HomeMy WebLinkAbout7/2/2003 - STAFF REPORTS (23) DATE: July 2, 2003
TO: City Council
FROM: Director of Public Works/City Engineer
APPROVE ENGINEERS REPORTAND RESOLUTION FORMING PARKWAYS MAINTENANCE
DISTRICT NO. 10 FOR "MOUNTAIN GATE" TRACT 30963
RECOMMENDATION:
That City Council approve an Engineer's Report regarding annual maintenance costs for off-site
landscaped parkways and approve a Resolution authorizing the formation of Parkways
Maintenance District No. 10 for a new 308 home subdivision at Highway 111 & Gateway Drive
called"Mountain Gate"Tract 30963.The development is by Century Crowell Communities(Century
Vintage Homes). This formation is being done under the Landscaping and Lighting Act of 1972 &
Proposition 218 legal procedures.
SUMMARY:
Century Vintage Homes, the property owner, has submitted a signed petition"Ballot" and a written
"Waiver of Notice of Hearing", waiving the 45-day notice requirement as a sole-owner developer
to form the referenced parkways maintenance district for Tract 30963. This will enable the annual
maintenance costs of the landscaped parkways to be placed on the Riverside County Tax
Assessors assessment rolls forfiscal year 2003/04 and on-going future years for the 308 proposed
single family homes within proposed Parkways Maintenance District No. 10 (PMD#10).
BACKGROUND:
On February 26, 2003 the City Council approved the Planned Development District (PDD) for
"Mountain Gate"Tract 30963 for a 308 unit single family home subdivision located at the northeast
corner of Highway 111 &Gateway Drive. The developer is Century Crowell Communities(Century
Vintage Homes) based in San Bernardino. The principals of Century have signed a petition
requesting the proposed Parkways District#10 formation referenced above. The project will be
built in fourteen phases on 83 acres over a period of 2 years or less, but the off-site parkways
landscaping will be installed in the first year of construction.
The proposed landscaping will include: palm trees,turfed areas with mow strips,desert indigenous
-trees & ground cover, annual flowers, a sprinkler irrigation & emitter drip system, walkways, and
retention basin at the following locations: Highway 111; Two entryway gates at 1. Gateway Drive
entry&2. Tramview Rd. entry; Hwy. 111 Retention Basin; end of street landscape at: Pamela Dr.;
Video Rd.; Lawrence Circle; Alberto Cir.; Jiminez Circle. The developer will install the referenced
landscaped parkways and gated entrys, including the irrigation system and all related landscape
&streetscape work at their own expense and the on-going maintenance costs will be placed on the
tax rolls to be paid annually by the property owners within the tract. The firm proposed to maintain
the landscaping will be"Pac West Land Care, Inc.",which currently maintains all of the City's other
parkways maintenance districts,as well as City Facilities,City parks and center medians. Pac West
provided the maintenance costs referenced in the Engineer's Report for PMD No. 10.
On April 2nd City Council approved the hiring of Albert A. Webb Associates as the Assessment
Engineer for the project and on June 11th City Council approved the resolution of intention for
Assessment District 161 forthe construction of streets,sewer,storm drains,water and other public
improvements for Tract 30963. The AD 161 Public Hearing is scheduled for July 30, 2003.
PMD No. 10 will include an annual "Consumers Price All Items Index" (All Urban Consumers)
automatic adjustment based on the greater Los Angeles- Riverside- Orange Counties regional
Consumers Price Index(CPI) to cover expected annual inflationary increases for labor, materials,
c2aA
PMD#10 Mountain Gate Tract 30963-page 2
water usage and SCE energy cost increases anticipated over future years. The Engineer's Report
for PMD#10 is on file in the City Clerk's office.
The City Council will not be required to conduct a Public Hearing, due to the attached Waiver,
signed by the developer's representative as current sole owner of the 83 acre subdivision. City
Council will be asked to consider approval of a Resolution approving the Engineer's Report and
ordering improvements forming Parkways Maintenance District No. 10.
The developer previously deposited$10,000 with the City to coverthe City's formation costs for the
proposed 1913/1915 Acts District and new Parkways Maintenance District#10. Those funds have
been established in account number 261-4492-43200, which will be used as the expenditure
account for this initial formation phase of the two proposed districts.
This proposed parkways maintenance district is being formed under the"Landscaping and Lighting
Act of 1972" (Division 15, Part 2 of the California Streets and Highways Code) and Article X111 D,
Section 4, of the California Constitution (Proposition 218).
There is no cost to the City for this maintenance district since all costs are either paid for by the
developer or assessed to the property owners on the annual assessors tax rolls since it has been
determined that all 308 properties within the subdivision receive special benefit from the proposed
landscaped parkways. /
�a-..+.mow yw�✓,� .d'� ems'
ROBERT L. MOHLER DAVID J. BARAKIAN
Grants & Government Affairs Manager Director of Public Works/City Engineer
APPROVED:
City Manager
ATTACHMENTS:
1. Signed petition "Ballot" from project Developer (as sole-landowner Century Homes)
2. "Waiver of Notice of Hearing" (waiving 45-day notice requirement as sole-landowner)
3. Engineer's Report dated June 5, 2003
4. District Boundary Map
5. Resolution approving Engineer's Report (FY 03/04 Assessment) and authorizing
the improvements, forming Parkways Maintenance District No.10
REVIEWED BY DEPT.OF FINANCE
H,\BobM\Data\Document\PMD10.Mounta in Gate.Formation.Res.7-2-03 IG+
aa�4 a-
DATE: June 5, 2003
AGENCY: City of Palm Springs
PROJECT: Parkways Maintenance District No. 10 "Mountain Gate Tract 30963"
(Northeast corner of Highway I I I (N. Palm Canyon) & Gateway Drive)
FISCAL YEAR: July 1, 2003 through June 30, 2004
.FROM: David J. Barakian, Director of Public Works/City Engineer
(Prepared by Robert L. Mohler, Grants and Government Affairs Manager)
PRELIMINARY ENGINEER'S REPORT
A. PARKWAY MAINTENANCE ANNUAL COSTS
1. Hwy. I I I & Gateway Dr. & certain public areas of Tr.30963
(Maintenance Cost Est. by Pac West Land Care, Inc.)* $42,234.00
2. a. Electrical for Sprinkler Controllers & Ground Lighting
(RGA Landscape Architects- Cost,Estimate)** 4,500.00
b. Desert Water Agency Provided Water (for Irrigation)**
(Estimated Water Costs) 36,500.00
SUBTOTAL 1 & 2 83,234.00
3. a. Maintenance, Parts and Repairs
(Estimated 5%) _ _ 4,162.00
b. City Administration Costs (Est. 10%) 8,323.00
TOTAL COSTS ESTIMATED FOR 2003/04 $95,719.00
B. NUMBER OF PARCELS IN DISTRICT - One (1) currently- (308 lots in future)
C. AMOUNT TO ASSESSMENT IN 2003/04 $959719.00
(To be assessed to Assessors Parcel No. 669-340-001-9 to
Century Vintage Homes as sole current land owner)
D. ANNUAL COSTS PER EACH PARCEL (FUTURE AMOUNTS TO ASSESSMENT)
Lots 1 thru 308- Tract No. 30963 (Future proportionate share = $310.78 aver. per lot)
E. See City Account No. 001-2451-43590 for budget detail
This report has been prepared pursuant to the "Landscaping and Lighting Act of 1972"
(DIVISION 15, PART 2 of the Streets & Highways' Code) and Article XIIID, Part 4 of the
California Constitution (Proposition 218). Note: PMD#10 shall include an annual "Consumers
Price All Items Index" (All Urban Consumers) based on the Los Angeles-Riverside-Orange
County regional Consumers Price Index (CPI) to cover expected future labor, material, water
& electrical costs anticipated for Parkways Maintenance District No. 10.
Dated:
David J. Barakian, PE RCE 28931
Director of Public Works/City Engineer
* Exhibit "A"- Cost Est. from Pac West Land Care, Inc. dated June 3, 2003 (2 pgs.
** Exhibit "B"- Cost Est. from RGA Landscape Architects, Inc. dated May 21, 2003(2 pgs.)pCoZ/Q 3
— ___ �—. •--.._. .-� r_� .�� �m .�� .�.� .yam ,a'� .� '� � � �� ,�'
ASSESSMENT DIAGRAM FOR T ' OF ' aeT
PARKWAYS MAINTENANCE DISTRICT NO. 10
"MOUNTAIN GATE"TRACT 30963
CITY OF PALM SPRNG.% COUNTY OF RIVERSEF, STATE OF CALAFORMA
RIS—WY 0= 2W3 AT TE M%q W =72uc}DOVAMMY
_OIILI%_M.➢!9]l(_ lli ff W}9[i A95E>9F]R
A'O,YMWIiY FM➢.ii¢9 OLSIII]Ci$iN TIE"FIB ff"RE plHly
AFL 4!TI£0IT'ff M1I\IISll£SLATE ff f 12 19 I , I !1 6i] I e 19 I f0 f2 11f i I2Y1211?212312,1012612J 12B 3,132911a�9�
GMT 1.RSO NI14iSL£NAPY A5�]R-0.EA(-fEiIIQA L.���_ALTA MIW�—L_L.��( I yJ"fiyR_TI�r uJ_ `I IIII 1I1 I I293U I
m"]rc J:� a�1f3 ez v�T1 r\.V---T-T-r T _LJ sumN Rxv�� y.Jr,% 2
� IItlI �— I I—I i �I �In 74 I j � � A� I�I�•I�I�I�I� ��� raj<�—
FIlEO SN TrE ffFL�6 TI£9f£R➢IIF]fF11T a sIIEEl9 OF LE II I L I —L I 192 14, 1 i I I I I ��� i I` I I I -f r �y —iI w 1 A ilE cm n=PALR 6Pnws Tl�_MY of .2m3. 10 I �J�T7�ATxTAT-Li_fl `.L_L. �L—L_j__� 1 S L11�I LIB
a snEE,s.cm PALM seH]wS -1 F— �rTTT�--,---.-� _'7 Nm] 2z
srATE nnug"r+rA 1w ]02 1w 1W se m GG s! I I I 1 I7 I- �a_{ 1
5 1 1 1 1 1 1 1 1 P11 �1 AS W 1571 S 1531521!]IlGI�I
M ASES4IXf MI5 LEVffD GY T!E CL pAfgL LF TE CSir ff 1M ]C9 110 111 „2 113 114 IIT''1
P.VJI SAII69 W"RE LOTH PIECEq AIU PME"lS CF LNO 3f.1N ,W I I i�� 1 1115 I ff6I 15 11!]I,LE�I 1521LL]53115,I]55 ]SS / I 157 15g]•�1Gp f6f]62,6316,f� ]e]1'� 3��—I
R1 TIC ASEE4,piF OIAfNAN[ry TIE_G,Y IF_503. I-,m-I `�J_ LTA LOryT-J"1—�L_lJ V—LLALTAC4NA 1�_L_J�r I I I I I I I I y 1 I--
SAID ASSE9QII oiAERVI Aw T]E AS439ENi{¢L IEiE FEmnm �e�T—TT
➢1 TIE LFF]�6 TIE 91gA]NIEIff]R,r1
ff 2W3.]FFEfptE s WIE io liE ASgS4E}:F M ,w 1 ,a 11241 -1 f22 ,2f I 1 1 s�1p I�114104a4l TT—��� r,�_110
)SGE��"�''L »» P: -- y1 I 1>2G „s ,,. „) � � j �- -' al , ,),�—IW!� �NLA� i , 01,., 11\1 j„ nj6lll�I 1 ],
FIlID III TF£6FL£6 TIE cm QFA(OF T1£CIFY 6 PILf !f� --r J �•A " 13
ST@l9.SFAM OF rAI W IA T _61Y fF 2W3 ` 1 /
Tom\ \ y AL TA
I >517, I y ) i'I�� ell ICI I i—IT�-,--T---, LTAn��-T"fZ —j W F—
�-faoJ 7] 7L 62 I�InI$I=Iulasl. 15,IlGI,N.el„1,61,51,1 \Yip,` 14
SITE a ,
/ 1 1 n AR%ZS6 PAF,M W.659-3I0-W1-9
ASS`E 9p W. CCtl01
Irb TRACT AV. 30963-1 7-LOTS 6.14 AO;ES
VICINITY MAP
�b � a' TRACT M7. 3O964-2 1W-Lars 60.E AGES
N.T.S. x]1A otq '1ej�.O. tf
` h o I TRACT AtJ. 3O5Ci3-3 107-cars P735 Af1E5
'j A L! E R i A. THIS A`31YQIF pTAfAM 6F£L]LY`SAi9 E4H 9FPMITE LGF RJ TOTAL- ,:1'l4=L07S 83M ADZ" NOT 1D SCµE
W PARtl OF L.VO IIIIFM MIMM TE PGlE1Mffi Cf TI£
lSS 06TPILT FW RTATLS mff3HLG TIE LIIEh AIO
•� �1�. OLE,SIlMI"S 6 LOIS 01 PAHIIv FEFFA To T!E OANFy A53Ev$S pl� M. �jjt'OY-6
5 5 011 C A i E$ AR£5II' i5 WPS FLP FIYN.YEM 2KQ4[03, A54'.SET/T ID, Oq'Nl3
W.O. Oa-0410
CITY OF PALM SPRINGS
PARKWAYS MAINTENANCE DISTRICT NO. 10
MOUNTAIN GATE, TRACT NO. 30963
WAIVER OF NOTICE OF HEARING
TO: The Honorable City Council of the City of Palm Springs:
The undersigned, being an authorized representative of the legal owner of Tract
No. 30963 in the City of Palm Springs, does hereby represent the following:
1) The City Council of the City of Palm Springs ("Council' and "City",
respectively) is taking proceedings to:
a) Subdivided Tract No. 30963 into 308 residential lots; and
b) Form Parkways Maintenance District No. 10 wider the
Landscaping and Lighting District Act of 1972 and in accordance with the legal
requirements of Article XIIIC of the Constitution of the State of California (Proposition
No. 218).
2) Proceedings wider lb) above must be completed prior to August 10, 2003,
in order that maintenance assessments on the property in Tract No. 30963 may be placed
thereon by the Riverside County Recorder for Fiscal Year 2003-2004 as required by the
City.
3) The undersigned does hereby waive for itself and its assigns all notices
and other communications with respect to such proceedings described in Section 1)b)
hereof and consents to the completion of such proceedings at the earliest possible time,
but in no event later than August 7, 2003, in order that such assessments may be levied
and collected in Fiscal Year 2003-2004.
Dated this " 3 _day of Ate, 2003.
CENTURY CROWELL COMMUNITIES
(CENTURY VINTAGE HOMES)
Mountain Gate Palm Springs Ventures,LLC
By: l - &
Title: A A Kel
1003/008/24700 vl a /�
BALLOT
PARKWAYS MAINTENANCE DISTRICT NO. 10
Parcel Number: Tract 30963 (APN 669-340-001-9)
Record Owner: Century Crowell Communities (Century Vintage Homes)
Mountain Gate Palm Springs Ventures, LLC
Address: 1535 South"D" Street, Suite 200
San Bernardino, CA 92408
Phone: (909) 381-6007 FAX: (909) 381-0041
YES, I APPROVE the proposed annual assessment of$95,719.00,
adjusted annually for inflation, on the parcel identified on this
ballot. (308 parcels x $310:78 per parcel= $95,719.00 total)
NO, I DO NOT APPROVE the proposed assessment on this
parcel.
Signature of Record Order, or Authorized Representative if the parcel is owned
by other than an individual.
RETURN THIS BALLOT TO:
City of Palm Springs
Parkways Maintenance District No. 10 Assessment District
P. 0. Box 2743
322 E. Tahquitz Canyon Way
Palm Springs, CA 92263
Your completed ballot may be mailed or personally delivered, but it must be received
prior to the end of the public hearing on August 10, 2003. Incomplete, late or unsigned
ballots will not be considered in the tabulation.
1003/008/24723 vl ���
t
City of Palm Springs
FAX TRANSMITTAL
DATE: JUKE 24,2003
FROM: Robert L. Mohler
Grants & Government Affairs Manager
CITY OF PALM SPRINGS
Public Works & Engineering Department
3200 E. Tahquitz Canyon Way (P.O. Box 2743)
Palm Springs, CA. 92263-2743 Phone: (760) 323-8250/ Fax 322-8360
BobM@ci.palm-springs.ca.us
TO: "Mountain Gate" SPECIAL DISTRICTS FORMATION TEAM:
1. Suzanne Harrell- Harrell & Co. (Financial Advisor)- Orange. (Fax 714-939-1462)
2. Paul Thompson &Merle Schulze-Webb Associates- Riverside (Fax 909-788-4139)
3. Sara Oberlies, Stone & Youngberg(Bond Underwriters)-LA (Fax 213-443-5023)
4. Carlos Cueva/Marty Butler- Century Vintage Homes- San Bern. (Fax 909-381-2617)
5. Urb Schreiner,Bond Counsel-Aleshire & Wynder- Irvine (Fax 949-223-1180)
SUBJECT: "MOUNTAIN GATE" Tract 30963 by Century Vintage Homes
Assessment District No. 161 (formation approved June 11, 2003)
REGARDING: PROPOSAL from EMPIRE ECONOMICS (Joseph T. Janczyk, PH.D)
MARKET ABSORPTION STUDY
This morning I received a written proposal from Joe Janczyk(at my request)to perform the
Market Absorption Study for the newly formed AD 161. Mr. Janczyk has operated as the
City's Market Absorption Analyst on 3 previous proposed Special Districts(in the mid-1990s)
and this would be his 4' assignment for the City. (See attached proposal- 11 pgs.)
Mr. Janczyk will need to work closely with the proposed Real Estate Appraiser,who is to be
selected by the Bond Underwriter and City hopefully this week.Both separate contracts should
be well under the amount requiring City Council approval, so their separate agreements
(Appraiser &Market Analyst) can be approved by the City Manager via Harold Good,Dir.
of Procurement & Contracting. The costs of the 2 consultants will be paid for by Century
Crowell Communities (Century Vintage Homes) as part of the AD 161 formation process.
NOTE: Please respond ASAP if you wish to provide comments. Thanks,
cc: Harold Good, Director of Procurement & Contracting
Dave Barakian, Director of Public Works/City Engineer
Trisha Sanders, City Clerk c/o Barbara White,Asst. City Clerk -
Tom Kanarr, Director of Finance/City Engineer
Troy Butzlaff,Assistant City Manager
PAGE 1 OF 12 PAGES I a
SCOPE OF SERVICES
MARKET ABSORPTION STUDY
CITY OF PALM SPRINGS
ASSESSMENT DISTRICT NO. 161
(MOUNTAIN GATE)
f� 1pp3
LP\NGl
SP
Prepared
for
City of Palm Springs
Attention: Mr. Robert L. Mohler
Prepared
by
Joseph T. Janczyk, Ph.D.
Empire Economics, Inc.
35505 Camino Capistrano, Suite 200
Capistrano Beach, CA 92624
June 19, 2003
Page 1
EMPIRE ECONOMICS, INC
Economic-Real Estate Consultants
Joseph T. Janczyk, Ph.D. _
35505 Camino Capistrano, Suite 200
Capistrano Beach, CA 92624
Phone: (949) 661-7012
Fax: (949) 661-8763
June 19,2003
Mr. Robert L. Mohler
Grants and Government Affairs Manager
City of Palm Springs
Public Works &Engineering Department
3200 E. Tahquitz Canyon Way (P.O. Box 2743)
Palm Springs, 92263-2743
Re: Market Absorption Study—Statement of Qualifications and Scope of Services
Assessment District No. 161 (Mountain Gate)
Dear Bob,
Empire Economics is pleased to provide you with a Statement of Qualifications and Scope of Services for the
Market Absorption Study for the City of Palm Springs Assessment District No.161; this is hereafter referred to
as AD No.161 (Mountain Gate).
The Market Absorption Study will provide the Bond Issue with a strong credit foundation, and also protect the
Issuer, based upon the following factors:
➢ A comprehensive analysis of the economic environment within which the AD No.161 (Mountain Gate
Residential Project) will be marketing their residential products. Although the United States economy is
currently experiencing a slowdown, Southern California's and Riverside County's economic prospects
are more favorable, for a variety of reasons which will be discussed in the Study. Consequently, an
understanding of the economic conditions for Southern California and Riverside County should prove to
be beneficial to the AD No.161 (Mountain Gate)Bond Issue.
➢ The Market Absorption Study will utilize the Empire Economics' 2003 Economic Model which
incorporates the actual annualized full data for 2002 on employment, construction activity and prices as
well as the new economic forecasts for 2003-2010+ time period, based upon the most recent forecasts
by UCLA, DRI and Chapman University, among others. Furthermore, comprehensive surveys of the
prices, sales rates and other characteristics of the currently active projects in the competitive Housing
Market Area will be conducted.
Page 2
➢ The Market Absorption Study, Summary and Delivery Letter will be distributed via E-Mail in PDF
format to facilitate its distribution and also its use in the Official Statement.
➢ Empire Economics will arrive at an estimate of the competitive market prices for the forthcoming
residential products in AD No.161 (Mountain Gate), and then confirm that the Special Assessments and
ad valorem property taxes for AD No.161 residential projects are within the City of Palm Springs's
policy guidelines.
➢ Empire Economics will arrive at the following market demand and absorption schedules for AD No.161
(Mountain Gate):
Aggregate Absorption Schedule—Entire Project
Absorption Schedules for Each Product Type
➢ Empire Economics will provide the appraiser with the absorption schedule for the discounted cash flow
analysis, a critical factor in arriving at the appraised value of AD No.161 (Mountain Gate).
As the Statement of Qualifications and Scope of Services will demonstrate, Empire Economics is well suited to
perform the Market Absorption Study for AD No.161 (Mountain Gate),based upon the following:
➢ Strong professional credentials.
➢ Extensive experience with land-secured financings.
➢ Credibility with rating agencies/bond funds.
➢ Competitive fee structure.
➢ Capability of completing the Study in a timely manner.
➢ Protecting the Issuer from potential market study liability.
Accordingly, the combination of these factors results in a Market Absorption Study which has a high degree of
credibility in the municipal marketplace, and, as such, strengthens the demand for the bonds (resulting in a more
competitive interest rate). Furthermore, Empire Economics' policies of conducting thorough research as well as
being fully insured protects the Issuer, the City of Palm Springs, from potential liability associated with the
Market Absorption Study.
If you have any additional comments or considerations, please contact me as I would be pleased to respond to
them.
I am looking forward to assisting you with the Bond Financing for AD No.161 (Mountain Gate)Bond Issue.
Sincerely,
o e anczyk,Ph.D.
E is Consultant
JTJ:rm
Page 3
SYNOPSIS OF EMPIRE ECONOMICS'
STATEMENT OF QUALIFICATIONS
AND SCOPE OF SERVICES
1. Credentials/Qualifications and Bond Financing Experience
Market Studies for Municipal Bond Issues: 1980-2002 $8+Billion
(Market Studies Conducted on behalf of Public Entities Only)
Mello-Roos/Assessment District Bond Issues: 200+Bond Issues for $4+Billion
Riverside County Mortgage Revenue Bond Program:
Market Studies for Bond Issues Amounting to $500+million
"Local" Bond Issues for Planned Communities/Business Parks in Riverside County
Cities of Palm Springs, Beaumont, and Indio
Presentations to Rating Agencies/Bond Funds in New York/Boston/Chicago: 25+times
Featured Speaker at UCLA and Municipal Bond Analysts Seminars: 5+times
Foothill/Eastern Toll Road: $1.8 Billion: Municipal Bond Issue of the Year for 1999
2. Approach to Performing the Market Absorption Study
Market Study Performed by Joseph T. Janczyk, Ph.D.
(Staff assists with compilation of data and market surveys.)
3. Consulting Services to be Performed
Contact with Property Owner to obtain proposed product mix characteristics and market-entry.
Utilize a Consensus Economic Forecast
Perform Comprehensive Competitive Market Analysis for Each Residential Product Type
Estimate Absorption Schedule: For Each Product Ttype
Absorption by Year, Market-Entry to Build-Out
4. Presentation/Dissemination of Absorption Schedules
Competitive Market Prices for Special Assessment Burden
Appraiser: Estimated Absorption Schedule for Discounted Cash Flow
Underwriter: Summary of Market Study for Official Statement
Page 4
5. Time Schedule for Conducting the Market Absorption Study
Preliminary Estimated Absorption Schedules: Week#4
Complete Comprehensive Market Study: Week# 5
6. Factors Underlying the Estimation of the Consulting Fee
Comprehensive Market Study—Approximately 90-100 Pages
Summary of Market Study for Official Statement—About 20 Pages
Certification to Use Market Study Srunmary for Bond Offering
Discussion of Prices/Absorption with the Special Assessment Analyst
Discussion of Absorption with Appraiser
Discussion of Market Study with the Underwriter
to Facilitate Marketing Bonds
Promptly Respond to Queries firom Prospective Bond Purchasers
Consulting Fee: Includes all of the above Reports/Services
7. Protect Issuer from Potential Market Study Liability
Diligent and Thorough Research of Economy, Local Market, and Proposed Project
Comprehensive Insurance Policies; Empire Economics (EE) is fully insured:
* Workmen's Compensation
* Commercial Liability
* Professional Errors/Omissions
Avoid Conflict of Interest
(EE is not providing consulting services to the Property Owner/Builder.)
Please refer to the following pages for a detailed description of Empire Economics' Statement of
Qualifications and Scope of Services.
Page 5
STATEMENT OF QUALIFICATIONS
AND SCOPE OF SERVICES:
DETAILED DESCRIPTION
1. Credentials/Oualifications and Bond Financing Experience
Empire Economics is an economic and real estate consulting firm that specializes in conducting
market absorption studies on behalf of public entities for residential, commercial-retail, and
industrial/office projects located throughout California, with an emphasis on Master Planned
Communities and Business Parks in Southern California, including the County of Riverside.
Empire Economics conducts market absorption studies only for governmental
entities, and this has provided numerous public entities with a high level of
comfort. By comparison, other firms that provide services to developers/builders
may encounter "conflicts of interest" in trying to represent both the private and
public sectors. Empire Economics' approach of representing the public sector also
enhances the credibility of the study in the municipal marketplace.
With respect to the City of Palm Springs's AD No.161 (Mountain Gate)'s Property
Owner (Century Homes), Empire Economics is not providing any consulting
services nor does it contemplate providing such services to the Property Owner
during the foreseeable future.
Empire Economics' experience includes more than $8 billion in municipal tax-exempt issues during
the past twenty years:
EMPIRE ECONOMICS' MUNICIPAL FINANCINGS
OVER $8+ BILLION IN BONDS
ED$4,150,000,000
o$z,T 5 0,0 g 0,0 Og
■$1,700,000,000 -
Fm m Irtg,91 Revenue Bonds MMello Roos/Assessment Districts ❑Transportation Corridors
Page 6
* Mortgage Revenue Bond Financings: Over fifty issues with bonds amounting to over
$1,700,000,000.
* Mello-Roos/Assessment District Financings: More than two-hundred issues with bonds
amounting to more than $4,150,000,000.
* Socioeconomic Forecast/Market Study for the $2,750,000,000+ of the San Joaquin
Hills and Foothill/Eastern Transportation Corridors' Toll Roads located in southern
Orange County; designated as the Municipal Bond Issue of the Year for 1999.
Furthermore, Empire Economics actively participates in numerous municipal bond industry events,
including the following:
➢ UCLA Municipal Bond Financing Seminars: Featured Luncheon Speaker
➢ Municipal Bond Industry Association - Speaker
➢ Best Practices for Continuing Disclosure —Panelist
➢ Rating Agency and Bond Insurer Presentations
* More than 25+Trips to New York/Boston/Chicago
➢ Meetings with Municipal Bond Funds:
* County of Riverside Investor Bond Site Tours
* Mello-Roos Bond Issues—Site Tours: Ladera, Aliso Viejo, and many others
* San Joaquin Hills and Foothill Eastern Corridors:
+ Ten Presentations in New York, Boston, and Chicago to Fifty+Bond Funds
With respect to the County of Riverside, in particular, Empire Economics (EE) has conducted Market
Studies for several of its CFDs and ADs.
Consequently, the Municipal Bond Funds are familiar with Empire Economics and also
the Market Studies that it has conducted for Planned Communities and Business Parks
in Southern California, in general, and Riverside County, in particular. This is
beneficial to the forthcoming Bond Issue for the AD No.161 (Mountain Gate), since
these Market Studies have enabled EE to establish a high degree of credibility with the
municipal Bond Funds and Rating Agencies. Finally, the Bond Funds are also familiar
with EE's Monitoring Reports for Riverside County and Orange County for its Mello-
Roos and Assessment Bond Issues, which provide them with timely information on the
development status of Planned Communities and Business Parks.
Page 7
2. Approach to Performing the Market Absorption Study
Empire Economics' Market Absorption Studies are conducted by Joseph T. Janczyk with assistance
from his staff.
The principal consultant for the Market Absorption Study is Dr. Joseph T. Janczyk. He
will design the economic real estate model for AD No.161 (Mountain Gate) and present
the conclusions to the City of Palm Springs and the Financing Team.
Additionally, he will be assisted by his staff, which will be responsible for the
compilation of the economic and real estate data required for the research and also
conduct market surveys of the comparable/competitive residential projects in the
Market Area.
Copies of the Market Absorption Study will be provided in PDF format to the appropriate parties and
discussed with them; additionally, a "Summary and Conclusions" of the Study will be provided in
PDF format for the Official Statement along with a Closing Certificate upon the Closing of the Bond
Issue. The Market Absorption Study, Summary and Delivery Letter will be distributed via E-Mail in
PDF format to facilitate its distribution and also its use in the Official Statement.
3. Consulting Services to be Performed
The purpose of this section is to provide an overview of the methodology underlying the Market
Absorption Study for AD No.161 (Mountain Gate); accordingly, the primary components are as
follows:
➢ Identification of the Development Status and Proposed Product Mix
The expected number of future housing units in AD No.161 (Mountain Gate) will be
identified based upon the planning approvals for the properties as well as the
development/marketing strategy of Century Homes. Specifically, AD No. 161 is expected
to offer 308 single-family detached homes on some 83 acres, some 4 units per acre.
➢ Macroeconomics Components
Based upon Empire Economics' experience in conducting more than two hundred
Market Studies, these macroeconomic factors are regarded as being the most
significant determinants of the actual performance of Planned Communities and
Business Parks in the marketplace, and, as such, they represent a critical component
of the Market Absorption Study.
* To arrive at long-term employment forecasts, Empire Economics compiles information
from economic forecasts that are available for the Southern California Market Region
and its counties by University of California Los Angeles (UCLA), Data Resources
Institute (DRI), California State University Fullerton (CSUF) and Chapman University
(CU). The use of a Consensus Employment Forecast for the Market Region is
substantiated by a comprehensive study of forecasts that was conducted by the Federal
Reserve Bank of New York which concluded that Consensus Forecasts, defined as
combining the forecasts of several firms or agencies, were found to have a consistently
Page 8
, higher degree of accuracy and reliability than any particular forecaster. Empire
Economics then uses these employment forecasts to derive estimates of the Southern
California's future demand for housing during the foreseeable future.
* Next the proportion of Southern California's future employment, residential,
commercial-retail and industrial/office growth that is expected to be captured by the
County of Riverside and the Market Area for AD No.161 (Mountain Gate) is
estimated. Southern California (SC), as a whole, essentially represents a self-contained
equilibrium with respect to employment and housing because the vast majority of
households employed in SC also have their primary residences in SC. Within Riverside
Comity, special consideration is given to the Coachella Valley and the City of Palm
Springs, with regards to their attractiveness for second-homes, primarily from
households that reside in Southern California.
➢ Microeconomics Components
* The microeconomic analysis focuses upon the competitiveness of the forthcoming
projects/products in AD No.161 (Mountain Gate), as compared to the competing
Planned Communities and other residential projects within the Market Area. The
analysis deals with various regional factors as well as the specific features/attributes of
the District's forthcoming projects.
* The competitiveness of AD No.161 (Mountain Gate)'s housing products is evaluated by
performing a systematic analysis of the expected characteristics of the forthcoming
projects/product types in the District with the comparable/competing projects in the
Competitive Market Area. Specifically, this involves a consideration of their respective
locations, prices, lot sizes, living areas, Special Taxes/Assessments, amenities, and
other factors. The result of this analysis is the competitiveness, and hence the capture
rate, for AD No.161 (Mountain Gate)'s products in the marketplace.
➢ Absorption Schedules
The market absorption schedules for the forthcoming residential single-family homes in AD No.161
(Mountain Gate) are presented in the following manner:
♦ Absorption Schedule for AD No.161 (Mountain Gate): This analyzes
the market demand and supply conditions for AD No.161 (Mountain Gate)
as a whole.
♦ Specific Absorption Schedules for AD No.161 Product Types: This
analyzes the market demand and supply conditions for each of the
residential product types in AD No.161 (Mountain Gate).
Therefore, the Market Absorption Study systematically proceeds from the macroeconomic analysis of
AD No.161 (Mountain Gate) Southern California Market Region's future employment, population,
and housing growth to the microeconomic analysis of the competitiveness of its projects, and then
arrives at the absorption schedules for the residential products, including absorption schedules for each
of the product types in AD No.161 (Mountain Gate).
Page 9
4. Presentation/Dissemination of Absorption Schedules
Based upon Empire Economics' previous experience in conducting Market Absorption Studies,
Empire Economics will provide the key results in a convenient form (PDF forinat) for the other
professionals.
* Special Assessment Analyst: Empire Economics will review the prices that are being
utilized in the Special Assessment Analysis for purposes of estimating the Total Tax
Burden placed upon the fixture homeowners. Additionally, Empire Economics will also
provide the Special Assessment Analyst with the estimated absorption schedules by
various product types so that the amounts of Special Assessments that are expected to
be paid by the developer/builder (as compared to the final-users/homeowners) can be
calculated.
* Appraiser: Empire Economics will provide the Appraiser with absorption schedules
for each of the product types, with respect to the number of units absorbed each year,
from market-entry to build-out.
* Underwriter: Empire Economics will provide copies of the Market Absorption Study
to the members of the finance team in the Bond Issue and furnish a "Summary and
Conclusions" of the Market Absorption Study for use in the Official Statement.
5. Time Schedule for Conducting the Market Absorption Study
Since Empire Economics has a background in performing Market Absorption Studies for Assessment
Districts, the proposed time schedule allows for an interaction with the financing team, so that the final
study is utilized in a timely and effective manner.
Preliminary Estimated Absorption Schedule. . . . . . . . . . . Week #4
Comprehensive Market Absorption Study. . . . . . . . . . . . Week # 5
Therefore, Empire Economics will provide the Special Assessment Analyst and also the Appraiser
with the information that they need in a timely manner so that they can proceed with their analysis, and
Empire Economics will deliver the Market Absorption Study five weeks after receiving authorization
from the City of Palm Springs to proceed.
Page 10
6. Factors Underlying the Estimation of the Consulting Fee
Empire Economics' fee schedule is based upon the costs of providing consulting services for a Market
Absorption Study that is appropriate for a Municipal Bond Financing. Specifically, the
comprehensiveness and scope of these consulting services are obtained from discussions with
prospective bond purchasers, the Bond Funds. Empire Economics maintains contact with the Bond
Funds through seminars, meetings, and telephone conversations. Accordingly, the services are as
follows:
➢ Comprehensive Market Study(PDF Format)
➢ Summary of Market Study(PDF Format) for Official Statement
➢ Certification to Use the Market Study Summary for the Bond Offering
➢ Discussion of Prices/Absorption with Special Assessment Analyst
➢ Discussion of Absorption with Appraiser
➢ Discussion of Market Study with the Underwriter to Facilitate Marketing Bonds
➢ Prompt Responsiveness to Queries from Prospective Bond Purchasers
The financial consideration for conducting the Market Absorption Study for AD No.161
(Mountain Gate) is as follows:
Comprehensive Market Absorption Study: Fee: $12,750
The Market Study fee of$12,750 includes all the services designated above.
The consulting fee will be billed as a retainer upon commencing research and then a final fee payable
within thirty days of the completion of the Market Study.
7. Protect Issuer from Potential Market Study Liability
➢ Diligent and Thorough Research of Economy, Local Market, and Proposed Project
➢ Comprehensive Insurance Policies; Empire Economics is fully insured:
* Workmen's Compensation
* Commercial Liability
* Professional Errors/Omissions
➢ Avoid Conflict of Interest
(Empire Economics is not providing consulting services to the Property Owner/Builder.)
Page 11
RESOLUTION NO.
OF THE CITY COUNCIL OF THE CITY OF PALM SPRINGS,
CALIFORNIA APPROVING THE SPREAD OF ANNUAL
ASSESSMENTS AND CONFIRMING THE ENGINEER'S REPORT,
DIAGRAM AND ASSESSMENT SPREAD FOR FORMATION OF
PARKWAYS MAINTENANCE DISTRICT NO. 10 ("MOUNTAIN
GATE" TRACT NO. 30963) AT NORTH PALM CANYON DRIVE
(HIGHWAY 111) &GATEWAY DRIVE AND ASSOCIATED TRACT
PARKWAYS&OFF-SITE LANDSCAPE FOR FISCAL YEAR 2003-
04. (MOUNTAIN GATE PMD-10)
WHEREAS in accordance with the provisions of the Landscaping and Lighting Act of 1972 that the
Engineer of Work has determined the estimated maintenance costs for the first year in order to
prepare the annual spread of assessment for Parkways Maintenance District No. 10, requested by
Century Crowell Communities (Century Vintage Homes) for"Mountain Gate" Tract 30963; and
WHEREAS Public Hearing notice was waived by,Century Crowell Communities as sole-owner
developer of Tract 30963 who filed a signed petition "Ballot" and "Waiver of Notice of Hearing"
(waiving the 45-day notice provision and the Public Hearing); and
WHEREAS the spread of assessment shall be forwarded to the County Tax Collectorwho, in turn,
shall place this assessment on the County Tax Roll.
The City Council of the City of Palm Springs, California, does hereby resolve as follows:
Section 1. The City Council does hereby declare its intent to levy and collect assessments
within Parkway Maintenance District No. 10 for the Fiscal Year 2003-04 for
"Mountain Gate", at the request of Century Crowell Communities, the developer.
Section 2. Description of Work-The public interest, convenience and necessity require, and
it is the intention of the City Council to order the following work to be done, to wit:
Plant, replace or repair, trim, water and generally maintain off-site trees, shrubs,
groundcover, grass, etc. within Parkway Maintenance District No. 10 (Mountain
Gate Tract 30963), along perimeter of a new 308 home subdivision located at the
northeast corner of North Palm Canyon Drive (Hwy. 111) and Gateway Drive.
Section 3. Description of Assessment District The City Council hereby makes the expenses
of said maintenance chargeable upon the District hereby declared to be the areas
benefitted by said maintenance and to be assessed to pay the costs and expenses
thereof, said assessments to be collected as a part of the property tax assessment
by the County Tax Collector's Office in the same manner and subject to the same
penalties for non-payment. (There are 308 single family lots within PMD No. 10).
Section 4. Engineer's Report - All of the said.work to be done shall be as shown on the
Boundary Maps of the Districts, on file in the office of the City Engineer, and in
accordance with the Engineer's Report on file in the office of the City Clerk. The
City Council hereby approves the Engineer's Report and reference is hereby made
to same for a more particular description of said work; and the same is incorporated
herein and made a part hereof. (Assessment in FY 03-04= $96,719, assessed to
Century Vintage homes as sole landowner in 03-04). Eventually the costs will be
assessed to all 308 landowners'as`homes sell in 03-04 & 04-05, which would
average $310.78 per parcel based'on 03-04 cost estimates.
Section 5. The City Clerk is hereby directed to file a certified copy of the diagram and
assessment roll with the County Taz Collector, together with a certifiied copy of
this Resolution upon its adoption and the auditor is requested to collect such
assessments on the tax roll in the manner and subject to the same penalties for
non-payment as are county property taxes.
Page 1 of 2 2VO
Parkways Maintenance District No. 10 Resolution-page 2
Section 6. This project is statutorily exempt from CEQA under Section 15273 of the guidelines
as an ongoing maintenance charge.
Section 7. Improvement Act - all of the work herein proposed shall be accomplished
pursuant to the "Landscaping and Lighting Act of 1972", being Division 15, Part
2 of the California Streets & Highways Code, beginning with Section 22500; and
Article XIIID, Section 4 of the California Constitution (Proposition 218).
Section 8. Designation of the Person to Receive Inquiries-The following person is designated
as the official to receive any inquiries concerning these improvements:
David J. Barakian
Director of Public Works/ City Engineer
City of Palm Springs- City Hall
3200 E. Tahquitz Canyon Way
Palm Springs, California 92262
Telephone: (760) 323-8253 (Ext. 8732)
ADOPTED this day of 2003
AYES:
NOES:
ABSENT:
ATTEST: CITY OF PALM SPRINGS, CALIFORNIA
By
City Clerk City Manager
REVIEWED &APPROVED:
Page 2 of 2
H:\USERS\BobM\DATA\D0CUMENi1PMD 10.MountainGate.Formation Res.7-2-03.res.wpd
aaBa.