Loading...
HomeMy WebLinkAbout04614 - COVE ELECTRIC CONVENTION CENTER CP02-19-32 DOC a 2003—G30G95 08/18/2003 08:00A Fee:NC Page 1 of 1 Recorded in Official Records County of Riverside Gary L. Orso Assessor, County Clerk & Recorder II III I I I I II I II III II II I III Return To: City Clerk City of Palm Springs P.O. Box 2743 Palm Springs, CA 92263-2743 NOTICE OF COMPLETION n NOTICE IS HEREBY given that: n3F 1. The City of Palm Springs, California is a municipal corporation, organized and incorporated pursuant to the laws of the State of California. 2. The City Clerk of the City of Palm Springs is authorized and directed to execute, on behalf of said City, any and all Notices of Completion. 3. The address of the City of Palm Springs is City Hall, 3200 E Tahquitz Canyon Way, Palm Springs, California (P.O. Box 2743, Palm Springs, CA 92263-2743). 4. The public work of improvement on the hereinafter referred to real property within the city was COMPLETED on the 4 n day of June,2003. 5. The name of the contractor(if named)for such work of improvement was: Cove Electric. 6. 'The public work improvement, which was completed in the City of Palm Springs, County of Riverside, State of California, is described as follows: Palm Springs Convention Center Expansion—Phase I, City Project#02-19. 7. The property address or location of said property is 797 E.Andreas, Palm Springs, CA 92262. City Project No: Agreement No: 4 vl ( Minute Order No: 7 2-? 02-19 02-19-032 DATED: ���`✓�' � CITY OF PAL A- RIN B . Executive Director-Airports PATRICIA A. SANDERS, being duly sworn, says: That she is the City Clerk of aforesaid City of Palm Springs, California, the corporation that executed the foregoing notice, that she makes this verification on behalf of said corporation; that she has read the foregoing Notice of Completion, and knows the contents thereof, and t the facts stated therein are true; that as said City Clerk, she makes this verification on behalf of s ermumcip2 corporation. a City Clerk Index No. Cove Electric Convention Center CP02-19-32 AGREEMENT #4614 M07227,1- „1,2-18-02 AGREEMENT THIS AGREEMENT made this y 1 (( y 4 y day of-� s�l�l-�, in the year 20 b and between the City of Palm Springs, a charter city, organized and existing in the County of Riverside, under and by virtue of the laws of the State of California, hereinafter designated as the City, and, Cove Electric, Inc. hereinafter designated as the Contractor. The City and the Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1 --THE WORK The Contractor shall complete the Work as specified or indicated under the Bid Schedule(s) of the City's Contract Documents entitled: Palm Springs Phase I Convention Center Expansion Electrical City Project No. 02-19-32 The Work is generally described as follows: provide all necessary labor, materials, equipment, hoisting, scaffolding, tools, rigging and anything else necessary to complete the work for the Palm Springs Phase I Convention Center Expansion. ARTICLE 2 -- COMMENCEMENT AND COMPLETION The Work to be performed under this Contract shall commence on the date specified in the Notice to Proceed by the City, and the Work shall be fully completed within the time specified in the Notice to Proceed. The City and the Contractor recognize that time is of the essence of this Agreement, and that the City will suffer considerable financial loss if the Work is not completed within the time specified in said Notice to Proceed, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. The damages suffered by the City would be extremely difficult or impractical to determine in the event of a Breach by the Contractor. Accordingly, the City and Contractor agree that the Contractor shall pay the amount provided below, as liquidated damages, for each calendar day that the Work is not completed in the time set forth above: $2,000.00 ARTICLE 3 -- CONTRACT PRICE The City shall pay the Contractor for the completion of the Work, in accordance with the Contract Documents, in current funds the Contract Price(s) named in the Contractor's Bid and Bid Schedule(s). ARTICLE 4 --THE CONTRACT DOCUMENTS The Contract Documents consist of the Notice Inviting Bids, Instructions to Bidders, the accepted Trade Bid and trade Bid Schedule(s), List of Subcontractors, Non-collusion Affidavit, Bidder's General Information, Bid Security or Bid Bond, this Agreement, Worker's Compensation Certificate, Performance Bond, Payment Bond, Notice of Award, Notice to Proceed, Notice of Completion, General Conditions of the Contract, Supplementary General Conditions, Exhibits A through G, Construction Drawings and Specifications, Addenda numbers 1 to 3, inclusive, and all Change Orders and Work Change Directives which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto. ARTICLE 5 -- PAYMENT PROCEDURES The Contractor shall submit Applications for Payment in accordance with provisions of the Standard Specifications as amended by the Special Provisions. Applications for Payment will be processed by the City as provided in the Contract Documents. ARTICLE 6 -- NOTICES Whenever any provision of the Contract Documents requires the giving of a written Notice, it shall be deemed to have been validly given if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the Notice. ARTICLE 7 -- MISCELLANEOUS Terms used in this Agreement which are defined in the Standard Specifications as amended by the Special Provisions will have the meanings indicated in said Standard Specifications and Special Provisions. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically, but without limitation, monies that may become due and monies that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. The City and the Contractor each binds itself, its partners, successors, assigns, and legal representatives, to the other party hereto, its partners, successors, assigns, and legal representatives, in respect of all covenants, agreements, and obligations contained in the Contract Documents. (Signatures on Next Page) IN WITNESS WHEREOF, the parties have executed and entered into this Agreement as of the date first written above. CITY OF PALM SPRINGS ATTPL., v a municipal corporation Y:\ CityClerk - .,y_ 1. ' >� �r �,��,1#4 {N 3 V �i� 4r it-L', ��rf�lYMnager r7 .Agreement over/urn 4pe►- $25,000 APPROVED AS TO FORM: _1" /� �fe Reviewed and approved by procurement & Contracting E By. pn¢diSP,g Date 9Jttr'. ' City Attorne P.C. Number­ CONTRACTOR: Check one:_Individual_Partnership_Corporation Corporations require two notarized signatures: One from each of the following: A. Chairman of Board, President,or any Vice President:AND B.Secretary,Assistant Secretary,Treasurer,Assistant Treasurer,or Chief Financial Officer). r (� ig'ature(not ized) Signature(notarized) /7 Name: /Uzi Rio / sV, Name: `�_� !?4 c. ) Title: Title: ✓I c'( B :` t Stateof State o0':L�//r�IQ�`�irr � County of )ss County of 4-r �ss / t On_``before me, �of,�Jc°.4 ti'b�Sri-t,�/p'I nfzr, On � 5%��— before me, personally appeared dt— yCr'd G� d-�cr--1J�-o L'J ""�cf personally appeared S iXl0A/ 'j,"�o-/ personally known to me (or proved to me on the b2SI9 of personally known to me (or proved to me on the basis of satisfactory evidence) to be the person(s)-whose name(s) satisfactory evidence) to be the person.(sT'whose name(s)— is/are subscribed to the within instrument and acknowledged is/are subscribed to the within instrument and acknowledged to me that he/s_,he/they executed the same in his/her"/their to me that he/she/they executed the same in his/her/their authorized capacity(tes), and that by his/her/their signature(s)- authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(&); or the entity upon behalf of on the instrument the person(&), or the entity upon behalf of which the person(s)acted,executed the instrument. which the person(s)acted,executed the instrument. WITNESS my hand and official seal. WITNESS my hand and official seal. Notary Signature: L Notary Signature: Notary Seal: Notary Seal: R06ERT J. DENMAN R08ERT J. DEN MAN Commtsion#12155278 < Commision#1285278 s ,y Notary Public-Califanit0 t C:r„ „�.n -„ Notary Public Cal'ifaniO aiverside County ' C4" "r ✓ Wvers�dti County, �,;'�; µyCa'nrn.6 °esCec21,71X11 /� mycorrrn.&T;ta 27,20I4 n�er�y�Y"`".I�Wi'` -. <� , -.v eY �i�a OUb UC.IVfYIdV 011 Bond # 184-99-00 PAYMENT BOND KNOW ALL MEN BY THESE PRESENTS, T'liat Insurance Company of the West as Surety, are held firmly bound unto the City of Palm Sprmgs, a Charier City, organized and existing in the County of Riverside, State of California, heremafter called the "City," in the sum of: two hundred seventy four thousand one hundred ($274.100,00) dollar. for the Payment of w[,rich sum well and tr,ly to be made, we bind ourselves, our heirs, executors, adrnm strators, successors, and assigns,loiritly and severally, firmly by these presents. WHEREAS, said Contractor has been awarded and is about to enter into the annexed agreement with said City to perform the Work as specified or indicated in the Contract Documents entitled: PALM SPRINGS Phase I Convention Center Expansion CITY PROJECT 02-19 ELECTRICAL NOW THEREFORE, if said Contractor, its subcontractors, its heirs, executors, administrators, successors, or assigns shall fail to pay for any materials,provisions, provender, equipment or other supphes used in, upon, for or about the performance of the Work contracted to be done, or for any work or labor thereon of any kited, of for amounts due under the Unemployment Insurance Code, or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of the Contractor and its subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with respect to such labor, all as required by the provisions of Tale XV, Chapter 7, Sections 3247-3252, inclusive, of the Civil Code of the State of California and acts amendatory thereof, and sections of other codes of the State of California referred to therein and acts amendatory thereof, and provided that the persons, comparues, or corporations so ftinr shing said materials, provisions, provender, equipment or other supplies, appliances or power used in, upon, for or about perfomance of the work contracted to be executed or performed, or any person, company or corporation renting or hiring Lmplements or machinery or power for or contributing to said work to be done, or any person who performs work or labor upon the same, or any person who supplies both work and materials therefor, shall have complied with the provisions of said laws, then said surety will pay the same in an amount not exceeding the sum herernbefore set forth and also wall pay, in case suit is brought upon this bond, a reasonable attomey's fee, as shall be fixed by the Court. This bond shall inure to the benefit of any and all persons reamed in Section 3181 of the Civil Code of the State of California so as to give a right of action to them or their assigns in any suit brought upon this bond. PROVIDED, that any alterations in the Work to be done or the materials to be famished, or changes in the time of completion,which may be made pursuant to the terms of said Contract Documents, shall not in any way release said Contractor or said Surety thereunder, nor shall any extensions of time granted under the provisions of said Contract Documents release either said Contractor or said surety, and notice of said alterations or extensions of the Agreement is hereby waived by said Surety. SIGNATURES ON NEXT PAGE W9JU� Bond # 184-99-00 SIGNED AND SEALED, this 20 day of December 2002 Surety Insur Company of the West Contractor ,Cove Elemp-ic Inc l By By, /1f'.L -{ 5' —J—osepn Al Garcia LaiiyJojko'Vs c' Title Attorney-in-fact t Title presiden ' (SEAL AND NOTARLkL ACICNO� LEDGMENT tl OF SURETY) ContractorBy Title Ae S I JPlJi u Corporations require two notarized signatures: One from each of the following: 1. Chairman of Board, President, or any Vice President: AND 2. Secretary, Assistant Secretary, Treasurer, Assistant Treasurer, or Chief Financial Officer). n No. 0001379 ICW GROUP Power of Attorney Insurance Company of the West Explorer Insurance Company Independence Casualty and Surety Company KNOW ALL MEN BY THESE PRESENTS That Insurance Company of the West, a Corporation duly organized under the laws of the State of California, Explorer Insurance Company,a Corporation duly organized under the laws of the State of Arizona,and Independence Casualty and Surety Company,a Corporation duly organized under the laws of the State of Texas,(collectively referred to as the"Companies"),do hereby appoint JOSEPH GARCIA,ANTHONY GARCIA AND ANNA SIERRA their true and lawful Attomey(s)-in-Fact with authority to date,execute,sign,seal,and deliver on behalf of the Companies,fidelity and surety bonds,undertakings, and other similar contracts of suretyship,and any related documents. IN WITNESS WHEREOF,the Companies have caused these presents to be executed by its duly authorized officers this 16th day of January,2001. ssaarrenrynr 0 raaoA4 opuTx ANou INSURANCE COMPANY OF THE WEST EXPLORER INSURANCE COMPANY Mtkat 95EAL'� o a INDEPENDENCE CASUALTY AND SURETY COMPANY ���leNA♦dD� � N John H.Craig,Assistant Secretary John L.Hannan,Executive Vice President State of California County of San Diego } ss. On January 16,2001,before me,Norma Porter,Notary Public,personally appeared John L.Haimuin and John H.Craig,personally known to me to be the persons whose names are subscribed to the within instrument,and acknowledged to me that they executed the same in their authorized capacities,and that by their signatures on the instrument,the entity upon behalf of which the persons acted,executed the instrument. Witness my hand and official seal. NOHMAPORTER COMM.+'fl 2575TY ` W, r. NOTARY PUaI-IC-f.ALIrORNIA fnii U y C UICGO COUNTY +' My Commission Expires 1.//►141'/'I,Nt/�1. MnRCI-f 1e,2004 Norma Porter,Notary Public RESOLUTIONS This Power of Attorney is granted and is signed,sealed and notarized with facsimile signatures and seals under authority of the following resolutions adopted by the respective Boards of Directors of each of the Companies: "RESOLVED. That the President,an Executive or Senior Vice President of the Company,together with the Secretary or any Assistant Secretary,are hereby authorized to execute Powers of Attorney appointing the person(s)named as Attomey(s)-in-Fact to date,execute,sign, seal,and deliver on behalf of the Company,fidelity and surety bonds,undertakings,and other similar contracts of suretyship,and any related documents RESOLVED FURTHER; That the signatures of the officers making the appointment,and the signature of any officer certifying the validity and current status of the appointment,may be facsimile representations of those signatures;and the signorine and seal of any notary,and the seal of the Company,may be facsimile representations of those signatures and seals,and such facsimile representations shall have the same force and effect as if manually affixed. The facsimile representations referred to herein may be affixed by stamping,printing,typing, or photocopying." CERTIFICATE I,the undersigned,Assistant Secretary of Insurance Company of the West,Explorer Insurance Company, and Independence Casualty and Surety Company, do hereby certify that the foregoing Power of Attorney is in full force and effect,and has not been revoked,and that the above resolutions were duly adopted by the respective Boards of Directors of the Companies,and are now in full force. IN WITNESS WHEREOF,I have set my hand this 20 day of December 2002 . John H. Craig,Assistant Secretary To verify the authenticity of this Power of Attorney you may call 1-800-877-1111 and ask for the Surety Division. Please refer to the Power of Attorney Number, the above named individual(s)and details of the bond to which the power is attached. CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT Ic State of California County of i( 1 VP25 r I e ss. on , before me, R0Le27- J J�e ^//�Fln../ Dale t Name and Title of Officer(e.g.,"Jane Doe,Notary public") F personally appeared r Name(s)of Slgner(sj" ' >) Xpersonally known to me ❑ proved to me on the basis of satisfactory evidence fito be the person(4 whose name(4 is/epb subscribed to the within instrument and fi acknowledged to me that he/Ae/they executed the same in his/her/their authorized -- capacity(igS), and that by his/hctr/their OBERT J. DENMAN signature(g) on the instrument the person(a), or J Commission#12aWB z the entity upon behalf of which the person(g) Notary Public-CalitomI acted, executed the instrument. Riverside County om fi MyCemm.E d D;c2L44 WITNESS my hand and official seal. �< Place Nolary Seal Abova Sign�y�tu�e oFl�Talary publ,c ,7I �I OPTIONAL Though the information below is not required by law,it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. Description of Attached Document I Title or Type of Document: '2�0 vu i) I - Document Date: �oZ —� 0 O a I Number of Pages: Signer(s) Other Than Named Above: fi Capacity(ies) Claimed by Signer Signer's Name: _ El Vice / fi Corporate Officer—Title%: V+c e 4�e Sr �PN� �,%t Top of thumb here P! ❑ Partner—❑ Limited ❑ General i ❑ Attorney in Fact I' ❑ Trustee ❑ Guardian or Conservator I ❑ Other: I fi Signer Is Representing:__ CIO Vz C I i I, m 1999 National Nolary Association•9350 no Solo Ave,P0.Box 2402•Chataworlh,CA 91313.2402•www.nalionalnolaryorg Prod.No.5907 Reorder.Call Toll-Free 1-800-876-6827 CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT Yrn r; ::;.rn^or„=�.,=rcr-',r,�,orc:;=:�;rc•ti�, ^.=r.c,'r.;r�r;•;;=^=r<:c.�cx-r.�^=e.c:^cr:,�:;,t^.=:=rcr.�r:rc,r:.m.,�;cr,--.;c - r� State of California c County of l</I(1P �f'i�Si ss. On 12 - "° , before me, s CL�JP• f J . L-) � Data Name of TIDe of OlFlcer(e g.,"Jane Doe,Notary Public") r personally appeared ✓Jo,/�C S/try Name(.)of S,ne 3) E�Kersonally known to me �l 0 proved to me on the basis of satisfactory �4 evidence fi ill to be the person(s) whose name(s) is/are G� subscribed to the within instrument and acknowledged to me that he/she/they executed the same in his/her/their authorized bl capacity(ies), and that by hislher/theirI signature(s) on the instrument the person(s), or the entity upon behalf of which the person(s) fi RCJ6E[:T J_DEWi'MAN acted, executed the instrument. k�jl / GOmrnFubfr L YlCn>r t11i.)� r+ &ltrcmta WITNESS my hand and official seal. 31 RiW ide County ht,Cesrun.E,#m DZec2l Me Place Notary Seal Above " j Signature of Nalary Public I� OPTIONALI l< Though the information below 1s not required by law,it may prove valuable to persons relying on the document F� and could prevent fraudulent removal and reattachment of this form to another document. hI Description of Attached Docume t / Title or Type of Document: Document Date: f "j U �� Number of Pages: �I I� Signer(s) Other Than Named Above: Capacity(ies) Claimed by Signer �I Signer's Name: Ic ❑ Individual t ' Top of thumb here l _ Corporate Officer—Title(s): ❑ Partner—❑ Limited ❑ Generale ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: Signer Is Representing: Ic tir vr,c._(;�.r��.�—'v'=(.=_c.'�.(:54`[-(-" _ -'=_c.'u-'t_.c:'_:'-4`_%4'`v'_'.S'(.v.i_'v�.G.w= "�-:.._.C:✓J�.C._'�--C.�'�.'v=�.'=(.'c_4'.c_t:�C.'iCi�:--'v"-v v"• 01999 National Notary As.oclahon•9350 De Selo Ave.,Po.box 2402•Chalswohh.CA91313-2 4 0 2•wwwnallonalnolary.org Prod No.5007 Reardon Call Toll-Free 1-800-076-6827 12/20/02 14: 49 FAX 3470103 BOB-DENAIAN Z 02 Bond # 184-99-00 PERFORMANCE BOND KNOW ALL MEN BY THESE PRESENTS, That Cove Electric. Inc.l as Contractor and Insurance Company of the West as Surety, are held firmly bound unto the Citv of Palm Springs, a Charter City, organized and existing in the County of Riverside, California, hereinafter called the "City," in the sum of: two hundred seventy four thousand one hundred (S274 100.00) dollars for the payment of which sum well and truly to be made, we bind ourselves, our heirs, executors, administrators, successors, and assigns,jointly and severally, firmly by these presents. WHEREAS said Contractor has been awarded and is about to enter into the annexed Agreement with said City to perform the Work as specified or indicated in the Contract Documents entitled: PALM SPRINGS Phase I Convention Center Expansion CITY PROJECT 02-19 Electrical NOW THEREFORE, if said Contractor shall perform all the requirements of said Contract Documents required to be performed on its part, at the times and in the manner specified herein, then this obligation shall be null and void, otherwise it shall remain in full force and effect. PROVIDED, that any alterations in the Work to be done or the materials to be furnished, or changes in the time of completion,which may be made pursuant to the terms of said Contract Documents, shall not in any way release said Contractor or said Surety thereunder, nor shall any extensions of time granted under the provisions of said Contract Documents,release either said Contractor or said Surety, and notice of such alterations or extensions of the Agreement is hereby waived by said Surety. SIGNATURES ON NEXT PAGE 12/20/02 14: 49 FAX 3470103 BOB-DENMAN Z 05 Bond # 184-99-00 SIGNED AND SEALED, this 20 day of December 2Y902 Su4osepa pany of the West Contractor Cove Elec r3c Inc / By By✓�= Title Attorney-in-fact I Larry Jkovsky v Title president (SEAL AND NOTARLA-L ACKNOWLEDGMENT OFSURETY) Contractor P By _ Title Corporations require two notarized signatures: One from each of the following: 1. Chairman of Board, President, or any Vice President: AND 2. Secretary, Assistant Secretary, Treasurer, Assistant Treasurer, or Chief Financial Officer). ll CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT State of California c ss. County of /�l VP2S I /—Ce- v3 , On before me, /`o�FiL% J ��/✓f J/� l/ c Dale Name and Title of Offaer e.( g,"Jane Doe,Notary Pubhc') personally appeared iinonJ 16c,� j,�C) VSif Name(a)of Signer(a ' 2rpersonally known to me ❑ proved to me on the basis of satisfactory evidence to be the person(4 whose name(')' is/are subscribed to the within instrument and acknowledged to me that he/si'ie/tAy executed the same in his/hl6i'Mir authorized yy _ capacity(194), and that by his/her/their y ROBERT J. DENMAN signature($) on the instrument the person(A, or J Canmission#i�a527B aa the entity upon behalf of which the person( 3 L. s NO1ayPu6fic-Colifnrria g acted, executed the instrument. Riverside County fi MyCcmm.Expifa ac27,�04 m WITNESS y hand and official seal. C Place Notary heal Above Sgrat.ta or Nalary Publ,o fi OPTIONAL Though the information below is not required by law, it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this form to another document. I I Description of Attached Document I Title or Type of Document: •2307L1 i) Document Date: /a -�PJ -'O a Number of Pages: I I Signer(s) Other Than Named Above: I Capacity(ies) Claimed by Signer Signer's Name: El Individual - Top of thumb here Corporate Officer—Title('s'): VC e d/, ❑ Partner—❑ Limited ❑ General ❑ Attorney in Fact ❑ Trustee ❑ Guardian or ConservatorI fi ❑ Other: I Signer Is Representing: Co y-e C- ........... 0 1990 Nallonal Notary A eocialion•9350 De Solo Ave.,P.O.Box 2402•Cbalawodh,CA 91313.2402•www na0onalnolaryorg Prod No.5907 Reorder Call Toll-Free 1-800-876-6827 No. 0001379 ICW GROUP Power of Attorney Insurance Company of the West Explorer Insurance Company Independence Casualty and Surety Company KNOW ALL MEN BY THESE PRESENTS. That Insurance Company of the West, a Corporation duly organized under the laws of the State of California, Explorer Insurance Company,a Corporation duly organized under the laws of the State of Arizona,and Independence Casualty and Surety Company,a Corporation duly organized under the laws of the State of Texas,(collectively referred to as the"Companies'),do hereby appoint JOSEPH GARCIA,ANTHONY GARCIA AND ANNA SIERRA their true and lawful Attomey(s)-in-Fact with authority to date,execute,sign,seal,and deliver on behalf of the Companies,fidelity and surety bonds,undertakings, and other similar contracts of suretyship,and any related documents IN WITNESS WHEREOF,the Companies have caused these presents to be executed by its duly authorized officers this l6ih day of January,2001 `tcorrxvr�,ry @ rat uR4 u"ecy"4La INSURANCE COMPANY OF THE WESTM �co"Palryie J�'PpPPegq��N� c?� y o EXPLORER INSURANCE COPANY '� SEAL n fit]' INDEPENDENCE CASUALTY AND SURETY COMPANY �rY 1,AP' fVr'�ireXl.4ve D� � � ti SfoPPIM" ''till gad 7oyr � }yft John H.Craig,Assistant Secretary John L.Hannum,Executive Vice President State of California County of San Diego } Ss. On January 16,2001,before me,Noma Porter,Notary Public,personally appeared John L Hammm and John H.Craig,personally lanown to me to be the persons whose names are subscribed to the within instrument,and acknowledged to me that they executed the same in their authorized capacities,and that by their signatures on dine instrument,the entity upon behalf of which the persons acted,executed the instrument Witness my hand and official seal. NORMA PORTER CONDIC #12575 40 N NOIA,.nge0.'GO IfORNIA u�i CF SANDIGGOCODNTY 77 tD�ilYl� My Canmissiun Erplres MARCI 119,2004 www�a Norma Porter,Notary Public RESOLUTIONS This Power of Attorney is granted and is signed,sealed and notarized with facsimile signatures and seals under authority of the following resolutions adopted by the respective Boards of Directors of each of the Companies: "RESOLVED: That the President, an Executive or Senor Vice President of the Company,together with the Secretary or any Assistant Secretary,are hereby authorized to execute Powers of Attorney appointing the persons)named as Attorney(s)-in-Fact to date,execute,sign, seal,and deliver on behalf of the Company,fidelity and surety bonds,undertakings,and other similar contracts of suretyship,and any related documents RESOLVED FURTHER: That the signatures of the officers making the appointment,and the signature of any officer certifying the validity and current status of the appointment,may be facsimile representations of those signatures;and the signature and seal of any notary,and the seal of the Company,may be facsimile representations of those signatures and seals,and such facsimile representations shall have the same force and effect as if manually affixed. The facsimile representations referred to herein may be affixed by stamping,printing,typing,or photocopying," CERTIFICATE I,the undersigned,Assistant Secretary of Insurance Company of the West,Explorer Insurance Company,and Independence Casualty and Surety Company, do hereby certify that the foregoing Power of Attorney is in full force and effect,and has not been revoked,and that the above resolutions were duly adopted by the respective Boards of Directors of the Companies,and are now in fill force IN WITNESS WHEREOF,I have set my hand this 20 dayof December 2OO2 John H.Craig,Assistant Secretary To verify the authenticity of this Power of Attorney you may call 1-800-877-1111 and ask for the Surety Division Please refer to the Power of Attorney Number, the above named individual(s)and details of the bond to which the power is attached. CALIFORNIA ALL-PURPOSE ACKNOWLEDGMENT �r�^.:-,^=rcr=r=rr-":c"r�-rcr:c^:<;cr=r=r=^^.cr--�.�r�rr�=^=rye•:^=ram r ^,�^::c=�.crs;<�r�'=rti^crc'-="�r;;.�,�-=rT^n; State of California I� ss. County of 21 IilerL5, � Lq it F �7 rrr555 On ��'�3 _c � , before me, '4/41 P4-°C' �1 pale n Name and Title of Officer(e g.,"Jane Doe,Notary Public') 'S personally appeared Name(s)of Signer(s) 4� P�lersonally known to me fi ❑ proved to me on the basis of satisfactory evidence to be the person(s) whose name(s) is/are �T subscribed to the within instrument and r acknowledged to me that he/she/they executed the same in hislheritheir authorized ?I capacity(ies), and that by his/her/their s�q signature(s) on the instrument the person(s), or ROBI=i T I DEYlVIA i the entity upon behalf of which the person(s) Comrni .ion h lr?52✓� acted, executed the instrument. Notca7a Public Calitarn:a . Y 'ririe County .3' ` .F- eaM1721,204 WITNESS my hand and official seal. F �1verr-- 2b.^ N? Ccu Irn .. - r, "t': ..Fay _--._ ., Place Notary SealAbove Sgnaiure of Notary Public I OPTIONAL Though the information below is not required by law,it may prove valuable to persons relying on the document and could prevent fraudulent removal and reattachment of this farm to another document. t Description of Attached Docuj en+r Title or Type of Document: J'C'�J` �a i� Document Date: -,)C Number of Pages: � l Signer(s) Other Than Named Above: ( Capacity(ies) Claimed by Signer Signer's Name: ❑ Individual Top of thumb here E<L Corporate Officer—Title(s): i� ❑ Partner—❑ Limited ❑ Generale 1. ❑ Attorney in Fact ❑ Trustee ❑ Guardian or Conservator ❑ Other: r Signer Is Representing: 'i I� I <. �.,"-4_Cw�.- _.::-.:)�C•,c='✓..'�:%!_c,"u.'�;::<�c.='"v4'�=(.'iG�(."�.'._.:"-Vc_..(:"-C.-4�c."c=t%'=:._'��--c._:.`=,f.�.t•-V_ "u':-4"c_-'v"`—C%==:�=:%_:T, 0 1999 National Notary Assodalion•9350 Do Solo Ave.,PD.Box 2402•Chalamith,CA 91 31 3-24 0 2•vfxw.nalionainotaryorg Prod No 5907 reorder.Call Toll-Free 1-300 676-6327 TRADE BID TRADE BID PACKAGE# 32 TRADE DESCRIPTION Electrical and Fire Life Safety BID TO: CITY OF PALM SPRINGS, CALIFORNIA The undersigned Bidder proposes and agrees,if this Bid is accepted,to enter into an Agreement with the City of Palm Springs in the form included in the Contract Documents (as defined in Article 4 of the Agreement) to perform the Work as specified or indicated in said Contract Documents entitled,TRADE BID FOR: PALM SPRINGS CONVENTION CENTER EXPANSION PHASE I PROJECT NO.02-19 Bidder accepts all of the terms and conditions of the Contract Documents,including without limitation those in the Notice Inviting Bids and Instructions to Bidders, dealing with the disposition of the Bid Security. This Bid will remain open for the period stated in the Notice Inviting Bids unless otherwise required by law. Bidder will enter into an Agreement within the time and in the manner required in the Instructions to Bidders,and will furnish the insurance certificates, Payment Bond, Performance Bond, and Permits required by the Contract Documents Bidder has examined copies of all the Contract Documents including the following Addenda (receipt of which is hereby acknowledged): �! Number / Date z 'a" ZOO 2_. Number-* Date -Z Z9=0"' Number *� Date 1z./2 .z007_ Number Date Bidder has familiarized itself with the nature and extent of the Contract Documents,the Work,the site,the locality where the Work is to be performed, the legal requirements (federal, state, and local laws, ordinances, rules, and regulations), and the conditions affecting cost, progress or performance of the Work and has made such independent investigations as Bidder deems necessary. In conformance with current statutory requirements of California Labor Code Section 1860,et seq.,the undersigned confirm the following as its certification: I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake self insurance in accordance with the provisions before commencing the performance of the Work of this Contract. To all the foregoing,and including all Bid schedule(s),List of Subcontractors,Non-collusion Affidavit,Bidder's General Information, and Bid Bond contained in these Bid Forms, said Bidder further agrees to complete the Work required under the Contract Documents within the Contract Time stipulated in said Contract Documents,and to accept in full payment therefore the Contract Price based on the Lump Sum or Unit Bid Price(s) named in the aforementioned Bidding Schedule(s). Date: IZ' F4• 24P®Z— Bidder: 4:�Djs Ia azr_m By: r Title: �� Go►r3T�-J �f a6am- TRADE BID TRADE BID FORMS - 2 TRADE BID SCHEDULE Lump Sum Price for Construction of The Palm Springs Convention Center Expansion Phase 1 Project No. 02-19 in the City of Palm Springs, California TRADE BID PACKAGE NO.: 32 TRADE BID PACKAGE DESCRIPTION: Electrical and Fire Life Safety TOTAL BID PRICE - (INCLUDING PERFORMANCE AND PAYMENT BOND PREMIUM) - $ Z44, 11o . 00 Price m figures -two 140'*Atiwjm- J �`�H I oe_ -�-e ar�►•lT� o�►�' t I + Price in words Price in words BIDDER: C EM-c4c— BY: Signets, TITLE: k%¢E• G�ug-�y _^77 / &IZ . DATE: 1�-l •�ra+C��- City of Palm Springs TRADE BID SCHEDULE - LUMP SUM PRICE TRADE BID FORMS - 3 INFORMATION REQUIRED OF BIDDER LIST OF SUBCONTRACTORS As required under Section 4100, at. seq., of the Public Contract Code, the Bidder shall list below the names and business address of each subcontractor who will perform Work under this Bid in excess of one-half of one percent of the Contractor's Total Bid Price, and shall also list the portion of the Work which will be done by such subcontractor. After the opening of bids, no changes or substitutions will be allowed except as otherwise provided by law. The listing of more than one subcontractor for each item of Work to be performed with the words "and/or" will not be permitted. Failure to comply with this requirement will render the Bid as non-responsive and may cause its rejection. Contractor Percent License Of Total Work to be Performed Number Contract Subcontractor's Name & address U71�1feT91 �.b/ r 2. 3. 4. 5. 6. 7. 8. City of Palm Springs LIST OF SUBCONTRACTORS TRADE BID FORMS - 4 NON-COLLUSION AFFIDAVIT TO BE EXECUTED BY OFFEROR AND SUBMITTED WITH PROPOSAL State of California I ) ss. County of TZ% leQ511D'€ ) I, ,* ir being first duly sworn, deposes and says that he or she is O -S 4ft..t - of 92,%vc 2-(e c�&G the party making the foregoing bid that the bid is not made in the interest of, or on behalf of, any undisclosed person, partnership, company, association, organization, or corporation; that the bid is genuine and not collusive or sham; that the bidder has not directly or indirectly induced or solicited any other bidder to put in a false or sham bid, and has not directly or indirectly colluded, conspired, connived, or agreed with any bidder or anyone else to put in a sham bid, or that anyone shall refrain from bidding; that the bidder has not in any manner, directly or indirectly, sought by agreement, communication, or conference with anyone to fix the bid price of the bidder or any other bidder, or to fix any overhead, profit, or cost element of the bid price, or of that of any other bidder, or to secure any advantage against the public body awarding the contract of anyone interested in the proposed contract; that all statements contained in the bid are true; and, further, that the bidder has not, directly or indirectly, submitted his or her bid price or any breakdown thereof, or the contents thereof, or divulged information or data relative thereto, or paid, and will not pay, any fee to any corporation, partnership, company association, organization, bid depository, or to any member or agent thereof to effectuate a collusive or sham bid. BIDDER Je BY �P.tLaLo.11LoJ51L`( L TITLE 1 [')E,%-A r ORGANIZATION (0 %j 4F IL4MQ-(�)4 L t Nj L , ADDRESS SUBSCRIBED AND SWORN TO BEFORE ME THIS Z DAY OF -k'e n6wc. gar, 2� > NOTARY P BLIC IN AND FOR SAID 14,-KSrWQ COUNTY AND STATE v F ( W;41ZA11 '4 J� ROBERT J. L F N� Cpmr Ionfl125SM MY COMMISSION EXPIRES: i llel KIM COLMV �fp�raDee21.� BIDDER'S GENERAL INFORMATION City of Palm Springs BID TRADE FORMS - 5 M �j°� PAL City of Palm Springs U11 n Department of Procurement and Contracting 3200 Tahquitz Canyon Way • Palm Springs,California 92262 TEL: (760) 323-8239 • FAX(760) 322-8372 • TDD(760) 864-9527 CITY OF PALM SPRINGS 3200 East Tahquitz Canyon Way Palm Springs, CA 92262 NOTICE TO ALL TRADE CONTRACTORS PHASE I EXPANSION OF THE PALM SPRINGS CONVENTION CENTER CITY PROJECT#02-19 ADDENDUM NO. 1 This Addendum is being issued for the following changes and informational items: SUMMARY OF CHANGES: This Addendum includes: 1. Change: (All Trades) Change bid date from December 10, 2002 to December 17, 2002. 2. Add: (All Trades) Section 19 to Instructions to Bidders - Construction Manager's Administration. 3. Add to Supplemental General Conditions (All Trades) Item 2A. 4. Add Exhibit"H" OSHA 30 Hour Policy (designated Trades). 5. Change Instructions to Bidders Section 8 Bid Form. (All Trades) 6. Informational: Scopes to be provided Monday, December 9, 2002. (All Trades) 7. Informational: Anticipated Project Schedule is available on the City's web site. 8. Informational Lists: (A) List of Pre-qualified Trade Contractors for those trades requiring pre-qualification and attendance at the mandatory pre-bid conference Post Office Box 2743 0 Palm Springs, California 92263-2743 (B) List of Trade Contractors who attended a Mandatory Pre-Bid Conference for applicable trades which did not require pre-qualification. 9. Delete Bid Package 16 - Fabric Sound Panels from the Notice Inviting Bids. DESCRIPTION OF CHANGES 1. Change Bid Date: A. Change Notice to Pre-Qualified Trade Contractors for the following trades: Trade Bid #1 Selective Demolition, Trade Bid #6 Structural Steel, Metal Decking & Miscellaneous Metals, Trade Bid #13 Metal Stud Framing & Drywall, EIFS, Insulation & Fireproofing, Trade Bid #28 Kitchen Equipment, Trade Bid#29 Plumbing,Trade Bid#30 HVAC,Trade Bid#31 Fire Protection and Trade Bid #32 Electrical, published in the Desert Sun on November 11 and November 16, 2002: Change Date and Time of Opening Bids from 2:00 p.m., local time, December 10, 2002 to 2:00 p.m., local time, December 17, 2002. B. Change Notice to Trade Contractors for the following trades: Trade Bid #4 Concrete & Reinforcing, Trade Bid #8 Roofing & Sheet Metal, Trade Bid #9 Doors, Frames&Hardware,Trade Bid#15 Acoustical Ceiling,Trade Bid#16 Fabric So&Wallcovering and Trade Bid#21 FRP,published in the Desert Sun on November 11 and November 16, 2002: Change Date and Time of Opening Bids from 3:00 p.m., local time, December 10, 2002 to 3:00 p.m., local time, December 17, 2002. C. Change Notice to Trade Contractors for the following trades: Trade Bid #5 Masonry,Trade Bid#10 Overhead Coiling Doors,Trade Bid#14 Ceramic Tile, Trade Bid #25 Dock Equipment: Change Date and Time of Opening Bids from 4:00 p.m., local time, December 10, 2002 to 4:00 p.m., local time, December 17,2002. 2. Add Article 19 to Instructions to Bidders - Administration of Trade Contracts under Construction Manager as follows: Article 19.0 Administration of Trade Contracts under Construction Manager. 19.a. Work is to be performed in accordance with the Construction Manager's Project Construction schedule. A detailed schedule and corresponding Schedule of Values will be required from all Contractors within 10 days from award of Contract, and will be used in developing, updating and modifying the Construction Manager's Project Construction schedule. Trade Contractor's will acknowledge that the Project Construction Schedule will include "out of sequence," and "phasing" of the work. Trade Contractor shall provide a three (3) week look ahead schedule of its work on a weekly basis. 19.b. Complete submittal log and packages including fabrication and delivery lead times shall be submitted to Construction Manager within 10 days of award of the Contract. 19.c. MSDS sheets shall be provided the Construction Manager and maintained on site for the duration of the Project. All trade contractors shall include handling material in accordance with the MSDS. 19.d. Trade Contractor acknowledges that he has visited the site and familiarized itself with the existing conditions, including phasing of work,which may influence the Work.Trade Contractor also warrants that he has reviewed the Contract Documents priorto execution of the Contract and has notified the Construction Manager of all conflicts contained therein that could affect cost, schedule or quality. If conflicts are found after the execution of the Contract, Contractor shall perform the Work in accordance with the Construction Manager's direction for no change in Contract Price or Time. 19.e. Trade Contractors shall be responsible for coordinating theirwork with other Trade Contractors scopes of work. Trade Contractors shall review and study the Drawings and Specifications, submittals, and shop drawings of the Work of other Trade Contractors with respect to the coordination of their work with these other Trade Contractors. i 19.f. Trade Contractor shall schedule the work and the presence of it's employees at the job site and any deliveries of supplies or materials by it's material men and suppliers to the job site on such days and at such times and during such hours, as may be required by the Construction Manager. Trade Contractor shall assume responsibility for such schedule compliance not only for it's employees,but also for its material men,suppliers and subcontractors. 19.g. Trade Contractor shall be responsible for the cost of expediting all deliveries of his materials to meet the requirements of the Construction Manager's progress schedule. Should it become necessary, in order to maintain job progress, for the Construction Manager to augment the Trade Contractor's expediting efforts, all such costs incurred by the Construction Manager shall be borne by the Trade Contractor, 19.11. Trade Contractor agrees that it will notify its employees and related personnel, via written handouts, that the use of illegal drugs, intoxicating beverages, and firearms or other weapons on the site is prohibited. 19.i. Strikes (including sympathy strikes)or any other stoppage of work by employees performing the work on, or delivering supplies or materials to, the Project shall not excuse any delay of the Trade Contractor in the proper performance of its work, regardless of whether the strike or other stoppage of work is attributed to union action or the decision of an individual employee. 19.j. No publicity releases (newspaper, radio, TV, advertisements, etc.) shall be issued without the prior review of the Owner and of the Construction Manager. No signs, other than field office identification signs, will be permitted. 19.k. Trade Contractor shall be responsible to continually update sepia drawings (with draftsman quality) of the working Drawings, large scale detail drawings, and specifications to show any and all field changes thereon. Sepia drawings shall be maintained in the Construction Manager's field office. Plumbing, Fire Protection, Mechanical,and Electrical Trade Contractors shall provide copies of the current as built drawings with their monthly payment requests. Payment requests will not be processed without these updated drawings. 19.1. Final Payment will not be processed by Construction Manager unless all required Record Drawings, As-Built Drawings, Operations and Maintenance Manuals, Guarantee/Warranty Letters, Care and Maintenance information, and all other Close-Out Documents are inventoried, approved, transmitted to and received by the Construction Manager. 19.m. The Trade Contractor shall furnish to Construction Manager,on a daily basis, a report of the total number of his workers employed on the job, hours worked, and a detailed description of the work performed by his own forces or that of his subcontractors. Contractor shall include copies of their job site toolbox meeting minutes, including participants sign in sheet. i 19.n. Trade Contractor shall be responsible for providing off-site storage facilities for his own materials at its cost. The storage of materials and equipment at the site shall be permitted only to the extent approved by the Construction Manager in advance. Location of Trade Contractor's items of storage, plant and tools requires approval from Construction Manager. 19.o. Electrical power will be provided on the site for the use of the Trade Contractors for the operation of small tools. Trade Contractors shall provide extension cords from distribution points.Temporary power will be provided by the electrical Trade Contractor. 19.p. Minimum temporary lighting will be provided to maintain the foot candle coverage required by law. Contractors are each required to provide their own necessary task lighting. Temporary lighting will be provided by the Electrical Trade Contractor. 19.q. Trade Contractor will be responsible for ventilating any hazardous, combustion, or other pollutant causing equipment or material, within the area(s) of Work, including all ventilation required by the MSDS. 19.r. Trade Contractor shall give the Work constant attention,management, and supervision through an authorized Superintendent and all necessary assistants. Such Superintendent shall be authorized to act for the Contractor in all matters relating to the Work, and all directions given him shall be binding.Trade Contractor must provide Contact name and emergency phone number to Construction Manager prior to commencement of work. 19.s. Trade Contractor shall be responsible to provide all scaffolding, toe boards, temporary shoring (engineered if required), ladders, scissor lifts, or any other equipment, including hoists, necessary to complete their work. Trade contractor shall ensure that all its employees,and subcontractor's shall be OSHA trained in the use of the equipment. 19.t. All equipment to be used indoors must be approved by the Construction Manager prior to the commencement of work. 19.u. Movement of all vehicles and equipment into and on the site, including unloading, shall be subject, to the control of the Construction Manager (including the flow of traffic patterns). Individual Contractors shall be responsible for observing established traffic regulations and for providing flagmen, as required, to prevent disruption to general traffic by his vehicle, equipment or operations. Trade Contractor is responsible for clearing all debris from streets, parking lots, or public areas resulting from its operations. 19.v. Temporary toilets will be provided for use of all workers. The restrooms within the Convention Center and adjoining Hotel are not to be used by Construction Personnel. Temporary toilets shall be provided by the Plumbing Trade Contractor. i 19.w. Temporary safety fencing and barricades may not be moved and/or altered without the prior consent of the Construction Manager. 19.x. Parking will only be allowed in designated areas. There will be NO Construction parking in the general lots forthe Convention Center or adjoining Hotel. Those vehicles found in violation of this policy, will be immediately towed from site,with the Owner of the vehicle held responsible for towing and storage costs. 19.y. Radios, tape recorders, cameras, video cameras, or any other audio or visual equipment are not permitted on the job site. 19.z. The display of any offensive pictures,words(including foul language), etc, on the job site is strictly prohibited and will be grounds for removal of the responsible personnel from the job site. 19.aa. Smoking, or smokeless tobacco, are not permitted on the job site (inside or out). Smoking will only be allowed in a designated area to be determined by the Construction Manager. Violation of this item may result in expulsion of individual(s)from the Project and/or monetary fines. 19.bb. Consumption of food and beverage on the Project will be limited to areas as designated by Construction Manager. There will be absolutely no food or drink allowed within the building. 19.cc. There will be no Communications with Conventioneers, Hotel guests, staff or Convention Center personnel, unless a safety item is at issue. 19.dd. Trade Contractors shall be responsible to protect all existing, or completed finishes. Trade Contractor will bear the costs for restoration, disinfection,cleaning,and/or replacement any areas damaged by their Work. 19.ee. Neither the Owner, nor the Construction Manager will be providing Guard Service for the job site. The Trade Contractor has the liability for any loss or damage to their tools, equipment or materials as a result of vandalism and/or theft. 19.ff. Trade Contractor shall directly arrange and call for all inspections required by the City, or other municipal agencies, as required, but will inform the Construction Manager in advance of said inspections.All permit plans and permits will be delivered to the Construction Manager. 19.gg. Trade Contractor's Foreman/Superintendentwill be required to attend weekly Safety/Coordination Meetings at a location on the site designated by the Construction Manager. 19.hh. Appropriate clothing and accessories shall be worn at all times. This includes, but is not limited to, work boots, eye protection, hard hats, etc. Shorts, sleeveless shirts or tank tops are not allowed. 19.ii. Positioning devices (body belts), used as a sole means or method of tie-off for fall protection compliance, without the use of an approved full body harness will not be permitted at any time. 19.jj. Only the use of approved lanyards having an approved deceleration device which complies with OSHA Standard: Fall Protection, 29 CFR 1926, in conjunction with an approved full body harness with D-ring at shoulder level, will be permitted as approved fall arrest system at any time. 19.kk. Use of roll-out, non-locking connector type snap hooks is prohibited for use at any time. 19,11. Construction Manager has developed a Project Construction Schedule that shows contract duration and approximate phasing, sequencing and relationships of the Work. This schedule is based on the Construction Manager's Schedule concepts developed prior to the start of Construction. The Project Construction Schedule is subject to change and update pending discussion, modifications, acceleration after receipt of each Trade Contractor's schedule, weekly schedule updates, and its submittal, material and equipment fabrication and delivery lead times following the award of the Contract and commencement of the Work. 19.mm It shall be the responsibility of the Trade Contractorto become familiar with the updated Schedule(s) and shall, at all times, cooperate with the Construction Manager to keep on the premises sufficient material, supervision, and manpower to perform the Work of their Contract in keeping with the Project Construction Schedule. 3 Add to Article 2 of Instructions to Bidders the following: 2.a. Bidders are assumed to be knowledgeable of their respective Trades of work and shall include all requirements to complete a complete, fully functional, code complying system ready for its intended use as described by the Construction Documents 4. Add Exhibit "H" OSHA 30 Hour Policy, for trades designated in the exhibit, attached. 5. Change Instructions to Bidders, Section 8, Bid Form. Replace existing second paragraph with the following:The envelope enclosing the Bid shall be sealed and addressed to the City of Palm Springs. The envelope shall be plainly marked in the upper left hand corner with the name and address of the Bidder and shall bear the words "Trade Bid for Palm Springs Convention Center Phase I Expansion" and the date and hour of opening bids. The name of the Trade and the Trade Bid Package Number shall also be clearly marked on the outside of the envelope. Each trade bid shall be enclosed in a separate envelope. 6. Informational: Scopes will be provided via Federal Express delivery Monday, December 9, 2002 to plan holders of record. 7. Informational The Anticipated Project Schedule is available at the City's web site. Go to www.d.palm-springs.ca.us. Go to Departments. Go to Procurement . Select appropriate document. 8. Informational: For your information the following lists are attached: A. A list of pre-qualified trade contractors for those trades requiring pre- qualification and attendance at the mandatory pre-bid conference. B. A list of Trade Contractors who attended a Mandatory Pre-Bid Conference for applicable trades which did not require pre-qualification. 9. Delete Bid Package 16- Fabric Sound Panels. This work is being deferred to Phase It of the expansion of the convention center. END OF ADDENDA NO. 1 BY ORDER OF THE CITY OF PALM SPRINGS City of Palm Springs Harold E. Good, CPPO Director of Procurement & Contracting Dated: December 5, 2002 Receipt of this addenda must be acknowledged on the Trade Bid Forms submitted with the bid package. Attachments: Exhibit "H" OSHA 30 Hour Policy List of Pre-Qualified Trade Contractors for Trades Requiring Pre-qualification and and Attendance at the Mandatory Pre-Bid Conference List of Trade Contractors who Attended the Mandatory Pre-Bid Conference Which Did Not Require Pre-Qualification i EXHIBIT H I OSHA 30-HOUR POLICY Palm Springs Convention Center Expansion Phase I Palm Springs, CA 1214/02 Trade Contractor and all lower tier sub-subcontractors shall comply with the requirements of OSHA 30-hour Training.All Trade Contractor's supervisory staff must be OSHA certified.Supervisory staff with written evidence of OSHA 30-hour certification within the last 3 years will be acceptable. Training for Trade Contractor's staff not currently certified, can be certified through Turner Knowledge Network (TKN). The web site address is www.turneruniversity.com and must be completed within 3 month from the date of its Trade Contract Agreement or no less than 30 days from start of work. Monthly Payment is contingent upon evidence of current certification or enrollment in the OSHA 30-hour training within the period specified above. Within 5 days of the date of Award of Contract, provide the following information: i Project Name Certified Subcontractor Supervisor's Name Y/N Sub-subcontractor(s) Supervisor's Name Y/N Supervisor's Name Y/N Supervisor's Name Y/N Supervisor's Name Y/N Note: Attach a copy of the certificate for Supervisors already certified. Please return this form to the attention of: TURNER CONSTRUCTION COMPANY David Livingston @ FAX: (760) 323-4918 PRE-QUALIFIED TRADE CONTRACTORS FOR TRADES REQUIRING PRE-QUALIFICATION AND ATTENDANT AT MANDATORY PRE-BID CONFERENCE. Trade Bid Name/Number Contractor 1 Selective Demolition Penhall Company Clauss Construction Forward Services, Inc. 6 Structural Steel, Metal Decking & Miscellaneous Metals Orange County Erectors, Inc. ACSS Law Steel 13 Metal Stud Framing & Drywall, EIFS, Insulation & Fireproofing Anning-Johnson Company Raymond Interior Systems Berger Bros Inc. Martin Bros 28 Kitchen Equipment TriMark Raygal, Inc. Kamran & Co. Duray/JF Duncan AM Fab 29 Plumbing SSW Mechanical Murray Company D/K Mechanical Kincaid Plumbing Co Pan Pacific Plumbing 30 HVAC SSW Mechanical ACCO Engineered Systems Cal-Air Inc. Couts Heating & Cooling Los Angeles Air Conditioning 31 Fire Protection Daart Engineering Shasta Fire Protection 32 Electrical SASCO Cove Electric System Electric Brudvik Inc. LIST OF ATTENDEES FOR THOSE TRADE BIDS REQUIRING ATTENDANCE AT THE PRE- BID MEETING BUT DID NOT HAVE TO PRE-QUALIFY 4 Concrete & Reinforcing Precision Concrete Forward Services, Inc. 8 Roofing & Sheet Metal Al Miller & Sons Roofing, Inc. AAA Roofing Service First Single Ply Roofing 18 Resinous Flooring Allied Industrial Coatings, Inc. Floor Seal Technology 1 AcII,* I Activity orig Early I Early ID Description Dur Start Finish Moblibmilon Mobilization _ XjA%wdTrdC,*,:b, Mobize ellpTrakr IAoblllzo dT 2 �� �"@ �et up Trailer arPoaY�`aFt� 127N7e(p ?/NaM1Pt>�mdTerpAurr 0 g iSet Temporary wer Pole E1a�nTerp f�nri Inapeetion of Te p,Power YffiI 3Energize T, p.PowerCor�t�Fe3vg © Install Conat action Fancing bhFlDarnF�ni 0 M- �1 I�}nn DlkLg F�r1t OEa btain De oPennitIhraiSpir,7;f,ieeeg R:On PemA Obtain KI chen Bullding"It d�N 0 17>7L Obtain Sp Inge Meeting R 1 Permitriad7rad3Cvi-acmes 81� Bld D tofatdCal�vSm 0 f13V CZ Award Tratle Contractors Kitchen — Start of Cdnstructlon "Phase 1-Kitchen - Damougon&Gradln 110D SdeOSptidor(B FbrtrCariryry&T1o6 i tIIlMip 0RYV3Li 11 o Sakolff 2 031MB3 101M173 S Shia Off Sprinkler(M Exl rlor Canopy& ffi T fills it10 YISia Cos,,fi nFen g 1 Id Safe Off Electrical 1130 PhAlOd oAg Lmdig[rd(ptf Bar f>awrB 13J 0 Install Site Construction Fencing 2 10WJ@ 13WdB f� Protect Loading Dock Cold Bo 1187 ShgaTrels 1180 DamoEd3rWbIFnsh T&in LnrdLza 1 10YP03 1014ttt3 0 Shore Tro,Ill. 3 JaWC0 1190 T-113-ayVhWaar pcMfm)atEaatrVVak q 10NMll 1 ® Demo�xt,rlor Well FI hh Tie-in Lotellons IM pruwC�kktr Temporary Visqueenis, rotectlon)at Ex dor Walls 1 iDYVJA 10ww 1120 F1rIn TT,,h(�rp3mr 0 Protect Gas Meter 1170 DemoTre[s 1 10W� 101MID 0 Remove Trash Compact 1181 DemcVnd 1 13.WIIi 13WJJ3 �-g����1e 3 ig1M7_D 1gy,�p 0 Demo 7rellls 19 Damolltlon of LoadlDock Roof Sir clung 72J0 Linn-CmoEbSF�;,Lmd-g LbdcWals&Fig 3 iSWi`Ai 171^fSLi 1230 Stdm&f?arflC3aie NavDilrgPm 2 AJ*M 2IW403 ® Demdl-Concrete Sl Loading Doc Walls&Figs 1g10 Sd Cagladn&Pad CaPr-�n 0 21Y Stage&Rough Graide New Building rem li Structure — idl m action&IPad Certlgcatlo 1930 SAey&Lapt 1 2I.LMII3 21.1MLt3 12g0 F�BIii33&DockWalro6}� &Layout 2 ?2W.O3 254Zlau SolCmpa*nTYs ets Buildln &Dock Wall F oling,0 2tYJ�721D InSbIR�atBA:Jg&DockWalFvosg 224,1M 27.W,D mpaction eat, 1gIB l ?%AEP ell Rebar a Bullding&Doc Wall Footings 17AZ7dANM MEPPbrBtiig&DOckWal FeUrgs 1er ln,peetl n FamCO4MPkM&Ra pWa; 3 �LMrA �1,7d73r Bullding Dock Wall Fo Ing, rm ColuPiers&Ramp ails Spin gets 25ROV02 MEP In. dlon Floteh Deis 13AMvo3 Forty&vPSC2 FMO25NOW2 Z,ZBnr Turner Ccn&truclionCompany 0.1. R,N,bn aw.rw,l da 05DEW21657 lrlt uA Mt, P.S.COnVelltlon Center Expansion ®Primavera Systems,Inc. Activity Activity Ong Early Early Inn, I ID Description Dur Start Finish 1d31 Baca UG MEP 2 31N433 31,WIE3 131� VWiF"W&CXimllvrlrrli*@i P'r1a 2 __ _____ .- _. - - _-__[ Backl'ill UIGME.P IIM Iklrr f m.0ll II Install Rahl;r 8 Colnnm Anr. tar Ruts®Piers m rnn Ila) Sri kr{xx,M1n 11 111 t1)11 11aba161kp ,dlnn 19x1 Stall hupanl an t I Ili I7kn fW riltl 1 Pour Cohu m I'len i 0n1,11,Wank 1340 BaddAWa66Dardod 1 OCf A Strip Pler Well Forms FetG� 2 O�.0 Q7F7 B Backnf all.&D¢mo'ed outings 1�0 GraisSnbmGadr 1 QA�31 O/fl$l7 M SOI�1 0 Q>7 A Grade SI bon Grade 130 SdSffiEdge&DxkArgk, 2 iD"�IB 11F7�13 Soil Com6action 1 Set SladdI Ede&Dock A lea °t' �E'�'g� 2 1ff�03 11f®D3 - ___ _Epoxy at E1rlstln gSiab 4170 Uo}mladSad 2 IT ITEBM - _ _- - r -- - - 1410 E1xkat@O.ims 1 t 72�iD 13 Vlaqulen and Sand 'W50 Fst3l Rdla 013 Blockut @ Columns 2 131 14F73313 41® R kiysdlxl 7N�C0 Instal Rebar 1470 RxrBliiigakOnGade 1 t7FEBCII 77F®[B Rehm Inspection WBO --}-- ---_. _ 0 Pour Buildin _I..- __SYpSbh&Wan Forts 1 17F7$li 17f®Ti -_. - - _� __-____ 9 Slab n Grade 1A?D SetSkuLA,-;f dC0Un A Siri Slab&Wall Forms 7 ITEB d 18TB03 A Set Structural Steel olumna _ 1� �5 � �'rs 3 19TEM 21F�3 }r� ' 1510 WeldConnefiz-Io NsirgSYuire&QgeG 3 21FEEW 2T�73 ® Install Structunl5teel Beams 1931 = iux}radc&Kd¢rs@F Fri:Wal 3 24f�B 2&1B03 ® Weld Connectlo,'(r8 to Existing Stmclure&Gusealt 15D Wadkglorhl 0 -- - -- _ __ -_ © Install StrongbaCk R Kickers Exlat Extr.Wall 1910 OmoE13krFrarig 2 29"®W 27FEBM Weld Inspection -- 1� k�dBoexnTrxk@E�g(+a�et 3 2 B Demo Exterior raming ONVIB 1MO isfa w'd Deddg&Cl. 4 0[irWim OB I ® Install Botto Track @ Existing Parapet 798J kls�l BatP61e ® Install Meta Decking 3 Closures 3 03M^A03 BAAR03 ■ Install Bent late 1590 hladoUSYaY�Sbal 2 O7MM703 iDM;03 - Exterior ® Monokot Structural Stesl M fayolt[ExkkrWals 1 2:EBM t'BD Ysta1T5.@�rp Dorrs 1 � 2 0 Layout Exterior ails 2lfD FraneExka Wals 2 23 27F�6 j A Install T.S.@ R it-up Doors is 0, 213D Pu1ti5WalRaln 4 �3 09vYY1T1 I Brame Exterior Walls 2110 Electrical Well RaLun-n 3 �03 mtM� Plumbing all Rough-in 3ID NcwGasPpkg P-#M 2 � ! - - - -- - - - - _ _ lAB Electrical W II Rough-In _- - 1840 EA-Fmrig� 0 New Gas Pip ng Rough-In - - 'Iti4J isFalF 'vSdiddrg Nelxgds) 1 I �Exterlar Framl g Inspection 1B8] SdFrma�rFalrs 1 {I: Install Exterior Scaffolding(to-eboards) EbiorSheeing Instal[Exte or kt m 0 QMy6U3 - _ —______ _ - __-- - _I -___- _ �-Ex BriE.Lo S h 'fi Nolnspectio RHO ELF3hq-"or&Rv,,b 3 CAvNF703 11AWLD - �Cbd 4 7DAMdTi 73vW�fB n R Revel is 190) FJFS Frell Coat 3 4'�klW2A 7BrMF1'B E.I.F.S esh Base Coat', 1931 IbroeSQ*idrg 1 1946Va3 19dN76 E.I.F Finish Coat 2)l0 Fstal f7akq Doors __._ _. ____ E Rem ve Scafflding_ 2 1gJWi6 21vy>f7B -- - _ __- - 2'ID Instal�as&Fladnae 2 2TvyA03 21ANJ"LO 0 Inst II Roll-upDoors 2731 kNaIMFP Inn 3 27rW703 21M'R11 0 his all Doors&Hardware 21CO Ca kE+Jov 2 24AM1N2D 23vYJi?3 I stal MEP Trim 0 sulk Exterior Sheet 2 of 11 Activity Activity Orlg Early Early ID Description Der Start Flnlah 1910 Patd1E.1FS@RodTen1 3 2*ANC3 26_v 0 3R0 F rrDms - -= -- ----- - _ ___ ® _hatch E.I.F.S @ Roof Tie-in's 3B0 tslal DoorSeab@P1kp Doors i iBVl'F7D 2dvWd]3 19 laint Exterior Doors 3H0 tffiI Dod,B rrpo­ 1 33JN7T3 g Install Door Seals @ Roll-up Doers Interior g Install Dock Bum r 1550 Lapwlie irrWals 1 QItiV+F�3 OIFMPoO 190 Frame lYa'rrWaF; I Layout lnt rior Wails iBle SdFDra&VVrdxvFrares 1 iUVI48M tWAAm Frame In erlor Wails 4080 SdFan Cris 2 11MNID3 1aAAF;03 1 Set Interior Door&Window Frames 2I91 Id<rttigWal Raghin&R�raTesl 5 11MN2D 17fNJYo 8 Set Fan oils ZIBO �'ralWal Pnprn&SeltJavPa�s 4 11t✓Ni@ 74M4i73 ---"- -- - -- -- -- -------- -- _Plum I_ng Wall Rough1ln&Pressure Test 1&!1 lHirFmrig 0 11hWffi Elecid I Wall Rough-Ip&Sat Now Pen;ls TAD E641raI Wal Ytpa ow 0 17MN2D Interior F aming Inspection 2223 PL+rbrgVJalhspedpl 0 IUVW:03 I Elecir cal Well Inspection 2230 DW4 3 1UvWo 31� Plum Ing Wall Inspadlon 15M l9k*,Urd11d1dRcoH)eck - M D all 3 1flbWi0i 21MWiD - 7, -I 2210 Soewlgxdur p 21AV493 III Ina lets Underside 1"f Roof Deck 7SD Tepe,Fbd&Fhj1 4 23�tNiD Scre Inspection 1�0 1s1a1tiJPCO.eAmd 5 2YvY+F3[D pe,Float&Flnlah 7540 ksfal0Mhaadgrrbig&R�mTEd 5 21NArU0 2BJJJJ33 ® InsblI HVAC Ovrtfieed 2B W� 1bIG lQMFm Spitd9rC1HP'pig,Dops&P.T. 5 3TvVJ703 _® InslellOwrhead Plumbing&Pressure Test _ 103) kdaiO.etxud E6riial 5 2VANr1Ti 27✓Jt7@ ® Install Flre Sprinkler O/H Plping,'Drops&P.T. 110D hial M"ARadq hM158F;PE}g&Re®reTeet 3 2WN706 © Install Overhead Electrical 2dvW1D Install H S&R and CHWS&R Piping&P i ears list ® I 2D0 PaitWals&Dy�ralCeirgs 3 27AMM 2BVAFA3 2370 lstalDsas&Hadk ainl Walls&Drywall Callings 2 YlT Ns 03 a Install D_oors&4tardware_ __ 1BA tFedFh/PC&I-M58ROfM&RPtiy Osteaf 0 31MN70.1 I. __ _ . ._ -_. ., _ _ 11 Inspect HVAC&HWS 6_WCHWS&R P Ing Overhead i� 1pedO,aleaiPlrriig 0 31tvWm I 4110 ism DH HVACD Wpig&PLnbig Fpg 2 31V OL^FFm Inspect Overhead Plumbing 103) k[{edFn Sp o.aleed 0 31M^Fa6 Insu ate O/H HVAC DuctlPlping&PI mbing Piping 1670 0 31MAFM YgiedO�ateadBedld Inspect Fin Sprinkler Overhead -Inspect Overhead ElocWcal_JI_-_. 23B] PaYDns&Frarffi 2 OVV=H¢3 OlAFitU Install Glsu l- -- -- 2AI1 Ceig Wras 2 07NTM OYPF403 Paint Doors&Frames 23D AmafialCeig Gid 2 03NTm Calling Wlre� 213D lUn Nev Bolor 0 OYQTiO3 Acoustical Ceiling Grid 23tD i�LgItFML 23W lsial Ceig DIkeers OleF7�3 Tle-In New B Iler 3 Install Light Fixtures Zia] laki5priissFlea� 3 OWTiT3 054TiT3 ® Install Ceiling Diffusers ZOO t�edOrt f�dlrC—P 0 051; 73 Install Sprinkler Heads 2340 6-*e L�IFttm, 1 03^FR03 � Inspect Overhead for Cove-up 2731 4sfa1 -- — _—_ _ ____ __ - _ 1 Enargke�Ight Fixtures CeigTie 2 OOerF�3 tONiL3 __ _1- 23M Aep&CakFhv 2 11NiiO3 1Ae1}7D B Install Ceiling Tile 210D PasinaFinig 5 1Wi'YB 17APFD3 M Prep&Caulk Floor 273) --IC i 15NTm iSWIYD Resinous Flooring 2RD FslaIVCFat Olfm 1 151FRII 15N°RT3 1 Seal Concrete Floor @ Dry Storage 2170 te"P4tberBaae@D'ySt a♦7e 2 iP,M-R-_B 17AFFi03 - - - - - -------- - --- -- _ _ _ _ _1 1_nsta_II VCT at_O_rtlu__ 2140 I staIFRP 4 iWRD3 2 0 Install Rubber Base Dry Storage Install FRP Sheel.3.of 11 -- Activity Activity Orig Early Early ID Description Dur Start Finish 7510 istal Ppe Salads 1r2tP 18WTigi 0 Install Pipe Bollards 25d1 PailPfpa9tnb 1 2fA9303 0 Paint Pipe Bollards 2450 Ele1LIdTrm 2 2SNin3 0 Electrical Trim AM P[rnbirgTrm 2 2N1TIM T 0Plumbing Trim 230 ��'��� 1 27'0� nstall Camer Gu rds SHIM mE4irrsrt 3 Set Kitchen Eq Ipment tslaID61 ud"ItHodiap 2 � 0Install Dishwas sr fi Hook-up 2M ItdtW Wial H}kxrat 3 03N41t➢ Kltch m E ul moot 2'LO C�mpSPudtl 3 ai�PFW 02 ANM -- ----- — -- — Ip HookClea Hook-u up ti Puun 2:A0 Cly iylec" 0 03ANM I' City Inspec0on timllOgairathwedn 0 0u'Am Health Dope ant Inspectloii ! 29D CryFial Ygxt6m 0 O%AW3 �70 tion Cu��dCmlWicY O amv w City Final frc Csrtlflub of Occupancy f Occu upa an Roof 7630 islalRodOas 3 O&A%9m VWFU3 ® Install R of Dralna -kmYffiIBoHr&CFdarag llrlPtfbrtrs 2 OUAAF03 07MN;U3 9 Install Bol�r ICondenslnp Unit Platforms 16l) i"ExtualanOubs 1 OOMAR73 01i 1 Install Exh au Fan Curbs , 17W SE M PRod la s 1 07%141B WMAi 0 Set MEP RZ Jacks 1710 FsYalTapaed Pafl'aLrirr3(}d 4 1DJWm3 13AARM 12d Install Tapered Roof Insulation E Crickets 1721 isfdl Rai - T---._—T FksIsgs 3 1ZM;C3 14NYiTi © Install Roof Flashinga 173D Rodiipecril 0 VA46 M pe 1740 tffiIMenlh-aeRodrg 3 14trWiX3 16,AWiD Roof In ® Instal Membrane Roofing 20 YstalRNBi'a4d WakPadi 3 19dW;C3 211NWU j ® Install Roof Ballast¢,Walk Pads 2410 Tim@R.nlClais 2 1gNN�3 2MVRMB Trim Roof Drelnsi 1780 SelBoit&Tai¢ad CadffsgLH 3 2yrK4903 23v1W7O 0 et Boller&Tank and Condensing Unit 2110 i"CariaLshugs 2 2VWzC3 23vWg0 El 1 stall Counter0a�hings 1750 SdEta9Fas 1 24A4 0 2M4RM 0 t Exhaust Fans frig filial Bow piping @Rart 5 2%WY0 OWFfQ3 Install Boller Piping @ Roof 3740 R=iA3RA1 aia 2 21tNVn3 iivV'fYB 0 Reroute Refrigerate Lines 1780 8x" Bo�SCads1ecf&Cu1� fild 3 31M*133 @PP128 ._. o __ _ _._ _ _ ___... ., —� � � � Ele tricai @Boller d.Condenser t:Qutleta @Roof , 3710 TedplirG 1 02AM m 0 Test Piping 1793 ttgledt3oDr6Catdacaf'phg BEl��I 0 01WT03 Inspect Boller Condenser Pit Ing 3 Electrical 113D iauizaid I"Bda Pipig 3 O3WFRU3 D7NPFg3 IN Insulate 3iLabel Boller Pip ng 21� Par[WdFbstzg8MioEW8Pbifomc 2 QNPFW 00dpm _ _ Paint Roof Flashing S Misc.Equip&Platfo_s W 21OI ClmnRodBPuxb" 1 1DWii06 10Md� 0 Clean Roof 3 Punchllst 21ID rk"Rdtgaen 0 1tW'R0_ __ +F1gal Roof inspection_ Bile 1W S"Winxfg Docklinz hh 3 2apM 22pm i Re ocate Loading Dock Area Draln 4000 Iaatl*ivMmuW al 1" 29IMM 29EM 1 Layout Now Masonry Wall 4010 Fetal MasmyWa6 2 M:EEM N Install Masonry Walls 402D C'roulMascuryWal 1 23IBM 281$I3 1 Grout Masonry Wall 4070 Buximmorr Wal 2 03AORD 011WfCi 7 Brown Maso ry Wall_ 4080 EIF.SFridrCa3l 2 O1 fBvY•(M i E.I.F.S Fin Cost Coat ! 400D 6rd�t:Car�dTrsdr ConfsrtrWab 3 ZNW�D 2Y.MAfB ® B�rck011S ComapctTmah Comps rWalls 4Df0 CraiaS6Aaa�6mCva8 2 23✓.Wn3 23vWIIi W rsde Site Area Slab on Grade 4� Sd Cnrlain 0 i moll Compaction 4D3) FNal Coriotla Rritarzlg 3 27tvNfYD 31tJWm Install Concrete Relnfordn ._ — <et 4 of 11 Activity Activity Orip Early Early 20117 ID Oeacrl llon ---D �^"� P Dur Start Finish 41M7_ RRelarrspahln_ 0 01Niu _ - - -- - Reber Inspection j Phase 2-E)dsB Mchan Intorlor li 2210 2ri10 KtlmBbdcl@NevtcdaRarn 1 1Q=�713 14 0 Construct Temporary Protection @New Locker Room ® 7730 0 7a Mial Sale❑ectr-dl Ftrrtrgpr1da 85s Kitchen Black 1 2%WU 2BJAR]3 0 Make Safe Electrical,Plumbing 8 Sprinklers T770 Rr Fluiv&ExrigChlRvnEwxrni 1 2EThNb3 7BvW7p 0 Protect Hoods&Existing Cold Room Equipment �WtM 1 ?UvWiD 0 Temp.Lighting TIH7 �reCelrg 2 31MN3D OIARRM 0 Demo Ceiling 2�2320 Dw redww E4.4,mni 2 31M*0 0IAP:C3 0 Disconnect Kitchen Equipment �90 Q3 JJab@aTra 2 31MW7Ti 01AFRO3 0 Demo CeilinglWalls @ Office Lat'altlrrb9n+tiPtntx9 1 31M4-03 31M4Qll 0 Lay-out underground Plumbing Pr 6KLIai Fi4.¢riat 2 31M4'i13 01Ag1D3 0 Relocate Kitchen Equipment Frame lal3rorn&Cd1 Pnp.VJal 1 01AMU QIAf'RD 0 Frame Locker Room&Cold Prep.Wall ng Du Cawa WPUrL 1 0 Sawcut Floor @ UIG Plumbing @ Rrrf,g 1 0 Demo Concrete @ U/G Plumbing 32d1 � �� 0 Set 8ackflow Device 41M YsbI HAS&R ardCHASSR Ppng&Fr�,Tc t fi IPPFfdb 03rv9dT3 Instal HWS&R and CHWS&R Piping S Pressure Test �® 282D Instal New DaD Om H/E�ral Pals{s 3 IPARd� OIIPR33 �iO Install New Electrical Panels 3 0u+f'f�t ;❑ Overhead HVAC 29GO Instal D=Fares 1 11Z^R3T3 Z/tll ❑; FR' A Install Door Frames Z� Oart Fm 2 @WT3U ❑ Demo FRP 20D OKaI� berg s 3 O Overhead Fire Sprinklers ifi70 Exarab llG Ptrrhg 2PRD303N Overhead Plumbing 33M Ystal Nas,Fennr DotrBCYste Pad 2 0 M� ❑ Excavate U/G Plumbing ❑ Install New Freezer Door&Closure Panel 23C YdaIUG FYrnhrcySef Ffx rSnksLYxs 2 C34°SdA 0Yv9YT3 ❑ Install U/G Plumbing/Set Floor Sinks/Drains YsfMi Sarh�s 0 U1rJidb �l Q Inspect O/H Sprinklers Yqud OHFYniig 0 Opp g - —0'�- — 0 Inspect O/H Plumbing ZlDJ Badro&Cmrubn p OiNTiD WAPFm3 I�®Inspect U/G Plumbing 2910 4H ED Backfill&Compaction Rn$fn Elmira1ai 0 OLD ©O/H Plumbing Inspection 2g70 @ 2 03N _ ❑ Rough-in Electrical Wall O,at fElerYrdl 3 O7AM03 OaNT D -- °@�_' 3140 Is1'#3Rntrg&WVS&Rad CHWS&R Rig 3 P/A9YD 03'N38 _ 9 i1 CHWS&R Piping El El Overhead Electrical __. -_ __ _ _ ____—_ ___- _- _ _- __ Insulate Plumbing 8 HWS&R an !/10 Liuchk 4 alll D n/N1y[1 g Drywa WWatYgxidrxr - 0 ®Boll Compaction IX1,�y�yy� — I ! 8 Electrical Wall Inspection ; 30O) 2 �T3 CYFFM ❑ Drywall Walls _ 30� PaY3t Qyr� 1 LE^R� � 0 Patch Drywall - -- ZTA Fbirrnot@11G F7rrtrgTes 1 lBPli 0 Pour Concrete@UIG PIu bin Trenches 2330 YspedWHJAC&H✓S&RCHAS&RFfig0,,h d 0 Q rR 9 Inspect O/H HVAG&HWS&R/CHWS R Piping Overhead 2BM Yspoci CNi � 0 03 0 Inspect O/H Electrical 4130 Bare&C1wd Hadlffi@Rsimrs 2 10NPI 03 11AqFM 0 Frame&Drywall Hard Lids@ Restrcoms 3010 Tape,FImIB Frc'h 3 14oRZ13 16Wid8 ! Tape,Floa[&Finish � Seel�E�'gWats —-----_ 3 -_14gRd73 16WTd73 ❑ Skim Coat Existing Walls 2 1GNFD3 VAIRM 011 Seal Walls 3lTD PariWals,SCR68FIaV Utl Cf3'r� 2 17A4d7i 1aVFM Paint Walls,Soffits&Hard Lid Ceilings 0 Sh, '-5 of 11 ActivltY Activity Ong Early Early ID Description Dur Start Finish 2230 Cearclia Flvig aQ Pe'Amrc 2 17/PF03 la6FFM 2ffiI lstal Ce1rg Grid&CeiigWms 2 136Vid71 21lAiD - -- ■ Ceramic The Floorin Restrooms 233) isialTdol RAma 3 2WS703 2 Install Calling Grid Celling Wires 200 4stal Ceig D'ihrssas 2 2T'1 23AITa3 Install Tollet Flxtu as 2910 iti6l LBttFrdres 2 71PFfi73 2;Wri13 I ■ Install Calling DlHpssers isdsimn r 2 224PFC3 23 ■ Install Light Fixtu a �� FiCalCeig Drop Cords 1 71lFFm 71.^1{313 — �— _ ■ Inatall5 rinklerH ads "2Mharl6rCasap 0 2yp� 1 Install Celling Oro Corde F°hr� 1 2VPFO 21NA0 Inspect Overhead or Cover-uprg T>e 2 2NPt�i ZYJ"f3T3 1 Flnergh"Light Fl une(P¢azgrias 1 2L+F�iQi 21q� ■ Ijratall Cailing TIIRv 2 2 ----- -'--'--- _..-- _____hnstall To list Accs "rigsBFiaor 1 2]^!ii➢ �, { ------- -- ■ Bead 01aat Flo r0°re 5 29yTiD t9d41ll33 j 11 Prep 6 Caulk F oor2 CEIVIAm UNA1W Resinous Flooring 3123 Instal Conffg"d, i O7M41L0 ONJA)w �■ Install FRPI 3131 �lWXn F4pTat 3 OUvt41U3 12V74193 - - - - - - " - - -- -- -- - - . -. "____ I_�_Install CorrlYerguards 31(D Ekxfrid Trcn 2 UIVA143 GRA193 I Sot KitclI en Equipment Pi+rtiOTdn 2 ta✓AlN CflY+111D i M Electrical.6m 31� Ktl�E4b*at 3 UTM14143 13JA1W ■ Plumbing Trim 31A Gawp d PLrd" 2 12viA1170 13�M14190 Hoak-up Kltchan Equlpm Int 3100 Ctykcperirr 0 I _-_ Clean-4 d Punchllst 319D HB*D*aFmrt irpain 0 14M4Y[D j City Inspection 33D C✓lyFrelY�e6n 0 I Health partment lnspectlon � ! 32b C-a�d� 0 igAM1gyIIi City Flnjal Inspection PI72Se2l-Cold T211P..bIen te of Occupan j Interior j 3230 Rr DUL -11 KH'a1@}}rnat 2 2%WU 31MVw I 32i0 Make Sa(BBac ftmkig3Fia Spuds 1 31MNSM 3IM40 ove DI hr esher It Kltcherl Equipment CaPR-brru@l3twadia 1 31M*03 31MV0 e Safe Elf trlcel,Plumbing S Fire Sprinkler 3231 Dean Ceig, 1 OWP01 OUWFII3 PlumbingjI@ Dishwasher 3Z/0 Da WalBFtrrTh 2 OtlFfiD � o Celling� 3370 DanoGyvalWaLcfrtg 1 d'i'PF✓03 IPVPfu1 __ _ .-___ mo Wall&Floor Tile Pa�Fn FJediml Wal 2 Olr'✓M mo Drywall Walls for MEP3440 Ra�¢rhPinttgWal 2 03^fiiTi Dimouph-In Elpctrical WellUF Lin agro"arrtig 1 (BAFFC3 0� ough-In Plumbing WalltFlorr1 Qi�d703 03NR11 oul Und�rgreund Plumbl gOrnW@UGPar ip6Smp 1 03 03 ---- -- ------ -- - - -- ---- - wcut Floor UIG Plumbin E SumpwdwJ &Rd UaaI,, iae 2 00^fTm OY Demo Conc l to UIG Plumb ng 8 Sump mdFiaSpti�s 2 U7^FF� Ot^PR73 ■ Overhand H AC 6 Rofdgant n LinesaslEksiial ■ Overhesd F rs SprinklersaylPuntig 1 L� � ■ Overfiesd EeeWealbt3GFtntlpSSurp � Ol^FIiD OW♦iN 1 Overhead Plumbing 310 YcpaaOHPu b U 1 01r'ftill 01°PfO S Exravate U/6 Plumbing E Su p --- -_-- 363) E7a#ia1Wal Fspaoln g (1 Inspect OIH!Plumbing 31D PlntigWal tcpedm 0 Electrical Wall Inspection 3® Rryaih?r*boaisi3firn&Oyral 1 071R ! Plumbing wall Inspection 0 Repair I Sheet R of 11 -. Activity Activity Orlg Early Early ID Description Dur Start Finish 3� 0�m Wl� Screw Inspection 3�0 Tam Tape,Ff�el&Frsh 3 MA COM-ii� 0 Tape,Float&Finish 3i3I Instal P Insial am lrrtkhkdohQSrisO-dfa 1 WFFpT3 WPPpB Install U/G PlumbinglSef hoar Sinks/Drain i 1 3480 kgaatOMWAC O �jA 0 Install Sump Trench Angle 350 ktpeclQHSpiides 0 07Kfl03 T-- — In OM WAC ffi70 kapedq}t paal�l p 07/F1U33 Inspect O(H Sprinklers 35M kYiCd E4 iRvmpa)*& ¢r"t 3 CYFR03 IONITC3 �ImpactOMl Electrical 3MO hgmd UGFIntip 0 Install Cgld Room Panels&Equipment _ O0^fiYO }ir 3310 Baddl&CngssitlG ti Hng 1 � t Impact U/ Plumbing 0 Beckfig&�Com act U/G PI mbiny 33D SdCnrpadn 0 00� - __ .__-____ __-._- __ __ _�P._- 3� FtuBad(Caufs@UGPhigTnrrizs&Sump 1 W^liiln Sall Compaction P ur Back Concro�e Q UIG Plmb' Tnnchea d Su p 1 3tID /vU9Tnrrh Oafs 9 1 10^R3B 10^FFM 0 Install EYsporator&Refri areal Piping 330 lrWalOilpccmTcTpgSiab 0 Set Ang I/a Trench Dral a 2 10W M WPFU3 M FsW Gd& - - -_--- - --- -- ---------.i-_ ._- _- ____ -_____ _-_7 install CPld Room Topping Slab C'�'a 9 1 11AA73M 11l�FQS 1 Install Calling Grid&Ceiling Whas 3A0 Tag Rekga-akrFT{ing 1 IJAPFC3 11FFFiD3 I 9 9 305D Bood Ballba 1 Test Ref g 1 erator Piping 11FFTiD 1lA9 U3 37 i stai Ce$g D'il sema 1 yAPRM yAPFC3 I 1 Baad BI at Floor 37IO Instal Ldt Fo&vm 1 hNFFa70 14^AdTM D Install:Ceiling DIRussri 3/D IsialSpHdaFlmdc 1 1NPf WFRN _ . .. - - - -__ --. __-. _ - - _. _ _. 0 _Install!Light Fixtures 318D ldalCdnggcpCurlS I 14NTO WPFCi 0 Install Sprinkler Heads 3710 HookupCcURcc 1 ! B Install'Ceiling Drop Coda 39U fagal Spfidas@ Cold Roam 1N i1^fiTB g Hook-up Cold Room Lights MW fepectRairg-fan Pbfg 0 14^fTiD i 0 Install'!ISprinklers Caid Room 3M kged0"haedfrCaaW 0 15Ni�M -- - - - -- - - - -- - - +Inapacl Refrlparatlon 3W kstal CeingTie 1 15g9703 154TdD ! Inspect Overhead for C,ver-up p'BnM�FDI n 1 Install Calling Tile 3330 1 1YR� ib:YTU3 1 En e l g 3@0 pop&C Rv 1 76^FSiT3 16Y•f� g rgize Light Flxturos 38M yens B Prep d Caulk Floor 3960 Y6al FRP 3 iG^FTYB 'IBP1T�3 _ _ __ . _ __ __.__- —. _._ _--.___ __ 0 Real Flooring 1 21AA>O3 2W}ioi -I_-----_ 3 MO SotKUME"nat p 7jpfT#➢ 2 0 Install FRP 0 S t Kitchen Equip ant 3800 E]ecLidTrim 1 MAPRB 22*M 3010 Plu tkgTrim 1 71!'PRR 71!'FFO3 1 El�ctrlcal Trim 3m kffiICanagsrds 1 1 Plumbing Trim FM � Ha:k PKIcxmE4#ret 2 Z ..___. _-__._-___.____ _- -___-___- _ _ I Install Come us a 3g� (7tamxp&Rrr1tT 2 Z3r.� ay�113 v Hook-up Kitchen quipment CtPkWedn 0 25 0 Clean-up&Punch tat 3970 Haoilh lapatretkapedn 0 g3^Fi�33 City Inspection 3033 OyFkeikzyedan 0 2B^Pf� Hsslth Daparhn nl Inspection -- - ---- ---- - Cit Final Ins a (ion ________-. -__---._ - ._ _. __ _.- __ _ Ciy_ __ . P-. __._.__._._ Cali2ddOm�A' 0 :CertInceisofO u an Root i 3B10 LaplRomfarpes�a O ndydv ftLrm 1 OtNRA DIPPRCB La out Roof Comp szor&Cond nsing Platform ! 3E30 kale!���6 1 02Nflm MAPF 3 g Demo Roof Tle-In CmiasgLkd Pfa&rm 2 � OUFFTS nslall Compres or&Condensl g Unit Platform p 3W Sd�F�Ja� 1 ! 1 Sal MEP Roof Jacks 2 OYFF0 0 Patch Roof '" Shr-7 of 11 Activity Activity Ong Early Early ID Description Dur Start Finish 3(H] S�Cmpesea6Cnrirrig Lhh 1 1(y4m lWPp i ffim HrsgaefonBCmdaeh Clap Piping2 0 Sat Compressor 6 Conde slog Unite 5321 Te9p�0 1MFF03 Refr Beratlon R Co donate Drain PI ing 1 154TtA 1SefT03 51110 l4edFTFi9 0 15�FfiD3 i 1 Test Piping 38M intfe&ubdPlFig 2 16�1 17APFCO �Inspe tPiping 37� PaY1I'beonra 1 10NiYD 1B - - ---- - _ ..-_._-. __ __ --. - - 0 Insulate 3 Label PI�Ir rg 3730 C1nRotla Rsdid 1 2W13� 2WTi[A --�� 1 Pon[r Plettorms --- Springs Meeting Rooms 0 Id Roof R Punchlbt rU429DD�QHWAJ0Q S Gradln l CoridrS m,3deS 2 00yVJtt3 10W4Ti ouspii"S 0 Install C rrldor Berries e Of Buckled 2 10W4A 0 Safe Off prinklers 2 O;W� 70 0 Safe Off lachlcal Sb CashaoireA riy 1 L13WlD OflYPlD I . nSPl'�ile�efvea B Install Sit Construction nosing @c�f+tBrilxAePnsE 1013y4J70 2U*W D me Springs Tl antra Ana QHHVAC 2 24W,1)3 27 M - - f 4M1 RnntNPG RA®CahLT nme OM HVA @ Springs Tlu be Area - 1 - - --- 4281 Faroe gad Brare — 1lWlD 21W4D IDamo fIVAC D rot(M Corridor 4690 k1"TarpaayUjfgaF�Oxln 1 3lORD3 21WJ� 0 Remove Stool Be me @ Stage Cu Ian 0 2u*m I 427D RarosBSal�lJlJs@7fiaioprea 1 9A7M Install Tampere Lighting 6 Pow 430D Sarni Fha 1 211W393 j 0 Remove d Saly go AHU's @ Threaat Ire Area 4310 Par CUMMEIB@Rkxr 2 � � 21V4 tD 0 ISawcut Floor - - - -- - --- 1 30WD3 0 Remove Cone eta @ Floor - 4321 (.Tan7lx�aleFvea 30� , 0 Clean Theatre Area Structure 433D hpot Baddt Care &G d.Said&Wmj 5 31.WJ7i 0&'�(ri 4i90 W Carpa3n 0 OB�13 0• Import,B cktlll,Compact Grade Sand Material 4370 Fsta117ehaDonek 2 O7F�D 1 Soil Com action 43D karat LiG FJertkal 2 O7Fi�00 1Q�03 Install abar Dowala 4;fO kspedL4GB." 0 10�"0 Install IG Electrical 4� ksFal F7rG� 0 - ____�___Dllnnlail Uabnrlectrical_ 2 11I7$Ti 1 - _ __ _ - - __ • Pour lab ec Grade 4031 PclgFc�e6zr 12�A __ __ 47t0 Parg�mOa� 1 13f�Ti 13�13 i 4410 hdalC�aahhWASdd Beamed Bang 10 14FEHD 442] S LPSI bin War Trd k 3 �[li OWJ4770 Install Operabl Wall Steel Bnma d Bracing 44M htrddeSn jrMSI d p OSvY�p OGoWIIi — -- - - - --. ..._ _ _ -_Sat Operabl Wall Track _ Interior 1 Monokote tmctural Steel 440 LarcLLkniaWel,&Ccitgs 1 WA4N�3 4510 � ��� 5 OR.WTn 13„Wa7 1 Layout Int Her Walls R Cal'Inga 4470 tsfaiO.rhVAC4G itrDA k 7 07M4900 17}vWY13 Install verhnd Electrical 49D halal FieSprWapH Pfig Dn){,eSp.T. 5 GIMAF i 13JJ4373 ! Instal Overhead HVAC E Corridor Due work 445D BachOlpaaUeWalSkdvih K4oWSWFnrg 3 UNA4" i llmgm Install Ire Sprinkler OIH Piping,Drops P.T. 4SD Frame t4ix;Pekrs VvaG Rcard.Wais -- --- - ------___—__-._ Box-In ruble Wall Steil with Metal Stu Frmg. 4 7Dvy4ip 13eW(Ii __ _ _- _ _ _ 4SD i;WChA Fire Spire 0 1%Wm Frame Isc.Perimeter Walls&Corridor ails 4540 --pau HEhce'raI 0 14JAfiO3 Inpect 1H Fire Sprinklirs 4B]D Wa18CnoiYr IUY1dFranighSped1n 0 13 Inspect OM Electrical 472D 1111set�rFmrs 3 13JAfT➢ 17AN4Y0 Wall 6 oorldor Tunnel Framing Inspec on ® SeL D or Framaa .__ She -q of 11 _. • -- - _---- Activity -- Orlg Early Early ID Description Dur Start Finish nFr 4ED ReFn Dryrel atCrnidr6 F7ed'ml Pumn 4 144WQ1 19VNA00 457D EkmiralWal Pugh 4 145M1M7D 19vtWU3 t>B Prell�ti.Drywall at Corridor a Electric I Room 49M Y9pedC"WN, 0 17 Elec rical Wall Rough-in 456D Frartp Coipr 7 19VV4;A Z7FMIiD Ins OM HVAC 4330 FJe6kslWalY�altn Q 1 - mndng Collings 431D Feialle Wak 4 21AM 23AARD3 Elac rical Wall Inspection I" Sel9afkal DauigiCas 3 23vWi73 2WAFD l! I subtle Walls -. 4HD LIWSIWab.CwltrPaLitaTirnelCodtr 5 MVVM OIMfiD 0 el Electrical DowMight Cans 4® �.��®1-�� Dryw 11 Wells,Corrld r Patch a Tun al Corridor 11111111 2 �M1aFiTl MWM 41ID Calling FrarO 0 27Mgn pdnkler Drops,@ Hard Lids `M -' -— eilln Fremin Ins sctlon 4yHal Ceir� 5 TrtvWYB tYFFlTD 9gP___-_ 4WD Wai Soewhapadm 0 OWR3�3 - -- -�--�- - Drywall Callings -- 48M G&VS00W kpedil 0 Wall Screw Inspection 4700 TaMFI0d&ftdr 7 03M3iD 1IAFTiO3 69,Calling ScnVy Inspection 4710 Paitcohos 5 09+FR73 15Nia3 Tape,ZI at a Flnlsh 4LU fatal DouS Frmssa Fia>3aaa 3 I1WTM 7vpFM Pai- nt Ceilings___ 4740 hshlV�god BasaBflesat#nRal q 1O^Pr7B 154Fin3 ® Install Doors,Frames Hardware �10 RelehBase E FtrrU@ Candor Doors 3 14r,J:RM 1gy-f1Qi ® Install Wood Base a Presentntlon Rail 479p Au ch'ral�.g Gry 3 1G 18afii'S Repair Bass a Floes ng @ Corridor oom v 4780 W��IB 3 1Gy{1p3 13l4T�1 ID Acoustical Calling Grid 4010 hsfllLgi Foam oQSanim Cmrix 1 1fi^FfYA 16�NIIi - _- _ - - - .. - ® Walicovering 4030 hsal Sprkla kH 2 15^lTiA 17M103 Install Light FixluF 4$Service C rrldor 0 420 Plow Cairig Ddfisas 1 1� 16� 0 Instal Sprinkler Heads 47:D PatiWak,Do or,Bare a Pak 3 17AFFM 2VFfm 0 Install Calling Diffuse". 'B00 i's41LVi FoM.@Amisk-a1 3 21 y;ry-{YD ® Pelnt Walls,Doors,Base a Rails 47B7 iAalSarrlWal Patiis 5 21AFiifl3 - - - - _ - - - _ _m_Install Light Fixtures Acoustical a^FfiO3 - ______. _ 487o Fetal Ce7rg DiAssers@Amtsicdi Ceigs 3 p V *RM Install Sound Weil Panels ggd3 halal SprhlirrFkadr�AmsYa31C¢Irg, 3 2LaFfm Install iCelling Dlrfuts m@ Acoustical Callings ` S®ICazrna 1 71lFT� MNiib Install Sprinkler He ds @ Acoustical Ceilings ■ I 4BCD 4� F+ .1®U.�i Fooras 2 ZYWYp 3 al Concrete 48A Instal fCtbaBas@Seixi Caidr 1 � '- -- - --- - - - -- __ner Energize Light Fl Mures 1 Se E. g_ H _ 433D t>sfal Ildb.�{tp 0 Install Rubber Base @ Seth, Corridor B ---- 4880 Install Celhg Tie 3 �i^lT1D //Iriapect Overhead or Cover-Up 4770 Eladzical Tarn 2 ?5�7171D Install Ceiling Ile 40m � 9 5 C8vY�1113 t■ Electrical Trim 4®D tstal Opa#le Wal Parek 3 G M1tA 03V141O3 _. _ _ _ ___ _ _- _-______ _._-_ - _ __ Irmudi Ca tin 4Bt0 ClsenlpB Rrdil 2 OSJAI1D 07AM14YII3 Install Open le Wall Panels 40M �'�F�eddr 0 UNI' 3 0 Clean-up a Punchllst 49D Cas mia dOM-Wq 0 Q7A,14Ym City Final I specllon Roof CarSBcate f Occupancy MCbs YNPersakrsaTeii Lnrdrs 1 1ON47D iQVW703 . 4 l@�FOL.�Tbis 1 Layout R f Penetrations:a Tla- 3 IJWFM 1344M Y In Loeatlo s FS@TshluaFrs p 11A41 1 ■ Dames ooMg®SNeI POC'1 Tie-Ina rlOpaiKry FrQa2arrk 1 14MNiD 1,NNYa3 i Demo E I.F.S Q Tie-in Locations U k � 1 Cut-In oof Opening,for Ductwork 90 1 17 KM 17t WU3 _1 Stub- p Ductwork ar SoearaNllaCozbsarPrrc -I- --in-stall- - - -- -- - 7 1BVW703 �.MFiTi - -- -- -- --' - -Mach' Screen a AHU Condenser PI Norms � - ---- ic Rsiwrs 0 1B✓ o Clear Public Reetrooms '- Sheet 9 of 11 - Activity Activity Orig Early Early 11 ID Description Dur Start Flnlah 5133 VVdJg Ypecln 0 STiD ShcvEpf2TdJaio 1 Z!M^fTD 27MgO etding Inspection tU10 SdNU,ExIa6FenaGrrHea 1 27I.Wiln ZlIvWUi 0 IMEP Roof Jacks 517D 0 TN - - ._ - - - _ 0 sl AHU,Exhaust Fan a Conde_n r Eli kffiIFdcdFiJAACaPlntigpp@aVek 5 2UvVRM 03^PfQi I Tear public Resfrooms 97g1 t>da117Kg�L 2 2UNJb3 31t.WM Install Roof HVAC a Plumbinj Piping a Vents 5170 Frara Meth Soeen 2 iBTA^Fn3 31tviN'di �i Install Rofrlgenmt Lines 3W tidal FizlDrd &akSa+jdTrapsa Fm Onpas 5 2UvW373 03FM Frame Mach.Screen 5131 Fmr4gY to Install Root Ductwork, and Trap*6 it Dampers - 0 31Mlnm 5140 t�IC9rmiBmd(B Medl SaeaT p 01 0 � Framing lnsp;cllun - - 5IM Fdal PlassrS/siorn0 Medr c.aeai 5 0.;J}m CB'ffdD Install Cement Board a Mech.l Screen 9A0 TesF@H✓ACd RntigF'Ipi@ 3 OixlTdi ® Install Pla�ater System @Mach.Screen _ Install Electrical _ p ___�____-__ ___- ____ -__ _-- _ '.D30 hsWEbdr-d@EgrpTeda Srxv®O� 3 Otri"f103 OWFU3 li Testing HlrACa Plumbing Iping - 51(D Pathl�fg 3 00^PF173 - - Equipment maxi Sorvlce outlets 51® PathEU=S@Teink�fus 2 OYAFA'D D7APFTD ON Patch Roofing ' 51� Y6ped f�Yg 0 03 ® Patch E.I.F.S @ Tie-in locations toped RadE].*W p Inspect Roof Piping &10 tah3balaLdFYdf'ptg 2 tg^F17[0 l A O3 Inspect Rpof Electrical 9ID7 PMRodSlarlhhgaF4gaPW,,, 3 itAA706 i5WiiO3 �-Insulate a Label Roof Piping Paint Rgof Shel,Fbh'g Equip a Plalfo s m 52D C�nF>�faFisri'l<1 2 1GA4iS 17l�F4�3 - S3D Frel Radtcpedm 0 1aNfn 13 Clean Roof a Punchllit Pan — Flnaf Roof ins action Demolition a Grading 443D S�Spaydya 3 73W� ® Relocate Kitchen Equl mant 44D0 Sato OREgttal 2 141TVJD3 15Y4II3 ■ Safe Off Sprinklers 2 711ML0 iSyVM ■ Safe Electrical�D senaopa,Tt g z 141wm 5wm OIf( 42d1 Dutppd'Tki Am ■ Sale 3I1I Cep Plumbing 5 IRWIM 22WM _Dulno Admin.Are _4WD 0erroQHWNAC@AckmnA® 2 7LLW13 231MD3 _.- - __. - _ ..__._ __ - 4�1 FiemeaS N-L1;@pdrtlp� a D,m0 O/H Admin.Area 1 231^1Jfli 23Y4d[1 0 R ve a Salv AHU's @ Admin 4297 Cl3rrPAtir Pnn 1 S1N7ID 211NX9 6.iW 0. 0 C can Admin.Area Interior SM La�rzlWah ! 1 0/7v4VU1 D7Myaq{ S� FrarTteVJaHa Ceigs 5 1Q.MFn3 g Layout We is 14AAeFYl3 L Frame alb a Callings Le�allltila9n�Rniig 1 1UAAFM 1U.N4m 5310 Osfxrsl INN,d RaF9odmtt� 5 1Uv4Y�3 I Layout U derground Plumbing SND O.efrndFlydig 4 1UiWm �134r47N ._. _____- __- _.____.___ ___. Overhe d FirElweSEarl kls yeretlon Lines S&D Saw1Flox@UGRnti@a Overhe d Plumbing T�P 1 11kN4i 11AWn3 0 Sawcut loor @ U/G Plumbing a Sump 53b DernGa�aQI.IGRrrt4gd3np 2 11tN4� 12f.Wh1 5dDD Eio'�il1C'RiTbi@aElrr{s 1 13vWiTi 13vWm ■ Demo C ncrets @ U/G Plumbing a Sump 5400 kMxd OH Fm Sptidoe 0 13M�f;ii ! Y Exeava _U/G Plumbing a Sumps 5110 kq.+edQH Ehrlkal 0 13dN3D Inspect 0/H Piro Sprinklers - -- - - -- 542D Yt;'odOH Rrrog 0 13'J.sFa7 Inspect O/H Electrical Inspect O/H Plumbing "" Sheet 10 of 11 -- r Y Activity Orlg Early Early ID Description Dur Start Finish 5363 Rughrn Rn�U@7� 3 VAVM 1BANY11 RRou h-In Electrical @ Wall Sg0 14AgU iB,443fA cu h-In Plumbing Walla 54fl hrCal llG FLrixpSHRuSii¢�4aie 2 tMiW10i 17NJJ?A -_I_ ._- _ _ _. _....__ _. ___ _ ___® ._ 9(� __..___ YepedGH WAG Instal UIG PlumbinglSet Floor Sinks/ rains S� 0 Yµy+fyTi 5M Flarig�1 0 Inspect OM HVAC 90 S9t B9c"Dm VtCans 1 17kh43N 17N.KiD Fram g Inspection I SM tr�l Tnadr --TAW-01 Set E ecWcsl Downtig1 Cans S+G 1 17hW703 1 Instal SumpTrench Angle_ SABD ycpedLlG Rrrtig 0 17NW3O3 -- - __ _ SC9) �rlidWalFryaln 0 1BrW3Q3 Inspe UIG Plumb 518D plByyylt 0 13�YYm Electrical Wall Inspection Sii g�dCurp dUGRirbig 1 1BvW�3 1RvW�l Plu bing Well Inspection SM Sol C'arpeoin 0 B Sac II d Compact USG Plumbing 1B 5980 tiyialayyals 2 iBvMfm 27JlJII3 ._ _.__ +Soil ompadlon.-. 0 Ins lab Walls MIDScrew pywl 3 7IIvWII1 2 D all 9"10 part � t 5 9 - . -- .I __ _•S;raw TInstall Beer Room Panels d E It 0 569D Tie,Fbetd Frsh 5 2%VRM P 55S) healBMPR Pam& p loath inlsh CeTrzds p ONPRm @ � r_ qulpment__ WM YffiIOais,Fraris&I-tadtaa 1 01APFO O PRO3 Paint Cellingp 55M Fstamoull is Install Doors,Fmmea&Hardware �a 1 OL^FFYII OIPNd13 Install Roof Ladder 5&b - Accus"Ceiling Grd t�G 2 0 ONIFM Install Evaporator d Refrigerant Piping SN0 halal Cd ntx nTUSbb I OSxAi@ OY� - 0_Acoustical Calling Grid_ _ 55� Is Lk*d Frdr� 1 07Pl3iD WF'PRA _ - f - - - - a Install Cold Room Topping>�lab _--- 1 Install Light Fixtures 5570 Fra31 9 Dlfi�rs 2 Ofl^fTiTi Install Celli DlRussers g��orHeaJs 1 �� U/Pi}"113 a Instal Sp�lnkler Heads BYO B 1 Hook-u Bur Room LI hti _ tq.'edO.ah�trCns- 1 WlFR03 07lAYD -_.__ _____-.._..�-_....-__ _._____.- __. - 1 Instal Sin nkim @ Bur Room - SEBO MM 0 � Inspect 0lerhead for Covet-U 57d1 q�y ne 1 03aFFi.D OOWTfD 0 Energize Ight Fixtures p 5710 p�WAs�s 4 � Oak 1 1 Install Grilling The _ ___ _ _ ____ ____ ___ __ _ ll_•__Paint Walls&_Doors_ 57A ply F� 1 16WFCB IGWFCi 0 Sul Concrete Floor �4i 2 17� 78 ® Set Kitchen Equlp nt Elec�rlcal Trim NEED �SIM TrirnKIJ- 3 17M♦703 18NTU3 B Plumbing Trim Est 3 �^R701 0 Hook-u TInspe ment ST10 Carp&Flrrl� 2 aMl - - -� - - __ -- - - Clean-up �f 0 57D7 FheltDrfulneri Ft 0 City Inspe !B00 Final Health Dpection �10 CelLaie 0 �Y"fi13 ��City Finz3' 0 D^lTim Csrtlflwle of Occupancy _ Sheet 11 of 11 ?ALM S City of Palm Springs _4 Department of Procurement and Contracting 0,ro"�O"•'"C , P �" 3200 Tahquitz Canyon Way • Palm Springs,California 92262 e q<<FO Rw TEL:(760)323-8239 • FAX(760)322-8372 • TDD(760)864-9527 CITY OF PALM SPRINGS 3200 East Tahquitz Canyon Way Palm Springs,CA 92262 NOTICE TO ALL TRADE CONTRACTORS PHASE I EXPANSION OF THE PALM SPRINGS CONVENTION CENTER CITY PROJECT#02-19 ADDENDUM NO. 2 This Addendum is being issued for the following changes and informational items: 1. Add Part V Scopes of Work (All Trades): 2. Provided for your convenience: Hard copy of Addendum #1 issued December 5, 2002, and transmitted electronically to all plan holders. Note: Includes anticipated master construction schedule, (All Trades) which is also available on the city's web site. Go to www.ci.palm-springs.ca.us. Go to Departments. Go to Procurement. END OF ADDENDA NO. 2 BY ORDER OF THE CITY OF PALM SPRINGS City of Palm Springs Harol;�d, CPPO Director of Procurement& Contracting Dated: December 6, 2002 Receipt of this addenda must be acknowledged on the Trade Bid Forms submitted with the bid package. Attachments: Scopes of Work(All Trades) Courtesy hard copy of Addendum#1 previously issued. Courtesy hard copy of Anticipated Master Construction Schedule (All Trades) Post Office Box 2743 0 Palm Springs, California 92263-2743 SCOPE OF WORK TRADE CONTRACT NO. 32 ELECTRICAL & FIRE LIFE SAFETY PALM SPRINGS CONVENTION CENTER EXPANSION PHASE I CITY OF PALM SPRINGS, CALIFORNIA Provide all necessary labor, materials, equipment, hoisting, scaffolding, tools, rigging and anything else necessary to complete the Electrical and Fire Life Safety Work for the Palm Springs Convention Center Expansion Phase I Project. I. GENERAL: A. All conditions as set forth in the Safety Program as adopted by the City of Palm Springs (Exhibit A), Master Construction Schedule for Bidding Information (Exhibit B), General Liability and Automobile Insurance Limits (Exhibit C), Document List dated November 1, 2002 (Exhibit D), Construction Manager's Standard Provisions (Exhibit E) and Temporary Utilities for Construction Purposes (Exhibit F) are to be considered as part of the work. B. The Drawings and Specifications dated October 30, 2002 (Exhibit D), indicate the General Scope of Work. C. Trade Contractors shall carefully examine this Scope of Work to be performed and the relationship of this work to the work being performed by other Trade Contractors. D. Where a Specification Section is specifically included in the scope of this Trade Contract, it is intended that all work covered by that Specification Section will be included except as otherwise specificallv noted. Other specification sections referred to either in these specifications or on the Drawings are included by reference. E. The word "provide" when used herein shall mean furnish and install completely, including all costs of labor, materials, equipment, hoisting, layout, scaffolding, tools, rigging and any other facilities necessary to complete the Work. F. OSHA 30 hour training policy, Exhibit H. II. SCOPE OF WORK A- All work defined in the Specification Sections listed below is specifically included, but not limited to, the Scope of Work of this Trade Contractor, unless specifically excluded in Paragraph C below. 02060 - Building Demolition 16010 - Electrical— General Provisions 16110 - Raceways 16120 - Wire and Cable Page 1 12/7/02 Palm Springs Convention Center Expansion Phase I Scope of Work Electrical &Fire Life Safety Page 2 16140 - Devices 16170 - Low Voltage Disconnect Switches 16181 - Low Voltage Fuses 16182 - Low Voltage Circuit Breaker 16450 - Grounding System 16472 - Distribution Panelboards 16485 - Motor Controllers 16500 - Lighting Fixtures 16520 - Lighting Control Systems B. As further clarification, Trade Contractor shall: 1. Trade Contractor recognizes that the electrical and fire life safety systems are not the only piping mechanical or electrical systems required of this structure. As such Trade Contractor agrees to fully coordinate and cooperate with all MEP trades to achieve a fully functional facility, therefore, Trade Contractor will attend and participate in all coordination review meetings with other MEP and specialty equipment Trade Contractors to assure that conflicts between equipment and building services are minimized during demolition and-installation. 2. All electrical fire alarm low voltage tie-ins and shut-downs during demolition and installation phase will be the electrical Trade Contractors responsibility and will be coordinated with Convention Center and other Trades through the Construction Manager so that there is no impact to the existing facilities or operations. 3. All fire alarm tie-ins and shut downs during demolition and installation will include notification of the City Fire Department, Monitoring Company and other Trade Contractors through the Construction Manager. 4. Provide all fire watch services as required until systems are restored. 5. Trade Contractor shall make safe all electrical (including fire alarm systems) in areas of demolition and relocate equipment. Trade Contractor acknowledges that make safe will include, but not limited to, capping, electrical, removal of electrical conduit, feeders, wire, devices, ect. at source of panels. Existing panels will be recircuited and labeled accordingly. Any services routed within demo areas will be maintained and restored to properly fit with the new construction with no impact to existing systems or facilities. 6. Rework all remaining electrical and dimmer panels as necessary for functioning of systems. 7. Disconnect all power to demoed, relocated, HVAC, plumbing, electrical and kitchen equipment. Provide power and hook up of all new, relocated or reinstalled HVAC, plumbing, electrical, cold room, and kitchen equipment. Page 2 12/7102 Palm Springs Convention Center Expansion Phase I Scope of Work Electrical &Fire Life Safety Page 3 S. Trade Contractor will review all vendor, mechanical, plumbing, cold room, kitchen equipment drawings and shop drawings for coordination, compatibility of this equipment with the electrical and fire alarm systems. 9. Provide power to all HVAC equipment including temperature control. 10. Trade Contractor recognizes that this electrical work must be performed in accordance with applicable codes, including the latest edition of National Electrical Code and as required by the Contract Documents and the City of Palm Springs. 11. Trade Contractor specifically includes but not limited to, all necessary conduit, conduit supports, hangers, junction boxes, pull boxes, devices including trim, switches, receptacles, phone jacks, data, grounding system, cabinets and enclosures, etc. all light fixtures including but not limited to stands supports, seismic bracing, etc. All panel boards, dimmer panels, transformers, disconnects, all fire alarm panels and devices as intended for a fully complete integrated, fully functional, code complying, electrical, fire alarm, and low voltage systems. 12. Trade Contractor recognizes that flex conduit will not be allowed. 13. Trade Contractor specifically includes all necessary identification, which includes but may not be to, panel labels, panel circuit lists, nameplates wire labels, conduit labels applied after finish paint by others. Provide marking on each junction or pull box so as to provide for a complete labeled and readily identifiable electrical system. This labeling shall be a continuation of the existing electrical identification system. This may require relabeling of existing panels. 14. Furnish all transformers, disconnects, ect. As necessary for complete fully functioning equipment installation. 15. Provide all conduit boxes and pull strings for data and communications 16. Trade Contractor shall coordinate and cooperate/participate with the line voltage and controls for the HVAC, DDC temperature control, boiler, kitchen equipment and cold box equipment Trade Contractors. 17. Trade Contractor shall furnish, install, wire, and integrate into the existing fire alarm system the fire alarm and smoke detection systems as required by the Contract Documents as necessary for a fully integrated, fully functional, code complying, fire life safety system. This includes but not limited to, all necessary door mag holders, remote alarm panels, equipment interlocks, smoke/fire dampers, duct detector, interlocks and shutdowns for HVAC systems. This also includes all necessary connections and interlocks with sprinkler flow switches, taper switches, and fire suppression systems. 18. Fire alarm system shall be installed in accordance with Contract Documents. Title 24, NFPA, and City Fire Department. Page 3 12/7/02 Palm Springs Convention Center Expansion Phase I Scope of Work Electrical & Fire Life Safety Page 4 19. Trade Contractor shall properly attach, hang.and secure any existing conduit that are no longer properly secured due to demolition of previously existing walls and ceilings. 20. Provide all trenching, including saw cutting, breaking and removal of existing paving, excavation, shoring, bedding material, backfill, and compaction relative to underground electrical conduit work. Include removal of spoils from the jobsite. 21. Provide excavation, backfill and re-compaction of all trenches in accordance with the drawings, specifications and "Geotechnical Investigation Update Report" dated June 21, 2002, 2002, all prepared by Converse Consultants. The grade will be left to +/- 0.1 of a foot. 22. Provide concrete encasement work for the underground electrical work where required. 23. Provide all line voltage including conduit, wire, interconnections, terminations, and disconnects for all equipment and control panels. 24. Provide all plywood backboards, bracing, supports, and brackets as required. 25. Provide all wiring for electric door hardware as required. 26. Include cost of labor to receive and distribute materials furnished by others for installation by this Trade Contractor. 27. Provide expansion and seismic joints for electrical work- 28. Provide backing and any additional structural support required for installation of any wall and ceiling mounted electrical equipment. 29. Provide sheet metal closures, flashing, counter flashing, etc. for roof, floor, and wall penetrations as required for your own work. Review and coordinate details to provide watertight assemblies with other Trades. 30. Furnish all anchor bolts and concrete embed items required for the installation of electrical equipment to the Concrete Trade Contractor and/or Masonry Trade Contractor in order to accommodate concrete pour schedule. Include all seismic, sound, and vibration isolation work. 31. Provide all fasteners, brackets, supports, hangers, connectors, and appurtenances required for a complete installation of all systems. 32. Provide grouting at electrical equipment base plates. 33. Provide all cutting, drilling, patching, and repair as required for installation of the Work. 34. Provide all required hangers to route overhead work as necessary to avoid interference with the other trades and with existing job conditions. Page 4 12/7/02 Palm Springs Convention Center Expansion Phase I Scope of Work Electrical &Fire Life Safety Page 5 35. Provide all required permits and inspections for the Work. Coordinate inspections with Construction Manager. 36. Provide approved fire stop material and safing at all penetrations through rated walls and slabs required by your work to meet all code requirements. Include sealants, caulking, backer rods, fire and smoke seals, etc. 37. Furnish all access doors as required per code or for inspection and accessibility to the appropriate Trade Contractor for installation. Include cost for delivery, distribution and layout. 38. Provide any necessary "out of sequence work" required for proper coordination and installation of all associated work. 39. Coordinate the electrical work with other Trades for proper fit and execution. 40. Coordinate all electrical work with the architectural and structural elements of the building. 41. Provide complete shop drawings, templates and product data submittals for all systems included in the Work, as specified for approval by the Architect, Engineer and City Fire Department. 42. Maintain a current set of as-builts for all electrical work. Submit monthly "as-built" updates for review prior to monthly payment applications. 43. Submit operation and maintenance manuals two (2) month prior to acceptance of the Work. Trade Contractor agrees progress payment will be held if the submission of the operation manuals is late. As- builts and warranties must be submitted (15) days after completion of Work. 44. Provide all systems' acceptance testing. 45. Trade Contractor will attend coordination meetings with other Trade Contractors. 46. Provide daily clean up and removal of all debris created by your work. 47. Make safe all demolished electrical work around the site. Coordinate this work with all other site Trade Contractors. 48. Provide a Safety Program and be responsible for safety of all electrical work and panel lockout procedures. Any extra safety precautions shall be included as directed by Turner. Include a competent person who has participated and is certified through the OSHA 30 hours. 49. Provide Daily Construction Reports to Construction Manager. 50. Provide and maintain the following temporary service for the project as indicated on Exhibit "F" including, but not limited to: Page 5 12/7/02 Palm Springs Convention Center Expansion Phase I Scope of Work Electrical & Fire Life Safety Page 6 51. All temporary electrical work shall be installed so as not to interfere with permanent construction. 52. All temporary facilities are to be maintained and kept in good operating condition. 53. Include any premium time required when transferring from temporary power to permanent power. 54. This Trade Contractor shall dissemble and remove from the property all temporary electrical wiring and equipment when it is no longer required. 55. The temporary power installation shall be protected against weather damage and normal operations of other trades. 56. Provide temporary lighting of not less than one-foot candle per square foot or as required by CAL-OSHA on each floor. Task lighting will be by the respective Trades. 57. Coordinate all Electrical finish layouts with the Architect and Interior Design Consultants. 58. Provide all barricades and covers as required for the underground Electrical Work. 59. Provide power and interface to all mechanical equipment (HVAC, plumbing, & fire protection), including disconnects as required. Include starters as required. Include installation and hook-up all starters. 60. Provide all access panels of the proper size, type and rating required for the Work. Installation shall be by the drywall subcontractor. Subcontractor shall be responsible for providing the drywall subcontractor with a count and location of the access panels prior to installation. 61. Provide all roof jacks. 62. Provide roof service outlets and remote disconnects for all roof top equipment. 63. Provide extension rings at new and existing walls and ceilings including but not limited to, FRP, E.I.F.S or specified wall finish systems to insure electrical trim is properly installed. 64. Remove, salvage and store light fixtures at existing pantry for removal of ceiling for overhead work by others. Replace light fixtures after ceiling is reinstalled. 65. Provide all new light fixtures at existing kitchen. 66. Provide 220v temp power source at kitchen and meeting room areas for use by Fire Proofing and steel Trade Contractors. 67. Provide all new floor boxes at meeting rooms. Page 6 1217/02 Palm Springs Convention Center Expansion Phase I Scope of Work Electrical & Fire Life Safety Page 7 68. Provide all electrical ceiling drop cords and connectors for hookup of kitchen equipment. Cords shall be approved for sanitary application at kitchen/pantry areas. 69. Provide and install lights for cold rooms. This includes cold prep and beer storage. 70. Trade Contractor will insure that new panels will fit in location shown. Should there be any conflict contra tractor shall relocate existing panels where reasonably possible to accommodate new panels. All shut downs of electrical panels will be coordinated through the Construction Manager. 71. Provide all bracing and support for electrical devices and fixtures as required by code. Provide engineered supports and bracing as required for any oversized fixtures. 72. Provide conduit, boxes, and pull string only for public address systems. 73. Provide conduit and pull string for temperature controls. 74. Safe-off electrical at loading dock canopy and patio trellis prior to demolition. 75. Provide for and connect new and reused kitchen equipment. 76. Provide the following insurance for Combined Single Limit or Aggregate, in the amounts described: A. Comprehensive General Liability, in the amount of 3,000,000.00, including: a. Premises and Operation b. Elevators C. Independent Contractors d. Blanket Contractual Including Liability Assumed by Insured Under the Subcontract. B. Comprehensive Automobile Liability in the amount of 1,000,000.00, including: a. Owned b. Non-owned C. Hired Automobile Exposures. C. WORK EXCLUDED: 1. The following items are specifically excluded from the Work: 1. ITVAC controls. D. LABOR RATES: Page 7 12/7/02 Palm Springs Convention Center Expansion Phase I Scope of Work Electrical & Fire Life Safety Page 8 1. To determine the sum to be paid for labor and materials for change order work performed under a time and material basis, the following hourly rates shall be multiplied by the number of approved hours for each classification of labor. These hourly rates represent full and complete compensation (including overhead and profit) for providing labor. In addition, these rates represent full and complete compensation for the cost of incidental items including but not limited to such things as small tools and equipment (valued at less than $250), travel expense, fuel, employee parking, etc. E. ALTERNATES: None F. ALOWANCES: None G. GENERAL INFORMATION: 1. Mechanical. Plumbing and Electrical drawings are schematic. Each MEP Trade Contractor is responsible for coordinating his work for proper fit and execution. 2. In addition, the Work will include the requirements of General Conditions, Supplementary Conditions, and Division 1, General Requirements. 3. The drawings, specifications, and other information listed as Contract Documents indicate the general scope of Work, and do not necessarily indicate or describe everything required for the full performance and completion of the Work. Trade Contractor shall be solely responsible for completing the Work in accordance with code requirements and the reasonable intent of the Contract Documents. 4, Trade Contractor shall visit the site and become familiar with the existing conditions and the physical condition of the site. Trade Contractor shall examine and fully understand the Contract Documents and all other exhibits, attachments, engineering reports, soils reports, special studies, and existing conditions to the extent necessary to perform the Work. 5. Trade Contractor acknowledges that he will be working in an existing, fully functional facility. As such, Trade Contractor will allow for the Owner's needs for security and cleanliness and will perform this work without disruption of the Owner's day-to-day operation. Page 8 12/7/02 Palm Springs Convention Center Expansion Phase I Scope of Work Electrical & Fire Life Safety Page 9 6. Trade Contractor acknowledges that Turner is the Construction Manager and as such has no field forces or material handling capability to assist Trade Contractor. Page 9 12/7/02 _ 7,qr Adf`rftY p, ty Orig ,Early Early ID Description Dur Start Finish - Mobilization Mobilization once 0 ,� keobiliza drp 1010 S7rair 2 <gJa,112 �JJ.4P 'Set up Trailer 1031 SdTarpoayPwaRia 1 DN7.@ 2M?A2 0 ISet Temporary war Pole 1030 ircinecicridTumppmr 0 271,10v@ inspection of Te p.Power j 1010 5eJ®Te1p Rx+a 3 flS6702 O1DEO72 _IN Enargize Tam .Power _ -- 1CBJ tidal Coniu�n Fenig 2 ! '4f Install Canst uction Fencing 1060 Cbian OaroPent 0 1lLEOrP Obtain De o Permit 1070 Wan KYdxn Bdilg Font 0 10DECO2 Obtain Ki then Building Pgrmlt l ,1210 Ct1al S�"k'leal'9 Roan Peand 0 1CCE002 Obtain Sp ngs Meeting Riom Permit 4150 Bid Dale 0 171JUX0 __ Bid D to 4161 Awad Trade Ccria�bs 0nW Award Tralea Contractors 1080 SandCa 4wtic 1 0 C I*M Start of Cdnstruction I Kitchen Phase 1•Kltdlen Demolition d Gradln 1100 SzfeCaSpl' @E�trCa4N&Try 1 0ll4m 03W�1 0 Safe Off Sprinkler @ Ext riot Canopy&T ellls 1110 SdoClFElamm'ral 2 DIKED taWMD M Safe Off Electrical logo hM Sie Corshxbun Faxt6 1 caw Install Sit.Construction'Fencing 1130 Plohdld#t7lratg Dock Cdl Boc 2 lapm 1&ib= 51 Protect,Existing Loadi g Dock Cold Bo 11® ShnaTrels 1 laW4W iaW473 0 Share TrNlis_.. 118D DennEdalorWai Fi%h@T�1 Ts 3 tOWJm 14,YWll r ® Demo F: 0 or Wall FI (ah @ Tla-In Lo liana 119D TarprrayVsgml(Raler4n)atE+�tTWak 4 laWM13 15WID lid Tempgrary Visquean(�refection)at Ex riot Walls 1 taWM]3 1oWt13 0 Protect Gas Meter 1131 RaraeT Cmpstr 1 iQWfd73 taWhll3 0 Remove Trash Compact r !, 1170 DerroTnLs 1 13i*M 13W-E3 g Demo Try ellis 11:D Darcfildloa➢Ig Dock RodShriae 3 1lpV 1SWND 0 Demolition of Loadln Dock Rcaf Sir cture 1ZD Darn ConaeaSabednedr60ockwak&Fos 3 15wo 17J*M ® Demqq'•Concrete SI a,Loading Doc II Walls d Figs 123p Stalm&Ra�l(3ai1 Nav01rtipMae 2 176M 2gW433 © Stal(e&Rough Gra a New Building tea In 3oiCmp�&PadCe*aaw 0 MI*W SoIILCam actlon&Pad Certl0catlo I Structure Sney&laµt 1 21,P= 21,W,03 a Su ey&layout IM 1210 ac3josu&JU&Da1cWalF0ofig 2 22yqM 23W,p3 B E covets Bulldin &Dock Wall F oiings , 12� SdCorpeclionTests 0 241AM +S it Compaction asts 13D Fsal Pabaat9tiU&WdcWalFooY'95 2 XPUB Z,ylla3 N nstall Rebara Building&Doc Wall Footings �I� 1400 5 2WtA3 3a1MC13 ® U/G MEP UG MEP 0 VIRUS ebar Inspecllpn 1TJ0 R�ilm 1 $yt,� ifll^t•D3 g Pour Building Dock Wall Foo Inge 1�0 PurSuHrU&DDdcWal F0" t200 Fum Cdrm Pers&F>arpWak 3 �Y+I� 31,yJ,D3 Form Colum Plers&Ramp V�alls 142D LAG fvP lePediOn 0 Say, w U/G MEP Ins dlon PSC2 Sired 1 d 11 7Sbn Dab 25rk)V02 � Fan1 Bw Dale ReWebn Checked Flnlah Dab 13MAY03 Pro9rece Be, Turner Construction Company Dda Deb 25NDv0z P.S.Convention Center Expansion Run Dab 05DEG0216:57 cal al Ac0viry ©Primavera Systems,Inc. Activity Activity Drill Early Early ID Description Dur Start Finish 1430 Badd lJG NEP 2 3awlm 31.14,133 _ Backliill U/G MEP 1300 Fslel Rainr&CdamPrdraBols@Ros 2 3116M 034M Install Reb'rd Column Anc or Bolts @Piers 1310 ReUaFgsdQi 0 034M ��Rebar Inap ctlon 1440 Sol hepe� 0 � Solllnspect on 1323 RaaCdam RasBParpwbis 1 0>Fl$B OfEBM 1 Pour Colu n Piers&Ramp Walla 13M Srp Pia&WalFans 1 05FEB13 0 Slri Pier Wall Forma 1340 Bad9Wab&Danded Focigs 2 Off�B 07F� 0 BackFlll alladDemo'ed cotings ! 13® G-aJoSlabarGad3 1 WF73303 UlFB303 I g Grade SI b on Grade 13M Solcojatn 0 WFEBCO Soil Com action 1330 SrfSbb Erpa&OodcPrg s 2 1ffEB03 11F3B M 0 Set Slap Edge&Dock glea 138D EpoyDm&atE:x*pSbb 2 1ff®03 11F®03 _ G E Dowels at Exlstln Slab 4170 Vm peenwdS3d 2 12�03 13�FB ® Visqu on and Sand 1410 Bhd<al@Cdaos 1 131$73 1233303 1 Block ut@Columns 1457 rail Reber 2 1�03 VFB3M 0 Install Reber 1483 Ftdarslermn 0 14FEE03 Reba,'Inspection 147U PtarBAIUSbb Cn Grade 1 17FEBM VFEEM 1_Pour_ Building Slab_ n Grade 14M SrpSbb&Wal Fans 1 17F�Ii 17F� 1 Stdlp Slab d Wall Fo _s- 1---- 14M Sot3mdrAS6dCdere 1 1ff13303 1833303 0 So Structural Steel olumna ! 1'.BO h5lal Ord Sled Beene 3 iRiBm 21Fffi3 ® I tall Structural S eel Beams ! j 1510 Wed CarsrbasbEx'sigShrlte&C11 3 21F�B 2>�Q3 SI Weld Conneetle s to Existing St�ucture&Gussets 1930 isWSYcr#@ck&KJc1m@E)w1EW.WJ 3 24FEBW 2ffEBM ® Install Stron be k&Klckem Exlst Exit.Wall i 15D Wad hpadal 0 2FEBW - - -- --�---- - -- ----- Weld Inspection 1910 DerroEdalrFiang 2 2TEB33 Z/FB303 9 Demo Exterior Framing 'IrHI ratC BatmTrark@Evfig F+aapd 3 27FEB03 OlvAlI 13 Install Botto @ TrackExistinra g Papet 1530 FffiIMaal DedagdCloaa� 4 03JFF1D OBvW-d73 �t� Install Meta Decking dClosures 19(D FNal Berl Plele 3 03Aqu O%lwa 1590 MomkleShriralSleel 2 04413 IGA4 3 ® Monokot Structural Steel: Exterior 1990 LaraiF_+JarrWale 1 24FEB33 24FEBM I 0 ayout Exterlor aIla 159J rsblTS.@RoltpOms 1 1 Install T.S.@R II-up Doors ! 2D7 Rome Exia!orWals 2 ffW OFB03 ®�Fnma Exterior Walln Frn 2'B0 lxgWaIRx#m 4 2� 03AWO Plumbing all Rough-In 2110 ElDdrko Wa1Rad h 3 2ffaM OAMia Electrical W II Rounh-In_ 210 New Gas Rpig Ra#m 2 2ff43303 MM6F403 - _--- ---- ------ ---- New Gas Pip ng Rough n -- 18V EAB"Frans(j rcpemn 0 29iBM Exterior Framl gInspection 1lgJ rsWEd=Sraloft P&boads) 1 2FEBM Install Exterior Scaffolding(toerboards) 00 SutExea D=Frmes 1 2}EBM Set Exterior D or Frames 18B] Fsle150avDasCls 2 09VIAM O&V14"M _ fill Install Exte or Dens-Glas 1870 EearvrStxeirg rxper/un 0 OM.4b6 18M EJFS � ek rn&Pee 3 UIMA D 11Mqu Exterior S11 eting Inspection E.I.F.S I sulation d Reveve�is 1900 EIFSMrkhCod � 4 1QwWiB 13AH4YB ! ® E.I.F.S ash Base Coat 1900 EIFS Fr�Cc�# 3 14KWU 1&vWR33 l� BAY Finish Coat 1920 Rarnesmfdirg i 19ffiFM 19`MFE3 _ 0 Rem ve ScaffoidlngI 2M Instal Rcitp Doss 2 19440 2146RM - ---_ - --------- -- p Ins+ II Roll-up Doors aril Fshl[.Uas&Wdnae1 2 21440 21MAFM 19 in all Doors 8 Hardware 218D FddF�,EPTrrn 3 214ARM 24NAIM � j ® I staI MEP Trim fill210D Caukakror 2 21N.^A03 23JNi06 0 sulk Exterior Sheet 2 of 11 Acdvtty Activity Orig Early Early ID Description Dur Start Flnlsh 1910 Palda ElFB@RcafTen 3 b 3 24NVRM MAIR Dill Patchpatch E.LF.S Roof Tie-in's Wi03 27N Paii6mrtr�as 2 21MM 2 m slot Exterior Dpors - 3B0 Instal 1 2MN7B 2MeAB 9 Install Door Seals @ Roll-up Do rs 2)30 tffiILbdcBrnpa 1 27vy'f�3 2fMFn3 0 Install Dock Bumaer Interior 158J jiarcutincriorwab 1 WIvY4iB OMWfiB j 0 Layout Interior Walls 1570 Frame Inier"Wels 2 UINP 3 IMWi03 ® Frame Interior Walls 1810 Sotk*=Dxr&VAdav aces 1 1OvWi73 1UVPRD3 1 Set Interior Door&Window Frames 4090 SetFan Cols 2 1INWO 126ORM I m Set Fan Calls 2190 HntMWa1Rruglm&RestreTe3 5 IINK D 17M6RM _ ® Plumbing Wall Rough,in&Pressure Tc at 21M BaiFalWal Ra.gFnn&SdNew Pateh 4 11tvWO 14M4A3 ® Electrical Wall Rough-in&Set New Paris ls 1t2O Irk"Fannginsperhn 0 11MV0 interior Framing Inspecti1 2200 BadfralWal 0 17MW703 � PlumigWalkwoolim 0 1tM�3 Filarial Wall l Inspection �Plumbing Wall Inepactlon 2230 DrWal 3 111440 2MARM M D mail 1587 FellalelkdrsdodRaUDelk 3 19AARB 21rvW;03 ® Insulate Underside of Roof Deck 2210 Spew h�edari 0 2fJWg3 inspection 2250 Tale,Float&Frisk 4 2 44FM 2%OFM I ® Tape,Float&Finish 159D 5 24Iv61`13 23JAA06 ® Install HVAC Overhead 1640 tnsMO.aleadP mbvG&PressreTest 5 24HWYD 21MFC3 _ _ _ ® Install Overhea Plumbin &Pressure Test 1610 ts6l Fie Spi9daOHFpig,Drtps&P.T. 5 21MoAA 23vWd7.1 ® Install Flre Sprinkler OlH Piping,;Drops&P.T. 1633 ICI O.sisad Seriirai 5 34MNYB 20IAFi03 5W Install Overhead Electrical 4100 Instal W68R and GVMR Ppig&Pressure Test 3 2%44AB 23OFM InstallH &R and CHWS&R Piping&Pressure Test IN 2270 F'atWals&Llywal Ceigs 3 29M^Fili 23vW3g3 ® slot Walla&DPI all Ceilings j 2370 hsiall)=&Hard a 2 27MARE ® Install Doors&Hardware 1600 lsaadHJAC&MNS&P.p-Nv5&RPrigCkatwi 0 31NWYB - _ ---- Inspect HVAC&HWS&RICHWS&R PliiiAng Overhead I ilk FgiedC.eised Plrrtig 0 31MNn6 ♦Inspect Overhead Plumbing 4110 Islata OH WAC DAM'pig&Robing Pioig 2 31NAFC3 01PFM Insu ate O/H HVAC Duct/Plping&PI mbing Piping d7I j 16'0 I�edFie Spi1�Crelaed 0 311vWY0 Inspect Fire Sprinkler Overhear 1670 hspataishadEtoc" 0 31M N,^HI33 _ Inspect Overhead Electrical 2730 Inow Glass 1 31KAVM 31NORM Install Glass 2390 PatDoas&Fra es 2 OtAPF03 074Pf)3 Paint Doors Frames 2233 Calling Wires 2 O7PRW 034PRR3 M Ceiling Wires 2290 Auantiral Ceig Gid 2 aWPFD3 04APF403 © Acoustical Calling Grid 2130 Tsh Now Baiar 0 03^PRJ3 - Tle-In New Boller 23t0 h9a1 L}ytFed<ras 3 OiMR73 03Wi143 ® Install Ll9ht Fixtures 2310 Instal Coiling Dams 3 OV�PAB O6^Ri13 j ® Install Ceiling Diffusers 23X n"SpaiderHeeds 3 O0PFC3 Oa6FF03 ® install Sprlinkler Heads 233D tlpedO.eAwd6rColaap 0 OPFFM Inspect Overhead for Cove-up 2340 Finagle LililtRksus 1 McpFul ( WF03 _ 0 Energize Light Fixtures 2430 6sfal CekgTie 2 1 O9*FU 10eFiik3 m Install Ceiling Tile 231D Psp&CakRocr 2 11AFFC3 WJPRM j ® Prep&Caulk Floor AM R"nsFloaig' 5 11PFFM IZARi73 ® Resinous Flooring 242D Sed Cando FkngDySIxage 1 15N-FC3 E23*fM a Seal Cloncrets Floor®Dry Storage 29M hs41VCFal 011ie 1 15WF403 _ 1 Insta":lV at Office 2410 hstaiAbbaBass@LtyStr� 2 4FARxi3 Install Rubber Base Dry Storage 2140 IstalFRP 4 la6PR)3 ® Install FRP Sheet 3 of l l dsdty kg„�y Orig Early Early Ac Ii Description Dur start Finish I , 1 1&4Pi3 la*91 1 1 Install Pipe Bollards 2510 k-dA Fps Bolsds B Paint Pipe Bollards 25M PaiFpaBdlad', 1 21Nib3 21PA903 _ © Electrical Trim 21`D F_IecdicalTrkn 2 — —1I— III Plumbing Trim 21® PYrt!bhgTrkn 0 Install Comer Gu rds 25M In Caner r- 1 23D T3 ®i Set Kitchen Eq Ipment 24M Shc�1>a,E4fnxst 3 79^Ff'im MI Install Dishwas er&Hook-up 2760 kioall)dva3hrxF - 2 apm Nook-u Kitc enE ul ment M I'ktp KthenEqui rrrrt 3 30WFCB 07M4tID Clean-up&P nchllat 25M ClarxQ&Psrd'" 3 30^PFiD3 Ogv14Ym [ City Inapectlpn 25M Ck7k�edxn 0 04vWtID Health Dope mant Inspecdori Z� I�eFsp�aYnvik�ed+l 0 09✓✓AAY00 City Final In pection 93D ClyFkdln 0 Certiflwta 0c,cupancy n 2370 Catidadompacl 0 OEivM1T8 Roof ® Install R of Drains 1630 legal RodlDn re 3 OBvy47CB 1QvNfd73 1®0 ��&Casder�lkiPbltzrsns 2 C>3vl^iN 9AVFI 3 M Install Boll r&Condansin I Unit Platforms ilia � � 1 OBCuiWvWYB l7Bvti I 1 Install Exh ust Fan Curbs i 07(vy%13 O>MNTD I 1l Set MEP R�of Jacks 1 kHalTa(sed Rodkmtatim&Crkkds 4 1D�MF�3 13IvWiD3 ___ _ _ _ _ _ ___ -- __—_-- __©InstallFQRqwdf of Insulatlar &Crickets 3 VA40 14ty AfU _ ® Installing$ ; 1727 Ir�l Raull ushros Roof I 1730 Rodktyodm 0 14144U OM In stne Roofing 1740 kv#dtvlar8rarif tJ 3 14NWFdA 1(ivW�3 M Inallast¢Walk Pads 2123 kdd Roo(Ba�&WakPads 3 10tvtW7(B 21IvW38 ! 2 13vW7D 2TvWYl3 __ ____.__ .___ __ 13 TriDralna! 214D Tan @NodGau "- -* ® et Boller&Tanis and Condensing Unit 1760 Sded'&Tads ad CadansFg 1 k" 3 21fvWi70 2TNt�13 2 M I stall Countarfla�hings 2110 FstalCoaealashrps 0 S t Exhaust Fans 1 2Y t4Y8 1797 Sd68agFas Install Boller pIping @Roof im hniu Bokrpom@R 5 2fvW M Reroute ROH-10 to Lines _ 23740 27AY'Fm ulus __ ____ -- EYV I Bdv- & &aids@� 3 31mk933 MAPFC3 Ele trical @ Boller&!Condenser&Qutleta @Roof 3710 TedPpkp 1 07FF1300 MNIF03 U Test Piping 179 & O3wp &Eledrel 0 t) Inspect Boller Condenser PI Ing&Electrical 1603 kmlab&tabd BoiXPrg 3 03eP" VA ® Insulate BLabd Boller Pip ng 21E0 PariRodFkxJsg&Msc Equp&Plrilarrs 2 O3gM R�3 Paint Roof Flashing&Misc.E ulp&Pieria s M 1 1lW'fi6 10^FHTi — g Clean Root 8 Punchllst 2160 ClanRod&Rrdki Final Roof Ins action 217D Find Rodk3{smn 0 1'NAZ3 Site IM Rd7�eloedrvDcd A;aaQan 2 21Yytp yyJ.CB Re ovate Loading ock Area Drain 2TEB33 1 Layout New Me my Wall m � 40tNVVI"aciW 4010 kx-alMasaryWalls 2 2393303 7/f113M M Install Mason Walls Grout Mason ! 40A CiaLLM�ayWal 1 Wall i Brown Mesa Wall 40ID BusnkIRSOWWol 2 03MgO — —;I-- --- M E.LF.S Finl h Coat 40M EtFSFkiEhCcd 2 OVAN13 &df ConcpdTraisCarpadTWat 3 2TN>f�3 ® 0 ck('ill& 4O30 Bad Comapdt Trash Comps r Walla 2 ZgvV4O a3vY�FYB M lab on Grade rade Si te An a S 4040 GradaSehaaS�mt3ada oil Compaction! 40M WCaRadm 9 27T Install Concrete Reinforcing 40M kslol Cagde Rakixag Sheet 4 of 11 Activity Activity Orig Early Early ID OescdpUon Dur Start Finish - 44C REbariapedlxr 0 01PH�33 Reber ins action Phase 2 6 Edstl Interior i 2210 CaArCTmWaYRc6doi(o�fJewtcd�Fdxrn 1 1ff1331i iQ-®pp g Cons ct Temporary Pr faction @New docker Room 270 kkt� 0 j lichen Black Blark 2780 Make Sale 1 2%iAM 2[11440 1 Make Safe EtecIdcal,Plumbing Sprinklers 2740 Prckc!Ftxd;&Exsfg CoURnnF�t 1 2ffANU 28vPFO 1 Protect Hoods 8 Existing Cold fZ,oOm Equipment 1 2?FMHI3 2R„AR03 1 Tom .LI ht2M TWO LU" in 2703 DemaCeI g 2 31NVVM OIPA303 — Demo Calling 2M Lwr-WKU- rFxl�rx+1 2 31MAM OIPPFC3 Disconnect Kitchen Equipmen lumbin 2'80 Oare C8IQYW��pgre 2 31IVAFO OVAR�i Demo CalllnpWIalls Q Office 260 ta}aA.tdagaadPtartiB 1 31MOFM 31NWY8 Layout UKitche E u Pment �i10 Rdxale IQJw rpnat 2 31NIAM OtAPFM � ___ Relocate Kitchen E uI ment 210 Frartefnda3livn&CoHprgx Wal 1 171AFFt0 QNPFd13 _ - -- Frame Lockeri Room&Cold Prep.Wall 2M S�avu1FLv@UGV"Tixg 1 L11PPFC3 Ot*FCB I Sawcut Floorll@UIG PIumbin9ii 3"EO DaroCagdaQUGptartalg 1 01PAi10 O1PPF93 ! Demo ConcreFa @UIG Plumbing 32M SdWjdwl) m 1 OIPPFC3 01A-FC3 Set eacktlow,1l7evica I 4131 Fka1 FNJ5&Rad " Fh6& roT� 6 Q�f�fiTi OOaR7Ii �- __ Ins_taI HWS&Rand CHWS&RPiping i P_re_asura_Tes_t__M______,______ 2FH7 isFal NevL7amral Parek 3 OW-F778 I ® Install New Electrical Panels! 278D O.u1�1FNAC 3 DVS ® Overhead HVAC �D Fstal DorrFnrnas - 1 07 OXFFn3 ! 0 Install Door Frames 211:0 � 2 07aau U1^PRD III Demo FRP 2790 Offead Fie Spikes 3 IpPA�3 DIAPFCi _ —_�_—_—. ® Overhead Fire Sprinklers 3M O,eteedFlrrbg ® Overhead P'umbing 2 03ePriD T W Excavate UIG Plumbing 2.�T0 6o.�llO FlntFg ! 3® FstalNavFre®erpoor&C1sre Pad 2 OWiiB O'1t°R00 ® InstallN IG Plumbing/Sat Door&Coo Sin Panel 28M ietJ UG Pkmcrgo.+etFb rSriaA7are 2 O'V!{iCfl OVPr7T8 ® Install UIG PlumbinglSet Flopr Sinks/Drains �4O itSpedQH SprFkas 0 0 _ _ _ __ Ina act OIHIS rinklera ispedwRntag - 0 OiPFtiD Inspect IG Fl mbin g HBO igedtiGF'Intag 0 ovffM Inspect UIG''lumbing ZriD Baddl&Ccnpadim 2 ONPFiC3 WPFF�3 ® Sackful& ICompacflon BIO QH Flmtxg i4l 0 O1MFrl3 - OIH Plumbing Inspection 2710 Roghn Eleo"@Wal 2 Q/Per� 0 — Ill Rough-In Electrical@Wal Omfisad rah 3 07APFC3 0. 3 © Overhead Electrical 3IA0 to"aRmtFg&HA58RardCHVrA7Pifig 3 O7PPRO8 O*Ffai ! nsulate Plumbin &HWS&R an CHWS&R Pipin p� Zf10 SdCm�afm 0 Q/PFFiIi ! Soil compjaction �D t7e�ttalWal hWecVn 0 OBPFfII3 — I 0 Electrical Wall Inspection 3000 Orywaiwak 2 OB^PFril OO�PFY73 ® Drywall ells 3� F�hQy+rd 1 0&W773 0 Patch Drylvall Z>31 prrConori9Co UGRnt+gT has 1 OB°A7O3 OB^PFi03 g Pour Conlfrete U/G Plu bing Tronches 2I+0 i�edQHHJPC&HAS8RaAN58RPt:rgOMhaad O O3�PR03 Ins act OM HVAC&HWS&WCHWS R Plping Overh ad iWx#QH BaYd 0 OO4i><t3 Inspect O/H Electrical 4IM Fi &D>velHurll �Raioars 2 IGBP W 1t�3 — O Frame&'D ell Hard LI s ReaVooms 3= Tape,Flx4&Fib 3 14^PF� tO�fiD ■ Tape;Float&Flnlsh iW0 Stan CodEx�gWab 3 4l^fi� 1OaPFC3 ® Sklm;Coat ExistingW Its 3A Way 2 16� 17PF77Q1 I Seal Walls 3r8J PartWaH,Sof&F�d Lid Callings 2 17A94B 18^PFilb Paint Walls SoffnsB Hard LidC ilin a 1 Sheet 5 of 11 Activity Activity Orig Early Early ID Description Our Stag Finish 2290 CaamicTiaFUurg@Re9oorrs 2 17PFT113 IaAPFD 2 18FD3 21AYiD g oodn Restmoma�0 Install CEig Ctl&CegWres Ceramic The Fl Inatall Ceiling Grid ,Ceiling Wires � insw Ceig Dtlfussers 2 ? ® Inatall Toilet Fixtures 2010 WULUNFD"as 2 2WiYli Zi�PFC3 ■ Inatall Calling DIH aaere ■ I stall LI ht Fixtu s 232) 1nSWCaling DmpC 2 77PAiO ZWga3 ■ Inatall5 rinklerH ads �� 4sDl Ceirg LYepConk 1 27PPr7Ti Tl^FF�3 In tall Ceiling Dro Cords 2MD tzpedOslc�irCoerap 0 2:APR03 fi �70 awni-LightFids 1 2 2iAM Inspect Overhead Zt r Cover-up insw Ceiling Tie 2 24M�3 XAfiiO3 i 0 Energize Light Flurea I ■ Install CeilingTile 2 k�IToidAo»� 1 24APFM 2tAFFC3 0 Inatall Toiletlsorlea no BeadEWFloor �Elpicar 1 2 j ■I Bead Blast Flo r 3090 9 Prep&Caulk F oor 31ID RasrasFlnnrg 5 2 Resinous Flooring lnswE;r�310 Insist FRO I 07VMAM OnAYYM ■ Ina tall FRPI _ 0 Install Comer wards 3100 EledrkdT r� 3 03JA1173 12v14YID M Set Kitchen Equipment 2 D Electrical Trim 3110 PYntigTom 2 QTJAITA BJA11)3 0 Plumbing Trim �® �m��wi 3 ogmm 13tVN,1� Hook-up Kitchen EgWpm nt gl 3170 Cl�trp&PU1&& 2 12�M11Ii 13JA1113 l' IIIClean-uI &Punchliat Cl1'Inspection0 14M4YU3 f --�City Inspection 3103 HedhDepaYnertYeierlm 0 Health Department Inspection 32X1 QyFrelftpacam 0 City Final Inspection3210 Ca��dy 0 � Certificate o(Occupan Phase 3•Cold Prep Interior ' Equpmant 32g Wrae� s& ' 31kWiT3 3 tvt^fi13 Remove Diah Asher& Kitchen Equipment 33O MaMeSafe Elziial ptnihrg&Fie Make Safa ElacWcal,Plumbing Fire Sprinkler 31M40 _ 31MgM Cap Plumbingl@ Dishwasher p DaroCeitgs i OIPFI3II QIPPr7D Demo Ceilings WD DumWal&FbrrTle 2 0�3 01l�PI� Demo Wall&Floor Tile 33/0 DaroDyAdWaktsMlP 1 02 O2APFU3 g Demo Drywall Walls for MEP 3530 Rarglxl E]ec4�Wa1 2 Rtofi3U O✓PFTi� 0 Rough•in Electrical Wall 3M PO nPLntFyWal 2 0 Rough•In Plumbing Wall 3�D Layout Underground Plumblrlg 379D �tatdPlrrhg&9+rp 1 O'irRm QW 0 Sawcut Floo� UIG Plumbing l) &Sump ._ _ _- ___.. _ _ . _ _ __ ---_.�@._ 33•DDO DamCaneu@LIG FIrrt}pBSrtp 1 (TViia43 03rPRM f 0 Demo Concrp4 @ UIG Plumb ng Sump 3370 Ouateal H✓AC&F7igaatn lrzn 2 � WPFU3 ■ Overhead HYAC&Rafdgsrs n Lines 3i00 OAfxW lie 3330 a 2 43^PFig Oil ■ Overhead F,rs Sprinklers 2 03APFM oNFSiD 0 Overhead Elcculcal 3410 O.at_Pln&g 1 0� appp D 0 Overhead Plumbin 33W � & 1 OiMFm 0 - — g Excavate UIG Plum bin &Su 3M 1116130C100HPtrrhrg 1 j07APFMC3 l 0 Inspect O/H'Plumbing p 35M Elec"Wal Fspe�n 0 0/PF1b3 3M RntgWalFsperlLn 0 07APFC13 Electrical Wall Inspection Plumbing Wall Inspection 3® RFaiyun&DrY+� i WNi�3 0 Re air/Re lace Insulation D all Sheet 6 of 11 Activity Acdvriy Orig Early Early _ Io Description our Start Finish D7PFfII3 Screw Inspection 3M Tap%Fbt&Frbh 3 07PF903 aAMM Ed Tape,Float&Finish ` 333] ysF3lilG FirttigSd.FhrSiieLkaB 1 97Pfi773 07AFIFimr Install U/G Plumbing/Set leor Sinks/Oraln 0 342) Isla)SirrpTiadikoia 1 D7PFFE3 07AFC3 0 Install Sump Trench Angie 3190 IHreddQH HJA: 0 07APFC3 Ins OM HVAC 3MO FcpadgH Sprides 0 07A9713 Inspect O/H Sprinklers 3510 Irsped0HIBac ial 0 07lPfi3 I Inspect 0111 Electrical 3570 iffiICdl Faun Paeh&Equpmat 3 IErPFM 10%PFM ® Install Cold Room Panels&Equipment 33D kcpatul3purttg 0 036FTid3 Inspect Ufa+Plumbing 3310 Baldl&CarpartUG Pt+rtrg 1 O54R303 lEG"f1D _ g Back....&.Cora act U/G Piumbin 330 fsolcarpaj 0 QAPFW So0 Compaction 339D RarBadcCo0d3@UGFtrtpTm1dxs&Suap 1 ONTO 0Aq;03 Four Back Concre Q UIG PImb'Q Trenches&Su p 0 3W hsWEvgrorelr&Rei'gera-tFpig 2 CoWFM 10*FM M Install Elaporator&Reid Brant Piping � Sdtvp)re@Tnad1Dr" 1 10'WRT3 IN9ze3 9 Set Anglles Q Trench Drains OWO inealCOUROmnTgpgSIal) 2 10'LTA3 1VFM _ _ _ 01 Install Cold Room To ia Slab 38M kffiIQeigCsii&CeirgWies 1 tUtPRO3 1VERM -- — _ I O Install Ceiling Grid&Ceiling Wines M) TestRarggalorPpig 1 11AMB 11AR;W 0 Test Refrigerator Piping !, W Bel i 11A'RD 11APFC3 0 Bead Billet Floor 3751 Instal Calling DtlOseis i 14WitD 144A06 j 0 Install Coiling Diffusers 3787 ksialLigtFomres 1 14A4703 74hYiB _ 0 Install Light Fixtures 3770 tdalSptidaHeads 1 44A4YB 1MPf3D 0 Install Sprinkler Heads; 378) halal Calling DruP Cads i 146PRC3 14W9Rl3 0 Install Ceiling Drop Cords 3790 HAVColdnam g'ts 1 VAPFU3 14rPF03 0 Hook-up Cold Room Lights 3®0 kiMSpn1das@ColdRran 1 148PR03 144FFM 1 0 Install Sprinklers Q Cold Room 3tB0 tepadReGga-d6mFlEirg 0 14FPR13 +insect Refrigeration Filling 3331 hped0,edrasdlbrCo ,p 0 15Vf;03 wage,cll Overhead for Ci ver-up 3510 kWal Cetrg Tie i 15sARM 15^NiX1 0 Install Calling Tile 3030 ErgalpefgiFahres 1 15°PF'O3 15 0 EngerPlze Light Fixtures 3310 jFMp&CaukPlxr 1 16%P833 15PHi]3 0 Prep&Caulk Floor I 39f'J R1snsFkniig 3 10/4Tri3 18iWi¢3 _ l 09 Reall ous Floorin 33M IneWFRP 1 2tAPFW 2tAMM a Insltall FRP 3JW SeKlUM64pnixt 2 21PFRCD 23WFE3 01 5qqt Kitchen Equip ant 3900 FJecalral Trim 1 WFU MAPFC3 0 El9ctrlcal Trim 3M Plntiy Trin 1 224PRT3 MAPFC3 0 Plumbing Trim 3® hotel Caragads i M*FCB 27PRiR3 _ _ 0 Install Comerguards 3M FtdupfQim67{rrai 2 ZWiiA 21rPFi73 0 Hook-up Kitchen lqulpment W paa'rap&Fund t 2 23*F03 24APF? 3 J M Claan-up&Punch list Irty h�erYxt 0 XAPRB City Inspection �JO Heelr Depatrai hped. 0 2MM Health Departm nt Inspection 3990 OtlFielYepock, 0 35^Ff0 _ _ __ CI Final Inspection 30 CaOfizddOmpany 0 BrA T 7B _ — Cerdflcate of Oc:upancy Roof 3310 IaralRdCatp®or&CadasgPlifnrtl 1 OlAma OI*M La lout Roof Comp essor&Cond nsing Platform 3� DemoFknf@TiMn 1 m lPl 0 Demo Roof(P Tie-In 3330 tested Cnrpritau&Crrxkrsigl3riPdfrnn 2 fT3PFRl3 01aPFi13 nstail CompYes or&Condensi g Unit Platform 3 35p SalvEProdiads 1 WPFTt13 WA'RB i 0 Sat MEP Rpof Jacks M pathRbd 2 OYFFM I M*FW 13 Patch Roof Sheet 7 of 11 Activity Adivlty OriD Early Early ID Description Our Start Finish 388D SetCmpnsar&CodaagU-is 1 106FFM 104PRO3 . 0 Set Compressor&Conde sing Units 3670 2 11PF7703 14VRM Refr geration&Co denate Drain Pir ing So TestPpm 1 154FFU3 154FFM 0 Test Piping 5530 FapadPiprg 0 15N-FO3 InaPett Piping 330 fa6dd`Land +9 2 15VSC3 17PfiiO3 _ ® Insulate d Label Mel 3M PaiPub s 1 186PRM 1BWR23 0 Paint Platforms 373D CJaai Rad&FUridt:Y 1 21MR03 216FRM i 0 Clean Roof 8 Punchlist Springs Meeting Rooms Mieft Roams Demolition&Grading 4190 FsfalComiuBa*adas 2 a3W473 10W4D © install C rrldor Barrlcadd,3 4200 SabOffSprkHs 2 01MC3 1018M 0 Safe Off sprinklers 4210 SaieORBac" 2 031ANTi 10141'M 0 Safe Off electrical 4183 Fslal Sao Cora wbon Fang 1 03W430 011^A03 0 Inata1151t1 Construction Fencing 42330 OarnSpnfyTh®rePrm 10 1314M 2&W403 420 �roQH FP/!+G o O/H H _ eaten Area oOSPr�Ti�aPna3 2 �� �� ® Demo OIH HVA�@Springs The tre Area `� °W��@��T 3 X� ® ;Demo HVAC D ct@ Conidor 42B0 I�rnaSbd Bears oC547e Qr� 1 21V7413 2U*D3 B Remove Steel BelaIms @ Stage Cu an 4M FebITmpoayulit"a mer 0 31.W433 Install Temperer) Lighting&Po 4Zi17 Retna&Sa.WePl-LF'@Tiraielvm 1 27d*M 27ibm _ _ ,___ 0_RRemovo&SaIvlllllla eAH Thr tre Ama _U's eat @ _ 43DFlocr 1 �Sawcut Floor - _ _- ----f 4310 jRemoeCcxida@Pbcr 2 ffiW^D3 29140 © Remove Conc Is @ Floor 4323 CiienTheakaA m i MKM MI*M 8: Clean Theatre Area Structure 4330 HpWt Baddl,Carpod&GiadaS"NIaka 5 31JW43 UEBM ® Import,Backliill,Compact I Grade Sand M�terial 4340 SolCarpeaT 0 UEBMj Soil Com�acdon 4370 Fetal RehaDo.�eb 2 OIFEB0i 10�q Install ebar Dowels 4350 Fria Ur.Elardrei �Tf 2 07F IU:EBM M Install /G Electrical � 4380 FUO EYc" 0 1LF♦� In ed U/G Electrical 43BD Fdal Reber 2 11F®33 12FEB13 — —�---- 0 Install ebar 4390 RetalRpackn 0 124EBM �Reber nspectlon � 4400 Pw&bmGrada 1 13 MM 13im i Pour lab on Grade 4410 FNalCpadiaWaSlad Beared9azg 10 14FE330 Zh1330'3 ® Install Openbl Wall Steel Beams&Bracing 4421 SetOpw"WalTrak 3 01+N4iD Wall Track 4430 ModaolaShduralSbd 2 MM;03 MAAR03 3 Monokote Structural Steel I Interior 4440 jLaraAIr6=rWa1s&CeAVs 1 WNAFw aIKV D Y Layout Int der Walls d Ceilings 4510 Fatal O.erl3aad Badrd 5 M1,4 3 13AAFM Install verhead Electrical 4470 Fabl OMhMdWAC&CmdrDjA%c k T 07KOFM 17NWYD ® Instal Overhead HVAC&Corridor Duc ork 45CD Fsd FreSpriidaQHFrpMDcs&P.T. 5 U/M40 iamm Install Irs Sprinkler O/H Plping,Drops P.T. 44M fte Cpaah MSleduihMatafSWFmg 3 UNARM 11M4 3 _ _ ® Box-in O era6le Wall Steel with Metal Stu FrmD. 4830 Frame Mar PairxlerWab&CardorWak 4 IMPR 3 1%W433 ® am* ,11sc.Perimeter Walls&Corridor ally 453D FpetCHFh SPFidas 0 13vWYS1 4510 FcpectO141bcFral 0 13vW7n Inpect IH Fire Sprinklers 48M Wa1&CoodxTurdAanig Fx{sem 0 13V14M �Inapect OlH Electrical 4727 SdQnFrune 3 13r4Vai 17NWs)3 WaII& ooridor Tunnel.'Framing Inapec on ® Set D r Frames Sheet 8 of 11 Activity Activity Oft Early Early ID Description Dur Start Finish c. 4631 Nero DywWatCahtr&E3oc"Ro= 4 VMWM igvW�M ® Preli .Drywall at Cgrddor&Electric}I Room, 4570 t3a<Lipl Wall Rol 4 1MN42D 1gvW�3 ® Elec�cal Wall Rough•In 4527 hTertOtI HVPC 0 17M40 Ina OM HVAC 493) Frall fig' 7 10MWi0.3 9MW ® raming Callings 450 E7adtlmlWalkcpecdon 0 IRla a1 Elec rrial Wall Ins eotlon 4510 Fs1ail 4 2.1VAFM zMaRMOld ll lsulate Walls 46V SstElx"Dax4tCas 3 23MFM 27M*M IN 3et Electrical Downlight Cans 4610 I DyAolWab,CarbxPeizh&Ttmd Carndx 5 2JVAFM DtAPFITi Dryw ill Walls,Condit r Patch&Tunnel Corridor 4880 SpirMrDops@H-1Jds 2 2%44R 3 27NI6FU j 0 prinkler Dropa�,(�HardLlda 410 Ce"Ran"Inspection 0 27NARM 1 _ ellln Frail Ins action 4870 Dyual Ceilings 5 Z1NAF170 __. 4®U Wal Spew Fspedin 0 QWiit3 �__—_---_ -� Drywall Celllugs 41330 Ceig Saowi r 0 07iWfY6 Wall Screw ini;Pectic. Coiling Scra Inspection 4700 Tape,Ftei&FFish 7 03WFY6 11AFFM ® Tape,F pat&Finish 4710 PattCeips 5 00Wi3D i5aFR13 4730 total Dose,FnmaeBFHdrara 3 004Rtt3 11PRiD3 _ - —__ _ ._.. _ ____ _ ® Paint Ceilings T_ ® Install Doors,Frames&Hardware 4740 "Wood Base&Nmeriamn Rai 4 lGAA 3 15Win3 ® Install��,Woad Base bPY;eaentation Rail SM0 ReparBae&Fbrtg@C;oAirpoas 3 kYPFn3 16W'PoXi Repair Baae&Floo n 1 p g @ Corridor oors Ol 4790 Paou,kal Calling Grid 3 18WF1D 184FFC3 © Acoustical Ceiling Grid 4760 Watnaig 3 i6W{773 18Wi700 OO W_allcove_rl_n_g_______. 4010 hdalLgiFodues@Sertioa Candy 1 16Wi�3 16WiO3 Install Light Flxtu as @ Service C rrldor 0 4d30 In"SMWI-Haads 2 1GVR33 17APR33 O Install Sprinkler Heads 4�1 Instal Ceirg Dtfisers 1 164M 16WiiD i 0 Install Coiling Diffusers 47EU PalWaIs Doom Basa&Ra6 3 17PPF03 21PPFU3 ® tall Walls,Door lti 48M kxWUVtPo9rea@7+ooA" 3 21AI 0i ZPFFM Light s,Base&Ralti 4780 I sYdSourd Wa Panels 5 21PAu6 25Wii6 � In Light Fbdurys UD Acoustical 4810 tsrdlCeig D'IOrssas@Aoxsti-dCeigs 3 2LWiII3 Z3W - --- _-- ® Install Sound Wall Panels 4ed1 Instal SpniderHmds@Pmistr2lOdrip 3 21Nii70 y3egyS Install Calling D(ffua3 rs@Acoustical Callings GB -- — Inat�ll Sprinkler He ds @Acoustical Callings ® 1 41100 SedCaoeb 1 21PFF00 27FWF703 0 S9al Concrete 4850 EnaqzaLlhtFWaas 2 23OF{03 30PAM _ ® EremitsLI In Fix ures 410 � �@Sa^eCartkr 1 23Wi303 2 ~Install Rub. r Base @ Seriv Corridor 0 4030 tsped0vahaadbrCO rUp 0 2WTO Inspect Overhead�or Cover-Up 48M Instal CeltgTie 3 25WRI 3 23AFFIM ®' Install Celling The 47A ElaNcalTrm 2 � � film I Electrical Trim 4870 trial Capdrg 5 23Wi3I3 03�441M _ ____ _ [OWEInstall Car stin 48M Fdal Opembu Wal Paeh 3 OdvWYD3 0&MM Install Opera Is Wall Panels law4g10 G �t aaxp&Nrd 2 03+MKTi D7M41L0 Is Clean-ups Punchlist 40M OtyFheltelel 0 GM A143 48D CadoeledOrnpary 0 071v141D3 I City Frost I spection Roof Certificate of Occu an ' 49e0 1 Layout R f Penetrations&Val Locatlo a Lara4FdxfF6�aIcrs&Ts Lcmbia 1 1Qv1^R13 1lritWU3 4087 I�rrioFhoig@Sand POC';Tets 3 11Mk1M laW703 ® Demo oofing @ Steel POC's Tie-Ins 4WD DaroE1FS@To Wcairs 2 11134113 12MR13 ® Demo E LF.S @ Tla•In Locations 4MO can RodOp"ga4rDa*wk 1 14AVFM Vh WY)3 0 Cut-In oof Openings for Ductwork 0700 SlixpDuAsak 1 17A4e O 17NPM 0 Stub Ductwork SM In"Kiedr Soern&PHU&CaffisaPtl6ns 7 1BvWF113 23,44jZt3 Install Mach Screen&AHU Condenser Pl ffonns 0® 5160 ClaNlblicReamrs 0 18viWi6 Clear Public Raatrooms Sheet 9 of 11 Activity Activity Orlg Early Early ID Description our Start Finish 5130 jVvsdrGhzpecsW 0 2ffA4RM � SUIvEPFMJads 1 27MOF0 2dN3� aiding Inspection Y. 0 t MEP Roof Jacks 5A SAAFt1,64adFa1&Catdrea 1 27NVR)3 ZRdNYB t AHU Exhaust Fan&Conden r 5170 C1earPubk Rei 0 ZIN16BM leer Public Res{rooms SOB] Instal RodWAC&Pirrbro PpG&Veffe 5 2%W0 Install Roat HVAC&PlumbinjPiping&Vents 5030 kxW RSiganxt Lhaa 2 2iv4WQ 3lMk9)3 Install Refrigerant Lines 5110 FrareMadtSoeen 2 214AP03 31M RM Frame Mech.Screen 5R31 1redFkdQriwkSandTups&Ra1)xnm 5 2114AF03 0YFF03 _ i_ _ Install 3oof Ductwork, ound Traps&-Fire Dampers MR 512D Framing lrcpedul 0 31WO 11,Framing Inspection 5140 FsfelCarsrtBmd@Merit` set 2 ONAQi MNFFD 11 Install Carron Board@ Mach.Screen 515) Yso1F1adaSh}trn@Mah aieen 5 aYFFC3 Lg^FfY13 ® Install Plaaster System @MPch.Screen W70 TedrgF4JAC&P1rrt:MPprg 3 01,AFF113 05MF1B MR Testing HVAC&Plumbing (ping 50M IsW Boc"@ EXmwt&SeMm03Ee5 3 00PTQ1 OYPFC3 j Install Electdcal�@Equipment Service Outlets 51W Pathpaku 3 WPFU 096M i i ® Patch Ro4Ong 5163 Path EIF.S@Tents 2 OW3�3 WPPR03 Patch E.I. S@Tlwln locations 5190 kcpatPodPlfig 0 M*RD3 Inspect R1 kof Piping Sm PactRodE3ed d' 0 096PF03 Inspect Rpof Electrical f3210 haiu&labdFWPprU 2 094PFC3 10^M _ _ _ __ _ _ _©_ Insulate_3Label Roof Piping SO PartFbdV1ed}Mb&Ecp0&PUb s 3 IIA'F03 15APR03 Paint Roof Steel,FLah'g&Equip&Platfo s ® f SM Omn Rod&R'<rd" 2 15^PFU 17APF03 0 Clea Roof&Punchlist 50 Final Radnopeckn 0 l&4PISA i FInaI'Roof ins action'. Pantry Pariby Demolition&Grading Wo Rsbrda Ww E"imt 3 OaWD3 13WM ® Relocate Kitchen Equipment 4430 Safe Of,-prttdes 2 14,W'D0 15W4.T3 a Safe ON Sprinklers 4403 Safe ORFJec" 2 14pm 1516to 0 Safe O(f Electrical Sm -ab&CapFirr N 2 14AD3 15WO ® Safe&Cap Plumbing 4723 Da Adf n Aue 5 16140 22WM ® Demo Admin.Are 4040 OaroCW-IFiJPG@AdmAea 2 22WfII 23WD3 D I Omo OM HVAC @I Admin.Area 4333 RsrRe&S�aA-IA@Ad1nAea 1 23W403 23WIB 0 Remove&Salvagg AHU's@Admin 4&0 C1eenAck rtAea 1 24WJ13 2ti,4M g Clean Admin.Areaal Interior 5mo Laraiwafe 1 ONVAR i UNAN90 g Layout Wa Is sm RarneWafe&Ceigs 5 lavAR 3 14WO I�'I Frame Malls&Ceilings' sm so OmhoodU RaSpd � 4 1WAM 1%OM _. I. ®Ov•hs atFir AS ri Sprinkle,* 111 I tion Lines scrtuea a �• 5MO Ovelsed Floc" 4 1Dv M 13JN703 - ---- - ® Overhead Electrical �- 5340 O.eF WRrTbN 4 IU*RD3 W6,R 3 ® Overhei id Plumbing 5'SD SanalF3a@l3GRrrtiG&3ury 1 iiMNb3 11MN3B g Sawcut loor @ UIG Plumbing&Sump 5300 DmCaaJe@UGP1Rnbg&SL p 2 iIMARI 3 12'd^R73 0 Demo C ncrate @ WG Plumbing&Sump 5'GD FxaAeLIGPLUbr &ears 1 13v M 1344M _ _'i g Excavate WG Plumbing E,Sum s 5400 jInopedCHF=Sp ikles 0 13JMD Inspect O/H Fire Sprinklan 5410 krpetGH�cal 0 13vW� ♦Inspect O/H Electrical 5423 YspetlOHRrttig 0 13vWn3 Inspect OIH Plumbing Sheet 10 of l l Adivhy Activity Orig Early I Early _ ID Description Dur Start Finish M Rougi-Bemra@Wal 3 14NVWM IffAqu M Rou h-In Electrical @ Wall ^" 6M 1RXdMftntrQ@VV& 3 14MgM MIAREG ® Rau hdn Plumbing Q Walls I rr 543D 2 iM1AR13 17MAR13 5H Instal UIG Plumbingl5at Floor Sinks/ rains 5M hpedOHFNPG 0 14VAIW I TInspect OM HVAC 5M Frd Fsped" 0 17NAim :i Framing Inspection 5M) SeElac lDoei¢1Cas 1 171vAM 17KA903 0 Set E ectrical Downlight Cans 5VO trtaiSu pTiarch Ards 1 17MkgW 17KVfM 0 Instal Sump Trench Annie Sggp tweduGptrtbg 0 17NAFM — ! Inspe UIG Plumbing r� Bec"Welispahn 0 1RAw3 Electrical Wall inspection 50 PtntigWalisixc n 0 iRV.N303 ♦Plumbing Wall Inspection 5500 lBaJJ&CurYpadLVGP1urnbru 1 18AMRD iBJ,Nd73 0 Backfiil3 Compact UfG Plumbing 5520 jSdCompaclion 0 194AR13 _ Soll om action 5480 Iku}alaWals 2 12 OM ! 11 Ins late Walla B510 1 Dryvrai 3 2%PFC03 24MARM ® Drywall EM) Sg ispedin 0 24N FM S raw Inspection 5590 ITape,Fbed&Fridr 5 23v1°R73 31NIAREG Tape,Float d Finish � h"BeerpnnPaeS&BWnat 5 2ffAd 3 034PFC3 Install Beer Room Panels 8 E,uI ment 5Ti10 PatdCeii gs 2 01PfiiO3 0*fu 3 Paint Ceilingls �D kffiIDons,Frames&Fia�ae 1 OI/ViU3 O APFC3 Install Doora,Frames&Hardware 5BO 5800 Asians"Ceing Grid Iaat Pprg 1 OI,4FFU3 OWi7fA _. _ __ ---_ .--_ g nstusti of Cdder jkmWRodI 1 OIF�3 OV4=RD Install Roof L 2 MAFriO3 MAPF 03 ❑ Install Evap rator ti Refrigaront Piping 59U Pm�ICeTrg CxN ailing Grid_ M0 i�ICWPCoMT�gSbb 1 OiN*703 IHeFFd13 Room Topping$lab 5eM install-driFl Axess 1 OIPF�6 WPRi73 0 Install Light Fixtures So Ins�Cafrg 00fiissers 2 WPFFCB CBPdiO3 ® Install Culling Diffussers Wil ie4lSpttdaFkais 2 WP>-Ti0.3 OBPPFdT3 © Install Spiinkler Heads g HxkrpBeerP nLihks 1 COPPFOG 07APF03 0 Hook-u Bleer Room Ll hts' 5figp Fr lSpritJ3s@BeerRran 1 07APPM WPFFi13 0 Install Sprinklers @ Bear Room � icpedOMhMdtrCo W 0 Onppi3 Inspect Overhead for Covey-Up efflD Enegjza UJtFAres 1 05*FC3 056PFCB 0 Energize Light Fixtures 5730 Instal CeiigTile 1 OOAR303 C96PFCB 0 Install Ceiling Tile 5710 PatWa"hays 4 10VIRM 15*FC3 lid Paint Walls&Doors SM SedCande Fhor 1 1fiePF303 16^FRT3 0 Seal Concrete Floor SM SdXidenBd,munt 3 17PPR73 2tAFF03 ® Set Kitchen EquIpm ant 5740 Eleciical Trim 2 17P9F;(3 1a6FF(S D Electrical Trim SM PrzrbtgTrtn 2 17APROB 184FFC3 D Plumbing Trim 5M Hxk-LpIQJwE4pnat 3 VAPF 3 24AFi13 Oil Hook-up Kitchen Equipment 57A Own vSRyz1'ivt 2 25%qFM 2 APRC3 00 Clean-up 6 Pun 1111111 SM ClyInWodlon g 25WFU3 City Inspection SRO HeehDepanotigedin 0 25OPFC3 Health Departm°Int Inspection 5100 ClyPinalrpei-n 0 23'{� City Final Inspection EM Cad6'aHdOoopancy g 23"� Certificate of Occu anc Sheet 11 of 11 pF PALM s, City of Palm Springs Department of Procurement and Contracting roRPORAiEO,+P 3200E Tabquirz Canyon Way • Palm Springs,California 92262 141TORN" Tel: (760)323-8239 • Fax: (760)322-8372 • Web:www.d.palm-springs.cams CITY OF PALM SPRINGS 3200 East Tahquitz Canyon Way Palm Springs, CA 92262 NOTICE TO TRADE CONTRACTORS (ALL TRADES) PHASE I EXPANSION OF THE PALM SPRINGS CONVENTION CENTER CITY PROJECT#02-19 ADDENDUM NO. 3 This Addendum is being issued for the following changes and informational items: 1. Replace Table of Contents (3 pages)with revised Table of Contents, pages 1, 2 and 3. 2. Add:To bid Package#32 - Electrical and Fire Life Safety II. SCOPE OF WORK F. ALLOWANCES Trade Contractor shall build an allowance of$5,000 (five thousand dollars) into the bid for exterior lighting to be specified at a later date. 3. Add to bid Package #01 - Selective Demolition II. SCOPE OF WORK B.As further clarification, Trade Contractor shall: 58. After their salvage of AHU#3 and AHU#6 (by other trade contractor) remove steel platforms, their attachments and supports. Post Office Box 2743 0 Palm Springs, California 92263-2743 4. Add: to bid Package #28 - Kitchen Equipment II. SCOPE OF WORK A. Add to "A" §10265 -Wall Surface Protection Systems. 5. Replace: Exhibit "D", Document List, pages 1 through 6 with revised Exhibit"D", pages 1 through 6. 6. Replace: Exhibit "F", Temporary Utilities for Construction Purposes, pages 1 through 3, with revised Exhibit "F", pages 1 through 3. 7. Add: to Qualified Bidders List A. Add to attachment to Addendum #1 entitled "Pre-Qualified Trade Contractors for Trades Requiring Pre-qualification and Attendance at Mandatory Pre-Bid Conference" Janikowski Plumbing, Inc. to Trade Bid Package#29 (Plumbing). B. Add to attachment to Addendum#1 entitled "List of Attendees for Those Trade Bids Requiring Attendance at the Pre-Bid Meeting But Did Not Have to Pre-Qualify" B E Mc Murray Construction, Inc. to Trade Bid Package #4 (Concrete & Reinforcing) 8. Add: To PART IV- CONSTRUCTION DRAWINGS AND SPECIFICATIONS as attached. Section 08110 Steel Doors and Frames Section 08211 Flush Wood Doors Section 08305 Access Doors Section 08331 Overhead Coiling Doors Section 08710 Finish Hardware Section 09512 Acoustical Tile Ceiling Section 09651 Resilient Tile Flooring Section 09900 Painting Section 09775 Fibreglass Reinforced Panels Section 10660 Operable Walls Section 10265 Impact- Resistant Wall Protection 9. Informational: Attached Requests for Information with responses by Architect and Engineer. Numbers PB #01 - PB #22 10. Delete Bid Package#9 Doors, Frames & Hardware from the Notice Inviting Bids dated November 11, 2002. Perspective bidders for Bid Package#9 should contact Director of Procurement & Contracting 760-323-8239 for additional information. END OF ADDENDA NO. 3 BY ORDER OF THE CITY OF PALM SPRINGS City of Palm Springs Harold E. Good, CPPO Director of Procurement & Contracting Dated: December 12, 2002 Receipt of this addenda must be acknowledged on the Trade Bid Forms submitted with the bid package. Attachments: Revised Table of Contents (3 pages) Revised Exhibit"D" (6 pages) Revised Exhibit"F (3 pages) SK-1 (2 pages) Additional Specifications as referenced in Item 8 above Pre-Bid RFI Log (2 pages) HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theatre Reconfiguration 10/30/02 TABLE OF CONTENTS DIVISION 0 - BIDDING REQUIREMENTS To be provided by the City of Palm Springs DIVISION I - GENERAL REQUIREMENTS Section 01010 - Summary of the Work Section 01040 - Coordination Section 01045 - Cutting and Patching Section 01050 - Field Engineering Section 01200 - Project Meetings Section 01300 - Submittals Shop Drawings Product Data and Samples Section 01400 - Quality Control Section 01421 - Reference Standards and Definitions Section 01631 - Substitutions Section 01700 - Contract Closeout Section 01720 - Project Record Documents Section 01730 - Operation and Maintenance Data Section 01740 - Warranties DIVISION 2 - SITE CONSTRUCTION Section 02060 - Building Demolition Section 02222 - Excavation Section 02300 - Earthwork DIVISION 3 - CONCRETE Section 03100 — Concrete Formwork Section 03300 - Cast-In-Place Concrete DIVISION 4 - MASONRY Section 04200 - Unit Masonry DIVISION 5 - METALS Section 05120 - Structural Steel Section 05210 — Steel Joists Section 05310 - Steel Deck Section 05400 - Cold-Formed Metal Framing Section 05500 - Metal Fabrications Section 05810 - Expansion Joint Cover Assemblies Table of Contents Page 1 Revised 12/12/02 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theatre Reconfiguration 10130/02 DIVISION 6 -WOOD AND PLASTICS Section 06100 - Rough Carpentry DIVISION 7 -THERMAL AND MOISTURE PROTECTION Section 07210 - Building Insulation Section 07241 — Exterior Insulation and Finish Systems — Class PB Section 07533 — Single-Ply Membrane Roofing Section 07716— Roof Expansion Assemblies Section 07720 — Roof Accessories Section 07811 — Sprayed Fire Resistive Materials DIVISION 8 - DOORS AND WINDOWS Section 08110 - Steel Doors and Frames Section 08211 - Flush Wood Doors Section 08305 - Access Doors Section 08331 - Overhead Coiling Doors Section 08710 - Finish Hardware DIVISION 9 - FINISHES Section 09253 - Gypsum Sheathing Section 09255— Gypsum Board Assemblies Section 09310 - Ceramic Tile Section 09571 - Acoustical Tile Ceilings Section 09651 — Resilient Tile Flooring Section 09671 — Resinous Flooring Section 09680 - Carpet (Owner Supplied and Installed) Section 09775 — Fiberglass Reinforced Panels Section 09900 - Painting Section 09841 —Acoustical Wall Panels DIVISION 10 - SPECIALTIES Section 10265 - Wall Surface Protection Systems Section 10660 — Operable Walls DIVISION 11 - EQUIPMENT Section 11400— Food Service Equipment DIVISION 12 - FURNISHINGS - Not Used DIVISION 13 - SPECIAL CONSTRUCTION - Not Used Table of Contents Page 2 Revised 12/12/02 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theatre Reconfiguration 10/30/02 DIVISION 14 - CONVEYING SYSTEMS - Not Used DIVISION 15 - MECHANICAL Section 15000 — Mechanical Specification Section 15300 — Fire Protection Specification Section 15400 — Plumbing Specification Section 15855 —Air Handling Units DIVISION 16 - ELECTRICAL Section 16010 — Electrical — General Provisions Section 16110 — Raceways Section 16120 —Wire and Cable Section 16140 - Devices Section 16170 — Low Voltage Disconnect Switches Section 16181 — Low Voltage Fuses Section 16182 — Low Voltage Circuit Breaker Section 16450 — Grounding System Section 16460 — Low Voltage Transformers Section 16471 — Branch Circuit Panelboards Section 16472 — Distribution Panelboards Section 16485 — Motor Controllers Section 16500 — Lighting Fixtures Section 16520 — Lighting Control System Revised 12/12/02 Table of Contents Page 3 EXHIBIT D I PALM SPRINGS CONVENTION CENTER DOCUMENT LIST November 1, 2002 Architectural Architect/ Description Date Drawing No. Engineer ARCHITECTURAL A0.01 HNTB Sheet Index, Directory 10/30/02 A0.02 HNTB General Notes and Abbreviations 10/30/02 A0.03 HNTB Partition Types 10/30/02 Ao.05 HNTB Accessibility Details 10/30/02 AD0.01 HNTB Demolition Plan and Section-Kitchen 10/30/02 AD0.02 HNTB Demolition Plan and Section-Springs Theater 10/30/02 A1.00 HNTB Overall Site Plan 10/30/02 A1.01 HNTB Overall Floor Plan 10/30/02 A1.02 HNTB Overall Existing First Floor Plan 10/30/02 A1.10 HNTB Enlarged Plan-Kitchen Area 10/30/02 A1.11 HNTB Enlarged Plan-Meeting Rooms 10/30/02 A1.20 HNTB Enlarged Roof Plans-Kitchen and Meeting Rooms 10/30/02 A1.21 HNTB Enlarged Restroom: Stairs and Ramp 10/30/02 A2.01 HNTB Exterior Elevations 10/30/02 A2.10 HNTB Building Sections 10/30/02 A3.01 HNTB Wall Sections 10/30/02 A3.02 HNTB Wall Sections 10/30/02 A4.01 HNTB Roof Details 10/30/02 A4.02 HNTB Miscellaneous Details 10/30/02 A6.01 HNTB Interior Elevations-Kitchen 10/30/02 A6.02 HNTB Interior Elevations 10/30/02 A7.01 HNTB Room Finish Schedule 10/30/02 A8.01 HNTB Overall Reflected Ceiling Plan 10/30/02 A8.10 HNTB Enlarged Reflected Ceiling Plan-Kitchen Area 10/30/02 A8.11 HNTB Enlarged Reflected Ceiling Plan-Meeting Rooms 10/30/02 A8.20 HNTB Ceiling Details 10/30/02 A9.01 HNTB Door Schedule and Details 10/30/02 STRUCTURAL S1.01 HNTB General Notes 10/30/02 S1.02 HNTB Typical Concrete Details 10/30/02 S1.03 HNTB Typical Steel Details 10/30/02 S1.04 HNTB Typical Steel Deck Details 10/30/02 S2.01 HNTB Enlarged Floor Plan-Meeting Rooms 10/30/02 S2.02 HNTB Enlarged Roof Plan-Meeting Rooms 10/30/02 S2.11 HNTB Enlarged Floor and Foundation Plan-Kitchen 10/30/02 S2.12 HNTB Enlarged Roof Framing Plan-Kitchen 10/30/02 S3.01 HNTB Sections and Details 10/30/02 S3.02 HNTB Sections and Details 10/30/02 S3.03 HNTB Sections and Details 10/30/02 Page 1 of 6 Revised 12/12/02 EXHIBIT D PALM SPRINGS CONVENTION CENTER DOCUMENT LIST November 1, 2002 Architectural Architect/ Description Date Drawing No. Engineer MECHANICAL MO.01 HNTB Symbols, Abbreviations, and Notes 10/30/02 MO.02 HNTB Mechanical Requirements 10/30/02 MO.03 HNTB Mechanical Schedules 10/30/02 M1.10 HNTB Enlarged Kitchen HVAC Floor Plan 10/30/02 M1.11 HNTB Enlarged Meeting Rooms HVAC Floor Plan 10/30/02 M1.12 HNTB Enlarged Kitchen HVAC Roof Plan 10/30/02 M1.13 HNTB Enlarged Meeting Rooms HVAC Roof Plans 10/30/02 M2.01 HNTB Mechanical Details 10/30/02 M2.02 HNTB Mechanical Details 10/30/02 M2.03 HNTB Mechanical Control Diagrams 10/30/02 ELECTRICAL E0.01 HINTS Symbols List,Abbreviations, and Notes 10/30/02 EO.02 HNTB Partial Single Line Diagram, Light Fixture Schedule and Title 24 10/30/02 EO.03 HNTB Panel Schedule & Load Calculation 10/30/02 EO.04 HNTB Dimming System Riser Diagram 10/30/02 E1.10 HNTB Enlarged Kitchen Power Plan 10/30/02 E1.11 HNTB Enlarged Meeting Rooms Power Plan 10/30/02 E1.14 HNTB Enlarged Kitchen Electrical Roof Plan 10/30/02 E1.15 HNTB Enlarged Meeting Room Electrical Roof Plan 10/30/02 E8.10 HNTB Enlarged Kitchen Lighting Plan 10/30/02 E8.11 HNTB Enlarged Meeting Room Lighting Plan 10/30/02 E9.10 HNTB Special Outlet Details 10/30/02 PLUMBING P0.01 HNTB Symbol List,Abbreviations and Notes 10/30/02 PO.02 HNTB Plumbing Schedules 10/30/02 P1.10 HNTB Enlarged Kitchen Plumbing Plan 10/30/02 P1.11 HNTB Enlarged Pantry Plumbing Plan 10/30/02 P1.12 HNTB Enlarged Kitchen Plumbing Roof Plan 10/30/02 FOOD SERVICES KO-1 HNTB Notes and Symbols 10/30/02 KO-2 HNTB Construction and Installation Details KA-1 HNTB Equipment Plan 10/30/02 KA-2 HNTB Building Conditions Plan 10/30/02 KA-3 HNTB Plumbing Plan 10/30/02 Page 2 of 6 Revised 12/12/02 EXHIBIT D i PALM SPRINGS CONVENTION CENTER DOCUMENT LIST November 1, 2002 Architectural Architect/ Description Date Drawing No. Engineer FOOD SERVICES (con't) KA-4 HNTB Electrical Plan 10/30/02 KA-5 HNTB Refrig/Ventilation Plan 10/30/02 KA-6 HNTB Equipment Elevations 10/30/02 KB-1 HNTB Equipment Plan 10/30/02 KB-2 HNTB Building Conditions Plan 10/30/02 KB-3 HNTB Plumbing/Ventilation Plan 10/30/02 KB-4 HNTB Electrical Plan 10/30/02 KB-5 HNTB Refrig/Ventilation 10/30/02 Exhibit D Continued on next page I Page 3 of 6 Revised 12/12/02 EXHIBIT D PALM SPRINGS CONVENTION CENTER DOCUMENT LIST November 1, 2002 Specification Architect/ Description Date Number Engineer DIVISION 1 —GENERAL REQUIREMENTS 01010 HNTB Summary of the Work 10/30/02 01040 HNTB Coordination 10/30/02 01045 HNTB Cutting and Patching 10/30/02 01050 HNTB Field Engineering 10/30/02 01200 HNTB Project Meetings 10/30/02 01300 HNTB Submittals Shop Drawings Product Data and Samples 10/30/02 01400 HNTB Quality Control 10/30/02 01421 HNTB Reference Standards and Definitions 10/30/02 01631 HNTB Substitutions 10/30/02 01700 HNTB Contract Closeout 10/30/02 01720 HNTB Project Record Documents 10/30/02 01730 HNTB Operation and Maintenance Data 10/30/02 01740 HNTB Warranties 10/30/02 DIVISION 2—SITE CONSTRUCTION 02060 HNTB Building Demolition 10/30/02 02222 HNTB Excavation 10/30/02 02300 HNTB Earthwork DIVISION 3—CONCRETE 03100 HNTB Concrete Formwork 10/30/02 03300 HNTB Cast-In-Place Concrete 10/30/02 DIVISION 4—MASONRY 04200 HNTB Unit Masonry 10/30/02 DIVISION 5—METALS 05120 HNTB Structural Steel 10/30/02 05210 HNTB Steel Joists 10/30/02 05310 HNTB Steel Deck 10/30/02 05400 HNTB Cold-Formed Metal Framing 10/30/02 05500 HNTB Metal Fabrications 10/30/02 05810 HNTB Expansion Joint Cover Assemblies 10/30/02 DIVISION 6—WOOD AND PLASTICS 06100 HNTB Rough Carpentry 10/30/02 Page 4 of 6 Revised 12/12/02 EXHIBIT D PALM SPRINGS CONVENTION CENTER DOCUMENT LIST November 1, 2002 Specification Architect/ Description Date Number Engineer DIVISION 7—THERMAL AND MOISTURE PROTECTION 07210 HNTB Building Insulation 10/30/02 07241 HNTB Exterior Insulation and Finish Systems—Class PB 10/30/02 07533 HNTB Single-Ply Membrane Roofing 10/30/02 07716 HNTB Roof Expansion Assemblies 10/30/02 07720 HNTB Roof Accessories 10/30/02 07811 HNTB Sprayed Fire Resistive Materials 10/30/02 DIVISION 8—DOORS AND WINDOWS 08110 HNTB Steel Doors and Frames 10/30/02 08211 HNTB Flush Wood Doors 10/30/02 08305 HNTB Access Doors 10/30/02 08331 HNTB Overhead Coiling Doors 10/30/02 08710 HNTB Finish Hardware 10/30/02 DIVISION 9—FINISHES 09253 HNTB Gypsum Sheathing 10/30/02 09255 HNTB Gypsum Board Assemblies 10/30/02 09310 HNTB Ceramic Tile 10/30/02 09512 HNTB Acoustical Tile Ceilings 10/30/02 09651 HNTB Resilient Tile Flooring 10/30/02 09680 HNTB Carpet 10/30/02 09775 HNTB Fiberglass Reinforced Panels 10/30/02 09900 HNTB Painting 10/30/02 09841 HNTB Acoustical Wall Panels 10/30/02 DIVISION 10—SPECIALTIES 10265 HNTB Wall Surface Protection Systems 10/30/02 10660 HNTB Operable Walls 10/30/02 DIVISION 11 —EQUIPMENT 11400 HNTB Food Service Equipment 10/30/02 DIVISION 12—FURNISHINGS Not Used Page 5 of 6 Revised 12/12/02 EXHIBIT D PALM SPRINGS CONVENTION CENTER DOCUMENT LIST November 1, 2002 Specification Architect/ Description Date Number Engineer DIVISION 13—SPECIAL CONSTRUCTION Not Used DIVISION 14—CONVEYING SYSTEMS Not Used DIVISION 15—MECHANICAL 15000 HNTB Mechanical Specification 10/30/02 15300 HNTB Fire Protection Specification 10/30/02 15400 HNTB Plumbing Specification 10/30/02 15855 HNTB Air Handling Units 10/30/02 DIVISION 16—ELECTRICAL 16010 HNTB Electrical—General Provisions 10/30/02 16110 HNTB Raceways 10/30/02 16120 HNTB Wire and Cable 10/30/02 16140 HNTB Devices 10/30/02 16170 HNTB Low Voltage Disconnect Switches 10/30/02 16181 HNTB Low Voltage Fuses 10/30/02 16182 HNTB Low Voltage Circuit Breaker 10/30/02 16450 HNTB Grounding System 10/30/02 16460 HNTB Low Voltage Transformers 10/30/02 16471 HNTB Branch Circuit Panelboards 10/30/02 16485 HNTB Motor Controllers 10/30/02 16500 HNTB Lighting Fixtures 10/30/02 16520 HNTB Lighting Control System 10/30/02 Page 6 of 6 Revised 12/12/02 1 EXHIBIT F TEMPORARY UTILITIES FOR CONSTRUCTION PURPOSES I. Temporary Plumbing A. Scope of work provided by the Plumbing Trade Contractor. The temporary Plumbing, and monthly rental, to be provided, will include, but are not limited to, the following: 1. Temporary water from domestic water. • Water service and hook-up at CM's jobsite trailer for the duration of the project. CM, City, DWA and Convention Center/Hotel shall approve all water service tie-in locations. • Water service with '/, " hose bib at areas of expansion and renovation for the duration of the project. CM, City, and Convention Center/Hotel shall approve all water service tie-in locations. • Temporary Construction water meter to be utilized by all required Trade Contractor's for the duration of the project. • (1) V hose bib at 48"AFF at exterior of CM's jobsite trailer. • System will be sanitized for drinking purposes. • Cost of water to be paid by the City of Palm Springs, 2. Temporary Holding Tank and Toilets. • Holding tank and connection to CM's jobsite trailer restroom, including twice weekly pump-outs for the duration of project. • Four (4) portable toilets with hand-wash stations, including twice weekly pump-outs and water service for duration of project. Locations to be determined by the CM's Project Superintendent. Page 1 of 3 Revised 12/12/02 I EXHIBIT F TEMPORARY UTILITIES FOR CONSTRUCTION PURPOSES II. Temporary Electrical and Telephone A. Scope of work provided by the Electrical Trade Contractor. The temporary power, and monthly rental, to be provided, will include, but are not limited to, the following: 1. Temporary Power • Provide temporary power poles, service and hook-up of Ws jobsite trailer from approved designated location (i.e. the Convention Center, Hotel, or other) with pole-mounted metering device for the duration of the project. Service will be 100 amp, 3 phase 240 volts. • Provide temporary power poles and service to the kitchen expansion/renovation area from approved designated location (i.e. the Convention Center, Hotel, or other) with pole-mounted metering device for the duration of the project. Service will be 200 amp, 3 phase 240 volts. I • Power temporary power and service to the Springs Theatre/ new meeting room and dry storage renovation area from approved designated location (i.e. the Convention Center, Hotel, or other). Utilize an existing panel for the duration of the project. Service will be 200 amp, 3 phase 240 volts. • Provide up to (6) spider boxes at the areas of expansion/renovation as directed by jobsite Superintendent. • Cost of power will be paid by The City of Palm Springs. Page 2 of 3 Revised t2/12/02 EXHIBIT F TEMPORARY UTILITIES FOR CONSTRUCTION PURPOSES 2. Temporary Lighting • Provide and install (3) temporary power poles with (2) top-mounted security lights at far corners of construction fencing at CM's jobsite trailer compound area. • Provide temporary overhead lighting within the areas of expansion/renovation of not less than one foot-candle power square foot or as required by CAL-OSHA as need for the duration of the project. Task lighting will be by the respective trade contractors. 3. Temporary Telephone • Provide and install telephone lines and hook-up at CM's jobsite trailer from an approved designated location (i.e. the Convention Center, Hotel, or other)for the duration of the project. Provide a minimum of 4 phone lines. III. Temporary Trash Dumpsters A. Scope of work provided by the Demolition Trade Contractor. The temporary trash dumpster, monthly rental, and disposal fees to be provided, will include, but are not limited to, the following: 1. Temporary Trash Dumpsters • Provide two (2) 40-cuyd temporary trash dumpsters with weekly dump service at each area of the expansion/renovation area for construction trash debris for the duration of the project. These dumpsters are above and beyond the necessary "low-boys' and "other" 40-cuyd dumpsters that will be required for demolition, removal and disposal under the selective demolition scope of work. • Provide one (1) 4 cuyd temporary trash dumpster with weekly dump service at the CM's jobsite trailer for the duration of the project. Page 3 of 3 Revised 12/12/02 x IS, � � -i INWE 1 1 $CIS& ' . �.. 3/4 CI S&1 4lY I N. I- y{,}� H S&.T/ 7 t _ PRE-BID RFI LOG RFI# DATE RFI DETAIL RESPONSE RESPONSE DATE PB-1 11/23/02 There is an area(receiving)in the kitchen which she 12/5/2002 The Health Department has reviewed the exposed ceiling open to structure.This area will be used to ceiling in the Receiving Area and they have not take transport food items from loading to the kitchen.We issue. Provide the diffuser indicated in the sketch don't believe that this will be acceptable to the Dept.c F provided by Syska&Hennessey. Health.Please advise. PB-2 11/25/2002 Drawings show condensers for kitchen above ceiling, 12/5/2002 The new condenser for this project are indicated to b but CC personal indicate they are on roof located on the roof. Relocation of existing condense was not included in the scope of the project. The design work required to accomplish this would involy all of the consultants and require input from the original manufacturers relative to the configuration o the condensers and compressors,their weights and centers of gravity and their utility requirements. Sine these units were not intended for an exterior application,some kind of weatherproof enclosure will need to be designed This is more work than can be accomplished during the bid process. HNTB concur that relocating the condensers will benefit the project and will perform the design tasks necessary to accomplish this if authorized to do so by the City. P13-3 11/25/200 Is it acceptable to use native sand for fill? 12/5/2002 Per item 5 Appendix C of the soils report. PB-4 11/25/2002 The drawings show 4"crushed gravel as base,but 12/5/2002 Provide base under interior slabs in accordance with spec's indicate vapor barrier w/2"of native sand. the soils report. Please advise if vapor bamer/sand alternative is acceptable. P13-5 11/25/2002 Currently there is exterior lighting at the dock area,IN 12/5/2002 This will be addressed in an addendum prior to bid. new plans have no provisions for any Is it an oversigi t or have all exterior lights been eliminated? PB-6 11/25/2002 The HVAC ducts at the S.&E.Corridors of the 12/5/2002 This is a contractor's mean and methods. Springs Theater havehard lid under them.What is the intended method for replacement? PB-7 11/25/2002 Still need final specs on the carpeUflooring.Please 12/5/2002 Carpet will be purchased and installed by the City to advise. allow them to take advantage of pricing arrangement PB-8 11/25/2002 What is to become of the existing camera at the 12/5/2002 This will be addressed in an addendum prior to bid. loading dock area?Does there need to be power and backin for anew one? PB-9 11/26/2002 KA.2 shows flooring to be quarry[Ile in Cold Prep Rm 12/5/2002 Resinous flooring. 111,however,the finish schedules list it as resinous. Please clarify PB-10 11/25/2002 Duplicate of P13-1 12/5/2002 Duplicate of PB-1 PB-11 11/25/2002 Roof stairs show on the Roof plan drawing,but not or 1 2/512 0 0 2 The roof ladder comes down in the Telephone Room the floor plan drawing.Please clarify where the locati of the roof stairs will be. PB-12 11/25/200 The Convention Center indicates that they want the 12/5/2002 Delete all reference to vinyl wall covering in the wall covering to he removed from the S.&E.corridor project Where vinyl wall covering was previously (only the side abutting the Springs Theater)and to be specified,provided painted drywall. finished with paint to match.Please advise P13-13 11/25/2002 It is not clear if any communication/data wiring is 12/5/2002 The scope of communications wiring is limited to included in the scope of work.Please clarify if this conduit,which is show on the drawings. needs to be included. PB-14 11/2712002 A note on drawing M1.10 states to remove and replac a 12/5/2002 The Diffusers and air quantities were indicated on th existing air diffusers and grilles with new,these new latest drawings that were issued on November 21, are to have the same air quality as existing.Nothing 2002. M1.11 will be reissued. the existing is shown on the drawing to determine this sco e of work. PB-15 11/27/2002 The scope or work note of drawing MIA 1 states to 12/5/2002 The Contractor shall field verify the AHU's and remove AHU-6 and AHU-3 and all associated duct ductwork to be removed and needs to refer to the work and piping Nothing of existing is shown. lavallable As-Bwlts drawings. PB-16 11/27/2002 The scope of work note on drawing M1.11 states to 12/5/2002 Same as PB-15 above. remove the duct work in the hallway and leae existing duffusers.The diffsers aer shown but not the duct work. PB-17 11/27/2002 There is no condensate drain piping shown on the 12/5/2002 Condensate drain is under the HVAC scope not the plumbing drawings for any of the fan coils,split Plumbing and should be routed to the nearest recept systems or the new Air Handler Unit. as noted on Mechanical drawings and per specs. Regarding item PB-17,the condensate drain for the new AHU can be routed to the existing hub drain serving existing AHU-4.As to the fan coil units,the condensate drain can be routed to nearest floor sink within the Kitchen Area.The split type indoor evaporated can be routed to the adjacent existing Janitor sink. PB-18 12/2/2002 Per details 1&2JS3.03,closure plate is required on 12/11/200 Detail 2/53.03 shall apply along deck edge along lines 8.6,21.9&21.2 sheet 52.12?What is required Column line 21.9 with 3/8" on the balance of this roof area and what is the bent plate as reference on detail 6/Sl.04,however,if material? "L"exceed 6 inches, then the stiffener plate should be in triangular shape as called out in detail 6/S1.04. Detail 1/53.03 shall apply to column lines B6 and 21 2 Detail 1/Sl.04 shall apply to all other edges of deck Dimension'V shall be provided by Architect for all conditions. PB-19 12/2/2002 On the finish schedule,room 101,dry storage shows 12/5/2002 ACT-1 GWB.On reflective ceiling print shows Act-1? PB-20 12/2/2002 Are we to replace all of the T-bar orjust what is on th 12/5/2002 Pending finish schedule?—sent request for what areas.MS PB-21 1219/2002 Drawings state that the acoustical ceiling tile is 2'x2', but the detail shows 2'x4',plus here is not a specification for type of tile. PB-22 12/10/2002 Electrical&fire Life Safety specifications,Para.II,B, 12/11/200 There is no public address system. line item 72;"Provide conduit,boxes and pull string only for public address systems."A public address system is not defined on the drawings,please clarify. HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 l SECTION 08110-STEEL DOORS AND FRAMES PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes steel doors and frames. 1.3 SUBMITTALS A. General: Submit each item in this Article according to the Conditions of the Contract and Division 1 Specification Sections. B. Product Data for each type of door and frame specified, including details of construction, materials, dimensions, hardware preparation, core, label compliance, sound ratings, profiles, and finishes. C. Shop Drawings showing fabrication and installation of steel doors and frames. Include details of each frame type, elevations of door design types, conditions at openings, details of construction, location and installation requirements of door and frame hardware and reinforcements, and details of joints and connections. Show anchorage and accessory items. D. Door Schedule: Submit schedule of doors and frames using same reference numbers for details and openings as those on Contract Drawings. 1. Indicate coordination of glazing frames and stops with glass and glazing requirements. E. Samples for initial selection in the form of manufacturer's color charts showing the full range of colors available for factory-finished doors and frames. F. Samples for verification of each type of exposed finish required, prepared on Samples not less than 3 by 5 inches (75 by 125 mm) and of same thickness and material indicated for final unit of Work. Where finishes involve normal color and texture variations, include Sample sets showing the full range of variations expected. G. Oversize Construction Certification: For door assemblies required to be fire rated and exceeding limitations of labeled assemblies, submit certification of a testing agency acceptable to authorities having jurisdiction that each door and frame assembly has been constructed to conform to design, materials, and construction equivalent to requirements for labeled construction. 1.4 QUALITY ASSURANCE STEEL DOORS AND FRAMES 08110- 1 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Provide doors and frames complying with ANSI/SDI 100 'Recommended Specifications for Standard Steel Doors and Frames"and as specified. B. Fire-Rated Door Assemblies: Units that comply with NFPA 80, are identical to door and frame assemblies tested for fire-test-response characteristics per ASTM E 152, and are labeled and listed by UL, Warnock Hersey, or another testing and inspecting agency acceptable to authorities having jurisdiction. 1. Oversize Fire-Rated Door Assemblies: For units exceeding sizes of tested assemblies, provide certification by a testing agency acceptable to authorities having jurisdiction that doors conform to all standard construction requirements of tested and labeled fire-rated door assemblies except for size. 2. Temperature-Rise Rating: Where indicated, provide doors that have a temperature-rise rating of 450 deg F (250 deg C) maximum in 30 minutes of fire exposure. 1.5 DELIVERY, STORAGE,AND HANDLING A. Deliver doors and frames cardboard-wrapped or crated to provide protection during transit and job storage. Provide additional protection to prevent damage to finish of factory-finished doors and frames. B. Inspect doors and frames on delivery for damage. Minor damages may be repaired provided refinished items match new work and are acceptable to Architect; otherwise, remove and replace damaged items as directed. C. Store doors and frames at building site under cover. Place units on minimum 4-inch- (100-mm- ) high wood blocking. Avoid using nonvented plastic or canvas shelters that could create a humidity chamber. If cardboard wrappers on doors become wet, remove cartons immediately. Provide minimum 1/4-inch (6-mm)spaces between stacked doors to promote air circulation. PART2-PRODUCTS 2.1 MANUFACTURERS A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. Steel Doors and Frames: a. Amweld Building Products, Inc. b. Benchmark Commercial Doors. C. Ceco Door Products. d. Copco Door Co. e. Curries Co. f. Deansteel Manufacturing Co. g. Fenestra Corp. h. Kewanee Corp. i. Mesker Door, Inc. j. Pioneer Industries. k. Republic Builders Products, STEEL DOORS AND FRAMES 08110-2 HNTB #36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 I. Steelcraft. 2. Prefinished Interior Steel Frames: a. Dunbarton Corp. (Rediframe Products). b. Timely Industries. 2.2 MATERIALS A. Hot-Rolled Steel Sheets and Strip: Commercial-quality carbon steel, pickled and oiled, complying with ASTM A 569 (ASTM A 569M). B. Cold-Rolled Steel Sheets: Carbon steel complying with ASTM A 366 (ASTM A 366M), commercial quality, or ASTM A 620 (ASTM A 620M), drawing quality, special killed. C. Galvanized Steel Sheets: Zinc-coated carbon steel complying with ASTM A 526 (ASTM A 526M), commercial quality, or ASTM A 642 (ASTM A 642M), drawing quality, hot-dip galvanized according to ASTM A 525, with A 60 or G 60 (ASTM A 525M, with Z 180 or ZF 180) coating designation, mill phosphatized. D. Supports and Anchors: Fabricated from not less than 0.0478-inch- (1.2-mm-)thick steel sheet; 0.0516-inch- (1.3-mm-)thick galvanized steel where used with galvanized steel frames. E. Inserts, Bolts, and Fasteners: Manufacturer's standard units. Where items are to be built into exterior walls, hot-dip galvanize complying with ASTM A 153, Class C or D as applicable. 2.3 DOORS A. Steel Doors: Provide 1-3/4-inch- (44-mm-) thick doors of materials and ANSI/SDI 100 grades and models specified below, or as indicated on Drawings or schedules: 1. Interior Doors: Grade ll, heavy-duty, Model 1, full flush design, minimum 0.0478-inch- (1.2-mm-)thick cold-rolled steel sheet faces. 2. Exterior Doors: Grade ll, heavy-duty, Model 1, full flush design, minimum 0.0516-inch- (1.3-mm-)thick galvanized steel sheet faces. B. Door Louvers: Provide louvers according to SDI 111C for interior doors where indicated, with blades or baffles formed of 0.0239-inch- (0.6-mm-) thick cold-rolled steel sheet set into minimum 0.0359-inch- (0.9-mm-)thick steel frame. 1. Sight-Proof Louvers: Stationary louvers constructed with inverted V-shaped or Y-shaped blades. 2. Lightproof Louvers: Stationary louvers constructed with baffles to prevent light from passing from one side to the other, any angle. 3. Fire-Rated Automatic Louvers: Louvers constructed with movable blades closed by actuating fusible links at 150 deg F (65 deg C) and labeled and listed for use in fire-rated door assemblies of type and fire-resistance rating indicated by the same inspecting and testing agency who established fire-resistance rating of door assembly. 2.4 FRAMES STEEL DOORS AND FRAMES 08110-3 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration i 10/30/02 A. Provide metal frames for doors, transoms, sidelights, borrowed lights, and other openings, according to ANSI/SDI 100, and of types and styles as shown on Drawings and schedules. Conceal fastenings, unless otherwise indicated. Fabricate frames of minimum 0.0478-inch- (1.2-mm-) thick cold-rolled steel sheet. 1. Fabricate frames with mitered or coped and continuously welded corners. Fabricate frames for interior openings over 48 inches (1220 mm)wide from 0.0598-inch- (1.5-mm-)thick steel sheet. 5. Fabricate exterior frames for openings over 48 inches (1220 mm)wide from 0.0635-inch- (1.6-mm-)thick galvanized steel sheet. 6. Form exterior frames from 0.0635-inch- (1.6-mm-)thick galvanized steel sheet. B. Door Silencers: Except on weatherstripped frames, drill stops to receive 3 silencers on strike jambs of single-door frames and 2 silencers on heads of double-door frames. C. Plaster Guards: Provide minimum 0.0179-inch- (0.45-mm-) thick steel plaster guards or mortar boxes at back of hardware cutouts where mortar or other materials might obstruct hardware operation and to close off interior of openings. D. Grout: When required in masonry construction, as specified in Division 4 Section "Unit Masonry." 2.5 FABRICATION A. Fabricate steel door and frame units to be rigid, neat in appearance, and free from defects, warp, or buckle. Where practical, fit and assemble units in manufacturer's plant. Clearly identify work that cannot be permanently factory assembled before shipment, to assure proper assembly at Project site. Comply with ANSI/SDI 100 requirements. 1. Internal Construction: One of the following manufacturer's standard core materials according to SDI standards: a. Resin-impregnated paper honeycomb. b. Rigid polyurethane conforming to ASTM C 591. C. Rigid polystyrene conforming to ASTM C 578. d. Unitized steel grid. e. Vertical steel stiffeners. f. Rigid mineral fiber with internal sound deadener on inside of face sheets. 2. Clearances: Not more than 1/8 inch (3.2 mm) at jambs and heads, except not more than 1/4 inch (6.4 mm) between non-fire-rated pairs of doors. Not more than 3/4 inch (19 mm) at bottom. a. Fire Doors: Provide clearances according to NFPA 80. B. Fabricate exposed faces of doors and panels, including stiles and rails of nonflush units, from only cold-rolled steel sheet. C. Tolerances: Comply with SDI 117 "Manufacturing Tolerances Standard Steel Doors and Frames." D. Fabricate concealed stiffeners, reinforcement, edge channels, louvers, and moldings from either cold-or hot-rolled steel sheet. STEEL DOORS AND FRAMES 08110-4 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 E. Galvanized Steel Doors, Panels, and Frames: For the following locations, fabricate doors, panels, and frames from galvanized steel sheet according to SDI 112. Close top and bottom edges of doors flush as an integral part of door construction or by addition of minimum 0.0635- inch- (1,6-mm-) thick galvanized steel channels, with channel webs placed even with top and bottom edges. Seal joints in top edges of doors against water penetration. 1. At exterior locations. 2. At exterior locations and where indicated. 3. Where indicated. F. Exposed Fasteners: Unless otherwise indicated, provide countersunk flat or oval heads for exposed screws and bolts. G. Thermal-Rated (Insulating) Assemblies: At exterior locations and elsewhere as shown or scheduled, provide doors fabricated as thermal-insulating door and frame assemblies and tested according to ASTM C 236 or ASTM C 976 on fully operable door assemblies. 1. Unless otherwise indicated, provide thermal-rated assemblies with U-value rating of 0.41 Btu/sq. ft,x h x deg F (2.33 Wlsq. m x K) or better. H. Sound-Rated (Acoustical) Assemblies: Where shown or scheduled, provide door and frame assemblies fabricated as sound-reducing type, tested according to ASTM E 1408, and classified according to ASTM E 413. 1. Unless otherwise indicated, provide acoustical assemblies with STC sound ratings of 33 or better. I. Hardware Preparation: Prepare doors and frames to receive mortised and concealed hardware according to final door hardware schedule and templates provided by hardware supplier. Comply with applicable requirements of SDI 107 and ANSI At 15 Series specifications for door and frame preparation for hardware. 1. For concealed overhead door closers, provide space, cutouts, reinforcing, and provisions for fastening in top rail of doors or head of frames, as applicable. J. Reinforce doors and frames to receive surface-applied hardware. Drilling and tapping for surface-applied hardware may be done at Project site. K. Locate hardware as indicated on Shop Drawings or, if not indicated, according to the Door and Hardware Institute's (DHI) "Recommended Locations for Architectural Hardware for Standard Steel Doors and Frames." L. Glazing Stops: Minimum 0.0359-inch- (0.9-mm-) thick steel or 0.040-inch- (1-mm-) thick aluminum. 1. Provide nonremovable stops on outside of exterior doors and on secure side of interior doors for glass, louvers, and other panels in doors. 2. Provide screw-applied, removable, glazing beads on inside of glass, louvers, and other panels in doors. 2.6 FINISHES, GENERAL STEEL DOORS AND FRAMES 08110- 5 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Comply with NAAMM's "Metal Finishes Manual" for recommendations relative to applying and designating finishes. B. Comply with SSPC-PA 1, "Paint Application Specification No. 1,"for steel sheet finishes. C. Apply primers and organic finishes to doors and frames after fabrication. 2.7 GALVANIZED STEEL SHEET FINISHES A. Surface Preparation: Clean surfaces with nonpetroleum solvent so that surfaces are free of oil or other contaminants. After cleaning, apply a conversion coating of the type suited to the organic coating applied over it. Clean welds, mechanical connections, and abraded areas, and apply galvanizing repair paint specified below to comply with ASTM A 780. 1. Galvanizing Repair Paint: High-zinc-dust-content paint for regalvanizing welds in galvanized steel, with dry film containing not less than 94 percent zinc dust by weight, and complying with DOD-P-21035 or SSPC-Paint 20. B. Factory Priming for Field-Painted Finish: Where field painting after installation is indicated, apply air-dried primer specified below immediately after cleaning and pretreatment. 1. Shop Primer: Zinc-dust, zinc-oxide primer paint complying with performance requirements of FS TT-P-641, Type ll. C. Baked-Enamel Finish: Immediately after cleaning and pretreating, apply manufacturer's standard 2-coat, baked-enamel finish consisting of prime coat and thermosetting topcoat,with a minimum dry film thickness of 1 mil (0.0254 mm)for topcoat. Comply with paint manufacturer's instructions for applying and baking to achieve a minimum dry film thickness of 2 mils (0.0508 mm). 1. Color and Gloss: As indicated by manufacturer's color and gloss designations. 2. Color and Gloss: Match Architect's sample. 3. Color and Gloss: As selected by Architect from manufacturer's full range of choices for color and gloss. 2.8 STEEL SHEET FINISHES A. Surface Preparation: Solvent-clean surfaces to comply with SSPC-SP 1 to remove dirt, oil, grease, and other contaminants that could impair paint bond. Remove mill scale and rust, if present, from uncoated steel to comply with SSPC-SP 5 (White Metal Blast Cleaning) or SSPC- SP 8 (Pickling). B. Pretreatment: Immediately after surface preparation, apply a conversion coating of type suited to organic coating applied over it. C. Factory Priming for Field-Painted Finish: Apply shop primer that complies with ANSI A224.1 acceptance criteria, is compatible with finish paint systems indicated, and has capability to provide a sound foundation for field-applied topcoats. Apply primer immediately after surface preparation and pretreatment. D. Baked-Enamel Finish: Immediately after cleaning and pretreating, apply manufacturer's standard 2-coat, baked-enamel finish consisting of prime coat and thermosetting topcoat that STEEL DOORS AND FRAMES 08110-6 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration l 10/30/02 complies with ANSI A250.3. Comply with paint manufacturer's instructions for applying and baking to achieve a minimum dry film thickness of 2 mils (0.0508 mm). 1. Color and Gloss: As indicated by manufacturer's color and gloss designations. 2. Color and Gloss: Match Architect's sample. 3. Color and Gloss: As selected by Architect from manufacturer's full range of choices for color and gloss. PART 3-EXECUTION 3.1 INSTALLATION A. General: Install steel doors, frames, and accessories according to Shop Drawings, manufacturer's data, and as specified. B. Placing Frames: Comply with provisions of SDI 105, unless otherwise indicated. Set frames accurately in position, plumbed, aligned, and braced securely until permanent anchors are set. After wall construction is completed, remove temporary braces and spreaders, leaving surfaces smooth and undamaged. 1. Except for frames located in existing concrete, masonry, or gypsum board assembly construction, place frames before constructing enclosing walls and ceilings. 2. In masonry construction, install at least 3 wall anchors per jamb adjacent to hinge location on hinge jamb and at corresponding heights on strike jamb. Acceptable anchors ! include masonry wire anchors and masonry T-shaped anchors. 3. At existing concrete or masonry construction, install at least 3 completed opening anchors per jamb adjacent to hinge location on hinge jamb and at corresponding heights on strike jamb. Set frames and secure to adjacent construction with bolts and masonry anchorage devices. 4. In metal-stud partitions, install at least 3 wall anchors per jamb at hinge and strike levels. In steel-stud partitions, attach wall anchors to studs with screws. 5. In in-place gypsum board partitions, install knock-down,slip-on,drywall frames. 6. Install fire-rated frames according to NFPA 80. C. Door Installation: Fit hollow-metal doors accurately in frames, within clearances specified in ANSI/SDI 100. 1. Fire-Rated Doors: Install with clearances specified in NFPA 80. 2. Smoke-Control Doors: Comply with NFPA 105. 3.2 ADJUSTING AND CLEANING A. Prime Coat Touchup: Immediately after erection, sand smooth any rusted or damaged areas of prime coat and apply touchup of compatible air-drying primer. B. Protection Removal: Immediately before final inspection, remove protective wrappings from doors and frames. END OF SECTION 08110 - STEEL DOORS AND FRAMES 08110-7 HNTB #36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 SECTION 08211 - FLUSH WOOD DOORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1. Solid-core doors with wood-veneer faces. 1.3 SUBMITTALS A. Product Data: For each type of door. Include details of core and edge construction, trim for openings, and louvers. 1. Include factory-finishing specifications. B. Shop Drawings: Indicate location, size, and hand of each door; elevation of each kind of door; construction details not covered in Product Data; location and extent of hardware blocking; and other pertinent data. 1. Indicate dimensions and locations of mortises and holes for hardware. 2. Indicate dimensions and locations of cutouts. 3. Indicate requirements for veneer matching. 4. Indicate doors to be factory finished and finish requirements. 5. Indicate fire ratings for fire doors. C. Samples for Initial Selection: Color charts consisting of actual materials in small sections for finish showing that it matches that of the existing doors in the same area. D. Samples for Verification: As follows: 1. Corner sections of doors approximately 8 by 10 inches (200 by 250 mm)with door faces and edgings representing the typical range of color and grain for each species of veneer and solid lumber required. Finish sample with same materials proposed for factory- finished doors. 1.4 QUALITY ASSURANCE A. Source Limitations: Obtain flush wood doors through one source from a single manufacturer. B. Quality Standard: Comply with the following standard: 1. NWWDA Quality Standard: NWWDA I.S.1-A, "Architectural Wood Flush Doors." FLUSH WOOD DOORS 08211 - 1 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 j 2. AWI Quality Standard:. AWI's "Architectural Woodwork Quality Standards" for grade of door, core, construction,finish, and other requirements. C. Fire-Rated Wood Doors: Doors complying with NFPA 80 that are listed and labeled by a testing and inspecting agency acceptable to authorities having jurisdiction, for fire ratings indicated, based on testing according to NFPA 252. 1. Test Pressure: Test at atmospheric pressure. 2. Oversized, Fire-Rated Wood Doors: For door assemblies exceeding sizes of tested assemblies, provide manufacturer's certificate stating that doors comply with all standard construction requirements of tested and labeled fire-door assemblies except for size. 3. Temperature-Rise Rating: At stairwell enclosures, provide doors that have a temperature-rise rating of 450 deg F (250 deg C) maximum in 30 minutes of fire exposure. 4. Temperature-Rise Rating: At stairwell enclosures, provide doors that have a temperature-rise rating of 250 deg F (139 deg C) maximum in 30 minutes of fire exposure. 1.5 DELIVERY, STORAGE,AND HANDLING A. Protect doors during transit, storage, and handling to prevent damage, soiling, and deterioration. Comply with requirements of referenced standard and manufacturer's written instructions. 1. Individually package doors in plastic bags or cardboard cartons. 2. Individually package doors in cardboard cartons and wrap bundles of doors in plastic sheeting. 3. Comply with WIC's Technical Bulletin 420-R for delivery, storage, and handling of doors. B. Mark each door with individual opening numbers used on Shop Drawings. Use removable tags or concealed markings. 1.6 PROJECT CONDITIONS A. Environmental Limitations: Do not deliver or install doors until conditions for temperature and relative humidity have been stabilized and will be maintained in storage and installation areas during the remainder of the construction period to comply with requirements of the referenced quality standard for Project's geographical location. 1.7 WARRANTY A. General Warranty: Door manufacturer's warranty specified in this Article shall not deprive the Owner of other rights the Owner may have under other provisions of the Contract Documents and shall be in addition to, and run concurrent with, other warranties made by the Contractor under requirements of the Contract Documents. B. Door Manufacturer's Warranty: Submit written agreement on door manufacturer's standard form, signed by manufacturer, Installer, and Contractor, agreeing to repair or replace defective doors that have warped (bow, cup, or twist) more than 1/4 inch (6.35 mm) in a 42-by-84-inch (1067-by-2134-mm) section or that show telegraphing of core construction in face veneers FLUSH WOOD DOORS 08211 -2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration t 10/30/02 exceeding 0.01 inch in a 3-inch (0.25 mm in a 75-mm) span, or do not comply with tolerances in referenced quality standard. 1. Warranty shall also include installation and finishing that may be required due to repair or replacement of defective doors. 2. Warranty shall be in effect during the following period of time after the date of Substantial Completion: a. Hollow-Core Interior Doors: Two years. PART2- PRODUCTS 2.1 MANUFACTURERS A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. Flush Wood Doors: a. Algoma Hardwoods Inc. b. Ampco Products, Inc. C. Buell Door Co. d. Chappell Door Co. e. Eagle Plywood &Door Manufacturing, Inc. f. Eggers Industries;Architectural Door Division. g. Graham Manufacturing Corp. h. Haley Brothers, Inc. i. Ideal Wood Products, Inc. j. IPIK Door Co., Inc. k. Marlite. I. Mohawk Flush Doors, Inc. M. Oshkosh Architectural Door Co. n. Poncraft Door Co. 0. Vancouver Door Company, Inc. p. V-T Industries Inc. q. Weyerhaeuser Co. 2. Metal Louvers for Doors: a. Air Louvers, Inc. b. Anemostat Door Products. C. Construction Specialties, Inc. d. Leslie-Locke, Inc. 2.2 DOOR CONSTRUCTION, GENERAL A. Doors for Transparent Finish (door type D): Match existing doors in the same area. 2.3 SOLID-CORE DOORS FLUSH WOOD DOORS 08211 -3 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration �i 10/30/02 A. Particleboard Cores: Comply with the following requirements: 1. Particleboard: ANSI A208.1, Grade LD-1. 2. Blocking: Provide wood blocking at particleboard-core doors as follows: a. 5-inch (125-mm)top-rail blocking, at doors indicated to have closers. b. 5-inch (125-mm) bottom-rail blocking, at exterior doors and doors indicated to have kick, mop, or armor plates. C. 5-inch (125-mm)midrail blocking, at doors indicated to have exit devices. B. Fire-Rated Doors: Comply with the following requirements: 1. Construction: Construction and core specified above for type of face indicated or manufacturer's standard mineral-core construction as required to provide fire rating indicated. 2. Blocking: For mineral-core doors, provide composite blocking with improved screw- holding capability approved for use in doors of fire ratings indicated and as follows: a. 5-inch (125-mm)top-rail blocking. b. 5-inch (125-mm) bottom-rail blocking, at doors indicated to have kick, mop, or armor plates. C. 4-1/2-by-1 0-inch (114-by-250-mm) lock blocks. d. 5-inch (125-mm) midrail blocking, at doors indicated to have exit devices. e. As necessary to eliminate need for through-bolting hardware. 3. Edge Construction: At hinge stiles, provide manufacturer's standard laminated-edge construction with improved screw-holding capability and split resistance and with outer stile matching face veneer. 4. Pairs: Provide fire-rated pairs with fire-retardant stiles that are labeled and listed for kinds of applications indicated without formed-steel edges and astragals. 2.4 FABRICATION A. Fabricate flush wood doors in sizes indicated for Project site fitting. B. Factory fit doors to suit frame-opening sizes indicated, with the following uniform clearances and bevels, unless otherwise indicated: 1. Comply with clearance requirements of referenced quality standard for fitting. Comply with requirements of NFPA 80 for fire-rated doors. C. Factory machine doors for hardware that is not surface applied. Locate hardware to comply with DHI-WDHS-3. Comply with final hardware schedules, door frame Shop Drawings, DHI A115-W series standards, and hardware templates. 1. Coordinate measurements of hardware mortises in metal frames to verify dimensions and alignment before factory machining. D. Openings: Cut and trim openings through doors to comply with applicable requirements of referenced standards for kind(s)of door(s) required. 1. Light Openings: Trim openings with moldings of material and profile indicated. FLUSH WOOD DOORS 08211 -4 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 2. Louvers: Factory install louvers in prepared openings. 2.5 FACTORY FINISHING A. General: Comply with referenced quality standard's requirements for factory finishing. B. Finish wood doors at factory to match the existing doors. PART 3-EXECUTION 3.1 EXAMINATION A. Examine installed door frames before hanging doors. 1. Verify that frames comply with indicated requirements for type, size, location, and swing characteristics and have been installed with plumb jambs and level heads. 2. Reject doors with defects. B. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 INSTALLATION A. Hardware: For installation, see Division 8 Section "Finish Hardware." B. Manufacturer's Written Instructions: Install wood doors to comply with manufacturer's written instructions, referenced quality standard, and as indicated. 1. Install fire-rated doors in corresponding fire-rated frames according to NFPA 80. C. Job-Fit Doors: Align and fit doors in frames with uniform clearances and bevels as indicated below; do not trim stiles and rails in excess of limits set by manufacturer or permitted with fire- rated doors. Machine doors for hardware. Seal cut surfaces after fitting and machining. 1. Clearances: Provide 1/8 inch (3.2 mm) at heads, jambs, and between pairs of doors. Provide 1/8 inch (3.2 mm) from bottom of door to top of decorative floor finish or covering. Where threshold is shown or scheduled, provide 1/4 inch (6.4 mm) from bottom of door to top of threshold. a. Comply with NFPA 80 for fire-rated doors. 2. Bevel non-fire-rated doors 1/8 inch in 2 inches (3-1/2 degrees)at lock and hinge edges. 3. Bevel fire-rated doors 1/8 inch in 2 inches (3-1/2 degrees) on lock edge; trim stiles and rails only to extent permitted by labeling agency. D. Factory-Finished Doors: Restore finish before installation, if fitting or machining is required at Project site. 3.3 ADJUSTING AND PROTECTING A. Operation: Rehang or replace doors that do not swing or operate freely. FLUSH WOOD DOORS 08211 -5 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 B. Finished Doors: Refinish or replace doors damaged during installation. C. Protect doors as recommended by door manufacturer to ensure that wood doors are without damage or deterioration at the time of Substantial Completion. END OF SECTION 08211 FLUSH WOOD DOORS 08211 -6 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 SECTION 08305-ACCESS DOORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following types of access doors: 1. Wall access doors. 2. Fire-rated wall access doors. 3. Ceiling access doors. 4. Fire-rated ceiling access doors. B. Related Sections: The following Sections contain requirements that relate to this Section: 1. Division 4 Sections for building in anchors and grouting frames set in masonry construction. 2. Division 7 Section 'Roof Accessories"for roof hatches. 3. Division 8 Section "Door Hardware"for mortise or rim cylinder locks. 4. Division 9 Section "Gypsum Board Assemblies"for gypsum board walls and ceilings. 5. Division 9 Section "Tile"for ceramic tile walls. 6. Division 9 Section "Acoustical Tile Ceilings" for access tile in suspended or furred acoustical tile ceilings. 7. Division 15 Section "Duct Accessories"for duct access doors. 1.3 SUBMITTALS A. General: Submit each item in this Article according to the Conditions of Contract and Division 1 Specification Sections, B. Product data for each type of access door assembly specified, including details of construction relative to materials, individual components, profiles, finishes, and fire-protection ratings (if required). 1. Include complete schedule, including types, general locations, sizes, wall and ceiling construction details, latching or locking provisions, and other data pertinent to installation. C. Shop drawings showing fabrication and installation of customized access doors and frames, including details of each frame type, elevations of door design types, anchorage, and accessory items. D. Samples, 3-inch (75-mm) by 5-inch (125-mm) minimum size, of each panel face material showing factory-finished color and texture. ACCESS DOORS 08305 - 1 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 1.4 QUALITY ASSURANCE A. Single-Source Responsibility: Obtain access doors for entire Project from one source and by a single manufacturer. B. Fire-Rated Door Assemblies: Units that comply with NFPA 80, are identical to door and frame assemblies tested for fire-test-response characteristics per test method as indicated below, and are labeled and listed by UL, Warnock Hersey, or another testing and inspecting agency acceptable to authorities having jurisdiction. 1. Test Method for Vertical Installations: ASTM E 152. 2. Test Method for Horizontal Installations: ASTM E 119. C. Size Variations: Obtain Architect's acceptance of manufacturer's standard size units, which may vary slightly from sizes indicated. 1.5 COORDINATION A. Verification: Determine specific locations and sizes for access doors needed to gain access to concealed equipment, and indicate on schedule specified under"Submittals"Article. PART2-PRODUCTS 2.1 MANUFACTURERS A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated in the Work include, but are not limited to, the following: B. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. Acudor Products Inc. 2. Bar-Co, Inc. Div.,Alfab, Inc. 3. Cesco Products. 4. Elmdor Manufacturing Co. 5. J.L. Industries. 6. Karp Associates, Inc. 7. Larsen's Manufacturing Co. 8. Milcor, Inc. 9. Nystrom, Inc. 10. The Williams Bros. Corporation of America. 2.2 MATERIALS A. Steel Sheet: ASTM A 366 (ASTM A 366M) commercial-quality, cold-rolled steel sheet with baked-on, rust-inhibitive primer. B. Zinc-Coated Steel Sheet: ASTM A 591 (ASTM A 591 M), Electrolytic zinc-coated steel sheet with Class C coating and phosphate treatment to prepare surface for painting. ACCESS DOORS 08305-2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 C. Stainless-Steel Sheet: ASTM A 167, Type 304 with No. 4 finish according to ASTM A 480 (ASTM A 480M). 2.3 ACCESS DOORS A. Insulated, Fire-Rated Access Doors: Self-latching units consisting of frame, trim, door, insulation, and hardware, including automatic closer, interior latch release, and complying with the following requirements: 1. Frame with Exposed Trim: Perimeter frame with integral exposed trim complying with the following requirements: a. Metal: 0.0598-inch-(1.52-mm-)thick steel sheet. b. Metal: 0.0598-inch-(1.52-mm-)thick zinc-coated steel sheet. C. Metal: 0.0625-inch- (1.59-mm-)thick stainless-steel sheet. d. Trim: 1-inch (25.4-mm)flange overlapping surfaces surrounding door frame. e. Trim: 1-1/4-inch (31.75-min)flange overlapping surfaces surrounding door frame. 2. Trimless Frame: Perimeter frame complying with the following requirements: a. Metal: 0.0598-inch-(1.52-mm-)thick steel sheet. b. Metal: 0.0598-inch- (1.52-mm-)thick zinc-coated steel sheet. C. Metal: 0.0625-inch- (1.59-mm-)thick stainless-steel sheet. d. Frame Configuration: Flange integral with frame and overlapping face of adjoining gypsum board,with surface formed to receive joint compound. e. Frame Configuration: Zinc-coated steel sheet edge trim with both face and back flanges; face flange formed to receive joint compound,with thickness required to fit over edges of adjoining gypsum board panels. 3. Door: 0.0359-inch- (0.91-mm-)thick steel sheet, welded pan type. 4. Door: 0,0359-inch-(0.91-mm-)thick zinc-coated steel sheet, welded pan type. 5. Door: 0.0375-inch-(0.95-mm-)thick stainless-steel sheet, welded pan type. 6. Hinges: Continuous type. 7. Latches: Bolt type, operated by either a ring turn or flush key device (keyed alike). 8. Insulation: 2-inch- (50.8-mm-)thick mineral-fiber insulation. 9. Fire-Protection Rating for Walls: 1-1/2 hours. 10. Fire-Protection Rating for Walls: 1-1/2 hours with a temperature rise not exceeding 250 deg F (139 deg C)at the end of 30 minutes. 11. Fire-Protection Rating for Ceilings: 1 hour for wood-framed walls and other combustible wall assemblies. 12. Fire-Protection Rating for Ceilings: 3 hours for combustible assemblies. B. Noninsulated, Fire-Rated Doors for Walls: Self-latching units consisting of frame, trim, door, and hardware, including automatic closer, interior latch release, and complying with the following requirements: 1. Frame: 0,0598-inch- (1.52-mm-)thick steel sheet. 2. Frame: 0.0598-inch- (1.52-mm-)thick zinc-coated steel sheet. 3. Frame: 0.0625-inch- (1.59-mm-)thick stainless-steel sheet. 4. Door: 0.0598-inch- (1.52-mm-)thick steel sheet. 5. Door: 0.0598-inch-(1.52-mm-)thick zinc-coated steel sheet. 6. Door: 0.0625-inch-(1.59-mm-)thick stainless-steel sheet. ACCESS DOORS 08305-3 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 7. Hinge: Continuous type. 8. Latches: Bolt type, operated by either a ring turn or flush key device (keyed alike). 9. Fire-Protection Rating for Walls: 1-1/2 hours. C. Flush Access Doors with Exposed Trim: Units consisting of frame with exposed trim, door, hardware, and complying with the following requirements: 1. Frame: 0.0598-inch-(1.52-mm-)thick steel sheet. 2. Frame: 0.0598-inch- (1.52-mm-)thick zinc-coated steel sheet. 3. Frame: 0.0625-inch- (1.59-mm-)thick stainless-steel sheet. 4. Door: 0.0747-inch-(1.90-mm-)thick steel sheet. 5. Door: 0.0747-inch- (1.90-mm-)thick zinc-coated steel sheet. 6. Door: 0.0781-inch-(1.98-mm-)thick stainless-steel sheet. 7. Trim: Flange integral with frame, 3/4 inch (19 mm) wide, overlapping surrounding finished surface. 8. Hinge: Continuous type. 9. Locks: Flush, screwdriver-operated cam. 10. Locks: Key-operated cylinder lock. D. Trimless, Flush Access Doors for Gypsum Board: Units consisting of frame, concealed edge trim, door, hardware, and complying with the following requirements: 1. Frame: 0.0598-inch-(1.52-mm-)thick steel sheet. 2. Frame: 0.0598-inch- (1.52-mm-)thick zinc-coated steel sheet. 3. Frame: 0.0625-inch-(1.59-mm-)thick stainless-steel sheet. 4. Door: 0.0747-inch-(1.90-mm-)thick steel sheet. 5. Door: 0.0747-inch-(1.90-mm-)thick zinc-coated steel sheet. 6. Door: 0.0781-inch- (1.98-mm-)thick stainless-steel sheet. 7. Concealed, Gypsum Board Edge Trim: 0.0299-inch (0.76-mm) zinc-coated or galvanized-steel sheet with face flange formed to receive joint compound. 8. Hinge: Concealed spring pin or continuous type. 9. Locks: Screwdriver-operated cam. 10. Locks: Key-operated cylinder lock. E. Trimless, Flush Access Doors for Plaster: Units consisting of frame, casing bead, door, hardware, and complying with the following requirements: 1. Frame: 0.0598-inch- (1.52-mm-)thick steel sheet. 2. Frame: 0.0598-inch- (1.52-mm-)thick zinc-coated steel sheet. 3. Frame: 0.0625-inch- (1.59-mm-)thick stainless-steel sheet. 4. Door: 0.0747-inch-(1.90-mm-)thick steel sheet. 5. Door: 0.0747-inch- (1.90-mm-)thick zinc-coated steel sheet. 6. Door: 0.0781-inch- (1.98-mm-)thick stainless-steel sheet. 7. Plaster Casing Bead: 0.0299-inch (0.76-mm) zinc-coated-steel casing bead with flange formed out of expanded metal lath. 8. Hinge: Concealed spring pin or continuous type. 9. Locks: Screwdriver-operated cam. 10. Locks: Key-operated cylinder lock. F. Trimless, Recessed Doors for Gypsum Board Assemblies: Units consisting of frame with concealed edge trim, door, hardware, and complying with the following requirements: 1. Frame: 0.0897-inch-(2.30-mm-)thick steel sheet. 2. Frame: 0.0897-inch- (2.30-mm-)thick zinc-coated steel sheet. ACCESS DOORS 08305-4 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 3. Frame: 0.0938-inch-(2.40-mm-)thick stainless-steel sheet. 4. Door: 0.0598-inch-(1.52-mm-)thick steel sheet, recessed 1 inch (25.4 mm). 5. Door: 0.0598-inch- (1.52-mm-)thick zinc-coated steel sheet, recessed 1 inch (25.4 mm). 6. Door: 0.0625-inch- (1.59-mm-)thick stainless-steel sheet, recessed 1 inch (25.4 mm). 7. Concealed, Gypsum Board Edge Trim: 0,298-inch (0,76-mm) zinc-coated steel sheet gypsum board edge trim formed to receive joint compound. 8. Hinge: Concealed, pivoting-rod type. 9. Locks: Flush to finished surface, screwdriver-operated cam. 10. Locks: Flush to finished surface, key-operated cylinder lock. G. Recessed Door for Plaster: Units consisting of frame with concealed edge trim, recessed door, hardware, and complying with the following requirements: 1. Frame: 0.0897-inch-(2.30-mm-)thick steel sheet. 2. Frame: 0.0897-inch- (2.30-mm-)thick zinc-coated steel sheet. 3. Frame: 0.0938-inch- (2.40-mm-)thick stainless-steel sheet. 4. Door: 0.0598-inch- (1.52-mm-) thick steel sheet, recessed 112 inch (12.7 mm) and lined with self-furring 3.4 lb./sq. yd. (1.8 kg/sq. m)flat-rib, galvanized-steel lath. 5. Door: 0.0598-inch- (1.52-mm-) thick zinc-coated steel sheet, recessed 1/2 inch (12.7 mm) and lined with self-furring 3.4 lb./sq. yd. (1.8 kg/sq. m)flat-rib, galvanized-steel lath. 6. Door: 0.0625-inch- (1.59-mm-) thick stainless-steel sheet, recessed 1/2 inch (12.7 mm) and lined with self-furring 3.4 lb./sq. yd. (1.8 kg/sq. m)flat-rib, galvanized-steel lath. 7. Plaster Casing Bead: 0.0299-inch (0.76-mm) zinc-coated-steel casing bead with flange formed out of expanded metal lath. 8. Hinge: Concealed, pivoting-rod type. 9. Locks: Flush to finished surface, screwdriver-operated cam. 10. Locks: Flush to finished surface, key-operated cylinder lock. H. Recessed Doors for Acoustical Tile Ceilings: Units consisting of frame with no exposed trim, recessed door to receive tile, hardware, and complying with the following requirements: 1. Frame: 0.0897-inch-(2.30-mm-)thick steel sheet. 2. Frame: 0.0897-inch-(2.30-mm-)thick zinc-coated steel sheet. 3. Frame: 0.0938-inch- (2.40-mm-)thick stainless-steel sheet. 4. Door: 0.0598-inch-(1.52-mm-)thick steel sheet, recessed 1 inch (25.4 mm). 5. Door: 0.0598-inch- (1.52-mm-)thick zinc-coated steel sheet, recessed 1 inch (25.4 mm). 6. Door: 0.0625-inch- (1.59-mm-)thick stainless-steel sheet, recessed 1 inch (25.4 mm). 7. Hinge: Concealed, pivoting-rod type. 8. Locks: Flush to finished surface, screwdriver-operated cam. 9. Locks: Flush to finished surface, key-operated cylinder lock. I. High-Security Access Doors: For maximum security in areas where access is required. 1. Frames: 3/16-inch (4.76-mm) by 2-inch (50.8-mm) by 2-inch (50.8-mm) angle welded with joints ground smooth. 2. Door: 0.1345-inch- (3.40-mm-)thick steel sheet. 3. Hinges: Heavy-duty steel welded to door and frame. 4. Locks: Heavy-duty, detention-type lock. 5. Locks: Doors prepared for mortise (or rim cylinder) lock furnished in Division 8 Section "Door Hardware." 2.4 FABRICATION ACCESS DOORS 08305-5 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. General: Manufacture each access door assembly as an integral unit ready for installation. B. Steel Access Doors and Frames: Continuous welded construction. Grind welds smooth and flush with adjacent surfaces. Furnish attachment devices and fasteners of type required to secure access panels to types of supports indicated. 1. Exposed Flange: Nominal 1 to 1-1/2 inches (25.4 to 38.1 mm)wide around perimeter of frame. 2. For gypsum board assemblies or gypsum veneer plaster, furnish frames with edge trim for gypsum board or gypsum base. 3. For full-bed plaster applications, furnish frames with galvanized expanded metal lath and exposed casing bead,welded to perimeter of frame. 4. For installation in masonry construction, furnish frames with adjustable metal masonry anchors. C. Recessed Panel Doors: Form face of panel to provide recess for application of applied finish. Reinforce panel as required to prevent buckling. 1. Furnish recessed panel doors for concealed installation in acoustic tile ceiling systems. 2. Furnish recessed panel doors and frames with expanded metal lath for concealed installation in plaster. D. Locking Devices: Furnish number required to hold door in flush, smooth plane when closed. 1. For cylinder lock, furnish 2 keys per lock and key all locks alike. 2. For recessed panel doors, provide access sleeves for each locking device. Furnish plastic grommets and install in holes cut through finish. PART 3 - EXECUTION 3.1 PREPARATION A. Advise Installers of other work about specific requirements relating to access door installation, including sizes of openings to receive access door and frame, as well as locations of supports, inserts, and anchoring devices. Furnish inserts and anchoring devices for access doors that must be built into other construction. Coordinate delivery with other work to avoid delay. 3.2 INSTALLATION A. Comply with manufacturer's instructions for installing access doors. B. Set frames accurately in position and attach securely to supports with plane of face panels aligned with adjacent finished surfaces. C. Install concealed-frame access doors flush with adjacent finish surfaces. 3.3 ADJUST AND CLEAN A. Adjust hardware and panels after installation for proper operation. ACCESS DOORS 08305- 6 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 B. Remove and replace panels or frames that are warped, bowed, or otherwise damaged. END OF SECTION 08305 ACCESS DOORS 08305-7 HNTB #36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 SECTION 08331 -OVERHEAD COILING DOORS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following types of overhead coiling doors: 1. Service doors. B. Related Sections include the following: 1. Division 8 Section "Door Hardware'for lock cylinders and keying. 2. Division 9 Section "Painting"for field-applied paint finish. 3. Division 16 Section "Conductors and Cables" for electrical service and connections for powered operators, and accessories. 4. Division 16 Section "Disconnect Switches and Circuit Breakers' for disconnect switches and circuit breakers for powered operators. 1.3 DEFINITIONS A. Operation Cycle: One complete cycle of a door begins with the door in the closed position. The door is then moved to the open position and back to the closed position. 1.4 PERFORMANCE REQUIREMENTS A. Structural Performance: Provide overhead coiling doors capable of withstanding the effects of gravity loads and the following loads and stresses without evidencing permanent deformation of door components: 1. Wind Load: Uniform pressure (velocity pressure) of 20 Ibf/sq. ft. (960 Pa), acting inward and outward. B. Operation-Cycle Requirements: Design overhead coiling door components and operator to operate for not less than 10,000 cycles. C. Operation-Cycle Requirements: Design overhead coiling door components and operator to operate for not less than 20,000 cycles. D. Operation-Cycle Requirements: Design overhead coiling door components and operator to operate for not less than 20,000 cycles and for 10 cycles per day. 1. Include tamperproof cycle counter. OVERHEAD COILING DOORS 08331 - 1 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration i 10/30/02 1.5 SUBMITTALS A. Product Data: For each type and size of overhead coiling door and accessory. Include details of construction relative to materials, dimensions of individual components, profiles, and finishes. Provide roughing-in diagrams, operating instructions, and maintenance information. Include the following: 1. Setting drawings, templates, and installation instructions for built-in or embedded anchor devices. 2. Summary of forces and loads on walls and jambs. 3. Motors: Show nameplate data and ratings; characteristics; mounting arrangements; size and location of winding termination lugs, conduit entry, and grounding lug; and coatings. 4. Fire-Rated Doors: Information describing fire-release system, including testing and resetting instructions. B. Shop Drawings: For special components and installations not dimensioned or detailed in manufacturer's data sheets. 1. Wiring Diagrams: Detail wiring for power, signal, and control systems. Differentiate between manufacturer-installed and field-installed wiring and between components provided by door manufacturer and those provided by others. C. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available for units with factory-applied finishes. D. Samples for Verification: Of each type of exposed finish required, prepared on Samples of size indicated below and of same thickness and material indicated for Work. Where finishes involve normal color and texture variations, include Sample sets showing the full range of variations expected. 1. Curtain Slats: 12-inch (300-mm)length. 2. Bottom Bar: 6-inch (150-mm)length. 3. Guides: 6-inch (150-mm) length. 4. Brackets: 6 inches (150 mm) square. 5. Hood: 6 inches (150 mm) square. 6. Laminate-Clad Counter Panel Product: 6 inches (150 mm) square, for each type, color, pattern, and surface finish, laminated to core. E. Installer Certificates: Signed by manufacturer certifying that installers comply with specified requirements. F. Oversize Construction Certification: For door assemblies required to be fire-rated and exceeding limitations of labeled assemblies, submit certification of a testing agency acceptable to authorities having jurisdiction that each door and frame assembly has been constructed to comply with design, materials, and construction equivalent to requirements for labeled construction. 1.6 QUALITY ASSURANCE OVERHEAD COILING DOORS 08331 -2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Installer Qualifications: Engage an experienced installer who is an authorized representative of the overhead coiling door manufacturer for both installation and maintenance of units required for this Project. B. Source Limitations: Obtain overhead coiling doors through one source from a single manufacturer. 1. Obtain operators and controls from the overhead coiling door manufacturer. C. Fire-Rated Door Assemblies: Provide assemblies complying with NFPA 80 that are identical to door and frame assemblies tested for fire-test-response characteristics per UL 1 Ob, and that are labeled and listed for fire ratings indicated by UL, FM, ITS/Warnock Hersey, or another testing and inspecting agency acceptable to authorities having jurisdiction. D. Oversize Fire-Rated Door Assemblies: For units exceeding sizes of tested assemblies, provide certification by a testing agency acceptable to authorities having jurisdiction that doors comply with all standard construction requirements of tested and labeled fire-rated door assemblies, except for size. E. Listing and Labeling: Provide electrically operated fixtures specified in this Section that are listed and labeled. 1. The Terms"Listed" and "Labeled": As defined in NFPA 70,Article 100. 2. Listing and Labeling Agency Qualifications: A "Nationally Recognized Testing Laboratory" as defined in OSHA Regulation 1910.7. PART 2- PRODUCTS 2.1 MANUFACTURERS A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to,the following: B. Manufacturer: Subject to compliance with requirements, provide products by one of the following: 1. Alpine Overhead Doors, Inc. 2. Atlas Door Corp.; Div. of Clopay Building Products Co. 3. The Cookson Company. 4. Cornell Iron Works Inc. 5. Dynamic Closures (1995) LTD. 6. Mahon Door Corp. 7. McKeon Rolling Steel Door Company, Inc. 8. Overhead Door Corporation. 9. Pacific Rolling Door Co. 10. Raynor Garage Doors. 11. Roll-Lite Door Corp.; Div. of Clopay Building Products Co. 12. Southwestern Steel Rolling Door Co. 13. Wayne-Dalton Corp. 14. Windsor Door; A United Dominion Company. OVERHEAD COILING DOORS 08331 -3 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 2.2 DOOR CURTAIN MATERIALS AND CONSTRUCTION A. Door Curtain: Fabricate overhead coiling door curtain of interlocking slats, designed to withstand wind loading indicated, in a continuous length for width of door without splices. Unless otherwise indicated, provide slats of material thickness recommended by door manufacturer for performance, size, and type of door indicated, and as follows: 1. Steel Door Curtain Slats: Structural-quality, cold-rolled galvanized steel sheets complying with ASTM A 653, with G90 (ASTM A 653M, with Z275)zinc coating. 2. Stainless-Steel Door Curtain Slats: Type 300 series, ASTM A 240 (ASTM A 240M) or ASTM A 666. 3. Aluminum Door Curtain Slats. ASTM B 209 (ASTM B 209M) or ASTM B 221 (ASTM B 221M), alloy and temper recommended by aluminum producer and finisher for type of use and finish indicated. a. Provide manufacturer's standard S-configuration slats. J. Provide manufacturer's standard flat-profile slats. 4. Insulation: Fill slat with manufacturer's standard rigid cellular polystyrene or polyurethane-foam-type thermal insulation complying with maximum flame-spread and smoke-developed indices of 75 and 450, respectively, according to ASTM E 84. Enclose insulation completely within metal slat faces. 5. Inside Curtain Slat Face: To match material of outside metal curtain slat and as follows: a. Galvanized Steel Sheet Thickness: Not less than 0.028 inch (0.7 mm). b. Stainless-Steel Sheet Thickness: Not less than 0.025 inch (0.65 mm). C. Aluminum Sheet Thickness: Same thickness as outside aluminum curtain face slat. B. Endlocks: Malleable-iron castings galvanized after fabrication, secured to curtain slats with galvanized rivets, or high-strength nylon. Provide locks on not less than alternate curtain slats for curtain alignment and resistance against lateral movement. C. Endlocks: Manufacturer's standard locks on not less than alternate curtain slats for curtain alignment and resistance against lateral movement. D. Windlocks: Malleable-iron castings secured to curtain slats with galvanized rivets or high- strength nylon, as required to comply with wind load. E. Bottom Bar: Consisting of 2 angles, each not less than 1-1/2 by 1-1/2 by 1/8 inch (38 by 38 by 3 mm) thick, either galvanized or stainless-steel or aluminum extrusions to suit type of curtain slats. F. Bottom Bar: Manufacturer's standard continuous channel or tubular shape, either stainless- steel or aluminum extrusions to suit type of curtain slats. 1. Astragal: Provide a replaceable, adjustable, continuous, compressible gasket of flexible vinyl, rubber, or neoprene, between angles or fitted to shape, as a cushion bumper for interior door. 2. Provide motor-operated doors with combination bottom astragal and sensor edge. G. Curtain Jamb Guides: Fabricate curtain jamb guides of steel angles, or channels and angles, with sufficient depth and strength to retain curtain, to allow curtain to operate smoothly, and to withstand loading. Build up units with not less than 3/16-inch- (5-mm-) thick, galvanized steel OVERHEAD COILING DOORS 08331 -4 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 sections complying with ASTM A 36 (ASTM A 36M), and ASTM A 123. Slot bolt holes for guide adjustment. Provide removable stops on guides to prevent overtravel of curtain and a continuous bar for holding windlocks. H. Curtain Jamb Guides: Fabricate curtain jamb guides of angles, or channels and angles of material and finish to match curtain slats, with sufficient depth and strength to retain curtain, to allow curtain to operate smoothly, and to withstand loading. Provide continuous integral wear strips to prevent metal-to-metal contact and minimize noise of travel and removable stops on guides to prevent overtravel of curtain. 2.3 HOODS AND ACCESSORIES A. Hood: Form to entirely enclose coiled curtain and operating mechanism at opening head and act as weatherseal. Contour to suit end brackets to which hood is attached. Roll and reinforce top and bottom edges for stiffness. Provide closed ends for surface-mounted hoods and fascia for any portion of between-jamb mounting projecting beyond wall face. Provide intermediate support brackets as required to prevent sag. 1. Fabricate steel hoods, for steel doors, of not less than 0.028-inch (0.7-mm) thick, hot-dip galvanized steel sheet with G90 (Z275) zinc coating, complying with ASTM A 653 (ASTM A 653M). 2. Fabricate hoods of stainless-steel sheet, Type 300 series, complying with ASTM A 240 (ASTM A 240M) or ASTM A 666, and not less than 0.025-inch (0.65-mm) thick, for stainless-steel doors. 3. Include automatic drop baffle to guard against passage of smoke or flame. 4. Fabricate aluminum hoods, complying with ASTM B 209 (ASTM B 209M), alloy and temper recommended by aluminum producer and finisher for type of use and finish indicated, and not less than 0.032 inch (0.8 mm)thick,for aluminum doors. 5. Shape: Round. 6. Shape: Square. 7. Exterior Mounted Door: Fabricate hood with sealant-joint bead profile for applying joint sealant. B. Integral Frame, Hood, and Fascia: Provide welded assemblies of the following sheet metal: 1. Fabricate of not less than 0.064-inch- (1.6-mm-)thick, hot-dip galvanized steel sheet with G90 (Z275)zinc coating, complying with ASTM A 653 (ASTM A 653M). 2. Fabricate of not less than 0.0625-inch- (1.6-mm-) thick, stainless-steel sheet, Type 300 series, complying with ASTM A 240 (ASTM A 240M)or ASTM A 666. C. Integral Sills: Fabricate sills as integral part of frame assembly of same sheet metal, but not less than 0.078 inch (2.0 mm)thick. D. Fire-Rated Counter: Provide fire-door manufacturer's high-pressure decorative laminate covered countertop, UL tested and labeled for 1-1/2-hour fire rating for approved use with fire- door assembly. 1. High-Pressure Decorative Laminate: Match color, pattern, and finish indicated by reference to manufacturer's standard designations for these characteristics. 2. High-Pressure Decorative Laminate: Provide Architect's selections from manufacturer's full range of colors, patterns, and finishes of type used in fire-door assembly tested by UL. OVERHEAD COILING DOORS 08331 -5 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 E. Smoke Seals: Provide UL-listed and-tested smoke-seal perimeter gaskets. F. Weatherseals: Provide replaceable, adjustable, continuous, compressible weather-stripping gaskets fitted to bottom and at top of exterior doors, unless otherwise indicated. At door head, use 1/8-inch- (3-mm-) thick, replaceable, continuous sheet secured to inside of curtain coil hood. 1. Provide motor-operated doors with combination bottom weatherseal and sensor edge. 2. In addition, provide replaceable, adjustable, continuous, flexible, 1/8-inch- (3-mm-) thick seals of flexible vinyl, rubber, or neoprene at doorjambs for a weathertight installation. G. Windows: Provide windows of 1/4-inch (6-mm) clear, transparent acrylic sheet, of size and in arrangement shown. Set glazing in vinyl, rubber or neoprene glazing channel secured to curtain slats. H. Push/Pull Handles: For push-up-operated or emergency-operated doors, provide galvanized steel lifting handles on each side of door. 1. Provide pull-down straps or pole hooks for doors more than 84 inches (2130 mm) high. I. Slide Bolt: Fabricate with side locking bolts to engage through slots in tracks for locking by padlock, located on both left and right jamb sides, operable from coil side. J. Fabricate locking device assembly with lock, spring-loaded dead bolt, operating handle, cam plate, and adjustable locking bar to engage through slots in tracks. 1. Locking Bars: Single-jamb side, operable from inside only. 2. Locking Bars: Single-jamb side, operable from outside only. 3. Locking Bars: Single-jamb side, operable from inside and outside. 4. Locking Bars: Full-disc Cremone type, both jamb sides, operable from inside and outside. 5. Lock cylinder is specified in another Division 8 Section. K. Chain Lock Keeper: Suitable for padlock. L. Where door unit is power operated, provide safety interlock switch to disengage power supply when door is locked. M. Provide automatic-closing device inoperative during normal door operations, with governor unit complying with requirements of NFPA 80, with easily tested and reset release mechanism, and designed to be activated by the following: 1. Governor: Oscillating type. 2. Governor: Viscous-speed type. 3. Temperature rise and melting point of 165 deg F (74 deg C) replaceable fusible links, interconnected and on both sides of wall of door opening. 4. Manufacturer's standard UL-labeled smoke detector and door-holder-release devices. 5. Manufacturer's standard UL-labeled heat detector and door-holder-release devices. 6. Building fire alarm and detection system and door-holder-release devices. 2.4 COUNTERBALANCING MECHANISM OVERHEAD COILING DOORS 08331 -6 HNTB #36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. General: Counterbalance doors by means of adjustable-tension steel helical torsion spring, mounted around a steel shaft and contained in a spring barrel connected to door curtain with required barrel rings. Use grease-sealed bearings or self-lubricating graphite bearings for rotating members. B. Counterbalance Barrel: Fabricate spring barrel of hot-formed, structural-quality, welded or seamless carbon-steel pipe, of sufficient diameter and wall thickness to support rolled-up curtain without distortion of slats and to limit barrel deflection to not more than 0.03 in./ft. (2.5 mm/m)of span under full load. C. Provide spring balance of one or more oil-tempered, heat-treated steel helical torsion springs. Size springs to counterbalance weight of curtain, with uniform adjustment accessible from outside barrel. Provide cast-steel barrel plugs to secure ends of springs to barrel and shaft. D. Fabricate torsion rod for counterbalance shaft of cold-rolled steel, sized to hold fixed spring ends and carry torsional load. E. Brackets: Provide mounting brackets of manufacturer's standard design, either cast-iron or cold-rolled steel plate with bell-mouth guide groove for curtain. 2.5 FINISHES, GENERAL A. General: Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes. B. Appearance of Finished Work: Variations in appearance of abutting or adjacent pieces are acceptable if they are within one-half of the range of approved Samples. Noticeable variations in the same piece are not acceptable. Variations in appearance of other components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast. 2.6 ALUMINUM FINISHES A. Finish designations prefixed by AA conform to the system established by the Aluminum Association for designating aluminum finishes. B. Manufacturer's standard mill finish. C. Class Il, Clear Anodic Finish: AA-M12C22A31 (Mechanical Finish: nonspecular as fabricated; Chemical Finish: etched, medium matte; Anodic Coating: Architectural Class II, clear coating 0.010 mm or thicker)complying with AAMA 607.1. D. Powder-Coat-Applied Finish: Apply manufacturer's standard powder-coat-applied finish consisting of primer and topcoat(s) according to coating manufacturer's written instructions for cleaning, pretreatment, application, thermosetting, and minimum dry film thickness. 1. Color and Gloss: As indicated by manufacturer's color and gloss designations. 2. Color and Gloss: Match Architect's sample. 3. Color and Gloss: As selected by Architect from manufacturer's full range of colors and glosses. OVERHEAD COILING DOORS 08331 -7 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 2.7 STEEL AND GALVANIZED STEEL FINISHES A. Factory Primer for Field Finish: Apply manufacturer's standard primer, compatible with field- applied finish according to coating manufacturer's written instructions for cleaning, pretreatment, application, and minimum dry film thickness. 1. Apply to ferrous surfaces except zinc-coated metal. B. Thermoset Finish: Apply manufacturer's standard baked finish consisting of primer and thermosetting topcoat according to coating manufacturer's written instructions for cleaning, pretreatment, application, thermosetting, and minimum dry film thickness. C. Powder-Coat-Applied Finish: Apply manufacturer's standard powder-coat-applied finish consisting of primer and topcoat(s) according to coating manufacturer's written instructions for cleaning, pretreatment, application,thermosetting, and minimum dry film thickness. 1. Color and Gloss: As indicated by manufacturer's color and gloss designations. 2. Color and Gloss: Match Architect's sample. 3. Color and Gloss: As selected by Architect from manufacturer's full range of colors and glosses. 2.8 STAINLESS-STEEL FINISHES A. General: Remove or blend tool and die marks and stretch lines into finish. 1. Grind and polish surfaces to produce uniform, directional textured, polished finish indicated,free of cross scratches. Run grain with long dimension of each piece. B. Bright, Cold-Rolled, Unpolished Finish: No. 2B finish. C. Bright, Directional Polish: No.4 finish. D. When polishing is completed, passivate and rinse surfaces. Remove embedded foreign matter and leave surfaces chemically clean. 2.9 MANUAL DOOR OPERATORS A. Provide manual operators, unless electric door operators are indicated. When not shown, provide chain-hoist operator unit. B. Push-up Operation: Design counterbalance mechanism so required lift or pull for door operation does not exceed 25 Ibf(111 N). C. Chain-Hoist Operator: Provide manual chain-hoist operator consisting of endless steel hand chain, chain pocket wheel and guard, and gear-reduction unit with a maximum 35-Ibf (155-N) effort for door operation. Provide alloy steel hand chain with chain holder secured to operator guide. D. Crank-Hoist Operator: Provide crank-hoist operator consisting of crank and crank gearbox, steel crank drive shaft, and gear-reduction unit. Size gears to require no more than 35-Ibf(155- N) effort to turn crank. Fabricate gearbox to completely enclose operating mechanism and be oil tight. Provide manufacturer's standard crank-locking device. OVERHEAD COILING DOORS 08331 -8 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10130/02 1. Provide manufacturer's standard removable operating arm for each crank-gear unit. 2.10 ELECTRIC DOOR OPERATORS A. General: Provide electric door operator assembly of size and capacity recommended and provided by door manufacturer for door and operational life specified, with electric motor and factory-prewired motor controls, starter, gear-reduction unit, solenoid-operated brake, clutch, remote-control stations, control devices, integral gearing for locking door, and accessories required for proper operation. B. Comply with NFPA 70. C. Disconnect Device: Provide hand-operated disconnect or mechanism for automatically engaging sprocket-chain operator and releasing brake for emergency manual operation while disconnecting motor, without affecting timing of limit switch. Mount disconnect and operator so they are accessible from floor level. Include interlock device to automatically prevent motor from operating when emergency operator is engaged. D. Design operator so motor may be removed without disturbing limit-switch adjustment and without affecting emergency auxiliary operator. E. Provide control equipment complying with NEMA ICS 1, NEMA ICS 2, and NEMA ICS 6, with NFPA 70 Class 2 control circuit, maximum 24-V, ac or dc. F. Door-Operator Type: Provide wall-, hood-, or bracket-mounted,jackshaft, gear-head-type door operator unit consisting of electric motor, enclosed worm-gear running-in-oil primary drive, chain and sprocket secondary drive, and quick disconnect-release for manual operation. G. Door-Operator Type: Provide wall-, hood-, or bracket-mounted,jackshaft, gear-head hoist-type door operator unit consisting of electric motor, enclosed worm-gear running-in-oil primary drive, chain and sprocket secondary drive, and auxiliary chain-hoist and floor level disconnect. H. Electric Motors: Provide high-starting torque, reversible, continuous-duty, Class A insulated, electric motors, complying with NEMA MG 1,with overload protection, sized to start, accelerate, and operate door in either direction,from any position, at not less than 2/3 fps (0.2 m/s)or more than 1 fps (0.3 m/s),without exceeding nameplate ratings or considering service factor. 1. Type: Polyphase, medium-induction type. 2. Service Factor: According to NEMA MG 1, unless otherwise indicated. 3. Coordinate wiring requirements and electric characteristics of motors with building electrical system. 4. Provide open dripproof-type motor, and controller with NEMA ICS 6, Type 1 enclosure. 5. Provide totally enclosed, nonventilated or fan-cooled motors, fitted with plugged drain, and controller with NEMA ICS 6,Type 4 enclosure where indicated. I. Remote-Control Station: Provide momentary-contact, 3-button control station with push-button controls labeled "Open;'"Close,"and "Stop." 1. Provide interior units, full-guarded, surface-mounted, heavy-duty type, with general- purpose NEMA ICS 6, Type 1 enclosure. 2. Provide exterior units, full-guarded, standard-duty, surface-mounted, weatherproof type, NEMA ICS 6,Type 4 enclosure, key operated. OVERHEAD COILING DOORS 08331 -9 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10130/02 J. Obstruction Detection Device: Provide each motorized door with indicated external automatic safety sensor able to protect full width of door opening. Activation of sensor immediately stops and reverses downward door travel. 1. Photoelectric Sensor: Manufacturer's standard system designed to detect an obstruction in door opening without contact between door and obstruction. a. Self-Monitoring Type: Provide self-monitoring sensor designed to interface with door operator control circuit to detect damage to or disconnection of sensing device. When self-monitoring feature is activated, door operates to close only with constant pressure on close button. 2. Sensor Edge: Provide each motorized door with an automatic safety sensor edge, located within astragal or weather stripping mounted to bottom bar. Contact with sensor immediately stops and reverses downward door travel. Connect to control circuit using manufacturer's standard take-up reel or self-coiling cable. a. Provide pneumatically actuated automatic bottom bar. b. Provide electrically actuated automatic bottom bar. 1) Self-Monitoring Type: Provide self-monitoring,4-wire configured device. K. Limit Switches: Provide adjustable switches, interlocked with motor controls and set to automatically stop door at fully opened and fully closed positions. L. Provide electric operators with ADA-compliant audible alarm and visual indicator lights. M. Radio Control: Provide radio control system consisting of the following: 1. 3-channel universal coaxial receiver to open, close, and stop door, 1 per operator. 2. Multifunction remote control. 3. Remote antenna mounting kit. PART 3-EXECUTION 3.1 INSTALLATION A. General: Install door and operating equipment complete with necessary hardware, jamb and head mold strips, anchors, inserts, hangers, and equipment supports according to Shop Drawings, manufacturer's written instructions, and as specified. 1. Install fire-rated doors to comply with NFPA 80. 3.2 ADJUSTING A. Lubricate bearings and sliding parts; adjust doors to operate easily, free from warp, twist, or distortion and fitting weathertight for entire perimeter. 3.3 DEMONSTRATION OVERHEAD COILING DOORS 08331 - 10 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30102 A. Startup Services: Engage a factory-authorized service representative to perform startup services and to train Owner's maintenance personnel as specified below: 1. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment. a. Test door closing when activated by detector or alarm connected fire-release system. Reset door-closing mechanism after successful test. 2. Train Owner's maintenance personnel on procedures and schedules related to startup and shutdown, troubleshooting, servicing, preventive maintenance, and procedures for testing and resetting release devices. 3. Review data in the maintenance manuals. Refer to Division 1 Section "Contract Closeout." 4. Review data in the maintenance manuals. Refer to Division 1 Section "Operation and Maintenance Data" 5. Schedule training with Owner with at least 7 days'advance notice. END OF SECTION 08331 OVERHEAD COILING DOORS 08331 - 11 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30102 SECTION 08710 FINISH HARDWARE Part 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Door Hardware B. Specific Omissions: Hardware for the following is specified or indicated elsewhere. 1. Windows. 2. Cabinets, including open wall shelving and locks. 3. Signs, except where scheduled. 4. Toilet accessories, including grab bars. 5. Installation. 6. Rough hardware. 1.2 REFERENCES: A. Use date of standard in effect as of Bid date. B. American National Standards Institute—ANSI 156.18—Materials and Finishes. C. ANSI A117.1 —Specifications for making buildings and facilities usable by physically handicapped people. D. ADA—Americans with Disabilities Act of 1990 E. BHMA—Builders Hardware Manufacturers Association F. DHI—Door and Hardware Institute G. NFPA—National Fire Protection Association 1. NFPA 80—Fire Doors and Windows 2. NFPA 101 —Life Safety Code 3. NFPA 105—Smoke and Draft Control Door Assemblies 4. NFPA 252—Fire Tests of Door Assemblies H. UL—Underwriters Laboratories 1. UL10C—Fire Tests of Door Assemblies (Positive Pressure) 2. UL 305—Panic Hardware I. WHI—Warnock Hersey Incorporated J. State of California Building Code K. Local Applicable Codes L. SDI—Steel Door Institute M. WDI—Wood Door Institute N. AWI—Architectural Woodwork Institute O. NAAM—National Association of Architectural Metal Manufacturers 1.3 SUBMITTALS&SUBSTITUTIONS FINISH HARDWARE 08710-1 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. SUBMITTALS: Submit six copies of schedule per Division 1. Organize vertically formatted schedule into"Hardware Sets"with index of doors and headings, indicating complete designations of every item required for each door or opening. Include following information: 1. Type, style, function, size, quantity and finish of hardware items. Use BHMA Finish codes per ANSI Al56.18. 2. Name, part number and manufacturer of each item. 3. Fastenings and other pertinent information. 4. Location of hardware set coordinated with floor plans and door schedule. 5. Explanation of abbreviations, symbols, and codes contained in schedule. 6. Mounting locations for hardware. 7. Door and frame sizes, materials and degrees of swing. 8. List of manufacturers used and their nearest representative with address and phone number. 9. Catalog cuts. 10. Manufacturer's technical data and installation instructions for electronic hardware. 11. Date of jobsite visit. B. Bid and submit manufacturer's updated/improved item if scheduled item is discontinued. C. Make substitution requests in accordance with Division 1. Include product data and indicate benefit to the Project. Furnish operating samples on request. D. Furnish as-built/as-installed schedule with closeout documents, including keying schedule,wiring/riser diagrams, manufacturers'installation, adjustment and maintenance information, and supplier's final inspection report. 1.4 QUALITY ASSURANCE: A. Qualifications: 1. Hardware supplier:direct factory contract supplier who employs a certified architectural hardware consultant(AHC), available at reasonable times during course Work for project hardware consultation to Owner, Architect and Contractor. (1) Responsible for detailing, scheduling and ordering of finish hardware. B. Hardware: New,free of defects, blemishes and excessive play. Obtain each kind of hardware (latch and locksets, exit devices, hinges and closers)from one manufacturer. C. Exit Doors: Operable from inside with single motion without the use of a key or special knowledge or effort. D. Fire-Rated Openings: In compliance with NFPA 80. Hardware UL10C/UBC-7-2 (positive pressure)compliant for given type/size opening and degree of label. Provide proper latching hardware, non-flaming door closers, approved-bearing hinges, plus resilient and required intumescent seals. Furnish openings complete. FINISH HARDWARE 08710-2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 1. Note: scheduled seals may exceed selected door manufacturer's requirements. See 2.6.E for clarification. E. Pre-Installation Meetings: Initiate and conduct with supplier, installer and related trades, coordinate materials and techniques, and sequence complex hardware items and systems installation. Convene at least one week prior to commencement of related work. 1.5 DELIVERY, STORAGE AND HANDLING: A. Delivery: coordinate delivery to appropriate locations (shop or field). 1. Permanent keys and cores: secured delivery direct to Owner's representative. B. Acceptance at Site: Items individually packaged in manufacturers' original containers, complete with proper fasteners and related pieces. Clearly mark packages to indicate contents, locations in hardware schedule and door numbers. C. Storage: Provide locked storage area for hardware, protect from moisture,sunlight, paint, chemicals, etc... 1.6 PROJECT CONDITIONS: A. Where exact types of hardware specified are not adaptable to finished shape or size of members requiring hardware, provide suitable types having as nearly as practical as the same operation and quality as type specified, subject to Architect's approval. B. Prior to submittal, carefully inspect existing conditions to verify finish hardware required to complete Work, including sized, quantities, and sill conditions material. If conflict between the scheduled material and existing conditions, submit request for directions from Architect. Include date of jobsite visit in the submittal. 1.7 SEQUENCING AND COORDINATION: A. Coordinate with concrete. B. Reinforce walls. C. Coordinate finish floor materials and floor-mounted hardware. D. Conduit and raceways as needed for electrical, electronic and electro-pneumatic hardware items. Fire/life-safety system interfacing. Point-to-point wiring diagrams plus riser diagrams to related trades. E. Furnish manufacturer templates to door and frame fabricators. F. Use hardware consultant to check Shop Drawings for doors and entrances to confirm that adequate provisions will be made for proper hardware installation. 1. Confirm that door manufacturers furnish necessary UBC-7-2 compliant seal packages. FINISH HARDWARE 08710-3 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 1.8 WARRANTY: A. Part of respective manufacturers' regular terms of sale. Provide manufacturers' warranties: 1. Closers: Ten years mechanical, 1 2. Exit Devices: Three years. 3. Hinges: Life of Building. 4. Other Hardware: Two years. 1.9 COMMISSIONING: A. Test door hardware operation with climate control system and stairwell pressurization system both at rest and while in full operation. B. Test electrical, electronic and electro-pneumatic hardware systems for satisfactory operation. C. Test hardware interfaced with fire/life-safety system for proper operation and release. 1.10 MAINTENANCE: 1 A Extra Materials: Provide 5%or a minimum of one,whichever is greater, additional hardware items: locksets, exit devices, closers and electronic hardware. See schedule under"Miscellaneous Material'. PART2- PRODUCTS 2.1 MANUFACTURERS: A. Listed acceptable alternate manufacturers: submit for review products with equivalent function and features of scheduled products. ITEM: MANUFACTURER: Hinges (HAG) Hager Key System (SCH) Schlage Locks (SCH)Schlage Exit Devices (VON)Von Duprin Closers (LCN) LCN Auto Flush Bolts (IVE) Ives Coordinators (IVE) Ives Silencers (IVE) Ives Kickplates (IVE) Ives Stops& Holders-exterior (IVEO Ives Stops& Holders—interior (iVE) Ives FINISH HARDWARE 08710-4 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 Overhead Stops (GLY)Glynn-Johnson Thresholds (PEM) Pemko Seals& Bottoms (PEM)Pemko Signs (HAG)Hager B. Provide hardware items required to complete the work in accordance with these specifications and manufacturers' instructions. 1. Include items inadvertently omitted from this specification. Note these items in submittal for review. 2. Where scheduled item is now obsolete, bid and furnish manufacturers updated item at no additional cost to the project. 2.2 HANGING MEANS: A. Conventional Hinges: Hinge open widths minimum, but, of sufficient throw to permit maximum door swing. Steel or stainless steel pins and concealed bearings. 1. Three hinges per leaf to 7 foot, 6 inch height. Add one for each additional 30 inches in height, or any fraction thereof. 2. Extra heavy weight hinges on doors over 3 foot, 5 inches in width. 3. Outswinging exterior doors: non-ferrous with non-removable(NRP)pins. 4. Non-ferrous material exteriors and at doors subject to corrosive atmospheric conditions. 5. Provide shims and shimming instructions for proper door adjustment. 2.3 LOCKSETS, LATCHSETS, DEADBOLTS: A. Mortise Locksets and Latchsets: as scheduled. 1. Chassis: cold-rolled steel, handing field-changeable without disassembly. 2. Latchbolts:3/<inch throw stainless steel anti-friction type. 3. Lever Trim:through-bolted, accessible design, cast lever or solid extruded bar type levers as scheduled. Filled hollow tube design unacceptable. a. Spindles:security design independent break-away. Breakage of outside lever does not allow access to inside lever's hubworks to gain wrongful entry. 4. Thumbturns: accessible design not requiring pinching or twisting motions to operate. 5. Deadbolts:stainless steel 1-inch throw. 6. Electric operation: Manufacturer-installed continuous duty solenoid. 7. Strikes: 16 gage curved steel, bronze or brass with 1 inch deep box construction, lips of sufficient length to clear trim and protect clothing. 8. Scheduled Lock Series and Design: Schlage L9000 series, 17 9. A design 10. Certifications: a. ANSI A156.13, 1994, Grade 1 Operational, Grade 1 Security. b. ANSI/ASTM F476-84 Grade 31 UL Listed.: FINISH HARDWARE 08710-5 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 B. Extra Heavy Duty Cylindrical Locks and Latches: as scheduled. 1. Chassis: cylindrical design, corrosion-resistant plated cold-rolled steel, through- bolted. 2. Locking Spindle: stainless steel, interlocking design. 3. Latch Retractors:forged steel. Balance of inner parts: corrosion-resistant plated steel, or stainless steel. 4. Lever Trim: accessible design, independent operation, spring-cage supported, minimum 2"clearance from lever mid-point to door face. 5. Electric operation: Manufacturer-installed continuous duty solenoid. 6. Strikes: 16 gage curved steel, bronze or brass with 1"deep box construction, lips of sufficient length to clear trim and protect clothing. 7. Lock Series and Design: Schlage D series Sparta design.. 8. Certifications: a. ANSI A156.2, 1994, Series 4000, Grade 1. b. UL listed for A label and lesser class single doors up to 4ft x 8ft. 2.4 EXIT DEVICES/PANIC HARDWARE A. General features: 1. Independent lab-tested 1,000,000 cycles. 2. Push-through touch pad design. No exposed touch bar fasteners, no exposed cavities when operated. Return stroke fluid dampeners and rubber bottoming dampeners, plus anti-rattle devices. 3. a/,"throw deadlocking latchbolts. 4. No exposed screws to show through glass doors. 5. Non-handed basic device design with center case interchangeable with all functions, no extra parts required to effect change of function. 6. Releasable with 32 lb. maximum pressure under 250 lb. load to the door. B. Specific features: 1. Non-Fire Rated Devices: cylinder dogging. 2. Lever Trim: Breakaway type, forged brass or bronze escutcheon min .130" thickness, match lockset lever design. 3. Rod and latch guards with surface vertical rod devices. 4. Fire-Labeled Devices: UL label indicating "Fire Exit Hardware". Vertical rod devices less bottom rod (LBR)unless otherwise scheduled. 5. Electrically Operated Devices: Single manufacturer source for electric latch retraction devices, electrically controlled trim, power transfers, power supplies, monitoring switches and controls. 2.5 CLOSERS 4011 /4111 A. General: One manufacturer for closer units throughout the Work, including surface closers, high security closers, overhead concealed closers,floor closers, low-energy door operators and electromagnetic hold-open closers. FINISH HARDWARE 08710-6 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 B. Surface Closers: Full rack-and-pinion type cylinder with removable non-ferrous cover and cast iron body. Double heat-treated pinion shaft, single piece forged piston, chrome- silicon steel spring. 1. ISO 2000 certified. Units stamped with date-of-manufacture code. 2. Independent lab-tested 10,000,000 cycles. 3. Thru-bolts and wood doors unless doors are provided with closer blocking. Non- sized and adjustable. Place closers inside building, stairs and rooms. 4. Plates, brackets and special templating when needed for interface with particular header, door and wall conditions and neighboring hardware. 5. Opening pressure: Exterior doors 8.5 lb., interior doors 5 lb., labeled fire doors 15 lb. 6. Separate adjusting valves for closing speed, latching speed and backcheck, fourth valve for delayed action where scheduled. 7. Extra-duty arms (EDA)at exterior doors scheduled with parallel arm units. 8. Exterior door closers:tested to 100 hours of ASTM B117 salt spray test,furnish data on request. 9. Exterior doors do not require seasonal adjustments in temperatures from 120 degrees F to-30 degrees F,furnish data on request. 10. Non-flaming fluid will not fuel door or floor covering fires.. 2.6 OTHER HARDWARE A. Automatic Flush Bolts: Low operating force design, "LBR"type. B. Overhead Stops: Stainless steel (300 series). Non-plastic mechanisms and finished metal end caps. Field-changeable hold-open,friction and stop-only functions, C. Kick Plates: Four beveled edges, .050 inches minimum thickness, height and width as scheduled. Sheet-metal screws of bronze or stainless steel to match other hardware. D. Door Stops: Provide stops to protect walls, casework or other hardware. 1. Unless otherwise noted in Hardware Sets, provide wall type with appropriate fasteners. Where wall type cannot be used, provide floor type. If neither can be used, provide overhead type.. E. Seals: Finished to match adjacent frame color. Resilient seal material:solid high-grade neoprene. UL label applied to seals on rated doors. Substitute products: certify that the products equal or exceed specified material's thickness and durability. Proposed substitutions: submit for approval. 1. Solid neoprene: MIL Spec. R6855-CL III, Grade 40. 2. Non-corroding fasteners at in-swinging exterior doors. 3. Sound control openings: Use components tested as a system using nationally accepted standards by independent laboratories. Ensure that the door leafs have the necessary sealed-in-place STC ratings, Adhesive mounted components not acceptable. Fasten applies seals over bead of sealant. 4. Fire-rated Doors, Resilient Seals: ULIOCIUBC-7-2 compliant. Coordinate with selected door manufacturers and selected frame manufacturer's requirements. Where rigid housed resilient seals are scheduled in this section and the selected door manufacturer only requires an adhesive mounted resilient seal,furnish rigid FINISH HARDWARE 08710-7 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 housed seal at minimum, or both the rigid housed seal and the adhesive applied seal if necessary to fulfill door manufacturer's requirement. Adhesive applied seal alone is deemed insufficient for this project where rigid housed seals are scheduled. 5. Fire-rated Doors, Intumescent Seals: Furnish fire-labeled opening assembly complete and in full compliance with UL10C/UBC-7-2. Furnished by selected door manufacturer,these seals vary in requirement by door type and door manufacture. Adhesive applied intumescent strips are not acceptable, use concealed-in-door-edge type or kerled-in-frame type. Careful coordination required. F. Automatic door bottoms: low operating force units. Doors with automatic door bottoms plus head and jamb seals cannot require more than two pounds operating force to open when closer is disconnected. G. Thresholds:As scheduled and per details. Substitute products: certify that the products equal or exceed specified material's thickness. Proposed substitutions: submit for approval. 1. Exteriors: Set in full bed of butyl-rubber or polyisobutylene mastic sealant complying with requirements in Division 7"Thermal and Moisture Protection'. Non-ferrous 114 inch fasteners and lead expansion shield anchors, or Red-Head #SFS-1420 (or approved equivalent) Flat Head Sleeve Anchors (SS/FHSL). 2. Sound control openings: Set in bed of mastic sealant. H. Fasteners: Generally, exposed screws to be Phillips or Robertson drive. Pinned TORX drive at high security areas. Flat head sleeve anchors (FHSL) may be slotted drive. Sheet metal and wood screws:full-thread. Sleeve nuts: full length to prevent door compression. I. Silencers: Interior hollow metal frames, 3 for single doors, 4 for pairs of doors. Omit where adhesive mounted seal occurs. Leave no unfilled/uncovered pre-punched silencer holes. J. Key Control Software: Same manufacturer as key cylinders, supply to Owner. 2.7 FINISH: A. Generally BHMA 626 Satin Chromium and 605 Polished Brass. 1. Areas using BHMA 626 to have push-plates, pulls and protection plates of BHMA 630, Satin Stainless Steel, unless otherwise noted. B. Door closers: factory powder coated to match other hardware, unless otherwise noted. 1. Provide satin-chrome plated arms, tracks and covers where scheduled bright metallic powder coat(789—MTLPC)not available. C. Aluminum items: match predominant adjacent material. Seals to coordinate with frame color. FINISH HARDWARE 08710-8 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 2.8 KEYING REQUIREMENTS: A. Key System: Schlage Everest patented keyway, non-interchangeable core typically with interchangeable core type operating cylinders for panic hardware. Key blanks available only from factory-direct sources, not available from after-market key blank manufacturers. For estimate use factory GMK charge. Initiate and conduct meeting(s)with Owner to determine system keyway(s)and structure, furnish Owner's written approval of the system. 1. Existing factory registered master key system. 2. Non-I.C. construction keying: inserted type partial key. At substantial completion, remove inserts in Owner's presence; demonstrate consequent non-operability of construction key. Give all removed inserts and all constructruction keys to Owner. 3. Furnish 10 construction keys. 4. Furnish 2 construction control keys. 5. Furnish 1 extractor tool 35-057. 6. Recombinate entire project at no extra expense to Owner if missing construction keys. B. Key Cylinders: utility patented, 6-pin solid brass construction. C. Locks and cylinders: keyed at factory of lock manufacturer where permanent records are maintained. Locks and cylinders same manufacturer. D. Permanent keys:secured shipment direct from point of origination to Owner. E. Bitting List: Secured shipment direct from point of origination to Owner upon completion.. PART 3- EXECUTION 3.1 ACCEPTABLE INSTALLERS: A. Factory trained, certified, and carries a factory-issued card certifying that person as a "Certified Installer . Alternative: can demonstrate suitably equivalent competence and experience. 3.2 PREPARATION: A. Ensure that walls and frames are square and plumb before hardware installation. B. Locate hardware per SDI-100 and applicable building,fire, life-safety, accessibility, and security codes. 1. Notify Architect of any code conflicts before ordering material. 2. Where new hardware is to be installed near existing doors/hardware scheduled to remain, match locations of existing hardware. C. Existing frames and doors scheduled to receive new hardware: carefully remove existing hardware,tag and bag, and turn over to Owner. FINISH HARDWARE 08710-9 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 1. Patch and fill wood frames and doors with solid wood stock or dowel material before cutting for new hardware. Do not reuse existing screw holes--fill and re- pilot. 2. Metal doors/frames:Weld or fasten with screws:filler pieces in existing hardware cut-outs and mortises not scheduled for re-use by new hardware. Leave surfaces smooth-- no applied patches. 3.3 INSTALLATION A. Install hardware per manufacturer's instructions and recommendations. Do not install surface-mounted items until finishes have been completed on substrate. Set units level, plumb and true to line and location. Adjust and reinforce attachment substrate for proper installation and operation. 1. Gaskets: install jamb-applied gaskets before closers, overhead stops, rim strikes, etc. Install sweeps across bottoms of doors before astragals, cope sweeps around bottom pivots, trim astragals to tops of sweeps. 2. When hardware is to be attached to existing metal surface and insufficient reinforcement exists, use RivNuts, NutSerts or similar anchoring device for screws. B. Locate floor stops not more than 4 inches from the wall. C. Drill pilot holes for fasteners in wood doors and/or frames. D. Lubricate and adjust existing hardware scheduled to remain. Carefully remove and give to Owner items not scheduled for reuse. 3.4 ADJUSTING A. Adjust and check for proper operation and function. Replace units,which cannot be adjusted to operate freely and smoothly. 1. Hardware damaged by improper installation or adjustment methods to be repaired or replaced to Owner's satisfaction. B. Inspection: Use hardware supplier. Include suppliers with closeout documents. C. Follow-up inspection: Installer to provide letter of agreement to Owner that approximately 6 months after substantial completion, installer will visit Project with representatives of the manufacturers of the locking devices and door closers to accomplish following: 1. Re-adjust hardware. 2. Evaluate maintenance procedures and recommend changes or additions, and instruct Owner's personnel. 3. Identify items that have deteriorated or failed. 4. Submit written report identifying problems and likely future problems. 3.5 DEMONSTRATION: FINISH HARDWARE 08710-10 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Demonstrate electrical, electronic and pneumatic hardware systems, including adjustment and maintenance procedures. 3.6 PROTECTION/CLEANING: A. Cover installed hardware, protect from paint, cleaning agents,weathering, carts/barrows, etc. Remove covering materials and clean hardware just prior to substantial completion. B. Clean adjacent wall,frame and door surfaces soiled from installation/reinstallation process. 3.7 SCHEDULE OF FINISH HARDWARE A. See door schedule in drawings for hardware set assignments. HW SET: 001 6 EA SWING CLEAR HINGE AB70024.5 652 HAG 1 SET AUTO FLUSH BOLT FB31P 626 IVE 1 EA STOREROOM LOCK D80PD SPA 626 SCH 2 EA ARMOR PLATE 8400 40 X 2"LDW 630 IVE 2 EA SURFACE CLOSER 4011 X ST-1544 689 LCN 2 EA OVERHEAD HOLDER 100H-ADJ 630 GLY 2 EA EDGE GUARD 182P 630 HAG 2 EA SILENCER SR64 GRY IVE HW SET: 002 ALL HARDWARE BY DOOR MANUFACTURER B/O HW SET: 003 3 EA HINGE AB800 4.5 X 4 NRP 630 HAG 1 EA VANDAL RESIST. LOCK D96PD SPA 626 SCH 1 EA SURFACE CLOSER 4111 EDA 689 LCN 1 EA KICK PLATE 8400 10 X 1 LDW 630 IVE 1 EA FLOOR STOP FS18S BLK IVE 1 SET PERIMETER SEAL 303AS HEAD&JAMBS AL PEM 1 EA THRESHOLD 270A MS&A AL PEM FINISH HARDWARE 08710-11 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 HW SET: 004 3 EA HINGE AB700 4.5 X 4 652 HAG 1 EA OFFICE LOCK D50PD SPA 626 SCH 1 EA WALL BUMPER WS406CVX 630 IVE 3 EA SILENCER SR64 GRY IVE HW SET: 005 6 EA SWING CLEAR HINGE AB7002 4.5 652 HAG 1 SET AUTO FLUSH BOLT FB31P 626 IVE 1 EA VANDAL RESIST LOCK D94PD SPA 626 SCH 2 EA ARMOR PLATE 8400 40 X 2" LDW 630 IVE 1 EA COORDINATOR CDR X FL 628 IVE 2 EA SURFACE CLOSER 4011 X ST-1544 689 LCN 2 EA OVERHEAD HOLDER 100H-ADJ 630 GLY 2 EA EDGE GUARD 182P 630 HAG 1 SET PERIMETER SEAL 303AS HEAD&JAMBS AL PEM 1 EA THRESHOLD 270A MS&A AL PEM HW SET: 006 3 EA HINGE AB700 4.5 X 4 652 HAG 1 EA PRIVACY LOCK D40S SPA 626 SCH 1 EA SURFACE CLOSER 4111 EDA 689 LCN 1 EA WALL BUMPER WS406CVX 630 IVE 3 EA SILENCER SR64 GRY IVE 1 EA SIGN 370M[W"MEN'OR"WOMEN'AS REQUIRED BLU HAG HW SET: 007 3 EA HINGE AB7004.5X4 652 HAG 1 EA PASSAGE D10S SPA 626 SCH 1 EA WALL BUMPER WS406CVX 630 IVE 3 EA SILENCER SR64 GRY IVE HW SET: 008 FINISH HARDWARE 08710-12 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 8 EA HINGE AB750 4.5 X 4 632 HAG 1 SET AUTO FLUSH BOLT FB32 605 IVE 1 EA CLASSROOM LOCK L9070P 17A 605 SCH 2 EA KICKPLATE 8400 10 X 2"LDW 605 IVE 1 EA COORDINATOR COR X FL 628 IVE 1 EA ASTRAGAL S77B BRN PEM 2 EA SURFACE CLOSER 4111 EDA 696 LCN 2 EA DOME STOP FS436 605 IVE 1 SET SEAL S88 HEAD &JAMBS BRN PEM HW SET: 009 8 EA HINGE AB750 4.5 X 4 632 HAG 1 SET CONST LATCHING BOLT FB51P 605 IVE 1 EA STOREROOM LOCK L9080P 17A 605 SCH 2 EA KICKPLATE 8400 10 X 2"LDW 605 IVE 2 EA OVERHEAD HOLDER 450H 605 GLY 2 EA SILENCER SR64 GRY IVE HW SET: 010 3 EA HINGE AB750 4.5 X 4 632 HAG 1 EA CLASSROOM LOCK L9070P 17A 605 SCH 1 EA KICKPLATE 8400 10 X 2"LDW 605 IVE 1 EA SURFACE CLOSER 4011 696 LCN 1 EA WALL BUMPER WS406CVX 605 IVE 1 SET SEAL S88 HEAD &JAMBS BRN PEM HW SET: 011 3 EA HINGE AB750 4.5 X 4 632 HAG 1 EA STOREROOM LOCK D80PD SPA 626 SCH 1 EA SURFACE CLOSER 4111 CUSH 696 LCN 1 SET SEAL S88 HEAD &JAMBS BRN PEM HW SET: 012 8 EA HINGE AB750 4.5 X 4 632 HAG 1 EA CLASSROOM LOCK L9070P 17A 605 SCH FINISH HARDWARE 08710-13 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 2 EA KICKPLATE 8400 10 X 2"LDW 605 IVE 1 EA COORDINATOR COR X FL 628 IVE 1 EA ASTRAGAL S77B BRN PEM 2 EA SURFACE CLOSER 4111 CUSH 696 LCN 1 SET SEAL S88HEAD &JAMBS BRN PEM HW SET: 013 6 EA HINGE AB750 4.5 X 4 632 HAG 2 EA ELEC. HINGE AB750 4.5 X 4 ETW 632 HAG 1 EA ELEC FIRE EXIT DEVIC EL9847EO-F LBR 605 VON 1 EA ELEC FIRE EXIIT DEVI EL9847L-F X17 LBR 605 VON 1 EA IC RIM CYLINDER 20-057 605 SCH 2 EA KICKPLATE 8400 10 X 2"LDW 605 IVE 1 EA ASTRAGAL S77B BRN PEM 2 EA SURFACE CLOSER 4111 EDA 696 LCN 2 EA MAG DOOR HOLDER SEM7830-24VDC 605 LCN 1 SET SEAL S88 HEAD &JAMBS BRN PEM END OF SECTION FINISH HARDWARE 08710-14 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 SECTION 09512-ACOUSTICAL TILE CEILINGS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1. Ceilings consisting of acoustical tiles and suspension systems. 1.3 SUBMITTALS A. Product Data: For each type of product specified. B. Coordination Drawings: Reflected ceiling plans drawn to scale and coordinating penetrations and ceiling-mounted items. Show the following: 1. Ceiling suspension system members. 2. Method of attaching suspension system hangers to building structure. 3. Initial direct-access openings. 4. Ceiling-mounted items including light fixtures; air outlets and inlets; speakers; sprinklers; and special moldings at walls, column penetrations, and other junctures of acoustical ceilings with adjoining construction. C. Samples for Initial Selection: Manufacturer's color charts consisting of actual acoustical tiles or sections of acoustical tiles, suspension systems, and moldings showing the full range of colors, textures, and patterns available for each type of ceiling assembly indicated. D. Samples for Verification: 1. 12"X12"samples of each acoustical tile type, pattern, and color. 2. Set of 12-inch- (300-mm-)long samples of concealed suspension system members. 3. Set of 12-inch- (300-mm-) long samples of exposed moldings for each color and system type required. E. Qualification Data: For firms and persons specified in "Quality Assurance" Article to demonstrate their capabilities and experience. Include lists of completed projects with project names and addresses, names and addresses of architects and owners, and other information specified. F. Product Test Reports: Indicate compliance of acoustical tile ceilings and components with requirements based on comprehensive testing of current products. ACOUSTICAL TILE CEILINGS 09512- 1 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 G. Research/Evaluation Reports: Evidence of acoustical tile ceiling's and components'compliance with building code in effect for Project,from a model code organization acceptable to authorities having jurisdiction. 1.4 QUALITY ASSURANCE A. Installer Qualifications: Engage an experienced installer who has completed acoustical tile ceilings similar in material, design, and extent to that indicated for this Project and with a record of successful in-service performance. B. Source Limitations for Ceiling Units: Obtain each acoustical ceiling tile from one source with resources to provide products of consistent quality in appearance and physical properties without delaying the Work. C. Source Limitations for Suspension System: Obtain each suspension system from one source with resources to provide products of consistent quality in appearance and physical properties without delaying the Work- 1. Obtain both acoustical ceiling tiles and suspension system from the same manufacturer. D. Fire-Test-Response Characteristics: Provide acoustical tile ceilings that comply with the following requirements: 1. Fire-response tests were performed by UL, ITS/Warnock Hersey, or another independent testing and inspecting agency that is acceptable to authorities having jurisdiction and that performs testing and follow-up services. 2. Surface-burning characteristics of acoustical tiles comply with ASTM E 1264 for Class A materials as determined by testing identical products per ASTM E 84. 3. Fire-resistance-rated assemblies, which are indicated by design designations from UL's "Fire Resistance Directory,"from ITS/Wamock Hersey's"Directory of Listed Products,"or from listings of another testing and inspecting agency, are identical in materials and construction to those tested per ASTM E 119. 4. Products are identified with appropriate markings of applicable testing and inspecting agency. E. Preinstallation Conference: Conduct conference at Project site to comply with requirements of Division 1 Section "Project Meetings." 1.5 DELIVERY, STORAGE,AND HANDLING A. Deliver acoustical tiles and suspension system components to Project site in original, unopened packages and store them in a fully enclosed space where they will be protected against damage from moisture,direct sunlight, surface contamination, and other causes. B. Before installing acoustical tiles, permit them to reach room temperature and a stabilized moisture content. C. Handle acoustical tiles carefully to avoid chipping edges or damaging units in any way. 1.6 PROJECT CONDITIONS ACOUSTICAL TILE CEILINGS 09512-2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Environmental Limitations: Do not install acoustical tile ceilings until spaces are enclosed and weatherproof, wet-work in spaces is complete and dry, work above ceilings is complete, and ambient temperature and humidity conditions are maintained at the levels indicated for Project when occupied for its intended use. 1.7 COORDINATION A. Coordinate layout and installation of acoustical tiles and suspension system with other construction that penetrates ceilings or is supported by them, including light fixtures, HVAC equipment,fire-suppression system, and partition assemblies. 1.8 EXTRA MATERIALS A. Not Required PART2- PRODUCTS 2.1 MANUFACTURERS A. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, those indicated for each designation in the Acoustical Tile Ceiling Schedule at the end of Part 3. B. Products: Subject to compliance with requirements, provide one of the products indicated for each designation in the Acoustical Tile Ceiling Schedule at the end of Part 3. 2.2 ACOUSTICAL TILES, GENERAL A. Acoustical Tile Standard: Provide manufacturer's standard tiles of configuration indicated that comply with ASTM E 1264 classifications as designated by types, patterns, acoustical ratings, and light reflectances, unless otherwise indicated. 1. Mounting Method for Measuring Noise Reduction Coefficient: Type E-400; plenum mounting in which face of test specimen is 15-3/4 inches (400 mm) away from test surface per ASTM E 795. 2. Acoustical tile in the Main Kitchen shall have a scubbable surface approved by the Riverside County Health Department for use in food prearation areas. B. Acoustical Tile Colors and Patterns: Match appearance characteristics indicated for each product type. 1. Where appearance characteristics of acoustical tiles are indicated by referencing ASTM E 1264 pattern designations and not manufacturers' proprietary product designations, provide products selected by Architect from each manufacturer's full range of products that comply with requirements indicated for type, pattern, color, light reflectance, acoustical performance, edge detail, and size. 2.3 METAL SUSPENSION SYSTEMS, GENERAL ACOUSTICAL TILE CEILINGS 09512-3 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Metal Suspension System Standard: Provide manufacturer's standard metal suspension systems of types, structural classifications, and finishes indicated that comply with applicable ASTM C 635 requirements. B. Metal Suspension System Characteristics: Comply with requirements indicated in the Acoustical Panel Ceiling Schedule at the end of Part 3. C. Finishes and Colors, General: Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes. Provide manufacturer's standard factory-applied finish for type of system indicated. 1. High-Humidity Finish: Comply with ASTM C 635 requirements for"Coating Classification for Severe Environment Performance"where high-humidity finishes are indicated. D. Attachment Devices: Size for five times design load indicated in ASTM C 635, Table 1, Direct Hung, unless otherwise indicated. 1. Postinstalled Powder-Actuated Fasteners in Concrete: Fastener system of type suitable for application indicated, fabricated from corrosion-resistant materials, with clips or other accessory devices for attaching hangers of type indicated, and with capability to sustain, without failure, a load equal to 10 times that imposed by ceiling construction, as determined by testing per ASTM E 1190, conducted by a qualified testing and inspecting agency. E. Wire Hangers, Braces, and Ties: Provide wires complying with the following requirements: 1. Zinc-Coated Carbon-Steel Wire: ASTM A 641/A 641 M, Class 1 zinc coating, soft temper. 2. Size: Select wire diameter so its stress at three times hanger design load (ASTM C 635, Table 1, Direct Hung) will be less than yield stress of wire, but provide not less than 0.106-inch-(2.69-mm-)diameter wire. F. Hanger Rods: Mild steel, zinc coated or protected with rust-inhibitive paint. G. Flat Hangers: Mild steel,zinc coated or protected with rust-inhibitive paint. H. Angle Hangers: Angles with legs not less than 7/8 inch (22 mm)wide; formed with 0.04-inch- (1-mm-) thick, galvanized steel sheet complying with ASTM A 653/A 653M, G90 (Z275) coating designation; with bolted connections and 5/16-inch-(8-mm-)diameter bolts. I. Sheet-Metal Edge Moldings and Trim: Type and profile indicated or, if not indicated, manufacturer's standard moldings for edges and penetrations that fit acoustical tile edge details and suspension systems indicated; formed from sheet metal of same material and finish as that used for exposed flanges of suspension system runners. 1. For circular penetrations of ceiling, provide edge moldings fabricated to diameter required to fit penetration exactly. 2.4 ACOUSTICAL SEALANT A. Acoustical Sealant for Exposed and Concealed Joints: Manufacturer's standard nonsag, paintable, nonstaining latex sealant complying with ASTM C 834 and the following requirements: ACOUSTICAL TILE CEILINGS 09512-4 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 1. Product is effective in reducing airborne sound transmission through perimeter joints and openings in building construction as demonstrated by testing representative assemblies according to ASTM E 90. B. Acoustical Sealant for Concealed Joints: Manufacturer's standard nondrying, nonhardening, nonskinning, nonstaining, gunnable, synthetic-rubber sealant recommended for sealing interior concealed joints to reduce airborne sound transmission. C. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, the following: D. Products: Subject to compliance with requirements, provide one of the following: 1. Acoustical Sealant for Exposed and Concealed Joints: a. PL Acoustical Sealant; ChemRex, Inc., Contech Brands. b. AC-20 FTR Acoustical and Insulation Sealant; Pecora Corp. C. SHEETROCK Acoustical Sealant; United States Gypsum Co. PART 3-EXECUTION 3.1 EXAMINATION A. Examine substrates and structural framing to which acoustical tile ceilings attach or abut, with Installer present, for compliance with requirements specified in this and other Sections that affect ceiling installation and anchorage, and' other conditions affecting performance of acoustical tile ceilings. 1. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Coordination: Furnish layouts for preset inserts, clips, and other ceiling anchors whose installation is specified in other Sections. 1. Furnish concrete inserts and similar devices to other trades for installation well in advance of time needed for coordinating other work. B. Testing Substrates: Before installing adhesively applied tiles on wet-placed substrates such as cast-in-place concrete or plaster, test and verify that moisture level is below tile manufacturer's recommended limits. C. Measure each ceiling area and establish layout of acoustical tiles to balance border widths at opposite edges of each ceiling. Avoid using less-than-half-width units at borders, and comply with layout shown on reflected ceiling plans. 3.3 INSTALLATION A. General: Install acoustical tile ceilings to comply with publications referenced below per manufacturer's written instructions and CISCA's"Ceiling Systems Handbook." ACOUSTICAL TILE CEILINGS 09512-5 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 1. Standard for Ceiling Suspension System Installations: Comply with ASTM C 636. 2. Standard for Ceiling Suspension Systems Requiring Seismic Restraint: Comply with ASTM E 580. 3. CISCA's Recommendations for Acoustical Ceilings: Comply with CISCA's "Recommendations for Direct-Hung Acoustical Tile and Lay-in Panel Ceilings—Seismic Zones 0-2." 4. CISCA's Guidelines for Systems Requiring Seismic Restraint: Comply with CISCA's "Guidelines for Seismic Restraint of Direct-Hung Suspended Ceiling Assemblies— Seismic Zones 3&4." 5. U.B.C.'s "Metal Suspension Systems for Acoustical Tile and for Lay-in Panel Ceilings": U.B.C. Standard 25-2. B. Suspend ceiling hangers from building's structural members and as follows: 1. Install hangers plumb and free from contact with insulation or other objects within ceiling plenum that are not part of supporting structure or of ceiling suspension system. 2. Splay hangers only where required to miss obstructions; offset resulting horizontal forces by bracing, countersplaying, or other equally effective means. 3. Splay hangers only where required and, if permitted with fire-resistance-rated ceilings, to miss obstructions; offset resulting horizontal forces by bracing, countersplaying, or other equally effective means. 4. Where width of ducts and other construction within ceiling plenum produces hanger spacings that interfere with location of hangers at spacings required to support standard suspension system members, install supplemental suspension members and hangers in form of trapezes or equivalent devices. Size supplemental suspension members and hangers to support ceiling loads within performance limits established by referenced standards and publications. 5. Secure wire hangers to ceiling suspension members and to supports above with a minimum of three tight turns. Connect hangers directly either to structures or to inserts, eye screws, or other devices that are secure; that are appropriate for substrate; and that will not deteriorate or otherwise fail due to age, corrosion, or elevated temperatures. 6. Secure flat, angle, channel, and rod hangers to structure, including intermediate framing members, by attaching to inserts, eye screws, or other devices that are secure and appropriate for both structure to which hangers are attached and type of hanger involved. Install hangers in a manner that will not cause them to deteriorate or fail due to age, corrosion, or elevated temperatures. 7. Do not support ceilings directly from permanent metal forms or floor deck. Fasten hangers to cast-in-place hanger inserts, powder-actuated fasteners, or drilled-in anchors that extend through forms into concrete. 8. Do not attach hangers to steel deck tabs. 9. Do not attach hangers to steel roof deck. Attach hangers to structural members. 10. Space hangers not more than 48 inches (1200 mm) o.c. along each member supported directly from hangers, unless otherwise indicated; and provide hangers not more than 8 inches(200 mm)from ends of each member. C. Secure bracing wires to ceiling suspension members and to supports with a minimum of four tight turns. Suspend bracing from building's structural members as required for hangers, without attaching to permanent metal forms, steel deck, or steel deck tabs. Fasten bracing wires into concrete with cast-in-place or postinstalled anchors. D. Install edge moldings and trim of type indicated at perimeter of acoustical tile ceiling area and where necessary to conceal edges of acoustical units. ACOUSTICAL TILE CEILINGS 09512-6 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 1. Apply acoustical sealant in a continuous ribbon concealed on back of vertical legs of moldings before they are installed. 2. Screw attach moldings to substrate at intervals not more than 16 inches (400 mm) o.c. and not more than 3 inches (75 mm)from ends, leveling with ceiling suspension system to a tolerance of 1/8 inch in 12 feet (3 mm in 3.6 m). Miter corners accurately and connect securely. 3. Do not use exposed fasteners, including pop rivets, on moldings and trim. E. Install suspension system runners so they are square and securely interlocked with one another. Remove and replace dented, bent, or kinked members. F. Arrange directionally patterned acoustical tiles as follows: 1. As indicated on reflected ceiling plans. G. Install acoustical tiles in coordination with suspension system and exposed moldings and trim. Place splines or suspension system flanges into kerfed edges so tile-to-tile joints are closed by double lap of material. 1. Fit adjoining tile to form flush, tight joints. Scribe and cut tile for accurate fit at borders and around penetrations through tile. 2. Hold tile field in compression by inserting leaf-type, spring-steel spacers between tile and moldings, spaced 12 inches (305 mm)o.c. 3. Fabricate access units for special suspension system access members and tile units modified as required to allow for removal of access units. 4. Protect lighting fixtures and air ducts to comply with requirements indicated for fire- resistance-rated assembly. 3.4 CLEANING A. Clean exposed surfaces of acoustical tile ceilings, including trim, edge moldings, and suspension system members. Comply with manufacturer's written instructions for cleaning and touchup of minor finish damage. Remove and replace tiles and other ceiling components that cannot be successfully cleaned and repaired to permanently eliminate evidence of damage. END OF SECTION 09512 ACOUSTICAL TILE CEILINGS 09512- 7 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10130/02 SECTION 09651 -RESILIENT TILE FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1. Vinyl composition floor tile. 2. Resilient wall base and accessories. 1.3 SUBMITTALS A. Product Data: For each type of product specified. B. Samples for Initial Selection: Manufacturer's color charts consisting of units or sections of units showing the full range of colors and patterns available for each type of product indicated. 1.4 QUALITY ASSURANCE A. Installer Qualifications: Engage an experienced installer to perform work of this Section who has specialized in installing resilient products similar to those required for this Project and with a record of successful in-service performance. B. Source Limitations: Obtain each type, color, and pattern of product specified from one source with resources to provide products of consistent quality in appearance and physical properties without delaying the Work. 1.5 DELIVERY, STORAGE,AND HANDLING A. Deliver products to Project site in manufacturer's original, unopened cartons and containers, each bearing names of product and manufacturer, Project identification, and shipping and handling instructions. 1.6 EXTRA MATERIALS A. Not required. PART 2- PRODUCTS 2.1 MANUFACTURERS RESILIENT TILE FLOORING 09651 - 1 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10130/02 A. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include manufacturers doing business in Southern California that produce the products specified inb this section. 2.2 RESILIENT TILE A. Solid Vinyl Tile: Products complying with ASTM F 1700 and with requirements specified in the Resilient Tile Flooring Schedule. 2.3 RESILIENT ACCESSORIES A. Rubber Wall Base: Products complying with FS SS-W-40, Type I and with requirements specified in the Resilient Tile Flooring Schedule. 2.4 INSTALLATION ACCESSORIES A. Trowelable Leveling and Patching Compounds: Latex-modified, portland-cement-based formulation provided or approved by flooring manufacturer for applications indicated. B. Adhesives: Water-resistant type recommended by manufacturer to suit resilient products and substrate conditions indicated. PART 3-EXECUTION 3.1 EXAMINATION A. Examine substrates, areas, and conditions where installation of resilient products will occur, with Installer present, for compliance with manufacturer's requirements. Verify that substrates and conditions are satisfactory for resilient product installation and comply with requirements specified. B. Concrete Subfloors: Verify that concrete slabs comply with ASTM F 710 and the following: 1. Slab substrates are dry and free of curing compounds, sealers, hardeners, and other materials that may interfere with adhesive bond. Determine adhesion and dryness characteristics by performing bond and moisture tests recommended by flooring manufacturer. 2. Subfloor finishes comply with requirements specified in Division 3 Section "Cast-in-Place Concrete"for slabs receiving resilient flooring. 3. Subfloors are free of cracks, ridges, depressions,scale, and foreign deposits. 3.2 PREPARATION A. General: Comply with resilient product manufacturer's written installation instructions for preparing substrates indicated to receive resilient products. RESILIENT TILE FLOORING 09651 -2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 B. Use trowelable leveling and patching compounds, according to manufacturer's written instructions,to fill cracks, holes, and depressions in substrates. 3.3 TILE INSTALLATION A. General: Comply with tile manufacturer's written installation instructions. 3.4 CLEANING AND PROTECTING A. Perform the following operations immediately after installing resilient products: 1. Remove adhesive and other surface blemishes using cleaner recommended by resilient product manufacturers. 2. Sweep or vacuum floor thoroughly. 3. Do not wash floor until after time period recommended by flooring manufacturer. 4. Damp-mop floor to remove marks and soil. B. Protect flooring against mars, marks, indentations, and other damage from construction operations and placement of equipment and fixtures during the remainder of construction period. Use protection methods indicated or recommended in writing by flooring manufacturer. 1. Apply protective floor polish to floor surfaces that are free from soil, visible adhesive, and surface blemishes, if recommended in writing by manufacturer. a. Use commercially available product acceptable to flooring manufacturer. b. Coordinate selection of floor polish with Owner's maintenance service. 2. Cover products installed on floor surfaces with undyed, untreated building paper until inspection for Substantial Completion. 3. Do not move heavy and sharp objects directly over floor surfaces. Place plywood or hardboard panels over flooring and under objects while they are being moved. Slide or roll objects over panels without moving panels. C. Clean floor surfaces not more than 4 days before dates scheduled for inspections intended to establish date of Substantial Completion in each area of Project. Clean products according to manufacturer's written recommendations. 1. Before cleaning, strip protective floor polish that was applied after completing installation only if required to restore polish finish and if recommended by flooring manufacturer. 2. After cleaning, reapply polish to floor surfaces to restore protective floor finish according to flooring manufacturer's written recommendations. Coordinate with Owner's maintenance program. END OF SECTION 09651 RESILIENT TILE FLOORING 09651 -3 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 SECTION 09775—FIBERGLASS REINFORCED PANELS PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes surface preparation and field application of fiberglass reinforced panels. 1.3 SUBMITTALS A. Product Data: For each coating system specified. 1. Material List: An inclusive list of required materials. Indicate each material and cross- reference the specific finish system, and application. Identify each material by the manufacturer's catalog number and general classification. 2. Manufacturer's Information: Manufacturer's technical information, including label analysis and instructions for handling, storing, and applying each material proposed for use. B. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available for each type of finish-coat material indicated. 1.4 QUALITY ASSURANCE A. Applicator Qualifications: An experienced applicator who has a record of successful in-service performance. B. Source Limitations: Obtain materials from the same manufacturer. 1.5 DELIVERY, STORAGE,AND HANDLING A. Deliver materials to the Project site in the manufacturer's original, unopened packages and containers bearing manufacturer's name and label, and the following information: 1. Product name or title of material. 2. Product description (generic classification). 3. Manufacturer's stock number and date of manufacture. PART2-PRODUCTS FIBERGLASS REINFORCED PANELS 09775- 1 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 2.1 MANUFACTURERS A. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, Fiber-Lite Liner Panels by Nudo Products, Inc. or an approved equal. B. Thickness: .090" C. Fire Rating: Class C D. Flexural Strength (psi): 9,200 per ASTM D—790. E. Panel Size:To fit the application—see interior elevations. Minimize seams. F. Tensile Strength (psi) 6,400 per ASTM D 638 PART 3-EXECUTION 3.1 EXAMINATION A. Examine substrates and conditions, with the Applicator present, under which fiberglass reinforced panels will be applied,for compliance with coating application requirements. 1. Apply panels only after unsatisfactory conditions have been corrected and surfaces to receive fiberglass reinforced panels are thoroughly dry. 2. Start of application is construed as the Applicator's acceptance of surfaces within that particular area. A. Coordination of Work: 2. Notify the Architect about anticipated problems using the coatings specified over substrates primed by others. 3.2 PREPARATION A. General: Remove plates, equipment, shelving, conduits, machined surfaces, and similar items already in place that are not to be covered. . 1. After completing installation, reinstall items removed using workers skilled in trades involved. B. Cleaning: Before applying fiberglass reinforced panels,clean substrates of substances that could impair bond of panels. Remove oil and grease before cleaning. 1. Schedule cleaning and coating application so dust and other contaminates from cleaning process will not fall on wet, newly coated surfaces. C. Surface Preparation: Clean and prepare surfaces to be laminated according to the manufacturer's written instructions for each particular substrate condition, and as specified. 3.3 INSTALLATION A. General: Laminate panels to the new or existing wall surface, including ceramic tile, using fast setting, genral purpose adhesives (100% coverage). Leave room for expansion per the manufacturer's recommondation. Install per the manufacturer's written instructions. FIBERGLASS REINFORCED PANELS 09775-2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 B. Finish the installation at all transitions, including between panel with the manufacturer's standard vinyl moldings. Color to match panel. All seams are to be moisture tight. Apply caulk where required. 3.4 CLEANING A. Cleanup: At the end of each workday, remove rubbish, empty cans, rags, and other discarded coating materials from the Project site. 1. After completing fiberglass reinforced panels application, clean spattered surfaces. Remove spattered adhesive by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces. 3.6 PROTECTION A. Protect work of other trades, whether being laminated or not, against damage from fiberglass reinforced panel operation. Correct damage by cleaning, repairing, replacing, and relaminating, as approved by the Architect. END OF SECTION 09775 FIBERGLASS REINFORCED PANELS 09775-3 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 SECTION 09900-PAINTING PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes surface preparation and field painting of the following: 1. Exposed exterior items and surfaces. 2. Exposed interior items and surfaces. 3. Surface preparation, priming, and finish coats specified in this Section are in addition to shop priming and surface treatment specified in other Sections. B. Paint exposed surfaces, except where the paint schedules indicate that a surface or material is not to be painted or is to remain natural. If the paint schedules do not specifically mention an item or a surface, paint the item or surface the same as similar adjacent materials or surfaces whether or not schedules indicate colors. If the schedules do not indicate color or finish, the Architect will select from standard colors and finishes available. 1. Painting includes field painting of exposed bare and covered pipes and ducts (including color-coding), hangers, exposed steel and ironwork, and primed metal surfaces of mechanical and electrical equipment. C. Do not paint prefinished items, concealed surfaces, finished metal surfaces, operating parts, and labels. 1.3 DEFINITIONS A. General: Standard coating terms defined in ASTM D 16 apply to this Section. 1. Flat refers to a lusterless or matte finish with a gloss range below 15 when measured at an 85-degree meter. 2. Eggshell refers to low-sheen finish with a gloss range between 5 and 20 when measured at a 60-degree meter. 3. Satin refers to low-sheen finish with a gloss range between 15 and 35 when measured at a 60-degree meter. 4. Semigloss refers to medium-sheen finish with a gloss range between 30 and 65 when measured at a 60-degree meter. 5. Full gloss refers to high-sheen finish with a gloss range more than 65 when measured at a 60-degree meter. 1.4 SUBMITTALS PAINTING 09900- 1 HNTB #36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10130/02 A. Product Data: For each paint system specified. Include block fillers and primers. 1. Material List: Provide an inclusive list of required coating materials. Indicate each material and cross-reference specific coating, finish system, and application. Identify each material by manufacturer's catalog number and general classification. 2. Manufacturer's Information: Provide manufacturer's technical information, including label analysis and instructions for handling, storing, and applying each coating material proposed for use. 3. Certification by the manufacturer that products supplied comply with local regulations controlling use of volatile organic compounds (VOCs)including the SCAQMD. B. Samples for Verification: Of each color and material to be applied, with texture to simulate actual conditions, on representative Samples of the actual substrate. 1. Provide stepped Samples, defining each separate coat, including block fillers and primers. Use representative colors when preparing Samples for review. Resubmit until required sheen, color, and texture are achieved. 2. Provide a list of materials and applications for each coat of each sample. Label each sample for location and application. 1.5 QUALITY ASSURANCE A. Applicator Qualifications: Engage an experienced applicator who has completed painting system applications similar in material and extent to that indicated for this Project with a record of successful in-service performance. B. Source Limitations: Obtain block fillers, primers, and undercoat materials for each coating system from the same manufacturer as the finish coats. 1.6 DELIVERY, STORAGE,AND HANDLING A. Deliver materials to the Project Site in manufacturer's original, unopened packages and containers bearing manufacturer's name and label, and the following information: 1. Product name or title of material. 2. Product description (generic classification or binder type). 3. Manufacturer's stock number and date of manufacture. 4. Contents by volume,for pigment and vehicle constituents. 5. Thinning instructions. 6. Application instructions. 7. Color name and number. 8. VOC content. B. Store materials not in use in tightly covered containers in a well-ventilated area at a minimum ambient temperature of 45 deg F (7 deg C). Maintain containers used in storage in a clean condition,free of foreign materials and residue. 1.7 PROJECT CONDITIONS A. Apply water-based paints only when the temperature of surfaces to be painted and surrounding air temperatures are between 50 and 90 deg F (10 and 32 deg C). PAINTING 09900-2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 B. Apply solvent-thinned paints only when the temperature of surfaces to be painted and surrounding air temperatures are between 45 and 95 deg F(7.2 and 35 deg C). C. Do not apply paint in rain, fog, or mist; or when the relative humidity exceeds 85 percent; or at temperatures less than 5 deg F (3 deg C)above the dew point; or to damp or wet surfaces. 1. Painting may continue during inclement weather if surfaces and areas to be painted are enclosed and heated within temperature limits specified by manufacturer during application and drying periods. PART2- PRODUCTS 2.1 MANUFACTURERS A. Available Products: Subject to Compliance with requirements, products that may be incorporated into the Work include, but are not limited to, products listed in the paint schedules. B. Products: Subject to compliance with requirements, provide one of the products in the paint schedules. C. Manufacturers Names: The following manufacturers are referred to in the paint schedules by use of shortened versions of their names, which are shown in parentheses: 1. Benjamin Moore&Co. (Moore). 2. Dunn Edwards 3. Sherwin-Williams Co. (S-W). 4. ICI. 5. Frazee. 2.2 PAINT MATERIALS, GENERAL A. Material Compatibility: Provide block fillers, primers, undercoats, and finish-coat materials that are compatible with one another and the substrates indicated under conditions of service and application, as demonstrated by manufacturer based on testing and field experience. B. Material Quality: Provide manufacturer's best-quality paint material of the various coating types specified. Paint-material containers not displaying manufacturer's product identification will not be acceptable. 1. Proprietary Names: Use of manufacturer's proprietary product names to designate colors or materials is not intended to imply that products named are required to be used to the exclusion of equivalent products of other manufacturers. Furnish manufacturer's material data and certificates of performance for proposed substitutions. C. Colors: Provide color selections made by the Architect. PART 3-EXECUTION 3.1 EXAMINATION PAINTING 09900-3 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Examine substrates, areas, and conditions, with the Applicator present, under which painting will be performed for compliance with paint application requirements. 1. Do not begin to apply paint until unsatisfactory conditions have been corrected and surfaces receiving paint are thoroughly dry. 2. Start of painting will be construed as the Applicator's acceptance of surfaces and conditions within a particular area. B. Coordination of Work: Review other Sections in which primers are provided to ensure compatibility of the total system for various substrates. On request, furnish information on characteristics of finish materials to ensure use of compatible primers. 1. Notify the Architect about anticipated problems using the materials specified over substrates primed by others. 3.2 PREPARATION A. General: Remove hardware and hardware accessories, plates, machined surfaces, lighting fixtures, and similar items already installed that are not to be painted. If removal is impractical or impossible because of the size or weight of the item, provide surface-applied protection before surface preparation and painting. 1. After completing painting operations in each space or area, reinstall items removed using workers skilled in the trades involved. B. Cleaning: Before applying paint or other surface treatments, clean the substrates of substances that could impair the bond of the various coatings. Remove oil and grease before cleaning. 1. Schedule cleaning and painting so dust and other contaminants from the cleaning process will not fall on wet, newly painted surfaces. C. Surface Preparation: Clean and prepare surfaces to be painted according to manufacturer's written instructions for each particular substrate condition and as specified. 1. Provide barrier coats over incompatible primers or remove and reprime. 2. Cementitious Materials: Prepare concrete, concrete masonry block, cement plaster, and mineral-fiber-reinforced cement panel surfaces to be painted. Remove efflorescence, chalk, dust, dirt, grease, oils, and release agents. Roughen as required to remove glaze. If hardeners or sealers have been used to improve curing, use mechanical methods of surface preparation. a. Use abrasive blast-cleaning methods if recommended by paint manufacturer. b. Determine alkalinity and moisture content of surfaces by performing appropriate tests. If surfaces are sufficiently alkaline to cause the finish paint to blister and burn, correct this condition before application. Do not paint surfaces where moisture content exceeds that permitted in manufacturer's written instructions. C. Clean concrete floors to be painted with a 5 percent solution of muriatic acid or other etching cleaner. Flush the floor with clean water to remove acid, neutralize with ammonia, rinse, allow to dry, and vacuum before painting. PAINTING 09900-4 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30102 3. Wood: Clean surfaces of dirt, oil, and other foreign substances with scrapers, mineral spirits, and sandpaper, as required. Sand surfaces exposed to view smooth and dust off. a. Scrape and clean small, dry, seasoned knots, and apply a thin coat of white shellac or other recommended knot sealer before applying primer. After priming, fill holes and imperfections in finish surfaces with putty or plastic wood filler. Sand smooth when dried. b. Prime, stain, or seal wood to be painted immediately on delivery. Prime edges, ends, faces, undersides, and backsides of wood, including cabinets, counters, cases, and paneling. C. When transparent finish is required, backprime with spar varnish. d. Backprime paneling on interior partitions where masonry, plaster, or other wet wall construction occurs on backside. e. Seal tops, bottoms, and cutouts of unprimed wood doors with a heavy coat of varnish or sealer immediately on delivery. 4. Ferrous Metals: Clean ungalvanized ferrous-metal surfaces that have not been shop coated; remove oil, grease, dirt, loose mill scale, and other foreign substances. Use solvent or mechanical cleaning methods that comply with the Steel Structures Painting Council's(SSPC) recommendations. a. Blast steel surfaces clean as recommended by paint system manufacturer and according to requirements of SSPC-SP 10. b. Treat bare and sandblasted or pickled clean metal with a metal treatment wash coat before priming. C. Touch up bare areas and shop-applied prime coats that have been damaged. Wire-brush, clean with solvents recommended by paint manufacturer, and touch up with the same primer as the shop coat. 5. Galvanized Surfaces: Clean galvanized surfaces with nonpetroleum-based solvents so surface is free of oil and surface contaminants. Remove pretreatment from galvanized sheet metal fabricated from coil stock by mechanical methods. D. Materials Preparation: Mix and prepare paint materials according to manufacturer's written instructions. 1. Maintain containers used in mixing and applying paint in a clean condition, free of foreign materials and residue. 2. Stir material before application to produce a mixture of uniform density. Stir as required during application. Do not stir surface film into material. If necessary, remove surface film and strain material before using. 3. Use only thinners approved by paint manufacturer and only within recommended limits. E. Tinting: Tint each undercoat a lighter shade to simplify identification of each coat when multiple coats of the same material are applied. Tint undercoats to match the color of the finish coat, but provide sufficient differences in shade of undercoats to distinguish each separate coat. 3.3 APPLICATION A. General: Apply paint according to manufacturer's written instructions. Use applicators and techniques best suited for substrate and type of material being applied. 1. Paint colors,surface treatments, and finishes are indicated in the schedules. PAINTING 09900-5 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 2. Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions detrimental to formation of a durable paint film. 3. Provide finish coats that are compatible with primers used. 4. The term "exposed surfaces" includes areas visible when permanent or built-in fixtures, convector covers, covers for finned-tube radiation, grilles, and similar components are in place. Extend coatings in these areas, as required, to maintain the system integrity and provide desired protection. 5. Paint surfaces behind movable equipment and furniture the same as similar exposed surfaces. Before the final installation of equipment, paint surfaces behind permanently fixed equipment or furniture with prime coat only. 6. Paint interior surfaces of ducts with a flat, nonspecular black paint where visible through registers or grilles. 7. Paint back sides of access panels and removable or hinged covers to match exposed surfaces. 8. Finish exterior doors on tops, bottoms, and side edges the same as exterior faces. 9. Finish interior of wall and base cabinets and similar field-finished casework to match exterior. 10. Sand lightly between each succeeding enamel or varnish coat. B. Scheduling Painting: Apply first coat to surfaces that have been cleaned, pretreated, or otherwise prepared for painting as soon as practicable after preparation and before subsequent surface deterioration. 1. The number of coats and the film thickness required are the same regardless of application method. Do not apply succeeding coats until the previous coat has cured as recommended by the manufacturer. If sanding is required to produce a smooth, even surface according to manufacturer's written instructions, sand between applications. 2. Omit primer on metal surfaces that have been shop primed and touchup painted. 3. If undercoats, stains, or other conditions show through final coat of paint, apply additional coats until paint film is of uniform finish, color, and appearance. Give special attention to ensure edges, corners, crevices, welds, and exposed fasteners receive a dry film thickness equivalent to that of flat surfaces. 4. Allow sufficient time between successive coats to permit proper drying. Do not recoat surfaces until paint has dried to where it feels firm, does not deform or feel sticky under moderate thumb pressure, and where application of another coat of paint does not cause the undercoat to lift or lose adhesion. C. Application Procedures: Apply paints and coatings by brush, roller, spray, or other applicators according to manufacturer's written instructions. 1. Brushes: Use brushes best suited for the type of material applied. Use brush of appropriate size for the surface or item being painted. 2. Rollers: Use rollers of carpet, velvet back, or high-pile sheep's wool as recommended by the manufacturer for the material and texture required. 3. Spray Equipment: Use airless spray equipment with orifice size as recommended by the manufacturer for the material and texture required. D. Minimum Coating Thickness: Apply paint materials no thinner than manufacturer's recommended spreading rate. Provide the total dry film thickness of the entire system as recommended by the manufacturer. 3.4 CLEANING PAINTING 09900-6 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Cleanup: At the end of each workday, remove empty cans, rags, rubbish, and other discarded paint materials from the site. 1. After completing painting, clean glass and paint-spattered surfaces. Remove spattered paint by washing and scraping. Be careful not to scratch or damage adjacent finished surfaces. 3.5 PROTECTION A. Protect work of other trades, whether being painted or not, against damage by painting. Correct damage by cleaning, repairing or replacing, and repainting, as approved by Architect. B. Provide "Wet Paint" signs to protect newly painted finishes. Remove temporary protective wrappings provided by others to protect their work after completing painting operations. 1. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces. Comply with procedures specified in PDCA P1. 3.6 EXTERIOR PAINT SCHEDULE A. Concrete Masonry Units: Provide the following finish systems over exterior concrete masonry units: 1. Semigloss, Acrylic-Enamel Finish: 2 finish coats over a block filler and a primer. a. Block Filler: High-performance, latex block filler applied at spreading rate recommended by the manufacturer to achieve a total dry mill thickness of not less than 4.0 mils (0.102 mm). 1) Devoe: 52902 Bloxfil 200 Interior/Exterior Latex Block Filler. 2) Fuller: 280-00 Interior/Exterior Latex Block Filler. 3) Glidden: 5317 Ultra-Hide Block Filler Latex Interior- Exterior. 4) Moore: Moorcraft Interior& Exterior Block Filler#173. 5) PPG: 6-7 Speedhide Interior/Exterior Masonry Latex Block Filler. 6) P&L: Z/F 98 Pro-Hide Plus Block Filler. b. Primer: Alkali-resistant, exterior, acrylic-latex primer applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.4 mils (0.036 mm). 1) Devoe: Primer not required over block filler. 2) Fuller: Primer not required over block filler. 3) Glidden: Primer not required over block filler. 4) Moore: Primer not required over block filler. 5) PPG: Primer not required over block filler. 6) P&L: Z/F 1001 Suprime "1" Multi-Purpose 100 Percent Acrylic Primer. PAINTING 09900-7 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 C. First and Second Coats: Semigloss, exterior, acrylic-latex enamel applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 2.4 mils (0.061 mm). 1) Devoe: 17XX Wonder-Shield Semi-Gloss Exterior Acrylic Latex House and Trim Paint. 2) Fuller: 664-XX Weather King II Semi-Gloss House & Trim Paint. 3) Glidden: 6600 Series Spred Ultra Exterior Gloss Latex House &Trim Paint. 4) Moore: MoorGlo Latex House &Trim Paint#096. 5) PPG: 78 Line Sun-Proof Semi-Gloss Acrylic Latex House and Trim Paint. 6) P& L: Z/F 3100 Series Aqua Royal Latex House & Trim Finish. B. Ferrous Metal: Provide the following finish systems over exterior ferrous metal. Primer is not required on shop-primed items. 1. Semigloss, Acrylic-Enamel Finish: 2 finish coats over a rust-inhibitive primer. a. Primer: Rust-inhibitive metal primer applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.3 mils (0.033 mm). 1) Devoe: 13101 Mirrolac Rust Penetrating Metal Primer. 2) Fuller: 621-04 Blox-Rust Alkyd Metal Primer. 3) Glidden: 5205 Glid-Guard Tank&Structural Primer, Red. 4) Moore: IronClad Retardo Rust-Inhibitive Paint#163. 5) PPG: 6-208 Speedhide Interior/Exterior Rust Inhibitive Steel Primer. 6) P& L: S/D 1009 Suprime "9" Interior/Exterior Alkyd Metal Primer. b. First and Second Coats: Semigloss, exterior, acrylic-latex enamel applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 2.6 mils (0.066 mm). 1) Devoe: 17XX Wonder-Shield Semi-Gloss Exterior Acrylic Latex House and Trim Paint. 2) Fuller: 664-XX Weather King II Semi-Gloss House & Trim Paint. 3) Glidden: 6600 Series Spired Ultra Exterior Gloss Latex House &Trim Paint. 4) Moore: MoorGlo Latex House&Trim Paint#096. 5) PPG: 78 Line Sun-Proof Semi-Gloss Acrylic Latex House and Trim Paint. 6) P &L: Z/F 3100 Series Aqua Royal Latex House & Trim Finish. PAINTING 09900-8 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 C. Zinc-Coated Metal: Provide the following finish systems over exterior zinc-coated (galvanized) metal surfaces: 1. Semigloss,Acrylic-Enamel Finish: 2 finish coats over a galvanized metal primer. a. Primer: Galvanized metal primer applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.2 mils (0.031 mm). 1) Devoe: 8502/8520 Mirrolac-WB Interior/Exterior Waterborne Flat'DTM Primer and Finish. 2) Fuller: 621-05 Blox-Rust Latex Metal Primer. 3) Glidden: 5205 Glid-Guard Tank& Structural Primer, Red, 4) Moore: IronClad Galvanized Metal Latex Primer#155. 5) PPG: 90-709 Pitt-Tech One Pack Interior/Exterior Primer/Finish DTM Industrial Enamel. 6) P& L: Z/F 1003 Suprime "Y Interior/Exterior Latex Metal Primer. b. First and Second Coats: Semigloss, exterior, acrylic-latex enamel applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 2.6 mils (0.066 mm). 1) Devoe: 17XX Wonder-Shield Semi-Gloss Exterior Acrylic Latex House and Trim Paint. 2) Fuller: 664-XX Weather King II Semi-Gloss House & Trim Paint. 3) Glidden: 6600 Series Spired Ultra Exterior Gloss Latex House&Trim Paint. 4) Moore: MoorGlo Latex House&Trim Paint#096. 5) PPG: 78 Line Sun-Proof Semi-Gloss Acrylic Latex House and Trim Paint. 6) P& L: Z/F 3100 Series Aqua Royal Latex House & Trim Finish. 3.8 INTERIOR PAINT SCHEDULE A. Gypsum Board: Provide the following finish systems over interior gypsum board surfaces: 1. Flat Acrylic Finish: 2 finish coats over a primer. a. Primer: Latex-based, interior primer applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.2 mils (0.031 mm). 1) Devoe: 50801 Wonder-Tones Interior Vinyl Latex Primer- Sealer. 2) Fuller: 220-20 Pro-Tech Interior Latex Wall Primer and Sealer. 3) Glidden: 5111 Spired Ultra Latex Primer-Sealer. PAINTING 09900-9 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 4) Moore: Regal First Coat Interior Latex Primer & Underbody#216. 5) PPG: 17-10 Quick-Drying Interior Latex Primer-Sealer. 6) P & L: Z/F 1004 Suprime"4" Interior Latex Wall Primer. b. First and Second Coats: Flat, acrylic-latex-based, interior paint applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 2.5 mils (0.064 mm). 1) Devoe: 36XX Wonder-Tones Interior Latex Flat Wall Paint. 2) Fuller: 202-XX Acrylic Latex Wall Paint. 3) Glidden: 4000 Series Spred Ultra Flat Latex Wall and Trim Paint. 4) Moore: Regal Wall Satin#215. 5) PPG: 80 Line Wallhide Interior Wall Flat Latex Paint. 6) P &L: Z/F 2000 Series Vapex Latex Flat Wall Finish. 2. Semigloss,Alkyd-Enamel Finish: 2 finish coats over a primer at the new ADA restrooms. a. Primer: Latex-based, interior primer applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.2 mils (0.031 mm). 1) Devoe: 50801 Wonder-Tones Interior Vinyl Latex Primer- Sealer. 2) Fuller: 220-20 Pro-Tech Interior Latex Wall Primer and Sealer. 3) Glidden: 5111 Spred Ultra Latex Primer-Sealer. 4) Moore: Regal First Coat Interior Latex Primer & Underbody#216, 5) PPG: 17-10 Quick-Dry Interior Latex Primer-Sealer. 6) P&L: Z/F 1001 Suprime "1" 100 Percent Acrylic Multi- Purpose Primer. 7) S-W: ProMar 200 Interior Latex Wall Primer 1328W200. b. First and Second Coats: Odorless, semigloss, alkyd, interior enamel applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 2.6 mils (0.066 mm). 1) Devoe: 26XX Velour Interior Alkyd Semi-Gloss Enamel. 2) Fuller: 206-XX Interior Alkyd Semi-Gloss Enamel. 3) Glidden: UH 8400 Ultra Traditional Alkyd Semi-Gloss Enamel. 4) Moore: Moore's Alkyd Dulamel#207. 5) PPG: 27 Line Wallhide Low Odor Interior Enamel Wall and Trim Semi-Gloss Oil. 6) P&L: S/D 5700 Cellu-Tone Alkyd Satin Enamel. 7) S-W: Classic 99 Interior Alkyd Semi-Gloss Enamel A-40 Series. 17-10 Quick-Dry Interior Latex Primer-Sealer. 6) P & L: Z/F 1001 Suprime "T' 100 Percent Acrylic Multi- Purpose Primer. PAINTING 09900- 10 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 7) S-W: ProMar 200 Interior Latex Wall Primer 1328W200. B. Ferrous Metal: Provide the following finish systems over ferrous metal: 1. Semigloss, Acrylic-Enamel Finish: One finish coat over an enamel undercoater and a primer. a. Primer: Quick-drying, rust-inhibitive, alkyd-based or epoxy-metal primer, as recommended by the manufacturer for this substrate, applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.5 mils (0.038 mm). 1) Devoe: 13101 Mirrolac Rust Penetrating Metal Primer. 2) Fuller: 621-04 Blox-Rust Alkyd &Structural Metal Primer, 3) Glidden: 5207 Glid-Guard Tank&Structural Primer,White. 4) Moore: IronClad Retardo Rust-Inhibitive Paint#163. 5) PPG: 6-208 Speedhide Interior/Exterior Rust Inhibitive Steel Primer. 6) P & L: S 4551 Tech-Gard High Performance Rust Inhibitor Primer. b. Undercoat: Alkyd, interior enamel undercoat or semigloss, acrylic-latex, interior enamel, as recommended by the manufacturer for this substrate, applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.3 mils (0.033 mm). 1) Devoe: 39XX Wander-Tones Semi-Gloss Interior Latex Enamel. 2) Fuller: 220-07 Interior Alkyd Enamel Undercoat. 3) Glidden: 8200 Series Spred Ultra Latex Semi-Gloss Enamel. 4) Moore: Moore's Alkyd Enamel Underbody#217. 5) PPG: 6-6 Speedhide Interior Quick-Drying Enamel Undercoater. 6) P& L: Z/F 4100 Series Accolade Interior Semi-Gloss. C. Finish Coat: Semigloss, acrylic-latex, interior enamel applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.3 mils (0.033 mm). 1) Devoe: 39XX Wonder-Tones Semi-Gloss Interior Latex Enamel. 2) Fuller: 214-XXAA Enamel Interior Acrylic Latex Semi- Gloss Enamel. 3) Glidden: 8200 Series Spired Ultra Latex Semi-Gloss Enamel. 4) Moore: Moore's Regal AquaGlo Vinyl-Acrylic Latex Enamel#333, 5) PPG: 88-110 Satinhide Interior Enamel Wall & Trim Lo- Lustre Semi-Gloss Latex. PAINTING 09900- 11 HNTB #36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 6) P& L: Z/F 4100 Series Accolade Interior Semi-Gloss. 2) Fuller: 110-XX Fullerglo Alkyd Semi-Gloss Enamel. 3) Glidden: UH 8400 Ultra Traditional Alkyd Semi-Gloss Enamel. 4) Moore: Satin Impervo#235. 5) PPG: 27 Line Wallhide Low Odor Interior Enamel Wall and Trim Semi-Gloss Oil. 6) P& L: SID 5700 Cellu-Tone Alkyd Satin Enamel. 7) S-W: Classic 99 Interior/Exterior Semi-Gloss Alkyd Enamel A-40 Series. C. Zinc-Coated Metal: Provide the following finish systems over zinc-coated metal: 1. Semigloss, Acrylic-Enamel Finish: 2 finish coats over a primer. a. Primer: Galvanized metal primer applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.2 mils (0,031 mm). 1) Devoe: 13201 Mirrolac Galvanized Metal Primer, 2) Fuller: 621-05 Blox-Rust Latex Metal Primer. 3) Glidden: 5207 Glid-Guard Tank&Structural Primer, White. 4) Moore: IronClad Galvanized Metal Latex Primer#155. 5) PPG: 90-709 Pitt-Tech One Pack Interior/Exterior Primer/Finish DTM Industrial Enamel. 6) P& L: Z/F 1003 Suprime "Y Interior/Exterior Latex Metal Primer. b. First and Second Coats: Semigloss, acrylic-latex, interior enamel applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 2.6 mils (0.066 mm). 1) Devoe: 39XX Wonder-Tones Semi-Gloss Interior Latex Enamel. 2) Fuller: 214-XXAA Enamel Interior Acrylic Latex Semi- Gloss Enamel. 3) Glidden: 8200 Series Spred Ultra Latex Semi-Gloss Enamel. 4) Moore: Moore's Regal AquaGlo Vinyl-Acrylic Latex Enamel#333. 5) PPG: 88-110 Satinhide Interior Enamel Wall & Trim Lo- Lustre Semi-Gloss Latex. 6) P& L: Z/F 4100 Series Accolade Interior Semi-Gloss. Metal Latex Primer#155. 5) PPG: 90-709 Pitt-Tech One Pack Interior/Exterior Primer/Finish DTM Industrial Enamel. 6) P&L: Z/F 1003 Suprime "Y Interior/Exterior Latex Metal Primer. 7) S-W: Galvite Paint B50W3. PAINTING 09900- 12 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 b. Undercoat: Alkyd, interior enamel undercoat or semigloss, interior, alkyd-enamel finish coat, as recommended by the manufacturer for this substrate, applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.2 mils (0.031 mm). 1) Devoe: 26XX Velour Interior Alkyd Semi-Gloss Enamel. 2) Fuller: 220-07 Interior Alkyd Enamel Undercoat. 3) Glidden: UH 8400 Series Spred Ultra Traditional Alkyd Semi-Gloss Enamel. 4) Moore: Moore's Alkyd Enamel Underbody#217. 5) PPG: 6-6 Speedhide Interior Quick-Drying Enamel Undercoater. 6) P & L: S/D 1011 Suprime "11" Interior Alkyd Wood Primer. 7) S-W: ProMar 200 Interior Alkyd Semi-Gloss Enamel B34W200. C. Finish Coat: Odorless, semigloss, alkyd, interior enamel applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.4 mils (0.036 mm). 1) Devoe: 26XX Velour Interior Alkyd Semi-Gloss Enamel. 2) Fuller: 110-XX Fullerglo Alkyd Semi-Gloss Enamel. 3) Glidden: UH 8400 Ultra Traditional Alkyd Semi-Gloss Enamel. 4) Moore: Satin Impervo#235. 5) PPG: 27 Line Wallhide Low Odor Interior Enamel Wall and Trim Semi-Gloss Oil. 6) P & L: S/D 5700 Cellu-Tone Alkyd Satin Enamel. 7) S-W: Classic 99 Interior Alkyd Semi-Gloss Enamel A-40 Series. END OF SECTION 09900 PAINTING 09900- 13 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 SECTION 10265- IMPACT-RESISTANT WALL PROTECTION PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1. Corner guards. B. Related Sections include the following: 1. Division 5 Section "Metal Fabrications" for steel angle and bent plate corner guards fabricated from rolled metal. 2. Division 6 Section 'Rough Carpentry" for wood blocking and grounds for surface- mounted wall guards, corner guards, and handrails. 3. Division 8 Section "Door Hardware"for stainless-steel mop, kick, armor, and push plates. C. Alternates: Refer to Division 1 Section "Alternates" for description of Work in this Section affected by alternates. 1.3 SUBMITTALS A. Samples for Verification: Submit 12" long samples of the corner guards as shown on the drawings (see detail 9/A8.20)and the method of adhering the unit. 1.4 QUALITY ASSURANCE A. Installer Qualifications: An experienced installer who has completed installation of impact- resistant wall protection system components similar in material, design, and extent to that indicated for this Project and whose work has resulted in construction with a record of successful in-service performance. B. Manufacturer Qualifications: A firm experienced in manufacturing impact-resistant wall protection system components similar to those required for this Project and with a record of successful in-service performance. IMPACT-RESISTANT WALL PROTECTION 10265- 1 HNTB #36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 PART 2-PRODUCTS 2.1 MANUFACTURERS A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering impact-resistant wall protection system products that may be incorporated into the Work include all reputable manufacturers engaged in the fabrication of stainless steel corner guards operating in the State of California. 2.2 MATERIALS A. Stainless-Steel Plate: Type 304, minimum 0.0625 inch (1.6 mm). B. Adhesive: Type recommended by the manufacturer for use with material on the substrate indicated. 2.3 CORNER GUARDS A. Stainless-Steel Corner Guards: Paper-covered, satin-finish, 0.0625-inch (1.6-mm) minimum, stainless-steel sheet corner guards; height as indicated. Provide 90-degree turn, unless otherwise indicated; and formed edges. Wing size, mounting method and corner radius shall be as shown on the drawing. 2.4 STAINLESS-STEEL FINISHES A. Bright, Directional Polish: No.4 finish. 1. Remove tool and die marks and stretch lines or blend into finish. 2. Grind and polish surfaces to produce uniform, directionally textured, polished finish indicated,free of cross scratches. Run grain with long dimension of each piece. PART 3- EXECUTION 3.1 EXAMINATION A. Examine areas and conditions in which impact-resistant wall protection system components and impact-resistant wall covering materials will be installed. 1. Complete finishing operations, including painting, before installing impact-resistant wall protection system components. 3.2 PREPARATION IMPACT-RESISTANT WALL PROTECTION 10265-2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10130102 A. General: Before installation, clean substrate to remove dust, debris, and loose particles. 3.3 INSTALLATION A. Install impact-resistant wall protection system components level, plumb, and true to line without distortions. 1. Do not use materials with chips, cracks, voids, stains, or other defects that might be visible in the finished Work. 3.4 CLEANING A. Remove excess adhesive using methods and materials recommended by the manufacturer. B. Remove surplus materials, rubbish, and debris, resulting from installation, on completion of work and leave installation areas in neat, clean condition. END OF SECTION 10265 IMPACT-RESISTANT WALL PROTECTION 10265-3 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 SECTION 10660—OPERABLE WALLS PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes surface preparation and field insalation of manually operable wall panels in the meeting rooms. Operable walls are to be hinged in pairs, center track,top supported and stored locally. B. Panel Facing Material: Fabric to match the existing in meeting rooms. C. Sound Transmission Classification (STC): Provide and install operable wall units capable of achieving a minimum laboratory test rating of STC-48 when tested in accordance with ASTM E90 without the facing material. 1.3 SUBMITTALS A. Product Data: Submit manufacturer's technical dataq and installation instructions. B. Certifications: Submit certifications from an independent testing laboratory that the product meets the specifications for STC rating,fire rating and flame spread classification. C. Shop Drawings: Submit shop drawings for fabrication and erection, including plans, elevations, large scale details, anchorages, and accessory items. Provide location template drawings for items supported or acchored to the structure permenently. D. Maintenance and Care Manuals: Covering the operable partition and all manufactured accessories. 1.4 QUALITY ASSURANCE A. Installer Qualifications: An experienced installer who has a record of successful in-service performance. 1.5 DELIVERY, STORAGE,AND HANDLING A. Deliver operable partitions to the Project site in the manufacturer's original, unopened packages and containers bearing manufacturer's name and label. PART2-PRODUCTS OPERABLE WALLS 10660- 1 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 2.1 MANUFACTURERS A. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, the Classic 7000 Series Model 7600 Omni-directional by Hufcor(to match the existing meeting rooms)or an approved equal. B. Operation: Operable walls shall consist of top supported, manually operated, continuously hinged rolling panels equipped with two 4-wheel ball bearing trolleys with automatic retractable floor seals. C. Hinges: Continuously hinged panels shall be of the manufacturer's standard design. D. Track: Type 53 Omni-Directional to 1500 lbs. Shall be suspended by all-thread steel rods from the structure above. Track system shall provide a captive and"free-flow"method of panel travel through 6" radius turns at every change in track direction and through the stacking wyes. Panels shall readily accumulate of their respective storage locations as indicated on the drawings. E. Trolleys: Panels shall be supported by 4-wheel radial type steel ball bearing wheels. Trolley pendent bolt shall be attached to the panelo utilizing steel reinforced plates welded to the top panel trame rail. Steel trolleys running on aluminum track are not acceptable. F. Perimeter Sound Seals: Top seal shall be continuous contact vinyl fin sweep seals. Bottom seals shall be automatically actuated by movement of one panel against another without face cranks. PART 3-EXECUTION 3.1 EXAMINATION A. Examine substrates and conditions, with the installer present, under which moveable panels will be installed,for compliance with manufacturer's requirements. 3.2 PREPARATION General: Installation shall be performed under the supervision of factory-trained mechanics in strict accordance with the manufacturer's printed installation manual to ensure satisfactory operation. 3.3 INSTALLATION Each partition will be tested in accordance with ASTM E336-76 using the "reverberant field" procedure inand full octive bands (not one third bands). Field Sound Transmission Class (FSTC) ratings will be determined in accordance with ASTM E413-73. In each test the minimum rating shall be STC 40. 3.4 CLEANING OPERABLE WALLS 10660-2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Cleanup: At the end of each workday, remove rubbish from the Project site. 3.6 PROTECTION A. Protect work of other trades, whether being laminated or not, against damage from fiberglass reinforced panel operation. Correct damage by cleaning, repairing, and replacing as approved by the Architect. END OF SECTION 01160 OPERABLE WALLS 10660-3 12i 23,2002 13:39 FAX 0002 ACORD ; l I '[. DATE ►��il ''r`:"' Y-x - � L'a.�...iaca�� °;f 't��' N, I >rll � il^I „ ti ic:`'I ..rl .,, ,rl .,r,,•:r I.7^.'Grt{!L .r r, `.'O.LSF,'knj,RWr `P+n lux I'S n y ��, 1 k . 122:3/ryC�E PnooucER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORWTION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE FEDERATED MUTUAL INSURANCE COMPANY HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR 5701 W,TBI&VI BOL'IBVBEd ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. _ Glendale, AZ 85036Pho _ COMPANIES AFFORDING COVERAGE _ Horne:Off ICE; Owatonna. COMPANY FEDERATED MUTUAL INSURANCE COMPANY OR Home Pffice; Owatonna, N1N 5506D a A FEDERATED SERVICE INSURANCE COMPANY rNsuP[o - .... 303-2?1.3 •..._. � - COVE ELECTRIC INC 77.824 WILDCAT DRIVE B PALM DESERT CA 92211 COMPANY C COMPANY '-- D iq TI IS '9 TD CERTIFY THAT HE POLICIC5 OF II J5TF. OERTIFIOA7E MA0 BEupY�i'HAYS BEEN 1557ED TO THE INSURED NAMEIO�AeO'VE FOR ITHE P041CY PERIOD „ k JDIGATED, MAY YI i HSTANDINO ryl REOLIREb1EN$TERM OR CONDITION OF ANT CCNTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS Y BE Is54REG OP, MA'( PERTAIN, THE INSURANCE AFFORDED BY THE FOJCIEB CESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLU5I ONS AND CONDITIONS OF SUCH POLICIES.LIMITS SHOWN MAY HAVE YFEN flEDUCL•D BY PAID CLAIMS. Ln TY.[OF INSuv Ci POLIOYEFFGCTOIE I FUMY-xPERAIION ,iR — AN POLICY NUM[[R . DATEN'MJIDDM1Y) DATE/MMAID/YYI LIMIT[ CENTRAL LIABILITY GFN[RAL AcOnEOATE f 2 DOD 000 X CDNmERG�hL GFNERAL LIAR LITY MP,YLPLGG F ODO,DOO �I PIIGDUCT3-1' '� A I CLAIMS MADE IKI OCCUR 9370893 D I 1 I 5/17i02 I 05,17/03 .PERsoNA. I a novlNnMr 1 G00 C00 owNFP•s'a covTRAcroR'D Pnor I !TCN cecuPr.GncE [ 1,000i000 .._... — FIRE DAMA.ak:AAVWOWe, I: 100000 VIED EXP IA— ACT O.mO FILE LIABILITY X Al.�au-a I jcoM�INm sNCLE LIMrt + 1,000,000_ ALL 0 NNf D AUTUe A SCHEDU.ED AUTOS HIRED cures WOLLYIN.ILR1 IS 9370693 05/17/OE 05/17/03 aF wRPm -" I KON OWNED AUTCS GDCILY INJUFr is �FfY E2�een0 i PAOPFFRY 9AA;hcE s - II:yLRACELIABIl1TV I AUTO ONLY-EA ACCrENT E W.T AUTU i� 4— iiAFNACHA 6AG CFZ[IODAENTGr: Excels.IAoluTr MOH OCCURRNC .5C 00I0C..0.. 00A X1FORPA 9370073 O5/17 05/17/03 Aaneagre 50 THAN VMOgFLIA FORM I 000 i W'OR"ERG COm P[N[,ETICNA4O 1 •q ATU- OTW .. EMPLCYEPS'LIARILITY —TRAYTG T THE"POIRPETCH: OTMC CRG ARE. EEt L ECUTNE �EACL NLL 1 SEASE wPOMYLMIT I DESCWP?qH aF OPFl10.TIDIfaM1OCATIDNa1lHICL[G/GPEGUL ITEMS CERTIFIC--TEHOWERIS AN ADDITIONAL INSURED0119 BE ADOL INSO:TURNER C019RUCT101.CITYOF MLA 5FRINGIS GENEML LIAR W ITCOVEDAUE AS nS THE CM F qFI PHASBI CDNYENTION CFNIER ED(RgN510N CITY OF VALM 9NgW05 CERTIFf TURNER ' 4' P.,A PIv, t y p X '. .T4R CON E.. r f311 [T��Lry�y�1(I{ll„y'. LLS XIi I�'1,tL SS lle ry,lt Ill { '?i^l':d111 L� �.3!'1�is% STRUCTION 433 MOULD ANY OP THE ABOVE DESCRIBED POLICIES AE CANCII BEFORE TN[ 275 INDIAN CANYON EXPU411CR DATE TMNIFOF. THE ISSUING COMPANY WILL ENDEAVOR TO MAIL SOUTH PALM SPI INQS CA 92284 -'Q CAYG WRIMEN NOTID[TO THE OUR11FICATE MOLDER NAMED TO THE LEFT. RUT FAIWIT TO AWL BUCH NOTICE SMALL SUPOEE NO EAUCATION OA UARILITT OF ANY KIND UPON THE COMPAV. ITS ACENTS DR AFMESENTATNEB. UTNGRIPED REPRE A SENT ATIV I .Y -ir LryEesl r -, tJ l n"••r::' .rvn i' vsl.'n. 'rk, .fir{..'.: Olt Sl A ',t"rf\li'Ir,1:IFf _.N'J! rNrYFFP,fn F.0 in NVNN3Q-QOH E0TOLV9 XVH LS £T £0/OT/TO T07 P.O. BOX 420807, SAN FRANCISCO, CA 94142b807 COMPENSATION - FLJJ CEIRT!I ATE OF WORKERS'COMPENSATION INSURANCE JARUAR 9,, 2003 POLICY NUMBER: 046-0i.1, ?fii Ci('s f.1:1.'"r., CERTIFICATE EXPIRES: O CI.C`L [M PLSM SPI 3-00 A tt'UTT- CAP1eC11? STY 0113 PALM SR T.M,US CA 92262 ' JOB: P111 E ] CONV'EWTIOL^T C`CP yP"iISTQ\i This is to certify that we have issued a valid Workers' Compensation insurance policy in a form approved by the California _ _Insurance Commissioner to the employer named below for the policy period indicated.__ This policy is not subject to cancellation by the Fund except upon tpadays'advance written notice to the employer. We will also give you days'advance notice should this policy be cancelled prior to its normal"expiration. This certificate of Insurance is not an insurance policy and does not amend, extend or alter the coverage afforded by the policies listed herein. Notwithstanding any requirement, term, or condition-of any contractor other document with respect to which this certificate of insurance may be issued or may pertaim.the' insurance afforded by. the policies described herein is subject to all the terms, exclusions and conditions of such policies. - AUTHORIZED FEPRESFNTATIVIE PRESIDENT } fXLOYER S LFABILI`1T LIMIT MCLUIDING DEF ME COSTS_ T31,000,000 PER OCCUPPENCE P.MDORSTEMENT !2055 u'NTI."LPD' C:Ea1 1 ICflTL fOLDF R.S'Td0'TICF.; FFDGU'T in 01/01/03 IS ATTACHED '.TO &D FOFdE A nmw OF 'PHIS POLY r. EMPLOYER COVE L'I ECTL TG •NC: - DLL_! COVE EL[{CT'k,JC'CQ MC PfO 1 ;U 'r F,t', 9,22J1 - O �GCIII.- IR].IA THIS 0OMAS-A,13LUEPATTERNEDBACKGROUND SrIF 102621 3 12,2312l)02 13:39 FAX i�J i)93 FodSr:tr d hater al Copy - fonts arid farmat may Vary from Cr!yinat TW5 ENDORSEMENT CHANGES THE POLICY.PLEASE READ R CAREFULLY. ADDITIONAL INSURED-OWNERS,LESSEES OR CONTRACTORS (FORM S) Tris endorsement modifies insurance provided under the following: COMMERCIAL.GENERAL LIABILITY COVERAGE PART SCHEDULE Name oil Person or Organization, TURNER CONSTRUCTION 275 INDIAN CANYON SOUTH PALM SPRINGS CA 92264 of no entry appears above, information required to complete this endorsement Will be shown in the Deelaratlons as applicable to this endorsement.) WHO IS AN INSURED (Section ID is amended to include as an insured the person or OrgerYZL6on shown in the Schedule,but only with respect to liability ansing out of"your work'tor that Insured by or for you. Jab cc Project: ANY COVERAGE PROVIDED BY THIS ENDORSEMENT APPLIES ONLY TO PHASE 7 CONVENTION CENTER EXPANSION CITY OF PALM SPRINGS'ADOL INSO:TURNER CONST&CITY OF PALM SPRINGS InSUMM COVE ELECTRIC INC 77-824 WILDCAT DRIVE PALM DESERT CA 92211 Copyright,Insurance Services Office,Inc„1992 CG-F-64(05-spy Policy Number; 9370693 Transaction Effective Date: 12-27AO02 (CG 2010 -.7-951 zo[;I 90TOLVC %VA L9:9T 90/OT/TO Client#: 50 RRA ACORD.. CERTIFICATE OF LIABILITY INSURANCE 7DATE114/(MM 031DDIr ) PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Van Gilder Insurance Corp. ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE 700 Broadway,Suite 1000 HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR y ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. Denver,CO 80203 303 837-8500 li INSURERS AFFORDING COVERAGE roup —INSURED IN uRERAssociated IndemNSURERA Hartford m y Corp. Fentress Bradburn Architects, LTD, 421 Broadway INSURERC Kemper Ins Cos(Select AcctS) Denver, CO 80203 INSURER Security Ins Cc of Hartford INSURER E. COVERAGES ..w� THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS. INTION TR TYPE OFINSURANCE POLICY NUMBER POLICY EFFECTIVE PDATE(MM/DENY) LIMITS A GENERAL LIABILITY 348BAPC3433 03/20/03 03/20/04 EACH OCCURRENCE 12000000 'X COMMERCIAL GENERAL LIABILITY FIRE DAMAGE(Any one Ire) $2000000 CLAIMS MADE C OCCUR MEG EXP(Any one person) $1 Q QOO PERSONAL R ADV INJURY $2,000,000 GENERAL AGGREGATE $4 00O 000 _ GEN'L AGGREGATE LIM IT APPLIES PER. PRODUCTS -COMPIOPAGG $4000000 POLICY I'l LOG A AUTOMOBILE LIABILITY 34UECER2688 03/20/03 03/20/04 COMBINED SINGLE LIMIT X ANY AUTO (Ea.radonl) $1,000,000 ALL OWNED AUTOS BODILY INJURY $ _ SCHEDULED AUTOS (Per person) X HIRED AUTOS BODILY INJURY accident) X (Per ac $NON-OWNED AUTOS ( _ _- -- --- -- -- PROPERTY DAMAGE-�$(Per accident) $ GARAGE LIABILITY AUTO ONLY-EA ACCIDENT ;$ ANY AUTO OTHERTHAN EA ACC S AUTO ONLY. AGO I$ B EXCESS LIABILITY XYZ85510691 03/20/03 03/20/04 EACH OCCURRENCE $1 000 000 X OCCUR CLAIMS MADE AGGREGATE $1 OOO O00 DEDUCTIBLE $ RETENTION $ $ C WORKERS COMPENSATION AND 7CQ28624107 01/01/03 01/01/04 X WC GTATU- OTR- C STATLU- ER_ EMPLOYERS'LIABILITY E.L EACH ACCIDENT $1,000,000 E L DISEASE-EA EMPLOYEE;$1,000,000 EL DISEASE-POLICY LIMIT $1,000,000 _ D OTHER Architects& AEE0702061 04/29/03 04/29/04 $2,000,000 per claim (Engineers $2,000,000 annl aggr. Professional Liab DESCRIPTION OF OPERATIONSILOCATIONSIVEHICLES/EXCLUSIONS ADDED BY ENDORSEMENTISPECIAL PROVISIONS Agreement#A4615;Architectural Design Conv,Ctr. Expansion The Certificate Holder is listed as an Additional Insured,under General and Automobile Liability only,in respects to their interest in work performed by the insured as per written specified contracts. CERTIFICATE HOLDER !ADD ITIONALINSURED,INSURER LETTER: CANCELLATION SHOULD ANYOF TH E ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION City of Palm Springs DATE THEREOF, THE ISSUING INSURER WILL ENDEAVOR TOMAIL30—DAYS WRITTEN Attn: Patricia A.Sanders NOTICETOTHE CERTIFICATE HOLDER NAM ED TOTHE LEFT,BUT FAILURE TO DO SO SHALL Office of City Clerk IMPOSE NO OBLIGATION OR LIABILITY OF ANYKIND UPON THE INSURER,ITS AGENTS OR P.O.Box 2743 REPRESENTATIVES. Palm Springs,CA 92263-6966 AUTHORIZED REPRESENTATIVE ACORD 25-S(7197)1 of 1 #S311478/M299017 w VRG Q ACORD CORPORATION 1988