Loading...
HomeMy WebLinkAbout04642 - AL MILLER & SONS ROOFING CONVENTION CENTER CP02-19-08 OOC U 2003-530504 08/18/2003 08:00A Fee:NC Page 1 of 1 Recorded in Official Records County of Riverside Gary L. Orso Assessor, County Clerk & Recorder I IIIIII IIIII IIIIII III III I IIII IIIIII III IIIII IIII III Return To: City Clerk City of Palm Springs P.O. Box 2743 Palm Springs, CA 92263-2743 NOTICE OF COMPLETION NOTICE IS HEREBY given that: 1 The City of Palm Springs, California is a municipal corporation, organized and incorporated pursuant to the laws of the State of California. 2. The City Clerk of the City of Palm Springs is authorized and directed to execute, on behalf of said City, any and all Notices of Completion. 3. The address of the City of Palm Springs is City Hall, 3200 E Tahquitz Canyon Way, Palm Springs, California (P.O. Box 2743, Palm Springs, CA 92263-2743). 4. The public work of improvement on the hereinafter referred to real property within the city was COMPLETED on the 4 n day of June, 2003. 5. The name of the contractor (if named) for such work of improvement was: AI Miller & Sons Roofing, Inc.. 6. The public work improvement, which was completed in the City of Palm Springs, County of Riverside, State of California, is described as follows Palm Springs Convention Center Expansion—Phase I, City Project#02-19. 7. The property address or location of said property is: 797 E.Andreas, Palm Springs, CA 92262. _ City Project No: Agreement No: 4L,�j Z Minute Order No: 'Z 04 a'7 02-19 02-19-08 DATED. Z J03 CITY OF PALM SPRINGS By ( U'- Exe utt e Director-Airports PATRICIA A. SANDERS, being duly sworn, says: That she is the City Clerk of aforesaid City of Palm Springs, California, the corporation that executed the foregoing notice; that she makes this verification on behalf of said corporation; that she has read the foregoing Notice of Completion, and knows the contents thereof, and that the facts stated therein are true; that as said City Clerk, she makes this verification on behalf of said micfp° rporation. City t rk Index No. Al Miller Roofing Convention Ctr CP02-19-08 AGREEMENT #4642 Proj Admin signed 2-14-03 AGREEMENT m ' THIS AGREEMENT made this /'° day in the year 2003, by and between the City of Palm Springs, a charter city, organized and e; isting in the County of Riverside, under and by virtue of the laws of the State of California, hereinafter designated as the City, and, Al Miller Roofing hereinafter designated as the Contractor. The City and the Contractor, in consideration of the mutual covenants hereinafter set forth, agree as follows: ARTICLE 1 --THE WORK The Contractor shall complete the Work as specified or indicated under the Bid Schedule(s) of the City's Contract Documents entitled: Palm Springs Phase I Convention Center Expansion Roofing & Sheet Metal City Project No. 02-19 The Work is generally described as follows: provide all necessary labor, materials, equipment, hoisting, scaffolding, tools, rigging and anything else necessary to complete the work for the Palm Springs Phase I Convention Center Expansion. ARTICLE 2 -- COMMENCEMENT AND COMPLETION The Work to be performed under this Contract shall commence on the date specified in the Notice to Proceed by the City, and the Work shall be fully completed within the time specified in the Notice to Proceed. The City and the Contractor recognize that time is of the essence of this Agreement, and that the City will suffer considerable financial loss if the Work is not completed within the time specified in said Notice to Proceed, plus any extensions thereof allowed in accordance with Article 12 of the General Conditions. The damages suffered by the City would be extremely difficult or impractical to determine in the event of a Breach by the Contractor. Accordingly, the City and Contractor agree that the Contractor shall pay the amount provided below, as liquidated damages, for each calendar day that the Work is not completed in the time set forth above: $1,000.00 ARTICLE 3 -- CONTRACT PRICE The City shall pay the Contractor for the completion of the Work, in accordance with the Contract Documents, in current funds the Contract Price(s) named in the Contractor's Bid and Bid Schedule(s).���' �� �+ ARTICLE 4 --THE CONTRACT DOCUMENTS The Contract Documents consist of the Notice Inviting Bids, Instructions to Bidders, the accepted Trade Bid and trade Bid Schedule(s), List of Subcontractors, Non-collusion Affidavit, Bidder's General Information, Bid Security or Bid Bond, this Agreement, Worker's Compensation Certificate, Performance Bond, Payment Bond, Notice of Award, Notice to Proceed, Notice of Completion, General Conditions of the Contract, Supplementary General Conditions, Exhibits A through G, Construction Drawings and Specifications, Addenda numbers 1 to 3, inclusive, and all Change Orders and Work Change Directives which may be delivered or issued after the Effective Date of the Agreement and are not attached hereto. ARTICLE 5 -- PAYMENT PROCEDURES The Contractor shall submit Applications for Payment in accordance with provisions of the Standard Specifications as amended by the Special Provisions. Applications for Payment will be processed by the City as provided in the Contract Documents. ARTICLE 6 -- NOTICES Whenever any provision of the Contract Documents requires the giving of a written Notice, it shall be deemed to have been validly given if delivered in person to the individual or to a member of the firm or to an officer of the corporation for whom it is intended, or if delivered at or sent by registered or certified mail, postage prepaid, to the last business address known to the giver of the Notice. ARTICLE 7 -- MISCELLANEOUS Terms used in this Agreement which are defined in the Standard Specifications as amended by the Special Provisions will have the meanings indicated in said Standard Specifications and Special Provisions. No assignment by a party hereto of any rights under or interests in the Contract Documents will be binding on another party hereto without the written consent of the party sought to be bound; and specifically, but without limitation, monies that may become due and monies that are due may not be assigned without such consent (except to the extent that the effect of this restriction may be limited by law), and unless specifically stated to the contrary in any written consent to an assignment, no assignment will release or discharge the assignor from any duty or responsibility under the Contract Documents. The City and the Contractor each binds itself, its partners, successors, assigns, and legal representatives, to the other party hereto, its partners, successors, assigns, and legal representatives, in respect of all covenants, agreements, and obligations contained in the Contract Documents. (Signatures on Next Page) IN WITNESS WHEREOF, the parties have executed and entered into this Agreement as of the date first written above. CITY OF PALM SPRINGS ATTEST: a municipal corporation ' d P \By:< t.; -ii.._ .. C:c_._i( If1 L t /L By: / City Clerk ''' $`(� City Manager E Agreement over/under $25,000 APPROVED AS TO FORM: Reviewed and approved by Procurement & Contracting By: "= City Attorne Initials L6­ Date P.O. Number CONTRACTOR: Check one:_Individual_Partnership Corporation Corporations require two notarized signatures: One from each of the following: A. Chairman of Board,President,or any Vice President:AND B.Secretary,Assistant Secretary,Treasurer,Assistant Treasurer,or Chief Financial Officer). By. / �/� L s 1 Signatdrre(notarized) Signature (notarized) S 1 Name: d ;� G Name: 1 Title: 'a fS`tA.r.��'.lfk. Title: 1 r State of`R�l� State of County of ` Jss County of r ss On\\ t6 o Q a' before me, ff�� (�\\\ �— On �`�7, before me, ' personally appeared Qr r \• personally appeared personally known to me (or proved to me on the basis of personally known to me (or proved to me on the basis of s tisfactory evidence) to be the person(s) whose name(s) satisfactory evidence) to be the person(s) whose names) s(sre subscri ed to the within instrument and acknowledged is re subscribed to the within instrument and acknowledged to me that 0 e/ he/[hey executed thesame in Oar me that 11& hishe/they executed the same in er/their authorized capacity(ies), and that by is/ er/their signature(s) authorized capacity(ies), and that by is er/their signature(s) on the instrument the person(s), or the entity upon behalf of on the instrument the person(s), or the entity upon behalf of which the person(s)acted,executed the instrument. which the person(s)acted,executed the instrument. WITNESS my hand and official seal. WITNESS my hand and official seal. Notary Signature: �• � d� Notary Signature: Notary Seal: Notary Seal: ar"" " RIE HARE rr r. GENE ,quvn .......uun................HARE +. COmm.$1282120 > GENE MARIE HARE Notary Public-Califomla',D w Comm.51282120 7i �' x r ° Riverside County Noiary Public-Califomip'�a My Commission Explfes� Riverside County z November 24,2004 r My Commission Ex Ifes� pp .n wuuu upr um a ruu uuuuu7 November 24,2004 �e oerererunrrnnururuuuurrnnrrnma W J V �qaf �� � `�i, ., -, _ �. -.. .,�,.l,f,L..., , . i�i',r .� r' ��;' Bond #BD 471881 s Premium: $510.00 annually PERFORMANCE BOND KNOW ALL MEN BY THESE PRESENTS, That AL PITLLER & SONSaMW4 &r�• NATIONWIDE P!UTUAL INSURANCE COMPANY , as Surety,are held firmly bound unto the City of Palm Springs,a Charter City,organized and existing in the County of Riverside, California,hereinafter called the"City,"in the sum of:Thirty Three Thousand Nine Hundred Eighty ($33.980.00) dollars for the payment of which sum well and truly to be made,we bind ourselves, our heirs, executors, administrators,successors,and assigns,jointly and severally, firmly by these presents. WHEREAS said Contractor has been awarded and is about to enter into the annexed Agreement with said City to perform the Work as specified or indicated in the Contract Documents entitled: PALM SPRINGS Phase I Convention Center Expansion CITY PROJECT 02-19-5 ROOFING&SHEET METAL NOW THEREFORE, if said Contractor shall perform all the requirements of said Contract Documents required to be performed on its part,at the times and in the manner specified herein,then this obligation shall be null and void, otherwise it shall remain in full force and effect. PROVIDED,that any alterations in the Work to be done or the materials to be furnished,or changes in the time of completion, which may be made pursuant to the terms of said Contract Documents,shall not in any way release said Contractor or said Surety thereunder,nor shall any extensions of time granted under the provisions of said Contract Documents,release either said Contractor or said Surety,and notice of such alterations or extensions of the Agreement is hereby waived by said Surety. SIGNATURES ON NEXT PAGE SIGNED AND SEALED,this 15 Lh day of January , 9t 2003 Contractor AL DIILLER & SONS ROOFING Inc. Contractor AL MILLER & SONS ROOFING INC. By Y By ✓ i Title Title Corporations require two notarized signatures: One from each of the following: 1. Chairman of Board, President, or any Vice President: AND 2. Secretary, Assistant Secretary, Treasurer, Assistant Treasurer, or Chief Financial Officer). SEAL AND NOTARIAL ACKNOWLEDGMENT OF SURETY Zw Surety NA ANCE C011? BY \'err �=Ja�- Title Att rnev—in—Fact d { State of NIGHT THUMBPRINT(OPTIONAL) O i; County of w II it ¢ s On 1 d�1�3 before me, j 1 A 1 INAMEI TL,i VANE�� 3...... Y PGBLI "I o I) personally appeared o j INAMEI 1 I NENI a personally known to me or proved t e on the basis of satisfactory evidence ;I j to be the person(s) whose nap s Is re subscribed to the within "nstrument �r#'November num muuuunand acknowledged to me that h h they executed the same in is er/their itiGENE MARIE HAREauthorized capacity(ies), and that b is er/their signature(s) on the Instrument Comm.#tze2tzo '�the person(s), or the entity upon beh of which the person(s) acted, executed Ntary Public-cahfornlobthe instrument. aRiverside county 242004sWrt smy hand and officials a """"""°'.°^ I j 1 —1 N TA YI (SEAL) PAYMENT BOND KNOW ALL MEN BY THESE PRESENTS, That NATIONWIDE HUTUAL INSURANCE COMPANY as Surety, are held firmly bound unto the City of Palm Springs, a Charter City,organized and existing in the County of Riverside, State of California, hereinafter called the "City," in the sum of: Thirty Three Thousand Nine Hundred Eighty($33 980 00) dollars, for the payment of which sum well and truly to be made, we bind ourselves,our heirs, executors,administrators, successors, and assigns,jointly and severally, firmly by these presents. WHEREAS, said Contractor has been awarded and is about to enter into the annexed agreement with said City to perform the Work as specified or indicated in the Contract Documents entitled: PALM SPRINGS Phase I Convention Center Expansion CITY PROJECT 02-19-8 ROOFING&SHEET METAL NOW THEREFORE, if said Contractor, its subcontractors,its heirs,executors, administrators, successors, or assigns shall fail to pay for any materials,provisions,provender, equipment or other supplies used in,upon, for or about the performance of the Work contracted to be done, or for any work or labor thereon of any kind,or for amounts due under the Unemployment Insurance Code,or for any amounts required to be deducted, withheld, and paid over to the Employment Development Department from the wages of employees of the Contractor and its subcontractors pursuant to Section 13020 of the Unemployment Insurance Code with respect to such labor, all as required by the provisions of Title XV,Chapter 7,Sections 3247-3252, inclusive,of the Civil Code of the State of California and acts amendatory thereof, and sections of other codes of the State of California referred to therein and acts amendatory thereof,and provided that the persons,companies,or corporations so famishing said materials, provisions,provender,equipment or other supplies,appliances or power used in,upon,for or about performance of the work contracted to be executed or performed,or any person,company or corporation renting or hiring implements or machinery or power for or contributing to said work to be done,or any person who performs work or labor upon the same,or any person who supplies both work and materials therefor, shall have complied with the provisions of said laws,then said surety will pay the same in an amount not exceeding the sum hereinbefore set forth and also will pay, in case suit is brought upon this bond,a reasonable attorney's fee, as shall be fixed by the Court. This bond shall inure to the benefit of any and all persons named in Section 3181 of the Civil Code of the State of California so as to give a right of action to them or their assigns in any suit brought upon this bond. PROVIDED,that any alterations in the Work to be done or the materials to be furnished,or changes in the time of completion,which may be made pursuant to the terms of said Contract Documents, shall not in any way release said Contractor or said Surety thereunder,nor shall any extensions of time granted under the provisions of said Contract Documents release either said Contractor or said surety,and notice of said alterations or extensions of the Agreement is hereby waived by said Surety. SIGNATURES ON NEXT PAGE SIGNED AND SEALED, this 15th day of January 49c 2003 Surety N IO TWIDE MU UA INSURANCE OMPANY Contractor AL MILLER & SONS ROO,PIIIG INC. � ) By By Title Attorney-in-Fact Titleii Cif (SEAL AND NOTARIAL ACKNOWLEI OFSURETY) Contractor AL MILLER & SONS ROOFING INC. By_ �✓` � • Title / Corporations require two notarized signatures: One from each of the following: 1. Chairman of Board, President, or any Vice President: AND 2. Secretary,Assistant Secretary,Treasurer,Assistant Treasurer, or Chief Financial Officer). i State of ° a {� RIGHT THUMBPRINT(OPTIONAL) I County of It f it 1 w I On 6 before me, 1 A INA /TIT "JANE D E.N TARY PDBLI "I o If personally appeared S I , , INAMEI 1 F NERI II ~ II If personally known to me or proved to a on the basis of satisfactory evidence to be the persons) whose na s) s/ re subscribed to the withi nstrument i and acknowledged to me tha he Fj they executed the same in his er/their 11 "".' GENE MARIE HARE �{y, Comm.9;1282120 authorized capacity(ieS), and that b his her/their Slgnature(s) on the Instrument ai Notary Public-Callfornio'Ip f 3 the person(s), or the entity upon beha of which the person(s) acted, executed Riverside County t the instrument. Z '^My Commission Expires i ' No sembeo 24.2004 ; o +umew d vve vvv Wi e s my hand \and �official sea " ev, neu, lNqT E F N TAFYI -- — \�` -- (SEAL) WOLCOTT S THREE ALL PURPOSE ACKNOWLEDGMENTS classprice 01994 WOLCOTTS FORMS,INC ENTS WITH FINGERPRINTS IIIIIIIIIIIII IIIII IIIII III IIII 7 67775 63238 5 ;i t4877 Power of Attorney KNOW ALL MEN BY THESE PRESENTS THAT Nationwide Mutual Insurance Company, a corporation organized under the laws of the Stale of Ohio, with its principal office in the City of Columbus, Ohio, hereinafter called "Company', does hereby make, constitute and appoint PAUL W. LEWIS DIANE M. NIELSEN ANN WILLARD PALM DESERT CA each in their individual capacity, its true and lawful Attorney-In-Fact with full power and authority to sign,seal, and execute in its behalf any and al] bonds and undertakings and other obligatory instruments of similar nature in penalties not exceeding the sum of FIVE HUNDRED THOUSAND AND NO/100 DOLLARS S 500,000.00 and to bind the Company thereby, as fully and to the same extent as if such instruments were signed by the duly authorized officers of the Company; and all acts of said Attorney pursuant to the authority hereby given are hereby ratified and confirmed. This Power of Attorney is made and executed pursuant to and by authority of the following resolution duly adopted by the Board of Directors of the Company. "RESOLVED, that the President, or any Senior Vice President, Resident Vice President or Second Vice President by,and the same hereby is, authorized and empowered to appoint Attorneys-In-Fact of the Company and to authorized them to execute any and all bonds, undertakings, recognizances, contracts of indemnity, policies, contracts guaranteeing the fidelity of persons holding positions of public or private trust, and other writings obligatory in nature which the business of the Company may require; and to modify or revoke, with or without cause, any such appointment or authority. The authority granted hereby shall in no way limit the authority of other duly authorized agents to sign and countersign any of said documents on behalf of the Company." -RESOLVED FURTHER, that such Attorneys-In-Fact shall have full power and authority to execute and deliver any and all such documents and to bind the Company,subject to the terms and limitations of the power of attorney issued to them, and to affix the seal of the Company thereto, provided,however, that said seal shall riot be necessary for the validity of any such documents." This Power of Attorney is signed and sealed by facsimile under and by the following By-Laws duly adopted by the Board of Directors of the Company. ARTICLE VIII "Section 10. Execution of instruments . Any Vice President and any Assistant Secretary or Assistant Treasurer shall have the power and authority to sign or attest all approved documents, instruments, contracts or other papers in connection with the operation of the business of the company in addition to the Chairman and Chief Executive Officer, President,Treasurer and Secretary; provided,however, the signature of any of them may be printed,engraved or stamped on any approved document,contract,instrument or other papers of the Company. IN WITNESS WHEREOF, the said Nationwide Mutual Insurance Company has caused this instrument to be sealed and duly attested by the signature of its Vice President the 28th day of April, 1999. "NA ACKNOWLEDGMENT A�r' By: �" ' `� `^� �iQSEAL STATE OF IOWA Vice President COUNTY OF POLK SS 'Q...us. SLq��� a�1 On this 28th day of April, 1999, before me came the above named Vice President for Nationwide Mutual Insurance Company, to me personally known to be the officer described in and who executed the preceding instrument, and he acknowledged the execution of the same,and being by me duly sworn,deposes and says,that he is the officer of the Company aforesaid, that the seal affixed thereto is the corporate seal of said Company, and the said corporate seal and his signature were duly affixed and subscribed to said instrument by the authority and direction of said Company.��C�� nn awi 'o�wmm a Notary Public My Commission expires March 24, 2002 CERTIFICATE 1, John F. Delaloye, Assistant Secretary of Nationwide Mutual Insurance Company, do hereby certify that the Resolution included herein is a true and correct transcript from the minutes of the meeting of the Board of Directors duly called and held on the 6th day of September, 1967,and the same has not been revoked or amended in any manner;that said Douglas L. Andersen was on the date of the execution of the foregoing Power of Attorney the duly elected Vice President of Nationwide Mutual Insurance Company and the corporate seal and his signature as Vice President were duly affixed and subscribed to the said instrument by the authority of said Board of Directors. IN WITNESS WHEREOF, I have hereunto subscribed my name as Assistant Secretary, and affixed the corporate seal of said Company this day ofAr;� / 0 20213 This Power of Attorney expires Assistant Secretary Bd 1 (04 07/07/0300)00 FY use STATE OF CALIFORNIA COUNTY OF RIVERSIDE ON 2003 BEFORE ME, YVONNE R. ORTIZ - NOTARY PUBLIC, PERSONALLY APPEARED ANN WILLARD personally known to me (or proved to me on the basis of satisfactory evidence) Y�17t3idE evid to be _ '"YV9NE R. .c��RTIZ p} the person(s) whose name(s) is/are subscribed commisaion fs 1240129 to the within instrument and acknowledged R Notary Public-California € a Riverside county to me that he/she/they executed the same in gfjcomrn.E!4pi�z Cd 30,200 his/her/their authorized capacity(ies), and that by his/her/their signature(s) on the instrument the person(s) or the entity upon behalf of SEAL which the person(s) acted, executed the instrument. WITNESS my hand and official seal. Signature ALL PURPOSE ACKNOWLEDGMENT TRADE BID SCHEDULE Lump Sum Price for Construction of The Palm Springs Convention Center Expansion Phase I Project No. 02-19 in the City of Palm Springs, California TRADE BID PACKAGE NO.: 8 TRADE BID PACKAGE DESCRIPTION: Roofing & Sheet Metal TOTAL BID PRICE - (INCLUDING PERFORMANCE AND PAYMENT BOND PREMIUM) - $y�_ o Win in figures Thirty 'Three Thousand Nine Hundred Eighty Dollars and No Cents; Pnce in words J Pnce m words BIDDER: Al le, BY: j nature f / TITLE(-(!neral Manager DATE: 12/17/02 City of Palm Springs TRADE BID SCHEDULE - LUMP SUM PRICE TRADE BID FORMS - 3 TRADE BID TRADE BID PACKAGE# 8 TRADE DESCRIPTION Roofing & Sheet Metal BID TO: CITY OF PALM SPRINGS, CALIFORNIA The undersigned Bidder proposes and agrees,if this Bid is accepted,to enter into an Agreement with the City of Palm Springs in the form included in the Contract Documents (as defined in Article 4 of the Agreement) to perform the Work as specified or indicated in said Contract Documents entitled,TRADE BID FOR: PALM SPRINGS CONVENTION CENTER EXPANSION PHASE I PROJECT NO. 02-19 Bidder accepts all of the terms and conditions of the Contract Documents,including without limitation those in the Notice Inviting Bids and Instructions to Bidders, dealing with the disposition of the Bid Security. This Bid will remain open for the period stated in the Notice Inviting Bids unless otherwise required by law. Bidder will enter into an Agreement within the time and in the manner required in the Instructions to Bidders,and will furnish the insurance certificates, Payment Bond, Performance Bond, and Permits required by the Contract Documents Bidder has examined copies of all the Contract Documents including the following Addenda (receipt of which is hereby acknowledged): Number f Date 12/02/02 Number 2 Date 12/06/02 Number 3 Date 12/12/02 Number Date Bidder has familiarized itself with the nature and extent of the Contract Documents,the Work,the site,the locality where the Work is to be performed, the legal requirements (federal, state, and local laws, ordinances, rules, and regulations), and the conditions affecting cost, progress or performance of the Work and has made such independent investigations as Bidder deems necessary. In conformance with current statutory requirements of California Labor Code Section 1860,at seq.,the undersigned confirm the following as its certification: I am aware of the provisions of Section 3700 of the Labor Code which require every employer to be insured against liability for worker's compensation or to undertake self insurance in accordance with the provisions before commencing the performance of the Work of this Contract. To all the foregoing,and including all Bid schedule(s),List of Subcontractors,Non-collusion Affidavit,Bidder's General Information, and Bid Bond contained in these Bid Forms, said Bidder further agrees to complete the Work required under the Contract Documents within the Contract Time stipulated in said Contract Documents,and to accept in full payment therefore the Contract Price based on the Lump Sum or Unit Bid Price(s) named in the aforementioned Bidding Schedule(s). -� Date: 12/17/02 Bidder: Al Miller & Sons Roofing, lncf� By: R i`se Mi er �su�•,�,•i Title: Gen al Manager TRADE BID TRADE BID FORMS - 2 BIDDER'S GENERAL INFORMATION The Bidder shall furnish the following information. Additional sheets shall be attached as required. Failure to complete Item Nos. 1, 3, and 8 will cause the Bid to be non-responsive and may cause its rejection. In any event,no award will be made until all of the Bidder's General Information(i.e. Items 1 through 9, inclusive)is provided to the City. 1. BIDDER/CONTRACTOR'S name and street address: Al Miller & Sons Roofing Inc. 68-760 Summit Drives Cgt-harlrgl Ciry CA 9 234 Name of Licensee, RMO', or RME' C. A Miller er 2. CONTRACTOR'S telephone number: ( 760 ) 328-6616 3. CONTRACTOR'S license: Primary Classification C39 State License Number 336547 Expiration Date 07/4142004 Supplemental license classifications: C39 HIC Name of licensee and RMO' or RME2, if different from line (1), above 4. Name of person who inspected the site of the proposed Work for the Bidder: Name: John Lamons Date of inspection: 12/04/02 5. Surety Company and Agent who will provide the required Bonds on this Contract: Name of Surety Paid by rashier's ehprk in the r of $3, C 9 A On Address Palm Desert National Bank 73-745 El Paseo, Palm Desert, CA 92260 Surety Company Agent Telephone Numbers: Agent( ) Surety ( ) 'Responsible Management Officer Responsible Management Employee BIDDER'S GENERAL INFORMATION City of Palm Springs BID TRADE FORMS - 7 BIDDER'S GENERAL INFORMATION (Continued) 6. ATTACH TO THIS BID the experience resume of the person who will be designated as General Construction Superintendent or on-site Construction Manager for the Contractor. 7. ATTACH TO THIS BID a financial statement,references,and other information, sufficiently comprehensive to permit an appraisal of Contractor's current financial condition. 8. ATTACH TO THIS BID a list of 3 projects completed as of recent date involving work of similar type and complexity, listing the following data for each project: (1) Project Name Fsmeralda Ballroom Contract Price $203,000.00 Name, Address, and Telephone Number of Owner's Project Representative X.D. Olson 2955 Main St. , 'Third Floor, Irvine, CA 92614 949-474-2001 (2) Project Name Parking Structure Contract Price $23,000.00 Name, Address, and Telephone Number of Owner's Project Representative City of Palm Springs (3) Project Name Palm Springs 'Tramway Contract Price $57,000.00 Name, Address, and Telephone Number of Owner's Project Representative Palm Springs Aerial Tramway One Tramway Road, Palm Springs. CA 92262 17E-1391 BIDDER'S GENERAL INFORMATION City of Palm Springs BID TRADE FORMS - 8 OF PALM S City of Palm Springs Department of Procurement and Contracting C P 3200 Tahquirz Canyon Way • Palm Springs, California 92262 qI I F0?, TEL: (760)323-8239 . FAX(760) 322-8372 • TDD(760) 864-9527 CITY OF PALM SPRINGS 3200 East Tahquitz Canyon Way Palm Springs, CA 92262 NOTICE TO ALL TRADE CONTRACTORS PHASE I EXPANSION OF THE PALM SPRINGS CONVENTION CENTER CITY PROJECT#02-19 ADDENDUM NO. 1 This Addendum is being issued for the following changes and informational items: SUMMARY OF CHANGES: This Addendum includes: 1. Change: (All Trades) Change bid date from December 10, 2002 to December 17, 2002. 2. Add: (All Trades) Section 19 to Instructions to Bidders - Construction Manager's Administration. 3. Add to Supplemental General Conditions (All Trades) Item 2A. 4, Add Exhibit"H" OSHA 30 Hour Policy (designated Trades). 5. Change Instructions to Bidders Section 8 Bid Form. (All Trades) 6. Informational: Scopes to be provided Monday, December 9, 2002. (All Trades) 7. Informational: Anticipated Project Schedule is available on the City's web site. 8. Informational Lists: (A) List of Pre-qualified Trade Contractors for those trades requiring pre-qualification and attendance at the mandatory pre-bid conference Post Office Box 2743 0 Palm Springs, California 92263-2743 (B) List of Trade Contractors who attended a Mandatory Pre-Bid Conference for applicable trades which did not require pre-qualification. 9. Delete Bid Package 16 - Fabric Sound Panels from the Notice Inviting Bids, DESCRIPTION OF CHANGES 1. Change Bid Date: A. Change Notice to Pre-Qualified Trade Contractors for the following trades: Trade Bid #1 Selective Demolition, Trade Bid #6 Structural Steel, Metal Decking & Miscellaneous Metals, Trade Bid #13 Metal Stud Framing & Drywall, EIFS, Insulation & Fireproofing, Trade Bid #28 Kitchen Equipment, Trade Bid#29 Plumbing,Trade Bid#30 HVAC,Trade Bid#31 Fire Protection and Trade Bid #32 Electrical, published in the Desert Sun on November 11 and November 16, 2002: Change Date and Time of Opening Bids from 2:00 p.m., local time, December 10, 2002 to 2:00 p.m., local time, December 17, 2002. B. Change Notice to Trade Contractors for the following trades: Trade Bid #4 Concrete & Reinforcing, Trade Bid #8 Roofing & Sheet Metal, Trade Bid #9 Doors, Frames& Hardware,Trade Bid#15 Acoustical Ceiling,Trade Bid#16 Fabric So&Wallcovering and Trade Bid#21 FRP,published in the Desert Sun on November 11 and November 16, 2002: Change Date and Time of Opening Bids from 3:00 p.m., local time, December 10, 2002 to 3:00 p.m., local time, December 17, 2002. C. Change Notice to Trade Contractors for the following trades: Trade Bid #5 Masonry,Trade Bid#10 Overhead Coiling Doors,Trade Bid#14 Ceramic Tile, Trade Bid #25 Dock Equipment: Change Date and Time of Opening Bids from 4:00 p.m., local time, December 10, 2002 to 4:00 p.m., local time, December 17, 2002. 2. Add Article 19 to Instructions to Bidders - Administration of Trade Contracts under Construction Manager as follows: Article 19.0 Administration of Trade Contracts under Construction Manager. 19.a. Work is to be performed in accordance with the Construction Manager's Project Construction schedule. A detailed schedule and corresponding Schedule of Values will be required from all Contractors within 10 days from award of Contract, and will be used in developing, updating and modifying the Construction Manager's Project Construction schedule. Trade Contractors will acknowledge that the Project Construction Schedule will include"out of sequence," and "phasing" of the work. Trade Contractor shall provide a three (3) week look ahead schedule of its work on a weekly basis. 19.b. Complete submittal log and packages including fabrication and delivery lead times shall be submitted to Construction Managerwithin 10 days of award of the Contract. 19.c. MSDS sheets shall be provided the Construction Manager and maintained on site for the duration of the Project. All trade contractors shall include handling material in accordance with the MSDS. 19.d. Trade Contractor acknowledges that he has visited the site and familiarized itself with the existing conditions,including phasing ofwork,which may influence the Work.Trade Contractor also warrants that he has reviewed the Contract Documents prior to execution of the Contract and has notified the Construction Manager of all conflicts contained therein that could affect cost, schedule or quality. If conflicts are found after the execution of the Contract, Contractor shall perform the Work in accordance with the Construction Manager's direction for no change in Contract Price or Time. 19.e. Trade Contractors shall be responsible for coordinating theirwork with other Trade Contractors scopes of work. Trade Contractors shall review and study the Drawings and Specifications, submittals, and shop drawings of the Work of other Trade Contractors with respect to the coordination of their work with these other Trade Contractors. 19.f. Trade Contractor shall schedule the work and the presence of it's employees at the job site and any deliveries of supplies or materials by it's material men and suppliers to the job site on such days and at such times and during such hours, as may be required by the Construction Manager. Trade Contractor shall assume responsibility for such schedule compliance not only for it's employees,but also for its material men,suppliers and subcontractors. 19.g. Trade Contractor shall be responsible for the cost of expediting all deliveries of his materials to meet the requirements of the Construction Manager's progress schedule. Should it become necessary, in order to maintain job progress, for the Construction Manager to augment the Trade Contractor's expediting efforts, all such costs incurred by the Construction Manager shall be borne by the Trade Contractor. 19.h. Trade Contractor agrees that it will notify its employees and related personnel, via written handouts, that the use of illegal drugs, intoxicating beverages, and firearms or other weapons on the site is prohibited. 19.i. Strikes (including sympathy strikes)or any other stoppage of work by employees performing the work on, or delivering supplies or materials to,the Project shall not excuse any delay of the Trade Contractor in the proper performance of its work, regardless of whether the strike or other stoppage of work is attributed to union action or the decision of an individual employee. 19.j. No publicity releases (newspaper, radio, TV, advertisements, etc.) shall be issued without the prior review of the Owner and of the Construction Manager. No signs, other than field office identification signs, will be permitted. 19.k. Trade Contractor shall be responsible to continually update sepia drawings (with draftsman quality)of the working Drawings, large scale detail drawings,and specifications to show any and all field changes thereon. Sepia drawings shall be maintained in the Construction Manager's field office. Plumbing, Fire Protection,Mechanical,and Electrical Trade Contractors shall provide copies of the current as built drawings with their monthly payment requests. Payment requests will not be processed without these updated drawings. 19.1. Final Payment will not be processed by Construction Manager unless all required Record Drawings, As-Built Drawings, Operations and Maintenance Manuals, Guarantee/Warranty Letters, Care and Maintenance information, and all other Close-Out Documents are inventoried, approved, transmitted to and received by the Construction Manager. 19.m. The Trade Contractor shall furnish to Construction Manager,on a daily basis, a report of the total number of his workers employed on the job, hours worked, and a detailed description of the work performed by his own forces or that of his subcontractors. Contractor shall include copies of their job site toolbox meeting minutes, including participants sign in sheet. 19.n. Trade Contractor shall be responsible for providing off-site storage facilities for his own materials at its cost. The storage of materials and equipment at the site shall be permitted only to the extent approved by the Construction Manager in advance. Location of Trade Contractor's items of storage, plant and tools requires approval from Construction Manager. 19.o. Electrical power will be provided on the site for the use of the Trade Contractors for the operation of small tools. Trade Contractors shall provide extension cords from distribution points.Temporary power will be provided by the electrical Trade Contractor. 19.p. Minimum temporary lighting will be provided to maintain the foot candle coverage required by law. Contractors are each required to provide their own necessary task lighting. Temporary lighting will be provided by the Electrical Trade Contractor. 19.q. Trade Contractor will be responsible for ventilating any hazardous, combustion, or other pollutant causing equipment or material, within the area(s) of Work, including all ventilation required by the MSDS. 19.r. Trade Contractor shall give the Work constant attention,management, and supervision through an authorized Superintendent and all necessary assistants. Such Superintendent shall be authorized to act for the Contractor in all matters relating to the Work, and all directions,given him shall be binding.Trade Contractor must provide Contact name and emergency phone number to Construction Manager prior to commencement of work. 19.s. Trade Contractor shall be responsible to provide all scaffolding, toe boards, temporary shoring (engineered if required), ladders, scissor lifts, or any other equipment, including hoists, necessary to complete their work. Trade contractor shall ensure that all its employees,and subcontractor's shall be OSHA trained in the use of the equipment. 191 All equipment to be used indoors must be approved by the Construction Manager prior to the commencement of work. 19.u. Movement of all vehicles and equipment into and on the site,including unloading, shall be subject to the control of the Construction Manager (including the flow of traffic patterns). Individual Contractors shall be responsible for observing established traffic regulations and for providing flagmen, as required, to prevent disruption to general traffic by his vehicle, equipment or operations. Trade Contractor is responsible for clearing all debris from streets, parking lots, or public areas resulting from its operations. 19.v. Temporary toilets will be provided for use of all workers. The restrooms within the Convention Center and adjoining Hotel are not to be used by Construction Personnel. Temporary toilets shall be provided by the Plumbing Trade Contractor. 19.w. Temporary safety fencing and barricades may not be moved and/or altered without the prior consent of the Construction Manager. 19.x. Parking will only be allowed in designated areas. There will be NO Construction parking in the general lots forthe Convention Centeror adjoining Hotel. Those vehicles found in violation of this policy, will be immediately towed from site,with the Owner of the vehicle held responsible for towing and storage costs. 19.y. Radios,tape recorders, cameras, video cameras, or any other audio or visual equipment are not permitted on the job site. 19.z. The display of any offensive pictures,words(including foul language), etc, on the job site is strictly prohibited and will be grounds for removal of the responsible personnel from the job site. 19.aa. Smoking, or smokeless tobacco, are not permitted on the job site (inside or out). Smoking will only be allowed in a designated area to be determined by the Construction Manager. Violation of this item may result in expulsion of individual(s)from the Project and/or monetary fines. 19.bb. Consumption of food and beverage on the Project will be limited to areas as designated by Construction Manager. There will be absolutely no food or drink allowed within the building. 19.cc. There will be no Communications with Conventioneers, Hotel guests, staff or Convention Center personnel, unless a safety item is at issue. 19.dd. Trade Contractors shall be responsible to protect all existing, or completed finishes. Trade Contractor will bear the costs for restoration, disinfection,cleaning,and/or replacement any areas damaged by their Work. 19.ee. Neither the Owner, nor the Construction Manager will be providing Guard Service for the job site. The Trade Contractor has the liability for any loss or damage to their tools, equipment or materials as a result of vandalism and/or theft. 19.ff. Trade Contractor shall directly arrange and call for all inspections required by the City, or other municipal agencies, as required, but will inform the Construction Manager in advance of said inspections.All permit plans and permits will be delivered to the Construction Manager. 19.gg. Trade Contractor's Foreman/Superintendentwill be required to attend weekly Safety/Coordination Meetings at a location on the site designated by the Construction Manager. 19.hh. Appropriate clothing and accessories shall be worn at all times.This includes, but is not limited to, work boots, eye protection, hard hats, etc. Shorts, sleeveless shirts or tank tops are not allowed. 19.ii. Positioning devices (body belts), used as a sole means or method of tie-off for fall protection compliance,without the use of an approved full body harness will not be permitted at any time. 19.jj. Only the use of approved lanyards having an approved deceleration device which complies with OSHA Standard: Fall Protection, 29 CFR 1926, in conjunction with an approved full body harness with D-ring at shoulder level, will be permitted as approved fall arrest system at any time. 19.kk. Use of roll-out, non-locking connector type snap hooks is prohibited for use at any time. 19.11. Construction Manager has developed a Project Construction Schedule that shows contract duration and approximate phasing, sequencing and relationships of the Work. This schedule is based on the Construction Manager's Schedule concepts developed prior to the start of Construction. The Project Construction Schedule is subject to change and update pending discussion, modifications, acceleration after receipt of each Trade Contractor's schedule, weekly schedule updates, and its submittal, material and equipment fabrication and delivery lead times following the award of the Contract and commencement of the Work. 19.mm It shall be the responsibility of the Trade Contractorto become familiar with the updated Schedule(s) and shall, at all times, cooperate with the Construction Manager to keep on the premises sufficient material, supervision, and manpower to perform the Work of their Contract in keeping with the Project Construction Schedule. 3 Add to Article 2 of Instructions to Bidders the following: 2.a. Bidders are assumed to be knowledgeable of their respective Trades of work and shall include all requirements to complete a complete, fully functional, code complying system readyfor its intended use as described by the Construction Documents 4. Add Exhibit"H" OSHA 30 Hour Policy, for trades designated in the exhibit, attached. 5. Change Instructions to Bidders, Section 8, Bid Form. Replace existing second paragraph with the following:The envelope enclosing the Bid shall be sealed and addressed to the City of Palm Springs. The envelope shall be plainly marked in the upper left hand corner with the name and address of the Bidder and shall bear the words "Trade Bid for Palm Springs Convention Center Phase I Expansion" and the date and hour of opening bids. The name of the Trade and the Trade Bid Package Number shall also be clearly marked on the outside of the envelope. Each trade bid shall be enclosed in a separate envelope. 6. Informational: Scopes will be provided via Federal Express delivery Monday, December 9, 2002 to plan holders of record. 7. Informational The Anticipated Project Schedule is available at the City's web site. Go to www.ci.palm-springs.ca.us. Go to Departments. Go to Procurement . Select appropriate document. 8. Informational: For your information the following lists are attached: A. A list of pre-qualified trade contractors for those trades requiring pre- qualification and attendance at the mandatory pre-bid conference. B. A list of Trade Contractors who attended a Mandatory Pre-Bid Conference for applicable trades which did not require pre-qualification. 9. Delete Bid Package 16-Fabric Sound Panels.This work is being deferred to Phase II of the expansion of the convention center. END OF ADDENDA NO. 1 BY ORDER OF THE CITY OF PALM SPRINGS City of Palm Springs Harold E. Good, CPPO Director of Procurement& Contracting Dated: December 5, 2002 Receipt of this addenda must be acknowledged on the Trade Bid Forms submitted with the bid package. Attachments: Exhibit"H" OSHA 30 Hour Policy List of Pre-Qualified Trade Contractors for Trades Requiring Pre-qualification and and Attendance at the Mandatory Pre-Bid Conference List of Trade Contractors who Attended the Mandatory Pre-Bid Conference Which Did Not Require Pre-Qualification 0 EXHIBIT H OSHA 30-HOUR POLICY Palm Springs Convention Center Expansion Phase I Palm Springs, CA 1214/02 Trade Contractor and all lower tier sub-subcontractors shall comply with the requirements of OSHA 30-hour Training.All Trade Contractor's supervisory staff must be OSHA certified.Supervisory staff with written evidence of OSHA 30-hour certification within the last 3 years will be acceptable. Training for Trade Contractor's staff not currently certified, can be certified through Turner Knowledge Network (TKN). The web site address is www.turneruniversity.com and must be completed within 3 month from the date of its Trade Contract Agreement or no less than 30 days from start of work. Monthly Payment is contingent upon evidence of current certification or enrollment in the OSHA 30-hour training within the period specified above. Within 5 days of the date of Award of Contract, provide the following information: Project Name Certified Subcontractor Supervisor's Name Y/N Sub-subcontractor(s) Supervisor's Name Y/N Supervisor's Name Y/N Supervisor's Name Y/N Supervisor's Name Y/N Note: Attach a copy of the certificate for Supervisors already certified. Please return this form to the attention of: TURNER CONSTRUCTION COMPANY David Livingston @ FAX: (760) 323-4918 PRE-QUALIFIED TRADE CONTRACTORS FOR TRADES REQUIRING PRE-QUALIFICATION AND ATTENDANT AT MANDATORY PRE-BID CONFERENCE. Trade Bid Name/Number Contractor 1 Selective Demolition Penhall Company Clauss Construction Forward Services, Inc. 6 Structural Steel, Metal Decking & Miscellaneous Metals Orange County Erectors, Inc. ACSS Law Steel 13 Metal Stud Framing & Drywall, EIFS, Insulation & Fireproofing Anning-Johnson Company Raymond Interior Systems Berger Bros Inc. Martin Bros 28 Kitchen Equipment TriMark Raygal, Inc. Kamran & Co. Duray/JF Duncan AM Fab 29 Plumbing SSW Mechanical Murray Company D/K Mechanical Kincaid Plumbing Co Pan Pacific Plumbing 30 HVAC SSW Mechanical ACCO Engineered Systems Cal-Air Inc. Couts Heating & Cooling Los Angeles Air Conditioning 31 Fire Protection Daart Engineering Shasta Fire Protection 32 Electrical SASCO Cove Electric System Electric Brudvik Inc. PALM IS' City of Palm Springs V n Department of Procurement and Contracting 3200 E.Tahquitz Canyon Way • Palm Springs,California 92262 cgtlFoRNoP Tel:(760)323-8239 • Fax:(760)322-8372 • Web: www.a.palm-springs.ca.us CITY OF PALM SPRINGS 3200 East Tahquitz Canyon Way, Palm Springs, CA 92262 NOTICE TO TRADE CONTRACTORS (ALL TRADES) PHASE I EXPANSION OF THE PALM SPRINGS CONVENTION CENTER CITY PROJECT#02-19 ADDENDUM NO. 3 This Addendum is being issued for the following changes and informational items: 1. Replace Table of Contents (3 pages)with revised Table of Contents, pages 1, 2 and 3. 2. Add: To bid Package#32- Electrical and Fire Life Safety II. SCOPE OF WORK F. ALLOWANCES Trade Contractor shall build an allowance of$5,000 (five thousand dollars) into the bid for exterior lighting to be specified at a later date. 3. Add to bid Package#01 - Selective Demolition II. SCOPE OF WORK B.As further clarification, Trade Contractor shall: 58. After their salvage of AHU#3 and AHU#6 (by other trade contractor) remove steel platforms, their attachments and supports. Post Office Box 2743 • Palm Springs, California 92263-2743 r ' 4. Add: to bid Package #28 - Kitchen Equipment II. SCOPE OF WORK A. Add to "A" §10265 -Wall Surface Protection Systems. 5. Replace: Exhibit"D", Document List, pages 1 through 6 with revised Exhibit"D", pages 1 through 6. 6. Replace: Exhibit"F", Temporary Utilities for Construction Purposes, pages 1 through 3, with revised Exhibit"F", pages 1 through 3. 7. Add: to Qualified Bidders List A. Add to attachment to Addendum #1 entitled "Pre-Qualified Trade Contractors for Trades Requiring Pre-qualification and Attendance at Mandatory Pre-Bid Conference" Janikowski Plumbing, Inc. to Trade Bid Package#29 (Plumbing). B. Add to attachment to Addendum #1 entitled "List of Attendees for Those Trade Bids Requiring Attendance at the Pre-Bid Meeting But Did Not Have to Pre-Qualify" B E Mc Murray Construction, Inc, to Trade Bid Package#4 (Concrete & Reinforcing) 8. Add: To PART IV- CONSTRUCTION DRAWINGS AND SPECIFICATIONS as attached_ Section 08110 Steel Doors and Frames Section 08211 Flush Wood Doors Section 08305 Access Doors Section 08331 Overhead Coiling Doors Section 08710 Finish Hardware Section 09512 Acoustical Tile Ceiling Section 09651 Resilient Tile Flooring Section 09900 Painting Section 09775 Fibreglass Reinforced Panels Section 10660 Operable Walls Section 10265 Impact- Resistant Wall Protection 9. Informational: Attached Requests for Information with responses by Architect and Engineer. Numbers PB#01 - PB#22 10. Delete Bid Package #9 Doors, Frames & Hardware from the Notice Inviting Bids dated November 11, 2002_ Perspective bidders for Bid Package #9 should contact Director of Procurement & Contracting 760-323-8239 for additional information. f END OF ADDENDA NO. 3 BY ORDER OF THE CITY OF PALM SPRINGS City of Palm Springs Harold E. Good, CPPO Director of Procurement& Contracting Dated: December 12, 2002 Receipt of this addenda must be acknowledged on the Trade Bid Forms submitted with the bid package. Attachments: Revised Table of Contents (3 pages) Revised Exhibit"D" (6 pages) Revised Exhibit"F" (3 pages) SK-1 (2 pages) Additional Specifications as referenced in Item 8 above Pre-Bid RFI Log (2 pages) HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theatre Reconfiguration 10/30/02 TABLE OF CONTENTS DIVISION 0 - BIDDING REQUIREMENTS To be provided by the City of Palm Springs DIVISION I - GENERAL REQUIREMENTS Section 01010 - Summary of the Work Section 01040 - Coordination Section 01045 - Cutting and Patching Section 01050 - Field Engineering Section 01200 - Project Meetings Section 01300 - Submittals Shop Drawings Product Data and Samples Section 01400 - Quality Control Section 01421 - Reference Standards and Definitions Section 01631 - Substitutions Section 01700 - Contract Closeout Section 01720 - Project Record Documents Section 01730 - Operation and Maintenance Data Section 01740 - Warranties DIVISION 2 - SITE CONSTRUCTION Section 02060 - Building Demolition Section 02222 - Excavation Section 02300 - Earthwork DIVISION 3 - CONCRETE Section 03100— Concrete Formwork Section 03300 - Cast-In-Place Concrete DIVISION 4 - MASONRY Section 04200 - Unit Masonry DIVISION 5 - METALS Section 05120 - Structural Steel Section 05210 — Steel Joists Section 05310 - Steel Deck Section 05400 - Cold-Formed Metal Framing Section 05500 - Metal Fabrications Section 05810 - Expansion Joint Cover Assemblies Table of Contents Page 1 Revised 12/12/02 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theatre Reconfiguration 10/30/02 DIVISION 6 -WOOD AND PLASTICS Section 06100 - Rough Carpentry DIVISION 7 -THERMAL AND MOISTURE PROTECTION Section 07210 - Building Insulation Section 07241 — Exterior Insulation and Finish Systems — Class PB Section 07533 — Single-Ply Membrane Roofing Section 07716 — Roof Expansion Assemblies Section 07720— Roof Accessories Section 07811 — Sprayed Fire Resistive Materials DIVISION 8 - DOORS AND WINDOWS Section 08110 - Steel Doors and Frames Section 08211 - Flush Wood Doors Section 08305 -Access Doors Section 08331 - Overhead Coiling Doors Section 08710 - Finish Hardware DIVISION 9 - FINISHES Section 09253 - Gypsum Sheathing Section 09255 — Gypsum Board Assemblies Section 09310 - Ceramic Tile Section 09571 - Acoustical Tile Ceilings Section 09651 — Resilient Tile Flooring Section 09671 — Resinous Flooring Section 09680 - Carpet (Owner Supplied and Installed) Section 09775 — Fiberglass Reinforced Panels Section 09900 - Painting Section 09841 — Acoustical Wall Panels DIVISION 10 - SPECIALTIES Section 10265 - Wall Surface Protection Systems Section 10660 — Operable Walls DIVISION 11 - EQUIPMENT Section 11400 — Food Service Equipment DIVISION 12 - FURNISHINGS - Not Used DIVISION 13 - SPECIAL CONSTRUCTION - Not Used Revised 12/12/02 Table of Contents Page 2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theatre Reconfiguration 10/30/02 DIVISION 14 - CONVEYING SYSTEMS - Not Used DIVISION 15 - MECHANICAL Section 15000 — Mechanical Specification Section 15300,— Fire Protection Specification Section 15400 — Plumbing Specification Section 15855 —Air Handling Units DIVISION 16 - ELECTRICAL Section 16010— Electrical — General Provisions Section 16110 — Raceways Section 16120—Wire and Cable Section 16140 - Devices Section 16170 — Low Voltage Disconnect Switches Section 16181 — Low Voltage Fuses Section 16182 — Low Voltage Circuit Breaker Section 16450 — Grounding System Section 16460 — Low Voltage Transformers Section 16471 — Branch Circuit Panelboards Section 16472 — Distribution Panelboards Section 16485— Motor Controllers Section 16500— Lighting Fixtures Section 16520 — Lighting Control System Revised 12/12l02 Table of Contents Page 3 EXHIBIT D PALM SPRINGS CONVENTION CENTER DOCUMENT LIST November 1, 2002 Architectural Architect/ Description Date Drawing No. Engineer ARCHITECTURAL A0.01 HNTB Sheet Index, Directory 10/30/02 A0.02 HNTB General Notes and Abbreviations 10/30/02 A0.03 HNTB Partition Types 10/30/02 A0.05 HNTB Accessibility Details 10/30/02 AD0.01 HNTB Demolition Plan and Section-Kitchen 10/30/02 AD0.02 HNTB Demolition Plan and Section-Springs Theater 10/30/02 A1.00 HNTB Overall Site Plan 10/30/02 A1.01 HNTB Overall Floor Plan 10/30/02 A1.02 HNTB Overall Existing First Floor Plan 10/30/02 A1.10 HNTB Enlarged Plan-Kitchen Area 10/30/02 A1.11 HNTB Enlarged Plan-Meeting Rooms 10/30/02 A1.20 HNTB Enlarged Roof Plans-Kitchen and Meeting Rooms 10/30/02 A1.21 HNTB Enlarged Restroom: Stairs and Ramp 10/30/02 A2.01 HNTB Exterior Elevations 10/30/02 A2.10 HNTB Building Sections 10/30/02 A3.01 HNTB Wall Sections 10/30/02 A3.02 HNTB Wall Sections 10/30/02 A4.01 HNTB Roof Details 10/30/02 A4.02 HNTB Miscellaneous Details 10/30/02 A6.01 HNTB Interior Elevations-Kitchen 10/30/02 A6.02 HNTB Interior Elevations 10/30/02 A7.01 HNTB Room Finish Schedule 10/30/02 A8.01 HNTB Overall Reflected Ceiling Plan 10/30/02 A8.10 HNTB Enlarged Reflected Ceiling Plan-Kitchen Area 10/30/02 A8.11 HNTB Enlarged Reflected Ceiling Plan-Meeting Rooms 10/30/02 A8.20 HNTB Ceiling Details 10/30/02 A9.01 HNTB Door Schedule and Details 10/30/02 STRUCTURAL S1.01 HNTB General Notes 10/30/02 S1.02 HNTB Typical Concrete Details 10/30/02 S1.03 HNTB Typical Steel Details 10/30/02 S1.04 HNTB Typical Steel Deck Details 10/30/02 S2.01 HNTB Enlarged Floor Plan-Meeting Rooms 10/30/02 S2.02 HNTB Enlarged Roof Plan-Meeting Rooms 10/30/02 S2.11 HNTB Enlarged Floor and Foundation Plan-Kitchen 10/30/02 S2.12 HNTB Enlarged Roof Framing Plan-Kitchen 10/30/02 S3.01 HNTB Sections and Details 10/30/02 S3.02 HNTB Sections and Details 10/30/02 S3.03 HNTB Sections and Details 10/30/02 Page 1 of 6 Revised 12/12/02 EXHIBIT D PALM SPRINGS CONVENTION CENTER DOCUMENT LIST November 1, 2002 Architectural Architect/ Description Date Drawing No. Engineer MECHANICAL M0.01 HNTB Symbols,Abbreviations, and Notes 10/30/02 MO.02 HNTB Mechanical Requirements 10/30/02 MO.03 HNTB Mechanical Schedules 10/30/02 M1.10 HNTB Enlarged Kitchen HVAC Floor Plan 10/30/02 M1.11 HNTB Enlarged Meeting Rooms HVAC Floor Plan 10/30/02 M1.12 HNTB Enlarged Kitchen HVAC Roof Plan 10/30/02 M1.13 HNTB Enlarged Meeting Rooms HVAC Roof Plans 10/30/02 M2.01 HNTB Mechanical Details 10/30/02 M2.02 HNTB Mechanical Details 10/30/02 M2.03 HNTB Mechanical Control Diagrams 10/30/02 ELECTRICAL EO.01 HNTB Symbols List, Abbreviations, and Notes 10/30/02 E0.02 HNTB Partial Single Line Diagram, Light Fixture Schedule and Title 24 10/30/02 EO.03 HNTB Panel Schedule & Load Calculation 10/30/02 EO.04 HNTB Dimming System Riser Diagram 10/30/02 E1.10 HNTB Enlarged Kitchen Power Plan 10/30/02 E1.11 HNTB Enlarged Meeting Rooms Power Plan 10/30/02 E1.14 HNTB Enlarged Kitchen Electrical Roof Plan 10/30/02 E1.15 HNTB Enlarged Meeting Room Electrical Roof Plan 10/30/02 E8.10 HNTB Enlarged Kitchen Lighting Plan 10/30/02 E8.11 HNTB Enlarged Meeting Room Lighting Plan 10/30/02 E9.10 HNTB Special Outlet Details 10/30/02 PLUMBING PO.01 HNTB Symbol List,Abbreviations and Notes 10/30/02 PO.02 HNTB Plumbing Schedules 10/30/02 P1.10 HNTB Enlarged Kitchen Plumbing Plan 10/30/02 P1.11 HNTB Enlarged Pantry Plumbing Plan 10/30/02 P1.12 HNTB Enlarged Kitchen Plumbing Roof Plan 10/30/02 FOOD SERVICES KO-1 HNTB Notes and Symbols 10/30/02 KO-2 HNTB Construction and Installation Details KA-1 HNTB Equipment Plan 10/30/02 KA-2 HNTB Building Conditions Plan 10/30/02 KA-3 HNTB Plumbing Plan 10/30/02 Page 2 of 6 Revised 12/12/02 EXHIBIT D PALM SPRINGS CONVENTION CENTER DOCUMENT LIST November 1, 2002 Architectural Architect/ Description Date Drawing No. Engineer FOOD SERVICES (con't) KA4 HNTB Electrical Plan 10/30/02 KA-5 HNTB Refrig/Ventilation Plan 10/30/02 KA-6 HNTB Equipment Elevations 10/30/02 KB-1 HNTB Equipment Plan 10/30/02 KB-2 HNTB Building Conditions Plan 10/30/02 KB-3 HNTB Plumbing/Ventilation Plan 10/30/02 KB-4 HNTB Electrical Plan 10/30/02 KB-5 HNTB Refrig/Ventilation 10/30/02 Exhibit D Continued on next page Page 3 of 6 Revised 12/12/02 EXHIBIT D PALM SPRINGS CONVENTION CENTER DOCUMENT LIST November 1, 2002 Specification Architect/ Description Date Number Engineer DIVISION 1 —GENERAL REQUIREMENTS 01010 HNTB Summary of the Work 10/30/02 01040 HNTB Coordination 10/30/02 01045 HNTB Cutting and Patching 10/30/02 01050 HNTB Field Engineering 10/30/02 01200 HNTB Project Meetings 10/30/02 01300 HNTB Submittals Shop Drawings Product Data and Samples 10/30/02 01400 HNTB Quality Control 10/30/02 01421 HNTB Reference Standards and Definitions 10/30/02 01631 HNTB Substitutions 10/30/02 01700 HNTB Contract Closeout 10/30/02 01720 HNTB Project Record Documents 10/30/02 01730 HNTB Operation and Maintenance Data 10/30/02 01740 HNTB Warranties 10/30/02 DIVISION 2—SITE CONSTRUCTION 02060 HNTB Building Demolition 10/30/02 02222 HNTB Excavation 10/30/02 02300 HNTB Earthwork DIVISION 3—CONCRETE 03100 HNTB Concrete Formwork 10/30/02 03300 HNTB Cast-In-Place Concrete 10/30/02 DIVISION 4—MASONRY 04200 HNTB Unit Masonry 10/30/02 DIVISION 5—METALS 05120 HNTB Structural Steel 10/30/02 05210 HNTB Steel Joists 10/30/02 05310 HNTB Steel Deck 10/30/02 05400 HNTB Cold-Formed Metal Framing 10/30/02 05500 HNTB Metal Fabrications 10/30/02 05810 HNTB Expansion Joint Cover Assemblies 10/30/02 DIVISION 6—WOOD AND PLASTICS 06100 HNTB Rough Carpentry 10/30/02 Page 4 of 6 Revised 12/12/02 EXHIBIT D PALM SPRINGS CONVENTION CENTER DOCUMENT LIST November 1, 2002 Specification Architect/ Description Date Number Engineer DIVISION 7—THERMAL AND MOISTURE PROTECTION 07210 HNTB Building Insulation 10/30/02 07241 HNTB Exterior Insulation and Finish Systems—Class PB 10/30/02 07533 HNTB Single-Ply Membrane Roofing 10/30/02 07716 HNTB Roof Expansion Assemblies 10/30/02 07720 HNTB Roof Accessories 10/30/02 07811 HNTB Sprayed Fire Resistive Materials 10/30/02 DIVISION 8—DOORS AND WINDOWS 08110 HNTB Steel Doors and Frames 10/30/02 08211 HNTB Flush Wood Doors 10/30/02 08305 HNTB Access Doors 10/30/02 08331 HNTB Overhead Coiling Doors 10/30/02 08710 HNTB Finish Hardware 10/30/02 DIVISION 9—FINISHES 09253 HNTB Gypsum Sheathing 10/30/02 09255 HNTB Gypsum Board Assemblies 10/30/02 09310 HNTB Ceramic Tile 10/30/02 09512 HNTB Acoustical Tile Ceilings 10/30/02 09651 HNTB Resilient Tile Flooring 10/30/02 09680 HNTB Carpet 10/30/02 09775 HNTB Fiberglass Reinforced Panels 10/30/02 09900 HNTB Painting 10/30/02 09841 HNTB Acoustical Wall Panels 10/30/02 DIVISION 10—SPECIALTIES 10265 HNTB Wall Surface Protection Systems 10/30/02 10660 HNTB Operable Walls 10/30/02 DIVISION 11 —EQUIPMENT 11400 HNTB Food Service Equipment 10/30/02 DIVISION 12—FURNISHINGS Not Used Page 5 of 6 Revised 12/12/02 EXHIBIT D PALM SPRINGS CONVENTION CENTER DOCUMENT LIST November 1, 2002 Specification Architect/ Description Date Number Engineer DIVISION 13—SPECIAL CONSTRUCTION Not Used DIVISION 14—CONVEYING SYSTEMS Not Used DIVISION 15—MECHANICAL' 15000 HNTB Mechanical Specification 10/30/02 15300 HNTB Fire Protection Specification 10/30/02 15400 HNTB Plumbing Specification 10/30/02 15855 HNTB Air Handling Units 10/30/02 DIVISION 16—ELECTRICAL 16010 HNTB Electrical—General Provisions 10/30/02 16110 HNTB Raceways 10/30/02 16120 HNTB Wire and Cable 10/30/02 16140 HNTB Devices 10/30/02 16170 HNTB Low Voltage Disconnect Switches 10/30/02 16181 HNTB Low Voltage Fuses 10/30/02 16182 HNTB Low Voltage Circuit Breaker 10/30/02 16450 HNTB Grounding System 10/30/02 16460 HNTB Low Voltage Transformers 10/30/02 16471 HNTB Branch Circuit Panelboards 10/30/02 16485 HNTB Motor Controllers 10/30/02 16500 HNTB Lighting Fixtures 10/30/02 16520 HNTB Lighting Control System 10/30/02 Page 6 of 6 Revised 12/12/02 EXHIBIT F TEMPORARY UTILITIES FOR CONSTRUCTION PURPOSES I. Temporary Plumbing A. Scope of work provided by the Plumbing Trade Contractor. The temporary Plumbing, and monthly rental, to be provided, will include, but are not limited to, the following: 1. Temporary water from domestic water. • Water service and hook-up at CM's jobsite trailer for the duration of the project. CM, City, DWA and Convention Center/Hotel shall approve all water service tie-in locations. • Water service with '/4 " hose bib at areas of expansion and renovation for the duration of the project. CM, City, and Convention Center/Hotel shall approve all water service tie-in locations. • Temporary Construction water meter to be utilized by all required Trade Contractor's for the duration of the project. • (1) 3/4" hose bib at 48"AFF at exterior of CM's jobsite trailer. • System will be sanitized for drinking purposes. • Cost of water to be paid by the City of Palm Springs. 2. Temporary Holding Tank and Toilets. • Holding tank and connection to CM's jobsite trailer restroom, including twice weekly pump-outs for the duration of project. • Four (4) portable toilets with hand-wash stations, including twice weekly pump-outs and water service for duration of project. Locations to be determined by the CM's Project Superintendent. Page I of 3 Revised 12/12/02 EXHIBIT F TEMPORARY UTILITIES FOR CONSTRUCTION PURPOSES II. Temporary Electrical and Telephone A. Scope of work provided by the Electrical Trade Contractor. The temporary power, and monthly rental, to be provided, will include, but are not limited to, the following: 1. Temporary Power • Provide temporary power poles, service and hook-up of Ws jobsite trailer from approved designated location (i.e. the Convention Center, Hotel, or other) with pole-mounted metering device for the duration of the project. Service will be 100 amp, 3 phase 240 volts. • Provide temporary power poles and service to the kitchen expansion/renovation area from approved designated location (i.e. the Convention Center, Hotel, or other) with pole-mounted metering device for the duration of the project. Service will be 200 amp, 3 phase 240 volts. • Power temporary power and service to the Springs Theatre/ new meeting room and dry storage renovation area from approved designated location (i.e. the Convention Center, Hotel, or other). Utilize an existing panel for the duration of the project. Service will be 200 amp, 3 phase 240 volts. • Provide up to (6) spider boxes at the areas of expansion/renovation as directed by jobsite Superintendent. • Cost of power will be paid by The City of Palm Springs. Page 2 of 3 Revised 12/12/02 EXHIBIT F TEMPORARY UTILITIES FOR CONSTRUCTION PURPOSES 2. Temporary Lighting • Provide and install (3) temporary power poles with (2) top-mounted security lights at far corners of construction fencing at CM's jobsite trailer compound area. • Provide temporary overhead lighting within the areas of expansion/renovation of not less than one foot-candle power square foot or as required by CAL-OSHA as need for the duration of the project. Task lighting will be by the respective trade contractors. 3. Temporary Telephone • Provide and install telephone lines and hook-up at CM's jobsite trailer from an approved designated location (i.e. the Convention Center, Hotel, or other)for the duration of the project. Provide a minimum of 4 phone lines. III. Temporary Trash Dumpsters A. Scope of work provided by the Demolition Trade Contractor. The temporary trash dumpster, monthly rental, and disposal fees to be provided, will include, but are not limited to, the following: 1. Temporary Trash Dumpsters • Provide two (2)40-cuyd temporary trash dumpsters with weekly dump service at each area of the expansion/renovation area for construction trash debris for the duration of the project. These dumpsters are above and beyond the necessary "low-boys" and "other" 40-cuyd dumpsters that will be required for demolition, removal and disposal under the selective demolition scope of work. • Provide one (1) 4 cuyd temporary trash dumpster with weekly dump service at the CM's jobsite trailer for the duration of the project. Page 3 of 3 Revised 12/12/02 j 51 t� L.. �■■il ,7��yif iy � .lrtk.Jl""�� 2-0 Z. CI &lit-C- 'I N .. 2'Rws3SF h.Sf. CD rr"o, 43' +e4 � aw � '+ii..n'♦ r- u.vi .'�'��.. :X14 �!I+-rn� 45 _ A xf T 52" ,stl- WA WAVY ell "14 0, 6 E A TO F."_4 ue "DR14, ............. ANO jz R J j I ,J, J, i®rA;4--;mHU'-rllftWl' HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 SECTION 08110-STEEL DOORS AND FRAMES PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes steel doors and frames. 1.3 SUBMITTALS A. General: Submit each item in this Article according to the Conditions of the Contract and Division 1 Specification Sections. B. Product Data for each type of door and frame specified, including details of construction, materials, dimensions, hardware preparation, core, label compliance, sound ratings, profiles, and finishes. C. Shop Drawings showing fabrication and installation of steel doors and frames. Include details of each frame type, elevations of door design types, conditions at openings, details of construction, location and installation requirements of door and frame hardware and reinforcements, and details of joints and connections. Show anchorage and accessory items. D. Door Schedule: Submit schedule of doors and frames using same reference numbers for details and openings as those on Contract Drawings. 1. Indicate coordination of glazing frames and stops with glass and glazing requirements. E. Samples for initial selection in the form of manufacturer's color charts showing the full range of colors available for factory-finished doors and frames. F. Samples for verification of each type of exposed finish required, prepared on Samples not less than 3 by 5 inches (75 by 125 mm) and of same thickness and material indicated for final unit of Work. Where finishes involve normal color and texture variations, include Sample sets showing the full range of variations expected. G. Oversize Construction Certification: For door assemblies required to be fire rated and exceeding limitations of labeled assemblies, submit certification of a testing agency acceptable to authorities having jurisdiction that each door and frame assembly has been constructed to conform to design, materials, and construction equivalent to requirements for labeled construction. 1.4 QUALITY ASSURANCE STEEL DOORS AND FRAMES 08110 - 1 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Provide doors and frames complying with ANSI/SDI 100 "Recommended Specifications for Standard Steel Doors and Frames" and as specified. B. Fire-Rated Door Assemblies: Units that comply with NFPA 80, are identical to door and frame assemblies tested for fire-test-response characteristics per ASTM E 152, and are labeled and listed by UL, Warnock Hersey, or another testing and inspecting agency acceptable to authorities having jurisdiction. 1. Oversize Fire-Rated Door Assemblies: For units exceeding sizes of tested assemblies, provide certification by a testing agency acceptable to authorities having jurisdiction that doors conform to all standard construction requirements of tested and labeled fire-rated door assemblies except for size. 2. Temperature-Rise Rating: Where indicated, provide doors that have a temperature-rise rating of 450 deg F(250 deg C) maximum in 30 minutes of fire exposure. 1.5 DELIVERY, STORAGE,AND HANDLING A. Deliver doors and frames cardboard-wrapped or crated to provide protection during transit and job storage. Provide additional protection to prevent damage to finish of factory-finished doors and frames. B. Inspect doors and frames on delivery for damage. Minor damages may be repaired provided refinished items match new work and are acceptable to Architect; otherwise, remove and replace damaged items as directed. C. Store doors and frames at building site under cover. Place units on minimum 4-inch- (100-mm- ) high wood blocking. Avoid using nonvented plastic or canvas shelters that could create a humidity chamber. If cardboard wrappers on doors become wet, remove cartons immediately. Provide minimum 1/4-inch (6-mm) spaces between stacked doors to promote air circulation. PART2-PRODUCTS 2.1 MANUFACTURERS A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. Steel Doors and Frames: a. Amweld Building Products, Inc. b. Benchmark Commercial Doors. C. Ceco Door Products_ d. Copco Door Co. e. Curries Co. f. Deansteel Manufacturing Co. g. Fenestra Corp. h. Kewanee Corp. i. Mesker Door, Inc. j. Pioneer Industries. k. Republic Builders Products. STEEL DOORS AND FRAMES 08110-2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 I. Steelcraft. 2. Prefinished Interior Steel Frames: a. Dunbarton Corp. (Rediframe Products). b. Timely Industries. 2.2 MATERIALS A. Hot-Rolled Steel Sheets and Strip: Commercial-quality carbon steel, pickled and oiled, complying with ASTM A 569 (ASTM A 569M). B. Cold-Rolled Steel Sheets: Carbon steel complying with ASTM A 366 (ASTM A 366M), commercial quality, or ASTM A 620 (ASTM A 620M), drawing quality, special killed. C. Galvanized Steel Sheets: Zinc-coated carbon steel complying with ASTM A 526 (ASTM A 526M), commercial quality, or ASTM A 642 (ASTM A 642M), drawing quality, hot-dip galvanized according to ASTM A 525, with A 60 or G 60 (ASTM A 525M, with Z 180 or ZF 180) coating designation, mill phosphatized. D. Supports and Anchors: Fabricated from not less than 0.0478-inch- (1.2-mm-)thick steel sheet; 0.0516-inch-(1.3-mm-)thick galvanized steel where used with galvanized steel frames. E. Inserts, Bolts, and Fasteners: Manufacturers standard units. Where items are to be built into exterior walls, hot-dip galvanize complying with ASTM A 153, Class C or D as applicable. 2.3 DOORS A. Steel Doors: Provide 1-3/4-inch- (44-mm-) thick doors of materials and ANSI/SDI 100 grades and models specified below, or as indicated on Drawings or schedules: 1. Interior Doors: Grade II, heavy-duty, Model 1, full flush design, minimum 0.0478-inch- (1.2-mm-)thick cold-rolled steel sheet faces. 2. Exterior Doors: Grade II, heavy-duty, Model 1, full flush design, minimum 0.0516-inch-- (1.3-mm-)thick galvanized steel sheet faces. B. Door Louvers: Provide louvers according to SDI 111C for interior doors where indicated, with blades or baffles formed of 0.0239-inch- (0.6-mm-) thick cold-rolled steel sheet set into minimum 0.0359-inch-(0.9-mm-)thick steel frame. 1. Sight-Proof Louvers: Stationary louvers constructed with inverted V-shaped or Y-shaped blades. 2. Lightproof Louvers: Stationary louvers constructed with baffles to prevent light from passing from one side to the other, any angle. 3. Fire-Rated Automatic Louvers: Louvers constructed with movable blades closed by actuating fusible links at 150 deg F (65 deg C) and labeled and listed for use in fire-rated door assemblies of type and fire-resistance rating indicated by the same inspecting and testing agency who established fire-resistance rating of door assembly. 2.4 FRAMES STEEL DOORS AND FRAMES 08110-3 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Provide metal frames for doors, transoms, sidelights, borrowed lights, and other openings, according to ANSI/SDI 100, and of types and styles as shown on Drawings and schedules. Conceal fastenings, unless otherwise indicated. Fabricate frames of minimum 0.0478-inch- (1.2-mm-)thick cold-rolled steel sheet. 1. Fabricate frames with mitered or coped and continuously welded comers. Fabricate frames for interior openings over 48 inches (1220 mm) wide from 0.0598-inch- (1.5-mm-)thick steel sheet. 5. Fabricate exterior frames for openings over 48 inches (1220 mm)wide from 0.0635-inch- (1.6-mm-)thick galvanized steel sheet. 6. Form exterior frames from 0.0635-inch- (1.6-mm-)thick galvanized steel sheet. B. Door Silencers: Except on weatherstripped frames, drill stops to receive 3 silencers on strike jambs of single-door frames and 2 silencers on heads of double-door frames. C. Plaster Guards: Provide minimum 0.0179-inch- (0.45-mm-) thick steel plaster guards or mortar boxes at back of hardware cutouts where mortar or other materials might obstruct hardware operation and to close off interior of openings. D. Grout: When required in masonry construction, as specified in Division 4 Section "Unit Masonry" 2.5 FABRICATION A. Fabricate steel door and frame units to be rigid, neat in appearance, and free from defects, warp, or buckle. Where practical, fit and assemble units in manufacturer's plant. Clearly identify work that cannot be permanently factory assembled before shipment, to assure proper assembly at Project site. Comply with ANSI/SDI 100 requirements. 1. Internal Construction: One of the following manufacturer's standard core materials according to SDI standards: a. Resin-impregnated paper honeycomb. b. Rigid polyurethane conforming to ASTM C 591. c. Rigid polystyrene conforming to ASTM C 578. d. Unitized steel grid. e. Vertical steel stiffeners. f. Rigid mineral fiber with internal sound deadener on inside of face sheets. 2. Clearances: Not more than 1/8 inch (3.2 mm)at jambs and heads, except not more than 1/4 inch (6.4 mm) between non-fire-rated pairs of doors. Not more than 3/4 inch (19 mm) at bottom. a. Fire Doors: Provide clearances according to NFPA 80. B. Fabricate exposed faces of doors and panels, including stiles and rails of nonflush units, from only cold-rolled steel sheet. C. Tolerances: Comply with SDI117 "Manufacturing Tolerances Standard Steel Doors and Frames" D. Fabricate concealed stiffeners, reinforcement, edge channels, louvers, and moldings from either cold-or hot-rolled steel sheet. STEEL DOORS AND FRAMES 08110-4 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 E. Galvanized Steel Doors, Panels, and Frames: For the following locations, fabricate doors, panels, and frames from galvanized steel sheet according to SDI 112. Close top and bottom edges of doors flush as an integral part of door construction or by addition of minimum 0.0635- inch- (1.6-mm-) thick galvanized steel channels, with channel webs placed even with top and bottom edges. Seal joints in top edges of doors against water penetration. 1. At exterior locations. 2. At exterior locations and where indicated. 3. Where indicated. F. Exposed Fasteners: Unless otherwise indicated, provide countersunk flat or oval heads for exposed screws and bolts. G. Thermal-Rated (Insulating) Assemblies: At exterior locations and elsewhere as shown or scheduled, provide doors fabricated as thermal-insulating door and frame assemblies and tested according to ASTM C 236 or ASTM C 976 on fully operable door assemblies. 1. Unless otherwise indicated, provide thermal-rated assemblies with U-value rating of 0.41 Btu/sq.ft. x h x deg F (2.33 W/sq. m x K)or better. H. Sound-Rated (Acoustical) Assemblies: Where shown or scheduled, provide door and frame assemblies fabricated as sound-reducing type, tested according to ASTM E 1408, and classified according to ASTM E 413. 1. Unless otherwise indicated, provide acoustical assemblies with STC sound ratings of 33 or better. I. Hardware Preparation: Prepare doors and frames to receive mortised and concealed hardware according to final door hardware schedule and templates provided by hardware supplier. Comply with applicable requirements of SDI 107 and ANSI A115 Series specifications for door and frame preparation for hardware. 1. For concealed overhead door closers, provide space, cutouts, reinforcing, and provisions for fastening in top rail of doors or head of frames, as applicable. J. Reinforce doors and frames to receive surface-applied hardware. Drilling and tapping for surface-applied hardware may be done at Project site. K. Locate hardware as indicated on Shop Drawings or, if not indicated, according to the Door and Hardware Institute's (DHI) "Recommended Locations for Architectural Hardware for Standard Steel Doors and Frames" L. Glazing Stops: Minimum 0.0359-inch- (0.9-mm-) thick steel or 0.040-inch- (1-mm-) thick aluminum. 1. Provide nonremovable stops on outside of exterior doors and on secure side of interior doors for glass, louvers, and other panels in doors. 2. Provide screw-applied, removable, glazing beads on inside of glass, louvers, and other panels in doors. 2.6 FINISHES, GENERAL STEEL DOORS AND FRAMES 08110-5 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Comply with NAAMM's "Metal Finishes Manual" for recommendations relative to applying and designating finishes. B. Comply with SSPC-PA 1, "Paint Application Specification No. 1,"for steel sheet finishes. C. Apply primers and organic finishes to doors and frames after fabrication. 2.7 GALVANIZED STEEL SHEET FINISHES A. Surface Preparation: Clean surfaces with nonpetroleum solvent so that surfaces are free of oil or other contaminants. After cleaning, apply a conversion coating of the type suited to the organic coating applied over it. Clean welds, mechanical connections, and abraded areas, and apply galvanizing repair paint specified below to comply with ASTM A 780. 1. Galvanizing Repair Paint: High-zinc-dust-content paint for regalvanizing welds in galvanized steel, with dry film containing not less than 94 percent zinc dust by weight, and complying with DOD-P-21035 or SSPC-Paint 20. B. Factory Priming for Field-Painted Finish: Where field painting after installation is indicated, apply air-dried primer specified below immediately after cleaning and pretreatment. 1. Shop Primer: Zinc-dust, zinc-oxide primer paint complying with performance requirements of FS TT-P-641,Type II. C. Baked-Enamel Finish: Immediately after cleaning and pretreating, apply manufacturer's standard 2-coat, baked-enamel finish consisting of prime coat and thermosetting topcoat, with a minimum dry film thickness of 1 mil (0.0254 mm)for topcoat. Comply with paint manufacturer's instructions for applying and baking to achieve a minimum dry film thickness of 2 mils (0.0508 mm). 1. Color and Gloss: As indicated by manufacturer's color and gloss designations. 2. Color and Gloss: Match Architect's sample. 3. Color and Gloss: As selected by Architect from manufacturers full range of choices for color and gloss. 2.8 STEEL SHEET FINISHES A. Surface,Preparation: Solvent-clean surfaces to comply with SSPC-SP 1 to remove dirt, oil, grease, and other contaminants that could impair paint bond. Remove mill scale and rust, if present, from uncoated steel to comply with SSPC-SP 5 (White Metal Blast Cleaning) or SSPC- SP 8 (Pickling). B. Pretreatment: Immediately after surface preparation, apply a conversion coating of type suited to organic coating applied over it. C. Factory Priming for Field-Painted Finish: Apply shop primer that complies with ANSI A224.1 acceptance criteria, is compatible with finish paint systems indicated, and has capability to provide a sound foundation for field-applied topcoats. Apply primer immediately after surface preparation and pretreatment. D. Baked-Enamel Finish: Immediately after cleaning and pretreating, apply manufacturers standard 2-coat, baked-enamel finish consisting of prime coat and thermosetting topcoat that STEEL DOORS AND FRAMES 08110-6 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 complies with ANSIA250.3. Comply with paint manufacturers instructions for applying and baking to achieve a minimum dry film thickness of 2 mils (0.0508 mm). 1. Color and Gloss: As indicated by manufacturer's color and gloss designations. 2. Color and Gloss: Match Architect's sample. 3. Color and Gloss: As selected by Architect from manufacturer's full range of choices for color and gloss. PART 3- EXECUTION 3.1 INSTALLATION A. General: Install steel doors, frames, and accessories according to Shop Drawings, manufacturers data, and as specified. B. Placing Frames: Comply with provisions of SDI 105, unless otherwise indicated. Set frames accurately in position, plumbed, aligned, and braced securely until permanent anchors are set. After wall construction is completed, remove temporary braces and spreaders, leaving surfaces smooth and undamaged. 1. Except for frames located in existing concrete, masonry, or gypsum board assembly construction, place frames before constructing enclosing walls and ceilings. 2. In masonry construction, install at least 3 wall anchors per jamb adjacent to hinge location on hinge jamb and at corresponding heights on strike jamb. Acceptable anchors include masonry wire anchors and masonry T-shaped anchors. 3. At existing concrete or masonry construction, install at least 3 completed opening anchors per jamb adjacent to hinge location on hinge jamb and at corresponding heights on strike jamb. Set frames and secure to adjacent construction with bolts and masonry anchorage devices. 4. In metal-stud partitions, install at least 3 wall anchors per jamb at hinge and strike levels. In steel-stud partitions, attach wall anchors to studs with screws. 5. In in-place gypsum board partitions, install knock-down, slip-on,drywall frames. 6. Install fire-rated frames according to NFPA 80. C. Door Installation: Fit hollow-metal doors accurately in frames, within clearances specified in ANSI/SDI 100. 1. Fire-Rated Doors: Install with clearances specified in NFPA 80. 2. Smoke-Control Doors: Comply with NFPA 105. 3.2 ADJUSTING AND CLEANING A. Prime Coat Touchup: Immediately after erection, sand smooth any rusted or damaged areas of prime coat and apply touchup of compatible air-drying primer. B. Protection Removal: Immediately before final inspection, remove protective wrappings from doors and frames. END OF SECTION 08110 STEEL DOORS AND FRAMES 08110-7 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 SECTION 08211 - FLUSH WOOD DOORS PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1. Solid-core doors with wood-veneer faces. 1.3 SUBMITTALS A. Product Data: For each type of door. Include details of core and edge construction, trim for openings, and louvers. 1. Include factory-finishing specifications. B. Shop Drawings: Indicate location, size, and hand of each door; elevation of each kind of door; construction details not covered in Product Data; location and extent of hardware blocking; and other pertinent data. 1. Indicate dimensions and locations of mortises and holes for hardware. 2. Indicate dimensions and locations of cutouts. 3. Indicate requirements for veneer matching. 4. Indicate doors to be factory finished and finish requirements. 5. Indicate fire ratings for fire doors. C. Samples for Initial Selection: Color charts consisting of actual materials in small sections for finish showing that it matches that of the existing doors in the same area. D. Samples for Verification: As follows: 1. Corner sections of doors approximately 8 by 10 inches (200 by 250 mm)with door faces and edgings representing the typical range of color and grain for each species of veneer and solid lumber required. Finish sample with same materials proposed for factory- finished doors. 1.4 QUALITY ASSURANCE A. Source Limitations: Obtain flush wood doors through one source from a single manufacturer. B. Quality Standard: Comply with the following standard: 1. NWWDA Quality Standard: NWWDA I.S.1-A, "Architectural Wood Flush Doors." FLUSH WOOD DOORS 08211 - 1 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 2. AWI Quality Standard: AWI's "Architectural Woodwork Quality Standards" for grade of door, core, construction, finish, and other requirements. C. Fire-Rated Wood Doors: Doors complying with NFPA 80 that are listed and labeled by a testing and inspecting agency acceptable to authorities having jurisdiction, for fire ratings indicated, based on testing according to NFPA 252. 1. Test Pressure: Test at atmospheric pressure. 2. Oversized, Fire-Rated Wood Doors: For door assemblies exceeding sizes of tested assemblies, provide manufacturer's certificate stating that doors comply with all standard construction requirements of tested and labeled fire-door assemblies except for size. 3. Temperature-Rise Rating: At stairwell enclosures, provide doors that have a temperature-rise rating of 450 deg F (250 deg C) maximum in 30 minutes of fire exposure. 4. Temperature-Rise Rating: At stairwell enclosures, provide doors that have a temperature-rise rating of 250 deg F (139 deg C) maximum in 30 minutes of fire exposure. 1.5 DELIVERY, STORAGE, AND HANDLING A. Protect doors during transit, storage, and handling to prevent damage, soiling, and deterioration. Comply with requirements of referenced standard and manufacturer's written instructions. 1. Individually package doors in plastic bags or cardboard cartons. 2. Individually package doors in cardboard cartons and wrap bundles of doors in plastic sheeting. 3. Comply with WIC's Technical Bulletin 420-R for delivery, storage, and handling of doors. B. Mark each door with individual opening numbers used on Shop Drawings. Use removable tags or concealed markings. 1.6 PROJECT CONDITIONS A. Environmental Limitations: Do not deliver or install doors until conditions for temperature and relative humidity have been stabilized and will be maintained in storage and installation areas during the remainder of the construction period to comply with requirements of the referenced quality standard for Project's geographical location. 1.7 WARRANTY A. General Warranty: Door manufacturer's warranty specified in this Article shall not deprive the Owner of other rights the Owner may have under other provisions of the Contract Documents and shall be in addition to, and run concurrent with, other warranties made by the Contractor under requirements of the Contract Documents, B. Door Manufacturer's Warranty: Submit written agreement on door manufacturer's standard form, signed by manufacturer, Installer, and Contractor, agreeing to repair or replace defective doors that have warped (bow, cup, or twist) more than 114 inch (6.35 mm) in a 42-by-84-inch (1067-by-2134-mm) section or that show telegraphing of core construction in face veneers FLUSH WOOD DOORS 08211 -2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 exceeding 0.01 inch in a 3-inch (0.25 mm in a 75-mm) span, or do not comply with tolerances in referenced quality standard. 1. Warranty shall also include installation and finishing that may be required due to repair or replacement of defective doors. 2. Warranty shall be in effect during the following period of time after the date of Substantial Completion: a. Hollow-Core Interior Doors: Two years. PART2- PRODUCTS 2.1 MANUFACTURERS A. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. Flush Wood Doors: a. Algoma Hardwoods Inc. b. Ampco Products, Inc. G. Buell Door Co- d. Chappell Door Co. e. Eagle Plywood &Door Manufacturing, Inc. f. Eggers Industries;Architectural Door Division. g. Graham Manufacturing Corp. h. Haley Brothers, Inc. i. Ideal Wood Products, Inc. j. IPIK Door Co., Inc. k. Marlite. I. Mohawk Flush Doors, Inc. M. Oshkosh Architectural Door Co. n. Poncraft Door Co. o. Vancouver Door Company, Inc. p. V-T Industries Inc. q. Weyerhaeuser Co. 2. Metal Louvers for Doors: a. Air Louvers, Inc, b. Anemostat Door Products. C. Construction Specialties, Inc. d. Leslie-Locke, Inc. 2.2 DOOR CONSTRUCTION, GENERAL A. Doors for Transparent Finish (door type D): Match existing doors in the same area. 2.3 SOLID-CORE DOORS FLUSH WOOD DOORS 08211 -3 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Particleboard Cores: Comply with the following requirements: 1. Particleboard: ANSI A208.1, Grade LD-1. 2. Blocking: Provide wood blocking at particleboard-core doors as follows: a. 5-inch (125-mm) top-rail blocking, at doors indicated to have closers. b. 5-inch (125-mm) bottom-rail blocking, at exterior doors and doors indicated to have kick, mop, or armor plates- C. 5-inch (125-mm) midrail blocking, at doors indicated to have exit devices. B. Fire-Rated Doors: Comply with the following requirements: 1. Construction: Construction and core specified above for type of face indicated or manufacturer's standard mineral-core construction as required to provide fire rating indicated. 2. Blocking: For mineral-core doors, provide composite blocking with improved screw- holding capability approved for use in doors of fire ratings indicated and as follows: a. 5-inch (125-mm)top-rail blocking. b. 5-inch (125-mm) bottom-rail blocking, at doors indicated to have kick, mop, or armor plates. C. 4-1l2-by-10-inch (114-by-250-mm) lock blocks. d. 5-inch (125-mm) midrail blocking, at doors indicated to have exit devices. e. As necessary to eliminate need for through-bolting hardware. 3. Edge Construction: At hinge stiles, provide manufacturer's standard laminated-edge construction with improved screw-holding capability and split resistance and with outer stile matching face veneer. 4. Pairs: Provide fire-rated pairs with fire-retardant stiles that are labeled and listed for kinds of applications indicated without formed-steel edges and astragals. 2.4 FABRICATION A. Fabricate flush wood doors in sizes indicated for Project site fitting. B. Factory fit doors to suit frame-opening sizes indicated, with the following uniform clearances and bevels, unless otherwise indicated: 1. Comply with clearance requirements of referenced quality standard for fitting. Comply with requirements of NFPA 80 for fire-rated doors. C. Factory machine doors for hardware that is not surface applied. Locate hardware to comply with DHI-WDHS-3. Comply with final hardware schedules, door frame Shop Drawings, DHI A115-W series standards, and hardware templates. 1. Coordinate measurements of hardware mortises in metal frames to verify dimensions and alignment before factory machining. D. Openings: Cut and trim openings through doors to comply with applicable requirements of referenced standards for kind(s)of door(s)required. 1. Light Openings: Trim openings with moldings of material and profile indicated. FLUSH WOOD DOORS 08211 -4 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 2. Louvers: Factory install louvers in prepared openings. 2.5 FACTORY FINISHING A. General: Comply with referenced quality standard's requirements for factory finishing. B. Finish wood doors at factory to match the existing doors. PART 3-EXECUTION 3.1 EXAMINATION A. Examine installed door frames before hanging doors. 1. Verify that frames comply with indicated requirements for type, size, location, and swing characteristics and have been installed with plumb jambs and level heads. 2. Reject doors with defects. B. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 INSTALLATION A. Hardware: For installation, see Division 8 Section "Finish Hardware" B. Manufacturer's Written Instructions: Install wood doors to comply with manufacturer's written instructions, referenced quality standard, and as indicated. 1. Install fire-rated doors in corresponding fire-rated frames according to NFPA 80. C. Job-Fit Doors: Align and fit doors in frames with uniform clearances and bevels as indicated below; do not trim stiles and rails in excess of limits set by manufacturer or permitted with fire- rated doors. Machine doors for hardware. Seal cut surfaces after fitting and machining. 1. Clearances: Provide 1/8 inch (3.2 mm) at heads, jambs, and between pairs of doors. Provide 1/8 inch (32 mm) from bottom of door to top of decorative floor finish or covering. Where threshold is shown or scheduled, provide 1/4 inch (6.4 mm) from bottom of door to top of threshold. a. Comply with NFPA 80 for fire-rated doors. 2. Bevel non-fire-rated doors 1/8 inch in 2 inches (3-1/2 degrees) at lock and hinge edges. 3. Bevel fire-rated doors 1/8 inch in 2 inches (3-1/2 degrees) on lock edge; trim stiles and rails only to extent permitted by labeling agency. D. Factory-Finished Doors: Restore finish before installation, if fitting or machining is required at Project site. 3.3 ADJUSTING AND PROTECTING A. Operation: Rehang or replace doors that do not swing or operate freely. FLUSH WOOD DOORS 08211 -5 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 B. Finished Doors: Refinish or replace doors damaged during installation. C. Protect doors as recommended by door manufacturer to ensure that wood doors are without damage or deterioration at the time of Substantial Completion. END OF SECTION 08211 FLUSH WOOD DOORS 08211 -6 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 SECTION 08305-ACCESS DOORS PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following types of access doors: 1. Wall access doors. 2. Fire-rated wall access doors. 3. Ceiling access doors. 4. Fire-rated ceiling access doors. B. Related Sections: The following Sections contain requirements that relate to this Section: 1. Division 4 Sections for building in anchors and grouting frames set in masonry construction. 2. Division 7 Section 'Roof Accessories"for roof hatches. 3. Division 8 Section "Door Hardware"for mortise or rim cylinder locks. 4. Division 9 Section "Gypsum Board Assemblies"for gypsum board walls and ceilings. 5. Division 9 Section 'Tile"for ceramic tile walls. 6. Division 9 Section "Acoustical Tile Ceilings' for access tile in suspended or furred acoustical tile ceilings. 7. Division 15 Section"Duct Accessories'for duct access doors. 1.3 SUBMITTALS A. General: Submit each item in this Article according to the Conditions of Contract and Division 1 Specification Sections. B. Product data for each type of access door assembly specified, including details of construction relative to materials, individual components, profiles, finishes, and fire-protection ratings (if required). 1. Include complete schedule, including types, general locations, sizes, wall and ceiling construction details, latching or locking provisions, and other data pertinent to installation. C. Shop drawings showing fabrication and installation of customized access doors and frames, including details of each frame type, elevations of door design types, anchorage, and accessory items. D. Samples, 3-inch (75-mm) by 5-inch (125-mm) minimum size, of each panel face material showing factory-finished color and texture. ACCESS DOORS 08305 -1 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 1.4 QUALITY ASSURANCE A. Single-Source Responsibility: Obtain access doors for entire Project from one source and by a single manufacturer. B. Fire-Rated Door Assemblies: Units that comply with NFPA 80, are identical to door and frame assemblies tested for fire-test-response characteristics per test method as indicated below, and are labeled and listed by UL, Warnock Hersey, or another testing and inspecting agency acceptable to authorities having jurisdiction. 1. Test Method for Vertical Installations: ASTM E 152. 2. Test Method for Horizontal Installations: ASTM E 119. C. Size Variations: Obtain Architect's acceptance of manufacturer's standard size units, which may vary slightly from sizes indicated. 1.5 COORDINATION A. Verification: Determine specific locations and sizes for access doors needed to gain access to concealed equipment, and indicate on schedule specified under"Submittals"Article. PART2- PRODUCTS 2.1 MANUFACTURERS A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated in the Work include, but are not limited to,the following: B. Manufacturers: Subject to compliance with requirements, provide products by one of the following: 1. Acudor Products Inc. 2. Bar-Co, Inc. Div.,Alfab, Inc. 3. Cesco Products. 4. Elmdor Manufacturing Co. 5. J.L. Industries. 6. Karp Associates, Inc. 7. Larsen's Manufacturing Co. 8. Milcor, Inc. 9. Nystrom, Inc. 10. The Williams Bros. Corporation of America. 2.2 MATERIALS A. Steel Sheet: ASTM A 366 (ASTM A 366M) commercial-quality, cold-rolled steel sheet with baked-on, rust-inhibitive primer. B. Zinc-Coated Steel Sheet: ASTM A 591 (ASTM A 591 M), Electrolytic zinc-coated steel sheet with Class C coating and phosphate treatment to prepare surface for painting. ACCESS DOORS 08305-2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 C. Stainless-Steel Sheet: ASTM A 167, Type 304 with No. 4 finish according to ASTM A 480 (ASTM A 480M). 2.3 ACCESS DOORS A. Insulated, Fire-Rated Access Doors: Self-latching units consisting of frame, trim, door, insulation, and hardware, including automatic closer, interior latch release, and complying with the following requirements: 1. Frame with Exposed Trim: Perimeter frame with integral exposed trim complying with the following requirements: a. Metal: 0.0598-inch-(1.52-mm-)thick steel sheet. b. Metal: 0.0598-inch-(1.52-mm-)thick zinc-coated steel sheet. C. Metal: 0.0625-inch-(1.59-mm-)thick stainless-steel sheet. d. Trim: 1-inch (25.4-mm)flange overlapping surfaces surrounding door frame. e. Trim: 1-1/4-inch (31.75-mm)flange overlapping surfaces surrounding door frame. 2. Trimless Frame: Perimeter frame complying with the following requirements: a. Metal: 0.0598-inch- (1.52-mm-)thick steel sheet. b. Metal: 0.0598-inch-(1.52-mm-)thick zinc-coated steel sheet. C. Metal: 0.0625-inch- (1.59-mm-)thick stainless-steel sheet. d. Frame Configuration: Flange integral with frame and overlapping face of adjoining gypsum board, with surface formed to receive joint compound. e. Frame Configuration: Zinc-coated steel sheet edge trim with both face and back flanges; face flange formed to receive joint compound,with thickness required to fit over edges of adjoining gypsum board panels. 3. Door: 0.0359-inch- (0.91-mm-) thick steel sheet, welded pan type. 4. Door: 0.0359-inch- (0.91-mm-) thick zinc-coated steel sheet,welded pan type. 5. Door: 0.0375-inch-(0.95-mm-) thick stainless-steel sheet, welded pan type. 6. Hinges: Continuous type. 7. Latches: Bolt type,operated by either a ring turn or flush key device (keyed alike). 8. Insulation: 2-inch- (50.8-mm-)thick mineral-fiber insulation. 9. Fire-Protection Rating for Walls: 1-1/2 hours. 10. Fire-Protection Rating for Walls: 1-1/2 hours with a temperature rise not exceeding 250 deg F (139 deg C) at the end of 30 minutes. 11. Fire-Protection Rating for Ceilings: 1 hour for wood-framed walls and other combustible wall assemblies. 12. Fire-Protection Rating for Ceilings: 3 hours for combustible assemblies. B. Noninsulated, Fire-Rated Doors for Walls: Self-latching units consisting of frame, trim, door, and hardware, including automatic closer, interior latch release, and complying with the following requirements: 1. Frame: 0.0598-inch-(1.52-mm-)thick steel sheet. 2. Frame: 0.0598-inch-(1.52-mm-)thick zinc-coated steel sheet. 3. Frame: 0.0625-inch-(1.59-mm-)thick stainless-steel sheet. 4. Door: 0.0598-inch-(1.52-mm-)thick steel sheet. 5. Door: 0.0598-inch- (1.52-mm-)thick zinc-coated steel sheet. 6. Door: 0.0625-inch-(1.59-mm-)thick stainless-steel sheet_ ACCESS DOORS 08305-3 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 7. Hinge: Continuous type. 8. Latches: Bolt type, operated by either a ring turn or flush key device(keyed alike). 9. Fire-Protection Rating for Walls: 1-1/2 hours. C. Flush Access Doors with Exposed Trim: Units consisting of frame with exposed trim, door, hardware, and complying with the following requirements: 1. Frame: 0.0598-inch-(1.52-mm-)thick steel sheet. 2. Frame: 0.0598-inch-(1.52-mm-)thick zinc-coated steel sheet. 3. Frame: 0.0625-inch- (1.59-mm-)thick stainless-steel sheet. 4. Door: 0.0747-inch- (1.90-mm-)thick steel sheet. 5. Door: 0.0747-inch- (1.90-mm-)thick zinc-coated steel sheet. 6. Door: 0.0781-inch- (1.98-mm-)thick stainless-steel sheet. 7. Trim: Flange integral with frame, 3/4 inch (19 mm) wide, overlapping surrounding finished surface. 8. Hinge: Continuous type. 9. Locks: Flush, screwdriver-operated cam. 10. Locks: Key-operated cylinder lock. D. Trimless, Flush Access Doors for Gypsum Board: Units consisting of frame, concealed edge trim, door, hardware, and complying with the following requirements: 1. Frame: 0.0598-inch-(1.52-mm-)thick steel sheet. 2. Frame: 0.0598-inch- (1.52-mm-)thick zinc-coated steel sheet. 3. Frame: 0.0625-inch- (1.59-mm-)thick stainless-steel sheet. 4. Door: 0.0747-inch-(1.90-mm-)thick steel sheet. 5. Door: 0.0747-inch- (1.90-mm-)thick zinc-coated steel sheet. 6. Door: 0.0781-inch- (1.98-mm-) thick stainless-steel sheet. 7. Concealed, Gypsum Board Edge Trim: 0.0299-inch (0.76-mm) zinc-coated or galvanized-steel sheet with face flange formed to receive joint compound. 8. Hinge: Concealed spring pin or continuous type. 9. Locks: Screwdriver-operated cam. 10. Locks: Key-operated cylinder lock. E. Trimless, Flush Access Doors for Plaster: Units consisting of frame, casing bead, door, hardware, and complying with the following requirements: 1. Frame: 0.0598-inch- (1.52-mm-)thick steel sheet. 2. Frame: 0.0598-inch- (1.52-mm-)thick zinc-coated steel sheet. 3. Frame: 0.0625-inch- (1.59-mm-)thick stainless-steel sheet. 4. Door: 0.0747-inch-(1.90-mm-) thick steel sheet. 5. Door: 0.0747-inch-(1.90-mm-)thick zinc-coated steel sheet. 6. Door: 0.0781-inch- (1.98-mm-)thick stainless-steel sheet. 7. Plaster Casing Bead: 0.0299-inch (0.76-mm) zinc-coated-steel casing bead with flange formed out of expanded metal lath. 8. Hinge: Concealed spring pin or continuous type. 9. Locks: Screwdriver-operated cam. 10. Locks: Key-operated cylinder lock. F. Trimless, Recessed Doors for Gypsum Board Assemblies: Units consisting of frame with concealed edge trim, door, hardware, and complying with the following requirements: 1. Frame: 0.0897-inch-(2.30-mm-)thick steel sheet. 2. Frame: 0.0897-inch- (2.30-mm-)thick zinc-coated steel sheet. ACCESS DOORS 08305-4 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 3. Frame: 0.0938-inch- (2.40-mm-) thick stainless-steel sheet. 4. Door: 0.0598-inch-(1.52-mm-)thick steel sheet, recessed 1 inch (25.4 mm). 5. Door: 0.0598-inch-(1.52-mm-)thick zinc-coated steel sheet, recessed 1 inch (25.4 mm). 6. Door: 0.0625-inch- (1.59-mm-)thick stainless-steel sheet, recessed 1 inch (25.4 mm). 7. Concealed, Gypsum Board Edge Trim: 0.298-inch (0.76-mm) zinc-coated steel sheet gypsum board edge trim formed to receive joint compound. 8. Hinge: Concealed, pivoting-rod type. 9. Locks: Flush to finished surface, screwdriver-operated cam. 10. Locks: Flush to finished surface, key-operated cylinder lock. G. Recessed Door for Plaster: Units consisting of frame with concealed edge trim, recessed door, hardware, and complying with the following requirements: 1. Frame: 0.0897-inch- (2.30-mm-)thick steel sheet. 2. Frame: 0.0897-inch- (2.30-mm-) thick zinc-coated steel sheet. 3. Frame: 0.0938-inch- (2.40-mm-)thick stainless-steel sheet. 4. Door: 0.0598-inch- (1.52-mm-) thick steel sheet, recessed 1/2 inch (12.7 mm) and lined with self-furring 3.4 lb./sq. yd. (1.8 kg/sq. m)flat-rib, galvanized-steel lath. 5. Door: 0.0598-inch- (1.52-mm-) thick zinc-coated steel sheet, recessed 1/2 inch (12.7 mm)and lined with self-furring 3.4 lb./sq. yd. (1.8 kg/sq. m)flat-rib, galvanized-steel lath. 6. Door: 0.0625-inch- (1.59-mm-) thick stainless-steel sheet, recessed 1/2 inch (12.7 mm) and lined with self-furring 3.4 lb./sq.yd. (1.8 kg/sq. m)flat-rib, galvanized-steel lath. 7. Plaster Casing Bead: 0.0299-inch (0.76-mm) zinc-coated-steel casing bead with flange formed out of expanded metal lath. 8. Hinge: Concealed, pivoting-rod type. 9. Locks: Flush to finished surface, screwdriver-operated cam. 10. Locks: Flush to finished surface, key-operated cylinder lock. H. Recessed Doors for Acoustical Tile Ceilings: Units consisting of frame with no exposed trim, recessed door to receive tile, hardware, and complying with the following requirements: 1. Frame: 0.0897-inch- (2.30-mm-)thick steel sheet. 2. Frame: 0.0897-inch- (2.30-mm-)thick zinc-coated steel sheet. 3. Frame: 0.0938-inch- (2.40-mm-)thick stainless-steel sheet. 4. Door: 0.0598-inch- (1.52-mm-)thick steel sheet, recessed 1 inch (25.4 mm). 5. Door: 0.0598-inch- (1.52-mm-)thick zinc-coated steel sheet, recessed 1 inch (25.4 mm). 6. Door: 0.0625-inch-(1.59-mm-)thick stainless-steel sheet, recessed 1 inch (25.4 mm). 7. Hinge: Concealed, pivoting-rod type. 8. Locks: Flush to finished surface, screwdriver-operated cam. 9. Locks: Flush to finished surface, key-operated cylinder lock. I. High-Security Access Doors: For maximum security in areas where access is required. 1. Frames: 3/16-inch (4.76-mm) by 2-inch (50.8-mm) by 2-inch (50.8-mm) angle welded with joints ground smooth. 2. Door: 0.1345-inch- (3.40-mm-)thick steel sheet. 3. Hinges: Heavy-duty steel welded to door and frame. 4. Locks: Heavy-duty, detention-type lock. 5. Locks: Doors prepared for mortise (or rim cylinder) lock furnished in Division 8 Section "Door Hardware-" 2.4 FABRICATION ACCESS DOORS 08305-5 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. General: Manufacture each access door assembly as an integral unit ready for installation. B. Steel Access Doors and Frames: Continuous welded construction. Grind welds smooth and flush with adjacent surfaces. Furnish attachment devices and fasteners of type required to secure access panels to types of supports indicated. 1. Exposed Flange: Nominal 1 to 1-1/2 inches (25.4 to 38.1 mm) wide around perimeter of frame. 2. For gypsum board assemblies or gypsum veneer plaster, furnish frames with edge trim for gypsum board or gypsum base. 3. For full-bed plaster applications, furnish frames with galvanized expanded metal lath and exposed casing bead,welded to perimeter of frame. 4. For installation in masonry construction, furnish frames with adjustable metal masonry anchors. C. Recessed Panel Doors: Form face of panel to provide recess for application of applied finish. Reinforce panel as required to prevent buckling. 1. Furnish recessed panel doors for concealed installation in acoustic tile ceiling systems. 2. Furnish recessed panel doors and frames with expanded metal lath for concealed installation in plaster. D. Locking Devices: Furnish number required to hold door in flush, smooth plane when closed. 1. For cylinder lock, furnish 2 keys per lock and key all locks alike_ 2. For recessed panel doors, provide access sleeves for each locking device. Furnish plastic grommets and install in holes cut through finish. PART 3- EXECUTION 3.1 PREPARATION A. Advise Installers of other work about specific requirements relating to access door installation, including sizes of openings to receive access door and frame, as well as locations of supports, inserts, and anchoring devices. Furnish inserts and anchoring devices for access doors that must be built into other construction. Coordinate delivery with other work to avoid delay. 3.2 INSTALLATION A. Comply with manufacturer's instructions for installing access doors. B. Set frames accurately in position and attach securely to supports with plane of face panels aligned with adjacent finished surfaces. C. Install concealed-frame access doors flush with adjacent finish surfaces. 3.3 ADJUST AND CLEAN A. Adjust hardware and panels after installation for proper operation. ACCESS DOORS 08305-6 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 B. Remove and replace panels or frames that are warped, bowed, or otherwise damaged. END OF SECTION 08305 ACCESS DOORS 08305-7 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 SECTION 08331 -OVERHEAD COILING DOORS PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 12 SUMMARY A. This Section includes the following types of overhead coiling doors: 1. Service doors. B. Related Sections include the following: 1. Division 8 Section"Door Hardware"for lock cylinders and keying. 2. Division 9 Section "Painting'for field-applied paint finish. 3. Division 16 Section "Conductors and Cables" for electrical service and connections for powered operators, and accessories. 4. Division 16 Section "Disconnect Switches and Circuit Breakers" for disconnect switches and circuit breakers for powered operators. 1.3 DEFINITIONS A. Operation Cycle: One complete cycle of a door begins with the door in the closed position. The door is then moved to the open position and back to the closed position. 1.4 PERFORMANCE REQUIREMENTS A. Structural Performance: Provide overhead coiling doors capable of withstanding the effects of gravity loads and the following loads and stresses without evidencing permanent deformation of door components: 1. Wind Load: Uniform pressure (velocity pressure) of 20 Ibf/sq. ft. (960 Pa), acting inward and outward. B. Operation-Cycle Requirements: Design overhead coiling door components and operator to operate for not less than 10,000 cycles. C. Operation-Cycle Requirements: Design overhead coiling door components and operator to operate for not less than 20,000 cycles. D. Operation-Cycle Requirements: Design overhead coiling door components and operator to operate for not less than 20,000 cycles and for 10 cycles per day. 1. Include tamperproof cycle counter. OVERHEAD COILING DOORS 08331 - 1 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 1.5 SUBMITTALS A. Product Data: For each type and size of overhead coiling door and accessory. Include details of construction relative to materials, dimensions of individual components, profiles, and finishes. Provide roughing-in diagrams, operating instructions, and maintenance information. Include the following: 1. Setting drawings, templates, and installation instructions for built-in or embedded anchor devices. 2. Summary of forces and loads on walls and jambs. 3. Motors: Show nameplate data and ratings; characteristics; mounting arrangements; size and location of winding termination lugs, conduit entry, and grounding lug; and coatings. 4. Fire-Rated Doors: Information describing fire-release system, including testing and resetting instructions. B. Shop Drawings: For special components and installations not dimensioned or detailed in manufacturer's data sheets. 1. Wiring Diagrams: Detail wiring for power, signal, and control systems. Differentiate between manufacturer-installed and field-installed wiring and between components provided by door manufacturer and those provided by others. C. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available for units with factory-applied finishes. D. Samples for Verification: Of each type of exposed finish required, prepared on Samples of size indicated below and of same thickness and material indicated for Work. Where finishes involve normal color and texture variations, include Sample sets showing the full range of variations expected. 1. Curtain Slats: 12-inch (300-mm) length. 2. Bottom Bar: 6-inch (150-mm) length. 3. Guides: 6-inch (150-mm) length. 4. Brackets: 6 inches (150 mm) square. 5. Hood: 6 inches (150 mm)square. 6. Laminate-Clad Counter Panel Product: 6 inches (150 mm) square, for each type, color, pattern, and surface finish, laminated to core. E. Installer Certificates: Signed by manufacturer certifying that installers comply with specified requirements. F. Oversize Construction Certification: For door assemblies required to be fire-rated and exceeding limitations of labeled assemblies, submit certification of a testing agency acceptable to authorities having jurisdiction that each door and frame assembly has been constructed to comply with design, materials, and construction equivalent to requirements for labeled construction. 1.6 QUALITY ASSURANCE OVERHEAD COILING DOORS 08331 -2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Installer Qualifications: Engage an experienced installer who is an authorized representative of the overhead coiling door manufacturer for both installation and maintenance of units required for this Project. B. Source Limitations: Obtain overhead coiling doors through one source from a single manufacturer. 1. Obtain operators and controls from the overhead coiling door manufacturer. C. Fire-Rated Door Assemblies: Provide assemblies complying with NFPA 80 that are identical to door and frame assemblies tested for fire-test-response characteristics per UL 10b, and that are labeled and listed for fire ratings indicated by UL, FM, ITS/Warnock Hersey, or another testing and inspecting agency acceptable to authorities having jurisdiction. D. Oversize Fire-Rated Door Assemblies: For units exceeding sizes of tested assemblies, provide certification by a testing agency acceptable to authorities having jurisdiction that doors comply with all standard construction requirements of tested and labeled fire-rated door assemblies, except for size. E. Listing and Labeling: Provide electrically operated fixtures specified in this Section that are listed and labeled. 1. The Terms"Listed"and "Labeled": As defined in NFPA 70,Article 100. 2, Listing and Labeling Agency Qualifications: A "Nationally Recognized Testing Laboratory"as defined in OSHA Regulation 1910.7. PART2-PRODUCTS 2.1 MANUFACTURERS A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering products that may be incorporated into the Work include, but are not limited to, the following: B. Manufacturer: Subject to compliance with requirements, provide products by one of the following: 1. Alpine Overhead Doors, Inc. 2. Atlas Door Corp.; Div. of Clopay Building Products Co. 3. The Cookson Company. 4. Cornell Iron Works Inc. 5. Dynamic Closures (1995) LTD. 6. Mahon Door Corp. 7. McKeon Rolling Steel Door Company, Inc. 8. Overhead Door Corporation. 9. Pacific Rolling Door Co. 10. Raynor Garage Doors. 11. Roll-Lite Door Corp.; Div. of Clopay Building Products Co. 12. Southwestern Steel Rolling Door Co. 13. Wayne-Dalton Corp. 14. Windsor Door;A United Dominion Company. OVERHEAD COILING DOORS 08331 -3 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 2.2 DOOR CURTAIN MATERIALS AND CONSTRUCTION A. Door Curtain: Fabricate overhead coiling door curtain of interlocking slats, designed to withstand wind loading indicated, in a continuous length for width of door without splices. Unless otherwise indicated, provide slats of material thickness recommended by door manufacturer for performance, size, and type of door indicated, and as follows: 1. Steel Door Curtain Slats: Structural-quality, cold-rolled galvanized steel sheets complying with ASTM A 653,with G90(ASTM A 653M,with Z275) zinc coating. 2. Stainless-Steel Door Curtain Slats: Type 300 series, ASTM A 240 (ASTM A 240M) or ASTM A 666. 3. Aluminum Door Curtain Slats. ASTM B 209 (ASTM B 209M) or ASTM B 221 (ASTM B 221 M), alloy and temper recommended by aluminum producer and finisher for type of use and finish indicated. a. Provide manufacturer's standard S-configuration slats. b. Provide manufacturer's standard flat-profile slats. 4. Insulation: Fill slat with manufacturers standard rigid cellular polystyrene or polyurethane-foam-type thermal insulation complying with maximum flame-spread and smoke-developed indices of 75 and 450, respectively, according to ASTM E 84. Enclose insulation completely within metal slat faces. 5. Inside Curtain Slat Face: To match material of outside metal curtain slat and as follows: a. Galvanized Steel Sheet Thickness: Not less than 0,028 inch (0.7 mm). b. Stainless-Steel Sheet Thickness: Not less than 0.025 inch (0.65 mm). C. Aluminum Sheet Thickness: Same thickness as outside aluminum curtain face slat: B. Endlocks: Malleable-iron castings galvanized after fabrication, secured to curtain slats with galvanized rivets, or high-strength nylon. Provide locks on not less than alternate curtain slats for curtain alignment and resistance against lateral movement. C. Endlocks: Manufacturers standard locks on not less than alternate curtain slats for curtain alignment and resistance against lateral movement. D. Windlocks: Malleable-iron castings secured to curtain slats with galvanized rivets or high- strength nylon, as required to comply with wind load. E. Bottom Bar: Consisting of 2 angles, each not less than 1-1/2 by 1-1/2 by 118 inch (38 by 38 by 3 mm) thick, either galvanized or stainless-steel or aluminum extrusions to suit type of curtain slats. F. Bottom Bar: Manufacturer's standard continuous channel or tubular shape, either stainless- steel or aluminum extrusions to suit type of curtain slats. 1. Astragal: Provide a replaceable, adjustable, continuous, compressible gasket of Flexible vinyl, rubber, or neoprene, between angles or fitted to shape, as a cushion bumper for interior door. 2. Provide motor-operated doors with combination bottom astragal and sensor edge. G. Curtain Jamb Guides: Fabricate curtain jamb guides of steel angles, or channels and angles, with sufficient depth and strength to retain curtain, to allow curtain to operate smoothly, and to withstand loading. Build up units with not less than 3/16-inch- (5-mm-) thick, galvanized steel OVERHEAD COILING DOORS 08331 -4 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 sections complying with ASTM A 36 (ASTM A 36M)., and ASTM A 123. Slot bolt holes for guide adjustment. Provide removable stops on guides to prevent overtravel of curtain and a continuous bar for holding windlocks. H. Curtain Jamb Guides: Fabricate curtain jamb guides of angles, or channels and angles of material and finish to match curtain slats, with sufficient depth and strength to retain curtain, to allow curtain to operate smoothly, and to withstand loading. Provide continuous integral wear strips to prevent metal-to-metal contact and minimize noise of travel and removable stops on guides to prevent overtravel of curtain. 2.3 HOODS AND ACCESSORIES A. Hood: Form to entirely enclose coiled curtain and operating mechanism at opening head and act as weatherseal. Contour to suit end brackets to which hood is attached. Roll and reinforce top and bottom edges for stiffness. Provide closed ends for surface-mounted hoods and fascia for any portion of between-jamb mounting projecting beyond wall face. Provide intermediate support brackets as required to prevent sag. 1. Fabricate steel hoods, for steel doors, of not less than 0.028-inch (0.7-mm) thick, hot-dip galvanized steel sheet with G90 (Z275) zinc coating, complying with ASTM A 653 (ASTM A 653M). 2. Fabricate hoods of stainless-steel sheet, Type 300 series, complying with ASTM A 240 (ASTM A 240M) or ASTM A 666, and not less than 0.025-inch (0.65-mm) thick, for stainless-steel doors. 3. Include automatic drop baffle to guard against passage of smoke or flame. 4. Fabricate aluminum hoods, complying with ASTM B 209 (ASTM B 209M), alloy and temper recommended by aluminum producer and finisher for type of use and finish indicated, and not less than 0.032 inch (0.8 mm)thick, for aluminum doors. 5. Shape: Round. 6. Shape: Square. 7. Exterior Mounted Door: Fabricate hood with sealant-joint bead profile for applying joint sealant. B. Integral Frame, Hood, and Fascia: Provide welded assemblies of the following sheet metal: 1. Fabricate of not less than 0.064-inch-(1.6-mm-)thick, hot-dip galvanized steel sheet with G90(Z275)zinc coating, complying with ASTM A 653 (ASTM A 653M). 2. Fabricate of not less than 0.0625-inch- (1.6-mm-) thick, stainless-steel sheet, Type 300 series, complying with ASTM A 240 (ASTM A 240M)or ASTM A 666. C. Integral Sills: Fabricate sills as integral part of frame assembly of same sheet metal, but not less than 0.078 inch (2.0 mm)thick. D. Fire-Rated Counter: Provide fire-door manufacturer's high-pressure decorative laminate covered countertop, UL tested and labeled for 1-1/2-hour fire rating for approved use with fire- door assembly. 1. High-Pressure Decorative Laminate: Match color, pattern, and finish indicated by reference to manufacturer's standard designations for these characteristics, 2. High-Pressure Decorative Laminate: Provide Architect's selections from manufacturer's full range of colors, patterns, and finishes of type used in fire-door assembly tested by UL. OVERHEAD COILING DOORS 08331 -5 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 E. Smoke Seals: Provide UL-listed and -tested smoke-seal perimeter gaskets. F. Weatherseals: Provide replaceable, adjustable, continuous, compressible weather-stripping gaskets fitted to bottom and at top of exterior doors, unless otherwise indicated. At door head, use 1/8-inch- (3-mm-) thick, replaceable, continuous sheet secured to inside of curtain coil hood. 1. Provide motor-operated doors with combination bottom weatherseal and sensor edge. 2. In addition, provide replaceable, adjustable, continuous, flexible, 1/8-inch- (3-mm-) thick seals of flexible vinyl, rubber, or neoprene at doorjambs for a weathertight installation. G. Windows: Provide windows of 1/4-inch (6-mm) clear, transparent acrylic sheet, of size and in arrangement shown. Set glazing in vinyl, rubber or neoprene glazing channel secured to curtain slats. H. Push/Pull Handles: For push-up-operated or emergency-operated doors, provide galvanized steel lifting handles on each side of door. 1. Provide pull-down straps or pole hooks for doors more than 84 inches(2130 mm) high. I. Slide Bolt: Fabricate with side locking bolts to engage through slots in tracks for locking by padlock, located on both left and right jamb sides, operable from coil side. J. Fabricate locking device assembly with lock, spring-loaded dead bolt, operating handle, cam plate, and adjustable locking bar to engage through slots in tracks. 1. Locking Bars: Single-jamb side, operable from inside only. 2. Locking Bars: Single-jamb side, operable from outside only. 3. Locking Bars: Single-jamb side, operable from inside and outside. 4. Locking Bars: Full-disc Cremona type, both jamb sides, operable from inside and outside. 5. Lock cylinder is specified in another Division 8 Section. K. Chain Lock Keeper: Suitable for padlock. L. Where door unit is power operated, provide safety interlock switch to disengage power supply when door is locked. M. Provide automatic-closing device inoperative during normal door operations, with governor unit complying with requirements of NFPA 80, with easily tested and reset release mechanism, and designed to be activated by the following: 1. Governor: Oscillating type. 2. Governor: Viscous-speed type. 3. Temperature rise and melting point of 165 deg F (74 deg C) replaceable fusible links, interconnected and on both sides of wall of door opening. 4. Manufacturer's standard UL-labeled smoke detector and door-holder-release devices. 5. Manufacturers standard UL-labeled heat detector and door-holder-release devices. 6. Building fire alarm and detection system and door-holder-release devices. 2.4 COUNTERBALANCING MECHANISM OVERHEAD COILING DOORS 08331 -6 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. General: Counterbalance doors by means of adjustable-tension steel helical torsion spring, mounted around a steel shaft and contained in a spring barrel connected to door curtain with required barrel rings. Use grease-sealed bearings or self-lubricating graphite bearings for rotating members. B. Counterbalance Barrel: Fabricate spring barrel of hot-formed, structural-quality, welded or seamless carbon-steel pipe, of sufficient diameter and wall thickness to support rolled-up curtain without distortion of slats and to limit barrel deflection to not more than 0.03 in./ft. (2.5 mm/m)of span under full load. C. Provide spring balance of one or more oil-tempered, heat-treated steel helical torsion springs. Size springs to counterbalance weight of curtain, with uniform adjustment accessible from outside barrel. Provide cast-steel barrel plugs to secure ends of springs to barrel and shaft. D. Fabricate torsion rod for counterbalance shaft of cold-rolled steel, sized to hold fixed spring ends and carry torsional load. E. Brackets: Provide mounting brackets of manufacturer's standard design, either cast-iron or cold-rolled steel plate with bell-mouth guide groove for curtain. 2.5 FINISHES, GENERAL A. General: Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes. B. Appearance of Finished Work: Variations in appearance of abutting or adjacent pieces are acceptable if they are within one-half of the range of approved Samples. Noticeable variations in the same piece are not acceptable. Variations in appearance of other components are acceptable if they are within the range of approved Samples and are assembled or installed to minimize contrast. 2.6 ALUMINUM FINISHES A. Finish designations prefixed by AA conform to the system established by the Aluminum Association for designating aluminum finishes. B. Manufacturer's standard mill finish. C. Class ll, Clear Anodic Finish: AA-M12C22A31 (Mechanical Finish: nonspecular as fabricated; Chemical Finish: etched, medium matte; Anodic Coating: Architectural Class Il, clear coating 0.010 mm or thicker)complying with AAMA 607.1. D. Powder-Coat-Applied Finish: Apply manufacturer's standard powder-coat-applied finish consisting of primer and topcoat(s) according to coating manufacturer's written instructions for cleaning, pretreatment, application,thermosetting, and minimum dry film thickness. 1. Color and Gloss: As indicated by manufacturers color and gloss designations. 2. Color and Gloss: Match Architect's sample. 3. Color and Gloss: As selected by Architect from manufacturer's full range of colors and glosses. OVERHEAD COILING DOORS 08331 -7 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 2.7 STEEL AND GALVANIZED STEEL FINISHES A. Factory Primer for Field Finish: Apply manufacturer's standard primer, compatible with field- applied finish according to coating manufacturer's written instructions for cleaning, pretreatment, application, and minimum dry film thickness. 1. Apply to ferrous surfaces except zinc-coated metal. B. Thermoset Finish: Apply manufacturer's standard baked finish consisting of primer and thermosetting topcoat according to coating manufacturer's written instructions for cleaning, pretreatment, application, thermosetting, and minimum dry film thickness. C. Powder-Coat-Applied Finish: Apply manufacturer's standard powder-coat-applied finish consisting of primer and topcoat(s) according to coating manufacturer's written instructions for cleaning, pretreatment, application, thermosetting, and minimum dry film thickness. 1. Color and Gloss: As indicated by manufacturer's color and gloss designations. 2. Color and Gloss: Match Architect's sample. 3. Color and Gloss: As selected by Architect from manufacturer's full range of colors and glosses. 2.8 STAINLESS-STEEL FINISHES A. General: Remove or blend tool and die marks and stretch lines into finish. 1. Grind and polish surfaces to produce uniform, directional textured, polished finish indicated, free of cross scratches. Run grain with long dimension of each piece. B. Bright, Cold-Rolled, Unpolished Finish: No.2B finish. C. Bright, Directional Polish: No. 4 finish. D. When polishing is completed, passivate and rinse surfaces. Remove embedded foreign matter and leave surfaces chemically clean. 2.9 MANUAL DOOR OPERATORS A. Provide manual operators, unless electric door operators are indicated. When not shown, provide chain-hoist operator unit. B. Push-up Operation: Design counterbalance mechanism so required lift or pull for door operation does not exceed 25 Ibf(111 N). C. Chain-Hoist Operator: Provide manual chain-hoist operator consisting of endless steel hand chain, chain pocket wheel and guard, and gear-reduction unit with a maximum 35-Ibf (155-N) effort for door operation. Provide alloy steel hand chain with chain holder secured to operator guide. D. Crank-Hoist Operator: Provide crank-hoist operator consisting of crank and crank gearbox, steel crank drive shaft, and gear-reduction unit. Size gears to require no more than 35-Ibf(155- N) effort to turn crank. Fabricate gearbox to completely enclose operating mechanism and be oil tight. Provide manufacturer's standard crank-locking device. OVERHEAD COILING DOORS 08331 -8 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 1. Provide manufacturer's standard removable operating arm for each crank-gear unit. 2.10 ELECTRIC DOOR OPERATORS A. General: Provide electric door operator assembly of size and capacity recommended and provided by door manufacturer for door and operational life specified, with electric motor and factory-prewired motor controls, starter, gear-reduction unit, solenoid-operated brake, clutch, remote-control stations, control devices, integral gearing for locking door, and accessories required for proper operation. B. Comply with NFPA 70. C. Disconnect Device: Provide hand-operated disconnect or mechanism for automatically engaging sprocket-chain operator and releasing brake for emergency manual operation while disconnecting motor, without affecting timing of limit switch. Mount disconnect and operator so they are accessible from floor level. Include interlock device to automatically prevent motor from operating when emergency operator is engaged. D. Design operator so motor may be removed without disturbing limit-switch adjustment and without affecting emergency auxiliary operator. E. Provide control equipment complying with NEMA ICS 1, NEMA ICS 2, and NEMA ICS 6, with NFPA 70 Class 2 control circuit, maximum 24-V, ac or dc. F. Door-Operator Type: Provide wall-, hood-, or bracket-mounted,jackshaft, gear-head-type door operator unit consisting of electric motor, enclosed worm-gear running-in-oil primary drive, chain and sprocket secondary drive, and quick disconnect-release for manual operation- G. Door-Operator Type: Provide wall-, hood-, or bracket-mounted,jackshaft, gear-head hoist-type door operator unit consisting of electric motor, enclosed worm-gear running-in-oil primary drive, chain and sprocket secondary drive, and auxiliary chain-hoist and floor level disconnect. H. Electric Motors: Provide high-starting torque, reversible, continuous-duty, Class A insulated, electric motors, complying with NEMA MG 1,with overload protection, sized to start, accelerate, and operate door in either direction,from any position, at not less than 2/3 fps (0.2 m/s) or more than 1 fps (0.3 m/s),without exceeding nameplate ratings or considering service factor. 1. Type: Polyphase, medium-induction type. 2. Service Factor: According to NEMA MG 1, unless otherwise indicated. 3. Coordinate wiring requirements and electric characteristics of motors with building electrical system. 4. Provide open dripproof-type motor, and controller with NEMA ICS 6,Type 1 enclosure. 5. Provide totally enclosed, nonventilated or fan-cooled motors, fitted with plugged drain, and controller with NEMA ICS 6,Type 4 enclosure where indicated. I. Remote-Control Station: Provide momentary-contact, 3-button control station with push-button controls labeled "Open," "Close," and "Stop" 1. Provide interior units, full-guarded, surface-mounted, heavy-duty type, with general- purpose NEMA ICS 6,Type 1 enclosure. 2. Provide exterior units, full-guarded, standard-duty, surface-mounted, weatherproof type, NEMA ICS 6,Type 4 enclosure, key operated. OVERHEAD COILING DOORS 08331 -9 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 J. Obstruction Detection Device: Provide each motorized door with indicated external automatic safety sensor able to protect full width of door opening. Activation of sensor immediately stops and reverses downward door travel. 1. Photoelectric Sensor: Manufacturers standard system designed to detect an obstruction in door opening without contact between door and obstruction. a. Self-Monitoring Type: Provide self-monitoring sensor designed to interface with door operator control circuit to detect damage to or disconnection of sensing device. When self-monitoring feature is activated, door operates to close only with constant pressure on close button. 2. Sensor Edge: Provide each motorized door with an automatic safety sensor edge, located within astragal or weather stripping mounted to bottom bar. Contact with sensor immediately stops and reverses downward door travel. Connect to control circuit using manufacturer's standard take-up reel or self-coiling cable. a. Provide pneumatically actuated automatic bottom bar. b. Provide electrically actuated automatic bottom bar. 1) Self-Monitoring Type: Provide self-monitoring,4-wire configured device. K. Limit Switches: Provide adjustable switches, interlocked with motor controls and set to automatically stop door at fully opened and fully closed positions. L. Provide electric operators with ADA-compliant audible alarm and visual indicator lights. M. Radio Control: Provide radio control system consisting of the following: 1. 3-channel universal coaxial receiver to open, close, and stop door, 1 per operator. 2. Multifunction remote control. 3. Remote antenna mounting kit. PART 3- EXECUTION 3.1 INSTALLATION A. General: Install door and operating equipment complete with necessary hardware, jamb and head mold strips, anchors, inserts, hangers, and equipment supports according to Shop Drawings, manufacturer's written instructions, and as specified. 1. Install fire-rated doors to comply with NFPA 80. 3.2 ADJUSTING A. Lubricate bearings and sliding parts; adjust doors to operate easily, free from warp, twist, or distortion and fitting weathertight for entire perimeter. 3.3 DEMONSTRATION OVERHEAD COILING DOORS 08331 - 10 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Startup Services: Engage a factory-authorized service representative to perform startup services and to train Owner's maintenance personnel as specified below: 1. Test and adjust controls and safeties. Replace damaged and malfunctioning controls and equipment. a. Test door closing when activated by detector or alarm connected fire-release system. Reset door-closing mechanism after successful test. 2. Train Owner's maintenance personnel on procedures and schedules related to startup and shutdown, troubleshooting, servicing, preventive maintenance, and procedures for testing and resetting release devices. 3. Review data in the maintenance manuals. Refer to Division 1 Section "Contract Closeout." 4. Review data in the maintenance manuals. Refer to Division 1 Section "Operation and Maintenance Data" 5. Schedule training with Owner with at least 7 days'advance notice. END OF SECTION 08331 OVERHEAD COILING DOORS 08331 - 11 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 SECTION 08710 FINISH HARDWARE Part 1 - GENERAL 1.1 SUMMARY A. Section Includes: 1. Door Hardware B. Specific Omissions: Hardware for the following is specified or indicated elsewhere. 1. Windows. 2. Cabinets, including open wall shelving and locks. 3. Signs, except where scheduled. 4. Toilet accessories, including grab bars. 5. Installation. 6. Rough hardware. 1.2 REFERENCES: A. Use date of standard in effect as of Bid date. B. American National Standards Institute—ANSI 156.18—Materials and Finishes. C. ANSI A117.1 —Specifications for making buildings and facilities usable by physically handicapped people. D. ADA—Americans with Disabilities Act of 1990 E. BHMA—Builders Hardware Manufacturers Association F. DHI—Door and Hardware Institute G. NFPA—National Fire Protection Association 1. NFPA 80—Fire Doors and Windows 2. NFPA 101 —Life Safety Code 3. NFPA 105—Smoke and Draft Control Door Assemblies 4. NFPA 252—Fire Tests of Door Assemblies H. UL—Underwriters Laboratories 1. UL10C—Fire Tests of Door Assemblies (Positive Pressure) 2_ UL 305— Panic Hardware I. WHI—Warnock Hersey Incorporated J. State of California Building Code K. Local Applicable Codes L. SDI—Steel Door Institute M. WDI—Wood Door Institute N. AWI—Architectural Woodwork Institute O. NAAM—National Association of Architectural Metal Manufacturers 1.3 SUBMITTALS &SUBSTITUTIONS FINISH HARDWARE 08710-1 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. SUBMITTALS: Submit six copies of schedule per Division 1. Organize vertically formatted schedule into"Hardware Sets"with index of doors and headings, indicating complete designations of every item required for each door or opening. Include following information: 1. Type, style,function, size, quantity and finish of hardware items. Use BHMA Finish codes per ANSI Al56.18. 2. Name, part number and manufacturer of each item. 3. Fastenings and other pertinent information. 4. Location of hardware set coordinated with floor plans and door schedule. 5. Explanation of abbreviations, symbols, and codes contained in schedule. 6. Mounting locations for hardware. 7. Door and frame sizes, materials and degrees of swing. 8. List of manufacturers used and their nearest representative with address and phone number. 9. Catalog cuts. 10. Manufacturer's technical data and installation instructions for electronic hardware. 11. Date of jobsite visit- B. Bid and submit manufacturer's updated/improved item if scheduled item is discontinued. C. Make substitution requests in accordance with Division 1. Include product data and indicate benefit to the Project. Furnish operating samples on request. D. Furnish as-built/as-installed schedule with closeout documents, including keying schedule,wiring/riser diagrams, manufacturers' installation, adjustment and maintenance information, and supplier's final inspection report. 1.4 QUALITY ASSURANCE: A. Qualifications: 1. Hardware supplier: direct factory contract supplier who employs a certified architectural hardware consultant(AHC), available at reasonable times during course Work for project hardware consultation to Owner,Architect and Contractor. (1) Responsible for detailing, scheduling and ordering of finish hardware. B. Hardware: New, free of defects, blemishes and excessive play. Obtain each kind of hardware (latch and locksets, exit devices, hinges and closers)from one manufacturer. C. Exit Doors: Operable from inside with single motion without the use of a key or special knowledge or effort- D. Fire-Rated Openings: In compliance with NFPA 80. Hardware UL10C/UBC-7-2(positive pressure)compliant for given type/size opening and degree of label_ Provide proper latching hardware, non-flaming door closers, approved-bearing hinges, plus resilient and required intumescent seals. Furnish openings complete. FINISH HARDWARE 08710-2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 1. Note: scheduled seals may exceed selected door manufacturer's requirements. See 2.6.E for clarification. E. Pre-Installation Meetings: Initiate and conduct with supplier, installer and related trades, coordinate materials and techniques, and sequence complex hardware items and systems installation. Convene at least one week prior to commencement of related work. 1.5 DELIVERY, STORAGE AND HANDLING: A. Delivery: coordinate delivery to appropriate locations (shop or field). 1. Permanent keys and cores: secured delivery direct to Owner's representative. B. Acceptance at Site: Items individually packaged in manufacturers'original containers, complete with proper fasteners and related pieces. Clearly mark packages to indicate contents, locations in hardware schedule and door numbers. C. Storage: Provide locked storage area for hardware, protect from moisture, sunlight, paint, chemicals, etc... 1.6 PROJECT CONDITIONS: A. Where exact types of hardware specified are not adaptable to finished shape or size of members requiring hardware, provide suitable types having as nearly as practical as the same operation and quality as type specified, subject to Architect's approval. B. Prior to submittal, carefully inspect existing conditions to verify finish hardware required to complete Work, including sized, quantities, and sill conditions material. If conflict between the scheduled material and existing conditions, submit request for directions from Architect. Include date of jobsite visit in the submittal. 1.7 SEQUENCING AND COORDINATION: A. Coordinate with concrete. B. Reinforce walls. C. Coordinate finish floor materials and floor-mounted hardware. D. Conduit and raceways as needed for electrical, electronic and electro-pneumatic hardware items. Fire/life-safety system interfacing. Point-to-point wiring diagrams plus riser diagrams to related trades. E. Furnish manufacturer templates to door and frame fabricators. F. Use hardware consultant to check Shop Drawings for doors and entrances to confirm that adequate provisions will be made for proper hardware installation. 1_ Confirm that door manufacturers furnish necessary UBC-7-2 compliant seal packages. FINISH HARDWARE 08710-3 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 1.8 WARRANTY: A. Part of respective manufacturers' regular terms of sale. Provide manufacturers' warranties: 1. Closers: Ten years mechanical, 1 2. Exit Devices: Three years. 3. Hinges: Life of Building. 4. Other Hardware: Two years. 1.9 COMMISSIONING: A. Test door hardware operation with climate control system and stairwell pressurization system both at rest and while in full operation. B. Test electrical, electronic and electro-pneumatic hardware systems for satisfactory operation. C. Test hardware interfaced with fire/life-safety system for proper operation and release. 1.10 MAINTENANCE: I A Extra Materials: Provide 5% or a minimum of one, whichever is greater, additional hardware items: locksets, exit devices, closers and electronic hardware. See schedule under"Miscellaneous Material". PART2- PRODUCTS 2.1 MANUFACTURERS: A. Listed acceptable alternate manufacturers:submit for review products with equivalent function and features of scheduled products. ITEM: MANUFACTURER Hinges (HAG) Hager Key System (SCH)Schlage Locks (SCH)Schlage Exit Devices (VON)Von Duprin Closers (LCN) LCN Auto Flush Bolts (IVE) Ives Coordinators (IVE) Ives Silencers (IVE) Ives Kickplates (IVE)Ives Stops &Holders-exterior (IVE0 Ives Stops & Holders—interior (iVE)Ives FINISH HARDWARE 08710-4 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 Overhead Stops (GLY)Glynn-Johnson Thresholds (PEM) Pemko Seals& Bottoms (PEM) Pemko Signs (HAG) Hager B. Provide hardware items required to complete the work in accordance with these specifications and manufacturers'instructions. 1. Include items inadvertently omitted from this specification. Note these items in submittal for review. 2. Where scheduled item is now obsolete, bid and furnish manufacturers updated item at no additional cost to the project. 2.2 HANGING MEANS: A. Conventional Hinges: Hinge open widths minimum, but, of sufficient throw to permit maximum door swing. Steel or stainless steel pins and concealed bearings. 1. Three hinges per leaf to 7 foot, 6 inch height. Add one for each additional 30 inches in height, or any fraction thereof. 2. Extra heavy weight hinges on doors over 3 foot, 5 inches in width. 3. Outswinging exterior doors: non-ferrous with non-removable (NRP)pins. 4. Non-ferrous material exteriors and at doors subject to corrosive atmospheric conditions. 5. Provide shims and shimming instructions for proper door adjustment. 2.3 LOCKSETS, LATCHSETS, DEADBOLTS: A. Mortise Locksets and Latchsets: as scheduled. 1. Chassis: cold-rolled steel, handing field-changeable without disassembly. 2. Latchbolts: 3/4 inch throw stainless steel anti-friction type. 3. Lever Trim:through-bolted, accessible design, cast lever or solid extruded bar type levers as scheduled. Filled hollow tube design unacceptable. a. Spindles: security design independent break-away. Breakage of outside lever does not allow access to inside lever's hubworks to gain wrongful entry. 4. Thumbturns: accessible design not requiring pinching or twisting motions to operate. 5. Deadbolts: stainless steel 1-inch throw. 6_ Electric operation: Manufacturer-installed continuous duty solenoid. 7. Strikes: 16 gage curved steel, bronze or brass with 1 inch deep box construction, lips of sufficient length to clear trim and protect clothing. 8. Scheduled Lock Series and Design: Schlage L9000 series, 17 9. A design 10. Certifications: a_ ANSI At56.13, 1994,Grade 1 Operational, Grade 1 Security. b. ANSUASTM F476-84 Grade 31 UL Listed.: FINISH HARDWARE 08710-5 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 B. Extra Heavy Duty Cylindrical Locks and Latches: as scheduled. 1. Chassis: cylindrical design, corrosion-resistant plated cold-rolled steel, through- bolted. 2. Locking Spindle:stainless steel, interlocking design. 3- Latch Retractors: forged steel. Balance of inner parts: corrosion-resistant plated steel, or stainless steel. 4. Lever Trim: accessible design, independent operation, spring-cage supported, minimum 2" clearance from lever mid-point to door face. - 5. Electric operation: Manufacturer-installed continuous duty solenoid. 6. Strikes: 16 gage curved steel, bronze or brass with 1"deep box construction, lips of sufficient length to clear trim and protect clothing. 7. Lock Series and Design: Schlage D series Sparta design.. 8. Certifications: a. ANSI A156.2, 1994, Series 4000, Grade 1. b. UL listed for A label and lesser class single doors up to 4ft x 8ft. 2.4 EXIT DEVICES/PANIC HARDWARE A. General features: 1. Independent lab-tested 1,000,000 cycles. 2. Push-through touch pad design. No exposed touch bar fasteners, no exposed cavities when operated. Return stroke fluid dampeners and rubber bottoming dampeners, plus anti-rattle devices. 3. '/4"throw deadlocking iatchbolts. 4. No exposed screws to show through glass doors. 5. Non-handed basic device design with center case interchangeable with all functions, no extra parts required to effect change of function. 6. Releasable with 32 lb. maximum pressure under 250 lb. load to the door. B. Specific features: 1. Non-Fire Rated Devices: cylinder dogging. 2. Lever Trim: Breakaway type,forged brass or bronze escutcheon min .130" thickness, match lockset lever design. 3. Rod and latch guards with surface vertical rod devices. 4. Fire-Labeled Devices: UL label indicating "Fire Exit Hardware". Vertical rod devices less bottom rod (LBR)unless otherwise scheduled. 5. Electrically Operated Devices: Single manufacturer source for electric latch retraction devices, electrically controlled trim, power transfers, power supplies, monitoring switches and controls. 2.5 CLOSERS 4011 /4111 A. General: One manufacturer for closer units throughout the Work, including surface closers, high security closers, overhead concealed closers, floor closers, low-energy door operators and electromagnetic hold-open closers. FINISH HARDWARE 08710-6 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 B. Surface Closers: Full rack-and-pinion type cylinder with removable non-ferrous cover and cast iron body. Double heat-treated pinion shaft, single piece forged piston, chrome- silicon steel spring. 1. ISO 2000 certified. Units stamped with date-of-manufacture code. 2. Independent lab-tested 10,000,000 cycles. 3. Thru-bolts and wood doors unless doors are provided with closer blocking_ Non- sized and adjustable. Place closers inside building, stairs and rooms. 4. Plates, brackets and special templating when needed for interface with particular header,door and wall conditions and neighboring hardware. 5. Opening pressure: Exterior doors 8.5 lb., interior doors 5 lb., labeled fire doors 15 lb. 6. Separate adjusting valves for closing speed, latching speed and backcheck, fourth valve for delayed action where scheduled. 7. Extra-duty arms (EDA) at exterior doors scheduled with parallel arm units. 8. Exterior door closers: tested to 100 hours of ASTM B117 salt spray test,furnish data on request. 9. Exterior doors do not require seasonal adjustments in temperatures from 120 degrees F to—30 degrees F, furnish data on request. 10. Non-flaming fluid will not fuel door or floor covering fires.. 2.6 OTHER HARDWARE A. Automatic Flush Bolts: Low operating force design, "LBR"type. B. Overhead Stops: Stainless steel (300 series). Non-plastic mechanisms and finished metal end caps. Field-changeable hold-open,friction and stop-only functions. C. Kick Plates: Four beveled edges, .050 inches minimum thickness, height and width as scheduled. Sheet-metal screws of bronze or stainless steel to match other hardware. D. Door Stops: Provide stops to protect walls, casework or other hardware. 1. Unless otherwise noted in Hardware Sets, provide wall type with appropriate fasteners. Where wall type cannot be used, provide floor type. If neither can be used, provide overhead type.. E. Seals: Finished to match adjacent frame color. Resilient seal material: solid high-grade neoprene. UL label applied to seals on rated doors. Substitute products: certify that the products equal or exceed specified material's thickness and durability. Proposed substitutions:submit for approval. 1. Solid neoprene: MIL Spec. R6855-CL III, Grade 40. 2. Non-corroding fasteners at in-swinging exterior doors. 3. Sound control openings: Use components tested as a system using nationally accepted standards by independent laboratories. Ensure that the door leafs have the necessary sealed-in-place STC ratings. Adhesive mounted components not acceptable. Fasten applies seals over bead of sealant. 4. Fire-rated Doors, Resilient Seals: UL10C/UBC-7-2 compliant. Coordinate with selected door manufacturers and selected frame manufacturer's requirements. Where rigid housed resilient seals are scheduled in this section and the selected door manufacturer only requires an adhesive mounted resilient seal,furnish rigid FINISH HARDWARE 08710-7 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 housed seal at minimum, or both the rigid housed seal and the adhesive applied seal if necessary to fulfill door manufacturer's requirement. Adhesive applied seal alone is deemed insufficient for this project where rigid housed seals are scheduled. 5. Fire-rated Doors, Intumescent Seals: Furnish fire-labeled opening assembly complete and in full compliance with UL10C/UBC-7-2. Furnished by selected door manufacturer, these seals vary in requirement by door type and door manufacture. Adhesive applied intumescent strips are not acceptable, use concealed-in-door-edge type or kerfed-in-frame type. Careful coordination required. F. Automatic door bottoms: low operating force units. Doors with automatic door bottoms plus head and jamb seals cannot require more than two pounds operating force to open when closer is disconnected. G. Thresholds:As scheduled and per details. Substitute products: certify that the products equal or exceed specified material's thickness. Proposed substitutions: submit for approval. 1. Exteriors: Set in full bed of butyl-rubber or polyisobutylene mastic sealant complying with requirements in Division 7 "Thermal and Moisture Protection". Non-ferrous'/.inch fasteners and lead expansion shield anchors, or Red-Head #SFS-1420 (or approved equivalent) Flat Head Sleeve Anchors (SS/FHSL). 2. Sound control openings: Set in bed of mastic sealant- H. Fasteners: Generally, exposed screws to be Phillips or Robertson drive. Pinned TORX drive at high security areas. Flat head sleeve anchors (FHSL) may be slotted drive. Sheet metal and wood screws:full-thread. Sleeve nuts: full length to prevent door compression. I. Silencers: Interior hollow metal frames, 3 for single doors,4 for pairs of doors. Omit where adhesive mounted seal occurs. Leave no unfilled/uncovered pre-punched silencer holes. J. Key Control Software: Same manufacturer as key cylinders, supply to Owner. 2.7 FINISH: A. Generally BHMA 626 Satin Chromium and 605 Polished Brass. 1. Areas using BHMA 626 to have push-plates, pulls and protection plates of BHMA 630, Satin Stainless Steel, unless otherwise noted. B. Door closers: factory powder coated to match other hardware, unless otherwise noted. 1. Provide satin-chrome plated arms, tracks and covers where scheduled bright metallic powder coat(789—MTLPC) not available. C. Aluminum items: match predominant adjacent material. Seals to coordinate with frame color. FINISH HARDWARE 08710-8 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 2.8 KEYING REQUIREMENTS: A. Key System: Schlage Everest patented keyway, non-interchangeable core typically with interchangeable core type operating cylinders for panic hardware Key blanks available only from factory-direct sources, not available from after-market key blank manufacturers. For estimate use factory GMK charge. Initiate and conduct meeting(s)with Owner to determine system keyway(s)and structure,furnish Owner's written approval of the system. 1. Existing factory registered master key system. 2. Non-I.C. construction keying: inserted type partial key. At substantial completion, remove inserts in Owner's presence; demonstrate consequent non-operability of construction key. Give all removed inserts and all constructruction keys to Owner. 3. Furnish 10 construction keys. 4. Furnish 2 construction control keys. 5. Furnish 1 extractor tool 35-057. 6. Recombinate entire project at no extra expense to Owner if missing construction keys. B. Key Cylinders: utility patented, 6-pin solid brass construction. C. Locks and cylinders: keyed at factory of lock manufacturer where permanent records are maintained. Locks and cylinders same manufacturer. D. Permanent keys: secured shipment direct from point of origination to Owner. E. Bitting List: Secured shipment direct from point of origination to Owner upon completion.. PART 3- EXECUTION 3.1 ACCEPTABLE INSTALLERS: A. Factory trained, certified, and carries a factory-issued card certifying that person as a "Certified Installer". Alternative:can demonstrate suitably equivalent competence and experience. 3.2 PREPARATION: A. Ensure that walls and frames are square and plumb before hardware installation. B. Locate hardware per SDIA 00 and applicable building,fire, life-safety, accessibility, and security codes. 1. Notify Architect of any code conflicts before ordering material. 2. Where new hardware is to be installed near existing doors/hardware scheduled to remain, match locations of existing hardware. C. Existing frames and doors scheduled to receive new hardware: carefully remove existing hardware, tag and bag, and turn over to Owner. FINISH HARDWARE 08710-9 L HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 1. Patch and fill wood frames and doors with solid wood stock or dowel material before cutting for new hardware. Do not reuse existing screw holes--fill and re- pilot. 2. Metal doors/frames:Weld or fasten with screws:filler pieces in existing hardware cut-outs and mortises not scheduled for re-use by new hardware. Leave surfaces smooth-- no applied patches. 3.3 INSTALLATION A. Install hardware per manufacturer's instructions and recommendations. Do not install surface-mounted items until finishes have been completed on substrate. Set units level, plumb and true to line and location. Adjust and reinforce attachment substrate for proper installation and operation. 1. Gaskets: install jamb-applied gaskets before closers, overhead stops, rim strikes, etc. Install sweeps across bottoms of doors before astragals, cope sweeps around bottom pivots,trim astragals to tops of sweeps. 2. When hardware is to be attached to existing metal surface and insufficient reinforcement exists, use RivNuts, NutSerts or similar anchoring device for screws. B. Locate floor stops not more than 4 inches from the wall. C. Drill pilot holes for fasteners in wood doors and/or frames. D. Lubricate and adjust existing hardware scheduled to remain. Carefully remove and give to Owner items not scheduled for reuse. 3.4 ADJUSTING A. Adjust and check for proper operation and function. Replace units, which cannot be adjusted to operate freely and smoothly. 1. Hardware damaged by improper installation or adjustment methods to be repaired or replaced to Owner's satisfaction. B. Inspection: Use hardware supplier. Include suppliers with closeout documents. C. Follow-up inspection: Installer to provide letter of agreement to Owner that approximately 6 months after substantial completion, installer will visit Project with representatives of the manufacturers of the locking devices and door closers to accomplish following: 1. Re-adjust hardware. 2. Evaluate maintenance procedures and recommend changes or additions, and instruct Owner's personnel. 3. Identify items that have deteriorated or failed. 4. Submit written report identifying problems and likely future problems. 3.5 DEMONSTRATION: FINISH HARDWARE 08710-10 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Demonstrate electrical, electronic and pneumatic hardware systems, including adjustment and maintenance procedures. 3.6 PROTECTION/CLEANING: A. Cover installed hardware, protect from paint, cleaning agents, weathering, carts/barrows, etc. Remove covering materials and clean hardware just prior to substantial completion. B. Clean adjacent wall, frame and door surfaces soiled from installation/reinstallation process. 3.7 SCHEDULE OF FINISH HARDWARE A. See door schedule in drawings for hardware set assignments. HW SET: 001 6 EA SWING CLEAR HINGE AB7002 4.5 652 HAG 1 SET AUTO FLUSH BOLT FB31P 626 IVE 1 EA STOREROOM LOCK D80PD SPA 626 SCH 2 EA ARMOR PLATE 8400 40 X 2" LDW 630 IVE 2 EA SURFACE CLOSER 4011 X ST-1544 689 LCN 2 EA OVERHEAD HOLDER 100H-ADJ 630 GLY 2 EA EDGE GUARD 182P 630 HAG 2 EA SILENCER SR64 GRY IVE HW SET: 002 ALL HARDWARE BY DOOR MANUFACTURER B/O HW SET: 003 3 EA HINGE AB800 4.5 X 4 NRP 630 HAG 1 EA VANDAL RESIST. LOCK D96PD SPA 626 SCH 1 EA SURFACE CLOSER 4111 EDA 689 LCN 1 EA KICK PLATE 8400 10 X 1 LDW 630 IVE 1 EA FLOOR STOP FS18S BILK IVE 1 SET PERIMETER SEAL 303AS HEAD &JAMBS AL PEM 1 EA THRESHOLD 270A MS&A AL PEM FINISH HARDWARE 08710-11 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 HW SET: 004 3 EA HINGE AB700 4.5 X 4 652 HAG 1 EA OFFICE LOCK D50PD SPA 626 SCH 1 EA WALL BUMPER WS406CVX 630 IVE 3 EA SILENCER SR64 GRY IVE HW SET: 005 6 EA SWING CLEAR HINGE AB7002 4.5 652 HAG 1 SET AUTO FLUSH BOLT FB31 P 626 IVE 1 EA VANDAL RESIST LOCK D94PD SPA 626 SCH 2 EA ARMOR PLATE 8400 40 X 2"LDW 630 IVE 1 EA COORDINATOR COR X FL 628 IVE 2 EA SURFACE CLOSER 4011 X ST-1544 689 LCN 2 EA OVERHEAD HOLDER 100H-ADJ 630 GLY 2 EA EDGE GUARD 182P 630 HAG 1 SET PERIMETER SEAL 303AS HEAD &JAMBS AL PEM 1 EA THRESHOLD 270A MS&A AL PEM HW SET:006 3 EA HINGE AB700 4.5 X 4 652 HAG 1 EA PRIVACY LOCK D40S SPA 626 SCH 1 EA SURFACE CLOSER 4111 EDA 689 LCN 1 EA WALL BUMPER WS406CVX 630 IVE 3 EA SILENCER SR64 GRY IVE 1 EA SIGN 370M[W"MEN'OR"WOMEN'AS REQUIRED BLU HAG HW SET: 007 3 EA HINGE AB700 4.5 X 4 652 HAG 1 EA PASSAGE D10S SPA 626 SCH 1 EA WALL BUMPER WS406CVX 630 IVE 3 EA SILENCER SR64 GRY IVE HW SET: 008 FINISH HARDWARE 08710-12 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 8 EA HINGE AB750 4.5 X 4 632 HAG 1 SET AUTO FLUSH BOLT FB32 605 IVE 1 EA CLASSROOM LOCK L9070P 17A 605 SCH 2 EA KICKPLATE 8400 10 X 2"LDW 605 IVE 1 EA COORDINATOR COR X FL 628 IVE 1 EA ASTRAGAL S77B BRN PEM 2 EA SURFACE CLOSER 4111 EDA 696 LCN 2 EA DOME STOP FS436 605 IVE 1 SET SEAL S88HEAD &JAMBS BRN PEM HW SET: 009 8 EA HINGE AB750 4.5 X 4 632 HAG 1 SET CONST LATCHING BOLT FB51P 605 IVE 1 EA STOREROOM LOCK L9080P 17A 605 SCH 2 EA KICKPLATE 8400 10 X 2"LDW 605 IVE 2 EA OVERHEAD HOLDER 450H 605 GLY 2 EA SILENCER SR64 GRY IVE HW SET: 010 3 EA HINGE AB750 4.5 X 4 632 HAG 1 EA CLASSROOM LOCK L9070P 17A 605 SCH 1 EA KICKPLATE 8400 10 X 21DW 605 IVE 1 EA SURFACE CLOSER 4011 696 LCN 1 EA WALL BUMPER WS406CVX 605 IVE 1 SET SEAL S88 HEAD &JAMBS BRN PEM HW SET:011 3 EA HINGE AB750 4.5 X 4 632 HAG i EA STOREROOM LOCK D80PD SPA 626 SCH 1 EA SURFACE CLOSER 4111 CUSH 696 LCN 1 SET SEAL S88HEAD &JAMBS BRN PEM HW SET:012 8 EA HINGE AB750 4.5 X 4 632 HAG 1 EA CLASSROOM LOCK L9070P 17A 605 SCH FINISH HARDWARE 08710-13 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 2 EA KICKPLATE 8400 10 X 21DW 605 IVE 1 EA COORDINATOR COR X FL 628 IVE 1 EA ASTRAGAL S77B BRN PEM 2 EA SURFACE CLOSER 4111 CUSH 696 LCN 1 SET SEAL S88 HEAD &JAMBS BRN PEM HW SET: 013 6 EA HINGE AB750 4.5 X 4 632 HAG 2 EA ELEC. HINGE AB750 4.5 X 4 ETW 632 HAG 1 EA ELEC FIRE EXIT DEVIC EL9847EO-F LBR 605 VON 1 EA ELEC FIRE EXIIT DEVI EL9847L-F X17 LBR 605 VON 1 EA IC RIM CYLINDER 20-057 605 SCH 2 EA KICKPLATE 8400 10 X 2"LDW 605 IVE 1 EA ASTRAGAL S77B BRN PEM 2 EA SURFACE CLOSER 4111 EDA 696 LCN 2 EA MAG DOOR HOLDER SEM7830-24VDC 605 LCN 1 SET SEAL S88 HEAD &JAMBS BRN PEM END OF SECTION FINISH HARDWARE 08710-14 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 SECTION 09512-ACOUSTICAL TILE CEILINGS PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1. Ceilings consisting of acoustical tiles and suspension systems. 1.3 SUBMITTALS A. Product Data: For each type of product specified. B. Coordination Drawings: Reflected ceiling plans drawn to scale and coordinating penetrations and ceiling-mounted items. Show the following: 1. Ceiling suspension system members. 2. Method of attaching suspension system hangers to building structure. 3. Initial direct-access openings. 4. Ceiling-mounted items including light fixtures; air outlets and inlets; speakers; sprinklers; and special moldings at walls, column penetrations, and other junctures of acoustical ceilings with adjoining construction. C. Samples for Initial Selection: Manufacturer's color charts consisting of actual acoustical tiles or sections of acoustical tiles, suspension systems, and moldings showing the full range of colors, textures, and patterns available for each type of ceiling assembly indicated. D. Samples for Verification: 1. 12"X12"samples of each acoustical the type, pattern, and color. 2. Set of 12-inch-(300-mm-) long samples of concealed suspension system members. 3. Set of 12-inch- (300-mm-) long samples of exposed moldings for each color and system type required. E. Qualification Data: For firms and persons specified in "Quality Assurance" Article to demonstrate their capabilities and experience. Include lists of completed projects with project names and addresses, names and addresses of architects and owners, and other information specified. F. Product Test Reports: Indicate compliance of acoustical tile ceilings and components with requirements based on comprehensive testing of current products. ACOUSTICAL TILE CEILINGS 09512- 1 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 G. Research/Evaluation Reports: Evidence of acoustical tile ceiling's and components'compliance with building code in effect for Project, from a model code organization acceptable to authorities having jurisdiction. 1.4 QUALITY ASSURANCE A. Installer Qualifications: Engage an experienced installer who has completed acoustical tile ceilings similar in material, design, and extent to that indicated for this Project and with a record of successful in-service performance. B. Source Limitations for Ceiling Units: Obtain each acoustical ceiling tile from one source with resources to provide products of consistent quality in appearance and physical properties without delaying the Work. C. Source Limitations for Suspension System: Obtain each suspension system from one source with resources to provide products of consistent quality in appearance and physical properties without delaying the Work. 1. Obtain both acoustical ceiling tiles and suspension system from the same manufacturer. D. Fire-Test-Response Characteristics: Provide acoustical tile ceilings that comply with the following requirements: 1. Fire-response tests were performed by UL, ITS/Warnock Hersey, or another independent testing and inspecting agency that is acceptable to authorities having jurisdiction and that performs testing and follow-up services. 2. Surface-burning characteristics of acoustical tiles comply with ASTM E 1264 for Class A materials as determined by testing identical products per ASTM E 84. 3. Fire-resistance-rated assemblies, which are indicated by design designations from UL's "Fire Resistance Directory,"from ITS/Warnock Hersey's "Directory of Listed Products,'or from listings of another testing and inspecting agency, are identical in materials and construction to those tested per ASTM E 119. 4. Products are identified with appropriate markings of applicable testing and inspecting agency. E. Preinstallation Conference: Conduct conference at Project site to comply with requirements of Division 1 Section "Project Meetings." 1.5 DELIVERY, STORAGE,AND HANDLING A. Deliver acoustical tiles and suspension system components to Project site in original, unopened packages and store them in a fully enclosed space where they will be protected against damage from moisture, direct sunlight, surface contamination, and other causes. B. Before installing acoustical tiles, permit them to reach room temperature and a stabilized moisture content. C. Handle acoustical tiles carefully to avoid chipping edges or damaging units in any way. 1.6 PROJECT CONDITIONS ACOUSTICAL TILE CEILINGS 09512-2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Environmental Limitations: Do not install acoustical tile ceilings until spaces are enclosed and weatherproof, wet-work in spaces is complete and dry, work above ceilings is complete, and ambient temperature and humidity conditions are maintained at the levels indicated for Project when occupied for its intended use. 1.7 COORDINATION A. Coordinate layout and installation of acoustical tiles and suspension system with other construction that penetrates ceilings or is supported by them, including light fixtures, HVAC equipment, fire-suppression system, and partition assemblies. 1.8 EXTRA MATERIALS A. Not Required PART2-PRODUCTS 2.1 MANUFACTURERS A. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, those indicated for each designation in the Acoustical Tile Ceiling Schedule at the end of Part 3. B. Products: Subject to compliance with requirements, provide one of the products indicated for each designation in the Acoustical Tile Ceiling Schedule at the end of Part 3. 2.2 ACOUSTICAL TILES, GENERAL A. Acoustical Tile Standard: Provide manufacturer's standard tiles of configuration indicated that comply with ASTM E 1264 classifications as designated by types, patterns, acoustical ratings, and light reflectances, unless otherwise indicated. 1. Mounting Method for Measuring Noise Reduction Coefficient: Type E-400; plenum mounting in which face of test specimen is 15-3/4 inches (400 mm) away from test surface per ASTM E 795. 2. Acoustical tile in the Main Kitchen shall have a scubbable surface approved by the Riverside County Health Department for use in food prearation areas. B. Acoustical Tile Colors and Patterns: Match appearance characteristics indicated for each product type. 1. Where appearance characteristics of acoustical tiles are indicated by referencing ASTM E 1264 pattern designations and not manufacturers' proprietary product designations, provide products selected by Architect from each manufacturer's full range of products that comply with requirements indicated for type, pattern, color, light reflectance, acoustical performance, edge detail, and size. 2.3 METAL SUSPENSION SYSTEMS, GENERAL ACOUSTICAL TILE CEILINGS 09512-3 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Metal Suspension System Standard: Provide manufacturer's standard metal suspension systems of types, structural classifications, and finishes indicated that comply with applicable ASTM C 635 requirements. B. Metal Suspension System Characteristics: Comply with requirements indicated in the Acoustical Panel Ceiling Schedule at the end of Part 3. C. Finishes and Colors, General: Comply with NAAMM's "Metal Finishes Manual for Architectural and Metal Products" for recommendations for applying and designating finishes. Provide manufacturer's standard factory-applied finish for type of system indicated. 1. High-Humidity Finish: Comply with ASTM C 635 requirements for"Coating Classification for Severe Environment Performance"where high-humidity finishes are indicated. D. Attachment Devices: Size for five times design load indicated in ASTM C 635, Table 1, Direct Hung, unless otherwise indicated. 1. Postinstalled Powder-Actuated Fasteners in Concrete: Fastener system of type suitable for application indicated, fabricated from corrosion-resistant materials, with clips or other accessory devices for attaching hangers of type indicated, and with capability to sustain, without failure, a load equal to 10 times that imposed by ceiling construction, as determined by testing per ASTM E 1190, conducted by a qualified testing and inspecting agency- E. Wire Hangers, Braces, and Ties: Provide wires complying with the following requirements: 1. Zinc-Coated Carbon-Steel Wire: ASTM A 641/A 641 M, Class 1 zinc coating, soft temper. 2. Size: Select wire diameter so its stress at three times hanger design load (ASTM C 635, Table 1, Direct Hung) will be less than yield stress of wire, but provide not less than 0.106-inch- (2.69-mm-) diameter wire. F. Hanger Rods: Mild steel, zinc coated or protected with rust-inhibitive paint. G. Flat Hangers: Mild steel, zinc coated or protected with rust-inhibitive paint. H. Angle Hangers: Angles with legs not less than 7/8 inch (22 mm) wide; formed with 0.04-inch- (1-mm-) thick, galvanized steel sheet complying with ASTM A 653/A 653M, G90 (Z275) coating designation;with bolted connections and 5/16-inch-(8-mm-) diameter bolts. I. Sheet-Metal Edge Moldings and Trim: Type and profile indicated or, if not indicated, manufacturers standard moldings for edges and penetrations that fit acoustical tile edge details and suspension systems indicated;formed from sheet metal of same material and finish as that used for exposed flanges of suspension system runners. 1. For circular penetrations of ceiling, provide edge moldings fabricated to diameter required to fit penetration exactly. 2.4 ACOUSTICAL SEALANT A. Acoustical Sealant for Exposed and Concealed Joints: Manufacturer's standard nonsag, paintable, nonstaining latex sealant complying with ASTM C 834 and the following requirements: ACOUSTICAL TILE CEILINGS 09512-4 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 1. Product is effective in reducing airborne sound transmission through perimeter joints and openings in building construction as demonstrated by testing representative assemblies according to ASTM E 90. B. Acoustical Sealant for Concealed Joints: Manufacturer's standard nondrying, nonhardening, nonskinning, nonstaining, gunnable, synthetic-rubber sealant recommended for sealing interior concealed joints to reduce airborne sound transmission. C. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, the following: D. Products: Subject to compliance with requirements, provide one of the following: 1. Acoustical Sealant for Exposed and Concealed Joints: a. PL Acoustical Sealant; ChemRex, Inc., Contech Brands. b_ AC-20 FTR Acoustical and Insulation Sealant; Pecora Corp. C. SHEETROCK Acoustical Sealant; United States Gypsum Co. PART 3- EXECUTION 3.1 EXAMINATION A. Examine substrates and structural framing to which acoustical tile ceilings attach or abut, with Installer present, for compliance with requirements specified in this and other Sections that affect ceiling installation and anchorage, and other conditions affecting performance of acoustical tile ceilings. 1. Proceed with installation only after unsatisfactory conditions have been corrected. 3.2 PREPARATION A. Coordination: Furnish layouts for preset inserts, clips, and other ceiling anchors whose installation is specified in other Sections. 1. Furnish concrete inserts and similar devices to other trades for installation well in advance of time needed for coordinating other work. B. Testing Substrates: Before installing adhesively applied tiles on wet-placed substrates such as cast-in-place concrete or plaster, test and verify that moisture level is below tile manufacturer's recommended limits. C. Measure each ceiling area and establish layout of acoustical tiles to balance border widths at opposite edges of each ceiling. Avoid using less-than-half-width units at borders, and comply with layout shown on reflected ceiling plans. 3.3 INSTALLATION A. General: Install acoustical tile ceilings to comply with publications referenced below per manufacturer's written instructions and CISCA's "Ceiling Systems Handbook." ACOUSTICAL TILE CEILINGS 09512-5 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 1. Standard for Ceiling Suspension System Installations: Comply with ASTM C 636. 2. Standard for Ceiling Suspension Systems Requiring Seismic Restraint: Comply with ASTM E 580. 3. CISCA's Recommendations for Acoustical Ceilings: Comply with CISCA's "Recommendations for Direct-Hung Acoustical Tile and Lay-in Panel Ceilings--Seismic Zones 0-2" 4. CISCA's Guidelines for Systems Requiring Seismic Restraint: Comply with CISCA's "Guidelines for Seismic Restraint of Direct-Hung Suspended Ceiling Assemblies-- Seismic Zones 3 &4." 5. U.B.C.'s "Metal Suspension Systems for Acoustical Tile and for Lay-in Panel Ceilings": U.B.C. Standard 25-2. B. Suspend ceiling hangers from building's structural members and as follows: 1. Install hangers plumb and free from contact with insulation or other objects within ceiling plenum that are not part of supporting structure or of ceiling suspension system. 2. Splay hangers only where required to miss obstructions; offset resulting horizontal forces by bracing, countersplaying, or other equally effective means. 3. Splay hangers only where required and, if permitted with fire-resistance-rated ceilings, to miss obstructions; offset resulting horizontal forces by bracing, countersplaying, or other equally effective means. 4. Where width of ducts and other construction within ceiling plenum produces hanger spacings that interfere with location of hangers at spacings required to support standard suspension system members, install supplemental suspension members and hangers in form of trapezes or equivalent devices. Size supplemental suspension members and hangers to support ceiling loads within performance limits established by referenced standards and publications. 5. Secure wire hangers to ceiling suspension members and to supports above with a minimum of three tight turns. Connect hangers directly either to structures or to inserts, eye screws, or other devices that are secure; that are appropriate for substrate; and that will not deteriorate or otherwise fail due to age, corrosion, or elevated temperatures. 6. Secure flat, angle, channel, and rod hangers to structure, including intermediate framing members, by attaching to inserts, eye screws, or other devices that are secure and appropriate for both structure to which hangers are attached and type of hanger involved. Install hangers in a manner that will not cause them to deteriorate or fail due to age, corrosion, or elevated temperatures. 7. Do not support ceilings directly from permanent metal forms or floor deck. Fasten hangers to cast-in-place hanger inserts, powder-actuated fasteners, or drilled-in anchors that extend through forms into concrete. 8. Do not attach hangers to steel deck tabs. 9. Do not attach hangers to steel roof deck. Attach hangers to structural members. 10. Space hangers not more than 48 inches (1200 mm) o.c. along each member supported directly from hangers, unless otherwise indicated; and provide hangers not more than 8 inches (200 mm)from ends of each member. C. Secure bracing wires to ceiling suspension members and to supports with a minimum of four tight turns. Suspend bracing from building's structural members as required for hangers, without attaching to permanent metal forms, steel deck, or steel deck tabs. Fasten bracing wires into concrete with cast-in-place or postinstalled anchors. D. Install edge moldings and trim of type indicated at perimeter of acoustical tile ceiling area and where necessary to conceal edges of acoustical units. ACOUSTICAL TILE CEILINGS 09512-6 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 1. Apply acoustical sealant in a continuous ribbon concealed on back of vertical legs of moldings before they are installed. 2. Screw attach moldings to substrate at intervals not more than 16 inches (400 mm) o.c, and not more than 3 inches (75 mm) from ends, leveling with ceiling suspension system to a tolerance of 1/8 inch in 12 feet (3 mm in 3.6 m). Miter corners accurately and connect securely. 3. Do not use exposed fasteners, including pop rivets, on moldings and trim. E. Install suspension system runners so they are square and securely interlocked with one another. Remove and replace dented, bent, or kinked members. F. Arrange directionally patterned acoustical tiles as follows: 1. As indicated on reflected ceiling plans. G. Install acoustical tiles in coordination with suspension system and exposed moldings and trim. Place splines or suspension system flanges into kerfed edges so tile-to-tile joints are closed by double lap of material. 1. Fit adjoining tile to form flush, tight joints. Scribe and cut tile for accurate fit at borders and around penetrations through tile. 2. Hold tile field in compression by inserting leaf-type, spring-steel spacers between tile and moldings, spaced 12 inches (305 mm)o.c. 3. Fabricate access units for special suspension system access members and tile units modified as required to allow for removal of access units. 4. Protect lighting fixtures and air ducts to comply with requirements indicated for fire- resistance-rated assembly. 3.4 CLEANING A. Clean exposed surfaces of acoustical tile ceilings, including trim, edge moldings, and suspension system members. Comply with manufacturer's written instructions for cleaning and touchup of minor finish damage. Remove and replace tiles and other ceiling components that cannot be successfully cleaned and repaired to permanently eliminate evidence of damage. END OF SECTION 09512 ACOUSTICAL TILE CEILINGS 09512-7 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 SECTION 09651 - RESILIENT TILE FLOORING PART 1 - GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections,apply to this Section. 12 SUMMARY A. This Section includes the following: 1. Vinyl composition floor tile. 2. Resilient wall base and accessories. 1.3 SUBMITTALS A. Product Data: For each type of product specified. B. Samples for Initial Selection: Manufacturer's color charts consisting of units or sections of units showing the full range of colors and patterns available for each type of product indicated. 1.4 QUALITY ASSURANCE A. Installer Qualifications: Engage an experienced installer to perform work of this Section who has specialized in installing resilient products similar to those required for this Project and with a record of successful in-service performance. B. Source Limitations: Obtain each type, color, and pattern of product specified from one source with resources to provide products of consistent quality in appearance and physical properties without delaying the Work. 1.5 DELIVERY, STORAGE,AND HANDLING A. Deliver products to Project site in manufacturer's original, unopened cartons and containers, each bearing names of product and manufacturer, Project identification, and shipping and handling instructions. 1.6 EXTRA MATERIALS A. Not required. PART 2- PRODUCTS 2.1 MANUFACTURERS RESILIENT TILE FLOORING 09651 - 1 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include manufacturers doing business in Southern California that produce the products specified inb this section. 2.2 RESILIENT TILE A. Solid Vinyl Tile: Products complying with ASTM F 1700 and with requirements specified in the Resilient Tile Flooring Schedule. 2.3 RESILIENT ACCESSORIES A. Rubber Wall Base: Products complying with FS SS-W40, Type I and with requirements specified in the Resilient Tile Flooring Schedule. 2.4 INSTALLATION ACCESSORIES A. Trowelable Leveling and Patching Compounds: Latex-modified, portland-cement-based formulation provided or approved by flooring manufacturer for applications indicated. B. Adhesives: Water-resistant type recommended by manufacturer to suit resilient products and substrate conditions indicated. PART 3-EXECUTION 3.1 EXAMINATION A. Examine substrates, areas, and conditions where installation of resilient products will occur, with Installer present, for compliance with manufacturer's requirements. Verify that substrates and conditions are satisfactory for resilient product installation and comply with requirements specified. B. Concrete Subfloors: Verify that concrete slabs comply with ASTM F 710 and the following: 1. Slab substrates are dry and free of curing compounds, sealers, hardeners, and other materials that may interfere with adhesive bond. Determine adhesion and dryness characteristics by performing bond and moisture tests recommended by flooring manufacturer. 2. Subfloor finishes comply with requirements specified in Division 3 Section "Cast-in-Place Concrete"for slabs receiving resilient flooring. 3. Subfloors are free of cracks, ridges, depressions, scale, and foreign deposits. 3.2 PREPARATION A. General: Comply with resilient product manufacturer's written installation instructions for preparing substrates indicated to receive resilient products. RESILIENT TILE FLOORING 09651 -2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 B. Use trowelable leveling and patching compounds, according to manufacturer's written instructions,to fill cracks, holes, and depressions in substrates. 3.3 TILE INSTALLATION A. General: Comply with tile manufacturer's written installation instructions. 3.4 CLEANING AND PROTECTING A. Perform the following operations immediately after installing resilient products: 1. Remove adhesive and other surface blemishes using cleaner recommended by resilient product manufacturers. 2. Sweep or vacuum floor thoroughly. 3. Do not wash floor until after time period recommended by flooring manufacturer. 4. Damp-mop floor to remove marks and soil. B. Protect flooring against mars, marks, indentations, and other damage from construction operations and placement of equipment and fixtures during the remainder of construction period. Use protection methods indicated or recommended in writing by flooring manufacturer. 1. Apply protective floor polish to floor surfaces that are free from soil, visible adhesive, and surface blemishes, if recommended in writing by manufacturer. a. Use commercially available product acceptable to flooring manufacturer. b. Coordinate selection of floor polish with Owner's maintenance service. 2. Cover products installed on floor surfaces with.undyed, untreated building paper until inspection for Substantial Completion. 3. Do not move heavy and sharp objects directly over floor surfaces. Place plywood or hardboard panels over flooring and under objects while they are being moved. Slide or roll objects over panels without moving panels. C. Clean floor surfaces not more than 4 days before dates scheduled for inspections intended to establish date of Substantial Completion in each area of Project. Clean products according to manufacturer's written recommendations. 1. Before cleaning, strip protective floor polish that was applied after completing installation only if required to restore polish finish and if recommended by flooring manufacturer. 2. After cleaning, reapply polish to floor surfaces to restore protective floor finish according to flooring manufacturers written recommendations. Coordinate with Owner's maintenance program. END OF SECTION 09651 RESILIENT TILE FLOORING 09651 -3 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 SECTION 09775—FIBERGLASS REINFORCED PANELS PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes surface preparation and field application of fiberglass reinforced panels. 1.3 SUBMITTALS A. Product Data: For each coating system specified. 1. Material List: An inclusive list of required materials. Indicate each material and cross- reference the specific finish system, and application. Identify each material by the manufacturer's catalog number and general classification. 2. Manufacturer's Information: Manufacturers technical information, including label analysis and instructions for handling, storing, and applying each material proposed for use. B. Samples for Initial Selection: Manufacturer's color charts showing the full range of colors available for each type of finish-coat material indicated. 1.4 QUALITY ASSURANCE A. Applicator Qualifications: An experienced applicator who has a record of successful in-service performance. B. Source Limitations: Obtain materials from the same manufacturer. 1.5 DELIVERY, STORAGE, AND HANDLING A. Deliver materials to the Project site in the manufacturer's original, unopened packages and containers bearing manufacturer's name and label, and the following information: 1. Product name or title of material. 2. Product description (generic classification). 3. Manufacturer's stock number and date of manufacture. PART2-PRODUCTS FIBERGLASS REINFORCED PANELS 09775- 1 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 2.1 MANUFACTURERS A. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, Fiber-Lite Liner Panels by Nudo Products, Inc. or an approved equal. B. Thickness: .090" C. Fire Rating: Class C D. Flexural Strength (psi): 9,200 per ASTM D—790. E. Panel Size:To fit the application—see interior elevations. Minimize seams. F. Tensile Strength (psi)6,400 per ASTM D 638 PART 3- EXECUTION 3.1 EXAMINATION A. Examine substrates and conditions, with the Applicator present, under which fiberglass reinforced panels will be applied,for compliance with coating application requirements. 1. Apply panels only after unsatisfactory conditions have been corrected and surfaces to receive fiberglass reinforced panels are thoroughly dry. 2. Start of application is construed as the Applicator's acceptance of surfaces within that particular area. A. Coordination of Work: 2. Notify the Architect about anticipated problems using the coatings specified over substrates primed by others. 3.2 PREPARATION A. General: Remove plates, equipment, shelving, conduits, machined surfaces, and similar items already in place that are not to be covered. _ 1. After completing installation, reinstall items removed using workers skilled in trades involved. B. Cleaning: Before applying fiberglass reinforced panels,clean substrates of substances that could impair bond of panels. Remove oil and grease before cleaning. 1. Schedule cleaning and coating application so dust and other contaminates from cleaning process will not fall on wet, newly coated surfaces. C. Surface Preparation: Clean and prepare surfaces to be laminated according to the manufacturers written instructions for each particular substrate condition, and as specified. 3.3 INSTALLATION A. General: Laminate panels to the new or existing wall surface, including ceramic tile, using fast setting, genral purpose adhesives (100% coverage). Leave room for expansion per the manufacturer's recommendation. Install per the manufacturer's written instructions. FIBERGLASS REINFORCED PANELS 09775-2 HNTB #36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 B. Finish the installation at all transitions, including between panel with the manufacturer's standard vinyl moldings. Color to match panel. All seams are to be moisture tight. Apply caulk where required. 3.4 CLEANING A. Cleanup: At the end of each workday, remove rubbish, empty cans, rags, and other discarded coating materials from the Project site. 1. After completing fiberglass reinforced panels application, clean spattered surfaces. Remove spattered adhesive by washing, scraping, or other methods. Do not scratch or damage adjacent finished surfaces. 3.6 PROTECTION A. Protect work of other trades, whether being laminated or not, against damage from fiberglass reinforced panel operation. Correct damage by cleaning, repairing, replacing, and relaminating, as approved by the Architect. END OF SECTION 09775 FIBERGLASS REINFORCED PANELS 09775-3 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 SECTION 09900- PAINTING PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes surface preparation and field painting of the following: 1. Exposed exterior items and surfaces. 2. Exposed interior items and surfaces. 3. Surface preparation, priming, and finish coats specified in this Section are in addition to shop priming and surface treatment specified in other Sections. B. Paint exposed surfaces, except where the paint schedules indicate that a surface or material is not to be painted or is to remain natural. If the paint schedules do not specifically mention an item or a surface, paint the item or surface the same as similar adjacent materials or surfaces whether or not schedules indicate colors. If the schedules do not indicate color or finish, the Architect will select from standard colors and finishes available. 1. Painting includes field painting of exposed bare and covered pipes and ducts (including color-coding), hangers, exposed steel and ironwork, and primed metal surfaces of mechanical and electrical equipment. C. Do not paint prefinished items, concealed surfaces, finished metal surfaces, operating parts, and labels. 1.3 DEFINITIONS A. General: Standard coating terms defined in ASTM D 16 apply to this Section. 1. Flat refers to a lusterless or matte finish with a gloss range below 15 when measured at an 85-degree meter. 2. Eggshell refers to low-sheen finish with a gloss range between 5 and 20 when measured at a 60-degree meter. 3. Satin refers to low-sheen finish with a gloss range between 15 and 35 when measured at a 60-degree meter. 4. Semigloss refers to medium-sheen finish with a gloss range between 30 and 65 when measured at a 60-degree meter- 5- Full gloss refers to high-sheen finish with a gloss range more than 65 when measured at a 60-degree meter. 1.4 SUBMITTALS PAINTING 09900- 1 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Product Data: For each paint system specified. Include block fillers and primers. 1. Material List: Provide an inclusive list of required coating materials. Indicate each material and cross-reference specific coating, finish system, and application. Identify each material by manufacturer's catalog number and general classification. 2. Manufacturer's Information: Provide manufacturer's technical information, including label analysis and instructions for handling, storing, and applying each coating material proposed for use. 3. Certification by the manufacturer that products supplied comply with local regulations controlling use of volatile organic compounds (VOCs)including the SCAQMD. B. Samples for Verification: Of each color and material to be applied, with texture to simulate actual conditions, on representative Samples of the actual substrate. 1. Provide stepped Samples, defining each separate coat, including block fillers and primers. Use representative colors when preparing Samples for review. Resubmit until required sheen, color, and texture are achieved. 2. Provide a list of materials and applications for each coat of each sample. Label each sample for location and application. 1.5 QUALITY ASSURANCE A. Applicator Qualifications: Engage an experienced applicator who has completed painting system applications similar in material and extent to that indicated for this Project with a record of successful in-service performance. B. Source Limitations: Obtain block fillers, primers, and undercoat materials for each coating system from the same manufacturer as the finish coats. 1.6 DELIVERY, STORAGE,AND HANDLING A. Deliver materials to the Project Site in manufacturer's original, unopened packages and containers bearing manufacturer's name and label, and the following information: 1. Product name or title of material. 2. Product description (generic classification or binder type). 3. Manufacturer's stock number and date of manufacture. 4. Contents by volume,for pigment and vehicle constituents. 5. Thinning instructions. 6. Application instructions. 7. Color name and number. 8. VOC content. B. Store materials not in use in tightly covered containers in a well-ventilated area at a minimum ambient temperature of 45 deg F (7 deg C). Maintain containers used in storage in a clean condition, free of foreign materials and residue. 1.7 PROJECT CONDITIONS A. Apply water-based paints only when the temperature of surfaces to be painted and surrounding air temperatures are between 50 and 90 deg F (10 and 32 deg C). PAINTING 09900-2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 B. Apply solvent-thinned paints only when the temperature of surfaces to be painted and surrounding air temperatures are between 45 and 95 deg F (7.2 and 35 deg C). C. Do not apply paint in rain, fog, or mist; or when the relative humidity exceeds 85 percent; or at temperatures less than 5 deg F (3 deg C)above the dew point;or to damp or wet surfaces. 1. Painting may continue during inclement weather if surfaces and areas to be painted are enclosed and heated within temperature limits specified by manufacturer during application and drying periods. PART2-PRODUCTS 2.1 MANUFACTURERS A. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, products listed in the paint schedules. B. Products: Subject to compliance with requirements, provide one of the products in the paint schedules. C. Manufacturers Names: The following manufacturers are referred to in the paint schedules by use of shortened versions of their names,which are shown in parentheses: 1. Benjamin Moore &Co. (Moore). 2. Dunn Edwards 3. Sherwin-Williams Co. (S-W). 4. ICI. 5. Frazee. 2.2 PAINT MATERIALS, GENERAL A. Material Compatibility: Provide block fillers, primers, undercoats, and finish-coat materials that are compatible with one another and the substrates indicated under conditions of service and application,as demonstrated by manufacturer based on testing and field experience. B. Material Quality: Provide manufacturer's best-quality paint material of the various coating types specified. Paint-material containers not displaying manufacturer's product identification will not be acceptable. 1. Proprietary Names: Use of manufacturer's proprietary product names to designate colors or materials is not intended to imply that products named are required to be used to the exclusion of equivalent products of other manufacturers. Furnish manufacturer's material data and certificates of performance for proposed substitutions. C. Colors: Provide color selections made by the Architect. PART 3- EXECUTION 3.1 EXAMINATION PAINTING 09900-3 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Examine substrates, areas, and conditions, with the Applicator present, under which painting will be performed for compliance with paint application requirements- 1. Do not begin to apply paint until unsatisfactory conditions have been corrected and surfaces receiving paint are thoroughly dry. 2. Start of painting will be construed as the Applicator's acceptance of surfaces and conditions within a particular area. B. Coordination of Work: Review other Sections in which primers are provided to ensure compatibility of the total system for various substrates. On request, furnish information on characteristics of finish materials to ensure use of compatible primers. 1. Notify the Architect about anticipated problems using the materials specified over substrates primed by others. 3.2 PREPARATION A. General: Remove hardware and hardware accessories, plates, machined surfaces, lighting fixtures, and similar items already installed that are not to be painted. If removal is impractical or impossible because of the size or weight of the item, provide surface-applied protection before surface preparation and painting. 1. After completing painting operations in each space or area, reinstall items removed using workers skilled in the trades involved. B. Cleaning: Before applying paint or other surface treatments, clean the substrates of substances that could impair the bond of the various coatings. Remove oil and grease before cleaning. 1. Schedule cleaning and painting so dust and other contaminants from the cleaning process will not fall on wet, newly painted surfaces. C. Surface Preparation: Clean and prepare surfaces to be painted according to manufacturer's written instructions for each particular substrate condition and as specified. 1. Provide barrier coats over incompatible primers or remove and reprime. 2. Cementitious Materials: Prepare concrete, concrete masonry block, cement plaster, and mineral-fiber-reinforced cement panel surfaces to be painted. Remove efflorescence, chalk, dust, dirt, grease, oils, and release agents. Roughen as required to remove glaze. If hardeners or sealers have been used to improve curing, use mechanical methods of surface preparation. a. Use abrasive blast-cleaning methods if recommended by paint manufacturer. b. Determine alkalinity and moisture content of surfaces by performing appropriate tests. If surfaces are sufficiently alkaline to cause the finish paint to blister and burn, correct this condition before application. Do not paint surfaces where moisture content exceeds that permitted in manufacturer's written instructions. C. Clean concrete floors to be painted with a 5 percent solution of muriatic acid or other etching cleaner. Flush the floor with clean water to remove acid, neutralize with ammonia, rinse, allow to dry, and vacuum before painting. PAINTING 09900-4 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 3. Wood: Clean surfaces of dirt, oil, and other foreign substances with scrapers, mineral spirits, and sandpaper, as required. Sand surfaces exposed to view smooth and dust off. a. Scrape and clean small, dry, seasoned knots, and apply a thin coat of white shellac or other recommended knot sealer before applying primer. After priming, fill holes and imperfections in finish surfaces with putty or plastic wood filler. Sand smooth when dried. b. Prime, stain, or seal wood to be painted immediately on delivery. Prime edges, ends, faces, undersides, and backsides of wood, including cabinets, counters, cases, and paneling. C. When transparent finish is required, backprime with spar varnish. d. Backprime paneling on interior partitions where masonry, plaster, or other wet wall construction occurs on backside. e. Seal tops, bottoms, and cutouts of unprimed wood doors with a heavy coat of varnish or sealer immediately on delivery. 4. Ferrous Metals: Clean ungalvanized ferrous-metal surfaces that have not been shop coated; remove oil, grease, dirt, loose mill scale, and other foreign substances. Use solvent or mechanical cleaning methods that comply with the Steel Structures Painting Council's (SSPC) recommendations. a. Blast steel surfaces clean as recommended by paint system manufacturer and according to requirements of SSPC-SP 10. b. Treat bare and sandblasted or pickled clean metal with a metal treatment wash coat before priming. C. Touch up bare areas and shop-applied prime coats that have been damaged. Wire-brush, clean with solvents recommended by paint manufacturer, and touch up with the same primer as the shop coat. 5. Galvanized Surfaces: Clean galvanized surfaces with nonpetroleum-based solvents so surface is free of oil and surface contaminants. Remove pretreatment from galvanized sheet metal fabricated from coil stock by mechanical methods. D. Materials Preparation: Mix and prepare paint materials according to manufacturer's written instructions. 1. Maintain containers used in mixing and applying paint in a clean condition, free of foreign materials and residue. 2. Stir material before application to produce a mixture of uniform density. Stir as required during application. Do not stir surface film into material. If necessary, remove surface film and strain material before using. 3. Use only thinners approved by paint manufacturer and only within recommended limits. E. Tinting: Tint each undercoat a lighter shade to simplify identification of each coat when multiple coats of the same material are applied. Tint undercoats to match the color of the finish coat, but provide sufficient differences in shade of undercoats to distinguish each separate coat. 3.3 APPLICATION A. General: Apply paint according to manufacturer's written instructions. Use applicators and techniques best suited for substrate and type of material being applied. 1. Paint colors, surface treatments, and finishes are indicated in the schedules_ PAINTING 09900-5 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs V Theater Reconfiguration 10/30/02 2. Do not paint over dirt, rust, scale, grease, moisture, scuffed surfaces, or conditions detrimental to formation of a durable paint film. 3. Provide finish coats that are compatible with primers used. 4. The term "exposed surfaces" includes areas visible when permanent or built-in fixtures, convector covers, covers for finned-tube radiation, grilles, and similar components are in place. Extend coatings in these areas, as required, to maintain the system integrity and provide desired protection. 5. Paint surfaces behind movable equipment and furniture the same as similar exposed surfaces. Before the final installation of equipment, paint surfaces behind permanently fixed equipment or furniture with prime coat only. 6. Paint interior surfaces of ducts with a flat, nonspecular black paint where visible through registers or grilles. 7. Paint back sides of access panels and removable or hinged covers to match exposed surfaces. 8. Finish exterior doors on tops, bottoms, and side edges the same as exterior faces. 9. Finish interior of wall and base cabinets and similar field-finished casework to match exterior. 10. Sand lightly between each succeeding enamel or varnish coat. B. Scheduling Painting: Apply first coat to surfaces that have been cleaned, pretreated, or otherwise prepared for painting as soon as practicable after preparation and before subsequent surface deterioration. 1. The number of coats and the film thickness required are the same regardless of application method. Do not apply succeeding coats until the previous coat has cured as recommended by the manufacturer. If sanding is required to produce a smooth, even surface according to manufacturer's written instructions, sand between applications. 2. Omit primer on metal surfaces that have been shop primed and touchup painted. 3. If undercoats, stains, or other conditions show through final coat of paint, apply additional coats until paint film is of uniform finish, color, and appearance. Give special attention to ensure edges, corners, crevices, welds, and exposed fasteners receive a dry film thickness equivalent to that of flat surfaces. 4. Allow sufficient time between successive coats to permit proper drying. Do not recoat surfaces until paint has dried to where it feels firm, does not deform or feel sticky under moderate thumb pressure, and where application of another coat of paint does not cause the undercoat to lift or lose adhesion. C. Application Procedures: Apply paints and coatings by brush, roller, spray, or other applicators according to manufacturer's written instructions. 1. Brushes: Use brushes best suited for the type of material applied. Use brush of appropriate size for the surface or item being painted. 2. Rollers: Use rollers of carpet, velvet back, or high-pile sheep's wool as recommended by the manufacturer for the material and texture required. 3. Spray Equipment: Use airless spray equipment with orifice size as recommended by the manufacturer for the material and texture required. D. Minimum Coating Thickness: Apply paint materials no thinner than manufacturer's recommended spreading rate. Provide the total dry film thickness of the entire system as recommended by the manufacturer. 3.4 CLEANING PAINTING 09900- 6 HNTB #36368 Palm Springs Convention Center Phase 1, Kitchen and Springs r Theater Reconfiguration 10/30/02 A. Cleanup: At the end of each workday, remove empty cans, rags, rubbish, and other discarded paint materials from the site. 1. After completing painting, clean glass and paint-spattered surfaces. Remove spattered paint by washing and scraping. Be careful not to scratch or damage adjacent finished surfaces. 3.5 PROTECTION A. Protect work of other trades, whether being painted or not, against damage by painting. Correct damage by cleaning, repairing or replacing, and repainting, as approved by Architect. B. Provide "Wet Paint' signs to protect newly painted finishes. Remove temporary protective wrappings provided by others to protect their work after completing painting operations. 1. At completion of construction activities of other trades, touch up and restore damaged or defaced painted surfaces. Comply with procedures specified in PDCA P1. 3.6 EXTERIOR PAINT SCHEDULE A. Concrete Masonry Units: Provide the following finish systems over exterior concrete masonry units: 1. Semigloss, Acrylic-Enamel Finish: 2 finish coats over a block filler and a primer. a. Block Filler: High-performance, latex block filler applied at spreading rate recommended by the manufacturer to achieve a total dry mill thickness of not less than 4.0 mils (0.102 mm). 1) Devoe: 52902 Bloxfil 200 Interior/Exterior Latex Block Filler. 2) Fuller: 280-00 Interior/Exterior Latex Block Filler. 3) Glidden: 5317 Ultra-Hide Block Filler Latex Interior- Exterior. 4) Moore: Moorcraft Interior& Exterior Block Filler#173. 5) PPG: 6-7 Speedhide Interior/Exterior Masonry Latex Block Filler. 6) P& L: Z/F 98 Pro-Hide Plus Block Filler. b. Primer: Alkali-resistant, exterior, acrylic-latex primer applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.4 mils (0.036 mm). 1) Devoe: Primer not required over block filler. 2) Fuller: Primer not required over block filler. 3) Glidden: Primer not required over block filler. 4) Moore: Primer not required over block filler. 5) PPG: Primer not required over block filler. 6) P& L: Z/F 1001 SUprime "1" Multi-Purpose 100 Percent Acrylic Primer. PAINTING 09900-7 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 C. First and Second Coats: Semigloss, exterior, acrylic-latex enamel applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 2.4 mils(0.061 mm). 1) Devoe: 17XX Wonder-Shield Semi-Gloss Exterior Acrylic Latex House and Trim Paint. 2) Fuller: 664-XX Weather King II Semi-Gloss House & Trim Paint. 3) Glidden: 6600 Series Spred Ultra Exterior Gloss Latex House&Trim Paint. 4) Moore: MoorGlo Latex House &Trim Paint#096. 5) PPG: 78 Line Sun-Proof Semi-Gloss Acrylic Latex House and Trim Paint. 6) P& L: Z/F 3100 Series Aqua Royal Latex House & Trim Finish. B. Ferrous Metal: Provide the following finish systems over exterior ferrous metal. Primer is not required on shop-primed items. 1. Semigloss,Acrylic-Enamel Finish: 2 finish coats over a rust-inhibitive primer. a. Primer: Rust-inhibitive metal primer applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.3 mils (0.033 mm). 1) Devoe: 13101 Mirrolac Rust Penetrating Metal Primer. 2) Fuller: 621-04 Blox-Rust Alkyd Metal Primer. 3) Glidden: 5205 Glid-Guard Tank&Structural Primer, Red. 4) Moore: IronClad Retardo Rust-Inhibitive Paint#163. 5) PPG: 6-208 Speedhide Interior/Exterior Rust Inhibitive Steel Primer. 6) P & L: SO 1009 Suprime "9" Interior/Exterior Alkyd Metal Primer. b. First and Second Coats: Semigloss, exterior, acrylic-latex enamel applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 2.6 mils (0.066 mm). 1) Devoe: 17XX Wonder-Shield Semi-Gloss Exterior Acrylic Latex House and Trim Paint. 2) Fuller: 664-XX Weather King II Semi-Gloss House & Trim Paint. 3) Glidden: 6600 Series Spred Ultra Exterior Gloss Latex House &Trim Paint. 4) Moore: MoorGlo Latex House &Trim Paint#096. 5) PPG: 78 Line Sun-Proof Semi-Gloss Acrylic Latex House and Trim Paint. 6) P& L: Z/F 3100 Series Aqua Royal Latex House & Trim Finish. PAINTING 09900-8 HNT13#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 C. Zinc-Coated Metal: Provide the following finish systems over exterior zinc-coated (galvanized) metal surfaces: 1. Semigloss,Acrylic-Enamel Finish: 2 finish coats over a galvanized metal primer. a. Primer: Galvanized metal primer applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 12 mils (0,031 mm). 1) Devoe: 8502/8520 Mirrolac-WB Interior/Exterior Waterborne Flat DTM Primer and Finish. 2) Fuller: 621-05 Blox-Rust Latex Metal Primer. 3) Glidden: 5205 Glid-Guard Tank& Structural Primer, Red. 4) Moore: IronClad Galvanized Metal Latex Primer#155. 5) PPG: 90-709 Pitt-Tech One Pack Interior/Exterior Primer/Finish DTM Industrial Enamel. 6) P& L: Z/F 1003 Suprime "Y Interior/Exterior Latex Metal Primer. b. First and Second Coats: Semigloss, exterior, acrylic-latex enamel applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 2.6 mils (0.066 mm). 1) Devoe: 17XX Wonder-Shield Semi-Gloss Exterior Acrylic Latex House and Trim Paint. 2) Fuller: 664-XX Weather King 11 Semi-Gloss House & Trim Paint. 3) Glidden: 6600 Series Spred Ultra Exterior Gloss Latex House &Trim Paint. 4) Moore: MoorGlo Latex House&Trim Paint#096. 5) PPG: 78 Line Sun-Proof Semi-Gloss Acrylic Latex House and Trim Paint, 6) P & L: Z/F 3100 Series Aqua Royal Latex House & Trim Finish. 3.8 INTERIOR PAINT SCHEDULE A. Gypsum Board: Provide the following finish systems over interior gypsum board surfaces: 1. Flat Acrylic Finish: 2 finish coats over a primer. a. Primer: Latex-based, interior primer applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.2 mils (0,031 mm). 1) Devoe: 50801 Wonder-Tones Interior Vinyl Latex Primer- Sealer. 2) Fuller: 220-20 Pro-Tech Interior Latex Wall Primer and Sealer. 3) Glidden: 5111 Spred Ultra Latex Primer-Sealer. PAINTING 09900-9 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 4) Moore: Regal First Coat Interior Latex Primer & Underbody 4216. 5) PPG: 17-10 Quick-Drying Interior Latex Primer-Sealer. 6) P & L: Z/F 1004 Suprime"4" Interior Latex Wall Primer. b. First and Second Coats: Flat, acrylic-latex-based, interior paint applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 2.5 mils (0.064 mm). 1) Devoe: 36XX Wonder-Tones Interior Latex Flat Wall Paint. 2) Fuller: 202-XX Acrylic Latex Wall Paint. 3) Glidden: 4000 Series Spred Ultra Flat Latex Wall and Trim Paint. 4) Moore: Regal Wall Satin#215. 5) PPG: 80 Line Wallhide Interior Wall Flat Latex Paint. 6) P & L: Z/F 2000 Series Vapex Latex Flat Wall Finish. 2. Semigloss,Alkyd-Enamel Finish: 2 finish coats over a primer at the new ADA restrooms. a. Primer: Latex-based, interior primer applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.2 mils (0.031 mm). 1) Devoe: 50801 Wonder-Tones Interior Vinyl Latex Primer- Sealer. 2) Fuller: 220-20 Pro-Tech Interior Latex Wall Primer and Sealer. 3) Glidden: 5111 Spred Ultra Latex Primer-Sealer. 4) Moore: Regal First Coat Interior Latex Primer & Underbody#216. 5) PPG: 17-10 Quick-Dry Interior Latex Primer-Sealer. 6) P & L: Z/F 1001 Suprime "1" 100 Percent Acrylic Multi- Purpose Primer. 7) S-W: ProMar 200 Interior Latex Wall Primer B28W200. b. First and Second Coats: Odorless, semigloss, alkyd, interior enamel applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 2.6 mils (0.066 mm). 1) Devoe: 26XX Velour Interior Alkyd Semi-Gloss Enamel. 2) Fuller: 206-XX Interior Alkyd Semi-Gloss Enamel. 3) Glidden: UH 8400 Ultra Traditional Alkyd Semi-Gloss Enamel. 4) Moore: Moore's Alkyd Dulamel#207. 5) PPG: 27 Line Wallhide Low Odor Interior Enamel Wall and Trim Semi-Gloss Oil. 6) P &L: S/D 5700 Cellu-Tone Alkyd Satin Enamel. 7) S-W: Classic 99 Interior Alkyd Semi-Gloss Enamel A-40 Series. 17-10 Quick-Dry Interior Latex Primer-Sealer. 6) P & L: Z/F 1001 Suprime "1" 100 Percent Acrylic Multi- Purpose Primer. PAINTING 09900- 10 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 7) S-W: ProMar 200 Interior Latex Wall Primer B28W200. B. Ferrous Metal: Provide the following finish systems over ferrous metal: 1. Semigloss, Acrylic-Enamel Finish: One finish coat over an enamel undercoater and a primer. a. Primer: Quick-drying, rust-inhibitive, alkyd-based or epoxy-metal primer, as recommended by the manufacturer for this substrate, applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.5 mils (0.038 mm). 1) Devoe: 13101 Mirrolac Rust Penetrating Metal Primer. 2) Fuller: 621-04 Blox-Rust Alkyd &Structural Metal Primer. 3) Glidden: 5207 Glid-Guard Tank&Structural Primer,White. 4) Moore: IronClad Retardo Rust-Inhibitive Paint#163. 5) PPG: 6-208 Speedhide Interior/Exterior Rust Inhibitive Steel Primer. 6) P &L: S 4551 Tech-Gard High Performance Rust Inhibitor Primer. b. Undercoat: Alkyd, interior enamel undercoat or semigloss, acrylic-latex, interior enamel, as recommended by the manufacturer for this substrate, applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.3 mils(0.033 mm). 1) Devoe: 39XX Wonder-Tones Semi-Gloss Interior Latex Enamel. 2) Fuller: 220-07 Interior Alkyd Enamel Undercoat. 3) Glidden: 8200 Series Spred Ultra Latex Semi-Gloss Enamel. 4) Moore: Moore's Alkyd Enamel Underbody#217. 5) PPG: 6-6 Speedhide Interior Quick-Drying Enamel Undercoater. 6) P&L: Z/F 4100 Series Accolade Interior Semi-Gloss. C. Finish Coat: Semigloss, acrylic-latex, interior enamel applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.3 mils(0.033 mm). 1) Devoe: 39XX Wonder-Tones Semi-Gloss Interior Latex Enamel, 2) Fuller. 214-XX AA Enamel Interior Acrylic Latex Semi- Gloss Enamel. 3) Glidden: 8200 Series Spred Ultra Latex Semi-Gloss Enamel. 4) Moore: Moore's Regal AquaGlo Vinyl-Acrylic Latex Enamel#333. 5) PPG: 88-110 Satinhide Interior Enamel Wall &Trim Lo- Lustre Semi-Gloss Latex. PAINTING 09900- t I HNTB #36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 6) P&L: Z/F 4100 Series Accolade Interior Semi-Gloss- 2) Fuller: 110-XX Fullerglo Alkyd Semi-Gloss Enamel. 3) Glidden: UH 8400 Ultra Traditional Alkyd Semi-Gloss Enamel. 4) Moore: Satin Impervo#235. 5) PPG: 27 Line Wallhide Low Odor Interior Enamel Wall and Trim Semi-Gloss Oil. 6) P& L: S/D 5700 Cellu-Tone Alkyd Satin Enamel. 7) S-W: Classic 99 Interior/Exterior Semi-Gloss Alkyd Enamel A-40 Series, C. Zinc-Coated Metal: Provide the following finish systems over zinc-coated metal: 1. Semigloss,Acrylic-Enamel Finish: 2 finish coats over a primer. a. Primer: Galvanized metal primer applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.2 mils (0.031 mm). 1) Devoe: 13201 Mirrolac Galvanized Metal Primer. 2) Fuller: 621-05 Blox-Rust Latex Metal Primer. 3) Glidden: 5207 Glid-Guard Tank&Structural Primer, White. 4) Moore: IronClad Galvanized Metal Latex Primer#155. 5) PPG: 90-709 Pitt-Tech One Pack Interior/Exterior Primer/Finish DTM Industrial Enamel. 6) P& L: Z/F 1003 Suprime "3" Interior/Exterior Latex Metal Primer. b. First and Second Coats: Semigloss, acrylic-latex, interior enamel applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 2.6 mils (0.066 mm). 1) Devoe: 39XX Wonder-Tones Semi-Gloss Interior Latex Enamel. 2) Fuller: 214-XX AA Enamel Interior Acrylic Latex Semi- Gloss Enamel. 3) Glidden: 8200 Series Spred Ultra Latex Semi-Gloss Enamel. 4) Moore: Moore's Regal AquaGlo Vinyl-Acrylic Latex Enamel#333. 5) PPG: 88-110 Satinhide Interior Enamel Wall & Trim Lo- Lustre Semi-Gloss Latex. 6) P & L: Z/F 4100 Series Accolade Interior Semi-Gloss. Metal Latex Primer#155. 5) PPG: 90-709 Pitt-Tech One Pack Interior/Exterior Primer/Finish DTM Industrial Enamel. 6) P &L: Z/F 1003 Suprime "3" Interior/Exterior Latex Metal Primer. 7) S-W: Galvite Paint B50W3. PAINTING 09900- 12 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 b. Undercoat: Alkyd, interior enamel undercoat or semigloss, interior, alkyd-enamel finish coat, as recommended by the manufacturer for this substrate, applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.2 mils (0.031 mm). 1) Devoe: 26XX Velour Interior Alkyd Semi-Gloss Enamel. 2) Fuller: 220-07 Interior Alkyd Enamel Undercoat. 3) Glidden: UH 8400 Series Spred Ultra Traditional Alkyd Semi-Gloss Enamel. 4) Moore: Moore's Alkyd Enamel Underbody#217. 5) PPG: 6-6 Speedhide Interior Quick-Drying Enamel Undercoater. 6) P & L: S/D 1011 Suprime "11" Interior Alkyd Wood Primer. 7) S-W: ProMar 200 Interior Alkyd Semi-Gloss Enamel B34W200. C. Finish Coat: Odorless, semigloss, alkyd, interior enamel applied at spreading rate recommended by the manufacturer to achieve a total dry film thickness of not less than 1.4 mils(0.036 mm). 1) Devoe: 26XX Velour Interior Alkyd Semi-Gloss Enamel. 2) Fuller: 110-XX Fullerglo Alkyd Semi-Gloss Enamel. 3) Glidden: UH 8400 Ultra Traditional Alkyd Semi-Gloss Enamel. 4) Moore: Satin Impervo#235. 5) PPG: 27 Line Wallhide Low Odor Interior Enamel Wall and Trim Semi-Gloss Oil. 6) P & L: S/D 5700 Cellu-Tone Alkyd Satin Enamel. 7) S-W: Classic 99 Interior Alkyd Semi-Gloss Enamel A-40 Series. END OF SECTION 09900 PAINTING 09900- 13 HNTB#36368 Palm Springs Convention Center y , Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 SECTION 10265- IMPACT-RESISTANT WALL PROTECTION PART 1 -GENERAL 1A RELATED DOCUMENTS A. Drawings and general provisions of Contract, including General and Supplementary Conditions and 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes the following: 1. Corner guards. B. Related Sections include the following: 1. Division 5 Section "Metal Fabrications" for steel angle and bent plate corner guards fabricated from rolled metal. 2. Division 6 Section 'Rough Carpentry" for wood blocking and grounds for surface- mounted wall guards, corner guards, and handrails. 3. Division 8 Section "Door Hardware"for stainless-steel mop, kick, armor, and push plates. C. Alternates: Refer to Division 1 Section "Alternates" for description of Work in this Section affected by alternates. 1.3 SUBMITTALS A. Samples for Verification: Submit 12" long samples of the corner guards as shown on the drawings (see detail 9/A8.20) and the method of adhering the unit. 1.4 QUALITY ASSURANCE A. Installer Qualifications: An experienced installer who has completed installation of impact- resistant wall protection system components similar in material, design, and extent to that indicated for this Project and whose work has resulted in construction with a record of successful in-service performance. B. Manufacturer Qualifications: A firm experienced in manufacturing impact-resistant wall protection system components similar to those "required for this Project and with a record of successful in-service performance. IMPACT-RESISTANT WALL PROTECTION 10265- 1 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 PART2-PRODUCTS 2.1 MANUFACTURERS A. Available Manufacturers: Subject to compliance with requirements, manufacturers offering impact-resistant wall protection system products that may be incorporated into the Work include all reputable manufacturers engaged in the fabrication of stainless steel corner guards operating in the State of California. 2.2 MATERIALS A. Stainless-Steel Plate: Type 304, minimum 0.0625 inch (1.6 mm). B. Adhesive: Type recommended by the manufacturer for use with material on the substrate indicated. 2.3 CORNER GUARDS A. Stainless-Steel Corner Guards: Paper-covered, satin-finish, 0.0625-inch (1.6-mm) minimum, stainless-steel sheet corner guards; height as indicated. Provide 90-degree turn, unless otherwise indicated; and formed edges. Wing size, mounting method and corner radius shall be as shown on the drawing. 2.4 STAINLESS-STEEL FINISHES A. Bright, Directional Polish: No.4 finish. 1. Remove tool and die marks and stretch lines or blend into finish. 2. Grind and polish surfaces to produce uniform, directionally textured, polished finish indicated, free of cross scratches. Run grain with long dimension of each piece. PART 3-EXECUTION 3.1 EXAMINATION A. Examine areas and conditions in which impact-resistant wall protection system components and impact-resistant wall covering materials will be installed. 1. Complete finishing operations, including painting, before installing impact-resistant wall protection system components. 3.2 PREPARATION IMPACT-RESISTANT WALL PROTECTION 10265-2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Y Theater Reconfiguration 10/30/02 A. General: Before installation, clean substrate to remove dust, debris, and loose particles. 3.3 INSTALLATION A. Install impact-resistant wall protection system components level, plumb, and true to line without distortions. 1. Do not use materials with chips, cracks, voids, stains, or other defects that might be visible in the finished Work. 3.4 CLEANING A. Remove excess adhesive using methods and materials recommended by the manufacturer. B. Remove surplus materials, rubbish, and debris, resulting from installation, on completion of work and leave installation areas in neat, clean condition. END OF SECTION 10265 IMPACT-RESISTANT WALL PROTECTION 10265-3 HNTB#36368 Palm Springs Convention Center y Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 SECTION 10660—OPERABLE WALLS PART 1 -GENERAL 1.1 RELATED DOCUMENTS A. Drawings and general provisions of the Contract, including General and Supplementary Conditions and Division 1 Specification Sections, apply to this Section. 1.2 SUMMARY A. This Section includes surface preparation and Feld insalation of manually operable wall panels in the meeting rooms. Operable walls are to be hinged in pairs, center track,top supported and stored locally. B. Panel Facing Material: Fabric to match the existing in meeting rooms. C. Sound Transmission Classification (STC): Provide and install operable wall units capable of achieving'a minimum laboratory test rating of STC-48 when tested in accordance with ASTM E90 without the facing material. 1.3 SUBMITTALS A. Product Data: Submit manufacturer's technical dataq and installation instructions. B. Certifications: Submit certifications from an independent testing laboratory that the product meets the specifications for STC rating, fire rating and flame spread classification- C. Shop Drawings: Submit shop drawings for fabrication and erection, including plans, elevations, large scale details, anchorages, and accessory items. Provide location template drawings for items supported or acchored to the structure permenently. D. Maintenance and Care Manuals: Covering the operable partition and all manufactured accessories. 1.4 QUALITY ASSURANCE A. Installer Qualifications: An experienced installer who has a record of successful in-service performance. 1.5 DELIVERY, STORAGE,AND HANDLING A. Deliver operable partitions to the Project site in the manufacturer's original, unopened packages and containers bearing manufacturer's name and label. PART 2-PRODUCTS OPERABLE WALLS 10660- 1 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 2.1 MANUFACTURERS A. Available Products: Subject to compliance with requirements, products that may be incorporated into the Work include, but are not limited to, the Classic 7000 Series Model 7600 Omni-directional by Hufcor(to match the existing meeting rooms)or an approved equal. B. Operation: Operable walls shall consist of top supported, manually operated, continuously hinged rolling panels equipped with two 4-wheel ball bearing trolleys with automatic retractable floor seals. C. Hinges: Continuously hinged panels shall be of the manufacturer's standard design. D. Track: Type 53 Omni-Directional to 1500 lbs. Shall be suspended by all-thread steel rods from the structure above. Track system shall provide a captive and"free-flow"method of panel travel through 6" radius turns at every change in track direction and through the stacking wyes. Panels shall readily accumulate of their respective storage locations as indicated on the drawings. E. Trolleys: Panels shall be supported by 4-wheel radial type steel ball bearing wheels. Trolley pendent bolt shall be attached to the panelo utilizing steel reinforced plates welded to the top panel trame rail. Steel trolleys running on aluminum track are not acceptable. F. Perimeter Sound Seals: Top seal shall be continuous contact vinyl fin sweep seals. Bottom seals shall be automatically actuated by movement of one panel against another without face cranks. PART 3-EXECUTION 3A EXAMINATION A. Examine substrates and conditions, with the installer present, under which moveable panels will be installed,for compliance with manufacturer's requirements. 3.2 PREPARATION General: Installation shall be performed under the supervision of factory-trained mechanics in strict accordance with the manufacturer's printed installation manual to ensure satisfactory operation. 3.3 INSTALLATION Each partition will be tested in accordance with ASTM E336-76 using the "reverberant field" procedure inand full active bands (not one third bands). Field Sound Transmission Class (FSTC) ratings will be determined in accordance with ASTM E413-73. In each test the minimum rating shall be STC 40. 3.4 CLEANING OPERABLE WALLS 10660-2 HNTB#36368 Palm Springs Convention Center Phase 1, Kitchen and Springs Theater Reconfiguration 10/30/02 A. Cleanup: At the end of each workday, remove rubbish from the Project site. 3.6 PROTECTION A. Protect work of other trades, whether being laminated or not, against damage from fiberglass reinforced panel operation. Correct damage by cleaning, repairing, and replacing as approved by the Architect. END OF SECTION 01160 OPERABLE WALLS 10660-3 PRE-IND RFI LOG RFI# DATE RFI DETAIL RESPONSE RESPONSE DATE 11123/0 There is an area(receiving)in the kitchen which sho 12/5/200 The Health Department has—reviewed the exposed ceiling open to structure.This area will be used to ceiling in the Receiving Area and they have not take transport food items from loading to the kitchen.We issue. Provide the diffuser indicated in the sketch don't believe that this will be acceptable to the Dept. provided by Syska&Hennessey. Health.Please advise. PB-2 11/25/200 Drawings show condensers for kitchen above ceiling, 12/5/2002 The new condenser for this project are indicated to b but CC personal indicate they are on roof. located on the roof. Relocation of existing condense was not included in the scope of the project. The design work required to accomplish this would involy all of the consultants and require input from the original manufacturers relative to the configuration o the condensers and compressors,their weights and centers of gravity and their utility requirements. Sinc these units were not intended for an exterior application,some kind of weatherproof enclosure will need to be designed. This is more work than can be accomplished during the bid process. HNTB concur that relocating the condensers will benefit the project and will perform the design tasks necessary to accomplish this if authorized to do so by the City. PB-3 11/25/200 Is it acceptable to use native sand for fill? 12/5/200-2 Per item 5 Appendix C of the soils report. PB-4 11125/2002 The drawings show 4"crushed gravel as base,but 12/5/200 Provide base under interior slabs in accordance with spec's indicate vapor barrier w/2"of native sand, the soils report. Please advise if vapor barrier/sand alternative is acceptable. PB-5 11/25/2002 Currently there is exterior lighting at the dock area,th 1215/2002 This will be addressed in an addendum prior to bid. new plans have no provisions for any.Is it an oversigl t or have all exterior lights been eliminated? PB-6 11125/2002 The HVAC ducts at the S.&E.Corridors of the 12/512002 This is a contractors mean and methods. Springs Theater havehard lid under them.What is the intended method for replacement? PB-7 11/25/2002 Still need final specs on the carpet/flooring.Please 1215/20N Carpet will be purchased and installed by the City to advise. allow them to take advantage of pricing arrangement PB-8 11/25/2002 What is to become of the existing camera at the 121512002 This will be addressed in an addendum prior to bid. loading dock area?Does there need to be power and backing for a new one? PB-9 11125/2002 KA.2 shows flooring to be quarry tile in Cold Prep Rm 12/5/200 Resinous flooring. 111,however,the finish schedules list it as resinous. Please clarif PB-10 11/25/2002 Duplicate of PB-1 12/512002 Duplicate of PB-1. PB-11 11/25/2002 Roof stairs show on the Roof plan drawing,but not on 12/5120R The roof ladder comes down in the Telephone Room the floor plan drawing.Please clarify where the locati of the roof stairs will be. PB-12 -Ti/25/2002 The Convention Center indicates that they want the 1215/2002 Delete all reference to vinyl wall covering in the wall covering to be removed from the S.&E.corridor project. Where vinyl wall covering was previously (only the side abutting the Springs Theater)and to be specified,provided painted drywall. An' h with vaint to match Please advisE PB-13 11/25/2002 It is not clear if any communication/data wiring is 12/512002 The scope of communications wiring is limited to included in the scope of work.Please clarify if this conduit,which is show on the drawings. needs to be included. PB-14 11/27/2002 A note on drawing M1.10 states b remove and repla 1215/2002 The Diffusers and air quantities were indicated on th existing air diffusers and grilles with new,these new latest drawings that were issued on November 21, are to have the same air quality as existing.Nothing c 2002. M1.11 will be reissued. the existing is shown on the drawing to determine this scope of work. PB-15 11127-12002 The scope of work note of drawing M1.11 states to 1215/2002,The Contractor shal field verify the AHUs and remove AHU-6 and AHU-3 and all associated duct ductwork to be removed and needs to refer to the work and piping.Nothing of existing is shown. available As-Builts drawings. PB-16 ,I U27/200 The scope of work note on drawing M1.11 states to 1215/2002 Same as PB-15 above. remove the duct work in the hallway and leas existing duffusers.The diffsers aer shown but not the duct work. �B-17 11/27/200 There is no condensate drain piping shown on the 12/5/2002 Condensate drain is under the HVAC scope not the plumbing drawings for any of the fan coils,split Plumbing and should be routed to the nearest recept systems or he new Air Handler Unit. as noted on Mechanical drawings and per specs. Regarding item PB-17,the condensate drain for the new AHU can be routed to the existing hub drain serving existing AHU-4.As to the fan coil units,the condensate drain can be routed to nearest floor sink within the Kitchen Area.The split type indoor evaporated can be routed to the adjacent existing Janitor sink. PB-18 12/2/2002 Per details 1&2/53.03,closure plate is required on 12/11/200 Detail 2/53.03 shall apply along deck edge along lines B.6,21.9&21.2 sheet S2.12?What is required Column line 21.9 with 3/8" on the balance of this roof area and what is the bent plate as reference on detail 6/S1.04,however,if material? "L"exceed 6 inches, then the stiffener plate should be in triangular shape as caged out in detail 6/51.04. Detail 1/S3.03 shag apply to column lines B6 and 212 Detail 1/51.04 shall apply to all other edges of deck. Dimension"L'shall be provided by Architectfor all conditions. PB-19 1212/2002 On the finish schedule,room 101,dry storage shows 12/5/200 ACT-1 GWB.On reflective ceiling print shows Act-1? PB-20 12/212002 Are we to replace all of the T-bar or just what is on th 12/5/2002 Pending finish schedule?—sent request for what areas.MS PB-21 12/9/2002 Drawings state that the acoustical ceiling tile is 2x2', but the detail shows 2'x4',plus here is not a specification for type of file. PB-22 12/10/2002 Electrical&fire Life Safety specifications,Para.II,B, 12/11/200 There is no public address system. line item 7Z"Provide conduit,boxes and pull string only for public address systems"A public address system is not defined on the drawings,please clarify. LIST OF ATTENDEES FOR THOSE TRADE BIDS REQUIRING ATTENDANCE AT THE PRE- BID MEETING BUT DID NOT HAVE TO PRE-QUALIFY 4 Concrete & Reinforcing Precision Concrete Forward Services, Inc. 8 Roofing & Sheet Metal Al Miller & Sons Roofing, Inc. AAA Roofing Service First Single Ply Roofing 18 Resinous Flooring Allied Industrial Coatings, Inc. Floor Seal Technology City of Palm Springs 4 Department of Procurement and Contracting 3200 Tahquitz Canyon Way • Palm Springs, California 92262 C'1 C 1 FO RASP TEL:(760)323-8239 - FAX(760) 322-8372 • TDD(760)864-9527 CITY OF PALM SPRINGS 3200 East Tahquitz Canyon Way Palm Springs, CA 92262 NOTICE TO ALL TRADE CONTRACTORS PHASE I EXPANSION OF THE PALM SPRINGS CONVENTION CENTER CITY PROJECT#02-19 ADDENDUM NO. 2 This Addendum is being issued for the following changes and informational items: 1. Add Part V Scopes of Work (All Trades): 2. Provided for your convenience: Hard copy of Addendum #1 issued December 5, 2002, and transmitted electronically to all plan holders. Note: Includes anticipated master construction schedule, (All Trades) which is also available on the city's web site. Go to www.ci.palm-springs.ca.us. Go to Departments. Go to Procurement. END OF ADDENDA NO. 2 BY ORDER OF THE CITY OF PALM SPRINGS City �off Palm Springs SSprings Harold E. Good, CPPO Director of Procurement& Contracting Dated: December 6,2002 Receipt of this addenda must be acknowledged on the Trade Bid Forms submitted with the bid package. Attachments: Scopes of Work (All Trades) Courtesy hard copy of Addendum #1 previously issued. Courtesy hard copy of Anticipated Master Construction Schedule(All Trades) Post Office Box 2743 1 Palm Springs, California 92263-2743 SCOPE OF WORK TRADE CONTRACT NO. 8 ROOFING & SHEETMETAL PALM SPRINGS CONVENTION CENTER EXPANSION PHASE I CITY OF PALM SPRINGS, CALIFORNIA Provide all necessary labor, materials, equipment, hoisting, scaffolding, tools, rigging and anything else necessary to complete the Roofing and Sheetmetal Work for the Palm Springs Convention Center Expansion Phase I Project. I. GENERAL: A. All conditions as set forth in the Safety Program, as adopted by the City of Palm Springs, (Exhibit A), Master Construction Schedule for Bidding Information (Exhibit B), General Liability and Automobile Insurance Limits (Exhibit C), Document List dated November 1, 2002 (Exhibit D), Construction Manager's Standard Provisions (Exhibit E) and Temporary Utilities for Construction Purposes (Exhibit F) are to be considered as part of the work. B. The Drawings and Specifications dated October 30, 2002 (Exhibit D), indicate the General Scope of Work. C. Trade Contractors shall carefully examine this Scope of Work to be performed and the relationship of this work to the work being performed by other Trade Contractors. D. Where a Specification Section is specifically included in the scope of this Trade Contract, it is intended that all work covered by that Specification Section will be included except as otherwise specifically noted. Other specification sections referred to either in these specifications or on the Drawings are included by reference. E. The word "provide" when used herein shall mean furnish and install completely, including all costs of labor, materials, equipment, hoisting, layout, ' scaffolding, tools, rigging and any other facilities necessary to complete the Work. F. OSHA 30 hour training policy, Exhibit H. II. SCOPE OF WORK A. All work defined in the Specification Sections listed below is specifically included, but not limited to, the Scope of Work of this Trade Contractor, unless specifically excluded in Paragraph C below. 07533— Single Ply Membrane Roofing 07716—Roof Expansion Assemblies 07720—Roof Accessories Page 1 12/6/02 Palm Springs Convention Center Expansion Phase I Scope of Work Roofing & Sheetmetal Page 2 B. As further clarification, Trade Contractor shall: 1. Provide all new roofing and patching of existing roof, including tapered insulation and new smooth river rock ballast to match existing. 2. Provide all pitch pockets, including, but not limited to, wood blocking, membrane flashing at all new steel bracing and tube steel tie-ins at roofing for mechanical screen and AHU platforms. 3. Patch all roofing in accordance with manufacturer's recommendations. All membrane to be welded. 4. Provide patching of roofing, included, but not limited to, all new MEP penetrations, roof jacks, and new structures and platforms, (mechanical screens & AHU platforms), condensing unit platforms, boiler platforms, equipment curbs, vents, roof jacks, roof hatches and exhaust fans. 5. Provide patching at all demolished penetrations, including but not limited to, roof hatch, vents and equipment and roof jacks. 6. Provide sheetmetal enclosures over demolished equipment curbs. Enclosures shall be installed 7. Provide all new sheet metal flashings, counterflashings, wall coping, mechanical screen coping, drips, new vertical and horizontal expansion joints, including extruded secondary seals, neoprene bellow covers, adhesives, backer rods and sealants for a watertight system Expansion joints shall be provided in accordance with details 6/A4.01 and 8/A4.02, and the intent of the Contract Documents. 8. Remove ballast at areas to prepare for demolition, installation and patching of roofing at of new structures, platforms, equipment, roof hatches, penetrations, roof jacks, steel bracing and tube steel. Replace ballast after completion of roof patch and roof acceptance. 9. Coordinate roofing with roof drains with plumbing Trade Contractor. 10. Include a cost allowance of 40 journeyman roofing hours for misc. roofing patching to be used at the discretion of the Construction Manager. A log of hours used will be kept and a credit provided by this Trade Contractor to the City of Palm Springs at the end of the project for any remaining unused hours. 11. Provide the following insurance for Combined Single Limit or Aggregate, in the amounts described: Page 2 1216/02 Palm Springs Convention Center Expansion Phase I Scope of Work Roofing& Sheetmetal Page 3 A. Comprehensive General Liability, in the amount of 3,000,000., including: a. Premises and Operation b. Elevators C. Independent Contractors d. Blanket Contractual Including Liability Assumed by Insured Under the Subcontract. B. Comprehensive Automobile Liability in the amount of 1,000,000., including: a. Owned b. Non-owned C. Hired Automobile Exposures. C. WORK EXCLUDED: 1. The following items are specifically excluded from the Work: 1. Metal Decking D. LABOR RATES: 1. To determine the sum to be paid for labor and materials for change order work performed under a time and material basis, the following hourly rates shall be multiplied by the number of approved hours for each classification of labor. These hourly rates represent full and complete compensation (including overhead and profit) for providing labor. In addition, these rates represent full and complete compensation for the cost of incidental items including but not limited to such things as small tools and equipment (valued at less than $250), travel expense, fuel, employee parking, etc. E. ALLOWANCES: None F. ALTERNATES: None G. GENERAL INFORMATION: 1. In addition, the Work will include the requirements of General Conditions, Supplementary Conditions, and Division 1, General Requirements. Page 3 12/6/02 Palm Springs Convention Center Expansion Phase I Scope of Work Roofing& Sheetmetal Page 4 2. The drawings, specifications, and other information listed as Contract Documents indicate the general scope of Work, and do not necessarily indicate or describe everything required for the full performance and completion of the Work. Trade Contractor shall be solely responsible for completing the Work in accordance with code requirements and the reasonable intent of the Contract Documents. 3. Trade Contractor shall visit the site and become familiar with the existing conditions and the physical condition of the site. Trade Contractor shall examine and fully understand the Contract Documents and all other exhibits, attachments, engineering reports, soils reports, special studies, and existing conditions to the extent necessary to perform the Work. 4. Trade Contractor acknowledges that he will be working in an existing, fully functional facility. As such, Trade Contractor will allow for the Owner's needs for security and cleanliness and will perform this work without disruption of the Owner's day-to-day operation. 5. Trade Contractor acknowledges that Turner is the Construction Manager and as such has no field forces or material handling capability to assist Trade Contractor, Page 4 12/6/02 ' Acll ift Orig Early Early - ID ,Description - Our Start Finish Mobilization Mobilization 1030 Mobbe 0 274"Q 1010 Se[upTrdie 2 fgobllize "M �JJdY et up Trailer logo SetTarpeayPoWPo' 1 ZT43A2 2n,13M)2 0 iSet Temporary war Pole 103D rryaindTarp Pang 0 244TA2 Inspection of To P.Power 1040 E13gzoTerpPaw 3 o27B_1R 010EOM _ ® Ene_rglze_Te �P Power 10M InaWConSru&nFarng 2 � © Install Conatl ction Fencing r i 1QA Obtain tes ant 0 1COE002 Obtain De o Penns[ Ki ObIaIrlSpig,Irk Phan Penll O ;MEOM ♦Obtain Ki an Building P�rmit 415D Bid Dab 0 17 ♦Obtain Sp nga Meeting Rgom Permit Bid D te__ 41B) AwadTrad, readDre 3 1✓LElSP' O31WD Award Tra a Contractors 'HllDaCor 0 03Wd$1 Start of C nstruction Kitchen Phase 1-Kitchen Demolition a Grading 1100 53a0cSp W@ExfxzrCaxpyaTrS 1 03WJD 03WJ03 0 Safe Off Sprinkler @ Ext riot Canopy a T sills 1110 SoteORE7emial 2 OOy4A3 101*0 © Safe Off Electrical 10.E Fskl Sea CareiDd;3n Farag 1 03W310 ! 1130 RcbdBdslingLoa gDods Call Sac 2 tOWdB 13NAIT3 0 Install Site Construction fencing 11BJ Shoe Treks ® ProtectjExisting Loading Dock Cold Bo - 1 1GPM 1ON403 _ _ G Shore Trellis 1180 DeroE§xbrvvWFir hQT"Lo�akxs 3 10W403 11M TerpeW Va[pean(Robcbn)gENI�iiyVak 0 Demo EMedor Wall FI Ish Q Tie-In Lo Ilona j- -- — Ilm RobdC�Mda 4 101WdD 15WND © Tompr rary Vlsqueen( rotectlon)at Ex Her Walla 1 iQWdB IW*M 0 ProtectG Meter 1120 DerloTrel's1120 �� 1 1QVN06 1GWyZ3 0 Remove Trash Compact r 0 Demo Trellis 11� DenlofmclLm6gpockRadShrisa 3 141^MD 1BYVJl3 © Demo Itlon of Loadin Dock Roof St cture �- 1210 Dan° CaoebSFab;,teadrgWdcWakaF� 3 1fiWrB 17.WSD © Dom d•Concrete SI s,Lcoding Dock Walls 6 Ftgs 1ZD Sbl®aRjghGadBMw8uI igAra 2 17U&M 21*M 1870 SolCarrac1naPad Cell zl 0 ® Stale a Rough Gra(1a Now Building rea �� SoII.DOm action a Pad Certigcatlo Structure 19� 3neEno � z 0 sul a12M aLa out Um SaEculaDudcWal 053aWM cavate Building a Dock Wall F clings 1231 SdskM 1nSU *U&DockW;aiFb" 2 it Compaetloneats .Wm nstall Robar a,Building a Doc Wall Footings 5U/G MEP 1270 Reb 01� FardcWal a6ar lnapactl n 1Z0 FarnB pVjibb i PourBuilding�d Dock Wall Foo Ings 1421 LIG Form Colum Plers a Ramp ails amn Oeb P5NOV02 PSC2 U/G MEP Ins ction Finish Dale 13MA M - Fart'aar Sheet 1 a111 Dale Dale 25ryDye2 � Proere Sar Turner Construction Company ReNsbn cn � Apeumd Run Dam OSDECO21a57 cnewinaomry P.S.Convention Center Expansion 0 Primavera Systems,Inc. Activity Activity Orig Early Early ID Description Our Start Finish 1430 Badil[M EP 2 31W403 31,1403 _ _ q Backfill U/G EP 1300 idal pets&ColrmArdxrBo6@Pies 2 311W103 03EE13 I Install Reb'r&Column Anc or Bolts @ Piers 1310 Fshaigstnl 0 <1 �Rebar Inspection 1410 Sol tcspeoyn 0 03 M � �Soil lnsped on 133) PorComrPms&Rarp Wale 1 07FEEM 0FEBM 1 Pour Colur in Piers&Ramp Walla 1330 Sip War&Wallars 1 O5EBM 051M ! 0 Strip Pier Wall Forma 1310 Bad9Wab&Derrped Faoigs 2 033$13 OiF®.Ti 1 0 Backfill alls&Derl ceilings .I 1393 QaleShbasGral 1 OIFEBM UNEEM Q Grade SI b on Grade 135l Sol Carmen 0 15 � Soil Com pactlon I 130 SdShbEU&DockArGI s 2 10=B373 11REfB 9 Set Slab Edge&Dock Ajigles 1380 EpoyDmesatFiaigShb 2 11FEBCB 11F®p ® E pewals atExIstInj Slab 417D May3etadSati 2 12`3303 137EB93 i 7 Wsqu an and Sand 1410 93ckW@Coms 1 121=EQ3 ITEE 3 I Y Blocknit @ Columns M Fdal Reba 2 13193E03 14FE303 & Install Reber 1433 Rab3tepeol 0 14F333D3 Rebar Inspection WM PorB iJ-gShb0nGrad3 1 17FEB33 17FEBM _ . 1 Pour Building Slab_IQ Grade 1487 WSJ&WalFans 1 17F®03 17FEBW 1 Strip Slab&Wall Fo s M SeISYWuaIShd Cotms 1 iB`EBD 189MM g Seel Structural Steel olumns 1!A0 igal ShriralSbalBmrs 3 1 S 21FEf3B IN 1 Istall Structural S eel Beams ! 1510 MUCa� if rsbEgShrLa&Gu,�6 3 21FEBM 25�03 MI Weld Connectlo s to Existing Structure&Gussets IM idaiSia�adc&Kr9as@EstEEr.Well 24FEE03 2F®03 _ _ _ _ © Install Stron ba k&Klckera 0 Exist Extr.Wall 152D Weld Inapeclon 0 29i33M - -- - -- — Weld Inspection 1940 DOMEtlalorftarig 2 2FEBM THEM ® Demo Exterior ranting 1933 k set Bo"nTratc@Basil Paapd 3 9FE73 03vNR73 rR Install Botto Track@ Existing Parapet 190 kr.4l Metal Daddg&(]sres 4 03v1^F�i Oevl^fiD3 I ® Install Meta Decklne&Clostires 1931 Itstd13a11F1aN 3 43vWiA ORMS03 Bant late 15V MaolaHShrYralSbd 2 Q/IvyV�i 1UvWil3 ® Mo iokot Structural Steel. i Exterior 1910 Lara;Exle"Wals 1 24FEBM 21Fi BM 0 ayout Exterior Walls IBM lnMT5,@Rokp Dons 1 2TEM 25i j 1 Install T.S.@ Roll-up Doors 2XD RanaExi r"Wab 2 2&�33 27F�73 B Frame Exterior Walls zM PtrrbigwalFtu<m 4 29933M 0%A903 Plumbing Wall Rough-in 2710 BodnzrelWal FlaogtH'i 3 04MAHai ____ 0 Electrical W II Rough-In 2II3 New CesFiling Ral 2 2%iBM 014M i New Gas Pip ng Rough-in — 18C E'dw"Rarigi spe" 0 4 Exterior Framir g Inspection ISO UIGVA9M 2fE503 I Install Exterior Scaffolding(toerboards) 1Bi0 SdF�trDrxrRanes � Set Exterior D r Frames 1830 ismlE4aiorDer&Q� i OBNJ�i I ® Install Exte or Dena•Glas ism EOaQShestg ispecin Exterior Sh ating inspection 18d3 EIF.Slstim&Raeak 3 11MARB I ® E.I.F.S{ sulatlon&Rsvetis M EIFSMasJrBsa Ccd 13AOM ® E.I.F.S ash Base Coat 19O Ell Fi ah Cod i 13AAMS ® E.I.FSFlnlsh Coat 1gn Fi moesmil 19AgM 1 Rempve ScaffoldingRnlW Daaa 3 2tv qn - -�— —�— _-�—--_--�- - nil Inst II Roll-up Doors 1112 lnMDoars&Hadmni 2 MVWW 21M*03 11 Ina all Doors&Hardware FstalkFPTrin 3 21ivNA03 2WWY6 i ® I staIMEPTrim 21C0 CahE it -2 1 24+MR73 2%41RM El CaulkExtedor Sheet 2 of 11 Activity Activity Orig Early Early ID Descrtptlon Dur Sfart Finish 1910 Patch EIFS Q RoofTei/s 3 24MAR03 2 27d/ PaFtENavDoos -- — etch E.I.F.S Roof Tie-in's 2 Z hNJiD 273D Fecal DoorSaak�Htl+p Liras 1 Bv*0 23vWY6 G aint Exterior Opors 2N0 Y�I Dock BrrFs 1 2TvNR13 23VA9D3 D Install Door Seals @ Roll-up Do re, Interior �, 0 Install Dock Bum r 1� LaratllaorWdl; 1 WMNu3 07NNi0 A Layout 1570 Frane"arirWals 2 OFANi13 1GANil3 lot nor Walls i 18M Setl�brpox&WndawRarea ® Frame In erior Walls i 1 1OJN773 1aAN773 1 Set Intent r Door&Wind Fr.41E0 � 2 11MN313 12A*03 21� HrrligWalF�LJ'nn8i3�raTest 5 likia 3 17MNYfi I I ® Sat Fan olia ® Plum In Wall Rau hen&Pressure T st 21� �rrR Wal Ramon& �^'� 4 11NPM 'NMNTD � A8 Electri I Wall Rough-16&Set Now Panils i837 F�orFarsg t�ecSTt 0 111A^Ftl3 7370 pec}Ir�iV�c�i -e 0 17MN1 Interior F aming Inspectign 22M PIs�Wel Yin 0 IMA900 �ElecV cal Wall inspection 2ZN �'� 3 iBvtN-iRi 25 WM Plum Ing WaII Inspecitlon 1580 Felre tktl->SdadP000(padc — .___. ____ m D all . 3 1 211ANi➢ ® Ins late linderslde of Roof Deck 2310 SaavFloo&n 0 22A Tape,Fig&FrNI q 2%VFM 23 I *Scre Inapectlon 1a0 I'dalWAr—O"Inaad 5 24IVM 2%1N ® ps,Float&Finish 1610 hoWaehaad Flrttig&R�TeA D 5 2q � 3 I IzTr7 Install HVAC Overhead VW;03 ® 1610 Install Overhead Plumbino&Pressure Test Yshl Fie SpriiderpH Ppg, mps&P.T. 5 2W� _ ._I _ __.___—_ 11E0 Istal O.etead 9edr-zl GMInstall Fire Sprinkler O/H Plping,;Drops&P.T. 5 ® Install Overhead Electrical 4100 Fed FN�58Rad CMN53R F{rgBPiearaT� 3 Install H &R and CHWS&R Piping&Pr sure Test ER ?2!0 & �� 3 27fAN 23 VfM23M ® slot Walls&D all Ceilings M Fdal Doos&Hadnea 2 T1 Af40i 78vVR¢i _ _ I __ ____ _ _ _ __! __ _G (Install Doors_&}Iardware M IQsdFNmhoEdPi birg 5&RP1igO�oiteai 0 311AN�t i Inspect HVAC&HWS&RICHWS&R PI I Overhead 1t� I O.etl�flrNig 0 3IMWM 41W IntleOHWPGD_dPbiig&Ptrrirg PF+g 2 31MN7A 01lFR73 Inspect Overhead Plumbing I�edRe i�'Osha� Insu ate O/H HVAC DucgPiping&PI mbing Piping 0 31I AFM 1670 IxspeCOmhaod Baciial 0 3.I� i Inspect Fire Sprinkler Overhear 2N0 Fatal Glass 1 31M 933 3iMAFC3 Ins ct Overhead Electrical Z97 PaitCuus&Frar� 2 01APF]3 NPFFU3 I Install Glass 22i7 Ceig Wren 2 Ip� 03N3� Paint Doom✓L Fnames G Calling WireP 2780 Ao>t�calCaYg Grid 2 aiAPFM Ol^Adi G Acoustical Calling Grid Zf3D Tleitt4avt3ohr 0 Ci^R373 i ZUO FatalLtFoaras 3 Oi^Ffiai Tie-in New Boller M10 Fatal Cetngmsers 3 OWfm OtIN ! ® Install Light Fixtures Zi21 Instal S(rikaFleedz 3 W'FF03 ® Install Ceiling Diffusers 2330 F9sdO.ehmd Lahaw 0 lHN}m ® Install Sprnkler Heads 2340 Erng®L}}tFcsres I 00sA3A Oa4FR03 Impact Overhead(or Cove-up 20 Instal Laing Tie 2 10N2iO3 — 0 Enar Ize LI ht Flxturea 2NO Ffflp&Caulk Flv 2 1f41.7@ 1M�6 G Install Ceiling TIIe 270D Resins 1 ® Prep Caulk Floor Ftrarg & 5 1VFFM 17AFFm i ®21M Se Resinous Flooring alCcnuuo Floa�DryStrsga 1 15WiD 15N3� DBD FsalVCfat011oa 1 15N'ROi 15APF00 0 Sssl goncrete Floor tG Dry Storage 2110 hoJ1RtbaBaseQpySIuage 2 iC�3 17PPf{13 _ — --__ ______ 1 Install,VCT at Otllce 2M Instal FRP y itvFRm I alInstall Rubber Base Dry Storage ' ® Install FRP Sheet 3 of 11 Aeti ty Activity _ Orlg Early Early Il) Daecription Dur Start Finish 2510 Instal Fps Bobdl. 1 'IBMFM laAPFOi 0 Install Pipe Bollards 2521) PartPpe Bolad; 1 21FFTr03 214P703 a Paint Pipe Bollards 20 Beckal hin 2 23AFRM 24A9;03 © Electrical Trim 2iB0 Pkmtag Trm 2 23DA�3 2OPFC3 i 0 P.Iumbing Trlm 2M icbi CorraGsds 1 3OFSm WPM 0 Irjstall Camer Gu rds _T 2470 lnsWDa E}¢ret 3 2i�ffl03 0®i Set Kitchen Eq (pment 2180 IffiI raBFtukt.p 2 2YFfO 2aWF03 lii Install Diahwaa er a Hook-up 20 ItdapIQ1enE}pnet 3 33AFFC3 Odv14143 I ai Hook-up Kitchen E ul ment 2500 Clear-W&Pax ist 3 336PFC3 CIA= Cleanup a P nchlist 2510 Ctyiegalon 0 03JA}LS ICity InspactiPn 21) HrsflDglalm3tiepedm 0 CA ITM Health Depa ant Inspection 25M IClyFwiWkpecbcn 0 Q%A'Y73 2570 CadmiedOw-W>y 0 03JANM j City Final In pectlon Ina Certificate o�Occu an Roof 163) karat Podtrans 3 C%Wm 19ANU EW Install R of Drains 1%0 "w BoieraCadasig UltPrtlonc 2 O&WRI3 OlNWO El Install Boil r a Condensing) Unit Platforms I W k�lEh3AF�nQahs 1 ORW2I3 ONaFm 0 Install Exh ust Fan u Crbs 1700 � 1 UNARM 07MV a Set MEP R�of Jacks 1710 ttgalTapaod Radlei'LnaCddwfs t 4 10MARM 13✓.4W7i ____ ___ _ ___ ____ _ a�_Install a Brad Roof Insulation 8 Crickets _. _r ___�__� 1723 LnsWRodFWhrgs 3 12Wd8 14.VW703 ® Install oof Fleshings ; 1730 RodizTerin 0 14KAaFM Roof In pectlon 1740 IstalMartaaeFLxfig 3 14NA911 18MAR33 C9 Inata 1 Membrane Roofing 2121 jk 3WRodBaIasI&WakPu[b 3 1 IRAW S 21tvWill3 I ! ® Ins It Roof Ballast Walk Pads 2W0 Tdn@F�dDais 2 IWAF03 21vt^RT1 CI Tri Roof Drains; I 1760 SetBdlaaTariz"C;on iaslg Lht 3 2 WRO3 23vW77; ®®et Boller a Tan s and Condensing Unit 2110 instal Euriewladags 2 24NPM 24vYJM I ® 1 stall Countar0a�hings � 1750 SdF�astl� 1 21AkJi13 2iAhM373 a S IExhaust Fans 1770 Fatal BokrPIp g@Root 5 23Agw OIAPFC3 ! Install Boller�Ipmg U Roof 3740 �°����� 2 ZVAR 3 Reroute RafrineFate Linea 1783 6Ddn28I Bo1;ra Cadww&CulKs Rcd 3 31t.NFi03 �PHi]3 � � Ele trice)@ Boller alCondenaer 8 qutlets @ Raof MO Tedplang 1 02*FC3 OWFO 1790 IHc{�ed Bc�aCadasaPprga Ela]icel 0 � Inspect Boller✓L Condenser PI Ing a Electrical a Test Piping 181 I�ataWBokrPkig 3 036FFE3 (AARFC3 C� Insulate BLabd Boller Pip ng 218D PartFmdF rgaM�FA.yB Plaforre 2 GIOPFCS W°Ff�3 _ _ _Paint Roof F ashing a Misc.E ulp a Platfc a 03 __ 2100 p�F3daPurdrst 1 1GAPM 10HTri3 a Clean Roof a Punchllst 2170 FrelRadhspe�n 0 11AM Final Roof Ins action site 12d3 LaMN wMasonyWal Dar 3 21VIy70 TLNM3 ® Re ovate Loading ock Area Drain 4<AD Laatt AksaryW� 1 � � 1 Layout New Me my Wall 4010 FdalMasarryWak 2 2FIM ZFE3333 B Install Masan Walls 4® CvatMaarryWal 1 GCS 2ffEBM Grout Mason Wall 4070 EamnMsorryWal 2 ONAgM OIMMiG3 0 Brown Maao ry Wall 4087 EIFSFirch Cod 2 OVAAFC3 O%Vfo 3 E.I.F.S FInI hCoat 4W0 BarldlaCarsg+dTtrrFh CarrpeNWa9 3 2TMFi00 21MN�1 MO B ckfill a Comapct Trash Comps Dr Wells 4D✓O GradagaPs�B�mOade 2 23AgU 23vW2D III de Site Area Slab on Grade 4� SdCarl 0 I oil Compaction; 40® Instal Casnad v Rertag 3 2MAFU3 31hWn3 Install Concrete Reinforcing Sheet 4 of 11 Activity ActivityOrig Early Early ID Description Dur Start Finish 4kD lRetharkWechm 0 0IMfi03110 Reber Ins ectlon Phase 2-Eldstl 10tG380`...; / •. Interior 22p jCworudTempaWPm6ckn@N9NLCdcrR=n 1 16EE13 103303 g Con ct Temporary Protection @ New(acker Room 2M KUeoBIxk 0 2%AAFC ' lichen Black 273D Malm5ak 6ait>31.Rnixg&SpHdaa 1 2RAORM 2ffviWM Make Safe Electrcal,Plumbing a Sprinklers 2740 Pnk3tlFloods&Exstg Cold P�E4{xnat 1 iFtvtof'3 230MM 1 Protect Hoods&Existing Cold R mm Equipment 2770 Turp.tdtg 1 21vW73 27vWFU3 _ 1 Tam .LI htln 278D DanoCelrg 2 311VN 3 ONAYI3 Demo Ceiling 2M 2 31N14M OL4PR)3 Disconnect Kitchen Equipmen 2M Dmn C*QWad@CMoe 2 31NWM 01APFM Demo Cellingmalls a ONke 2d0 LatatlkrlagardRrriig 1 31MAFC3 31MWO Layout Underground Plumbing 2MD RKtirai Exf.{mat 2 31M478 OLeFfai _ Relocate Kitchen Equipment 2M0 Rarre LodwPn &Cdi FnRWaI 1 01P1'im OIPFFM . F2me Locker]Room&Cold Pre p 2t0 SawtRv@UGP"nb g 1 OUPFO3 016PFU3 Sawcut Flaor�@ U/G Plumbing; .Wall 238D DuroCmpek@UGRrrbrg 1 Ot*F 3 0IAR; 3 Demo Concrete @ U/G Plumbing 3227 SdBaddb Duna 1 OIPNiD OtAFRM3 Set Backflow Device 412) ttCalFHl5BF2adl7iA'88li Ppg&PresareTal 6 O2NFi03 ORAFFU3 Ins_ta I_HWS&R and C_HWSSR_Piping 3 Pressure_Test_M 2210 4etal New FJabral Pack 3 O2APi13 ONF%D IS Install New Electrical Panels' 27e0 0ahmdW C 3 C2PFFE3 OVPF403 ® Overhead HVAC 2370 lffiIDmrFrames 1 02aRC3 (12APFC3 0 install Door Frames 279) OmFF4- 2 MAPR33 034PFO3 I ® Derma FRP 27W O.ahead Fire Spnldas 3 MAPF03 OPPRO3 ® Overhead Fire Sprinklers BID OmhEadPlydig 3 M*903 044Ai¢3 -- t_------- — ® Overhead Plumbing 270 2 MAPFU 034PFC30 Excavate UIG Plumbing 30m rafaltdavFra®r0ar&CbaraPad 2 M4PR03 034PIn ■ Install New Freezer Door&Closure Panel 2MIrM tiG RurtrgSet Four Sdt:Aans 2 03*fo ® Install U/G PlumbinglSat Floor SlnkalDolns 230 FspedOHSPIrNua 0 OVPFC3 Inspect O/HlSnrmklers 2330 hswLGFlrrtrg 0 OVA �Inspect O/H Plumhing ZIM Baddt&CaTpa*n 2 OWM WNW Inspect II&Plumbing mpaction 2810 OH Plrrtig� 0 OPFRM ® Backflll&Z Inspection � Ra#mBedid@Wd 2 07NR73 O& O/HPlumin gIntrical on _ __ ■ Rough-in Iactrical Wal B20 Overhead Six" 3 07APFC3 W^PRI1 i © Overhead Electrical 140 re 3tleFlrrtrg&FM/53RardQ*V dRFpig 3 O7� 0 %PFO3 nsulate Plumbin &HWS&R an CHWS&R Plpin I IN 2710 SAGarperin 0 O7PRQ3 on 29M BaonzaiWalrupecen 0 03AM �Sleoil Electrical allI 3000 D7oA Wals 2 17fl� 03� O drill♦Yallsl Inspection 3030 jFaffiDYAd 1 001FRM 3 i 0 Patch Dry Irail 2723 RUrcaoanis@ UG RntrgTnrdes 1 05*R03 mPPFi73 B Pour Concrete @ UIG Plun bang Trenches B3D hWCIH FiVAC&FMSeP.t}AWRpftOmhwd 0 016PFM Insj act OM HVAC&HWS&RICHWS LR Piping Overh ad 299D rgJed(]73 E3edzal 0 066F 6 Inspect O/H Electrical 4130 Rama&OyndFixd Lxh@RaA=rs 2 10*FM 11APFC3 _ I ■ Frame 3Drywall Hard Ll a Reatrooma 3010 Tape,Fbel&Fr'ifr 3 1NRC3 10rPR03 Il Tape;Float&Finish 2M SlenCcetExabgWak 3 14PR7O3 164PRM I ® Sklm,Coat ExlstIngW Its 3M SeaiWak 2 166FRM 17APFC3 ■ Seal Walls 315D PartWa1%Sdf6&Had lid 2 17PRF403 164PF4M Paint Walls Soffits&Hard Lid C ilin s ■ Sheet 5 of 11 Adivhy Activity Orlg Early Early ID Description Dur Start Finlah 2290 CBarnTis Ffiurg@Paesmrs 2 17ARi03 18gr4dS __ ___ __ ___ D Ceramic Tile Floodngi Q Reat;pome �0 lsal CeigGid&Ceig WSes 2 18oHiTt 24Wb3 r— Install Calling Grid Calling Wires 29CO IrsalTCeilg Dd0i 2 EV7f Zi�Pri13 ® Irjatall Toilet Flxtu s rr ■ Install Calling Difff seers 2f0 Fdal�Fcar� 2 22rPHCS 234TiD ■ Irjatall Light Fixtu a � I sial Fkerls 2 224PRO3 236PFM ■ In S rinkler H aria 31M 4sal Ceig DopCads 1 22�fi7D 21PTm 0 In tall Ceiling Dro Cords 2510 p FgledO.rdedixCoe 0 23^R;03 2370 ��F*Mms 1 2Wia3 2l�}'Q3 I �Iniapect Overhead far cover-up � Irsal CeligTi6 2 2NRn3 25*FC3 0 Energize Light Flxlturea 23ED i stalToidPmessiw 1 24AFFM 34*M ■ Install Ceiling TIIIp 0 Install Toilet Acuisodes 371D ��� 2 23�A713 � ■; Bead Blast Flo 33N Pmp&a Fbx 1 25%PFM � r 3 I g� Prep 6 Caulk F�061 Pwosfi>Arg 5 O%A)M Resinous Flooring 3lPD Instal FRP 2 aMM MAIM �■ Insstall FRPI 312) Instal Canag.3rls 1 G7 WM O1W)103 _ _ 0 Itall Corharguards 3131 SdigdeFzlQrst 3 O5 Y03 1ZMM — n Set Kitchen Equipment 3100 Elec4lwlTrim 2 OiTW M 0TvWY03 j Electricalh'rim 3110 RnihigTrin 2 l)3vM 05WYD3 0 Plumbin Trlm 3180 HOd Kldw E4pret 3 09VAM 13JAYm Hook-up Kitchen Equlpm Int 6 170 0 '14'� _ _ - _— _ Health partment Inspection City Ina' 8 io nchllat C7affKp pu dit 2 13vt4YID 13JAYO3 _ __ HadhDapannuthapoolon Faction coon Fro's ClyFrel 0 City Finil Inspeeton CaOTrJedOm{ery 0 14NAY03 Ca gcats of Occupancy Phase 3-Coo Prep Interior 3ZU Bros Cdr eS hdder@}prrat 2 33VWM 31MAF03 Remove Dishlasher3 Kitchen Equipment 3310 Make Safe Sxkial,Rrr6igd FwSpilJr 1 3lMVM 3lm47D Make Safe Elei trtcal,Plumbing 6 Fire Sprinkler 3M 1QPftrrft@DtMGSe 1 3196RM 31MWO � Cap Plumbing�@Dishwasher P WO �oWaI& 1 OtAGOPFYD 01!•R�03 Demo Celling 3370 DanoDyhdteTla 2 OIPFiIIi Demo Wall 3 Floor Tile 33433 RouglHrnElech�W l 2 ti Damo Drywall Wails for MEP i 0 Rcughdn Electrical Wall 340 �o RrnhgWd 2 � 0JAPF 3 ! 0 Rough-In Plumbing Wall 3280 laptUr�gwdRotrg 1 Q3aPRg Qi^FR33 0 Layout Und irground Plumblr g 32M SawLFbv@UGRrrbrU&& P 1 03rFT�i 0 3 ._ . _ 0_Saweut Fl u U/G Plumbin l a Sumte 33g CtrroCavelr®t1GRnbigdSrrp 1 � OWiiTi 0 Demo Concrpts/El U/G Plumbing Sump 3330 O,uteedH✓AC&RipadnUrea 2 034141D OL�M ■ Overhead Hy d Rehigero n Lines 3� Om heed Fee Sptldas 2 ONFIM 0M 01 Overhead Fire Sprinklers 300 Ove eed Balioal 2 036PFC3 O0M ■ Overhead Electrical 3410 Qetm3Rrr�g 1 d °y+R703 0 Overhead Plumhln 3310 Cxa.�LlGPtntig39rrp 1 oVM oVM 0 Excavate U/G Plumbing 3 Su p 3M I�edOHRrrhg 1 lHrR773 EGNMIM 0 Inspect OlH�Plumbing 3630 EledraiWal Fxperl<rr 0 07ARiD3 Elactrleal Wall Inapactlon 3590 Ftntrg WalF�aiur 0 W!•Am I Plumbing Wall Inspection 3M ��ek�rd4yM 1 WARM 0 Re air Re'lace insulation D all Sheet 6 of 11 Activity Activity Ong Early I Early ID Dascription Due Start Flniah - 390 Sa hspaarr 0 07PFN03 Screw Inspection 340 Tape,Fbat&Ptah 3 07PPAM CM03 ® Tape,Float&Finish ` 332D kWd LtGPkrrbMWFkxrSriairaa 1 07APFC3 67P Install U/G Plumbing/Set Ioor Sinks/Drain s 0 34d1 FatalSurpTNge 1 07l+}iM 07fPFII1 0 Install Sump Trench Angle 3460 kgredOHHJPG 0 WPPFE3 Ina OM HVAC 330 kg�edC/Fl Sprkidas 0 07MiTi 3510 kWertQHBecical 0 07PPF103 Inspect OIH Sprinklers 3� kMWCrtlFbniPa1as&E VTWt 3 07PPF703 10Yfi76 Inspect O/H Electrical 3M FpectLrnrdxg 0 Install CQId Room Panda&Equipment 3340 Lbddi&CarpaJUGPlntip 1 03APFC3 08Ki703 Inspect U/ Plumbing 0 Backfill&.Com act U/G Ph mbinee 3350 SctCarpaln 0 03Ndi06 Soil Compactlon 33E0 PUXBackcalaeka@UGRTLbTmrxtm&Srp 1 ONTM oaal 3 P>ur Back Concre a@ U/G Pimb I Trenches&Sur ip 0 3M Insist E.apaelr&RefyaatPprg 2 oatPRIM iQ*FEB © Install Evaporator&ReM;erant Piping M SetPrgies@TrerCiDas 1 10'AiD 1U*FC3 0 Set Anglia@Trench Deal ba 3930 ks4l Cc1dRoamTapsg Sbb 2 104PRIM 11APFC3 _ G Install Cold Room Topping Slab 3MO Instal Caig Geld&Ceiling Wh s 1 IIA9F t3 11APFM 0 Install Ceiling Grid&Calling Wires 3703 TestRaigeralrPprg 1 11APFM 11AMM 0 Test Refr(gerator Piping 3BM jBuadBaAFbx 1 11APF03 11NPFC3 0 Bead BIIst Floor 3710 Insist Calling DdOsas 1 VAPFC3 14APFO 0 install�Ceiling Diffusers 37W had Lglt Fles u 1 14FPRM IB 144P 0 Ins tat l;Ll ht Fixtures 3M FstalSpriderHeeds 1 W+Ff313 1Mldi13 0 Install!Sprinkler Heads; 3781 4Aal Ceilrg DopCads 1 14apm 144PFM i 0 InstalllCelling Drop Cords 3790 HodapCcIJ i anL" 1 'F4_w iMFiim 0 Hook•uuI p Cold Room Lights @��°m t 446FF D 14 0 InatalliSprinklars @Cold Room 3ES1 hspeclReigeAn Piing 0 144TM 3tt23 FzpadOAihaadIirCoer 0 1 . ____._.__— C IOE_act Refrl9amtlon P_Ipiny P 3M ksw Ceiling Tie 1 15AFFC3 15N'Fi1;3 -- — - IInstal t Overhead for CPver up 0 Instal Calling The 3T0 Pr p&Cauk tFrdues 1 15N'Fi8 i5�F1i13 0 Engerl Ize Light Flxtu s 3870 Rapti CakFba 1 16NTM 16N�3 I 0 Prep 8 Caulk Floor Fi�as Fkxreg 3 164PF03 184fiax3 ® Resinous Fl-orin 38M 4a41 FRP 1 2WPFC3 21APR03 0 In tali FRP 390 SdKLhan Egpnat 2 27PFfM 23N� d Slrt Kitchen Equip ant 3003 Eledhd Trim 1 9PFPiD 71PFTiD 0 El6ctricat Trim 3BI0 PkarbigTrkn 1 226PFU 27PPFCB 0 Plumbing Trim 3l� tffiICar'grd, 1 2Wi73 MAPF 03 _ 0 Install Comer guar a 39C �P�rO}isr.1 2 23WFM 2Y� 13 ook-up Kitchen qulpment OUD �&�lst 2 ZAPIU 2taPR8 0 Clean-up&Punch Ist 3� =h1M 0 2*FC3 City Inspection 30A F9a1rDgaYrerthTedn 0 2YFFC3 Health Dapartm nt Inspection 3A0 CiyFnallnWealn 0 2]sPRB 3000 Ceaiir�dOmpaxy g g _— — CI Flnallns a lion Certlflcate of O upancv Roof 3310 taiatPbdCarPaeav&CadavgPbbm 1 OPPR 3 Ot*fM La out Roof Comp esaor&Conti nsing Platform 3® DeroRod@THi1 1 02APFM 07N'fm I Demo Roof�Tie-In 363D kstalCarpassQ&CadavgtkiPkibrn 2 aAPFC3 OtPFRl3 natal)Comprea pr&Condensl g Unit Platform U 0640 SdMIEPFkd,hdo 1 07A4733 0 Set MEP Roof Jacks � PakhPbd 2 OBN 3 Ot3^PF4Ti . ® Patch Roof Sheet 7 of 11 Activity Activity Orfg Early Early _ 1D Description Dur Start Finish. DFr MY333) SelCarp®eBCader,,gliis 1 1WFRM 1GWFO3 0 Set Compressor 3 Conde sing Units 36M RdUffakonSCondxebDanPprg 2 =2LV4PF03AA9F;CW3 fiSi Raft geration 3 Cc Idonate Drain Pi ing 5m T�Pprg 1M 0 Test Piping 5M0 roped POW 03Q3 Inspect Piping 3030 Fs�SIaSd P1rG 2 ® Insulate ti Label PI I 3720 Paip"brra 1FO3 0 Pain Platforms 3730 Clear Rcd&Prdu 1373 0 Clean Roof .Punchlist Springs Meeting Rooms MMft ROMM Demolition d Grading 4190 i sfai CandorBaricada 2 Oawa 10W 433 0 Install C onrldor Barrlcadl. 4d10 Sak OESpiiHes 2 03WND 10WhD3 51 Safe Off 1,prinklers 4210 SabORElacrial 2 03AM 1QWM ® Safe Off electrical uction Fencing 44�] DeroHJPC Canis 3 24Wf CA 28Wfsti g In®®D�o OM� H D ct@ Springs ore Ira Area 4230 DaroS 'IgsTha*oAM 10 13W3D 24W 48] De oQHM1AC@Sp W.7h�aAee 2 2u*M 27.W�D3 4290 R Sod Beam@&MQA� 1 21WJ03 211^AC0 0 Remove Steel Beams m @Stage Cu an 481D Fshl Terporay Ugv"B Power 0 241^7433 Install Temporary Lighting 3 Pow?;r 420 t�rroe&S*e(jeA HJS@TI�YBA m 1 273NJ[[3 77,1�A4D 0 Remove 8 Saly a AHU - 4310 F�rue Cain@Rv 2 23W O � ©;Remove Conc et@ @Floor ' ' 4321 CtrrenThmkBAI)a 1 3algM 36Wa g,. Clean TheaVe Area Structure 43M 5 3144M offEBM ® Import,Backfill,Compact Grade Sand Material 4390 Sol Cm4�n 0 offEBM Soil Compaction 4370 Instal PA&Dones 2 WFEED 1ff73303 ® Install @bar Dowels 439] Instal lK'Elatlrrat 2 07FEE Q3 10193M o Install fG Electrical � IBeciral 0 Ins act UIG Electrical 43E0 2 11FEEM 12983M � 0 Install ebar Rebar napecllon 4400 PovsffimGala O 13�QT 13F� 0 Pour$lab on Grade t 44423410 tstalOpeat�WalSbd az Bears88g 10 14FEHIi Z!F®Q3 - - — --- — _ ® Install OPerabl Wall Steel Beams88recing 3 2lfffi3 011vW3Q1 { Set Op rabl Wa SetOpaahleWelTradc ll Track 4430 jMXdQbSkLKiJJSl8d 2 05vW403 OB4*J;03 9 Monokote tmclural Steel Interior 4440 jLarWhonxVVaIs&C&jgs 1 U1MgM OMMM I B Layout Int rior Walls$Cal ings 4510 Fsla1 G�¢tsaadFal 5 O7tvWi13 13MR13 ® Install verhead Electrical 4470 ITfel OvaleadWACdCwd-rDu2wk 7 07M4 0 17MBRM 2 Instal Overhead HVA�d Corridor Duc ork 4AD total Fie SpmlderOH PRR Dope 3 P.T. 5 07AMfm 131YARM ® Install Ire Sprinkler O/H Piping,Drops P.T. 4450 BrxitOpw"VVb1SWdvAhLWSWRrg 3 O7HW1D 111vWi00 _ � ___ ® Box-In rable Wall Steel with Metal Stu Frm 45�70 tp OHF'PemeleWe�3CmUorWals 4 10v1KU3 13MAROi ® Frame lac,Perimeter YWls B Corridor dls SpFid¢ra 0 13VORD3 450 tpedOHElad'raI 0 13AN306 Inpect 7H Fire Sprinklers 480D Wa13CooidrTmdFrarrip ttTradin 0 13v1M703 Impact O/H EI@cMcal Wa113 ocridor Tunnel'Framing Inspec on if 11 47Z7 WD.Fa 3 13�MFiYi 1 1 ® Set 0 or Frames Sheet 8 of 11 Activity Activity Ong Early Early 20112 _ ID Description Dur Stag Flnlah 0 46M Rarm DpvslalCarclr&Blxrzal Rccm 4 14M4M 1gvWi03 ® Preli Drywall at Corridor&Electric if Room 4570 Ell Wall Rnghn 4 141vWM igd4'YIO ® Elec rlcal Wall Rough-in 4�7 IzpectOl JPG 0 17MVM Ins OM HVAC 4� Fraying Ceilings 7 igMR17 Z7MWiTi 01� raming Ceilings 4tP0 Bo er�Walt 0 i11vWRTi Elec rical Wall Ina action 46f0 IrelafsWats 4 2MOM 2%SVW --- T-- — ® I sulate Walls 484D SBI E�rKaloxi,-jY DCars 3 27MWd70 et Electdcal Downli ht Cans ae 4MD D w*ConWIRal&Tu nslCartir 5 2%44;03 011 i Dryw ill Walls,Corrld r Patch&Tun el Corridor g � 48M SpH4rDgs@Ha3ffi 2 23vV4313 ZRviWifD '� Ceirg F+arig kzpedtan 0 21HWm 0 pdnklar Dropa�,@HardLlda sllln Framin line action 4WD DY+a Ce&gs 5 DMaRD 02aFFCB --- Drywall Celllttgs 4t21] VMSaew — �____—__—_ __ CeiGSaav 0 Wall Screw Infpedion 4tt� spa, 7 034IFFM 11PRi13 Ceiling Sci Inspection 4710 r Fallings h ® Tape,FII at&Finish 4730 �� 5 0MZD3 15N{703 ____ _ ____ _ M Paint Qellings 4733 hdalDmia,Freres&Hadnae 3 �3 iiPPR33 l 19 Install Doors,Frames&Hardware — 4740 ka4lNbcdBasa✓;Fhsertakn Rai 4 16WIIi 15N�3 ® Install�Wood Base&Pl sentatlon Rall SAO ReparBxa,&Fhmg@CM1JrD°°s 3 14^f3'iD3 18�A1Ti Repair Baae&Flop ng@Corridor ours ER 4M Aawsbc lCall GiJ 3 18Mi7T1 186PFC3 © Aco atical Calling Grid 4780 Wall 3 164PM 18OFFO _ OO Wallooverin 4910 Irc0 U¢tR&m@SelCarclr i 104FFM 16�fd13 __— g_.___,, Install Light Fiztulas @ Service C alder 0 InSU49M ni��4WD 2 ; ; 1 13 Install Sprinkler Heads 0 Install Ceiling Diffusers 4750 Pat Wate,Dous,Base&R* 3 17PPR73 21NW3 I ® Paint Walla,Doors,Base&Rails 4710 FdalSaud Walpa l 3 2W'fQi 2 illAPFM i _ I_______ _ ____® Install Lght Fill @ Acoustical 5 ZV•PROi � _______"_._ Q10 InstalCeill ® Install Sound Wall Panels Celrgs 3 24W313 2aAFTiti 402] It,41 r @ g; 3 21PFR13 y;nF{� Install Celling Diffuas ra @Acoustical Callings p Ins 11 Sprinkler He�ds @Acoustical Callings QD Seal Caen 1 71FJiiD3 22AM 0 Sal Concrete 4� Enag-L�IFuhsrs 2 23� 2NPRA 0 �ner Iza LI ht Fixtures 480 �R� @SaAeCu it 1 23� ZA9103 ,—Install Rub r Bass @ Seriv Corridor 0 48M IaPadOml adfrCo 4 0 2 �Igapect Overhead or Cover-Up 48MInstallCeJrg Tie 3 2"iMR73 2]eFfil3 M Install Calling The 4M Ele p c4¢al Trim 2 25�AiSi 23�A173 Electrical Trim 4TO I g 5 ?eau OTMY03 _ _ g,® Install Carratinn4EH0 t�lOperatleWzlPareb 3Od✓M Od.1411b Install Opera le Wall Panels i® awnW&F rrtfet 20 Clean•up llst4ftD CtyFirelFaparlm 0 MA)M40E0aGYCity Finalon Roof Cartificate f Occu an 44B) LaplPodF6ehakrs&rehtcrdas 1 14vWiSi 117 1 Layout R f Penetrations;&Tle-In Locatlo a D'rnO Hpd'g@smPa sTe„s 3 111,44M 13A6FM ® Demo oofing@StaeI POC'a Tie-Ins 4W0 DareE1FS@Tenlaakrs 2 11MeR13 IZ44 i6 B Demo E LF,S @ Tie-in Locations 40M Dlil PacfOpargs(sDu ak 1 1*44 li 14tNR16 0 Cut-In oof Openings(,or Ductwork ` M �P Drtrak 1 17Ml 17MARM 0 Stub Ductwork 511d1 Fdallvledr Soaen&WiJ&CadataeF l6ms 7 18AWn3 23VPRM — —Install Mec Scrom&AHU Condenur Pl Uorms Oi® 51� 0 iBWARl3 Clear Public Realrooms Sheet 9 of 11 Activity Activity Orip Early Early 2002 -3 rpm I ID Description Our Start Finish 5130 V*AkG iwo*r 0 5000 StU�PRay.drde 1 Z7MM3'B 2RvWm i gilding Inspection 1 t MEP Roof Jacks SAO SAPNJ,BtadFen&Cadsea 1 27NOM Z/M^F713 _ _ 1_ et AHD Exhaust Fan 6 Condon r 5170 Cl"RbIcl�ome 0 27MW301 - _--- - - - --- - ------- Isar Public a s 533) t Fan rooms krCalFZodliJAC&RntiG P4ii08VaH 5 271vNFY0 03�W773 Install Roof HVAC&Plumbin Plping&Vents M helal Reltgaart Unw 2 31MWi03 Install Refrigerant Linea 5110 Hare Much Screen 2 2FfVJ431i 31MWiCi anew RodD-dA SSardTlepe B Fie Darpas 5 211440 03APFO3 Frame Mech.Screen Install oof Ductwork, ound T_raps 6-flre Dampers 5127 - I_ -__-_ — ._FrarniG InTer,n 0 31M^Fn3 T ng lna ctlon5140 i�CwatBoad@Merh.Soear 2 OIPfFTB 07PPFY0l CemagI Board I Mech Screen 51W FafalFlaeler9Aian@MahSoan5 03PRi73 OYtTi13 stall Plaster System@Mch.Screen Sg0 TedrGHJACBRrrhiigPhiU3 OLWFU3 OBAF933 sting HVAC&Plumbing aping `mo FNal Eledrd@FsfprertBSavm Qyials 3 0�iInstall ElecMcal@Equlpment�Serv5100 Pak:hP4 rg 3 DVFF03 054PFCBtch Ragfing 5160 P80FIFS@Tehbm6cns 2 OVPF�i 07A-pR 3 tch E.LF.S @Tie-In locations SILO 1WectRRodRL*G 0 08*F i SOO Inspect Roof Piping Fgxd RadFladr� 0 O3^Ri03 Inspect R of Electrical I 52M kLkiu&Label Roc(PpG 2 MWFC3 1wiE _ _ _ _ __ _ _ 0 Inaulate_6La_bel Roof Plpin 5731 Part idcdStat}bhp&E4p&PHbnrc 3 ItOPRM 154Yn3 Paint Roof Steal,Flah'p E Equip 8 PlaHorma ® r rp S?5) C�RmfBRrrd� 2 15�PRTi 17PPR03 I O Claan Roof&Punchlist 59] Frrf Roof . t 0 15M i Final Roof Ins ectlon Pantry Pardry i Demolition&GradingWD - I RdxaHKiden 4pnent3 MI*M 13wr3 ® Relocate Kitchen Equi ment 448D Safe OESpttdas 2 143MdTi ISW473 ® Safe Off Sprinklers 44W SalaO&Ebciiral 1514M 0 Safe O(f Electrical 5H0 SamoAn Rnw 2 16PUB4RO 15YJJID - _ -- - ® Safa&I Cap Plumbin� — 47d7 RrroAdritP+ea 5 1S!^N10 ZBw�LB ® p ryto Admin.Ara -I4- 4210 Oemc WAC@ Aw 2 7 PM 23l^M O Demo OM HVA�Admin.Area 4� � 1 'eB�Nih@PrtrnPne 1 23R 433 23WM 1 Rlmave&Sah, AHU's@Admin rea 4ID CffiIPdmAea 1 241MYA 34PM 0 Clean Admin.Area Interior wo ut'atwas 1 07NVAFO 9A44F 3 g Layoutwals 5353 Framewals&Cail gs 5 1(fAAF D 14M40 i ® Frame ally&Cellings SM Laiafl_hdago"Flrnbro 1 1QMAl i iuv 1 Layout U derground Pluambing H310 O.alread WAG&RApaelini-ies 5 10vt 3 14M ® Overhe d HVAC&Refrigeration Linea SiID OasleedFreSpFi�n 4 1OvV4'{B 13dWi03 __ -______ _ __® Overhe d Firs S rinkler's `'� Qah00di3BCdbd1 4 1UMR33 13VAR3 _ ___I--- ® Ovarhs d Electdca�—__ 5340 Omhaed Rrrtrg 4 1U:Nf7B 13rYYili ® Overhe d Plumbing SGD SanNWa@UGRn-rg&Srry 1 11MAR03 1IM4A 3 I p Sawcut locr@UIG Plumbing&Sump 5300 CamCaxa6@i1GRrrbrG&anP 2 11MeHIi 12AMFQi 9 Demo C ncrete @ U/G Plumbing&Sump M Eaae6LlGRmbrg&srrpa 1 131vY4iB 13JN1A _ 9 Ezpva UIG Plumbin 6Sum s 5103 kapeci GHFireSm4des 0 13.Wi¢i Inspect O/H Fire Sprinklers 5410 itpedchisa*A 0 13vWR0i 5� hTadQHRrriiG 0 13vwi23 Inspect OM Electrical In pact 01H Plumbing I Sheet 10 of 11 Activity Activity Ong Early Early MAR - ID Description Dur Start Finish Frg 53M Rougl-EloCtial@Wal 3 14MVM 13AAFM ® Rou h-in Electrical Wall ^' 53M Rnr/*n Pumbru@web 3 14F 6M 19AAF403 ® Row h-in Plumbing Walla s' 5430 2 14467E 17MoA13 ® Instal UIG PIumbinglSet Floor Sinks/1 rains M IspectOH WAC 0 141vWU3 I Inspect OM HVAC - 5470 Flaring h*edon 0 17MH 3 Frem ng Inspection SetEkcaizlDoxt�tCas 1 17MAM 1mwn 0 Set E ectrical Downllght Cana 5440 IffiIStnpTnrichprgla 1 17NI40 17M*M 0 Instal Some Trench An le SAW Iced lGPlrrixg 0 17MAIO ——' " �Inspe U/G Plumbing" 54M peWjralWalinpedn 0 11IvWfQ3 Ele�cal Wall Inspection 516] BinixgWellepecim 0 16v1YII3 Plumbing Wall Inspection �D BaddUampedU4GRrrbrg 1 ladaf0 13vY47L3 � 0 Backfill&Compact U(G Plumbing 5mo Soicarpain 0 1RVAAM _ Soil om action 54M IsdetaWab 2 1gv1gQ 27M403 - ® Insulate Walls j 5510 gyAW 3 2MM 241447E ® Drywall 5523 csu�,t�n 0 �gIvNF3]3 S raw Inspection ;ti40 Tape,Rot&Fri 5 2S W O 31M140 I Tape,Float&Finish 554) "BeaRvn Pav6&6"XT"t 5 2ffA6F E GGIOP 3 Install Beer Room Panels&Equipment MO PaFtCeirgs 2 OtAPR33 07AA70 ` Paint Ceilings bl Dcas,SM hsFienrs&Haden U+A 1 OtOFF103 OM I Install Doors,IFrames&Hardware 5180 �pL{� i OIPPf7A 01APR13 Install Raof Ladder F6al E.'apmatr&ReiignatFM 2 MAPF403 O3%9ZM I I U Install Evapgrator&Refrigerant Piping 3i70 AcXsOd Ceig Grid 1 0OPF03 Ot4PR03 _ ___ __ ___ ___ _ 0 AcousticalT Calling Grid FL7D FAaI ColdRoinp ToirgS� 1 OVa;V3 ONPFSE _T 0 Install Cold Room Topping Slab 5� Idal Ughl Foares 1 07APFC3 07ARRM 0 Install Light Fixtures 5EE0 I2yy Cakg DOOrssas 2 WAPFn3 03egU "I ® Install Calling Diffussers 5570 j�SpnidarHeeds 2 07APRM OBOFFC3 © Install SpVnkler Heads 5M jHockup9ewFhu LUhis 1 07AFF03 (AAPFC3 0 Hook-up Beer Room Lights Bic �Spry�@B�F� 1 WPFSYE 07PPFiIi 0 Install Spr�nklere @Baer Room 80 IepectOmhoudfcrCoe Up 0 CewPF03 Inspect Overhead for Covey-Up Mo 5Mjzatt#3Fchres 1 054MM 00APR03 0 Energize tight Fixtures 1 S7d0 IrswcoisgTie 1 09QM 03hF813 0 Install Ceiling Tile 5710 PartWab&Dms 4 iGWFM 154FF73 M Paint Walls&Doors S700 SreiCarruloFhv 1 16*FC3 1 0 Seal Concrete Floor SM Se1F0 WE"net 3 17APFCB 27PA7E M Set Kitchen Equipment 5740 EMcircal trim 2 17ARF03 18*M D Electrical Trim 5M plm ingTrtn 2 17APH03 111r+PM D Plumbing Trim 50 Fhdatplaisr Egvr"t 3 22AM 21AFl73 _ F ook-up Kitchen Equipment sm C1aaKp&Pudiot 2 M*FU3 m Clean-up&Pun hiist SM Cl,Ispeckon 0 25*fU3 ity,Inspection 579:) Haei iDepalnathwedun 0 256PFC3 �Health Department Inspection M Cly Find Inspeoicil 0 M*FQ City Final Inspection SM CalirabdOnpacy 0 294FFM Certificate ofO tau anc Sheet 11 of 11 all%�01"Oo CERTIFICATE OF LIABILITY INSURANCE °aj115%a3" ' PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HRH Ins Sery of So California HOLDER. THIS CERTIFICATE DOES NOT AMEND, EXTEND OR License Number 0684503 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. 77-564 Country Club Dr. *401 COMPANIES AFFORDING COVERAGE Palm Desert CA 92211 COMPANY A State Fund INSURED COMPANY AI Miller 6 Sons Roofing Inc. B Travelers Casualty 6 Sure 68-760 Summit Drive COMPANY Cathedral City CA 92234 C Zurich Spec. % Tri-City COMPANY D COVERAGES THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED, NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS, EXCLUSIONS AND CONDITIONS OF SUCH POLICIES, LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS CO TYPE OF INSURANCE POLICY NUMBER POLICY EFFECTIVE POLICY EXPIRATION LIMITS LTR DATE (MM/DDNY) DATE (MMIDDIVY) C GENERAL LIABILITY TCS60181.01 06/01/02 06/01/03 GENERAL AGGREGATE $ 2,000,000 X COMMERCIAL GENERAL LIABILITY PRODUCTS-COMPIOP AGG $ 2,000 000 CLAIMS MADE M OCCUR PERSONAL &ADV INJURY $ 1,000,000 X OWNER'S&CONTRACTOR'S PLOT EACH OCCURRENCE $ 1 000 000 CG2503-PER JOB AGGREGATE FIRE DAMAGE(Any one fire) S 50,000 MED ENT(Any one person) $ 5,000 B AUTOMOBILE LIABILITY 810 73OH9548 05I01IO2 05I01l03 COMBINED SINGLE LIMIT $ 1 OUO 000 X ANY AUTO ALL OWNED AUTOS BODILY INJURY $ SCHEDULED AUTOS (Per person) X HIRED AUTOS BODILY INJURY $ X NON-OWNED AUTOS (Per aeoldenl) PROPERTY DAMAGE $ GARAGE LIABILITV AUTO ONLY EA ACCIDENT $ ANY AUTO OTHER THAN AUTO ONLY EACH ACCIDENT $ AGGREGATE $ EXCESS LIABILITY —�—�__ —�__�_ EACH OCCURRENCE S UMBRELLA FORM AGGREGATE S OTHER THAN UMBRELLA FORM $ WC ST OTH WORKERS COMPENSATION AND X TORY LI V MITS ER EMPLOYERS'LIABILITY A 285-1955-02 01/01103 01I01104 EL EACH AGE IL $ THE PROPRIETOR/ INCL EL DISEASE-POLIGY LIMIT $ 1 000 000 PARTNERS/EXECUTIVE OFFICERS ARE EXCL EL DISEASE-EA EMPLOYEE $ 1 000 000 OTHER DESCRI ION OF OPERATIONSILOCATIONSNEHICLESISPECIAL ITEMS Re Convention Center Expansion - project #02-19-8 Additional insured endorsement attached CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE CIIy of Palm Springs & Turner Construction Go. EXPIRATION DATE THEREOF,THE ISSUING COMPANY WILL ENDEAVOR TO MAIL 3290 Tahquitz Canyon Way 30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT, BUT FAILURE TO MAIL SUCH NOTICE SHALL IMPOSE NO OBLIGATION OR LIABILITY Palm Springs CA 92262 OF ANY KIND UP E COMPANY,ITS AGENTS DR REPRESENTATIVES AUTHORIZED PRE NTAFIVE Ann Willard ACORD 25-S (1195) LICENSE #0684503 © ACORD CORPORATION 1988 Jan. 15, 2003 Insured: AI Miller & Sons Roofing Inc. Insurance Company/policy number: Zurich Specialties #TCS60181-01 This endorsement changes the policy. Please read it carefully. CONTRACTORS ADDITIONAL INSURED This endorsement modifies insurance provided under the following: COMMERCIAL GENERAL LIABILITY COVERAGE PART WHO IS AN INSURED (Section II) is amended to include as an insured the person or organization shown in the Schedule, but only with respect to liability arising out of "your work' for that insured by or for you, and that is now being performed or to be performed during the term of this insurance. (ZRCONT.39) (8-01) PRIMARY/NONCONTRIBUTORY If you are required by the terms of any contract to provide primary insurance to any insured included by virtue of this endorsement, then this insurance shall be primary, but only with respect to liability arising out of "your work' for that insured by you or for you, and that is now being performed or to be performed during the term of this insurance. Any other insurance available to that insured will apply as excess and will not contribute towards the primary insurance afforded by the provisions of this endorsement. SCHEDULE NAME OF PERSON OR ORGANIZATION: City of Palm Springs Turner Construction Company LICENSE #0684503 ACORD CERTIFICAW OF LIABILITY INSU NCB OPD K E(DATMMIDD/YY) LM I IL1 08/14/03 PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION Affinity Insurance Service ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE Robert Haukom HOLDER.THIS CERTIFICATE DOES NOT AMEND,EXTEND OR PO Sox 609015 ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. San Diego CA 92160 - Phone: 858-505-4100 Fax:858-505-4072 �`�_� INSURERS AFFORDING COVERAGE INSURED INSURER A. Combined Specialty Insurance INSURERS t➢ Al Miller & Sons Roofing Co. a Inc INSURERCr`di` 68-760 Summit Drive INSURER D. Cathedral City CA 92234 INSURER E - COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS ILTR TYPE OF INSURANCE POLICY NUMBER DATE MD-EFFECTIVE DALTE(MM//DIp/AYT`I/) LIMITS GENERAL LIABILITY EACH OCCURRENCE S COMMERCIAL GENERAL LIABILITY FIRE DAMAGE(Any one Are) $ CLAIMS MADE FX] OCCUR MED EXP(Any one person) $ PERSONAL,ADV INJURY S GENERAL AGGREGATE S GENT AGGREGATE LIMIT APPLIES PER: PRODUCTS-COMPIOP AGG S POLICY FROECT F7 LOG J AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT $ ANY AUTO (Ea accident) ALL OWNED AUTOS BODILY INJURY $ SCHEDULED AUTOS (Per person) HIRED AUTOS BODILY INJURY $ NON-OWNED AUTOS (Per accident) PROPERTYDAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY-EA ACCIDENT S ANY AUTO OTHERTHAN EA ACC $ AUTO ONLY: AGG $ EXCESS LIABILITY EACH OCCURRENCE $ OCCUR CLAIMS MADE AGGREGATE $ $ DEDUCTIBLE $ RETENTION S S WORKERS COMPENSATION AND X TORY LIMITS ER A EMPLOYERS'LIABILITY ICW50107800 09/01/03 09/01/04 EL EACH ACCIDENT $ 1000000 E L.DISEASE-EA EMPLOYEE $ 10 DD 000 El DISEASE-POLICY LIMIT S 1DD0000 OTHER DESCRIPTION OF OPERATIONSILOCATIONSNEHICLESIEXCLUSIONS ADDED BY ENDORSEMENTISPECIAL PROVISIONS *10 Days for nonpayment of premium convention center expansion project #02-19-8 CERTIFICATE HOLDER 1" I ADDITIONAL INSURED;INSURER LETTER: A CANCELLATION PALMSPR SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,THE ISSUING INSURER WILL ENDEAVOR TO MAIL _30 DAYS WRITTEN NOTICE TO THE CERT FICATE O DER NAMEppppppD TO THE LEFT,BUT FAILURE TO DO SO SHALL City of Palm Springs IMPOSE NO(BLI IONO L IUTYOF�Y KIND UPON THE INSURER,ITS AGENTS OR & Turner Construction Co 3200 East Tahquitz Canyon Way REPRESENT, ES. Palm Springs CA 92262 AUTHORIZE PRESS IV e Pam/ House Aco ,� / ,✓ ACORD 25-S(7/97) q7ACORD CORPORATION 1988 Client#:2 &AllL= ACORU. CERTIFICATE OF LIABILITY INSURANCE 8120/MmonY r) 08/20/03 PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION HRH Insurance Services of ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE Southern California HOLDER.THIS CERTIFICATE DOES NOT AMEND,EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. 77-564 Country Club Dr.,#401 _,, Palm Desert,CA 92211 INSURERS AFFORDING COVERAGE NAIL# INSURED INSURERA: Travelers Indemnity Co.of Illinois Al Miller&Sons Roofing Inc 68-760 Summit Drive INSURER Cathedral City,CA 92234 msuRER c. INSURER D: INSURER E COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OFANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAY BE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES.AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS, INS OD' POLICY EFFECTIVE POLICY-EXPIRATION LTR NSRL TYPE OF INSURANCE POLICY NUMBER DATE MMIDDNY DATE(MMIDDNYI LIMITS GENERALLIABILITY EACH OCCURRENCE $ COMMERCIAL GENERAL LIABILITY DAAMIAGE ISES TOERENTEDn $ CLAIMS MADE El OCCUR MED EXP(Any one person) S PERSONAL S ADV INJURY $ GENERAL AGGREGATE 5 GEN-L AGGREGATE LIMIT APPLIES PER. PRODUCTS-COMPIOP AGG $ POLICY PRO- JECT LOG A AUTOMOBILE LIABILITY 8107391-19548 06/01/03 06/01/04 COMBINED SINGLE LIMIT $1,DDD,9DD X ANY AUTO _ - - _- _ - (Ea accident) ALL OWNED AUTOS - - "" SCHEDULED AUTOS �( IPI ,4r/ BODILY INJURY $ oI-�� �JAI _ !i �� (Per Parson) X HIRED AUTOS _ �L� " (�I t t ir'�.I �V.�70�n�SI BODILY INJURY X NON-OWNED AUTOS Ii _ - (Per accident) $ '- Pa% I V I- PROPERTY DAMAGE _Fv FTPe,- II-d'k) (Per accident) $ GARAGE LIABILITY AUTO ONLY-EA ACCIDENT S ANY AUTO OTHER THAN EA ACC $ AUTO ONLY. AGG $ EXSESSIUMBRELLA LIABILITY EACH OCCURRENCE $ OCCUR El CLAIMS MADE AGGREGATE $ $ DEDUCTIBLE III RETENTION 5 $ WORKERS COMPENSATION AND WC STATUS OTH- EMPLOYERS'LIABILITY IT ANY PROPRIETORIPARTNER/EXECUTIVE E L.EACH ACCIDENT S OFFICERIMEMBER EXCLUDED? EL DISEASE-EA EMPLOYEE $ If yes,descnbe under SPECIAL PROVISIONSbelow E.L DISEASE POLICY LIMIT $ OTHER - -- - --- _ DESCRIPTION OF OPERATIONS I LOCATIONS I VEHICLES I EXCLUSIONS ADDED BY ENDORSEMENT SPECIAL PROVISIONS Convention Center Expansion-Phase 1,277 N.Avenida Caballeros,Palm Springs,CA CERTIFICATE HOLDER CANCELLATION SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION City of Palm Springs DATE THEREOF,THE ISSUING INSURER WILL ENDEAVOR TO MAIL _-10 DAYS WRITTEN P.O.Box 2743 NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,BUT FAILURE TO DO 50 SHALL Palm Springs,CA 92263 IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR REPRESENTATIVES. AUTHORIZED REPRESENTATIVE ACORD 25(2001/08)1 of 2 #S60064/M53035 2M,JON © ACORD CORPORATION 1988 LICENSE #0684503 Ac- Rom _ CERTIFICA OF LIABILITY INSU C OP ID K DATE(/lDDNY) LMIL-2 09/ 6/03 PRODUCER THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE Desert Southwest Ins Brokers HOLDER.THIS CERTIFICATE DOES NOT AMEND,EXTEND OR 77-955 Calle Tampico ALTER THE COVERAGE AFFORDED BY THE POLICIES BELOW. La Quinta CA 92253 Phone: 760-771-5550 Fax:760-771-5755 INSURERS AFFORDING COVERAGE INSURED INSURER Lexington Insurance Company INSURER B Al Miller & Sons Roofing Inc. INSURER 0: 68-760 Summit Drive INSURERD Cathedral City CA 92234 INSURER E. COVERAGES THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD INDICATED.NOTWITHSTANDING ANY REQUIREMENT,TERM OR CONDITION OF ANY CONTRACTOR OTHER DOCUMENT WITH RESPECT TO WHICH THIS CERTIFICATE MAYBE ISSUED OR MAY PERTAIN,THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,EXCLUSIONS AND CONDITIONS OF SUCH POLICIES,AGGREGATE LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS, IN SR TypE OF INSURANCE POLICY NUMBER POLICY FFECTIVE POLICY XPIRATI N LT DATE MM/DD/YY DATE MM/DDIVV LIMITS GENERAL LIABILITY EACH OCCURRENCE $ 1000000 A X COMMERCIAL GENERAL LIABILITY 1070339 09/19/03 09/19/04 FIRE DAMAGE(Any one Ire) $ 50000 CLAIMS MADE E�]OCCUR MED EXP(Any one person) $ 0 PERSONAL&ADV INJURY $ 1000000 GENERAL AGGREGATE s 2000000 GEHL AGGREGATE LIMIT APPLIES PER PRODUCTS-COMP/OP AGE 81000000 POLICY PROJECT LOG AUTOMOBILE LIABILITY COMBINED SINGLE LIMIT ANY AUTO (Ea accident) $ ALL OWNED AUTOS BODILY INJURY $ SCHEDULED AUTOS (Per person) HIRED AUTOS BODILY INJURY $ NON OWNEDAUTOS (Per accident) PROPERTY DAMAGE $ (Per accident) GARAGE LIABILITY AUTO ONLY-EA ACCIDENT $ ANY AUTO OTHER THAN EA ACC $ AUTO ONLY AGO S EXCESS LIABILITY EACH OCCURRENCE $ OCCUR CLAIMS MADE AGGREGATE $ S DEDUCTIBLE $ RETENTION $ $ WORKERS COMPENSATION AND TORV LIMITS ER EMPLOYERS'LIABILITY E L EACH ACCIDENT $ E L.DISEASE-EA EMPLOYEE $ E L.DISEASE-POLICY LIMIT I$ OTHER DESCRIPTION OF OPERATIONSILOCATIONSIVEHICLESIEXCLUSIONS ADDED BY ENDORSEMENT/SPECIAL PROVISIONS CONVENTION CENTER EXPANSION PROJECT CERTIFICATE HOLDER Y ADDITIONAL INSURED;INSURER LETTER: A CANCELLATION TURNERC SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE THE EXPIRATION DATE THEREOF,THE ISSUING INSURER WILL ENDEAVOR TO MAIL 30 DAYS WRITTEN NOTICE TO THE CERTIFICATE HOLDER NAMED TO THE LEFT,BUT FAILURE TO DO SO SHALL TURNER CONSTRUCTION COMPANY IMPOSE NO OBLIGATION OR LIABILITY OF ANY KIND UPON THE INSURER,ITS AGENTS OR 3200 E. TAHQUITZ CANYON WAY REPRESENTATIVES. PALM SPRINGS CA 92262 AUTHORIZED REPRESENTATIVE I Bradle J. Salute ACORD 25-S(7197) °'' ©ACORD CORPORATION 1988