HomeMy WebLinkAbout4/2/2003 - STAFF REPORTS (13) DATE: April 2, 2003 TO: City Council FROM: Director of Public Works/City Engineer SWIM CENTER, POOL HOUSE & CONCESSION STAND IMPROVEMENTS RECOMMENDATION: It is recommended that the City Council reject all bids for the Swim Center, Pool House & Concession Stand Improvements, City Project 98-21; and authorize re-bidding of Bid Schedule A (swim center equipment replacement) and Bid Schedule C (pool deck resurfacing) only. SUMMARY: Award of this contract would have provided for replacement of swimming pool equipment for the existing Palm Springs Swim Center and construction of a new pool house (locker room and restroom facility)and concession stand(administration building), also associated with construction of the Palm Springs Skate Park facility located within Sunrise Park. Construction bids received on March 11, 2003, exceeded the project estimate; budgeted funds are unavailable to cover the lowest, responsive, responsible bidder. BACKGROUND: Widespread community support for, as well as previous Council endorsement of construction of a community skate park facility within the Sunrise Park grounds led to the award of a design contract with Site Design Group on April 24, 2002. Included in their contract was the preparation of plans to replace the swim center equipment and plans for construction of a new pool house(locker room and restroom facility)and concession stand (administration building). The two component projects (Swim Center and Skate Park)were separately bid due to funding considerations and to allow use of local funds on the Swim Center project. The plans and specifications for this project were prepared by the City's consultant, Site Design Group, and on December 18, 2002, the City Council approved and adopted the specifications for this project, and authorized advertisement for construction bids. The project was bid with three Bid Schedules (A through C). Bid Schedule A includes all work necessary to remove and replace the existing swim center mechanical equipment (pumps, filters, and heating system). Bid Schedule B includes all work necessary to construct the new pool house(bath, shower, and locker room facility)and concession stand(administration and office facility),consisting of approximately 5,522 square foot building, with all utilities, facilities, furnishings and fixtures. Additive Bid Schedule C includes all work necessary in installing anew pool deck coating of the existing swim center pool deck. 104 Swim Center, Pool House&Concession Stand Improvements April 2,2003 Page 2 On January 25 and February 1, 2003, the project was advertised for bids, and at 3:00 P.M. on March 11,2003, the Department of Procurement and Contracting received bids from the following contractors: Contractor Bid Sch A Bid Sch B Bid Sch C Total J. Murrey Construction, Inc. $395,000.00 $1,125,000.00 $71,000.00 $1,591,000.00 Redlands, CA 4-Con Engineering $298,702.00 $1,226,293.00 $75,000.00 $1,599,995.00 Fontana, CA Doug Wall Construction, Inc. $280,856.00 $1,342,225.00 $76,000.00 $1,699,081.00 Bermuda Dunes, CA Commercial Diversified, Inc. $335,000.00 $1,300,000.00 $85,000.00 $1,720,000.00 Twentynine Palms, CA At the last City Council study session,the City Council was updated on the status of this and the Palm Springs Skate Park Construction, (City Project 02-23). Staff had previously provided a final budget estimate of approximately $1,600,000 for the total project (Swim Center and Skate Park) which was determined by estimates provided by the City's consultant, Site Design Group. Given the fact that the Skate Park project's lowest bid was approximately$800,000 the combined total project cost of both the swim center and skate park projects is approximately $2,400,000. City Council directed staff to proceed with the redesign of the skate park project by relocating it easterly to clear the existing swim center restroom facility, and to postpone construction of the new restroom and locker room facility as bid with the swim center project. However, the critical element of the swim center project that requires implementation is the replacement of the swim center equipment, and with Council's concurrence, staff was directed to re-bid the swim center project without the new building scope of work. SUBMITTED: �_� DAVID J. BARAKIAN Director of Public Works/City Engineer APPROVED: DAVID H. READY City Manager ATTACHMENTS: 1. Minute Order CITY OF PALM SPRINGS NOTICE INVITING BIDS For constructing: Swim Center, Pool House & Concession Stand Improvements City Project 98-21 N-1 NOTICE IS HEREBY GIVEN that sealed bids for the Swim Center, Pool House & Concession Stand Improvements, City Project 98-21, will be received at the office of the Director of Procurement and Contracting of the City of Palm Springs, California, until 2 :30 P.M. on February 25, 2003 , at which time they will be opened and read aloud. N-2 DESCRIPTION OF THE WORK: The Work comprises the construction of a new bath and locker room facility and concession/administration building, complete with all required fixtures; removal and replacement of existing swim center filtration, heating and chemical equipment and systems, complete and in place; and all appurtenant work. The work shall be coordinated with the concurrent construction of the separately bid contract for the Palm Springs Skate Park Construction, City Project 02-23 . In submitting a bid, bidders agree to all required coordination efforts necessary to stage, phase, and schedule its work to be consistent with the timing of concurrent construction by other contractors that will be preparing portions of the job site in advance of, concurrent with, or after the work that is necessary as part of this contract . N-3 AWARD OF CONTRACT: (a) The City reserves the right after opening bids to reject any or all bids, to waive any informality (non- responsiveness) in a bid, or to make award to the lowest responsive, responsible bidder on the basis of the total sum of Bid Schedule A, B, and Additive Bid Schedule C, and reject all other bids, as it may best serve the interest of the City. Bidders shall bid on all Bid Schedules . (b) As a condition of award, the successful bidder will be required to submit payment and performance bonds and insurance . N-4 BID SECURITY: each bid shall be accompanied by a certified or cashier' s check or Bid Bond in the amount of 10 percent of the total bid price of the total sum of Bid SWIM CENTER, POOL HOUSE&CONCESSION STAND IMPROVEMENTS CITY PROJECT NO.98-21 1/24/03 1 NOTICE INVITING BIDS PAGE 1 Schedule A, B, and Additive Bid Schedule C, payable to the City of Palm Springs. N-5 BIDS TO REMAIN OPEN: The Bidder shall guarantee the Total Bid Price for a period of 60 calendar days from the date of bid opening. N-6 CONTRACTOR'S LICENSE CLASSIFICATION: The Contractor shall possess a valid Class B Contractor license at the time of submitting bids . N-7 PREVAILING WAGE RATES NOT APPLICABLE: Funding for the Work is with all local funds and, as provided under City Charter, will NOT require compliance with the prevailing wage requirements of the State of California. N-8 RETAINAGE FROM PAYMENTS: The Contractor may elect to receive 100 percent of payments due under the Contract Documents from time to time, without retention of any portion of the payment by the City, by depositing securities of equivalent value with the City in accordance with the provisions of Section 22300 of the Public Contract Code. N-9 PRE-BID VISIT TO WORK SITE: Prospective bidders are required to attend a pre-bid walk through of the proposed work site and existing facilities which will be conducted by the City at 10 : 00 A.M. on February 11, 2003 . Bidders should meet at the Community Center located on Pavilion Way, in the Sunrise Park grounds . Failure to participate in the pre-bid walk through may render a bidder as non-responsive. N-10 OBTAINING OR INSPECTING CONTRACT DOCUMENTS: (a) Contract Documents may be inspected without charge at the office of the City Engineer, 3200 East Tahquitz Canyon Way, Palm Springs, CA 92262 . (b) Complete sets of said Contract Documents may be purchased at $75 . 00 per set and are obtainable from the office of the City Engineer, 3200 East Tahquitz Canyon Way, Palm Springs, CA 92262 . No refund will be made of any charges for sets of Contract Documents . (c) An additional fee of $35 . 00 will be charged for sets of documents sent by mail . N-11 ADDRESS AND MARKING OF BIDS: The envelope enclosing the Bid shall be sealed and addressed to the City of Palm SWIM CENTER,POOL HOUSE&CONCESSION STAND IMPROVEMENTS CITY PROJECT NO.98-21 1/24/03 NOTICE INVITING BIDS PAGE Springs, and shall be delivered or mailed to the Director of Procurement and Contracting at 3200 East Tahquitz Canyon Way, Palm Springs, CA 92262 . The envelope shall be plainly marked in the upper left hand corner with the name and address of the Bidder and shall bear the words "Bid For. . . " followed by the title of the Project and the date and hour of opening Bids. The certified or cashier' s check or Bid Bond shall be enclosed in the same envelope with the Bid. Date By David J. Barakian, PE Director of Public Works/City Engineer SWIM CENTER,POOL HOUSE&CONCESSION STAND IMPROVEMENTS CITY PROJECT NO.98-21 1/24/03 NOTICE INVITING BIDS PAGE 3 PALM 1� City of Palm Springs 11 Department of Public Works and Engineering M \�NpopNp1��k y C 3200 E.Tabquia Canyon Way • Palm Springs, California 92262 F���\ - Tel:(760)323-8253 • Fax: (760) 322-8360 • Web: www.ci.pafm-sprmgs.ca.us CITY OF PALM SPRINGS Public Works & Engineering Department P.O. Box 2743 Palm Springs, CA 92263 ADDENDUM NO. 2 To all prospective bidders under Specifications for the Swim Center, Pool House & Concession Stand Improvements, City Project No. 98-21, which are to be received by the City of Palm Springs at the office of the Director of Procurement and Contracting at 3200 E. Tahquitz Canyon Way, Palm Springs, CA 92262, until 3:00 P.M. on Tuesday, March 4, 2003 (as was revised with Addendum No. 1): I. The following changes and clarifications shall be documented and considered as revisions to the project drawings: A. Sheet C-4.4 (4 of 57) shows the required installation of new pool equipment. With regard to the new heaters to be installed within the existing swim center mechanical room, in the event the new equipment will not physically fit through the existing doorway and into the existing swim center mechanical room, the Contractor shall be responsible for removal and replacement of the exterior CMU block wall of the mechanical room as required to deliver, furnish and install the specified heater equipment. All existing conduit, conductors, equipment and appurtenances currently attached or adjacent to the exterior wall to be protected in place, shall be removed and reinstalled as required. The cost of this required work shall be considered as included in the lump sum bid for Bid Schedule A, and no additional compensation shall be allowed therefore. B. Sheet A-2.0 (7 of 57) shows an entry/exit gate between the new locker room/rest room building and the administration/concession stand building, as well as separate entrance and exit gates to the Skate Park. An asterik (*) indicates that the 8' high wall connected to the east side of the administration/concession stand building, as well as the separate entrance and exit gates to the Skate Park and 8' high wrought iron fence are to be coordinated with construction as part of City Project 02-23. The asterik (*) indication referring to the 8' high wall connected to the east side of the administration/concession stand building is incorrect. This wall is to be constructed as part of the new administration/concession stand building, included in the scope of work identified by Bid Schedule B, and is more clearly shown on Sheet S-2.1 (25 of 57). Sheet S-2.1 identifies this wall, as well as the other walls that are part of the Skate Park entrance, all of which shall be constructed as part of the work included in Bid Schedule B. Post Office Box 2743 0 Palm Springs, California 92263-2743 Swim Center, Pool House&Concession Stand Improvements City Project 98-21 Addendum No.2 February 20,2003 C. Sheet A-2.0 (7 of 57), as well as the "Detail Grades Adjacent to Building" Detail, provided on Sheet C-4.2 (57 of 57), shows the Swim Center entry/exit gate located between the new locker room/rest room building and the administration/concession stand building; as well as the Skate Park separate entrance and exit gates. The asterik (*) indication should also refer to the Swim Center entry/exit gate located between the new locker room/rest room building and the administration/concession stand building. This gate, as well as the other 8' high wrought iron fence and Skate Park entrance and exit gates are within the scope of work included with the Palm Springs Skate Park Construction, City Project 02-23. The Contractor shall not include the cost of furnishing and installing these gates or wrought iron fence;these gates and fence will be furnished and installed as part of the construction, under separate contract, of the Palm Springs Skate Park, City Project 02-23. II. The Special Provisions as originally issued shall be used in submitting bids, and an acknowledgment of receipt of this Addendum No. 2 shall be entered on Page 2 of the Bid forms. Failure to provide such acknowledgment shall render the bid as non- responsive and subject to rejection. Date: February 20, 2003 BY ORDER OF THE CITY OF PALM SPRINGS By dxL David J. Barakian, PE Director of Public Works/City Engineer Civil Engineer C 28931 �t LI `'* 'I, City of Palm Springs i Department of Public Works and Engineering �`� �n"��„ �� 3200 P"'Pahquitz Canyon Way • Palm Springs, California 92262 o Tel: (760)323-8253 • Pax: (760)322-8360 • Web:www.ci.palm-springs.ca.us CITY OF PALM SPRINGS Public Works & Engineering Department P.O. Box 2743 Palm Springs, CA 92263 ADDENDUM NO. 4 To all prospective bidders under Specifications for the Swim Center, Pool House & Concession Stand Improvements; City Project No. 98-21, which are to be received by the City of Palm Springs at the office of the Director of Procurement and Contracting at 3200 E. Tahquitz Canyon Way, Palm Springs, CA 92262, until 3:00 P.M. on Tuesday, March 11, 2003 (as was revised with Addendum No. 3): I. The following changes shall be made in Part III - Technical Specifications: A. Add the following Section 1 .06 "Swimming Pool" to Section 01561, Temporary Environmental Controls: The City of Palm Springs will be responsible for emptying and removing a sufficient volume of water from the swimming pool facility to allow for the removal and replacement of all required swimming pool equipment, as well as temporary filtration and chemical treatment of the swimming pool facility during construction. B. Section 10170 "Plastic Toilet/Shower Compartments", Part 2 - Products, Subsection 2.02 - Materials, specifies solid phenolic and polymer toilet partitions. Addendum No. 3 clarified that solid phenolic core toilet partitions were to be used. Addendum No. 3 was in error. Solid plastic (polymer) toilet partitions as specified in Section 10170 (solid polymer resin with homogenous color, minimum 1" thick, seamless construction and edges eased) shall be used. ll. The following changes and clarifications shall be documented and considered as revisions to the project drawings: A. Detail 3 "Overhead @ Women's Shower-103" on Sheet A8.0 (18 of 57) shows the specified (T-Bar) ceiling mounted directly to roof joists. The following additional provisions and details shall be considered as included in the Detail, and elsewhere where this connection detail would be required: 1 . Suspend Tee's from plywood sheathing directly below roof channels. 2. Attach edge moldings to top chord of steel bar joists and T.S. louver headers with TEK screws @ 24" o.c. 3. Ceiling slope to follow roof slope. 4. Manufacturer to verify ceiling mounting acceptability prior t`o)installation. f tl r Post Office Box 2743 • Palm Springs, California 92263-2743 f M Swim Center, Pool House&Concession Stand Improvements City Project 98-21 Addendum No.4 February 28, 2003 III. The Special Provisions as originally issued shall be used in submitting bids, and an acknowledgment of receipt of this Addendum No. 4 shall be entered on Page 2 of the Bid forms. Failure to provide such acknowledgment shall render the bid as non- responsive and subject to rejection. Date: February 28, 2003 BY ORDER OF THE CITY OF PALM SPRINGS By r7 Cam( Marcus L. Fuller, PE Acting Director of Public Works/City Engineer Civil Engineer C 57271 d fz 1 J, No,3547 CITY OF PALM SPRINGS NOTICE INVITING BIDS `„) , rLbQ For constructing: SWIM Center, Pool House & .1, � _ConcesslorrSiantl-Improver'nents-- u ` - City Project 98-21 10e fi,;' NOTICE IS HEREBY GIVEN that sealed bids for for the pro Center, Coal House 9 Concession1, willbe Stand Improvements, of ] Protect or of will be received at the office of the Director l Procure- ment ment and Contracting of the City of Palm Springgs, at which t until 2.they P.M. on February ad 2003, at which time they will he opened and read aloud. N-2 DESCRIPTION OF THE WORK: The Work comprises the construction of a new bath and PROOF OF PUBLICATION locker roam facility and concession/administration e- building, complete with all required fixtures; re- moval and replacement of existing swim center filtration, heating and chemical equipment and (20I5.5.C.C.P) systems, complete and in place; and all appurte- nant work.The work shall he coordinated with the concurrent construction of the separately bid con- tract for the Palm Springs Skate Park Construc- tion, City Project 02-23. In submitting a bid, bid- ders agree to all required coordination efforts necessary to stage,phase, and schedule its work to be consistent with the timing of concurrent construction by other contractors that will be pre- paring portions of the job site in advance of, con- current with, or after the work that Is necessary as part of this contract. STATE OF CALIFORNIA N-3 AWARD OF CONTRACT: (a)The City reserves the right after opening bids - County Of Riverside to reject any or all bids, to waive any informality - - - — - - --- - - (non-responsiveness) in a bid, or to make award to the lowest responsive, responsible bidder on - -- the basis of the total sum of Bid Schedule A, B, and Additive Bid Schedule C, and retest all other bids,as It may best serve the interest of the City. Bidders shall bid on all Bid Schedules. to)As a condition of award,the successful bidder will be required to submit payment and perfor- mance hands and Insurance N-4 BID SECURITY:each bid shall be acconi nied by a certified or cashier's check or Bid Bond in the amount of 10 percent of the total bid pprice I am citizen of the[lolled States And a resident Of of the total sum of Bid Schedule A, B,and ddi- A trve Bid Schedule C, payable to the City of Palm Springs. the County aforesaid; I am over the age of eighteen N-5 BIDS TO REMAIN OPEN: The Bidder shall year's,and not a party t0 or interested in the guarantee the Total Bid Price for a period of 60 above-entitled matter.I am the principal clerk Of a calendar days from the date of bid opening. printer Of the,DESERT SUN PUBLISHING N-6 CONTRACTOR'S LICENSE CLASSIFICA- TION:The contractor shall a times a valid class B Contractor license h the Line of salad Class bids. printed and published in the city of Palm Springs, N-7 PREVAILING WAGE RATES NOT APPLICA- County of Riverside,and which newspaper has been BLE: Funding for the Work is with all local funds adjudged anewspaper of general circulation by the and,as provided under City Charter,will NOT re- quire compliance with the prevailing wage re- Superior Court of the County of Riverside,State of quirements of the State of California. California under the date of March 24,1988.Case N-8 RETAINAGE FROM PAYMENTS: The Con- tractor may elect to reserve 100 percent of ay- Number 191236;that the notice,of which the ments due under the Contract Documents pay- Number annexed is a printed copy(set in type time to time, without retention of any portion of not smaller the payment by the Clty, by depositing securities of aq uivalent value with the Cdy in accordance than non pariel,has been published in each regular with the provisions of Section 22300 of the Public and entire issue of said newspaper and not in any Contract Code. supplement thereof on the following dates,t0 wit: N-9 PRE-BID VISIT TO WORK SITE: Prospective bidders are required to attend a pre-bid walk through of the proposed work site yand-existing January 25t1r,February 1st facilities. .M bon Feibruary11,,conducted0 Bidders should -------------_ ------------______________ meet at the Community Center located on Pavil- ion Way, in the Sunrise Park grounds. Failure to participate in the pre-bid walk through may ren- der a bidder as non-responsive. '----------- OBTAINING OR INSPECTING CONTRACT DOCUMENTS: All in the year 2003 DOCUMENTS: (a)Contract Documents may City inspected without I certify (Or declare under penalty of perjury that the charge at the office of the, P Engl peer, , CA foregoing is true and correct. East Tahquitz Canyon Way, Palm Springs, CA 92262. 3rd (b) Complete sets of said Contract Documents Dated at Palm Springs,California this-------------daymay be ppurchased at$75.00 per set and are ob- joinable fmm the office of the City Engineer,3200 F¢bl"UarY East Tahquitz Canyon Way, Palm Springs, CA 92262 No refund will he made of any charges for Of_____________________________________ 2003 sets of Contract Documents. n li An ad fee of$35.00 will be charged for se sets of documents sent by mail `----- ---------J------------------------------- N-11 ADDRESS AND MARKING OF BIDS: The envelope enclosing the Bid shall be sealed and Signature addressed to the City of Palm Springs, and shall be delivered or marled to the Director of Procure- ment and Contracting at 3200 East Tahquitz Can- yon Way, Palm Springs, CA 92262.The envelope shall be plainly marked in the upper left hand cor- ner with the name and address of the Bidder and shall bear the words "Bid For..." followed by the title of the Project and the date and hour of open- ing Bids. The certified or cashier's check or Bid Bond shall be enclosed in the same envelope with the Bid Date By/s/David J. Betaken, PE,'- r of P ' lic Works/City Engineer MINUTE ORDER NO. REJECTING ALL BIDS FOR THE SWIM CENTER, POOL HOUSE & CONCESSION STAND IMPROVEMENTS, CITY PROJECT 98-21;AND AUTHORIZING RE-BIDDING OF BID SCHEDULE A (SWIM CENTER EQUIPMENT REPLACEMENT) AND BID SCHEDULE C (POOL DECK RESURFACING) ONLY I HEREBY CERTIFY that this Minute Order, rejecting all bids for the Swim Center, PoolHouse & Concession Stand Improvements, City Project 98-21; and authorizing re-bidding of Bid Schedule A (swim center equipment replacement) and Bid Schedule C (pool deck resurfacing) only, was adopted by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 2"a day of April, 2003. PATRICIA A. SANDERS City Clerk