HomeMy WebLinkAbout11/19/2003 - STAFF REPORTS (14) DATE: November 19, 2003
TO: City Council
FROM: Director of Public Works/City Engineer; Director of Community and
Economic Development.
FREY-JAYCEE BUILDING ADA IMPROVEMENT PROJECT CITY PROJECT NO. 03-
02
RECOMMENDATION:
It is recommended that the City Council Award a contract to Commercial Diversified Inc.,
in the amount of $53,800.00, for the Frey-Jaycee Building ADA Improvement Project,
City Project No. 03-02.
SUMMARY:
Award of this contract will provide for the remodeling of the existing kitchen facilities, to
meet current ADA codes; installation of new appliances (gas range with fire protection
system, food warming drawers, microwave, refrigerator, double bowl sink, garbage
disposal), new base cabinets, countertop, shelving, gypsum board, seamless flooring,
suspended grid ceiling with ceiling panels, fluorescent lighting, and all appurtenant work.
BACKGROUND:
In June 2001, City staff became involved in finding an alternative location for "The Well"
which had just lost its space at the Community Church and had begun to operate its
three day lunchtime feeding program (on Monday, Wednesday and Friday afternoons) in
Sunrise Park. Given an exhaustive and lengthy process of considering a more
appropriate alterative, in May 2002, the City Council through the Community
Development Block Grant (CDBG) Program allocated $86,380 to renovate a City facility
- Dr. R.G. Frey-Jaycee Building for The Well's use, as well as for the entire community.
In February 2003, the Department of Community and Economic Development submitted
a design request to Engineering Department for the Frey Jaycee Building ADA
Improvements. In March 2003, the Public Works and Engineering Department solicited
proposals from 12 architectural firms to prepare construction documents and
specifications for the complete remodel of the existing kitchen facilities located within the
Frey-Jaycee Building. In April 2003 a Contract Services Agreement was executed with
John R. Trueblood Architect. An asbestos survey was performed by Infotox, Inc., and
specific requirements for asbestos removal are included in the project specifications.
The project was advertised for bids on September 30 and October 7, 2003. On October
28, 2003 the following bid was received:
Contractor: Bid:
Commercial Diversified Inc.; Twentynine Palms, CA $53,800.00
The Engineer's estimate was $57,500,00. The low bidder is Commercial Diversified
Inc., from Twentynine Palms, CA. The company is a corporation whose officers are:
Richard Cobalis, President and Myrna Cobalis, Secretary/Treasurer.
PAGE 1
Sufficient funds are available in Account No. 137-4803-63540 (CQj3G funds.)
DAVID J. BARAKIAN (JOHNt. R ND
Director of Public Works/City Engineer ctor of=Mpunity and Economic
��----'' Development Department
APPROVED;s `
City Manager
ATTACHMENT: - Minute Order
REVIEWED BY DEPt OF FINANCE
PAGE 2
CITY OF PALM SPRINGS
NOTICE INVITING BIDS
For constructing FREY-JAYCEE BUILDING A.D.A. IMPROVEMENT PROJECT
C.P. 03-02
N-1 NOTICE IS HEREBY GIVEN that sealed bids for the FREY-JAYCEE BUILDING ADA
IMPROVEMENT PROJECT will be received at the office of the Procurement Manager
of the City of Palm Springs, California, until 2 P.M. on October 21, 2003 at
which time they will be opened and read aloud.
N-2 DESCRIPTION OF THE WORK: The Work comprises the remodeling of the
existing kitchen facilities, to meet current ADA codes; installation of new
appliances (gas range with fire protection system, food warming drawers,
microwave, refrigerator, double bowl sink, garbage disposer) , new base
cabinets, countertop, shelving, gypsum board, seamless flooring, suspended
grid ceiling with ceiling panels, fluorescent lighting, and all appurtenant
work.
N-3 AWARD OF CONTRACT:
(a) The City reserves the right after opening bids to reject any or all
bids, to waive any informality (non-responsiveness) in a bid, or to make award
to the lowest responsive, responsible bidder on the basis of the total sum of
Bid Schedule A and Additive Alternative Bid Schedule B, and reject all other
bids, as it may best serve the interest of the City.
(b)As a condition of award, the successful bidder will be required to submit
payment and performance bonds and insurance.
N-4 BID SECURITY: each bid shall be accompanied by a certified or cashier's
check or Bid Bond in the amount of 10 percent of the total bid price, payable
to the City of Palm Springs.
N-5 BIDS TO REMAIN OPEN: The Bidder shall guarantee the Total Bid Price for a
period of 60 calendar days from the date of bid opening.
N-6 CONTRACTOR'S LICENSE CLASSIFICATION: The Contractor shall possess a valid
Class B Contractor license at the time of award.
N-7 CALIFORNIA WAGE RATE REQUIREMENTS: The Contractor shall pay the general
prevailing rate of per diem wages as determined by the Director of the
Department of Industrial Relations of the State of California for the locality
where the work is to be performed. A copy of said wage rates is on file at the
office of the City Engineer. The Contractor and any subcontractors shall pay
not less than said specified rates and shall post a copy of said wage rates at
the project site.
N-6 FEDERAL WAGE RATES: The general prevailing rate of wages by the Secretary
of Labor are included in the Contract. If there is any difference between the
State or Federal wages rates, the Contractor must pay the higher of the 2
rates.
N-9 RETAINAGE FROM PAYMENTS: The Contractor may elect to receive 100 percent
of payments due under the Contract Documents from time to time, without
retention of any portion of the payment by the City, by depositing securities
of equivalent value with the City in accordance with the provisions of Section
22300 of the Public Contract Code.
N-10 FEDERAL NON-DISCRIMINATION PROVISION: Bidders Shall comply with the
President's Executive Order No. 11246.
Frey-Jaycee Building ADA Improvement NOTICE INVITING BIDS
City Project No. 03-02 PAGE 1
9/26/03
i v
N-11 FEDERAL INTEREST EXCLUSION: Any contract or contracts awarded under this
Notice Inviting Bids are expected to be funded in part by a grant from the
United States Government. Neither the United States nor any of its
departments, agencies, or employees is or will be a party to this Notice
Inviting Bids or any resulting Agreement. This procurement will be subject to
regulations contained in 40 CFR Part 33 and 35.
N-12 PRE-BID VISIT TO WORK SITE: Prospective bidders are required to attend a
pre-bid walk through of the proposed work site and existing facilities which
will be conducted by the City at 10 am on October 9, 2003. Failure to
participate in the pre-bid walk though will render a bidder as non-responsive.
N-13 OBTAINING OR INSPECTING CONTRACT DOCUMENTS:
(a) Contract Documents may be inspected without charge at the office of the
City Engineer, 3200 East Tahquitz Canyon Way, Palm Springs, CA 92262.
(b) Complete sets of said Contract Documents may be purchased at $25.00 per
set and are obtainable from the office of the City Engineer, 3200 East Tahquitz
Canyon Way, Palm Springs, CA 92262. No refund will be made of any charges for
sets of Contract Documents.
(c) An additional fee of $15.00 will be charged for sets of documents sent
by mail.
N-14 ADDRESS AND MARKING OF BIDS: The envelope enclosing the Bid shall be
sealed and addressed to the City of Palm Springs, and shall be delivered or
mailed to the Procurement Manager at 3200 East Tahquitz Canyon Way, Palm
Springs, CA 92262. The envelope shall be plainly marked in the upper left hand
corner with the name and address of the Bidder and shall bear the words "Bid
For. ." followed by the title of the Project and the date and hour of opening
Bids. The certified or cashier's check or Bid Bond shall be enclosed in the
same envelope with the Bid.
BY ORDER OF/THE
CITY
^�OFF� PALM SPRINGS
Date .�s�`/` L. 1 2003. CITY OF PALM SPRINGS
f By
David J. Barakian, P.E.
Director of Public Works/City Engineer
City of Palm Springs
Frey-Jaycee Building ADA Improvement NOTICE INVITING BIDS
City Project No. 03-02 PAGE2
9/26/03
MINUTE ORDER NO.
AWARDING CONTRACT TO COMMERCIAL DIVERSIFIED INC., IN THE
AMOUNT OF $53,800.00 FOR, THE FREY-JAYCEE BUILDING ADA
IMPROVEMENT PROJECT, CITY PROJECT NO. 03-02.
I HEREBY CERTIFY that this Minute Order, awarding Contract to Commercial Diversified
Inc., in the amount of$53,800.00 for the Frey-Jaycee Building ADA Improvement Project,
City Project No. 03-02, was adopted by the City Council of the City of Palm Springs,
California, in a meeting thereof held on the Igth day of November 2003.
PATRICIA A. SANDERS