Loading...
HomeMy WebLinkAbout3/26/2003 - STAFF REPORTS (3) DATE: March 26, 2003 TO: City Council FROM: Executive Director- Airports SOUTHERLY AIRPORT TERMINAL ACCESS ROADWAY SECURITY RECONFIGURATION - 300' RULE IMPLEMENTATION RECOMMENDATION: It is recommended that the City Council award a contract for the Southerly Airport Terminal Access Roadway Security Reconfiguration at the Palm Springs International Airport (AIP 3-06-0181-35, City Project 2002-20), subject to FAA approval. SUMMARY: In response to the events of September 11`h and the subsequent airport security regulations mandated by the Transportation Security Administration(TSA),this project will modify the Mid-Valley Parkway, Airport Extension and create a centralized inspection facility. Included with this improvement are landscaping, fencing, security equipment and overhead signage. Bid tabulation results will be provided at the March 26, 2003 meeting. BACKGROUND: In response to the events of September 11`h, and the subsequent security regulations mandated by the federal government, a blast analysis of the main passenger terminal at the Airport was completed. The blast analysis, which, due to the extreme confidentiality of the information contained in the report, was shared with the City Council in Closed Session, identified several mitigation measures which would improve the level of blast protection for the Airport. In response to two specific federal security requirements,the 300 ft rule and inspection of vehicles entering the secured area of the Airport, staff worked with the Transportation Security Administration (TSA) and developed a centralized inspection facility. This inspection facility and associated modifications to the Airport's loop roadway system will allow for inspections of vehicles as they desire to approach the main passenger terminal, as well as those vehicles who have a need to access the secured area of the Airport. TSA has been extremely supportive of the project and how it will provide a higher level of security for the passenger terminal,while at the same time being more efficient with the limited resources of the Airport. The most recent security regulations requiring the inspection of vehicles approaching the terminal were written around this project. The layout of the inspection facility, tensile fabric roof and landscaping have been approved by the Planning Commission. The City Council has authorized the procurement of the natural security barriers (palm trees), tensile fabric roof, security guard services and some pre-demolition work related to this project, all of which are currently underway or nearing completion. 314 Southerly Terminal Access Roadway March 26, 2003 Page 2 Section 7.03.040 of the newly enacted Procurement and Contracting Code requires that for public projects in excess of$100,000, the City Council approve and adopt the plans, specifications and working details, and authorize staff to advertise for construction bids. This action was taken by the Council on February 5, 2003, The bids are due at 2:00 p.m. on March 24, 2003 and will be provided to the City Council at the time of the meeting. In order to have this project completed by the end of the calendar year and minimize the disruption to the Airport during the busy travel season, the Mid-Valley Parkway, Airport Extension will be closed during the construction period. Staff estimates this closure will reduce the project construction time by a minimum of 45 days and reduce the project cost by approximately $500,000. Funding for the project will be available via Airport Improvement Program (AIP) grant 35 from the Federal Aviation Administration (FAA). MIKE N WILLIAMS, A.A.E. ALLEN F SMOOT, A.A.E Deputy Director- Operations Executive Director- Airports APPROVED: City Manager N\WordPerfect\City_Council\Engineering_Construction\Southerly_Terminal Access Award 03-26-2003.wpd � O 7 ( < �`\ h 1 a o — J ROADWAY BEFORE CONSTRUCTION PALM SPRINGS INTERNATIONAL AIRPORT y CJ i nTI II II 11 F i o r -ee a ve I 11 ° ° ° U \\\ ROADWAY AFTER CONSTRUCTION PALM SPRINGS INTERNATIONAL AIRPORT DATE: March 26, 2003 TO: City Council FROM: Executive Director-Airports SUPPLEMENTAL REPORT - SOUTHERLY AIRPORT TERMINAL ACCESS ROADWAY SECURITY RECONFIGURATION - 300' RULE IMPLEMENTATION RECOMMENDATION: It is recommended that the City Council award a contract for the Southerly Airport Terminal Access Roadway Security Reconfiguration at the Palm Springs International Airport(AIP 3-06-0181-35, City Project 2002-20), to Yeager Skanska, Inc in the amount of $7,796,239, waive minor irregularities and establish project administration parameters, subject to the approval of the Federal Aviation Administration (FAA). BACKGROUND: Bids for the the Southerly Airport Terminal Access Roadway project(AIP 3-06-0181-35, City Project 2002-20), were received on March 24, 2003: BIDDER BASE BID DBE ALTERNATE TOTAL BID PARTICIPATION #1 Yeager Skanska $7,796,239 9.2% $60,000 $7,796,239 Griffith Company $8,132,532 9.9% $60,000 $8,132,532 Matich Corporation $8,544,456 $30,000 $8,544,456 Granite Construction $8,689,915 10.0% $75,000 $8,989,915 Alternate#1 is for the installation of a 24" bore, underground duct bank. Alternate #1, the "24" Bored Underground Duct Bank" is not being recommended. A lower cost is included in the base bid for standard trenching excavation. The bid documents required that the prime contractor, with his or her organization perform an amount of work equal to at least 50% of the total contract. This provision is a standard utilized on airfield construction projects to ensure the Airport does not receive bids from inexperienced contractors; it should not have been included in this project. Staff recommends waiving this requirement. After reviewing all of the bids and the DBE (Disadvantaged Business Enterprise) commitment,the lowest responsive, responsible bidder is Yeager Skanska, Inc. at a bid price of $7,796,239 and a DBE commitment of 9.2%. 0A Southerly Terminal Access Roadway Security Reconfiguration March 26, 2003 Page 2 Funding for this project is as follows: FUNDS CURRENTLY AVAILABLE AIP 35 $4,136,009.00 AIP 33 (Match) $476,807.00 Roadway Landscaping $315,060.00 Sub Total I $4,927,876.00 FUTURE FUNDING AIP 36 Match (03/04 Budget) $900,000.00 AIP 36 (03/04 Grant) $1,088,363.00 O&M Revenue Reduction $880,000.00 Sub Total $2,868.363.00 GRAND TOTAL $7,796,239.00 All of the future funding will be in place by July 1, 2003 in plenty of time to cover costs of the project. Attached is the complete unit cost bid tabulation as well as a Resolution for City Council consideration. The Resolution awards the contract to Yeager Skanska, Inc., waives bid irregularities and appoints the Executive Director-Airports as the Project Administrator and authorizes the Project Administrator, subject to City Manager approval, to approve Change Orders up to 5% of the total base bid. ALLEN t- SMOOT, A.A.E. MIKE N WILLIAMS, A.A.E. Executive Director- Airports Deputy Director- Operations APPROVE '�l City Manager ATTACHMENTS: P� ` 1. Resolution 2. Bid Tabulation REVIEWED BY DEFT.OF FINANCE le N:\WordPerfect\City_Council\Engineering_Construction\Southerly_Terminai Access Supplemental 03-26-2003.wpd 3ACox RESOLUTION NO. OF THE CITY COUNCIL OF THE CITY OF PALM SPRINGS, CALIFORNIA, AWARDING A CONTRACT FOR THE SOUTHERLY AIRPORT TERMINAL ACCESS ROADWAY SECURITY RECONFIGURATION AT THE PALM SPRINGS INTERNATIONAL AIRPORT (AIP 3-06-0181-35, CITY PROJECT 2002-20)TO YEAGER SKANSKA, INC IN THE AMOUNT OF $7,796,239, WAIVING MINOR IRREGULARITIES AND ESTABLISHING CITY PROJECT ADMINISTRATOR AND ADMINISTRATION PARAMETERS,SUBJECT TO THE APPROVAL OF THE FEDERAL AVIATION ADMINISTRATION (FAA). WHEREAS the events of September 11'h and the security requirements mandated by the Transportation Security Administration (TSA) have greatly impacted the Palm Springs International Airport; and, WHEREAS the project had a pre-bid engineer's estimate of$8,100,000; and, WHEREAS the project plans and specifications were approved and adopted by the City Council on February 5, 2003 and the project has been advertised for a period of thirty (30) days for bid with bids being received on March 24, 2003, from Yeager Skanska, Inc., Griffith Company, Matich Corporation and Granite Construction Company; and, WHEREAS following careful review of the bids, the lowest, responsive, responsible bidder has been determined to be Yeager Skanska, Inc. NOW THEREFORE BE IT RESOLVED by the City Council of the City of Palm Springs as follows: 1. That the Southerly Airport Terminal Access Roadway Security Reconfiguration project (AIP 3-06-0181-35, City Project 2002-20)is awarded,subject to approval by the Federal Aviation Administration (FAA), to Yeager Skanska, Inc. in the amount of $7,796,239. 2. That item #20 of the bid "Special Provisions" requires the prime contractor, with his or her organization to perform an amount of work equal to at least 50%of the total contract cost is a provision not required for this project and is hereby waived as a minor irregularity. �. //'�� ex� Resolution - Southerly Terminal Access Roadway Security Reconfiguration March 26, 2003 Page 2 3. Thatthe Executive Director-Airports is hereby authorized to administerthe contractand is authorized to approve Change Orders up to 5% of the total contract amount, subject to City Manager approval. ADOPTED this day of 2003. AYES: NOES: ABSENT: ATTEST: CITY OF PALM SPRINGS, CALIFORNIA By City Clerk City Manager REVIEWED & APPROVED AS TO FORM: Palm Springs International Airport Project AIP 3-06-0181-35 Construction Bid Tabulation - Southerly Terminal Access SCHEDULE 1-Southerly Terminal Access Roadway Security Reconfrguration/lnspection Plaza Item No. Description Quantity UOM Unit Cost Engineer's Unit Cost Yeager Unit Cost Griffith Unit Cost Matich Unit Cost Granite CIVIL WORK MOBILIZATION,DEMOLITION P-100 Mobilization 1 LS 250,000.00 250,000.00 390,000.00 390,000.00 400,000.00 400,ODO.00 450,000.00 450,000.00 430,ODO.00 430,000.00 P-101 Traffic Control 1 LS 40,000.00 40,000.00 100,000.00 100,000.00 30,000.00 30,000.00 150,522.50 150,522.50 35,000.00 35,D00.00 P-140a Asphalt Pavement Remove 33,000 BY 2.00 66,000.00 2.50 82,500.00 1.30 42,9DO.00 2.50 82,500.00 2.00 66,000.00 P-140b Asphalt Pavement Remove 200 BY 2.50 500.00 6.50 1.300.00 2.00 4DO.00 23.00 4,600.00 1.00 200.00 P-140c Curb and Curb/Gutter Ren 5,400 LF 5.00 27,000.00 3.50 18,900.00 4.00 21,600.00 7.50 40,5DO.00 1.00 5,400.00 P-140d Concrete Spandrels,Drain 250 BY 30.00 7,500.00 15.00 3,750.OD 20.00 5,000.00 36.75 9,187.50 6.00 1,500.00 P-140e Concrete Sidewalk/Ramp/, 1,000 BY 25.00 25,000.00 6.50 6,500.00 5.00 5,000.00 15.00 15,000.00 3.00 3,000.00 P-140f Concrete Pavement(10-in 100 BY 25.00 2,500.00 20.00 2,000.00 40.00 4,000.00 96.00 9,600.00 12.00 1,200.00 EXCAVATION,ASPHALT PAVEMENT P-151 Clearing and Grubbing 1 LS 75,000.00 75,000.00 270,000.00 270,000.00 500,000.00 500,0DO.00 100,000.00 100,000.00 150,000.00 150,000.00 P-152a Unclassified Excavation 10,000 CY 10.00 100,000.00 25,00 250.000.00 16.50 165,ODO.00 21.00 210,000.00 12.00 120,000.00 P-1521b Borrow Excavation 5,000 CY 15.00 75,000.00 10.00 50,000.00 16.00 60,ODO.00 5.00 25,000.00 4.00 20,D00.00 P-199 Excavation,Trenches,Ear 1 LS 10,000.00 10,000,00 15,000,00 15,000.00 2,000.00 2,000.00 1.00 1.00 5,000.00 5,D00.00 P-209 Crushed Aggregate Base( 3,500 CY 35.00 122,500.00 35.00 122,500.00 43.00 150,500.00 40.75 142,625.00 33.00 115,500.00 P-217 Soil Sterilization 31,500 BY 0.15 4,725.00 0.07 2,205.00 0.09 2,835.00 0.10 3,150.00 0.05 1,575.00 P-218 Crushed Aggregate Shoult 2,000 Ton 20.00 40,000.00 15.00 30,000.00 25.00 50,000.00 22.00 44,000.00 24.00 48,000.00 P-401 a Plant Mix Bituminous Pave 7,000 Ton 40.00 280,000.00 30,00 210,000.00 30.00 210,000.00 30.75 215,250.00 27.00 189,000.00 P-401 b Bituminous Material(AR8C 450 Ton 250.00 112,500.00 260.00 117,000.00 240.00 108,ODO.00 230.00 103,500.00 200.00 90,000.00 P-603 Bituminous Tack Coat(SS 1,300 Gal 2.00 2,600.00 1.25 1,625.00 1.60 2,080.00 1.20 1,560.00 8.00 10,400.00 CURB,GUTTER,CONCRETE PAVEMENT P-61 Oa Install A1-6 Vertical Curb 800 LF 15.00 12,000.00 15.00 12,000.00 18.00 14,400.00 21.25 17,000.00 8.00 6,400.00 P-61 Ob Install A2-6 Curb and Gutt 24,000 LF 12.00 288,000.00 11.00 264,000.00 15.00 360,000.00 13.10 314,400.00 9.00 216,000.00 P-610c Install A2-8 Curb and Gutt 300 LF 20.00 6,000.00 13.00 3,900.00 21.50 6,450.00 70.00 21,000,00 22.00 6,600.00 P-610d Install PCC Drainpan,Gull 250 BY 40.00 10,000.00 56.00 14,000.00 68.50 17,125.00 60.00 15,000.00 50.00 12,500.00 P-610e Install PCC Sidewalk w/H 800 BY 35.00 28,000.00 32.00 25,600.00 30.00 24,000.00 30.00 24,000.00 55.00 44,000.00 P-61 Of Install PCC Colored Sidew 100 BY 45.00 4,500.00 45.00 4,500.00 58.00 5,800.00 82.00 8,200.00 62.00 6,200.00 P-61 Og Install 10"PCC Pavement 2,650 BY 95.00 251,750.00 90.00 238,500.00 71.00 188,150.00 57.25 151,712.60 57.00 151,050.00 REGULATORY SIGNAGE P-613a Remove Roadway Sign an 20 Ea. 25.00 500.00 40.00 800.00 43.00 860.00 42.00 840.00 40.00 800.00 P-613b Install New Roadway Sign 40 Ea. 80.00 3,200.00 150.00 6,000.00 160.00 6,400.00 155.00 6,200.00 160.00 6,400.00 P-613c Install New Roadway Sign 150 SF 25.00 3,750.00 15.00 2,250.OD 13.00 1,950.00 15.50 2,325.00 20.00 3,000.00 P-613d Relocate Roadway Sign P: 20 Ea. 120.00 2,400.00 85.00 1,700.00 90.00 1,800.00 88.00 1,760.00 90.00 1,800.00 P-613e Relocate from/to Alejo Yan 20 Ea. 200.00 4,000.00 150.00 3,000.00 120.00 2,400.00 105.00 2,100.00 150.00 3,000.00 P-613f Relocate on Site-Oversizi 10 Ea. 100.00 1,000.00 150.00 1,500.00 240.00 2,400.00 105.00 1,050.00 300.00 3,000.00 P-613g Relocate from/to Alejo Yan 20 Ea. 150.00 3,000.00 15.00 300.00 16.00 320.00 105.00 2,100.00 16.00 320.00 P-613h Relocate on Site-Precast 10 Ea. 75.00 750.00 15.00 150.00 16.00 160.00 105,00 1,050.00 16.00 160.00 A35PS,Rdwy,BidTab dated:3/24/2003 Page No. 1 Palm Springs International Airport Project AIP 3-06-0181-35 Construction Bid Tabulation -Southerly Terminal Access Item No. Description quantity UOM Unit Cost Engineer's Unit Cost Yeager Unit Cost Griffith Unit Cost Matich Unit Cost Granite PAVEMENT MARKINGS P-620a Remove Existing Pavemer 5,000 SF 2.00 10,000.00 0.20 1,000.00 0.10 500.00 0.15 750.00 0.20 1,000.00 P-620b Remove Existing Raised N 50 Ea. 10.00 500.00 0.60 30.00 0.55 27.50 0.50 25.00 1.00 50.00 P-620c Install New Pavement Mar 5,000 SF 2.50 12,500.00 2.50 12,500.00 2.70 13,500.00 2.55 12,750.00 3.00 15,000.00 P-620d Install Raised Non-Reflecti 700 Ea. 5.00 3,6W.00 1.00 700.00 1.10 770.00 1.05 735.00 2.00 1,400.00 P-620e Install Raised,One-Way,1 150 Ea. 10.00 1,500.00 1.00 150.00 1.10 165.00 1.05 157.50 2.00 300.00 P-620r Install Raised Non-Reflect! 400 Ea. 5.00 2,000.00 2.00 800.00 1.30 520.00 2.05 820.00 3.00 1,200.00 P-620g Install Raised,Two-Way,f 100 Ea. 12.00 1,200.00 3.00 300.00 3.20 320.00 3.15 315.00 3.00 300.00 P-620h Install Raised Retroreflecti, 40 Ea. 15.00 600.00 1.50 60.00 1.60 64.00 1.55 62.00 2.00 80.00 P-6201 Install Channelizer Post Dr 20 Ea. 35.00 700.00 30.00 600.00 5.20 104.00 5.20 104.00 6.00 120.00 P-620j Install Median Nose,Refle, 20 Ea. 25.00 500.00 30.00 600.00 5.20 104.00 5.20 104.00 6.00 120.00 DRAINAGE,WATER,SEWER D-701a Remove Existing Culvert 40 LF 20.00 800.00 40.00 1,600.00 75.00 3,000.00 17.00 680.00 20.00 800.00 D-701b Install 18"RCP Class 111 600 LF 50.00 30,000.00 120.00 72,000.00 67.00 40,200.00 89.00 53,400.00 120.00 72,000.00 D-701c Install 12"PVC,Schedule 100 LF 40.00 4,000.00 55.00 5,500.00 67.00 6,700.00 14.50 1,450.00 25.00 2,500.00 D-702a Remove 1"to 3"PVC War 700 LF 5.00 3,500.00 7.00 4,900.00 5.00 3,500.00 9.60 6,720.00 0.50 350.00 D-702b Install 1"PVC Sch.40 Wal 1,000 LF 12.00 12,000.00 20.00 20.000.00 25.00 25,000.00 7.80 7,800.00 18.00 18,000.00 D-702c Conned 1"PVC Waterline 7 Ea. 500.00 3,500.00 230.00 1,610.00 2,000.00 14,000.00 365.00 2,555.00 1,000.00 7,000.00 D-702d Galy.Riser w/ 3 Ea. 200.00 600.00 225.00 675.00 105.00 315.00 310.00 930.00 1,500.00 4,500.00 D-702e Relocate Fire Hydrant/Val% 1 Ea. 2,0D0.00 2,000.00 3,800.00 3,800.00 8,400.00 8,400.00 5,700.00 5.700.00 3,000.00 3.000.00 D-702f Install 4"ABS Sewer Pipe 250 LF 25.00 6,250.00 27.00 6,750.00 83.00 20,750.00 16.00 4,000.00 45.00 11,250.00 D-702g Conned 4"ABS Sewer Pil 3 Ea. 500.00 1,500.00 1,750.00 5,250.00 1,700.00 5,100.00 985.00 2,955.00 1,200.00 3,600.00 D-702h Install I%"SDR 21 PVC£ 1,000 LF 22.00 22,000.00 19.00 19,000.00 28.00 28,000.00 9.35 9,350.00 35.00 35,000.00 D-702i Conned 1%"SDR 21 PVC 5 Ea. 500.00 2,500.00 365.00 1,825.00 1,700.00 8,500.00 365.00 1.825.00 1,500.00 7,500.00 D-702j Install 12"xl Zx4"Concretc 10 Ea. 100.00 1,000.00 105.00 1,050.00 235.00 2,350.00 52.00 520.00 400.00 4,000.00 D-702k Install Metallic Warning To 2,000 LF 0.50 1,000.00 0.60 1,200.00 0.25 500.00 1,30 2,600.00 1.D0 2,000.00 D-715 Install Grinder Pump Static 1 Ea. 8,000.00 6,000.00 20,000.00 20,000.00 20,000.00 20,000.00 10,500.00 10,500.00 20,000.00 20,000.00 D-751a Remove Existing Curb Inle 7 Ea. 2,500.00 17,500.00 1,100.00 7,700.00 1,700.00 11,900.00 1,200.00 8,400.00 400.00 2,800.00 D-751b Install Curb Inlet C.P.S.TI 14 Ea. 6,000.00 84,000.00 3,500.00 49,000.00 3,200.00 44,800.00 3,400.00 47,600.00 5,500.00 77,000.00 D-751c Install Manhole 8 Ea. 6,000.00 48,000.00 9,000.00 72,000.00 6,400.00 51,200.00 725.00 5,800.00 4,000.00 32,000.00 D-751d Adjust Existing Manhole or 10 Ea. 2,000.00 20,000.00 1,800.00 18,000.00 2,400.00 24,000.00 1,700.00 17,000.00 500.00 5,000.00 SECURITY FENCE F-162a Install and Remove Tempc 200 LF 20.00 4,000.00 29.00 5,800.00 10.00 2,000.00 30.15 6,030.00 10.00 2,000.00 F-162b Remove Chain-Link Fence 3,400 LF 10.00 34,000.00 5.65 19,210.00 5.00 17,000.00 5.75 19,550.00 5.00 17,000.00 F-162c Remove Chain-Link Fence 4 Ea. 3,000.00 12,000.00 940.00 3,760.00 850.00 3,400.00 1,000.00 4,000.00 800.00 3,200.00 F-162d Install Chain-Link Fence(c 250 LF 25.00 6,250.00 38.50 9,625.00 18.00 4,500.00 40.00 10,000.00 18.00 4,500.00 F-162e Install Chain-Link Fence w 100 LF 30.00 3.000.00 49.50 4,950.00 30.00 3,000.00 51.25 5,125.00 30.00 3,000.00 FA 62f Install PVC Slats(screenir 250 LF 15,00 3,750.00 11.55 2,887.50 7.00 1,750.00 12.00 3,000.00 8.00 2,000.00 F-162g Install Chain-Link Fence S 1 Ea. 7,000,00 7,000.00 7,400.00 7,400.00 3,000.00 3,000.00 7,700.00 7,700.00 3,000.00 3,000.00 F-162h Install Steel Frame Screen 3 Ea. 12,000.00 38,000.00 9,000.00 27,000.00 6,500.00 19,500.00 9,400.00 28,200.00 6,000.00 18,000.00 X A35PS,Rdwy,B!dTab dated:3/24/2003 Page No,2 �L� Palm Springs International Airport Project AIP 3-06-0181-35 Construction Bid Tabulation -Southerly Terminal Access Item No. Description Quantity UOM Unit Cost Engineer's Unit Cost Yeager Unit Cost Griffith Unit Cost Matich Unit Cost Granite F-1621 Install Steel Bollard 15 Ea. 200.00 3,000.00 425.00 6,375.00 300.00 4,500.00 440.00 6,600.00 300.00 4,500.00 SECURITY WALLS SW-100;Remove CMU Security W2 100 LF 40.00 4,000.00 80.00 8,000.00 20.00 2,000.00 48.75 4,875.00 10.00 1.000.00 SW-1001 Install CMU Security Wall 1,000 LF 100.00 100,000.00 200.00 200,000.00 20.00 20,000.00 225.00 225,000.00 3D0.00 300,000.00 SW-100,Install CMU Security Wall 1,050 LF 60.00 63,000.00 175.00 183,750,00 70.00 73,500.00 205.00 215,250.00 220.00 231,000.00 US CUSTOMS,CANOPY ANCHORAGE,SIGNAL MODIFICATION MB-101 Relocate U.S.Customs Mi 1 LS 20,000.00 20,000.00 20,000.00 20,000.00 13,000.00 13,000.00 30,000.00 30,000.00 22,000.00 22,000.00 S-100 Install Tensile Membrane( 1 LS 260,000.00 260,000.00 300,000.00 300,000.00 320,000.00 320,000.00 265,000.00 265,000,00 325,000.00 325,000.00 S-101a Install PCC Island/Pedeste 4 Ea. 4,000.00 16,000.00 3,500.00 14,000.00 9,500.00 38,000.00 1,600.00 6,400.00 12,000.00 48,000.00 S-1011) Install PCC Island/Pedeste 4 Ea. 6,000.00 24,000.00 3,100.00 12,400.00 10,000.00 40,000.00 1.600.00 6,400.00 15,000.00 60,000.00 T-902 Dust Palliative 10 Ac 500.00 5,000.00 550,00 5,500.00 1,500.00 15,000.00 900.00 9,000.00 400.00 4,000.00 TS-100 Traffic Signal Modification: 1 LS 20,000.00 20,000.00 15,000.00 15,000.00 20,000.00 20,000.00 210,000.00 210,000.00 20,000.00 20,000.00 DIRECTIONAL SIGNAGE 10436a Install Post and Panel Sigr 2 Ea. 2,000-00 4,000.00 1,700.00 3,400.00 1,700.00 3,400.00 1,700.00 3,400.00 1,800.00 3,600.00 10436b Install Post and Panel Sigr 1 Ea. 3,000.00 3,000.00 2,400.00 2,400.00 2,400.00 2,400.00 2,600.00 2,600.00 2,500.D0 2,500.00 10437a Install Pylon Sign and Foa 3 Ea. 6,000.00 18,000.00 5,400.00 16,200.00 5,30M00 15,900.00 5,500.00 16,500.00 5,300.00 15,900.00 10437b Install Pylon Sign and Foo, 7 Ea. 5,000.00 35,GD0.00 4,500.00 31,500.00 4,500.00 31,500.00 4,600.00 32,200.00 4,500.00 31,500.00 10437c Install Pylon Sign and Foa 4 Ea. 70,000.00 280,000.00 38,500.00 154,000.00 38,000.00 152,000.00 32,000.00 128,000.00 37,000.00 148,000.00 10437d Install Pylon Sign and Foo 3 Ea. 90,000.00 270,000.00 4,800.00 14,400.00 47,000.D0 141.000.00 41,000.00 123,000.00 48,000.00 144,000.00 10437e Install Pylon Sign and Foo, 4 Ea. 35,000.00 140,000.00 20,000.00 80,000.00 20,000.00 80,000.00 19,500.00 78,000.00 22,000.00 88,000.00 10437f Install Pylon Sign and Foa 3 Ea. 40,000.00 120.000.00 27,000.00 81,000.00 27,000.00 81,000.00 26,600.00 79,800.00 28,000.00 84,000.00 10437g Install Pylon Sign and Fos 4 Ea. 50,000.00 200,000.00 37,000.00 148.000.00 36,000.00 144,000.00 32,000.00 128,000.00 38,000.00 152,000.00 10437h Install Pylon Sign and Fos 4 Ea. 4.500.00 18,000.00 14,000.00 56,000.00 14,000.00 56,000.00 9,000.00 36,000.00 15,000.00 60.000.00 10437i Install Pylon Sign and Fos 8 Ea. 4,500.00 36,000.00 2,000.00 16,000.00 2,100.00 16,800.00 2,100.00 16,800.00 2,200.00 17,600.00 10437j Install Pylon Sign and Foo, 1 Ea. 70,000.00 70,000.00 28,500.00 28,500.00 29,000.00 29,000.00 23,000.00 23,000.00 30,000.00 30,000.00 ELECTRICAL WORK L-101 Temporary Power and Cor i LS 20,000.00 20,000.00 103,000.00 103,000.00 105,000.00 105,000.00 50,000.00 50,000.00 100,000.00 100,000.00 L-102a Saw Cut,Rmvl,Replace C 40 LF 82.00 3,280.00 50.00 2,000.00 20.00 800.00 52.50 2,100.00 35.00 1.400.00 L-102b Saw Cut,Rmvl, Replace P 1,400 LF 8.00 11,200.00 20.00 28,000.00 14.00 19,600.00 10.50 14,700.00 25.00 35,000.00 L-103a Remove Existing 3#10 wii 200 LF 0.75 150.00 0.25 50.00 _ 0.25 50.00 0.50 100.00 0.25 50.00 L-103b Remove Existing 6#10 wii 600 LF 0.75 450.00 0.25 150.00 0.25 150.00 0.50 300.00 0.25 150.00 L-1030 Remove Existing 2#8 wire 1,400 LF 0.75 1,050.00 0.25 350.00 0.25 350.00 0.50 700.00 0.25 350.00 L-103d Remove Existing 3#6 wire 2,000 LF 0.75 1,500.00 0.25 500.00 0.25 500.00 0.50 1,000.00 0.25 500.00 L-103e Remove Existing 6#6 wire 600 LF 1.00 600.00 0.25 150.00 0.25 150.00 0.50 300.00 0.25 150.00 L-103f Remove Existing 2#4 wire 1,200 LF 0.75 900.00 0.25 300.00 0.25 300.00 0.50 600.00 0.25 300.00 L-103g Remove Existing 3#4 wire 3,800 LF 0.75 2,850.00 0.25 950.00 0.25 950.00 0.50 1,900.00 0.25 950.00 L-103h Remove Existing 4#410w 1,400 LF 1.00 1,400.00 0.25 350.00 0.25 350.00 0.50 700.00 0.25 350.00 L-1031 Remove Existing 6#2 wire 400 LF 1.25 500.00 0.25 100.00 0.25 100.00 0.50 200.00 0.25 100.00 L-103j Disconnect Existing Conne 5 Ea. 300.00 1,500.00 85.00 425.00 90.00 450.00 150.00 750.00 90.00 450.00 L-103k Remove AV]and Telephor 1,400 LF 0.75 1,050.00 0.25 350.00 0.25 350.00 2.00 2,800.00 0.25 350.00 t:]N7 A35PS,Rdwy,BidTab dated:3/24/2003 Page No.3 U�� Palm Springs International Airport Project AIP 3-06-0181-35 Construction Bid Tabulation -Southerly Terminal Access Item No. Description Quantity UOM Unit Cost Engineer's Unit Cost Yeager Unit Cost Griffith Unit Cost Matich Unit Cost Granite L-1031 Remove 25 Pr Telephone T 1,000 LF 1.00 1,000.00 0.25 250.00 0.25 250.00 2.00 2,000.00 0.25 250.00 L-103m Remove Small Intermediai 40 Ea. 200.00 8,000.00 85.00 3,400.00 87.00 3,480.00 100.00 4,000.00 90.00 3,600.00 L-103n Remove Large Pull Boxes 15 Ea. 400.00 6,000.00 550.00 8,250.00 600.00 9,000.00 100.00 1,500.00 600.00 9,ODO.00 L-1030 Remove Various Sized Co 1 LS 25,000.00 25,000,00 5,000.00 5.000.00 5,000.00 5,000.00 10,000.00 10,000.00 5,000.00 5,000.00 L-103p Remove Unknown Size Ce 2,000 LF 1.30 2,600.00 0.30 600.00 0.30 600.00 2.00 4,000.00 0.30 600.00 L-103q Remove Parking Lot Light 11 Ea. 1,200.00 13,200.00 150.00 11650.00 150.00 1,650.00 525.00 5,775,00 150.00 1,650.00 L-103r Remove Gate Drive Motor, 3 Ea. 1,000.00 3,000.00 525.00 1,575.00 565.00 1,695.00 525.00 1,575.00 550.00 1,650.00 L-103s Remove&Reinstall CCTV 1 Ea. 5,000.00 5,000.00 6,800.00 6,800.00 7,200.00 7,200.00 5,300.00 5,300.00 7,000.00 7,000.00 L-103t Remove Card Reader/Keyl 5 Ea. 500.00 2,500,00 115.00 575.00 120.00 600.00 260.00 1,300.00 120.00 600.00 L-103u Remove and Reinstall Car, 1 Ea. 700 700.00 1,100.00 1,100,00 1,200.00 1,200.00 11600.00 1,600.00 1,100.00 1,100.00 L-103v Remove Concrete Light Pr 11 Ea, 400.00 4,400.00 350.00 3,850.00 350.00 3,850.00 310.00 3,410.DO 350.00 3,850.00 L-103w Remove Taxiway Base Ca 30 Ea. 700.00 21,000.00 70.00 2,100.00 75.00 2,250.00 100.00 3,D00.00 70.00 2,100.00 L-104a Trench for Conduit w/P-I! 20,000 LF 6.00 120,000.00 14.50 290,000.00 15.50 310,000.00 10.25 205,000.00 15.DO 300,000.00 L-104b Trench for Conduit w/6-in, 10,000 LF 6.OD 60,000.00 6.40 64,000.00 6.80 68,000.00 5.00 50,000.00 7.00 70,000.00 L-105 see Alternate LA 06 Install New Pre-Cast Mant 8 Ea. 3,600.00 28,8DO.00 5,700.00 45,600.00 6,000.00 48,000.00 5,300.00 42,400.00 6,000.00 48,000.00 L-107a Install New Pre-Cast Pullb 16 Ea. 1,800.00 28,800.00 1,600.00 25,600.00 1,700.00 27,200.00 1,600.00 25,600.00 1,700.00 27,200.00 L-107b Install New Pre-Cast Pullb 35 Ea. 2,600.00 91,000.00 2.350.00 82,250.00 2,500.00 87,500.00 2,600.00 91,000.00 2,400.00 84,000.00 L-107c Install New Pre-Cast Pullb 45 Ea. 200.00 9,000,00 500.00 22,500.00 500.00 22,500.00 520.00 23,400.00 500.00 22,500.00 L-108a Install one 3/4-inch PVC C 2,000 LF 11.00 22,000.00 1.70 3,400.00 1.75 3,500.00 2.00 4,000.00 2.00 4,000.00 L-108b Install one 1-inch PVC Coi 8,000 LF 15.00 120,000.00 1.70 13.600.00 1.80 14,400.00 2.00 16,000.00 2.00 16,000.00 L-108c Install one 2-inch PVC Coi 30,000 LF 18.00 540,000.00 2.00 60,000.00 2.20 66,000.00 2.00 60,000.00 2.00 60,000.00 L-108d Install four 4-inch PVC Coi 4,000 LF 36.00 144,000,00 11.00 44,000.00 12.15 48,600.00 20.00 80,000.00 12.00 48,000.00 L-108e Install four 4-inch GRCI Cr 3,000 LF 43.00 129,000.00 39.00 117.000.00 42.00 126,000.00 41.50 124,500.00 40.00 120,000.00 L-108f Install one 1-inch GRC Co 300 LF 10.00 3,000.00 6.25 1,875.00 6.50 1.950.00 5.20 1,560.00 7.00 2,100.00 L-108g Install one 3-inch GRC Co 50 LF 42.00 2,100.00 12.00 600.00 13.00 650.00 10.25 512.50 15.00 750.00 L-109a Install 912 wires 500 LF 0.92 460.00 0.90 450.00 1.00 500.00 2.00 1,000.00 1.00 500.00 L-109b Install 3#12 wires 1,200 LF 1.40 1,680.00 1.20 1,440.00 1.25 1,500.00 2.00 2,400.00 2.00 2,400.00 LA 09c Install 4#12 wires 2,000 LF 1.84 3,680.00 1.60 3,200.00 1.75 3,500.00 2.00 4,000.00 2.00 4,000.00 L-109d Install 3#10 wires 400 LF - 1.60 640.00 1.30 520.00 1.50 6DO.00 2.00 800.00 2.00 800.00 L-109e Install 3#6 wires 400 LF 2.76 1,104.00 2.40 960.00 2.50 1,000.00 3.00 1,200.00 3.00 1,200.00 L-109f Install 4#6 wires 6,000 LF 3.68 22,080.00 2.75 16,500.00 3.00 18,000.00 3.00 18,000.00 3.00 18.000.00 L-109g Install #8wires 1,200 LF 1.00 1,200.00 1.40 1,680.00 1.50 1,800.00 3.00 3,600.00 2.00 2,400.00 L-109h Install 3#8 wires 500 LF 1.50 750.00 1.90 950.00 2.00 1,000.00 3,00 1,500.00 2.00 1,000.00 L-109i Install 4#8 wires 500 LF 2.00 1,000.00 2.30 1,150.00 2.50 1,250.00 3.00 1,500.00 3.00 1,500.00 L-1091 Install #4 wires 1,000 LF 1.42 1,420.00 2.10 2,100.00 2.25 2,250.00 3.00 3,000.00 3.00 3,000.00 L-109k Install 3#4 wires 10,000 LF 2.13 21,3DO.00 2.35 23,500.00 2.55 25,500.00 3.00 30,000.00 3.00 30,000.00 L-1091 Install 3#2 wires 1,200 LF 3.63 4,356.00 4.20 5,040.00 4.50 5,400.00 5.20 6,240.00 4.00 4,800.00 L-109m Install 4#2 wires 600 LF 4.84 2,904,00 6.40 3,240.00 5.50 3,300.00 5.20 3,120.00 6.00 3,600.00 L-109n Install 3#50OKcmil 2,500 LF 20.00 50,000.00 12.00 30,000.00 12.90 32,250.00 15.50 38,750.00 12.00 30,000.00 A35PS,Rdwy,BidTab dated:3l24/2003 Page No.4 Palm Springs International Airport Project AIP 3-06-0181-35 Construction Bid Tabulation - Southerly Terminal Access Item No. Description Quantity UOM Unit Cost Engineer's Unit Cost Yeager Unit Cost Griffith Unit Cost Matich Unit Cost Granite L-1090 Install 3#4/0 wires 200 LF 11.00 2,200.00 8.00 1,600.00 8.50 1,700.00 10.25 2,050.00 9.00 1,800.00 L-109p Install 4#410 wires 800 LF 15.00 12,000.00 8.80 7,040.00 10.50 8,400.00 10.25 8,200.00 11.00 8,800.00 L-109q Install 2#6 wires 1,200 LF 1.84 2,208.00 1.60 1,920.00 1.75 2,100.00 3.00 3,600.00 2.00 2,400.00 L-109r Install 6#6 wires 1,000 LF 5.52 5,520.00 4.15 4.150.00 4.50 4,500.00 5.20 5,200.00 5.00 5.000.00 L-109s Install 10#4 wires 600 LF 12.10 7,260.00 7.25 4,350.00 7.50 4,500.00 10.25 6,150.00 8.00 4,800.00 L-109t Install 4#2/0 wires 1,200 LF 10.28 12,336.00 7.65 9,180.00 8.25 9,900.00 10.25 12,300.00 8.00 9,600.00 L-109u Install 5#6 wires 800 LF 4.60 3,680.00 3.45 2,760.00 3.75 3,000.00 4.00 3,200.00 4.00 3,200.00 L-109v Install 6#10 wires 500 LF 3.24 1,620.00 2.30 1,150.00 2.50 1,250.00 3.00 1,500.00 3.00 1,500.00 L-109w Install 4#4 wires 400 LF 4.84 1,936.00 3.60 1,440.00 3.75 1,500.00 4.00 1,600.00 4.00 1,600.00 L-109x Install 6#2 wires 200 LF 9.30 1,860.00 38.75 7,750.00 40.00 8,000.00 20.50 4,100,00 44.00 8,800.00 L-109y Install 8#2 wires 500 LF 12.40 6,200.00 3.20 1,600.00 3.50 1,750.00 10.25 5,125.00 4.00 2,000.00 L-109z Install 2#10 wires 250 LF 10.80 2,700.00 1.25 312.50 1.25 312.50 3.00 760.00 2.00 500.00 L-109aa Install 10#6 wires 1,400 LF 9.20 12,880.00 6.30 8,820.00 6.50 9,100.00 10.25 14,350.00 7.00 91800.00 L-109ab Install 4#300Kcmil 100 LF 18.40 1,840.00 14.00 1,400.00 15.00 1,500.00 15.50 1,550.00 15.00 1,500.00 L-11 Ca Install cable in conduit,2-1 700 LF 6.00 4,200.00 3.00 2,100.00 3.00 2,100.00 5.20 3,640.00 3.00 2,100.00 L-110b Remove 2-1/c#8 5KV 700 LF 6.00 4,200.00 0.70 490.00 0.10 70.00 5.20 3,640.00 1.00 700.00 L-111a Remove&Relocate Existit 11 Ea. 1,400.00 15,400.00 57.00 627.00 60.00 660.00 155.00 1,705.00 60.00 660.00 L-111b Remove Existing Taxiway 7 Ea. 800.00 5,600.00 210,00 1,470.00 225.00 1,575.00 1,000.00 7,000.00 210.00 1,470.00 L-112a Install Type 10-Fixture Fl, 6 Ea. 1,100.00 6,600.00 670.00 4,020.00 725.00 4.350.00 625.00 3,750.00 700.00 4,200.00 L-112b Install Type ll-Fixture Fl, 2 Ea. 900.00 1,800.00 600.00 1,200.00 650.00 1,300.00 650.00 1,300.00 600.00 1,200.00 L-113a Install Type 12-In-Grounc 4 Ea. 800.00 3,200.00 730.00 2,920.00 775.00 3,100.00 725.00 2,900.00 750.00 3,000.00 L-113b Install Type 13-Low Leve 8 Ea. 600.00 4,800.00 650.00 5,200.00 675.00 5,400.00 825.00 6,600.00 650.00 5,200.00 L-113c Install Type l4-Bollard Li! 8 Ea. 1,800.00 14,400.00 950.00 7,600.00 975.00 7,800.00 1,100.00 8,800.00 1,000.00 8,000.00 L-113d Install Type 20-Walkway 50 Ea. 400.00 20,000.00 400.00 20,000.00 425.00 21,250.00 675.00 33,750.00 450.00 22,500.00 L-113e Install Type 21 -Landscap 170 Ea. 600.00 102,000.00 300.00 51,000.00 325.00 55,250.00 725.00 123,250.00 330.00 56,100.00 L-113f Install Type 22-Landscap 12 Ea. 1,200.00 14,400.00 560.00 6,720.00 600.00 7,200.00 725.00 8,700.00 600.00 7,200.00 L-113g Install Type 23-Landscap 16 Ea, 600.00 9,600.00 710.00 11,360.00 750.00 12,000.00 750.00 12,000.00 800.00 12,800.00 L-114a Install PCC P.Light Pole B 16 Ea. 700.00 11,200.00 450.00 7,200.00 450.00 7,200.00 520.00 8,320.00 500.00 8,000.00 L-114b Install PCC P.Light Pole B 51 Ea. 1,000.00 51.000.00 515.00 26,265.00 550.00 28,050.00 675.00 34,425.00 550.00 28,050.00 L-114c Install PCC R.Light Pole B 46 Ea. 1,400.00 64,400.00 790.00 36,340.00 850.00 39,100.00 1,100.00 50,600.00 800.00 36,800.00 L-115a Install P.Light Pole,2-Fixt. 1 Ea. 4,500.00 4,500.00 2,950.00 2,950.00 3,000.00 3,000.00 5,300.00 5,300.00 3200.00 3,200.00 L-115b Install P.Light Pole,2-Fixt. 7 Ea. 5,000.00 35,000.00 2,950.00 20,650.00 3,100.00 21,700.00 5,300.00 37,100.00 3,200.00 22,400.00 L-115c Install P.Light Pole,1-Fixt. 20 Ea. 4,000.00 80,000.00 1,980.00 39,600.00 2,100.00 42,000.00 5,300.00 106,000.00 2,200.00 44,000.00 L-115d Install P.Light Pole,2-Fixt. 20 Ea. 5,000.00 100,000.00 2,975.00 59,500.00 3,100.00 62,000.00 5,300.00 106,000.00 3,300.00 66,000.00 L-1159 Install R.Light Pole,2-Fixt. 16 Ea. 5,000.00 80,000.00 3,215.00 51,440.00 3,400.00 54,400.00 5,300.00 84,800.00 3,500.00 56,000.00 L-115f Install R.Light Pole, 1-Fixt. 35 Ea. 4,500.00 157,500.00 2,235.00 78,225.00 2,400.00 84,000.00 5,300.00 185,500.00 2,500.00 87,500.00 L-116a Relocate R.Light Pole,1-F 13 Ea. 1,200.00 15,600.00 365.00 4,745.00 375.00 4,875.00 520.00 6,760.00 400.00 5,200.00 L-116b Relocate P.Light Pole,1-F 11 Ea. 1,200.00 13,200.00 365.00 4,015.00 375.00 4,125.00 520.00 5,720.00 400.00 4,400.00 L-116c Relocate P.Light Pole,1-F 7 Ea. 1,200.00 8,400.00 365.00 2,555.00 375.00 2,625.00 725.00 5,075.00 400.00 2,800.00 L-116d Relocate P.Light Pole,2-F 6 Ea. 1,200.00 7,200.00 400.00 2,400.00 400.00 2,400.00 725.00 4.350.00 400,00 2,400.00 A35PB,Rdwy,BidTab dated:3/2 412 0 0 3 Page No.5 Palm Springs International Airport Project AIP 3-06-0181-35 Construction Bid Tabulation - Southerly Terminal Access Item No. Description Quantity UOM Unit Cost Engineer's Unit Cost Yeager Unit Cost Griffith Unit Cost Matich Unit Cost Granite L-116e Relocate P.Light Pale,2-F 2 Ea. 1,200.00 2,400.00 400.00 800.00 400.00 800.00 825.00 1,650.00 400.00 800.00 L-117 Relocate Ramp Floodlight 1 Ea. 3,000.00 3,000.00 1,250.00 1,250.00 1,300.00 1,300.00 520.00 520.00 1,500.00 1,500.00 L-118 Change-cut Parking Light 6 Ea. 500.00 3,000.00 190.00 1,140.00 200.00 1,200.00 775.00 4,650.00 200.00 1,200.00 L-119a Clean Lens and Re-Lamp 40 Ea. 150.00 6,000,00 77.00 3,080.00 60.00 3,200.00 83.00 3,320.00 100.00 4,000.00 L-119b Cleaning Existing Aluminu 15 Ea. 100.00 1,500.00 125.00 1,875.00 125.00 1,875.00 208.00 3,120.00 160.00 2,250.00 L-120 Paint Existing Steel Light f 30 Ea. 250.00 7,5W.00 200.00 6,000.00 200.00 6,000.00 880.00 26.400.00 200.00 6,000.00 L-121 Install Automatic Sliding G 4 Ea. 8,750.00 35.000.00 8.350.00 33,400.00 34,000.00 136,000.00 5,300.00 21,200.00 10,000.00 40,000.00 L-122 Install Overheight Vehicle 1 LS 112,000.00 112,000.00 72,000.00 72,000.00 75,000.00 75,000.00 30,000.00 30,000.00 90,000.00 90,000.00 L-123a Install Automatic Vehicle E 1 LS 190,000.00 190,000.00 235,850.00 235,850.00 240,000.00 240,000.00 220,000.00 220,000.00 290,000.00 290,000.00 L-123b Install Vehicle Barrier Gate 1 LS 35,000.00 35,000.00 74,000.00 74,000.00 77,000.00 77,000.00 50,000,00 50,000.00 100,000.00 100,000.00 L-124 Connect Signs and Vehick 16 Ea. 600.00 91600.00 990.00 15,840.00 1,000.00 16,000.00 2,100.00 33,600.00 1,000.00 16,000.00 L-125a Install 480 Volt Distributior 1 Ea. 6,000.00 6,000.00 6,125.00 6,125.00 6,500.00 6,500.00 3.400.00 3,400.00 7,000.00 7,000.00 L-125b Install 208 Volt Distributior 1 Ea. 7,000.00 7,000.00 3,325.00 3.325.00 3,500.00 3,500.00 4,700.00 4,700.00 4,000.00 4,000.00 L-125c Install 480 Volt Panelboarc 1 Ea. 3,000.00 3,000.00 1.900.00 1,900.00 2,000.00 2,000.00 1,300.00 1,300.00 2,000.00 2,000.00 L-125d Install 208 Volt Panelboarc 1 Ea. 2,000.00 2,000.00 1,335.00 1.335.00 1,400.00 1,400.00 1,300.00 1,300.00 1,500.00 1,500.00 L-126 Install Weatherproof Trans 1 LS 9,000.00 9,000.00 3,900.00 3,900.00 4,000.00 4,000.00 7,300.00 7,300.00 4,000.00 4,000.00 L-127 Install Grounding System 1 LS 3,000.00 3,000.00 5.600.00 5,600.00 6,000.00 6,000.00 15,000.00 15,000.00 6,000.00 6,000.00 L-128 Install Lighting Control Cal 1 LS 8,000.00 8,000.00 8,900.00 6,900.00 7,400.00 7,400.00 1,500.00 11500.00 7,000.00 7,000.00 L-129 Install Electronics Cabinet 1 LS 10,000.00 10,000.00 900.00 900.00 950.00 950.00 5,800.00 5,800.00 1,000.00 1,000.00 L-130a Install Fiber Optic Data Ca 1.500 LF 6.00 9,000.00 3.20 4,800.00 3.25 4,875.00 10.00 15'000.00 4.00 6,000.D0 L-130b Install 50 pair Telephone C 1,500 LF 6.00 9,000.00 0.95 1,425.00 0.10 150.00 6.25 9,375.00 1.00 1,500.00 L-130c Install 25 Pair Telephone 0 1,500 LF 3.00 4,500.00 1.40 2,100.00 1.50 2,250.00 5.70 8,550.00 2.00 3,000.00 L-130d Install AVI Control Cable 3,000 LF 1.50 4,500.00 0.90 2,700.00 1.00 3,000.00 5.00 15,000.00 1.00 3,000.00 L-131a Install Miscellaneous Secu 4 Ea. 4,000.00 16,000.00 11,800.00 47,200.00 12,000.00 48,000.00 11,000.00 44.000.00 12,000.00 48.000.00 LA31b Provide Vehicle Transponc 15 Ea. 100.00 1,500.00 40.00 600.00 40.00 600.00 2,600.00 39,000.00 40.00 600.00 L-149 Miscellaneous Electrical lA 1 LS 160,000.00 160,000.00 5,200.00 5,200.00 5,500,00 5,500.00 125,000.00 125,000.00 6,000.00 6,000.00 L-150 Inspection Facility Electric. 1 LS 46,800.00 46,800.00 75,000.00 75,000.00 78,000.00 78,000.00 55,000.00 55,000.00 75,000.00 75,000.00 INSPECTION(BUILDING)FACILITY IB-100 Inspection(Building)Facili 1 LS 225,200.00 225,200.00 500,000.00 500,000.00 687,000.00 687,000.00 600,000.00 600,000.00 690,000.00 690,000.00 NATURAL SECURITY BARRIER LANDSCAPING DEMOLITION,GRADING LS-100 Relocate Palm Trees-30' 65 Ea. 500.00 32,500.00 885.00 57,525.00 900.00 58,500.00 825.00 53,625.00 1,200.00 78,000.00 LS-101 Relocate Olive Trees-16 9 Ea. 400.00 3,600.00 858.00 7,722.00 1,600.00 14,400.00 775.00 6,975.00 6,000.00 54,000.00 LS-102 Remove Trees-15'to 30' 55 Ea. 500.00 27,500.00 943.00 51,865.00 400.00 22,000.00 340.00 18,700.00 550.00 30,250.00 LS-103 Remove Shrubs 250 Ea. 25.00 6,250.00 52.00 13,000.00 52.00 13,000.00 45.00 11,250.00 10.00 2,500.00 LS-104 Remove Decomposed Gra 7,500 SF 1.00 7,500.00 1.15 8,625.00 0.25 1,875.00 5.00 37,500.00 0.20 1,500.00 LS-105 Remove Reinforced CMU1 70 LF 15.00 1.050.00 60.00 4,200.00 30.00 2,100.00 68.25 4,777.50 8.00 560.00 LS-106 Remove Concrete Mow St 200 LF 5.00 1,000.00 12.00 2,400.00 4.00 800.00 20.00 4,000.00 0.50 100.00 LS-107 Relocate Boulders-6'Dia. 5 Ea. 100.00 500.00 900.00 4,500.00 850.00 4,250.D0 540.00 2,700.00 400.00 2,000.00 LS-110 Shaping and Fine Grading 145,000 SF 0.10 14.500.00 0.10 14,500.00 0.65 94,250.00 0.50 72,500.00 0.70 101,500.00 (132%7 A35PS,Rdwy,BidTab dated:3/24/2003 Page No.6 ix*�� Palm Springs International Airport Project AIP 3-06-0181-35 Construction Bid Tabulation - Southerly Terminal Access Item No. Description Quantity UOM Unit Cost Engineer's Unit Cost Yeager Unit Cost Griffith Unit Cost Matich Unit Cost Granite HARDSCAPE LS-120 Place Boulders,3'to 6'-(I 180 Ea. 75.00 13,500.00 220.00 39,600.00 200.00 36,000.00 195.00 35,100.00 450.00 81,000.00 LS-121 Install Concrete Edging-8 5,800 LF 10.00 58,000.00 16.00 92,800.00 8.00 46,400.00 9.35 54,230,00 10.00 58,000.00 LS-122 Install Crushed Rock 1 112 1,400 Ton 75.00 105,000.00 47.00 65,800.00 40.00 56,000.00 90.00 126,000.00 60.00 84,000.00 LS-123 Install Crushed Rock 114"1 300 Ton 72.00 21,600,00 100.00 30,000.00 130.00 39,000.00 155.00 46,500.00 120.00 36,000.00 IRRIGATION LS-130 Irrigation System Complete 1 LS 255,000.00 255,000.00 375,000.00 375,000.00 340,000.00 340,000.00 434,000,00 434,000.00 520,000.00 520,000.00 PLANTING Trees LS-140 Install Trees-36"box 65 Ea. 750.00 48,750.00 675.00 43,875.00 900.00 58,500.00 570.00 37,050.00 800.00 52,000.00 LS-141 Install Trees-24"box - 15 Ea. 240.00 3,600.00 300.00 4,500.00 200.00 3,000.00 230.00 3,450.00 550.00 8,250.00 LS-142 Place Washingtonia Filifen 110 Ea. 100.00 11,000.00 850.00 93,500.00 400.00 44,000.00 850.00 93,500.00 2,100.00 231,000.00 Shrubs LS-143 Install Shrubs-15 Gal.Ca 320 Ea. 80.00 25,600.00 90.00 28,800.00 70.00 22,400.00 52.00 16,640.00 70.00 22,400.00 LS-144 Install Shrubs-5 Gal.Can 2,400 Ea. 20.00 48,000.00 15.00 35,000.00 15.00 36,000.00 15.50 37,200.00 45.00 108,000.00 LS-145 Install Shrubs-1 Gal.Can 5,400 -Ea. 9.00 48,600.00 7.25 39,150.00 5.00 27,000.00 5.00 27,000.00 18.00 97,200.00 Ground Cover LS-146 Install Lantana Monteviden 550 Ea. 9.00 4,950.00 7.00 3,850.00 4.00 2,200.00 5.00 2,750.00 18.00 9,900.00 LS-147 Install Trachelospermum J 1,600 Ea. 0.40 640.00 2.50 4,000.00 1.70 2,720.00 2.00 3,200.00 9.00 14,400.00 Lawn LS-148 Install Sod 148,000 SF 0.55 81,400.00 0.45 66,600.00 0.45 66,600.00 0.50 74,000.00 0.80 118,400.00 TOTAL ESTIMATED COST(Schedule 1) 8,180,909.00 7,796,239.00 8,132,532.00 8,544,456.00 8,689,915.00 Yeager Griffith Matich Granite ALTERNATE ONE L-105 Install Underground 24-Inc 200 LF 210.00 42,000.00 300.00 60,000.00 300.00 60,000.00 150.00 30,000.00 375.00 75,000.00 took A35PS,Rdwy,BidTab dated:3/24/2003 Page No.7