HomeMy WebLinkAbout2/5/2003 - STAFF REPORTS (4) DATE: February 5, 2003 TO: City Council FROM: Executive Director- Airports SOUTHERLY TERMINAL ACCESS ROADWAY SECURITY RECONFIGURATION,300,RULE IMPLEMENTATION - APPROVAL OF PLANS RECOMMENDATION: It is recommended that the City Council approve and adopt the plans, specifications and working details,and authorize advertisement for construction bids for City Project#2002- 20, Southerly Terminal Access Roadway Security Reconfiguration at the Palm Springs International Airport. SUMMARY: Section 7.03.040 of the Procurement and Contracting Code requires that the Council approve and adopt plans, specifications and working details, and authorize the bid request for all public projects in excess of$100,000. Approval of this project will allow staff to proceed with this public project, with an estimated cost of $6,100,000. These changes are based on updated guidance from the Transportation Security Administration (TSA). BACKGROUND: In response to the events of September 11", and the subsequent security regulations mandated by the federal government, a blast analysis of the main passenger terminal at the Airport was completed. The blast analysis, which, due to the extreme confidentiality of the information contained in the report,was shared with the City Council in Closed Session, identified several mitigation measures which would improve the level of blast protection for the Airport. In response to two specific federal security requirements, the 300 ft rule and inspection of vehicles entering the secured area of the Airport, staff worked with the Transportation Security Administration (TSA) and developed a centralized inspection facility. This inspection facility and associated modifications to the Airport's loop roadway system,will allow for inspections of vehicles as they desire to approach the main passenger terminal as well as those vehicles who have a need to access the secured area of the Airport. In developing the design for this project, progress meetings were held with the Airport Commission and the City Council. Based on direction from the Council, a sub-committee was established to participate in the design of this project and provide input throughout the process. This sub-committee consisted of the Airport Commission Operations Sub- Committee, two (2) representatives from the Planning Commission and one (1) City Council member. This sub-committee proved invaluable in moving the design along quickly and being able to address the numerous design elements and user concerns. The layout of the inspection facility, tensile fabric roof and landscaping have been approved by the Planning Commission. 0 Southerly Terminal Access Roadway Security Reconfiguration - 300' Rule Implementation February 5, 2003 Page 2 TSA has been extremely supportive of the project and how it will provide a higher level of security for the passenger terminal, which being more efficient with the limited resources of the Airport.The most recent security regulations from the TSA were written around this project. Section 7.03.040 of the newly enacted Procurement and Contracting Code requires that for public projects in excess of$100,000, the City Council approve and adopt the plans, specifications and working details, and authorize staff to advertise for construction bids. The engineer's estimate for this project is $6,100,000. The Airport Commission will be updated on this item at it's regularly scheduled meeting of February 5, 2003. In order to have this project completed by the end of the calendar year and minimize the disruption to the Airport during the busy travel season,this item has been scheduled for advertisement of bids beginning February 19, 2003 and will necessitate the closure of the Mid-Valley Parkway, Airport Extension during the construction period. Due to the size of the plans and specifications, copies are available in the City Clerk's office for review. Funds are available in account #415-6600-56052. The funding is available via Airport Improvement Program (AIP) grant 35, which is 100% funded by the Federal Aviation Administration (FAA). MIKE N WILLIAMS, A.A.E. ALLEN F SMOOT, A.A.E. Deputy Director - Operations Executive Director-Airports APPROVES-.�'__ City Manager '%✓ Attachments: Minute Order REVIEWED BY DEPT. OF FINANCE N:\WordPerfect\City_Council\Engineering_Construction\Southerly_Access Roadway Modification Adoption 02-5-2003.wpd 0 L CITY OF PALM SPRINGS, CALIFORNIA NOTICE INVITING BIDS for SOUTHERLY TERMINAL ACCESS ROADWAY SECURITY RECONFIGURATION/INSPECTION PLAZA PALM SPRINGS INTERNATIONAL AIRPORT CITY PROJECT NO. 2002-20 FAA AIRPORT IMPROVEMENT PROJECT NO. 3-06-0181-35 NOTICE IS HEREBY GIVEN that sealed bids will be received at the Office of the Department of Procurement and Contracting of the City of Palm Springs, California, 3200 East Tahquitz Canyon Way, Palm Springs, California 92262 until, 2:00 PM, local time on March 21, 2003 at which time they will be opened and read aloud. Bids must be submitted in sealed envelopes marked on the outside "SOUTHERLY TERMINAL ACCESS ROADWAY SECURITY RECONFIGURATION/INSPECTION PLAZA". LOCATION OF WORK - The Work to be performed hereunder is located at 3400 E. Tahquitz Canyon Way, Palm Springs, California. DESCRIPTION OF THE WORK - The Work to be done includes, but may not be limited to, furnishing all construction, plant, necessary engineering, labor, tools, transportation, services, supervision, materials and equipment required to complete Schedule I for the Palm Springs International Airport. The Work involved includes the following: SCHEDULE [ Demolition, Utilities, Asphalt and Concrete Paving, Curb and Gutter, Vehicle Security Barrier Systems, Access Control Systems, Lighting, Traffic Signal Modifications, Roadway Directional and Traffic Regulation Signage, Roadway Marking, Erosion Control, Security Fencing and Gates, Security Walls, Inspection Plaza Building, Tensile Membrane Structure (informational), Tensile Membrane Structure Footings and Tie-Down Anchors, and Natural Security Barrier Landscaping OBTAINING OR INSPECTING CONTRACT DOCUMENTS - A complete set of Contract Documents dated February 20, 2003 may be obtained on, or after February 25, 2003 at J.P. Reprographics, 224 N. Indian Canyon Drive, Palm Springs, California 92262, phone (760) 325- 3717, fax (760) 325-0817. An additional charge of$100.00 will be made for plans, specifications and bid documents mailed out. Each Bidder must supply all information required by the complete bid documents and specifications. PROJECT ADVERTISEMENT - The project was advertised for bid February 21, 2003 and March 6, 2003. PRE-BID VISIT TO WORK SITE - All bidders are advised to examine the site to become familiar with all site conditions. The project will be shown to interested bidders at 10:00 AM, local time, on March 10,2003. Contractors will meet at the Palm Springs International Airport Conference Room, upstairs, for the Pre-Bid Conference. COMPLETION OF WORK - Time is of the essence. The Work must be completed within 180 calendar days after commencement date stated in the Notice To Proceed. AWARD OF CONTRACT- (a) The Work hereunder is set forth in Bid Schedule 1. The award of contract will be based on the lowest total bid, conditioned upon satisfying the requirements established by the Sponsor to evaluate efforts of the bidder to meet the Disadvantaged Business Enterprise Participation contract goals included in the Bid Conditions. The City reserves the right to award any or all parts of the various schedules to the lowest responsive, responsible bidder, and to reject all other bids, as it may best serve the interests of the City. The City reserves the right to waive any informality in or to reject any or all portions of the various low bids from qualified contractor bid items. The City further reserves the right after opening bids to reject any or all bids, or to waive any minor informality (non- responsiveness) in a bid. The award of the contract is subject to the approval of the Federal Aviation Administration. The Sponsor further reserves the right to negotiate changes with the low bidder in the scope of project, extent of the work, or to increase or decrease the size of the project, if so desired, all to the best interest of the Owner, prior to award of the contract. Additional information is included in BID CONDITIONS. (b) As a condition of award, the successful bidder will be required to submit bonds and insurance, prior to the execution of the Agreement by the City. Failure to meet this requirement shall constitute abandonment of the Bid by the Bidder and forfeiture of the Bid Bond. The Contract will then be awarded to the next lowest bidder. BID SECURITY - Each bid shall be accompanied by a certified cashier's check or Bid Bond in the amount of 10 percent of the total bid price (all schedules), payable to the City of Palm Springs, as a guarantee that the Bidder, if its Bid is accepted, will promptly ()btain the required Bonds and Insurance and will prepare the required submittal document and execute the Agreement. BIDS TO REMAIN OPEN - The Bidder shall guarantee the Total Bid Price for a period of 120 calendar days from the date ofBid Opening. CONTRACTOR'S LICENSE CLASSIFICATION - In accordance with the provisions of California Public Contract Code Section 3300, the City has determined that the Contractor shall possess a valid Class A Contractor License at the time the Contract is awarded. Failure to possess the specified license shall render the bid as nonresponsive and shall act as a bar to award of the Contract to any bidder not possessing said license at the time of award. The Contractor must be licensed to do business in the City of Palm Springs in accordance with the provisions of Chapter 9, Division 3, of the Business and Professions Code, and will be required to obtain a City Construction Permit No Fee from the Building Department and/or the Public Works Inspection Supervisor, City Hall, Palm Springs, California. STATEMENT OF QUALIFICATIONS - Each proposal must be accompanied by a statement of the bidder's qualifications to perform the work contemplated. The Statement of Qualifications shall be prepared on the form attached hereto. 1-2 } WAGE RATE REQUIREMENTS - (a) State - In accordance with the provisions of California Labor Code Section 1770, 1773, 1773.1, 1773.6 and 1773.7, as amended, the Director of the Department of Industrial Relations has determined the general prevailing rate of per diem wages in accordance with the standards set forth in Section 1773 for the locality in which the Work is to be performed. A copy of said wage rates is on file at the Department of Building and Safety, City Hall, Palm Springs, California. It shall be mandatory upon the Contractor to whom the Work is awarded and upon any subcontractor under the Contractor to pay not less than said specified rates to all workers employed by them in the execution of the Work, and shall post a copy of said wage rates at the project site. (b) Federal- The general prevailing rate of wages, as determined by the Secretary of Labor are included hereinafter as part of the Contract Documents; provided, that if there is any difference between the State of Federal wage rate for any given craft or mechanic needed to execute the work, it shall be mandatory upon the Contractor and any subcontractor to pay the higher of the two rates. All labor on the project shall be paid no less than the minimum wage rates established by the U.S. Secretary of Labor. TRADE RESTRICTIONS - All solicitations, contracts and subcontracts resulting from projects funded under AIP must contain the foreign trade restriction required by 49 CFR Part 30, Denial of Public Works Contracts to Suppliers of Goods and Services of Countries That Deny Procurement Market Access to U.S. Contractors. The Aviation Safety and Capacity Expansion Act of 1990 provides that preference be given to steel and manufactured products produced in the United States when funds are expended pursuant to a grant issued under the Airport Improvement Program. EQUAL EMPLOYMENT OPPORTUNITY AND AFFIRMATIVE ACTION REQUIREMENTS - Each bidder must complete, sign and furnish, prior to award of the contract, the 'Bidders Statement on Previous Contracts Subject to EEO Clause", a "Certification of Nonsegregated Facilities", and the "Assurance of Disadvantaged Business Enterprise Participation" as contained in the Bid Proposal. These items must be submitted with his or her bid. A Contractor having 50 or more employees and his or her subcontractors having 50 or more employees and who may be awarded a contract of $50,000 or more will be required to maintain an affirmative action program, the standards for which are contained in these specifications. The proposed contract is under and subject to Executive Order 11246, as amended, of September 24,1965, and to the Equal Employment Opportunity (EEO) and Federal Labor Provisions. The EEO requirements, labor provisions, and wage rates are included in the specifications an- bid documents and are available for inspection at the Department of Building and Safety, City Hall, Palm Springs, California. To be eligible for award, each bidder must comply with the affirmative action requirements which are contained in the specifications. Disadvantaged Business Enterprises (DBEs) as defined in 49 CFR Part 26 shall have the maximum opportunity to participate in the performance of contracts under this agreement. Consequently, the DBE requirements of 49 CFR Part 26 apply to this agreement. Women will be afforded equal opportunity in all areas of employment. However, the employment of women shall not diminish the standards of requirement for the employment of minorities. RETAINAGE FROM PAYMENT - The Contractor may elect to receive 100 percent payments due under the Contract Documents from time to time, without retention of any portion of the payment by the 1-3 M City, by depositing securities of equivalent value with the City in accordance with the provisions of Section 22300 of the Public Contract Code. Such securities, if deposited by the Contractor, shall be valued by the City, whose decision on valuation of the securities shall be final. Securities eligible for Investment under this provision shall be limited to those listed in Section 6430 of the Government Code or bank or savings and loan certificates of deposit. ADDRESS AND MARKING OF BIDS - The envelope enclosing the Bid shall be sealed and addressed to the City of Palm Springs, and shall be delivered or mailed to Harold E. Good, CPPO, Procurement Manager, at 3200 East Tahquitz Canyon Way, Palm Springs, CA 92262. The envelope shall be plainly marked in the upper left hand corner with the name and address of the Bidder and shall bear the words "NORTHERLY TERMINAL ACCESS ROADWAY SECURITY RECONFIGURATION" for the "PALM SPRINGS INTERNATIONAL AIRPORT", followed by the date and hour of opening Bids. The certified or cashier's check or Bid Bond shall be enclosed in the same envelope with the Bid. PROJECT ADMINISTRATION - All communications relative to this Work shall be directed to Mr. Rodger Sheraton, VSA AIRPORTS, Inc., 255 North El Cielo Road #419 Palm Springs, CA 92262, phone 760-318-0200, fax 760-318-0838, All questions relating to interpretation of the Contract Documents or products must be submitted in writing, ten days prior to bid opening, and any responses will be in the form of written addenda to the Documents. BY ORDER OF THE CITY OF PALM SPRINGS DATE: February 18,2003 CITY OF PALM SPRINGS BY BY Allen F. Smoot, A.A.E. Executive Director-Airports City of Palm Springs, CA State of California 1-4 CITY OF PALM SPRINGS, CALIFORNIA NOTICE INVITING BIDS Furnish, Clean and Store Palm Trees forthe SOUTHERLY TERMINAL ACCESS ROADWAY SECURITY RECONFIGURATION/INSPECTION PLAZA PALM SPRINGS INTERNATIONAL AIRPORT IFB#03-05 CITY PROJECT NO.2002-20 FAA AIRPORT IMPROVEMENT PROJECT NO. 3-06-0181-35 Washin tonia Filifera Palms 10' — 13' trunk height 20 each .....--. ----,---.....,.— — 14'— 16' trunk height 50 each - ------ --- -- .-,..-----—-----— 17'—20' trunk height 20 each NOTICE IS HEREBY GIVEN that sealed bids will be received at the office of the Director of Procurement and Contracting of the City of Palm Springs, California, 3200 East Tahquitz Canyon Way, Palm Springs, California 92262 until, 2:30 PM, local time on January 28, 2003, at which time they will be opened and read aloud. Bids must be submitted in sealed envelopes marked on the outside "SOUTHERLY TERMINAL ACCESS ROADWAY SECURITY RECONFIGURATION/INSPECTION PLAZA, SCHEDULE I - Furnish, Clean and Store Palm Trees'. PROJECT ADVERTISEMENT—The project was advertised for bid December 27, 2002 and January 10, 2003. BACKGROUND:The City of Palm Springs, Department of Aviation (AIRPORT) has received funding via an Airport Improvement Program (AIP)grant from the Federal Aviation Administration (FAA)for the above noted project.The materials are to be furnished, cleaned and stored in accordance with this IFB. DESCRIPTION OF THE MATERIALS: The material includes, but may not be limited to, furnishing all specified plant, necessary labor, tools, transportation, services, supervision, materials and equipment required to furnish, clean and store the materials in accordance with contract documents. Transport of the materials for installation at the project will be performed by others. STORAGE and PICKUP LOCATION: The materials shall be stored and ready for pickup within 50 miles of the airport. Time is of the essence. The Materials must be prepared, available, accessible and ready for pick-up 60 Calendar Days from the contract Notice To Proceed. OBTAINING OR INSPECTING BID DOCUMENTS: The specifications are provided in the "Invitation for Bids (IFB) 02-05" package, which is included with this announcement or by contacting the Department of Procurement&Contracting at(760)323-8237. Copies are available via the Internet at htti)://www.palmspringsairport.corn. NOTE: UPON RECEIVING THIS IFB VIA THE INTERNET, CONTACT RODGER SHERATON, VSA AIRPORTS VIA EMAIL resheraton(a)worldnet.att.net TO REGISTER AS AN OFFEROR. FAILURE TO REGISTER AS AN OFFEREOR MAY RESULT IN YOUR FIRM NOT RECEIVING BID ADDENDA. FAILURE TO ACKNOWLEDGE ADDENDA WITH YOUR BID MAY CAUSE YOUR BID TO BE CONSIDERED NOW RESPONSIVE. IFB 03-05 1.1-1 BASIS OF AWARD: It is the City's intent to award on an "ALL OR NOTHING" basis to the lowest responsive and responsible Bidder on the basis of the total price submitted on the Bid Proposal pages of this document. The City reserves the right after opening bids to reject any or all bids, or to waive any minor informality (non-responsiveness) in a bid. The award of the bid is subject to the approval of the Federal Aviation Administration(FAA). BIDS TO REMAIN OPEN:The Bidder shall guarantee the Total Bid Price for a period of 60 calendar days from the date of Bid Opening, FEDERAL REQUIREMENTS: Proposers attention is called to the United States Government requirements referenced in this IFB. PUBLIC RECORD: Proposers' attention is drawn to the fact that all bid documents submitted are subject to the California Code Section 6250 et seq., commonly known as the Public Records Act. Information contained in the bids may be made public after the review process has been completed in a recommendation for award to the Palm Springs City Council. ADDRESS AND MARKING OF BIDS: An original bid and two (2) copies of the complete bid must be received in the DEPARTMENT OF PROCUREMENT & CONTRACTING at 3200 East Tahquitz Canyon Way, Palm Springs, CA 92262 no later than January 28, 2003 @ 2:30 pm local time. Bids received without the required number of copies may be deemed non-responsive and may not receive further consideration. Envelopes must be clearly marked, "SOUTHERLY TERMINAL ACCESS ROADWAY SECURITY RECONFIGURATION/INSPECTION PLAZA, SCHEDULE I - Furnish, Clean and Store Palm Trees". It is the responsibility of the Offeror to see that any proposal sent via mail shall have sufficient time to be received by the specified date and time. Telegraphic, telephonic or facsimile proposals will not be accepted. Any bid received after the time and date specified for the opening of the bids will not be considered, but will be returned unopened. The Director of Procurement & Contracting will designate an official timepiece which shall be used to determine the official time for opening of bids, and which time shall be deemed correct and conclusive. BID ADMINISTRATION: All communications relative to this IFB shall be directed in writing to Rodger Sheraton, VSA AIRPORTS, 255 N. El Cielo Road #419, Palm Springs, CA 92262, (760) 318-0200, FAX (760) 318-0838 or email to: resheraton a(�worldnet.att.net. All questions relating to interpretation of the Contract Documents or products must be submitted in writing, ten days prior to bid opening, and any responses will be in the form of written addenda to the Documents. BY ORDER OF THE CITY OF PALM SPRINGS DATE: December 20, 2002 Allen F. Smoot,A.A.E. Executive Director—Airports City of Palm Springs, CA State of California IFB 03-05 1.1-2 yOF PALS -ti City of Palm prings c" Department of Procurement and Contracting * COANFO , k Cq<1 FO RN�P 3200 Tahquitz Canyon Way o Palm Springs,California 92262 TEL: (760) 323-8239 • FAX: (760) 322-8372 • TDD: (760) 864-9527 NOTICE INVITING BIDS INVITATION FOR BID (IFB) 03-03 AIRPORT IMPROVEMENT PROJECT NO. 3-06-0181-35 Security Guard Services for the Palm Springs International Airport NOTICE IS HEREBY GIVEN that the City of Palm Springs is accepting sealed bids from qualified professional security guard firms to perform various security functions at the Palm Springs International Airport. Work to be performed includes: The selected professional security guard firm shall provide all management, supervision, labor, equipment, supplies and materials necessary to satisfactorily perform security protection at various locations on the Airport. Specific procedures to be performed are mandated to the AIRPORT by the Transportation Security Agency (TSA). The selected firm shall plan, schedule, coordinate and assure effective performance of the services as outlined within this IFB. Sealed bids will be received at the office of the Director of Procurement and Contracting of the City of Palm Springs, California, 3200 East Tahquitz Canyon Way, Palm Springs, California 92262 until,3:00 PM, local time on January 28,2003, at which time they will be opened and read aloud. Bids must be submitted in sealed envelopes marked on the outside "Security Guard Services for the Palm Springs International Airport - IFB 03-03". BACKGROUND: The City of Palm Springs, Department of Aviation (AIRPORT) has received funding via an Airport Improvement Program (AIP)grantfrom the Federal Aviation Administration (FAA) for various security improvements related to the event of September 11`h. The services outlined within this IFB will be used during construction to ensure and maintain compliance with federal security regulations. The primary function of the guard services will be to monitor, observe and inspect vehicles which require access to secured portions of the Airport. Said services are anticipated to begin on or about April 1, 2003 and be complete on or about December 1,2003. Said services are anticipated to be required 7 days a week, including holidays between the hours of 0400 (L) to 0100 (L). SERVICE LOCATION: The services outlined within this IFB shall be performed at the following location: Palm Springs International Airport 3400 E Tahquitz Canyon Way Palm Springs, California 92262 • a City of Patin Springs IFB 03-03 Security Guard Services for the Palm Springs International Airport DESCRIPTION OF THE SERVICES: The proposed bid will be to furnish all labor, supervision, materials and supplies,equipment,and all otheritems incidental and/or necessary to satisfactorily perform security protection at various locations on the Airport. Specific procedures to be performed are mandated to the AIRPORT by the Transportation Security Administration (TSA). OBTAINING OR INSPECTING BID DOCUMENTS: The specifications are provided in the 'Invitation for Bids(IFB)03-03 package,which is included with this announcement orbycontacting the Department of Procurement & Contracting at (760) 323-8237. Copies are also available via the Internet at http://www.palmspringsairport.com. NOTE: UPON RECEIVING THIS IFB VIA THE INTERNET, CONTACT MARI LYNN BOSWELL, ADMINISTRATIVE SECRETARYVIA EMAIL MariLynnB ci.palm-springs.ca.usTOREGISTER AS AN OFFEROR. FAILURE TO REGISTER AS AN OFFEREOR MAY RESULT IN YOUR FIRM NOT RECEIVING BID ADDENDA. FAILURE TO ACKNOWLEDGE ADDENDA WITH YOUR BID MAY CAUSE YOUR BID TO BE CONSIDERED NON-RESPONSIVE. BASIS OF AWARD: It is the City's intent to award on an "ALL OR NOTHING' basis to the lowest responsive and responsible Bidder on the basis of the total price submitted on the Bid Proposal pages of this document. The City reserves the right after opening bids to reject any or all bids, or to waive any minor informality (non-responsiveness) in a bid. BIDS TO REMAIN OPEN: The Bidder shall guarantee the Total Bid Price for a period of 60 calendar days from the date of Bid Opening. ADDRESS AND MARKING OF BIDS:An original bid and two (2)copies of the complete bid must be received in the DEPARTMENT OF PROCUREMENT&CONTRACTING at 3200 EastTahquitz Canyon Way, Palm Springs, CA 92262 no later than January 28, 2003 @ 3:00 pm local time. Bids received without the required number of copies may be deemed non-responsive and may not receive further consideration. Envelopes must be clearly marked,"Security Guard Services forthe Palm Springs International Airport - IFB 03-03". It is the responsibility of the Offeror to see that any proposal sent via mail shall have sufficient time to be received by the specified date and time. Telegraphic, telephonic or facsimile proposals will not be accepted.Any bid received after the time and date specified for the opening of the bids will not be considered, but will be returned unopened. The Director of Procurement&Contracting will designate an official timepiece which shall be used to determine the official time for opening of bids, and which time shall be deemed correct and conclusive. City of Palrn Springs IFB 03-03 Security Guard Services for the Palm Springs International Airport BID ADMINISTRATION: All communications relative to this IFB shall be directed in writing to Bruce R Johnson, CPPO, C.P.M., Senior Procurement Specialist, 3200 East Tahquitz Canyon Way, Palm Springs, CA 92262, (760) 322-8373, FAX (760) 323-8238 or email to: BruceJ(cDci.palm-springs.ca.us.All questions relating to interpretation ofthe Contract Documents or products must be submitted in writing, ten (10) days prior to bid opening, and any responses will be in the form of written addenda to the Documents. BY ORDER OF THE CITY OF PALM SPRINGS DATE: Date published in The Public Record - January 14, 2003. BY HAROLD E GOOD, CPPO Director of Procurement and Contracting City of Palm Springs, California L:\RFP_RFQ's\Guard_Sewices\IFB_03-03_Guard Services NIB.wpd 04/18/2003 07:59 FAX 760 778 4731 The Desert Sun Class [a 001 V� No.CITY r,, p, ' CITY OF PALM SPRINGS, SOUITCALIFORNIA NOTICE INVITING BIDS for SOUTHERLY TERMINAL ACCESS ROADWAY SECURITY RECI PALM SPRINGS INTERNATIONAL L PLAZA PALM SPRINGS INTERNATIONAL AIRPORT CITY PROJECT NO,2002-20 FM AIRPORT IMPROVEMENT PROJECT N0.3-O6-01H1.35 NOTICE IS HEREBY GIVEN that sealed bids will t \�' be received at the Office of the Department of t1/ Procurement and Contracting of the itz of Palm I' lf\Y,iJI Springs, California, Cali East 7ahquitr Canyon Pf 1'' Way, Palm Springs, California 03 at,until, time the local time opened March read 21,alo03 at which time -/,I' they fittedll n sealed en e lopesaloud.Bids on the %� %' submitted in sealed envelopes marked on the 1 outside "SOUTHERLY TERMINAL ACCESS ROADWAY S RECONFIGURATION/INSPECTION PLAYA". Ip ; PROOF OF PUBLICATION This is space for Ci' LOCATION OF WORK The Work to be per- (20I5.5.C_C.P) formed hereunder is located at 3400 E.Taligwtz Canyon Way,Palm Spdngs,Califomia.i I b,'yf DESCRIPTION OF THE WORK-The Work to be .� r Fes' done includes,bon may not be necessary .t ifurnish- 6-,p I .f/ 1. ing all construction,plant,necessary eiiginoedng,. labor,tools,transportation,services;supervision, 1� materials and equipment required to complete G,�• Schedule I for the Palm Springs Intenational Airport. STATE OF CALIFORNIA The Work involved includes the following: County of Riverside SCHEDULE 1 Demolition,Utilities,Asphalt and Concrete Paving,Curti and Gutter,Vehicle Security Barrier ' Systems,Access Control Systems,Lighting, Traffic Signal Modifgations,Roadway Ouectional and Traffic Regulation Signage,Roadway - Marking,Emsion Control,Security Fencing and > Gates,Security Walls,Inspection Plaza Building, Tensile Membrane Structure(mfonnationap, 7 Tensile Membrane Structure Footings and Tie- Dawn Anchors,and Natural Security,Barrier Landscaping I am a citizen of the United States and a resident of Proof of Pi OBTAINING OR INSPECTING CONTRACT DOCUMENTS - A complete set of,I,Comract the County aforesaid; I am over the age of eighteen ----—------ Documents dated February 20, 2003 may be years,and not a party to or interested in the obtained on, or after February 25, 2o03'at J.P. Reprographics,224 N.Indian Canyon Drive,Palm above-entitled matter.I am the principal clerk of a Spdngs,California 92262,phone(760)I325.3717, printer of the,DESERT SUN PUBLISHING tax (760) 025-0817. An additional charge of S,00A0 will be made for plans,specifications and COMPANY a newspaper of general circulation, bid documents mailed out. printed and published in the city of Palm Springs, Each Bidder must supply all information required County of Riverside,and which newspaper has been by the complete bid documents and specifica- adjudged a newspaper of general circulation by the tions. " Superior Court of the County of Riverside,State of PROJECT ADVERTISEMENT-The project was California under the date of March 24,1988.Case advertised forbid Febmary 21,2003 and Mamh ,6,2003. - Number 191236; that the notice,of which the annexed is a printed co set in type not smaller `PRE-BID VISIT TO WORK SITE-All bidders are P PY YP advised to examine the site to become familiar than non pariel,has been published in each regular with all site conditions:The protl n ect will'be'shown and entire issue of said newspaper and not in an tta interested bidders at 10:00 AM,local time,o Y March 10,2003.Contractors will meet at the Palm supplement thereof on the following dates,to wit: Spdngs International Airport Conference;Roam, upstairs,for the Pre-Did Conference::,,-,1 February 21r`,March bra COMPLETION OF WORK.-'Tlme,is of the!, essence:The Work must be completednyithnn -----'-- 180 calendar days after commencement date', stated in the Notice To Proceed, AWARD OF CONTRA T ) ' All in the year 2003 (a) The Work hereunder;is 'set forth"in-Bid I certifyor declare under penalty of perjury that the Schedule 1:The award of contract will ,be based P Y P 1 Y on the lowest total bid,condkioned upon saitsfy- foregeing is true and correct. ing the requirements established by the Sponsor m .bid to evaluate efforts of the der to meet the 7 Disadvantaged Business Enterprise Paflicipation Dated at Palm Springs,California(his------day contractgoals included in the Bid Condhlons.-The March City reserves the right to award any or All parts of the various schedules to the lowest reapdnsive, of 2003 responsible biddy,and to reject all other bids,as _ it I bolt servatheirtterests of the C" rTAe City reserves the right to wary mfoon e an 1' Ili or t ao o V=Q� /�� ,, reject any ar all partis of.the various]aw hide �tr/JC.K, frem qualified contractar bid Rents.The;City fur- in rreserves the right after open ing bids to miect Signature any or all bids,or to waive any minor informality (non-responsiveness)in a bid.The award pithe contract is subject to the apprevabof th'e Federal Aviation Administration. he Sponsor further reserves the right to negotiate changes;with the low bidder in the scope of project,e,dantof the work,onto increase or decrease Uie.siie[of the project,if so desired,all to the best interest of the Owner,prior to award of the contract.Aflditional information is included in BID CONDITI�NSr .�.�'' q� Ib)As a condition of award,the sbi:ce. Didde� will be required to submR hoods hntl insurance, ,prior to the @xecution of the Ag2eme%i} 6y' the City.Failure To meet tliis'requirtment sfig(I oouafi- 04/18/2003 07:59 FAX 760 778 4731 The Desert Sun Class R 002 ba awarded to the near lowest niciam, .on �L BID SECURITY-Each bid shall be Bond iinn he j by o nt of cashier's check to Bid Bond in the . amount of 10 percentlto of City total bids price (all schedules), payable to the Bidder, i it Path'Springs, eas da guarantee that the Bidder,'rf it Bid,oaccept- Ins will promptly obtain the required Bonds and Insurance and well prepare the legteuq,submittal document and execute the Agiaement.l'',�1: ' BIDS TO REMAIN OPEN The Biddershall guar- antee the Total Bid Price for a period of 120 cal- endar days from the date ofBid Opodirifq. CONTRACTOR'S LICENSE CLASSIFICATION- In accordance with the provisions oA iCalifamia Public Contract Cade Section 3300,the City has determined that the Contractor shall possess a valid Class A.Contmctor License at th�time the Contract is awarded.Failure to possess)the spec- ified license shall render the bid as nonresponsive and sliall act as a bar to award of the Contract to any bidder not possessing said license at the time of award. The Contractor must be licensed,tc.rlo';business I in the City of Palm Springs in accordance with the gprovisions of Chapter 9, Division 3f:of 'the usiness and Professions Code,`and,will be required to.obtain a CityiConsbuction Permit No" Fee from the Building`'Depart inentyand/or-the Public'Works Inspection Supervispr,,ilCfty,,Hall, Palm Spnngs,California;11 1 1.-';- - STATEMENT OF.OUALIFICATIONS=•IEach'pro- posal must be accompanied by a statement of tha bidder's qualifications to pedonn 3he:waik con- templated.The Is errt ofOpalifications shall be prepared on the to attached hereto t i (a)State-Jn ar oalaCalnco i.n l h0,1773sions'of 1773.mla LaLicr Code Sem 77,,t b,' i 17or of 1773.E and ent of I as amend ied;tions h s,deter- mined of the Department of Industrial Relations has deter- mined the general prevailing rate ndard sat diem wages in 177 for the the standards set torah in Section rfor far the locality copy of in'j wa a rates do oto be performed.A copy of said wage rate's is on Ole all the Department of difo ta..I I s all City Hall, Palm Springs, tract r ito . shall be mandatory upon the Contractor to 'wham the Work is awarded and upon any,"sub!, an salor under the rates to all to pay not less'ihan said specified rates n all workers employed by them c16e execution of the Work,and shale•past a copy of said wage rotes of the project "e. as Fedora)-The general prevailing rate;ot wages, In to ini.by the Secretary th or am included s;provider as part a the Cdntmct Documents; provided,that U then) is any rate any between the State echaf Federal wage fate for any given craft or mechanic needed—to on the the work, a shall be ontratory,upa the Contractor and any suhconimctor,to Pay the higher of the two ratte5 :.:r;.�!il,;,.y'::i,t�;'f All labor an the project shall be peed nd�less Shan the minimum'wage rates established bi tha U.S. Secretary of.Labor. _ I TRADE RESTRICTIONS -All-sclicitatlons,can- tracts,and subcontracts resutting'irorn•projects funded under AIP,must contain the for?i9n trade restriction required by 49 CFR Part 90;Denial of Public'Works Contracts to:Sup'pliers picGoods and Services of Countries That Deny;ProcummepIl l Market Access to-U.S,Co[�tractoisiiy-'�l'±�a The Aviation Safety an Capac"ty ExPaps :Acti of 1990 provides that preference be given t,steel l and manufactured,.pmducts..producedliIn¢hej Untied States when funds are expended,grant pursuant! to a gnt issued under theAirport Impirovement Prognin.. }'{1r"41o},ljul'`"3,i8'nll:'.''o'`'±'"I EQUAL EMPLOYMENT OPPDYiTt1NIT_, AND AFFIRMATIVE ACTION REQUIREMENTS;-Each bidder must complete..sign and lure lr,prior to award of the contracq the'Bidders Stalergent oral Previous Contracts Subject_to-EEO.Clause", al "Certi oration of Nonsegm9aled Tacilities°, and the Assurance .of•Disad vent age$'I'Business Enterprise Participatiort:.as co id Proposal.These hems must be suhmhted with his or her bid. A Contractor having'50.�,ioS_more :employees and his or her subcontmetols having i$U cr.mom employees and whomay.heialvarcfed ntroct mf$50�000 or mare will he cared to 'rnaintain an affirmative action program t e stan- dards,for which ne corit uned In these'�pecifrca 'tong. ' The proposed coirtrn sit s under"and '&rNti(ectato " Executive Order.1124E as-:ameded of September 24,7965,- and to+„yrth }Jl,Equal, Employment Apportunity (EEOjdn„',!,,,eileml Labor Provia ns The EEO regUlfements�'?.labor provisions, a rates am,.lncluded,jin,;_the iivall- 04/18/2003 07:59 FAX 760 778 4731 The Desert Sun Class f�003 roamer Huaesa m�,o,„v,rya,-w,o. and manufacture The Aviation at an CapacitY,FxPonsion Act, of 1990 provides that Preto nce a given to steel ' 3 d,_products:�produced':,in the .: r. c�; United States whop tugdszm expended Pursuant) to grant issued❑ndod�,the,Airport Improvementi Program. EQUAL EMPLOYMENT"'OPPI)k17UNITY ANDS AFFIRMATIVE ACTION REQUIREMENTS-Each bidder Musttcomplete,.sign and furnish,prior to, award of the contract,the"Bidders Statement on' Previous Contracts Suhjact'to EEO Clause', a'' "Certification of Nonsegregated Facilities' and the 'Assurance of Disadvantagad-Business Enterprise Participation"as contained inthe Bid' Tn eplo ees and his or her subcontracts Proposal.These items must be submitted with his or, her bid. A' Contractor haying 50 or more I rs having ,�Stf,or more emplo00 or,d,who may heiawardetl $Apnlract,of 550,00 "or more will be required to metntain.an affirmative action program;the star- - - dalds for.which,are.contained in these spehifica-. hone . The propbsed'coptiact is or arid`-subJect.to Fxecutiyaw;Order 11246 "'as „amended; of Septemher; 24;195513aad to the_r Equal 'Employrrment ppportumiy (EEO) and Federal) Labor Provisions+Thp EEEO;requltemcnts; labor provisions;and.wage rates era mcluded in t e - specificationsan=,bid'documan and'am;avail - ablA,toc inspectibri at the Department'of Builtling and Safety,City Hall,Palm Springs Caldemia To be eligible for award,each bidder must comply with the aNnnative action requirements which are .contained In the specificatsm r < I Disadvantaged-Bull s Enterprises - defined in 49=CFR,Part 26 shall have the'maxi-i mum-,8pportuniry,�td'participate in ih'e pertonn-(' - ance�'ot;•;I�contracte'l:under:,this•agreemant.:. Consequently,lhd;OBE'iequirementsof 49 CFR� Part 28 appy,lo thisegroament.r ' Women will be.affortledY'equal"appartunity in all I - - - auras of emPI :Howeve;.tha employment:' r of women',shall'not'diminish the,standaMa of _ requirementfor-tho employmentof minorities.' RETAINAGE FROM PAYMENT-The Contractor' may elect to receive 100 percent payments due under the Contract Documents from time to time, without retention of any portion of the payment by the City,;.by depositing.securities of equivalent) value with the City in accordance with the provl- sions or Section'22300 of the Public Contract: Code. Such securities, if deposited by the i Cantractmt.shall,be valued by the City, whose',. decision on valuation of the securities shall he J' final.Securities eligible for Investment.under this t prevision shall be limited to those listed In Section 1 6430 of the Government Code or hank or savings . . _and loan certificates of deposit, ::'''=Q:.7...'.,,' "-.•:...•; ,. ADDRESS AND MARKING OF BIDS-The enve- :;, . lope enclosingg the Bid shall be sealed and _ -�addressed to the City of Palm Springs,and shall -be delivered or nralled to Harold E.Good,CPPO,, - __ Procurement,,.'Manage,,at 3200 East TA hquitr 1 Canyon Wa Pa1mS Tin s'CA 2262.Theeova='':',:::. - ....., airy .. . 6 P 9 , 8, I :. '�.laps o lal marked in upper - - - hwi b nl mark the off hand u P P PPe x calmer with the name and address of the Bidder I -- _-;and shall bear the words ROADWAY 'NORTHERLY TERMI NAL ACCESS.-. ROADWAY *�SECURITY - - ':RECONFIGURATION" for the PALMr SPRINGSONT - - iand our ofAo opening Bids. by erthedate or - :and hour of or Bid ends. all b certified or - - - - - - icashier's check or Bid Bond shall ha enclosed In - - - ithe same envelope with the Bid. ,PROJECT ADMINISTRATION'-AM communica- - bons relative to this Work shall be directed to Mr. - Rodger Sheraton,VSA AIRPORTS,Inc.,255 North _ - ` El Clan Road #419 Palm Springs, CA 92262, - phone 760.310-0200,fax 760.318-0838.All ques- tions relating to interpretation of the Contract - Documents or products must be submitted in writing, ten days prior to bid opening, and any responses will,be in the form of written addenda to the Documents. BY ORDER OF THE CITY OF PALM SPRINGS - DATE:February 18,2003 CITY OF PALM SPRINGS BY BY Allen F.Smoot,A.A.E. Executive Director-Airports' ...::.:. ... ....,,.. . .- . ...: .<.: State of Pal Springs,CA S t o California . PUB::February 21,March 6,2003 MINUTE ORDER NO. APPROVING AND ADOPTING THE PLANS, SPECIFICATIONS AND WORKING DETAILS, AND AUTHORIZING ADVERTISEMENT FOR CONSTRUCTION BIDS FOR CITY PROJECT #2002-20, SOUTHERLY TERMINAL ACCESS ROADWAY SECURITY RECONFIGURATION - 300' RULE IMPLEMENTATION AT THE PALM SPRINGS INTERNATIONAL AIRPORT. I HEREBY CERTIFY that this Minute Order, approving and adopting the plans, specifications and working details, and authorizing advertisement for construction bids for City Project#2002-20,Southerly Terminal Access Roadway Security Reconfiguration - 300' Rule Implementation at the Palm Springs International Airport, was adopted by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 5`h day of February, 2003. PATRICA A SANDERS City Clerk kz>