Loading...
HomeMy WebLinkAbout9/3/2003 - STAFF REPORTS (6) a-' DATE: September 3, 2003 TO: City Council FROM: Executive Director -Airports CONVENTION CENTER DESIGN CONTRACT AMENDMENT#1 RECOMMENDATION: It is recommended that City Council approve Amendment #1 to Agreement No. 4615 with Fentrees Bradburn Architects to reflect additional fees for scope changes to the Convention Center expansion project. SUMMARY: This action would approve an amendment to the Convention Center architect's contract to reflect scope changes up and through schematic design documents. BACKGROUND: The design contract with Fentress Bradburn Architects originally contemplated a $20 million dollar construction project over a twelve(12) month construction period. With the completion of the schematic design (SD), the SD estimate, and a value engineering exercise, the project met the overall Convention Center minimum needs, however, at an increased project cost of$25,524,753. In addition, due to the complexities of the project it will require fifteen (15) months of construction to complete. The original architectural base fee was set at 12.6%of estimated construction cost. Utilizing that percentage, the $5.5 million increase in estimated project cost would result in an increased architectural fee of$696,118. Staff has negotiated a fee of $408,040 as follows: • SD Revisions $ 13,320 - corridor north of ballroom - reduced S/E registration area - open Mesquite corridor • Construction Cost Adjustments - extension of two (2) weeks design period $ 48,000 - 12 month construction administration to 15 months $ 120,000 - increased scope (including landscaped design north parking lot) $ 194,360 - 9% reimbursables 32,000 Subtotal $394,720 Total Amendment#1 $408,040 It should be noted that the current contract has over $460,000 in speciality consultant options. At the current time staff is planning on over$300,000 of those funds to go un-utilized. 2A Convention Center Design Contract Amendment#1 September 3, 2003 Page 2 Amendment#1 to the design contract is attached for City Council review along with a Minute Order to approve the amendment. Funds are available from the Convention Center Expansion Account No. 26 1-42 82-5 0003. APPROVED: Allen F. Smoot, A. A. E. City Manager- Executive Director - Airports Attachments: 1, Minute Order 2. Amendment #1 REVIEWED BY DEPt OF FINANCE 3A � AMENDMENT #1 Agreement No. 4615 - Convention Center Design Services THIS FIRST AMENDMENT to Agreement No. 4615 for Contract Services, (herein "Agreement") made and entered into on the day of 2003, by and between CITY OF PALM SPRINGS (herein "City") and Fentress Bradburn Architect, Ltd. (herein"Architect') is hereby amended effective , , 2003, as follows: 1. Exhibit."A" Scope of Services is hereby amended by adding the following to "Program Confirmation:" "At completion of Schematic Design the City and Architect mutually agree that the Program has been modified to include: 1) Addition of a corridor north of the ballroom; and 2) Reduction of area in the southeast registration area; and 3) Opening of a portion of Mesquite corridor and relocation of HVAC unit; and 4) Landscape design for the north parking lot." 2. Exhibit "B" Special Requirements is hereby amended by increasing the "Construction Budget" from $20,000,000 to "$25,527,753." 3. Exhibit "C" Schedule of Compensation is hereby amended to reflect that the Lump Sum of $2,564,043, inclusive of reimbursables is increased to "$2,972,083" and itemized as follows: Program Confirmation and Master Plan Update 44,043 Schematic Design 342,750 Schematic Design Scope Adjustments 13,320 Design Development 565,000 Contract Documents 1,170,970 Contract Administration 569,000 Reimbursable Expenses 267,000 $2,972,083 4. Exhibit"D" Schedule of Performance is hereby amended by adding two (2) weeks additional time to each of the milestone dates. Except as specifically worded herein, all terms and conditions of the Agreement shall remain in full force and effect and performance of services under the Agreement shall be governed by the provisions of the Agreement. 3� 3 MINUTE ORDER NO. 7360 APPROVING AMENDMENT #1 TO 1 AGREEMENT 4615 WITH FENTRESS BRADBURN ARCHITECTS INCREASING DESIGN FEES AND INCREASING PROJECT BUDGET TO $25,524,753 FOR THE PHASE II CONVENTION CENTER EXPANSION PROJECT. A04615 ------------------ I HEREBY CERTIFY that this Minute Order, approving Amendment #1 to Agreement 4615 with Fentress Bradburn Architects increasing design fees and increasing project budget to $25,524,753 for the Phase II Convention Center Expansion Project, was adopted by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 3rd day of September, 2003. C I--. - PATRICIA A, SANDERS City Clerk 1