HomeMy WebLinkAbout3/19/2003 - STAFF REPORTS DATE: March 19, 2003 TO: City Council FROM: Executive Director-Airports ADDITIONAL WATER SERVICE - SOUTHERLY TERMINAL ACCESS ROADWAY RECOMMENDATION: It is recommended that the City Council approve the acquisition of additional water service as part of City Project #2002-20, the Southerly Terminal Access Roadway Security Reconfiguration, from Desert Water Agency in the amount of$44,480, subject to the approval of the Federal Aviation Administration (FAA). SUMMARY: This action would acquire additional irrigation and domestic water service for the Southerly Terminal Access Roadway Security Reconfiguration. This additional water service is 100% funded by a grant from the Federal Aviation Administration (FAA). BACKGROUND: In response to the events of September 11`h, and the subsequent security regulations mandated by the federal government, a blast analysis of the main passenger terminal at the Airport was completed. The blast analysis, which, due to the extreme confidentiality of the information contained in the report,was shared with the City Council in Closed Session, identified several mitigation measures which would improve the level of blast protection for the Airport. In response to two specific federal security requirements, the 300 ft rule and inspection of vehicles entering the secured area of the Airport, staff worked with the Transportation Security Administration (TSA) and developed a centralized inspection facility. This inspection facility and associated modifications to the Airport's loop roadway system,will allow for inspections of vehicles as they desire to approach the main passenger terminal as well as those vehicles who have a need to access the secured area of the Airport. In developing the design for this project, progress meetings were held with the Airport Commission and the City Council. Based on direction from the Council, a sub-committee was established to participate in the design of this project and provide input throughout the process. This sub-committee consisted of the Airport Commission Operations Sub- Committee, two (2) representatives from the Planning Commission and one (1) City Council member. This sub-committee proved invaluable in moving the design along quickly and being able to address the numerous design elements and user concerns. Due to the extensive landscaping, much of which serves as security barriers and the inspection facility, additional water service is required. This additional water service will be incorporated into the existing water service loop for the Airport. In addition to the extra requirements of this project, the overall domestic and irrigation water servcie for the Airport will be expanded. 1A Additional Water Service - Southerly Terminal Access Roadway Security Reconfiguration March 19, 2003 Page 2 Attached are the proposals from Desert Water Agency. The additional service will be installed in conjunction with the overall construction sequence. Funding is available via Airport Improvement Program (AIP) grant 35, account no 415- 6600-56052, AIP 35, I ro yr. ALLEN F S OOT, A.A.E. MIKE N WILLIAMS, A.A.E. Executive Director- Airports Deputy Director- Operations AP PROVE City Manager ATTACHMENTS: 1. Minute Order 2. Desert Water Agency Proposals REVIEWED BY DEPT. OF FINANCE N:\WordPerfect\City_Council\Engineering_Construction\Southerly_Roadway Water Service AIP 35 03-19-2003.wpd IAA STATEMENT Phone(760)323-4971 DESERT WATER AGENCY A Public Agency 1200 Gene Autry Trail South P.O.BOX 1710 PALM SPRINGS,CALIFORNIA 92263-1710 February 13, 2003 NAME VSA Airports Attn: Rodger Sheraton ADDRESS 255 N. El Cielo Road #4419 Palm Springs, CA 92262 DESCRIPTION REFERENCE: PALM SPRINGS AIRPORT INSTALLATION CHARGE FOR: CHARGES ON INVOICE 2 - 2"Services @ $975/ea.................................$1,950.00 2 - 2"Meters (160 gpm/ea) @ $400.00ea .............. 800.00 2 - 2"C.C.V. Assemblies @ $125/ea....................... 250.00 2 - 2 Back-up Facility Charges @ $8,120.00/ea..16,240.00 2 - 2" R.P. Backflow Devices @ $800/ea...............1,600.00 2 - Pavement Patches @ $385/ea .......................... 770.00 2 - Concrete Patches @ $315/ea............................ 630.00 TOTAL CHARGES ON INVOICE ........................................................ $22,240.00 "Charges on Invoice" are established amounts and not subject to adjustments. Prices are subject to change without notice. Upon receipt of the amount shown above, we will schedule the work to be done. If you have any questions, please contact Woody Adams, Senior Service Planner, at (760) 323-4971, extension 143. � A3 G/7LT/STAFF/ADAMS/VSA Ar MINUTE ORDER NO. APPROVING THE ACQUISITION OF ADDITIONAL WATER SERVICE AS PART OF CITY PROJECT #2002-20, THE SOUTHERLY TERMINAL ACCESS ROADWAY SECURITY RECONFIGURATION, FROM DESERT WATER AGENCY IN THE AMOUNT OF $44,480, SUBJECT TO THE APPROVAL OF THE FEDERAL AVIATION ADMINISTRATION (FAA). I HEREBY CERTIFY that this Minute Order approving the acquisition of additional water service as part of City Project #2002-20, the Southerly Terminal Access Roadway Security Reconfiguration, from Desert Water Agency in the amount of $44,480, subject to the approval of the Federal Aviation Administration (FAA),was adopted by the City Council of the City of Palm Springs, California in a meeting thereof held on the 19th day of March, 2003. PATRICIA A. SANDERS City Clerk IOB