,furnish rigid FINISH HARDWARE 08710-7 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 housed seal at minimum, or both the rigid housed seal and the adhesive applied seal if necessary to fulfill door manufacturer's requirement. Adhesive applied seal alone is deemed insufficient for this project where rigid housed seals are scheduled. 5. Fire-rated Doors, Intumescent Seals: Furnish fire-labeled opening assembly complete and in full compliance with UL10C/UBC-7-2. Furnished by selected door manufacturer,these seals vary in requirement by door type and door manufacture. Adhesive applied intumescent strips are not acceptable, use concealed-in-door-edge type or kerfed-in-frame type. Careful coordination required. F. Automatic door bottoms: low operating force units. Doors with automatic door bottoms plus head and jamb seals cannot require more than two pounds operating force to open when closer is disconnected. G. Thresholds:As scheduled and per details. Substitute products: certify that the products equal or exceed specified material's thickness. Proposed substitutions:submit for approval. 1. Exteriors: Set in full bed of butyl-rubber or polyisobutylene mastic sealant complying with requirements in Division 7"Thermal and Moisture Protection'. Non-ferrous 1/4 inch fasteners and lead expansion shield anchors, or Red-Head #SFS-1420 (or approved equivalent) Flat Head Sleeve Anchors (SS/FHSL). 2. Sound control openings: Set in bed of mastic sealant. H. Fasteners: Generally, exposed screws to be Phillips or Robertson drive. Pinned TORX drive at high security areas. Flat head sleeve anchors (FHSL) may be slotted drive. Sheet metal and wood screws:full-thread. Sleeve nuts: full length to prevent door compression. I. Silencers: Interior hollow metal frames, 3 for single doors, 4 for pairs of doors. Omit where adhesive mounted seal occurs. Leave no unfilled/uncovered pre-punched silencer holes. J. Key Control Software: Same manufacturer as key cylinders,supply to Owner. 2.7 FINISH: A. Generally BHMA 626 Satin Chromium and 605 Polished Brass. 1. Areas using BHMA 626 to have push-plates, pulls and protection plates of BHMA 630, Satin Stainless Steel, unless otherwise noted. B. Door closers:factory powder coated to match other hardware, unless otherwise noted. 1. Provide satin-chrome plated arms,tracks and covers where scheduled bright metallic powder coat (789—MTLPC) not available. C. Aluminum items: match predominant adjacent material. Seals to coordinate with frame color. FINISH HARDWARE 08710-8 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 2.8 KEYING REQUIREMENTS: A. Key System: Schlage Everest patented keyway, non-interchangeable core typically with interchangeable core type operating cylinders for panic hardware Key blanks available only from factory-direct sources, not available from after-market key blank manufacturers. For estimate use factory GMK charge. Initiate and conduct meeting(s)with Owner to determine system keyway(s) and structure, furnish Owner's written approval of the system. 1. Existing factory registered master key system. 2. Non-I.C. construction keying: inserted type partial key. At substantial completion, remove inserts in Owner's presence; demonstrate consequent non-operability of construction key. Give all removed inserts and all constructruction keys to Owner. 3. Furnish 10 construction keys. 4. Furnish 2 construction control keys. 5. Furnish 1 extractor tool 35-057. 6. Recombinate entire project at no extra expense to Owner if missing construction keys. B. Key Cylinders: utility patented, 6-pin solid brass construction. C. Locks and cylinders: keyed at factory of lock manufacturer where permanent records are maintained. Locks and cylinders same manufacturer. D. Permanent keys: secured shipment direct from point of origination to Owner. E. Bitting List: Secured shipment direct from point of origination to Owner upon completion.. PART 3- EXECUTION 3.1 ACCEPTABLE INSTALLERS: A. Factory trained, certified, and carries a factory-issued card certifying that person as a "Certified Installer'. Alternative: can demonstrate suitably equivalent competence and experience. 3.2 PREPARATION: A. Ensure that walls and frames are square and plumb before hardware installation. B. Locate hardware per SDI-100 and applicable building,fire, life-safety, accessibility, and security codes. 1. Notify Architect of any code conflicts before ordering material. 2. Where new hardware is to be installed near existing doors/hardware scheduled to remain, match locations of existing hardware. C. Existing frames and doors scheduled to receive new hardware: carefully remove existing hardware, tag and bag,and turn over to Owner. FINISH HARDWARE 08710-9 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 1. Patch and fill wood frames and doors with solid wood stock or dowel material before cutting for new hardware. Do not reuse existing screw holes--fill and re- pilot. 2. Metal doors/frames: Weld or fasten with screws: filler pieces in existing hardware cut-outs and mortises not scheduled for re-use by new hardware. Leave surfaces smooth --no applied patches. 3.3 INSTALLATION A. Install hardware per manufacturer's instructions and recommendations. Do not install surface-mounted items until finishes have been completed on substrate. Set units level, plumb and true to line and location. Adjust and reinforce attachment substrate for proper installation and operation. 1. Gaskets: install jamb-applied gaskets before closers, overhead stops, rim strikes, etc. Install sweeps across bottoms of doors before astragals, cope sweeps around bottom pivots, trim astragals to tops of sweeps. 2. When hardware is to be attached to existing metal surface and insufficient reinforcement exists, use RivNuts, NutSerts or similar anchoring device for screws. B. Locate floor stops not more than 4 inches from the wall. C. Drill pilot holes for fasteners in wood doors and/or frames. D. Lubricate and adjust existing hardware scheduled to remain. Carefully remove and give to Owner items not scheduled for reuse. 3.4 ADJUSTING A. Adjust and check for proper operation and function. Replace units,which cannot be adjusted to operate freely and smoothly. 1. Hardware damaged by improper installation or adjustment methods to be repaired or replaced to Owner's satisfaction. B. Inspection: Use hardware supplier, Include suppliers with closeout documents. C. Follow-up inspection: Installer to provide letter of agreement to Owner that approximately 6 months after substantial completion, installer will visit Project with representatives of the manufacturers of the locking devices and door closers to accomplish following: 1. Re-adjust hardware. 2. Evaluate maintenance procedures and recommend changes or additions, and instruct Owner's personnel. 3. Identify items that have deteriorated or failed. 4. Submit written report identifying problems and likely future problems. 3.5 DEMONSTRATION: FINISH HARDWARE 08710-10 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Demonstrate electrical, electronic and pneumatic hardware systems, including adjustment and maintenance procedures. 3.6 PROTECTION/CLEANING: A. Cover installed hardware, protect from paint, cleaning agents,weathering, carts/barrows, etc. Remove covering materials and clean hardware just prior to substantial completion. B. Clean adjacent wall,frame and door surfaces soiled from installation/reinstallation process. 3.7 SCHEDULE OF FINISH HARDWARE A. See door schedule in drawings for hardware set assignments. HW SET: 001 6 EA SWING CLEAR HINGE AB70024.5 652 HAG 1 SET AUTO FLUSH BOLT FB31P 626 IVE 1 EA STOREROOM LOCK D80PD SPA 626 SCH 2 EA ARMOR PLATE 8400 40 X 2"LDW 630 IVE 2 EA SURFACE CLOSER 4011 X ST-1544 689 LCN 2 EA OVERHEAD HOLDER 100H-ADJ 630 GLY 2 EA EDGE GUARD 182P 630 HAG 2 EA SILENCER SR64 GRY IVE HW SET: 002 ALL HARDWARE BY DOOR MANUFACTURER B/O HW SET: 003 3 EA HINGE AB800 4.5 X 4 NRP 630 HAG 1 EA VANDAL RESIST. LOCK D96PD SPA 626 SCH 1 EA SURFACE CLOSER 4111 EDA 689 LCN 1 EA KICK PLATE 8400 10 X 1 LDW 630 IVE 1 EA FLOOR STOP FS18S BLK IVE 1 SET PERIMETER SEAL 303AS HEAD &JAMBS AL PEM 1 EA THRESHOLD 270A MS&A AL PEM FINISH HARDWARE 08710-11 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30102 HW SET: 004 3 EA HINGE AB700 4.5 X 4 652 HAG 1 EA OFFICE LOCK D50PD SPA 626 SCH 1 EA WALL BUMPER WS406CVX 630 IVE 3 EA SILENCER SR64 GRY IVE HW SET: 005 6 EA SWING CLEAR HINGE AB7002 4.5 652 HAG 1 SET AUTO FLUSH BOLT FB31P 626 IVE 1 EA VANDAL RESIST LOCK D94PD SPA 626 SCH 2 EA ARMOR PLATE 8400 40 X 2" LDW 630 IVE 1 EA COORDINATOR COR X FL 628 IVE 2 EA SURFACE CLOSER 4011 X ST-1544 689 LCN 2 EA OVERHEAD HOLDER 100H-ADJ 630 GLY 2 EA EDGE GUARD 182P 630 HAG 1 SET PERIMETER SEAL 303AS HEAD &JAMBS AL PEM 1 EA THRESHOLD 270A MS&A AL PEM HW SET: 006 3 EA HINGE AB7004.5X4 652 HAG 1 EA PRIVACY LOCK D40S SPA 626 SCH 1 EA SURFACE CLOSER 4111 EDA 689 LCN 1 EA WALL BUMPER WS406CVX 630 IVE 3 EA SILENCER SR64 GRY IVE 1 EA SIGN 370M/W"MEN' OR"WOMEN'AS REQUIRED BLU HAG HW SET: 007 3 EA HINGE AB7004.5X4 652 HAG 1 EA PASSAGE D10S SPA 626 SCH 1 EA WALL BUMPER WS406CVX 630 IVE 3 EA SILENCER SR64 GRY IVE HW SET: 008 FINISH HARDWARE 08710-12 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 8 EA HINGE AB750 4.5 X 4 632 HAG 1 SET AUTO FLUSH BOLT FB32 605 IVE 1 EA CLASSROOM LOCK L9070P 17A 605 SCH 2 EA KICKPLATE 8400 10 X 2"LDW 605 IVE 1 EA COORDINATOR CDR X FL 628 IVE 1 EA ASTRAGAL S77B BRN PEM 2 EA SURFACE CLOSER 4111 EDA 696 LCN 2 EA DOME STOP FS436 605 IVE 1 SET SEAL S88 HEAD &JAMBS BRN PEM HW SET: 009 8 EA HINGE AB750 4.5 X 4 632 HAG 1 SET CONST LATCHING BOLT FB51P 605 IVE 1 EA STOREROOM LOCK L9080P 17A 605 SCH 2 EA KICKPLATE 8400 10 X 2"LDW 605 IVE 2 EA OVERHEAD HOLDER 450H 605 GLY 2 EA SILENCER SR64 GRY IVE HW SET: 010 3 EA HINGE AB7504.5X4 632 HAG 1 EA CLASSROOM LOCK L9070P 17A 605 SCH 1 EA KICKPLATE 8400 10 X 2"LDW 605 IVE 1 EA SURFACE CLOSER 4011 696 LCN 1 EA WALL BUMPER WS406CVX 605 IVE 1 SET SEAL S88 HEAD &JAMBS BRN PEM HW SET: 011 3 EA HINGE AB750 4.5 X 4 632 HAG 1 EA STOREROOM LOCK D80PD SPA 626 SCH 1 EA SURFACE CLOSER 4111 CUSH 696 LCN 1 SET SEAL S88 HEAD &JAMBS BRN PEM HW SET: 012 8 EA HINGE AB750 4.5 X 4 632 HAG 1 EA CLASSROOM LOCK L9070P 17A 605 SCH FINISH HARDWARE 08710-13 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10130/02 2 EA KICKPLATE 8400 10 X 2"LDW 605 IVE 1 EA COORDINATOR CDR X FL 628 IVE 1 EA ASTRAGAL S77B BRN PEM 2 EA SURFACE CLOSER 4111 CUSH 696 LCN 1 SET SEAL S88 HEAD &JAMBS BRN PEM HW SET: 013 6 EA HINGE AB7504.5X4 632 HAG 2 EA ELEC. HINGE AB750 4.5 X 4 ETW 632 HAG 1 EA ELEC FIRE EXIT DEVIC EL9847EO-F LBR 605 VON 1 EA ELEC FIRE EXIIT DEVI EL9847L-F X17 LBR 605 VON 1 EA IC RIM CYLINDER 20-057 605 SCH 2 EA KICKPLATE 840010X2"LDW 605 IVE 1 EA ASTRAGAL S77B BRN PEM 2 EA SURFACE CLOSER 4111 EDA 696 LCN 2 EA MAG DOOR HOLDER SEM7830-24VDC 605 LCN 1 SET SEAL S88 HEAD &JAMBS BRN PEM END OF SECTION FINISH HARDWARE 08710-14 HNTB #36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10130/02 SECTION 09512-ACOUSTICAL TILE CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1. Ceilings consisting of acoustical tiles and suspension systems. 1.3 SUBMITTALS A. Product Data: For each type of product specified. B. Coordination Drawings: Reflected ceiling plans drawn to scale and coordinating penetrations and ceiling-mounted items. Show the following: 1. Ceiling suspension system members. 2. Method of attaching suspension system hangers to building structure. 3. Initial direct-access openings. 4. Ceiling-mounted items including light fixtures; air outlets and inlets; speakers; sprinklers; and special moldings at walls, column penetrations, and other junctures of acoustical ceilings with adjoining construction. C. Samples for Initial Selection: Manufacturer's color charts consisting of actual acoustical tiles or sections of acoustical tiles, suspension systems, and moldings showing the full range of colors, textures, and patterns available for each type of ceiling assembly indicated. D. Samples for Verification: 1. 12"X12"samples of each acoustical tile type, pattern, and color. 2. Set of 12-inch-(300-mm-) long samples of concealed suspension system members. 3. Set of 12-inch- (300-mm-) long samples of exposed moldings for each color and system type required. E. Qualification Data: For firms and persons specified in "Quality Assurance" Article to demonstrate their capabilities and experience. Include lists of completed projects with project names and addresses, names and addresses of architects and owners, and other information specified. F. Product Test Reports: Indicate compliance of acoustical tile ceilings and components with requirements based on comprehensive testing of current products. ACOUSTICAL TILE CEILINGS 09512- 1 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 G. Research/Evaluation Reports: Evidence of acoustical tile ceiling's and components'compliance with building code in effect for Project, from a model code organization acceptable to authorities having jurisdiction. 1.4 QUALITY ASSURANCE A. Installer Qualifications: Engage an experienced installer who has completed acoustical tile ceilings similar in material, design, and extent to that indicated for this Project and with a record of successful in-service performance. B. Source Limitations for Ceiling Units: Obtain each acoustical ceiling tile from one source with resources to provide products of consistent quality in appearance and physical properties without delaying the Work. C. Source Limitations for Suspension System: Obtain each suspension system from one source with resources to provide products of consistent quality in appearance and physical properties without delaying the Work. 1. Obtain both acoustical ceiling tiles and suspension system from the same manufacturer. D. Fire-Test-Response Characteristics: Provide acoustical tile ceilings that comply with the following requirements: 1. Fire-response tests were performed by UL, ITS/Warnock Hersey, or another independent testing and inspecting agency that is acceptable to authorities having jurisdiction and that performs testing and follow-up services. 2. Surface-burning characteristics of acoustical tiles comply with ASTM E 1264 for Class A materials as determined by testing identical products per ASTM E 84. 3. Fire-resistance-rated assemblies, which are indicated by design designations from UL's "Fire Resistance Directory,"from ITS/Warnock Hersey's"Directory of Listed Products,"or from listings of another testing and inspecting agency, are identical in materials and construction to those tested per ASTM E 119. 4. Products are identified with appropriate markings of applicable testing and inspecting agency. E. Preinstallation Conference: Conduct conference at Project site to comply with requirements of Division 1 Section "Project Meetings." 1.5 DELIVERY, STORAGE, AND HANDLING A. Deliver acoustical tiles and suspension system components to Project site in original, unopened packages and stare them in a fully enclosed space where they will be protected against damage from moisture,direct sunlight, surface contamination, and other causes. B. Before installing acoustical tiles, permit them to reach room temperature and a stabilized moisture content. C. Handle acoustical tiles carefully to avoid chipping edges or damaging units in any way. 1.6 PROJECT CONDITIONS ACOUSTICAL TILE CEILINGS 09512-2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Environmental Limitations: Do not install acoustical tile ceilings until spaces are enclosed and weatherproof, wet-work in spaces is complete and dry, work above ceilings is complete, and ambient temperature and humidity conditions are maintained at the levels indicated for Project when occupied for its intended use. 1.7 COORDINATION A. Coordinate layout and installation of acoustical tiles and suspension system with other construction that penetrates ceilings or is supported by them, including light fixtures, HVAC equipment,fire-suppression system, and partition assemblies. 1.8 EXTRA MATERIALS A. Not Required PART 2- PRODUCTS 2.1 MANUFACTURERS A. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, those indicated for each designation in the Acoustical Tile Ceiling Schedule at the end of Part 3. B. Products: Subject to compliance with requirements, provide one of the products indicated for each designation in the Acoustical Tile Ceiling Schedule at the end of Part 3. 2.2 ACOUSTICAL TILES, GENERAL A. Acoustical Tile Standard: Provide manufacturer's standard tiles of configuration indicated that comply with ASTM E 1264 classifications as designated by types, patterns, acoustical ratings, and light reflectances, unless otherwise indicated. 1. Mounting Method for Measuring Noise Reduction Coefficient: Type E-400; plenum mounting in which face of test specimen is 15-3/4 inches (400 mm) away from test surface per ASTM E 795. 2. Acoustical tile in the Main Kitchen shall have a scubbable surface approved by the Riverside County Health Department for use in food prearation areas. B. Acoustical Tile Colors and Patterns: Match appearance characteristics indicated for each product type. 1. Where appearance characteristics of acoustical tiles are indicated by referencing ASTM E 1264 pattern designations and not manufacturers' proprietary product designations, provide products selected by Architect from each manufacturer's full range of products that comply with requirements indicated for type, pattern, color, light reflectance, acoustical performance, edge detail, and size. 2.3 METAL SUSPENSION SYSTEMS, GENERAL ACOUSTICAL TILE CEILINGS 09512- 3 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Metal Suspension System Standard: Provide manufacturer's standard metal suspension systems of types, structural classifications, and finishes indicated that comply with applicable ASTM C 635 requirements. B. Metal Suspension System Characteristics: Comply with requirements indicated in the Acoustical Panel Ceiling Schedule at the end of Part 3. C. Finishes and Colors, General: Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes. Provide manufacturer's standard factory-applied finish for type of system indicated. 1. High-Humidity Finish: Comply with ASTM C 635 requirements for"Coating Classification for Severe Environment Performance"where high-humidity finishes are indicated. D. Attachment Devices: Size for five times design load indicated in ASTM C 635, Table 1, Direct Hung, unless otherwise indicated. 1. Postinstalled Powder-Actuated Fasteners in Concrete: Fastener system of type suitable for application indicated, fabricated from corrosion-resistant materials, with clips or other accessory devices for attaching hangers of type indicated, and with capability to sustain, without failure, a Load equal to 10 times that imposed by ceiling construction, as determined by testing per ASTM E 1190, conducted by a qualified testing and inspecting agency. E. Wire Hangers, Braces, and Ties: Provide wires complying with the following requirements: 1. Zinc-Coated Carbon-Steel Wire: ASTM A 641/A 641 M, Class 1 zinc coating, soft temper. 2. Size: Select wire diameter so its stress at three times hanger design load (ASTM C 635, Table 1, Direct Hung) will be less than yield stress of wire, but provide not less than 0.106-inch- (2.69-mm-)diameter wire. F. Hanger Rods: Mild steel, zinc coated or protected with rust-inhibitive paint. G. Flat Hangers: Mild steel,zinc coated or protected with rust-inhibitive paint. H. Angle Hangers: Angles with legs not less than 7/8 inch (22 mm)wide; formed with 0.04-inch- (1-mm-)thick, galvanized steel sheet complying with ASTM A 653/A 653M, G90 (Z275) coating designation; with bolted connections and 5/16-inch-(8-mm-)diameter bolts. I. Sheet-Metal Edge Moldings and Trim: Type and profile indicated or, if not indicated, manufacturer's standard moldings for edges and penetrations that fit acoustical tile edge details and suspension systems indicated; formed from sheet metal of same material and finish as that used for exposed flanges of suspension system runners. 1. For circular penetrations of ceiling, provide edge moldings fabricated to diameter required to fit penetration exactly. 2.4 ACOUSTICAL SEALANT A. Acoustical Sealant for Exposed and Concealed Joints: Manufacturer's standard nonsag, paintable, nonstaining latex sealant complying with ASTM C 834 and the following requirements: ACOUSTICAL TILE CEILINGS 09512-4 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 1. Product is effective in reducing airborne sound transmission through perimeter joints and openings in building construction as demonstrated by testing representative assemblies according to ASTM E 90. B. Acoustical Sealant for Concealed Joints: Manufacturer's standard nondrying, nonhardening, nonskinning, nonstaining, gunnable, synthetic-rubber sealant recommended for sealing interior concealed joints to reduce airborne sound transmission. C. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, the following: D. Products: Subject to compliance with requirements, provide one of the following: 1. Acoustical Sealant for Exposed and Concealed Joints: a. PL Acoustical Sealant; ChemRex, Inc., Contech Brands. b. AC-20 FTR Acoustical and Insulation Sealant; Pecora Corp. C. SHEETROCK Acoustical Sealant; United States Gypsum Co. PART 3-EXECUTION 3.1 EXAMINATION A. Examine substrates and structural framing to which acoustical tile ceilings attach or abut, with Installer present, for compliance with requirements specified in this and other Sections that affect ceiling installation and anchorage, and other conditions affecting performance of acoustical tile ceilings. 1. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Coordination: Furnish layouts for preset inserts, clips, and other ceiling anchors whose installation is specified in other Sections. 1. Furnish concrete inserts and similar devices to other trades for installation well in advance of time needed for coordinating other work. B. Testing Substrates: Before installing adhesively applied tiles on wet-placed substrates such as cast-in-place concrete or plaster, test and verify that moisture level is below tile manufacturer's recommended limits. C. Measure each ceiling area and establish layout of acoustical tiles to balance border widths at opposite edges of each ceiling. Avoid using less-than-half-width units at borders, and comply with layout shown on reflected ceiling plans. 3.3 INSTALLATION A. General: Install acoustical tile ceilings to comply with publications referenced below per manufacturer's written instructions and CISCA's"Ceiling Systems Handbook." ACOUSTICAL TILE CEILINGS 09512-5 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 1. Standard for Ceiling Suspension System Installations: Comply with ASTM C 636. 2. Standard for Ceiling Suspension Systems Requiring Seismic Restraint: Comply with ASTM E 580. 3. CISCA's Recommendations for Acoustical Ceilings: Comply with CISCA's "Recommendations for Direct-Hung Acoustical Tile and Lay-in Panel Ceilings--Seismic Zones 0-2." 4. CISCA's Guidelines for Systems Requiring Seismic Restraint: Comply with CISCA's "Guidelines for Seismic Restraint of Direct-Hung Suspended Ceiling Assemblies-- Seismic Zones 3&4." 5. U.B.C.'s "Metal Suspension Systems for Acoustical Tile and for Lay-in Panel Ceilings": U.B.C. Standard 25-2. B. Suspend ceiling hangers from building's structural members and as follows: 1. Install hangers plumb and free from contact with insulation or other objects within ceiling plenum that are not part of supporting structure or of ceiling suspension system. 2. Splay hangers only where required to miss obstructions; offset resulting horizontal forces by bracing, countersplaying, or other equally effective means. 3. Splay hangers only where required and, if permitted with fire-resistance-rated ceilings, to miss obstructions; offset resulting horizontal forces by bracing, countersplaying, or other equally effective means, 4. Where width of ducts and other construction within ceiling plenum produces hanger spacings that interfere with location of hangers at spacings required to support standard suspension system members, install supplemental suspension members and hangers in form of trapezes or equivalent devices. Size supplemental suspension members and hangers to support ceiling loads within performance limits established by referenced standards and publications. 5. Secure wire hangers to ceiling suspension members and to supports above with a minimum of three tight turns. Connect hangers directly either to structures or to inserts, eye screws, or other devices that are secure; that are appropriate for substrate; and that will not deteriorate or otherwise fail due to age, corrosion, or elevated temperatures. 6. Secure flat, angle, channel, and rod hangers to structure, including intermediate framing members, by attaching to inserts, eye screws, or other devices that are secure and appropriate for both structure to which hangers are attached and type of hanger involved. Install hangers in a manner that will not cause them to deteriorate or fail due to age, corrosion, or elevated temperatures. 7. Do not support ceilings directly from permanent metal forms or floor deck. Fasten hangers to cast-in-place hanger inserts, powder-actuated fasteners, or drilled-in anchors that extend through forms into concrete. 8. Do not attach hangers to steel deck tabs. 9. Do not attach hangers to steel roof deck. Attach hangers to structural members. 10. Space hangers not more than 48 inches (1200 mm) o.c. along each member supported directly from hangers, unless otherwise indicated; and provide hangers not more than 8 inches(200 mm)from ends of each member. C. Secure bracing wires to ceiling suspension members and to supports with a minimum of four tight turns. Suspend bracing from building's structural members as required for hangers, without attaching to permanent metal forms, steel deck, or steel deck tabs. Fasten bracing wires into concrete with cast-in-place or postinstalled anchors. D. Install edge moldings and trim of type indicated at perimeter of acoustical tile ceiling area and where necessary to conceal edges of acoustical units. ACOUSTICAL TILE CEILINGS 09512-6 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10130/02 1. Apply acoustical sealant in a continuous ribbon concealed on back of vertical legs of moldings before they are installed. 2. Screw attach moldings to substrate at intervals not more than 16 inches (400 mm) o.c. and not more than 3 inches (75 mm)from ends, leveling with ceiling suspension system to a tolerance of 1/8 inch in 12 feet (3 mm in 3.6 m). Miter corners accurately and connect securely. 3. Do not use exposed fasteners, including pop rivets, on moldings and trim. E. Install suspension system runners so they are square and securely interlocked with one another. Remove and replace dented, bent, or kinked members. F. Arrange directionally patterned acoustical tiles as follows: 1. As indicated on reflected ceiling plans. G. Install acoustical tiles in coordination with suspension system and exposed moldings and trim. Place splines or suspension system flanges into kerfed edges so tile-to-tile joints are closed by double lap of material. 1. Fit adjoining tile to form flush, tight joints. Scribe and cut tile for accurate fit at borders and around penetrations through tile. 2. Hold tile Feld in compression by inserting leaf-type, spring-steel spacers between tile and moldings, spaced 12 inches(305 mm)o.c. 3. Fabricate access units for special suspension system access members and tile units modified as required to allow for removal of access units. 4. Protect lighting fixtures and air ducts to comply with requirements indicated for fire- resistance-rated assembly. 3.4 CLEANING A. Clean exposed surfaces of acoustical tile ceilings, including trim, edge moldings, and suspension system members. Comply with manufacturers written instructions for cleaning and touchup of minor finish damage. Remove and replace tiles and other ceiling components that cannot be successfully cleaned and repaired to permanently eliminate evidence of damage. END OF SECTION 09512 ACOUSTICAL TILE CEILINGS 09512-7 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 SECTION 09651 - RESILIENT TILE FLOORING PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1. Vinyl composition floor tile. 2. Resilient wall base and accessories. 1.3 SUBMITTALS A. Product Data: For each type of product specified. B. Samples for Initial Selection: Manufacturer's color charts consisting of units or sections of units showing the full range of colors and patterns available for each type of product indicated. 1.4 QUALITY ASSURANCE A. Installer Qualifications: Engage an experienced installer to perform work of this Section who has specialized in installing resilient products similar to those required for this Project and with a record of successful in-service performance. B. Source Limitations: Obtain each type, color, and pattern of product specified from one source with resources to provide products of consistent quality in appearance and physical properties without delaying the Work. 1.5 DELIVERY, STORAGE,AND HANDLING A. Deliver products to Project site in manufacturer's original, unopened cartons and containers, each bearing names of product and manufacturer, Project identification, and shipping and handling instructions. 1.6 EXTRA MATERIALS A. Not required. PART 2- PRODUCTS 2.1 MANUFACTURERS RESILIENT TILE FLOORING 09651 - 1 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include manufacturers doing business in Southern California that produce the products specified inb this section. 2.2 RESILIENT TILE A. Solid Vinyl Tile: Products complying with ASTM F 1700 and with requirements specified in the Resilient Tile Flooring Schedule. 2.3 RESILIENT ACCESSORIES A. Rubber Wall Base: Products complying with FS SS-W-40, Type I and with requirements specified in the Resilient Tile Flooring Schedule. 2.4 INSTALLATION ACCESSORIES A. Trowelable Leveling and Patching Compounds: Latex-modified, portland-cement-based formulation provided or approved by flooring manufacturer for applications indicated. B. Adhesives: Water-resistant type recommended by manufacturer to suit resilient products and substrate conditions indicated. PART 3-EXECUTION 3.1 EXAMINATION A. Examine substrates, areas, and conditions where installation of resilient products will occur, with Installer present, for compliance with manufacturer's requirements. Verify that substrates and conditions are satisfactory for resilient product installation and comply with requirements specified. B. Concrete Subfloors: Verify that concrete slabs comply with ASTM F 710 and the following: 1. Slab substrates are dry and free of curing compounds, sealers, hardeners, and other materials that may interfere with adhesive bond. Determine adhesion and dryness characteristics by performing bond and moisture tests recommended by flooring manufacturer. 2. Subfloor finishes comply with requirements specified in Division 3 Section "Cast-in-Place Concrete"for slabs receiving resilient flooring. 3. Subfloors are free of cracks, ridges, depressions,scale, and foreign deposits. 3.2 PREPARATION A. General: Comply with resilient product manufacturer's written installation instructions for preparing substrates indicated to receive resilient products. RESILIENT TILE FLOORING 09651 -2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 B. Use trowelable leveling and patching compounds, according to manufacturer's written instructions,to fill cracks, holes, and depressions in substrates. 3.3 TILE INSTALLATION A. General: Comply with tile manufacturer's written installation instructions. 3.4 CLEANING AND PROTECTING A. Perform the following operations immediately after installing resilient products: 1. Remove adhesive and other surface blemishes using cleaner recommended by resilient product manufacturers. 2. Sweep or vacuum floor thoroughly. 3. Do not wash floor until after time period recommended by flooring manufacturer. 4. Damp-mop floor to remove marks and soil. B. Protect flooring against mars, marks, indentations, and other damage from construction operations and placement of equipment and fixtures during the remainder of construction period. Use protection methods indicated or recommended in writing by flooring manufacturer. 1. Apply protective floor polish to floor surfaces that are free from soil, visible adhesive, and surface blemishes, if recommended in writing by manufacturer. a. Use commercially available product acceptable to flooring manufacturer. b. Coordinate selection of floor polish with Owner's maintenance service. 2. Cover products installed on floor surfaces with undyed, untreated building paper until inspection for Substantial Completion. 3. Do not move heavy and sharp objects directly over floor surfaces. Place plywood or hardboard panels over flooring and under objects while they are being moved. Slide or roll objects over panels without moving panels. C. Clean floor surfaces not more than 4 days before dates scheduled for inspections intended to establish date of Substantial Completion in each area of Project. Clean products according to manufacturer's written recommendations. 1. Before cleaning, strip protective floor polish that was applied after completing installation only if required to restore polish finish and if recommended by flooring manufacturer. 2. After cleaning, reapply polish to floor surfaces to restore protective floor finish according to flooring manufacturer's written recommendations. Coordinate with Owner's maintenance program. END OF SECTION 09651 RESILIENT TILE FLOORING 09651 -3 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 SECTION 09775—FIBERGLASS REINFORCED PANELS PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes surface preparation and field application of fiberglass reinforced panels. 1.3 SUBMITTALS A. Product Data: For each coating system specified. 1. Material List: An inclusive list of required materials. Indicate each material and cross- reference the specific finish system, and application. Identify each material by the manufacturer's catalog number and general classification. 2. Manufacturer's Information: Manufacturer's technical information, including label analysis and instructions for handling, storing, and applying each material proposed for use. B. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available for each type of finish-coat material indicated. 1.4 QUALITY ASSURANCE A. Applicator Qualifications: An experienced applicator who has a record of successful in-service performance. B. Source Limitations: Obtain materials from the same manufacturer. 1.5 DELIVERY, STORAGE,AND HANDLING A. Deliver materials to the Project site in the manufacturer's original, unopened packages and containers bearing manufacturer's name and label, and the following information: 1. Product name or title of material. 2. Product description (generic classification). 3. Manufacturer's stock number and date of manufacture. PART2-PRODUCTS FIBERGLASS REINFORCED PANELS 09775- 1 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 2.1 MANUFACTURERS A. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, Fiber-Lite Liner Panels by Nudo Products, Inc. or an approved equal. B. Thickness: .090" C. Fire Rating: Class C D. Flexural Strength (psi): 9,200 per ASTM D—790. E. Panel Size: To fit the application—see interior elevations. Minimize seams. F. Tensile Strength (psi)6,400 per ASTM D 638 PART 3- EXECUTION 3.1 EXAMINATION A. Examine substrates and conditions, with the Applicator present, under which fiberglass reinforced panels will be applied,for compliance with coating application requirements. 1. Apply panels only after unsatisfactory conditions have been corrected and surfaces to receive fiberglass reinforced panels are thoroughly dry. 2. Start of application is construed as the Applicator's acceptance of surfaces within that particular area. A. Coordination of Work: 2. Notify the Architect about anticipated problems using the coatings specified over substrates primed by others. 3.2 PREPARATION A. General: Remove plates, equipment, shelving, conduits, machined surfaces, and similar items already in place that are not to be covered. . 1. After completing installation, reinstall items removed using workers skilled in trades involved. B. Cleaning: Before applying fiberglass reinforced panels,clean substrates of substances that could impair bond of panels. Remove oil and grease before cleaning. 1. Schedule cleaning and coating application so dust and other contaminates from cleaning process will not fall on wet, newly coated surfaces. C. Surface Preparation: Clean and prepare surfaces to be laminated according to the manufacturer's written instructions for each particular substrate condition, and as specified. 3.3 INSTALLATION A. General: Laminate panels to the new or existing wall surface, including ceramic tile, using fast setting, genral purpose adhesives (100% coverage). Leave room for expansion per the manufacturer's recommendation. Install per the manufacturer's written instructions. FIBERGLASS REINFORCED PANELS 09775-2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 B. Finish the installation at all transitions, including between panel with the manufacturer's standard vinyl moldings. Color to match panel. All seams are to be moisture tight. Apply caulk where required. 3.4 CLEANING A. Cleanup: At the end of each workday, remove rubbish, empty cans, rags, and other discarded coating materials from the Project site. 1. After completing fiberglass reinforced panels application, clean spattered surfaces. Remove spattered adhesive by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces. 3.6 PROTECTION A. Protect work of other trades, whether being laminated or not, against damage from fiberglass reinforced panel operation. Correct damage by cleaning, repairing, replacing, and relaminating, as approved by the Architect. END OF SECTION 09775 FIBERGLASS REINFORCED PANELS 09775-3 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 SECTION 09900- PAINTING PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes surface preparation and field painting of the following: 1. Exposed exterior items and surfaces. 2. Exposed interior items and surfaces. 3. Surface preparation, priming, and finish coats specified in this Section are in addition to shop priming and surface treatment specified in other Sections. B. Paint exposed surfaces, except where the paint schedules indicate that a surface or material is not to be painted or is to remain natural. If the paint schedules do not specifically mention an item or a surface, paint the item or surface the same as similar adjacent materials or surfaces whether or not schedules indicate colors. If the schedules do not indicate color or finish, the Architect will select from standard colors and finishes available. 1. Painting includes field painting of exposed bare and covered pipes and ducts (including color-coding), hangers, exposed steel and ironwork, and primed metal surfaces of mechanical and electrical equipment. C. Do not paint prefinished items, concealed surfaces, finished metal surfaces, operating parts, and labels. 1.3 DEFINITIONS A. General: Standard coating terms defined in ASTM D 16 apply to this Section. 1. Flat refers to a lusterless or matte finish with a gloss range below 15 when measured at an 85-degree meter. 2. Eggshell refers to low-sheen finish with a gloss range between 5 and 20 when measured at a 60-degree meter. 3. Satin refers to low-sheen finish with a gloss range between 15 and 35 when measured at a 60-degree meter. 4. Semigloss refers to medium-sheen finish with a gloss range between 30 and 65 when measured at a 60-degree meter. 5. Full gloss refers to high-sheen finish with a gloss range more than 65 when measured at a 60-degree meter. 1.4 SUBMITTALS PAINTING 09900- 1 HNTB #36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Product Data: For each paint system specified. Include block fillers and primers. 1. Material List: Provide an inclusive list of required coating materials. Indicate each material and cross-reference specific coating, finish system, and application. Identify each material by manufacturer's catalog number and general classification. 2. Manufacturer's Information: Provide manufacturer's technical information, including label analysis and instructions for handling, storing, and applying each coating material proposed for use. 3. Certification by the manufacturer that products supplied comply with local regulations controlling use of volatile organic compounds(VOCs)including the SCAQMD. B. Samples for Verification: Of each color and material to be applied, with texture to simulate actual conditions, on representative Samples of the actual substrate. 1. Provide stepped Samples, defining each separate coat, including block fillers and primers. Use representative colors when preparing Samples for review. Resubmit until required sheen, color, and texture are achieved. 2. Provide a list of materials and applications for each coat of each sample. Label each sample for location and application. 1.5 QUALITY ASSURANCE A. Applicator Qualifications: Engage an experienced applicator who has completed painting system applications similar in material and extent to that indicated for this Project with a record of successful in-service performance. B. Source Limitations: Obtain block fillers, primers, and undercoat materials for each coating system from the same manufacturer as the finish coats. 1.6 DELIVERY, STORAGE,AND HANDLING A. Deliver materials to the Project Site in manufacturer's original, unopened packages and containers bearing manufacturer's name and label, and the following information: 1. Product name or title of material. 2. Product description (generic classification or binder type). 3. Manufacturer's stock number and date of manufacture. 4. Contents by volume, for pigment and vehicle constituents. 5. Thinning instructions. 6. Application instructions. 7. Color name and number. 8. VOC content. B. Store materials not in use in tightly covered containers in a well-ventilated area at a minimum ambient temperature of 45 deg F (7 deg C). Maintain containers used in storage in a clean condition,free of foreign materials and residue. 1.7 PROJECT CONDITIONS A. Apply water-based paints only when the temperature of surfaces to be painted and surrounding air temperatures are between 50 and 90 deg F (10 and 32 deg C). PAINTING 09900-2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10130/02 B. Apply solvent-thinned paints only when the temperature of surfaces to be painted and surrounding air temperatures are between 45 and 95 deg F (7.2 and 35 deg C). C. Do not apply paint in rain, fog, or mist; or when the relative humidity exceeds 85 percent; or at temperatures less than 5 deg F (3 deg C)above the dew point; or to damp or wet surfaces. 1. Painting may continue during inclement weather if surfaces and areas to be painted are enclosed and heated within temperature limits specified by manufacturer during application and drying periods. PART2-PRODUCTS 2.1 MANUFACTURERS A. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, products listed in the paint schedules. B. Products: Subject to compliance with requirements, provide one of the products in the paint schedules. C. Manufacturers Names: The following manufacturers are referred to in the paint schedules by use of shortened versions of their names, which are shown in parentheses: 1. Benjamin Moore&Co. (Moore). 2. Dunn Edwards 3. Sherwin-Williams Co. (S-W). 4. ICI. 5. Frazee. 2.2 PAINT MATERIALS, GENERAL A. Material Compatibility: Provide block fillers, primers, undercoats, and finish-coat materials that are compatible with one another and the substrates indicated under conditions of service and application, as demonstrated by manufacturer based on testing and field experience. B. Material Quality: Provide manufacturer's best-quality paint material of the various coating types specified. Paint-material containers not displaying manufacturer's product identification will not be acceptable. 1. Proprietary Names: Use of manufacturer's proprietary product names to designate colors or materials is not intended to imply that products named are required to be used to the exclusion of equivalent products of other manufacturers. Furnish manufacturer's material data and certificates of performance for proposed substitutions. C. Colors: Provide color selections made by the Architect. PART 3- EXECUTION 3.1 EXAMINATION PAINTING 09900-3 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Examine substrates, areas, and conditions, with the Applicator present, under which painting will be performed for compliance with paint application requirements. 1. Do not begin to apply paint until unsatisfactory conditions have been corrected and surfaces receiving paint are thoroughly dry. 2. Start of painting will be construed as the Applicator's acceptance of surfaces and conditions within a particular area. B. Coordination of Work: Review other Sections in which primers are provided to ensure compatibility of the total system for various substrates. On request, furnish information on characteristics of finish materials to ensure use of compatible primers. 1. Notify the Architect about anticipated problems using the materials specified over substrates primed by others. 3.2 PREPARATION A. General: Remove hardware and hardware accessories, plates, machined surfaces, lighting fixtures, and similar items already installed that are not to be painted. If removal is impractical or impossible because of the size or weight of the item, provide surface-applied protection before surface preparation and painting. 1. After completing painting operations in each space or area, reinstall items removed using workers skilled in the trades involved. B. Cleaning: Before applying paint or other surface treatments, clean the substrates of substances that could impair the bond of the various coatings. Remove oil and grease before cleaning. 1. Schedule cleaning and painting so dust and other contaminants from the cleaning process will not fall on wet, newly painted surfaces. C. Surface Preparation: Clean and prepare surfaces to be painted according to manufacturer's written instructions for each particular substrate condition and as specified. 1. Provide barrier coats over incompatible primers or remove and reprime. 2. Cementitious Materials: Prepare concrete, concrete masonry block, cement plaster, and mineral-fiber-reinforced cement panel surfaces to be painted. Remove efflorescence, chalk, dust, dirt, grease, oils, and release agents. Roughen as required to remove glaze. If hardeners or sealers have been used to improve curing, use mechanical methods of surface preparation. a. Use abrasive blast-cleaning methods if recommended by paint manufacturer. b. Determine alkalinity and moisture content of surfaces by performing appropriate tests. If surfaces are sufficiently alkaline to cause the finish paint to blister and burn, correct this condition before application. Do not paint surfaces where moisture content exceeds that permitted in manufacturer's written instructions. C. Clean concrete floors to be painted with a 5 percent solution of muriatic acid or other etching cleaner. Flush the floor with clean water to remove acid, neutralize with ammonia, rinse, allow to dry, and vacuum before painting. PAINTING 09900-4 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 3. Wood: Clean surfaces of dirt, oil, and other foreign substances with scrapers, mineral spirits, and sandpaper, as required. Sand surfaces exposed to view smooth and dust off. a. Scrape and clean small, dry, seasoned knots, and apply a thin coat of white shellac or other recommended knot sealer before applying primer. After priming, fill holes and imperfections in finish surfaces with putty or plastic wood filler. Sand smooth when dried. b. Prime, stain, or seal wood to be painted immediately on delivery. Prime edges, ends, faces, undersides, and backsides of wood, including cabinets, counters, cases, and paneling. C. When transparent finish is required, backprime with spar varnish. d. Backprime paneling on interior partitions where masonry, plaster, or other wet wall construction occurs on backside. e. Seal tops, bottoms, and cutouts of unprimed wood doors with a heavy coat of varnish or sealer immediately on delivery. 4. Ferrous Metals: Clean ungalvanized ferrous-metal surfaces that have not been shop coated; remove oil, grease, dirt, loose mill scale, and other foreign substances. Use solvent or mechanical cleaning methods that comply with the Steel Structures Painting Council's (SSPC) recommendations. a. Blast steel surfaces clean as recommended by paint system manufacturer and according to requirements of SSPC-SP 10. b. Treat bare and sandblasted or pickled clean metal with a metal treatment wash coat before priming. C. Touch up bare areas and shop-applied prime coats that have been damaged. Wire-brush, clean with solvents recommended by paint manufacturer, and touch up with the same primer as the shop coat. 5. Galvanized Surfaces: Clean galvanized surfaces with nonpetroleum-based solvents so surface is free of oil and surface contaminants. Remove pretreatment from galvanized sheet metal fabricated from coil stock by mechanical methods. D. Materials Preparation: Mix and prepare paint materials according to manufacturer's written instructions. 1. Maintain containers used in mixing and applying paint in a clean condition, free of foreign materials and residue. 2. Stir material before application to produce a mixture of uniform density. Stir as required during application. Do not stir surface film into material. If necessary, remove surface film and strain material before using. 3. Use only thinners approved by paint manufacturer and only within recommended limits. E. Tinting: Tint each undercoat a lighter shade to simplify identification of each coat when multiple coats of the same material are applied. Tint undercoats to match the color of the finish coat, but provide sufficient differences in shade of undercoats to distinguish each separate coat. 3.3 APPLICATION A. General: Apply paint according to manufacturer's written instructions. Use applicators and techniques best suited for substrate and type of material being applied. 1. Paint colors, surface treatments, and finishes are indicated in the schedules. PAINTING 09900-5 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 2. Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions detrimental to formation of a durable paint film. 3. Provide finish coats that are compatible with primers used. 4. The term "exposed surfaces" includes areas visible when permanent or built-in fixtures, convector covers, covers for finned-tube radiation, grilles, and similar components are in place. Extend coatings in these areas, as required, to maintain the system integrity and provide desired protection. 5. Paint surfaces behind movable equipment and furniture the same as similar exposed surfaces. Before the final installation of equipment, paint surfaces behind permanently fixed equipment or furniture with prime coat only. 6. Paint interior surfaces of ducts with a flat, nonspecular black paint where visible through registers or grilles. 7. Paint back sides of access panels and removable or hinged covers to match exposed surfaces. 8. Finish exterior doors on tops, bottoms, and side edges the same as exterior faces. 9. Finish interior of wall and base cabinets and similar field-finished casework to match exterior. 10. Sand lightly between each succeeding enamel or varnish coat. B. Scheduling Painting: Apply first coat to surfaces that have been cleaned, pretreated, or otherwise prepared for painting as soon as practicable after preparation and before subsequent surface deterioration. 1. The number of coats and the film thickness required are the same regardless of application method. Do not apply succeeding coats until the previous coat has cured as recommended by the manufacturer. If sanding is required to produce a smooth, even surface according to manufacturer's written instructions, sand between applications. 2. Omit primer on metal surfaces that have been shop primed and touchup painted. 3. If undercoats, stains, or other conditions show through final coat of paint, apply additional coats until paint film is of uniform finish, color, and appearance. Give special attention to ensure edges, corners, crevices, welds, and exposed fasteners receive a dry film thickness equivalent to that of flat surfaces. 4. Allow sufficient time between successive coats to permit proper drying. Do not recoat surfaces until paint has dried to where it feels firm, does not deform or feel sticky under moderate thumb pressure, and where application of another coat of paint does not cause the undercoat to lift or lose adhesion. C. Application Procedures: Apply paints and coatings by brush, roller, spray, or other applicators according to manufacturer's written instructions. 1. Brushes: Use brushes best suited for the type of material applied. Use brush of appropriate size for the surface or item being painted. 2. Rollers: Use rollers of carpet, velvet back, or high-pile sheep's wool as recommended by the manufacturer for the material and texture required. 3. Spray Equipment: Use airless spray equipment with orifice size as recommended by the manufacturer for the material and texture required. D. Minimum Coating Thickness: Apply paint materials no thinner than manufacturer's recommended spreading rate. Provide the total dry film thickness of the entire system as recommended by the manufacturer. 3.4 CLEANING PAINTING 09900-6 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Cleanup: At the end of each workday, remove empty cans, rags, rubbish, and other discarded paint materials from the site. 1. After completing painting, clean glass and paint-spattered surfaces. Remove spattered paint by washing and scraping. Be careful not to scratch or damage adjacent finished surfaces. 3.5 PROTECTION A. Protect work of other trades, whether being painted or not, against damage by painting. Correct damage by cleaning, repairing or replacing, and repainting, as approved by Architect. B. Provide "Wet Paint" signs to protect newly painted finishes. Remove temporary protective wrappings provided by others to protect their work after completing painting operations. 1. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces. Comply with procedures specified in PDCA P1. 3.6 EXTERIOR PAINT SCHEDULE A. Concrete Masonry Units: Provide the following finish systems over exterior concrete masonry units: 1. Semigloss,Acrylic-Enamel Finish: 2 finish coats over a block filler and a primer. a. Block Filler: High-performance, latex block filler applied at spreading rate recommended by the manufacturer to achieve a total dry mill thickness of not less than 4.0 mils (0.102 mm). 1) Devoe: 52902 Bloxfil 200 Interior/Exterior Latex Block Filler. 2) Fuller: 280-00 Interior/Exterior Latex Block Filler. 3) Glidden: 5317 Ultra-Hide Block Filler Latex Interior- Exterior. 4) Moore: Moorcraft Interior& Exterior Block Filler#173. 5) PPG: 6-7 Speedhide Interior/Exterior Masonry Latex Block Filler. 6) P& L: Z/F 98 Pro-Hide Plus Block Filler. b. Primer: Alkali-resistant, exterior, acrylic-latex primer applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.4 mils (0.036 mm). 1) Devoe: Primer not required over block filler. 2) Fuller: Primer not required over block filler. 3) Glidden: Primer not required over block filler. 4) Moore: Primer not required over block filler. 5) PPG: Primer not required over block filler. 6) P&L: Z/F 1001 Suprime "t" Multi-Purpose 100 Percent Acrylic Primer. PAINTING 09900-7 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 C. First and Second Coats: Semigloss, exterior, acrylic-latex enamel applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 2.4 mils (0.061 mm). 1) Devoe: 17XX Wonder-Shield Semi-Gloss Exterior Acrylic Latex House and Trim Paint. 2) Fuller: 664-XX Weather King II Semi-Gloss House & Trim Paint. 3) Glidden: 6600 Series Spred Ultra Exterior Gloss Latex House &Trim Paint. 4) Moore: MoorGlo Latex House &Trim Paint#096. 5) PPG: 78 Line Sun-Proof Semi-Gloss Acrylic Latex House and Trim Paint. 6) P & L: Z/F 3100 Series Aqua Royal Latex House & Trim Finish. B. Ferrous Metal: Provide the following finish systems over exterior ferrous metal. Primer is not required on shop-primed items. 1. Semigloss,Acrylic-Enamel Finish: 2 finish coats over a rust-inhibitive primer. a. Primer: Rust-inhibitive metal primer applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.3 mils (0.033 mm). 1) Devoe: 13101 Mirrolac Rust Penetrating Metal Primer. 2) Fuller: 621-04 Blox-Rust Alkyd Metal Primer. 3) Glidden: 5205 Glid-Guard Tank&Structural Primer, Red. 4) Moore: IronClad Retardo Rust-Inhibitive Paint#163. 5) PPG: 6-208 Speedhide Interior/Exterior Rust Inhibitive Steel Primer. 6) P&L: S/D 1009 Suprime "9" Interior/Exterior Alkyd Metal Primer. b. First and Second Coats: Semigloss, exterior, acrylic-latex enamel applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 2.6 mils (0.066 mm). 1) Devoe: 17XX Wonder-Shield Semi-Gloss Exterior Acrylic Latex House and Trim Paint. 2) Fuller: 664-XX Weather King II Semi-Gloss House & Trim Paint. 3) Glidden: 6600 Series Spred Ultra Exterior Gloss Latex House&Trim Paint. 4) Moore: MoorGlo Latex House&Trim Paint#096. 5) PPG: 78 Line Sun-Proof Semi-Gloss Acrylic Latex House and Trim Paint. 6) P &L: Z/F 3100 Series Aqua Royal Latex House & Trim Finish. PAINTING 09900-8 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10130/02 C. Zinc-Coated Metal: Provide the following finish systems over exterior zinc-coated (galvanized) metal surfaces: 1. Semigloss,Acrylic-Enamel Finish: 2 finish coats over a galvanized metal primer. a. Primer: Galvanized metal primer applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.2 mils (0.031 mm). 1) Devoe: 8502/8520 Mirrolac-WB Interior/Exterior Waterborne Flat DTM Primer and Finish. 2) Fuller: 621-05 Blox-Rust Latex Metal Primer. 3) Glidden: 5205 Glid-Guard Tank&Structural Primer, Red. 4) Moore: IronClad Galvanized Metal Latex Primer#155. 5) PPG: 90-709 Pitt-Tech One Pack Interior/Exterior Primer/Finish DTM Industrial Enamel. 6) P & L: Z/F 1003 Suprime "3" Interior/Exterior Latex Metal Primer. b. First and Second Coats: Semigloss, exterior, acrylic-latex enamel applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 2.6 mils (0.066 mm). 1) Devoe: 17XX Wonder-Shield Semi-Gloss Exterior Acrylic Latex House and Trim Paint. 2) Fuller: 664-XX Weather King II Semi-Gloss House & Trim Paint. 3) Glidden: 6600 Series Spred Ultra Exterior Gloss Latex House&Trim Paint. 4) Moore: MoorGlo Latex House &Trim Paint#096. 5) PPG: 78 Line Sun-Proof Semi-Gloss Acrylic Latex House and Trim Paint. 6) P&L: Z/F 3100 Series Aqua Royal Latex House & Trim Finish. 3.8 INTERIOR PAINT SCHEDULE A. Gypsum Board: Provide the following finish systems over interior gypsum board surfaces: 1. Flat Acrylic Finish: 2 finish coats over a primer. a. Primer: Latex-based, interior primer applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.2 mils (0.031 mm). 1) Devoe: 50801 Wonder-Tones Interior Vinyl Latex Primer- Sealer. 2) Fuller: 220-20 Pro-Tech Interior Latex Wall Primer and Sealer. 3) Glidden: 5111 Spred Ultra Latex Primer-Sealer. PAINTING 09900-9 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 4) Moore: Regal First Coat Interior Latex Primer & Underbody#216. 5) PPG: 17-10 Quick-Drying Interior Latex Primer-Sealer. 6) P &L: Z/F 1004 Suprime"4" Interior Latex Wall Primer. b. First and Second Coats: Flat, acrylic-latex-based, interior paint applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 2.5 mils (0.064 mm). 1) Devoe: 36XX Wonder-Tones Interior Latex Flat Wall Paint. 2) Fuller: 202-XX Acrylic Latex Wall Paint. 3) Glidden: 4000 Series Spred Ultra Flat Latex Wall and Trim Paint. 4) Moore: Regal Wall Satin#215. 5) PPG: 80 Line Wallhide Interior Wall Flat Latex Paint. 6) P & L: Z/F 2000 Series Vapex Latex Flat Wall Finish. 2. Semigloss,Alkyd-Enamel Finish: 2 finish coats over a primer at the new ADA restrooms. a. Primer: Latex-based, interior primer applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.2 mils (0.031 mm). 1) Devoe: 50801 Wonder-Tones Interior Vinyl Latex Primer- Sealer. 2) Fuller: 220-20 Pro-Tech Interior Latex Wall Primer and Sealer. 3) Glidden: 5111 Spred Ultra Latex Primer-Sealer. 4) Moore: Regal First Coat Interior Latex Primer & Underbody#216. 5) PPG: 17-10 Quick-Dry Interior Latex Primer-Sealer. 6) P & L: Z/F 1001 Suprime 1" 100 Percent Acrylic Multi- Purpose Primer. 7) S-W: ProMar 200 Interior Latex Wall Primer B28W200. b. First and Second Coats: Odorless, semigloss, alkyd, interior enamel applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 2.6 mils (0.066 mm). 1) Devoe: 26XX Velour Interior Alkyd Semi-Gloss Enamel. 2) Fuller: 206-XX Interior Alkyd Semi-Gloss Enamel. 3) Glidden: UH 8400 Ultra Traditional Alkyd Semi-Gloss Enamel. 4) Moore: Moore's Alkyd Dulamel#207. 5) PPG: 27 Line Wallhide Low Odor Interior Enamel Wall and Trim Semi-Gloss Oil. 6) P&L: S/D 5700 Cellu-Tone Alkyd Satin Enamel. 7) S-W: Classic 99 Interior Alkyd Semi-Gloss Enamel A-40 Series. 17-10 Quick-Dry Interior Latex Primer-Sealer. 6) P&L: Z/F 1001 Suprime "1" 100 Percent Acrylic Multi- Purpose Primer. PAINTING 09900- 10 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 7) S-W: ProMar 200 Interior Latex Wall Primer B28W200. B. Ferrous Metal: Provide the following finish systems over ferrous metal: 1. Semigloss, Acrylic-Enamel Finish: One finish coat over an enamel undercoater and a primer. a. Primer: Quick-drying, rust-inhibitive, alkyd-based or epoxy-metal primer, as recommended by the manufacturer for this substrate, applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.5 mils (0.038 mm). 1) Devoe: 13101 Mirrolac Rust Penetrating Metal Primer. 2) Fuller: 621-04 Blox-Rust Alkyd&Structural Metal Primer, 3) Glidden: 5207 Glid-Guard Tank&Structural Primer, White. 4) Moore: IronClad Retardo Rust-Inhibitive Paint#163. 5) PPG: 6-208 Speedhide Interior/Exterior Rust Inhibitive Steel Primer. 6) P& L: S 4551 Tech-Gard High Performance Rust Inhibitor Primer. b. Undercoat: Alkyd, interior enamel undercoat or semigloss, acrylic-latex, interior enamel, as recommended by the manufacturer for this substrate, applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.3 mils (0.033 mm). 1) Devoe: 39XX Wonder-Tones Semi-Gloss Interior Latex Enamel. 2) Fuller: 220-07 Interior Alkyd Enamel Undercoat. 3) Glidden: 8200 Series Spred Ultra Latex Semi-Gloss Enamel. 4) Moore: Moore's Alkyd Enamel Underbody#217. 5) PPG: 6-6 Speedhide Interior Quick-Drying Enamel Undercoater. 6) P & L: Z/F 4100 Series Accolade Interior Semi-Gloss. C. Finish Coat: Semigloss, acrylic-latex, interior enamel applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.3 mils (0.033 mm). 1) Devoe: 39XX Wonder-Tones Semi-Gloss Interior Latex Enamel. 2) Fuller: 214-XX AA Enamel Interior Acrylic Latex Semi- Gloss Enamel. 3) Glidden: 8200 Series Spred Ultra Latex Semi-Gloss Enamel. 4) Moore: Moore's Regal AquaGlo Vinyl-Acrylic Latex Enamel#333. 5) PPG: 88-110 Satinhide Interior Enamel Wall & Trim Lo- Lustre Semi-Gloss Latex. PAINTING 09900-11 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 6) P &L: Z/F 4100 Series Accolade Interior Semi-Gloss. 2) Fuller: 110-XX Fullerglo Alkyd Semi-Gloss Enamel. 3) Glidden: UH 8400 Ultra Traditional Alkyd Semi-Gloss Enamel. 4) Moore: Satin Impervo#235. 5) PPG: 27 Line Wallhide Low Odor Interior Enamel Wall and Trim Semi-Gloss Oil. 6) P & L: S/D 5700 Cellu-Tone Alkyd Satin Enamel. 7) S-W: Classic 99 Interior/Exterior Semi-Gloss Alkyd Enamel A-40 Series. C. Zinc-Coated Metal: Provide the following finish systems over zinc-coated metal: 1. Semigloss,Acrylic-Enamel Finish: 2 finish coats over a primer. a. Primer: Galvanized metal primer applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.2 mils (0.031 mm). 1) Devoe: 13201 Mirrolac Galvanized Metal Primer. 2) Fuller: 621-05 Blox-Rust Latex Metal Primer. 3) Glidden: 5207 Glid-Guard Tank&Structural Primer,White. 4) Moore: IronClad Galvanized Metal Latex Primer#155. 5) PPG: 90-709 Pitt-Tech One Pack Interior/Exterior Primer/Finish DTM Industrial Enamel. 6) P&L: Z/F 1003 Suprime "3" Interior/Exterior Latex Metal Primer. b. First and Second Coats: Semigloss, acrylic-latex, interior enamel applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 2.6 mils (0.066 mm). 1) Devoe: 39XX Wonder-Tones Semi-Gloss Interior Latex Enamel. 2) Fuller: 214-XX AA Enamel Interior Acrylic Latex Semi- Gloss Enamel. 3) Glidden: 8200 Series Spred Ultra Latex Semi-Gloss Enamel. 4) Moore: Moore's Regal AquaGlo Vinyl-Acrylic Latex Enamel#333. 5) PPG: 88-110 Satinhide Interior Enamel Wall &Trim Lo- Lustre Semi-Gloss Latex. 6) P & L: Z/F 4100 Series Accolade Interior Semi-Gloss. Metal Latex Primer#155. 5) PPG: 90-709 Pitt-Tech One Pack Interior/Exterior Primer/Finish DTM Industrial Enamel. 6) P& L: Z/F 1003 Suprime "3" Interior/Exterior Latex Metal Primer. 7) S-W: Galvite Paint B50W3. PAINTING 09900- 12 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 b. Undercoat: Alkyd, interior enamel undercoat or semigloss, interior, alkyd-enamel finish coat, as recommended by the manufacturer for this substrate, applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.2 mils (0.031 mm). 1) Devoe: 26XX Velour Interior Alkyd Semi-Gloss Enamel. 2) Fuller: 220-07 Interior Alkyd Enamel Undercoat. 3) Glidden: UH 8400 Series Spired Ultra Traditional Alkyd Semi-Gloss Enamel. 4) Moore: Moore's Alkyd Enamel Underbody#217. 5) PPG: 6-6 Speedhide Interior Quick-Drying Enamel Undercoater. 6) P& L: S/D 1011 Suprime 11" Interior Alkyd Wood Primer. 7) S-W: ProMar 200 Interior Alkyd Semi-Gloss Enamel B34W200. C. Finish Coat: Odorless, semigloss, alkyd, interior enamel applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.4 mils (0.036 mm). 1) Devoe: 26XX Velour Interior Alkyd Semi-Gloss Enamel. 2) Fuller: 110-XX Fullerglo Alkyd Semi-Gloss Enamel. 3) Glidden: UH 8400 Ultra Traditional Alkyd Semi-Gloss Enamel. 4) Moore: Satin Impervo#235. 5) PPG: 27 Line Wallhide Low Odor Interior Enamel Wall and Trim Semi-Gloss Oil. 6) P& L: S/D 5700 Cellu-Tone Alkyd Satin Enamel. 7) S-W: Classic 99 Interior Alkyd Semi-Gloss Enamel A-40 Series. END OF SECTION 09900 PAINTING 09900- 13 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10130/02 SECTION 10265- IMPACT-RESISTANT WALL PROTECTION PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1. Corner guards. B. Related Sections include the following: 1. Division 5 Section "Metal Fabrications" for steel angle and bent plate corner guards fabricated from rolled metal. 2. Division 6 Section 'Rough Carpentry" for wood blocking and grounds for surface- mounted wall guards, corner guards, and handrails. 3. Division 8 Section "Door Hardware"for stainless-steel mop, kick, armor, and push plates. C. Alternates: Refer to Division 1 Section "Alternates" for description of Work in this Section affected by alternates. 1.3 SUBMITTALS A. Samples for Verification: Submit 12" long samples of the corner guards as shown on the drawings (see detail 9/A8.20) and the method of adhering the unit. 1.4 QUALITY ASSURANCE A. Installer Qualifications: An experienced installer who has completed installation of impact- resistant wall protection system components similar in material, design, and extent to that indicated for this Project and whose work has resulted in construction with a record of successful in-service performance. B. Manufacturer Qualifications: A firm experienced in manufacturing impact-resistant wall protection system components similar to those required for this Project and with a record of successful in-service performance. IMPACT-RESISTANT WALL PROTECTION 10265- 1 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 PART 2- PRODUCTS 2.1 MANUFACTURERS A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering impact-resistant wall protection system products that may be incorporated into the Work include all reputable manufacturers engaged in the fabrication of stainless steel corner guards operating in the State of California. 2.2 MATERIALS A. Stainless-Steel Plate:Type 304, minimum 0.0625 inch (1.6 mm). B. Adhesive: Type recommended by the manufacturer for use with material on the substrate indicated. 2.3 CORNER GUARDS A. Stainless-Steel Corner Guards: Paper-covered, satin-finish, 0.0625-inch (1.6-mm) minimum, stainless-steel sheet corner guards; height as indicated. Provide 90-degree turn, unless otherwise indicated; and formed edges. Wing size, mounting method and corner radius shall be as shown on the drawing. 2.4 STAINLESS-STEEL FINISHES A. Bright, Directional Polish: No. 4 finish. 1. Remove tool and die marks and stretch lines or blend into finish. 2. Grind and polish surfaces to produce uniform, directionally textured, polished finish indicated,free of cross scratches. Run grain with long dimension of each piece. PART 3- EXECUTION 3.1 EXAMINATION A. Examine areas and conditions in which impact-resistant wall protection system components and impact-resistant wall covering materials will be installed. 1. Complete finishing operations, including painting, before installing impact-resistant wall protection system components. 3.2 PREPARATION IMPACT-RESISTANT WALL PROTECTION 10265-2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. General: Before installation, clean substrate to remove dust, debris, and loose particles. 3.3 INSTALLATION A. Install impact-resistant wall protection system components level, plumb, and true to line without distortions. 1. Do not use materials with chips, cracks, voids, stains, or other defects that might be visible in the finished Work. 3.4 CLEANING A. Remove excess adhesive using methods and materials recommended by the manufacturer. B. Remove surplus materials, rubbish, and debris, resulting from installation, on completion of work and leave installation areas in neat, clean condition. END OF SECTION 10265 IMPACT-RESISTANT WALL PROTECTION 10265-3 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 SECTION 10660—OPERABLE WALLS PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes surface preparation and field insalation of manually operable wall panels in the meeting rooms. Operable walls are to be hinged in pairs, center track,top supported and stored locally. B. Panel Facing Material: Fabric to match the existing in meeting rooms. C. Sound Transmission Classification (STC): Provide and install operable wall units capable of achieving a minimum laboratory test rating of STC-48 when tested in accordance with ASTM E90 without the facing material. 1.3 SUBMITTALS A. Product Data: Submit manufacturer's technical dataq and installation instructions. B. Certifications: Submit certifications from an independent testing laboratory that the product meets the specifications for STC rating,fire rating and flame spread classification. C. Shop Drawings: Submit shop drawings for fabrication and erection, including plans, elevations, large scale details, anchorages, and accessory items. Provide location template drawings for items supported or acchored to the structure permenently. D. Maintenance and Care Manuals: Covering the operable partition and all manufactured accessories. 1.4 QUALITY ASSURANCE A. Installer Qualifications: An experienced installer who has a record of successful in-service performance. 1.5 DELIVERY, STORAGE,AND HANDLING A. Deliver operable partitions to the Project site in the manufacturer's original, unopened packages and containers bearing manufacturer's name and label. PART2-PRODUCTS OPERABLE WALLS 10660-1 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 2.1 MANUFACTURERS A. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, the Classic 7000 Series Model 7600 Omni-directional by Hufcor(to match the existing meeting rooms) or an approved equal. B. Operation: Operable walls shall consist of top supported, manually operated, continuously hinged rolling panels equipped with two 4-wheel ball bearing trolleys with automatic retractable floor seals. C. Hinges: Continuously hinged panels shall be of the manufacturer's standard design. D. Track: Type 53 Omni-Directional to 1500 lbs. Shall be suspended by all-thread steel rods from the structure above. Track system shall provide a captive and"free-flow" method of panel travel through 6" radius turns at every change in track direction and through the stacking wyes. Panels shall readily accumulate of their respective storage locations as indicated on the drawings. E. Trolleys: Panels shall be supported by 4-wheel radial type steel ball bearing wheels. Trolley pendent bolt shall be attached to the panelo utilizing steel reinforced plates welded to the top panel trame rail. Steel trolleys running on aluminum track are not acceptable. F. Perimeter Sound Seals: Top seal shall be continuous contact vinyl fin sweep seals. Bottom seals shall be automatically actuated by movement of one panel against another without face cranks. PART 3- EXECUTION 3.1 EXAMINATION A. Examine substrates and conditions,with the installer present, under which moveable panels will be installed,for compliance with manufacturer's requirements. 3.2 PREPARATION General: Installation shall be performed under the supervision of factory-trained mechanics in strict accordance with the manufacturer's printed installation manual to ensure satisfactory operation. 3.3 INSTALLATION Each partition will be tested in accordance with ASTM E336-76 using the "reverberant field" procedure inand full octive bands (not one third bands). Field Sound Transmission Class (FSTC) ratings will be determined in accordance with ASTM E413-73. In each test the minimum rating shall be STC 40, 3.4 CLEANING OPERABLE WALLS 10660-2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30102 A. Cleanup: At the end of each workday, remove rubbish from the Project site. 3.6 PROTECTION A. Protect work of other trades, whether being laminated or not, against damage from fiberglass reinforced panel operation. Correct damage by cleaning, repairing, and replacing as approved by the Architect. END OF SECTION 01160 OPERABLE WALLS 10660-3 Client#: 32818 TRIMA A 0RD. CERTIFICATE OF LIABILITY INSURANCE 1DATE 2/23/02 D/YV) 2/23/02 PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Mastors &Servant, Ltd. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE 5700 Post Road HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. P.O. Box 1158 East Greenwich, RI 02818 INSURERS AFFORDING COVERAGE INSURED INSURER A: American and Foreign Insurance Co. TriMark USA, Inc. I INSURER B. Royal Insurance Company of America TriMark Raygal, Inc. INSURER c National Union Fire Ins. Co. (AIG) 2719 White Road INSURER D: Irvine, CA 92614 INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS ILTR TYPE OF INSURANCE POLICY NUMBER POLICVMM/EFFECTIVE POLICY EXPIRATION DATE DD/YY DATE MM/DD/YY LIMITS A �GENERAL LIABILITY A2SVO417460000 07/01/02 07/01/03 EACH OCCURRENCE $1000000 IX COMMERCIAL GENERAL LIABILITY FIRE DAMAGE(Any on.11re) $500, 00 —� CLAIMS MADE DX OCCUR ME ON (Any one person) $10 , PERSONAL&ADV INJURY $1,000,000 QQQ GENERAL AGGREGATE $2,000,000 GENT AGGREGATE LIM ITAPPLIES PER: PRODUCTS -COMP/OPAGG $2,000,000 POLICY i JE� LOC B AUTOMOBILE LIABILITY P2ST1122180002 07/01/02 07/01/03 COMBINED SINGLE LIMIT ANY AUTO (Ea accldenl) $1,000,000 ALL OWNED AUTOS I BODILY INJURY $ _ SCHEDULED AUTOS (Per person) HIRED AUTOS F_ BODILY INJURY $ NON-OWNED AUTOS (Per accldenl) PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY-EA ACCIDENT S __,ANY AUTO OTHER THAN EA ACC $ AUTO ONLY AGO $ C EXCESS LIABILITY �BE1393049 07/01/02 07/01/03 EACH OCCURRENCE $10000000 X OCCUR CLAIMS MADE AGGREGATE $10 000,000 DEDUCTIBLE S X RETENTION $10,000 S WC B WORKERS COMPENSATION AND 03P2CS396064 !07/01/02 07/01/03 X ORY IMIU- XOTH- LT V LIMITS ER EMPLOYERS'LIABILITY E.L.EACH ACCIDENT $1,000,000 I EL DISEASE-EA EMPLOYEE $1,000,000 EL DISEASE-POLICY LIMIT $1,000,000 OTHER A Install. Floater A2SVO417460000 07/01/02 07/01/03 In Storage: $500,000 In Transit: $500,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS *Except 10 days if nonpayment. City Project#02-19-28: Phase I Convention Center Expansion - Kitchen Equipment. General Liability Additional Insured as per Royal Form GC 0066 (01/96): City of Palm Springs and Turner Construction Company. CERTIFICATE HOLDER ADDmoNALINSUREDTNSURERLETTER: CANCELLATION SHOULD ANYOFTHE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION City of Palm Springs DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TOMAIL3D* DAYSWRITTEN Department of Procurement and Contracting NOTICETOTHE CERTIFICATE HOLDERNAMEDTOTHELEFr,BUTFAILURE TODOSOSHALL 3200 Tahquitz Canyon Way IMPOSE NO OBLIGATION OR LIABILITY OF ANYKIND UPON THE INSURE R,ITS AGENTS OR Palm Springs, CA 92262 REPRESENTATIVES. AUTHORIZEDREPRESENTATI E ACORD 25-S(7/97)l of 2 #S138671/M138105 SMS © ACORD CORPORATION 1988 IMPORTANT If the certificate holder is an ADDITIONAL INSURED,the policy(ies) must be endorsed. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on this certificate does not confer rights to the certificate holder in lieu of such endorsement(s). DISCLAIMER The Certificate of Insurance on the reverse side of this form does not constitute a contract between the issuing insurer(s), authorized representative or producer, and the certificate holder, nor does it affirmatively or negatively amend, extend or alter the coverage afforded by the policies listed thereon. ACORD25-S(7197)2 of 2 #S138671/M138105 (2) Giving directions or instructions, or Paragraph 4 is revised to increase the limit failing to give them, if that is the ,,,r ,.- - of earnings from $250 a day to $300 a primary cause of the injury or day. damage; 12. ADDITIONAL INSUREDS - BY CONTRACT, c. Under which the insured, if an architect, AGREEMENT OR PERMIT engineer or surveyor,assumes liabililyfor The following is added to SECTION II - WHO IS an injury or damage arising out of the AN INSURED: insured's rendering or failure to render professional services, including those 5. a. Any person or organization you are listed in b. above and supervisory, required by a written contract, agreement inspection, architectural or engineering or permit to name as an insured is an activities. insured but only with respect to liability d. That indemnifies any person or arising out of: organization for damage by fire, lightning 1. "Your work" performed for that or explosion to premises rented or loaned insured at the location designated in to you, the contract, agreement or permit; or 9. PROPERTY DAMAGE LIABILITY - ELEVATOR 2. Premises owned or used by you. AND SIDETRACK AGREEMENTS b. This insurance does hot apply unless the Under SECTION I, COVERAGE A., ITEM 2, contract, agreement or permit is executed EXCLUSIONS, the following applies: prior to the "bodily injury" or "property 1. Paragraphs (3), (4) and (6) of EXCLUSION j. damage". do not apply to"property damage"to property c. This insurance does not apply to the while on or being moved onto or off an rendering of or failure to render any elevator. professional services. 2. Exclusion k. does not apply to: d. This insurance is primary if that is required by the contract, agreement or a. "Your product" while on, being moved permit. onto or off an elevator; or b. Liability assumed under a sidetrack 13. FIRE, LIGHTNING OR EXPLOSION DAMAGE agreement. The last paragraph of SECTION 1, COVERAGE A, This insurance is excess over any other valid and 2. EXCLUSIONS is replaced by the following: collectible insurance available to the insured a. Exclusions c through n do not apply to whether primary, excess or contingent. damage by fire, lightning, or explosion to 10. NON-OWNED WATERCRAFT premises rented to you or temporarily occupied by you with permission of the Under SECTION I COVERAGE A., ITEM 2, owner. A separate limit of insurance applies EXCLUSIONS, Item g., Paragraph (2)(a) is to this coverage as described in LIMITS OF amended as follows: INSURANCE (SECTION III). a. Less that 51 feel long; and Paragraph 6 of SECTION III - LIMITS OF This provision 10 applies to any person, who with INSURANCE is replaced by the following: your consent, either uses or is responsible for 6. Subject to S. above, the most we will pay for the use of a watercra damages because of property damage to This insurance is excess over any other valid and premises rented by you or temporarily collectible insurance available to the insured occupied by you with permission of the owner whether primary, excess or contingent. resulting from fire, lightning or explosion, or any combination of the three, is the greater 11. BAIL BONDS/LOSS OF EARNINGS of: Under SUPPLEMENTARY PAYMENTS - a. $300,000; or COVERAGES A AND B: b. The amount shown next to Fire Damage 1. Paragraph 2 is revised to increase the limit Limit in the Declarations. for the cost of bail bands from $250 to $1,000, and This provision 13 does not apply if Fire Legal Liability coverage is not provided by this policy. GC 0066 0196 Page 3 of 5 B110 A2 SV041746 0000 T001 09252002 P1-00002214 y 14, INCIDENTAL MEDICAL MALPRACTILL >^RILIIY f. products which, after distribution or sale by you, have been labeled or relabeled or The definition of "bodily injury" is amended to or used as a container, part or ingredient of th include injury arising out the rendering any other thing or substance by or for the failure to render, during the policy period,, the vendor. following services: (A) medical, surgical, paramedical, dental, 2• This insurance does not apply to any insured x-ray or nursing service or treatment or vendor from whom you have acquired such the furnishing of food or beverages in products, or any ingredient, part or container, connection therewith; or entering into, accompanying or containing such products. (B) the furnishing or dispensing of drugs or 16. PROPERTY DAMAGE - BORROWED EQUIPMENT medical, dental or surgical supplies or appliances. Under SECTION 1, COVERAGE A., ITEM 2, EXCLUSIONS, the following is added to item j.: This insurance does not apply to any insured engaged in the business or occupation of a. This exclusion does not apply to "property providing any ofthe services described under(A) damage" to borrowed equipment while at a and (B) above except an employee of yours who jobsite and not being used to perform provides medical, paramedical, surgical, dental, operations. x-ray or nursing services. b. This insurance is excess over any other valid 15, ADDITIONAL INSURED -VENDORS and collectible insurance whether primary, If this policy provides Products Liability excess or contingent, or on any other basis. Coverage, WHO IS AN INSURED (SECTION 11) is 17. MOBILE EQUIPMENT REDEFINED amended to include as an insured any Under SECTION V - DEFINITIONS, ITEM 11, vendor you are required by a written contract paragraph f(1)(a)(b)(c) does not apply to self- or agreement to name as an insured, but only propelled vehicles of less than 1,000 pounds with respect to "bodily injury" or "property gross vehicle weight. damage' arising out of"your products"which are 18. ADDITIONAL INSURED - CLUB MEMBERS distributed or sold in the regular course of the vendor's business, subject to the following SECTION 11, WHO IS AN INSURED is amended to additional exclusions: include as an insured employees of the insured 1. The insurance afforded the vendor does not who participate in clubs ororganizations that are apply to: a function of employment and operate with full knowledge and approval of the insured, but only a. "Bodily injury" or "property damage' for with respect to their liability for your activities or which, the vendor is obligated to pay activities they perform on your behalf. damages by reason of the assumption of D DEFENSE COVERAGE FOR liability in a contract or agreement. This 19. LIMITE LIMITEITEES exclusion does not apply to liability for INDEMN damages that the vendor would have in Section 1, COVERAGE A., ITEM 2. Exclusions, the absence of the contractor agreement; exclusion b. Contractual Liability (2) is amended b. any warranty unauthorized by you; as follows: 2 Assumed in a contract or agreement that is c. any physical c hemical change in the ( ) an "insured contract", provided the "bodily product made intentionally by the vendor; injury" or "properly damage" occurs d. repackaging, unless unpacked solely for subsequent to the execution of the contract or the purpose of inspection, demonstration, agreement. Solely for the purposes of liability testing, or the substitution of parts under in an "insured contract", reasonable attorney instructions from the manufacturer, and lees and necessary litigation expenses then repackaged in the original container; incurred by or for a party other than an e. demonstration, installation, servicing or insured are covered under the terms of repair operations, except such operations SUPPLEMENTARY PAYMENTS - COVERAGE performed at the vendor's premises in A AND B, except that the provision that the connection with the sale of the product; insured must also be named is waived, provided: GC 0066 0196 Page 4 of 5 Client#: 32818 TRIMA AeORD. CERTIFICA k OF LIABILITY INSU NCE os;2s,tsa°"""Y' PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Masters &Servant, Ltd. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE 5700 Post Road HOLDER.THIS CERTIFICATE DOES NOT AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. P.O. Box 1158 East Greenwich, RI 02818 INSURERS AFFORDING COVERAGE NAIC# INSURED INSURERA American& Foreign Ins CO TriMark USA, Inc. INSURER B: Royal Insurance Company of Amoica. F TriMark Raygal, Inc. INsuRERQ National Union Fire-RISCO 2719 White Road INSURERD: Safeguard Insurance Company C',l Irvine, CA 92614 INSURER E: COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INSR ADD' LTR NSR TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION DATE MM/DD/Y1' DATE MM/DD/YY LIMITS A GENERAL LIABILITY QA2SV0417460 07/01/03 07/01/04 EACH OCCURRENCE $1000000 X COMMERCIAL GENERAL LIABILITY PREMIS DAMAGE TO RENTESE a.CCbD,cel §.300000 CLAIMS MADE 51OCCUR MED EXP(Any one person) $10000 - PERSONAL&ADV INJURY $1,000,000 GENERAL AGGREGATE s2,000,000 GEN'L AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMP/OP AGG $2000000 X POLICY PRO- JECT LOC B AUTOMOBILE UABILIFY P2ST11221800 07/01/03 07/01/04 COMBINED SINGLE LIMIT $1,BOO,6B0 X ANYAUTO (Ea accident) ALL OWNED AUTOS BODILY INJURY § SCHEDULED AUTOS (Per person) X HIRED AUTOS BODILY INJURY X NON-OWNED AUTOS (Peraccident) $ X Drive Other Car PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY-EA ACCIDENT $ ANY AUTO OTHERTHAN EA ACC $ AUTO ONLY: pGG § C EXCESS/UMBRELLA LIABILITY BE1393049 07/01/03 07/01/04 EACH OCCURRENCE $10 000 000 _X1 OCCUR CLAIMS MADE AGGREGATE $10 000 000 § DEDUCTIBLE $ X RETENTION $10000 $ D WORKERS COMPENSATION AND 03D2CS299612 07/01/03 07/01/04 - X WC STATU- Y oTR- EMPLOYERS'LIABILITY ORY ANY PROPRIETOP/PARTNER/EXECUTIVE E.L.EACH ACCIDENT $1,000,000 OFFICER/MEMBER EXCLUDED? E.L.DISEASE-EA EMPLOY5d$1,000,000 If yes, a under SPECIAL PROVISIONS below E.L.DISEASE-POLICY LIMIT 191.000,000 OTHER A Install. Floater A2SV0417460000 07/01/03 07/01/04 In Storage: $500,000 In Transit: $500,000 DESCRIPTION OF OPERATIONS/LOCATIONS/VEHICLES/EXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS *Except 10 days if non-payment. City Project#02-19-28: Phase 1 Convention Center Expansion -Kitchen Equipment. General Liability Additional Insured as per Royal Form GC 0066(01/96): City of Palm Springs and Turner Construction Company. CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION City of Palm Springs DATE THEREOF,THE ISSUING INSURER WILL ENDEAVOR TO MAIL _3D_ DAYS WRITTEN Department of Procurement and Contracting NOTICE TO THE CERT'IFICATE HOLDER NAMED TO THE LEFT.BUT FAILURETODO30SHALL 3200 Tahquitz Canyon Way IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR Palm Springs, CA 92262 REPRESENTATIVES. AUTHORIZED REPRESENTATI E ACORD 25(2001/08) 1 of 2 #S150881/M150329 ES 0 ACORD CORPORATION 1988