HomeMy WebLinkAbout1/7/2004 - STAFF REPORTS (4) DATE: January 7, 2003 TO: City Council FROM: Executive Director- Airports TRANSPORTATION SECURITY ADMINISTRATION BAGGAGE AREA- CHANGE ORDER#2 RECOMMENDATION: It is recommended that the City Council approve Change Order #2 to agreement #4741 with B.E. McMurray Construction, Inc for additional work items related to the Transportation Security Administration (TSA) Baggage Area (City Project 2003-07), in the amount of$60,824.85, for a revised total agreement amount of $537,830.85. SUMMARY: City Project #2003-07 is the development of a baggage screening area for the federally mandated Explosive Detection System (EDS) equipment, which has been supplied by the TSA. This is the second and final Change Order related to the completion of this project and includes project scope changes necessary for the timely completion of this project. BACKGROUND: In response to the events of September 11`", and the subsequent security regulations mandated by the federal government, screening of passenger luggage was required to be in place prior to December 31, 2002. The TSA initially placed all of this equipment in the lobby of the Airport's ticketing wing, which created serious congestion, poor customer service and at time, untenable exiting restrictions. In August of this year, the TSA was able to commit to three (3) CTX machines, which were placed into service in early October. This project converted an existing covered, but not enclosed area behind the ticket wing into a fully conditioned space capable of supporting the CTX machines. All of the baggage screening equipment has been removed from the ticket wing lobby. On June 4, 2003, City Council approved an agreement with B.E. McMurray Construction, Inc for this work. This represents the second and final change order for this project. Sufficient funds are available in account 415-6400-56057, EDS Facility.Expansion. Additionally, the Federal Aviation Administration (FAA) has indicated that the upcoming Airport Improvement Program (AIP) grant the Airport receives will include funding for the reimbursement of this project. This reimbursement will cover 90% of the cost with the remaining 10% coming from Airport funds. No general fund monies will be used for this project. Transportation Security Administration Baggage Area - Change Order#2 January 7, 2004 Page 2 A Minute Order is attached for City Council consideration. MIKE N WILLIAMS, A.A.E. " ALLEN F SMOOT, A.A.E. Deputy Director - Operations Executive Director - Airports APPROV City Manager ' Attachment: Minute Order Change Order REVIEWED BY DEPI OF FINANCE --yo&� N:\WordPerfect\City_Council\Engineering_Construction\TSA_Baggage Area Change Order#2 01-07-2004.wpd r CP_2003-07 Change Order 2 yjq� CHANGE ORDER NO. 2 PROJECT TITLE: TRANSPORTATION SECURITY ADMINISTRATION BAGGAGE AREA CITY PROJECT NO. CP2003-07, A4741 CONTRACT DATE: July 15, 2003 CONTRACTOR: B.E. McMurray Construction,Inc The following changes are hereby made to the Contract Documents: 1. Deletion: Removal of concrete pad in baggage area#4. 2. Addition: Provide new 277/480 electrical service for baggage conveyor belts. 3. Addition: Provide and install conduit and wiring for condensate pump. 4. Addition: Additional electrical outlets for baggage screening equipment. 5. Addition: Additional cord drops and electrical service for baggage screening equipment. 6. Addition:Removal of existing overhead door and installation of finished metal stud wall. 7. Addition:Extension of metal stud wall and finish for baggage area#5. 8. Addition:Installation of view portals in metal doors. 9. Addition: Installation of roof mounted exhaust ventilator. 10. Addition: Demolition of existing walls to allow for three (3) framed openings to accommodate baggage inspection in accordance with TSA requirements. Justification: 1. The project drawings showed a new concrete pad to be installed in baggage area #4. There is an existing concrete slab which meets the requirements and does not require removal(see Attachment 1, ($923.16)). 2. Due to the need for motorized baggage belts, additional electrical service was required (see Attachment 2,$19,941.00). 3. The condensate pump and associated conduit and wiring for Fan Coil Unit(FCU) #2 was note shown on the plans (see Attachment 3,$484.93). 4. In response to a request from the Transportation Security Administration(TSA),additional outlets for baggage screening equipment was added (see Attachment 4,$1,169.93). 5. In response to a request from the Transportation Security Administration (TSA), additional electrical cord drops were added for baggage screening equipment(see Attachment 5,$6,330.31). 6. An existing overhead roll-up door in baggage area #5 required removal and was not shown on the plans (see Attachment 6,$1,263.32). 7. The soffit and wall finish area for baggage area #5 did not have a detail provided in the project plans (see Attachment 7,$4,162.97. 8. Due to safety concerns, view portals were added to metal doors. Portals were not shown on project plans (see Attachment 8,$978.00). 9. Due to heat generated by the HVAC unit in this area, a roof mounted exhaust system is required to avoid long-term damage to the equipment(see Attachment 9,$18,161.00). 10. In order to allow for timely processing of passenger baggage in accordance with TSA protocols, an additional opening to an existing baggage belt was required. The necessity for this work occurred after construction was underway(see Attachment 10,$9,256.55). CHANGE TO CONTRACT PRICE Original Contract Price: $466,000.00 Tri 3 CHANGE ORDER NO. 2 Current Contract Price,as adjusted by previous change orders: $477,006.00 The Contract Price due to this Change Order will be increased by $60,824.85 The new Contract Price due to this Change Order will be: $537,830.85 CHANGE TO CONTRACT TIME The Contract Time will be increased by 30 calendar days. End of Contract date is November 13,2003. Approvals Required: To be effective,this order must be approved by the City of Palm Springs if it changes the scope of the objective of the project,or as may otherwise be required under the terms of the Contract Documents. Requested by date Mike N Williams,A.A.E.,Deputy Director-Operations Requested by date Allen Smoot,A.A.E.,Executive Director-Airports Ordered by date City of Palm Springs Accepted by date B.E.McMurray Construction,Inc. P:\data\TSA\EDS_Phase II\Buildin&-Encapsulaflon\CP_2003-07 Change Order 1 doc y�� MINUTE ORDER NO. APPROVING CHANGE ORDER #2 TO AGREEMENT #4741 WITH B.E. MCMURRAY CONSTRUCTION, INC FOR ADDITIONAL WORK ITEMS RELATED TO THE TRANSPORTATION SECURITY ADMINISTRATION BAGGAGE AREA (CITY PROJECT 2003-07), IN THE AMOUNT OF $60,824.85, FOR A REVISED TOTAL AGREEMENT AMOUNT OF $537,830.85. I HEREBY CERTIFY that this Minute Order approving Change Order#2 to agreement#4741 with B.E. McMurray Construction, Inc for additional work items related to the Transportation Security Administration Baggage Area (City Project 2003-07), in the amount of $60,824.85, for a revised total agreement amount of$537,830.85, was adopted by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 7`h day of January, 2004. PATRICIA A. SANDERS City Clerk 41115