HomeMy WebLinkAbout3/24/2004 - STAFF REPORTS DATE: March 24, 2004 TO: City Council FROM: Convention Center Project Administrator CONVENTION CENTER TRADE CONTRACTS -AWARD OF BIDS RECOMMENDATION: It is recommended that City Council award the second round of Trade Contracts for the Convention Center Phase II Expansion Project, City Project 02-27, subject to City Council approval of Bond Documents. SUMMARY: This action would result in the awarding of Trade Contracts for the Convention Center Phase II Project contingent upon the future approval of Bond Documents. BACKGROUND: The City Council has previously authorized the bidding of Trade Contracts for the Convention Center Phase II Expansion Project. There will be a total of 35 separate Trade Contracts bid on this project along with a separate purchase of Equipment. On March 23, 2004 the following Trade Contracts will be bid: TRADE # DESCRIPTION PRE-BID ESTIMATE 2 Dry Utilities $ 136,000 5 Asphalt Paving 182,137 7 Landscape & Irrigation 403,600 10 Structural Steel 5,614,424 11 Copper Facia 150,940 12 Metal Studs/EFTS/Insulation 2,951,912 13 Roofing 719,010 14 Flashing/Sheet Metal 339,070 15 Doors & Frames 186,200 16 Glass & Glazing 825,190 17 Acoustical Ceilings 1,145,590 18 Floor Stone & Tile 57,320 19 Lobby Carpet/VCT 557,866 20 Painting & Wall Covering 298,669 Total $ 13,567,923 At the City Council meeting Staff will provide a complete analysis on all bids received on 3/24/04 with recommendations for contract awards. ALLEN F. SMO T, AAE HAROLD E. GOOD, CPPO APPROVED City Manager REVIEWED BY DEPT. OF FINANCE W DATE: March 24, 2004 TO: City Council FROM: Convention Center Project Administrator SUBJECT: Supplemental Report— Item No.1 Trade# 9, Masonry/Stone Bids were opened on March 16, 2004 for the Masonry/stone trade with the following results: Bidder Amount John Barajas $1,164,452 Winegardner Masonry 2,100,000 DBM/Hatch 2,228,841 Kretschmer & Smith 2,568,000 With an estimate/budget of$1,446,201, staff was pleased with the low bid but concerned about the bid spread. Soon after opening the bids Mr Barajas notified the city of a clerical error in the amount of $407,000. The city staff has reviewed his documentation of the clerical error and recommends that the city accept his bid withdrawal for clerical error and returns his bid bond. With the other three bidders being so far over the designated budget staff recommends that all bids be rejected and that staff be authorized to re-bid the project. A resolution is attached for City Council consideration. Allen F. Smoot Harold E. Good Convention Center Project Manager Director of Procurement & Contracting APPROVED: CI�MANAGER Attachments: (1) Resolution �����✓ � C�/// CITY OF PALM SPRINGS, CALIFORNIA � ADVERTISEMENT FOR TRADE CONTRACTORS PRE-QUALIFICATION CONVENTION CENTER EXPANSION PHASE If CITY PROJECT 402-27 NOTICE IS NErE6Y GIVEN that the City of Palm Springs has determined that bidders for the below designated trade coral must be pre-qualified prior to submitting a bid on the Convention Center Expansion Phase If: Trade Rid Pochage it I Description Pichnnmary Cost ESP Contractor License Regared 1 i R f a Ile 11 nit _$B42 740 "A"ra D-2t 2 Di DBnties 31G9,500 A"or C-10 9 Grade o/Sire De clltion Ti 020.340 "A" 4 1 Dulled Piers T103.699 "A" 5 As halt Pewit $106100 "A"or C-12 6 Site Concrete I 5337 248 I "A"or 0-8 7 Landsca o is Irrigation $617200 C-27 e Concrete&Cancrete Rem Vorclnq $1,714,590 PCor 0-8 PROOF OF PUBLICATION Mascirms/Strom,Masomiry Veneer $2,123,260 C-29 10 Stromme.1 Steel Steel Joists, (20 1 d C !n C P) Metal Tucking&Miscellaneous Metals $6,304.580 C-51 \L 1J J 1. 1. 1 f 11 Copper Facia/hipaccialy Morris $200,000 C-23or 0-39 or 0-43 12 Metal Stud Framing&Drywall, DIES,GFRG,Insula8on $3,13324, C-2,C-9,C-26 or"B" 13 Rooting $726,010 0-39 14 Flashing,Steel Metal&Roofing Accessories $521,550 C-39 or C-43 15 Doors,Frames &Hardware $181 200 B"or C-5 iG I Glass&Fleeing $759,110 C-P 17 Acoustical&Specialty Failures $1,259,070 C-2 18 Stone rl..,i.q end Ceramic Tile 8220 C00 C-54 19 I Lobby Carpet Base&LIST $162,440 C-15 TATF OF CALIFORNIA 20 Paining and Wrn Coveung $229749 C-33 21 Plumbjne&Wet Winner 51,059.551 C-36 'aunty of Riverside 22 Hvnc $2225000 C-20 23 Fire Protection $249,490 C-16 car F_eci r. .21 792 - n 'Prinminay Cos[Estimates are provided to size the project orile bench[of interested trade contractors, They are not official engineer esbmatee It is mandatory that all lade COntacNrs who intend to submit a bid[of any of the above listed bid packages fully COure[e the Pre-quahflcation questionn proved materials requested herein and be approved by the City of Palm Springs to be on the final nuanced Bidders Refs. No bid will be accepted from a Tra aire,de Contractor Ihal has felled to comply wrN those le lion a es for the referenced bid pa0legea [I two or more busjnu s units submita bid as partof a Joint Venus,or expect to Sul mha bid IS part of a Joint Venture,each entity within the Joint Venture must be separately qua fed to bid The last dale to submit afully completed questionnaire is February 6 200A Trade Contractors who previously pre-qualdMd for Phase li of briefelectdo not need to pre-qualify again. Trade Contractors are encouraged to at11 a citizen of the United States and a resident of submit pre-goafirremfon packages Passing as pres lde,so that they may be noldief omissions of Information to be remedied or of thurpre-guohhcation status w to County aforesaid; I am over the age of eighteen in advmlcs of His and closing dates ears,and not a party to or interested in the Answers[a questions contained in lho pre-quallficahon questionnaire,information aboutaurrent bending capacity,notarized statement hem surety,and the most acre reviewed or audited financial statements,with accompanying notes and suppiemeri information are required.The City will use these documents as the basis of and bove-entitled matter.I am the principal clerk of a Trade Coon Contractors iys respect to d�baize don scope at co el awau upon on whole each Trade Cultural is durni ied th bid The pile reserves the right to check odlor e0uraer rioter of the,DESERT SUN PUBLISHING iteria .OMPANYanews ai erof eneralcirculation, The City reserves me right to adjust,increase hall suspend succeeddmepre-qualllicatmn rating based onsubsequentlyleorne inrmad0n Trade Contractors who p p g rating changes ambulant to disqualify them vall he refined,and given in opporllmdy foj a hearing consistent with the hearing pm¢duns described below for appolan Tinted and published in the city of Palm Springs, PillA alifiaahon rating 'ounty of Riverside,and which newspaper has been VVII it is tiro Alan[of the pre-quabecanon questionnaire and documents required merewi h to assist the City in decomi fi g bidder aeponsibibty prim to bid and to ai the City m selecting me lowest responsible bidder,neither the fact of pro-qualitiaahon,nor any pro-coul n oupon rating,will Bauble the City Rom a post bid oensiderml djudged a newspaper of general circulation by the and determination of wha tier a bidder Ilas inequality,fitness,rapacity antl experie ica to satearcnnly perform the proposed work,and has demonstrated the regmsde uperior Court of the County of Riverside,State of [rus[wm[hosay :alifm'nia under the date of March 24,1988.Case The Palm Springs Convention Center is owned and operated by the City of Palm Springs. The City has enclosed with Tuner Construction Company to servers Construction Monagorfor the project. Individual trade contrasts wall ratio,awarded and held by Ne Crty The propot js an expenses to the existing Palm Springs dumber 191236; that the notice,of which the Convention Canter Wodi nen deS emprowmadly 117,000 of of new construction for a total building area of approximately 265,000 of The expansion ncludea appr0 a mately 35,000 sf of ax1fibti hall apace,24000 sl of meahng room space,plus various support and an salary spaces The rile Is bounded by Cale Alvarado,Amado near u nwed is a printed copy(set in type not smaller antl Avoude Canallems The exraling Convention Center and Wyndhem Hotel will amain open and operational during the ooncruction period II is a ibruptned flan approximately 60 individual trade contracts vall he developed for construction of[he project ran non Radial,has been published in each regular Ild entire issue of said an newspaper and not in The pie-quah n p froatioolarps should be submitted antler seal and marled"CONFIDENTIAL' to Harold E.Good,Color Director of Procmement&Contraclmg,City of y Palm Springs,3200 E Tahgrutz Canyon Way,Palm Springs,Caldorma 9 2 2 63-2 74 3. npplement thereof on the following dates,to wit: The pre-quidHiostian packages(questionnaire III and finanmal statements)submitted by Trade Contractors are not public records and are net open to pubim inspe lion All incarnation rovlded will be II confidential i0 the extent permdMd by uses Cowl[he contents may be disclosed to third parties for purpose of verinca[rm or in of so crucial allogad9ns,or-In-Ike appeal homing.-Sete law agmres that the names of Trade Contractors applying for pre-qualification status shall be public records subject to hoodlum,and the fiat page of the questionnaire will be used for[[let purpose Each questionnaire must be signed under penalty of perjury In Los manner designated et the and of the form,by an Individual who has the legal autbon[y to and[he S 12iu Trade Contractor on whose behalf that person is signing. If any l mormanon provided by a Trade Contractor becomes mawurets,the Trade COntracmj must immediately :lltuar Y notify the City and provide updated accurate information in writing,under penally of perjury --------------------------------------------------------- Tile City reserves the right to waive rumor Irregularities and emissions in the Information centered in the pre-quamicatmn Re lcanon submit[ad,10 make all fruit dstal- mmall0ns,and to determine al any lime that the meVuanti mlion procedures will not be applied N a specific future public works prefect -----------------------------------—---------------'---'- Trade Contractors may submit pre quaidioa[ien packages during reguer woda119 hours on any day that the offices 9f the City of Palm Springs are open Trade ill in the year 2004 Contractors who submit a complete pre-quaidicatmn package will be nolllied of Inca qualification status no later than two business days after submission of the mforma o certify(or declare)under penalty of perjury that the The City9f Palm Springs ma refuse to rant re- ualifieallon where tile requested information and materials are not mvrde4 of no[provided b Rbmar y 6,2001 P 9 incomplete P 9 q P P sw ) 01'Cg0ing is true and correct. There la no appeal form a re peel TorenOfflocpm life application,nut aubmimation ire a later paled is trade ape Tha closing time for bids will n0f be changed in d 13ur malt ge accommodate supplementation of mcamplelo submissions,or late submissions Pie-nuclifkcatron is trade apemfie and will be evaluated separately fir each had paclege )aced at Palm Springs,California this--------day Where a timely and completed application results in a eating below but necessary to pre-qualify,an appeal can be made An appeal Is begun by the Trade Contractor deirvenng notice to[he City 9f its appeal of Hie decision will respect to its pre-qualification rating,no later Nan two business days prior to the closing time for the recall 20�4 of bids for this pioneer withou[a purely appeal,[he Trade Contractor waives any and all rights[o challenge the decision of the Crty,whether by admrmstralve process, —�r----- ---Ian as ry---I'------f------------------- ludioial process or any other legal oroeesa or proeeuding Noce.A Trade Contractor rown,e Co be round not pre-In seined for atlT,,dc ce a a ctor a trestle footrace to be let by the Crty Palm Springs until the Tratle Contractor meets she Crtbe depend,at pre In addition,a Trade Contractormay be found net pre-st bfied Poi either- -------- _ - ('I)Omission of regueafed information or Signature (2)Falsification of mfanmation The queslydnnmre is availace tram the City 01 Palm Springs,Department of Procurement&Contacting at 760-323-8237 Copies are also readaulo via N 9 ^, Internet ate, ij aim-spr n s ca up coal on"Departments"and go[0"Procurement" Upon downloading ilia questionnaire,pluses c9nMel Man Lynn Doswell, Admrmalanve Socrelary,via amad at Narl LVdnGtylcl noun-stufn ea ua to legislates an Prefer ALL QUESTIONS AND COMIVIUNICATIONS reiahva to Nm Wodr shall be directed to Harold E Good,CPPO,Director of Procurement&Occurring at 760-323-8239 0r e-mound t0 mroRGOm palm-sprmgs.ca us BY ORDER OF THE CITY Of PALM SPRINGS Dated December 31,2003 CITY OF PALM SPRINGS By RESOLUTION NO. OF THE CITY COUNCIL OF THE CITY OF PALM SPRINGS, CALIFORNIA, ACCEPTING THE CLERICAL ERROR, ALLOWING THE WITHDRAWAL OF BID AND RETURN OF BID BOND TO JOHN BARAJAS MASONRY FOR THE PALM SPRINGS CONVENTION CENTER EXPANSION,CITY PROJECT NO.02-27, TRADE CONTRACT NO.9 MASONRY/STONE,AND REJECT ALL REMAINING BIDS AND AUTHORIZE STAFF TO IMMEDIATELY REBID THE TRADE. WHEREAS,on March 16,2004 Trade Bid No.9 forthe Convention Center Expansion project, City Project No. 02-27, was opened with a pre-bid estimate/budget of$1,446,201; and WHEREAS, bids were received from John Barajas ($1,164,452), Winegardner Masonry ($2,100,000), DBM/Hatch ($2,228,841) and Kretschmer & Smith ($2,568,000); and WHEREAS, shortly after the bid opening the city was advised by the low bidder that he had discovered a large clerical error in his bid and was requesting a withdrawal of his bid; and WHEREAS, upon receipt of official correspondence from Mr Barajas outlining the specifics of the clerical error, staff conducted a review of the evidence submitted and concurs that a clerical error did occur; and WHEREAS, the remaining three bids are all well in excess of the established budget, NOW THEREFORE BE IT RESOLVED by the City Council of the City of Palm Springs as follows: Section 1. That the City finds that the low bidder John Barajas Masonry, submitted a bid with a clerical error and hereby allows the bids withdrawal and release of the bid bond ; and Section 2. That all other bids received for Trade Bid No. 9, Masonry/Stone, were in excess of the established budget and that they are all hereby rejected and staff is authorized to immediately rebid the Trade. ADOPTED this Day of March, 2004 AYES: NOES: ABSENT: ATTEST: CITY OF PALM SPRINGS , CALIFORNIA By City Clerk City Manager REVIEWED &APPROVED AS TO FORM 13 CONVENTION CENTER EXPANSION PHASE II TIME LINE 11/05/2002 Voters approved TOT increase from 10%to 12.5% 12/18/2002 Fentress Bradbuin Architects- Contract Approved(Budget Set @ $20m) 01103/2003 Turner Construction Selected as Construction Manager 03/05/2003 Construction estimate at $26,253,090 04/30/2003 Study session report showing that there was $24,205,812 funding available from Bonds for constriction. 09/30/2003 Fentress contract amended to increase construction budget to $25,527,753 11/02/2003 Voters approved TOT increase of 1% on Group Meeting Hotels 11/19/2003 First round of bids came in well over estimate and design team was sent back out to redesign project to meet the budget. 12/04/2003 Study session presentation on current estimate at$29,753,394 01/28/2004 Study Session presentation showing estimate at$26,638,239 (After VE cuts). Funds available for construction at that time were $26,348,239 plus bidding period contingency of$800,000 and % of the north parking lot fiords of$575,00 for a total of$27,723,239. 02/01/2003 Plan revision completed and project was put out on the street with an estimated construction cost of$28,041,531. 03/23/2003 All second round bids received and project is $6,828,990 over budget. 3/?` S ec, Palm Springs Convention Center Expansion City Project No. 02-27 PRESENTATION OF COMPETITIVE BIDS ',r:��'t '� f.•¢*'J� x 'r Ff�'' �• � �y�F` �� r "ar e s" '7' � . J L.. :�'�w�•..Y r„�k Tfi�� >��� y�Jt '� .( '(Tr k<i / �4` ,F q.•4 •.i<:-,;._ ,. L{ �,,�'��a ��'�`.l�`�M+ �,'i Y�''f�a:,���!r � � � "` "w ���,e'�� t�v Y ad ..t—`L < �'i�x y{y� ��*p$('f,J r•� �:!{�}� _f ,�f�, � �'�* �F - , �h /.�� �,�ry ,r'f> 'r• � � (!y.,✓,�,� Y! f` F7:, Y 1 '� �Y xi 1frtfls�ly/4 4•e.0 . hr #5'�1 .X1' !t•� JrJH r��'!, FJ�ai't/,yJ� i, alTY4 , �•l rµM' 1��k CITY COUNCIL PRESENTATION Special Meeting Dated: March 24, 2004 r ' PALM SPRINGS CONVENTION CENTER EXPANSION PROJECT Construction Costs �$tifiate Js'dct(/�1 Bras: Trade# Description Estimate Bid Variance 1 Demolition 1,012,203 369,233 642,970 2 Dry Utilties 136,000 114,406 21,594 3 Site Demo/Grading 747,154 747,154 0 no bid 4 Drilled Caissons 108,899 153,000 -44,101 5 Site Concrete-Civil 182,137 82,000 100,137 6 Site Concrete-Arch 367,456 352,275.78 15,180 7 Landscape & Irrig. 403,600 381,800 21,800 8 Concrete & Reinforci 1,702,204 1,897,000 -194,796 9 Masonry 1,446,201 1,700,000 -253,799 reject/rebid 10 Structural Steel 5,614,424 8,765,000 -3,150,576 11 Copper Facia 150,940 277,548 -126,608 12 Lath,Plaster Drywall 2,951,912 7,148,000 -4,196,088 13 Roofing 719,010 688,900 30,110 14 Flashing &Sheet Mel 339,070 348,095 -9,025 15 Doors,Frames & Hard\ 186,200 179,200 7,000 16 Glass &Glazing 825,190 598,700 226,490 17 Acoustical Ceilings 1,145,900 1,530,777 -384,877 18 Tile 57,320 119,000 -61,680 19 Carpet 557,886 251,350 306,536 20 Painting 298,669 361,000 -62,331 21 Plumbing 723,121 700,000 23,121 22 HVAC 2,375,000 2,648,743 -273,743 23 Fire Sprinklers 315,740 269,000 46,740 24 Electrical 2,296,027 1,511,000 785,027 25 Wet Utilities 328,469 623,880 -295,411 incl. $108,000 deduct 26 Mill Work 117,330 117,330 0 Quoting later 27 Waterproofing 34,620 34,620 0 Quoting later 29 Special Doors 24,500 24,500 0 Quoting later 32 Toilet Compartments 20,605 20,605 0 Quoting later 33 Misc. Specialties 62,550 62,550 0 Quoting later 34 Signage 94,000 94,000 0 Quoting later 35 Operable walls 501,200 498,000 3,200 38 Direct Purchase Equip 1,695,994 1,648,676 47,318 40 Parking Lot 500,000 553,177.85 53 178 TOTALS 28,041,531 34,870,520.63 •,, 0MWIV Palm Springs Convention Center Expansion Project Project Costs: Architectural Design $2,564,043 Special Studies 93,000 Arch Fee Increase ( $25.6M) 394,720 Arch Adjustment(SD-DD) 13,320 Arch Adjustment(DD-CD) 119,889 Environmental Docs. 58,000 Topo Survey 18,000 Pre-Const CM 174,502 CM Services 1,806,597 Turner Fee Increase ($25.6M) 162,400 City Representative 304,600 Plan Check(Fast Track) 68,000 Testing & Inspection 200,000 Blueprinting 85,000 City Administration 160,000 Builders Risk Insurance 30,500 SubTotal Soft Costs $6,252,571 Pre-Opening Marketing $400,000 FF&E Set Aside 400,000 General Requirements 741,025 Construction Contigency 3,642,990 Eohsfruction=Cost 34,870;520 °, Sub Total Hard Costs $40,054,535 TOTAL PROJECT COSTS $46,307,106 Land Set Aside $1,250,000 Needed Bond Proceeds $47,557,106 Proceeds Available $40,854,309 Addtl. Proceeds/cuts Needed $6,702,797 Listing of Recent Project Bids 6Na'shln fonfMS,Mbftl Pili' 6'sa Bld °21,600 s Lft.lsto S;buildin *13/4/200,4,;,C�,$Qi6,00,000= _$4;509140g - '2fi.3% New-, Pacolhla ail&dle'iS6hbo1 ' ,0b0's".'ff,.'1'sko - !1'�1;312/2004 $'r,-,21}73,Q{, $5;454,'b00 v: 58.9°(° Ali Palmdale Sherrlf Station Rebid-47,000 sq.ft, 11 acres site area,250 parking spaces 3/3/2004 $15,226,073 $15,098,500 -0.8% New SianatGaCde'nsti,&�;Sak'p�LfleMenta' }BIDSiRE''JECTED _ I1 /3/20045' 1'$>F006,2i .I I,Now, Transit Operations Buildin -6,660 s .it.,1 sto Government building 3/3/2004 $2,000,000 $1,814,212 -9.3% New (3;$„Wi',S.B isludenitlil(iiibmEx ,ans'ip'IY/Reriovehorj�,$21000os, {f l;yE'stones--2;U,dj1>yin s ` ,,,392I,2004 ':',$1112;,18Q000, �$'V00'000-9MU Add/Alt fvlTlD3bIp�0Ftj 141, ms ; 1i 8 site loo�'tions IEldrnenl'ry1 alassroofis&r )200 I r q '[ r;idder0lzation,wrk A [ IF n 'I ,, '�_' 1,312 �$6410g0 $6�Y_3 8800 '13:2°/ Ne^ r5 SanWiMarI6'P„bbIIc AdmIWBfd1,10100,0,s'.ft 1 b"uildin', 3/112004 ,:$2,08y000 $2,235„800 '7.2%-_ Nevi: Z ��r 6y rdas Callege'L'Ifirary' Pnase`II 62,000'sq fti'2 stories,l bldg 2/2T/2004 $'4650138 $6,592;200 Q0.6%- Newi SAN;i FERNANDO'-HIGHSC.00L-SAFETY'-8c ECH UPS Systeins,'Alatm y27/2004 $2,202,000� $2;984A79, 35.5% ' Alt Detedtipn S stems,•Voice$Data S stems;Pu_bllu Address,S'stems VineiStre°etrElementa School Classrooms= 10 classrooms. 2/2 712 0 0 4i �$3,600,000 $4,299,600, 19.4% Alt WHITTIER CITY SCHOOL DIST MOD URN17ATION':HVAC'&'und'ergroundutility _2126/2004:-$3i000,000, $3,74,0,000 24.7% - At 4� re-laceme6h - Santa Clara Medical Valley Speciality Center-Hospital 2/26/2004 $2,500,000 $2,636,411 5.5% Add/Alt Butte Co Courthouse-15,000 sq.ft,2 stories,(1 is below gound),2 bldgs,30 parking 2/25/2004 $2,900,000 $3,637,114 25.4% Alt spaces Spanish Springs Valley Library-32,500,1 story,1 building,91 parking spaces library 212512004 $4,500,000 $5,639,330 25.3% New SPANISH SPRINGS VALLEY LIBRARY(NV)-32,500 square feet, 1 story,1 building 2/25/2004 $4,500,000 $5,639,330 25.3% New ,91 parkin spaces UOSPRSyCHOLQGY� BLDG AD ITIONI'&REiN,EWAL,i3100bi SF(Rebk(tjl4er scope 2125/2,004 i$10225000i°$10;'894(191- �fi.5°/ Add/Al[ clia'lner } , „id ;�� r.a- -: rwu II._,� , F ., _ - SWEETWATER HIGH SCHOOL ENRICHMENT Sah Diego,Senior High School 21P4/2004 $2,300„0'0Q $2;Z15,000' 18�.0% Alt Alteration's MARLTON`SCHOOL-SAFETY&TECHNOLOGY- - 2/19'/2004 1$2,033(7261';$3,280;000 61,3% Alt PASADENA INDOOR/OUTDOOR SHOOTING RANGE 2/18/2004 $1,000,000 $1,940,000 94.0% New KARin /I-AMB,MIDDCE'SCHOOL(LasVegas)`148,000 square foot-1Istoryy 1,' 21812004 $20,000000; $21,558,700 7.8% -NevY build .16 ad[ces!'sile area 6--�'SIMI VALLEY CITY HALL SENIOR CENTER&CIVIC CENTER 2/17/2004 $15,000,000 $24,678,000 64.5% Add/Alt Banning'Hi h 5'chool'Gymnasium c Bldq 211212004= {$5;9 0,000 ,i$6,318,125 W8% NOW" -7-Z�> OXNARD WWTP HEADWORKS PROJECT Oxnard Wastewater Treatment Plant 2/11/2004 $30,219,200 $39,040,000 29.2% New DOWNTOWN RIVERSIDE PARKING STRUCTURE 6 241,330 square feet,6 stories, 2/1 112 0 0 4 $10,700,000 $12,740,000 19.1% New 1 building,558 Parking spaces UC;D'AVISiVE7;ly1;E;D CONSUMER EDUC P!{'Vh'ION Vetenngry Clmic LIn�3erslly 2111/2�00�1r 4110001000i I'ii {{]61946 1T.7/ Nel?,_" ColjsNmer Education Pavihoq'r _ _I !�,-- "1.'-� „_ -r ,� I, u. A ll, ,--iar , BEN'CHLEY,-WEINBERGER ELEMENTARY SCHOOL,San Diego-Modernization 2/10/2004 $2,000:0001 $2,695,477 34:8% Alt HUMBOLDT COUNTY ANIMAL SHELTER 13,537 square feet,1 story,1 building,24 2/3/2004 $2,500,000 $3,089,590 23.6% New parking s aces on a Cultural Center 211/2004 $22,000 000 $32,000 000 45 5/ New UC9JharmaSe"aPi6al L.,tm-es La;Jollat. r,,l„ - . :, ,.7J1I2004,.1'_$3,Oj000,000s ,$37{000;000;,p43'3/" New-, LEXINGTON JU{410R'HIGH SCHOOL,Cypress-101000 sgpare'feet,Jrstory,1 building-,$cope Junior;,Nigh School,Classroom[s]Administrative,Classroor-I 1/29/2004 $6,800,000 $7,643,000 12.4% Add/Alt Offiae s i Restroom - Tesora Del Val la Robid,,San'ta'Clarita(1st aid date Nov.2003)They saved money on 1/1 912 60 4 $10,646,280 $12,563,503 18.0% New O$IP Prop ram'604,437 s .fr.,.2 stories,3,buildin s,10 acres site area I - Lucille.Elementary School-35',000 a'.ft.,2 stories,10 buildings 12/9/2003 1 $7,139,300 $8,301,500 16.3% New Manhattan Beach Police&Fire Facility 11/31/2003 $22,845,000 $28,647,000 25.4% Add/Alt Anaheim-Police Satellite Station 11/15/2003 $3,800,000 $5,100,000 34.2% New _ Hermosa Beach Life Guard Station&Pier Entrance 11/15/2003 $3,400,000 $4,450,000 30.9% New JeffersonElernenta School,LAUSID 11/1/2003'; �$20,000;000 $31',200,000 F 56.00/,i New U,CSB PSYCp,IOI'$OGY1 BLDG;1Sg`ntz Barthzi&On final Bld lit S,7111/2003,,;$EAt2Q0 000.;:$12]200 000-;h`IOi6°/N.Ad'd/AIC Senior Community Center,Rancho Cucamonga 11/1/2003 $17.000,000 $17,600,000 35% New DWP Headquarters,Los Angeles 10/15/2003 $20,000,000 $26,000,000 30.0% New Vir inia Park Rehab,Santa Monica 10/1/2003 $8,000,000 $8,900,000 11.3% New Palmdale Sheriffs Station 9l1/2003 $12,000,000 $17,000,000 41.7% New Transit Ad,,,and Maintenance,Santa Clarita 9/1/2003 $14,600,000 $16,200,000 11.0% New , DOT DISTRICT 11 OFFICE BUILDING San Diego-301,000 square feet,5 buildings, 8/12/2003 $56,200,000 $66,537,000 18.4% New 12 acres site area Schools and Community Colleges UC System Projects= CW.1 R°10.1 m Pmf ml all, UCI Design and Constructlon Services Richard Gonser AIA CSI Page 1 of 1 3/18/2004 The above Projects are from various public sources including Reed Construction Bulletin as of 311912004. CONVENTION CENTER EXPANSION PHASE II TIME LINE 11/05/2002 Voters approved TOT increase from 10% to 12.5% 12/18/2002 Fentress Bradburn Architects- Contract Approved(Budget Set @ $20m) 01/03/2003 Turner Construction Selected as Construction Manager 03/05/2003 Construction estimate at $26,253,090 04/30/2003 Study session report showing that there was $24,205,812 funding available from Bonds for constriction. 09/30/2003 Fentress contract amended to increase constriction budget to $25,527,753 11/02/2003 Voters approved TOT increase of 1% on Group Meeting Hotels 11/19/2003 First round of bids came in well over estimate and design team was sent back out to redesign project to meet the budget. 12/04/2003 Study session presentation on current estimate at $29,753,394 01/28/2004 Study Session presentation showing estimate at $26,638,239 (After VE cuts). Funds available for constriction at that time were $26,348,239 plus bidding period contingency of$800,000 and t/z of the north parking lot funds of$575,00 for a total of$27,723,239. 02/01/2003 Plan revision completed and project was put out on the street with an estimated construction cost of$28,041,531. 03/23/2003 All second round bids received and project is $6,828,990 over budget. Palm Springs Convention Center Expansion City Project No. 02-27 PRESENTATION OF COMPETITIVE BIDS � 1, an'� .r� r i, u+V} _ �`,. ,+ '•✓' �', _ '+� �f � 'N C" r -�`r� Y`" �•`- �. � �{ �?' /�f�1 � `� � '�rr Rx x i��^� 1�i� '4� !Y',l :.r..,.-:`.:: ram'; t+, ' r' A�j„ f''ri f'�`v"� I i I Vr •. �`` ,:+''Y�y",.f�,r'.� P 11 5 ` fY �S� � � �.� {.. t^ D �a •I .5 f -f' .✓ .u✓;r.{'' x ��! r �xy !, 1 Yr. yF- J .7 CITY COUNCIL PRESENTATION Special Meeting Dated: March 24, 2004 PALM SPRINGS CONVENTION CENTER EXPANSION PROJECT Construction 02sts5tafe Vs Acft Bids ` Trade# Description Estimate Bid Variance 1 Demolition 1,012,203 369,233 642,970 2 Dry Willies 136,000 114,406 21,594 3 Site Demo/Grading 747,154 747,154 0 no bid 4 Drilled Caissons 108,899 153,000 -44,101 5 Site Concrete-Civil 182,137 82,000 100,137 6 Site Concrete-Arch 367,456 352,275.78 15,180 7 Landscape & Irrig. 403,600 381,800 21,800 8 Concrete & Reinforci 1,702,204 1,897,000 -194,796 9 Masonry 1,446,201 1,700,000 -253,799 reject/rebid 10 Structural Steel 5,614,424 8,765,000 -3,150,576 11 Copper Facia 150,940 277,548 -126,608 12 Lath,Plaster Drywall 2,951,912 7,148,000 -4,196,088 13 Roofing 719,010 688,900 30,110 14 Flashing & Sheet Mel 339,070 348,095 -9,025 15 Doors,Frames & Hard% 186,200 179,200 7,000 16 Glass& Glazing 825,190 598,700 226,490 17 Acoustical Ceilings 1,145,900 1,530,777 -384,877 18 Tile 57,320 119,000 -61,680 19 Carpet 557,886 251,350 306,536 20 Painting 298,669 361,000 -62,331 21 Plumbing 723,121 700,000 23,121 22 HVAC 2,375,000 2,648,743 -273,743 23 Fire Sprinklers 315,740 269,000 46,740 24 Electrical 2,296,027 1,511,000 785,027 25 Wet Utilities 328,469 623,880 -295,411 incl. $108,000 deduct 26 Mill Work 117,330 117,330 0 Quoting later 27 Waterproofing 34,620 34,620 0 Quoting later 29 Special Doors 24,500 24,500 0 Quoting later 32 Toilet Compartments 20,605 20,605 0 Quoting later 33 Misc. Specialties 62,550 62,550 0 Quoting later 34 Signage 94,000 94,000 0 Quoting later 35 Operable walls 501,200 498,000 3,200 38 Direct Purchase Equip 1,695,994 1,648,676 47,318 40 Parking Lot 500,000 553,177.85 53 178 TOTALS 28,041,531 34,870,52063 ,_, ,9 T",b4 Bud at,p Palm Springs Convention Center Expansion Project Project Cosfs: Architectural Design $2,564,043 Special Studies 93,000 Arch Fee Increase ($25.6M) 394,720 Arch Adjustment(SD-DD) 13,320 Arch Adjustment (DD-CD) 119,889 Environmental Docs. 58,000 Topo Survey 18,000 Pre-Const CM 174,502 CM Services 1,806,597 Turner Fee Increase ($25.6M) 162,400 City Representative 304,600 Plan Check(Fast Track) 68,000 Testing & Inspection 200,000 Blueprinting 85,000 City Administration 160,000 Builders Risk Insurance 30,500 SubTotal Soft Costs $6,252,571 Pre-Opening Marketing $400,000 FF&E Set Aside 400,000 General Requirements 741,025 Construction Contigency 3,642,990 ivo'nstruction>Cost Sub Total Hard Costs $40,054,535LL TOTAL PROJECT COSTS $46,307,106 Land Set Aside $1,250,000 Needed Bond Proceeds $47,557,106 Proceeds Available $40,854,309 Addtl. Proceeds/cuts Needed $6,702,797 Listing of Recent Project Bids W'a'shlil gW:MS,MJfh-Pdr` 'se'-Bld -21',600s. ;fC'lsto y;'9')Huif_din "314/2004: I:d$3,8,00000 ,I_$00&108 .°r25,3%i 'New f -.-� P6661h(aSMLddle School-,22i0;00 s"' ft.-i1sto -_ �,,3%312004'-,i1$3=821`736 $5t754,000- r5&9% Alt' Palmdale Sherrif Station Rebid-47,000 sq.ft,11 acres site area,250 parking spaces 3/3/2004 $15,226,073 $15,098,500 -0.8% New Sierra Gardbna'&Sa?g6n CEIehienta BIDS REJECTED .' 'r�'3/3/2004;- $4,000,000,. - 'Newt Transit O erations Buildin -8,660 s .ft.,1 sto Government building3/3/2004 $2,000,000 $1,814,212 -9.3% New CSU;SB�StuOntlu"` slon stones,2''nlon Ex an" /R60vapo`(ilk','$2S000s l yiPJ' dulldi i s '.73/2/2004'd P$.12i139 0P4--J$14',110I0,00O--IIt`'f6,2%°;,IAddlAlt Silddrinbzet pplD oclkssi'ooms IBjtll(2) 3siteilgc' tioips Elemen[,ariJr iclapsrooms& � ' 3%2/200411, $Firr6',2i IT04000i $81�39@800 32/ 1 NetYIf Santa Marla P,ubllc'A'dm'in;Bld'T;l0000 s',ftrl buildjn' 3H/2004 T .$2,0851000 $2,235,800 7.'2! - NeW'7 Z Gyp'ress College Library Phesegl 62,OOp sq Ili-2-stories,I blIdg 2/27/2004 $3;8,50,138 $6,592,200 80b7. _New't S'AN'FERNANDC)HIGH SCHOOL SAFETY'&TECH UPS'6jr'sterns Albion& "'.2/2y/20q'4� �$2,2g2,000, $2;084,079�, 356%' Alt Detection S stern'sj-Voice!&Data Systems,Public AddressZ3 stems _ Vine'Stre"et ElementaryYSchool Classrooms+ 10 classrooinsi 2/27/2004 '$3,600,000 $4,299;600 194% Alt WHITTIER-CITY SCHOOL DIST-MODERNIZATION-HVAC'&'underground utility ',2/26/2004 $310,00,000 $3,740,000 ' 124.7% All replacement Santa Clara Medical Valley Speciality Center-Hospital 2/26/2004 $2,500,000 $2,636,411 5.5% Add/Alt Butte Co Courthouse-15,000 sq.ft,2 stories,(1 is below gound),2 bldgs,30 parking 2/25/2004 $2,900,000 $3,637,114 25.4% Alt spaces11 Spanish Springs Valley Library-32,500,1 story,1 building.91 parking spaces library 2/25/2004 $4,500,000 $5.639,330 25.3% New SPANISH SPRINGS VALLEY LIBRARY(NV)-32,500 square feet, 1 story,1 building 2/25/2004 $4,500,000 $5,639,330 25.3% New ,91 parking spaces Ut,`$SrPSYCHOLOGY BLpOADDITION,&RENEWAL 31'qp9 SF(Rebid,after scope ' -p ,_,i- 1 , i , y _ "2125/2o 1 $110225/OOp j $1g,8941%g1 .i&661 Add/Ali oh .TrI r- Ti :,r 1' %i a SW(ETWATER HIGH SCHOOL ENRICHMENT-"San Diego,Senior High'School 2/20./2004, $2;300,OOQ $2„715,000 180%� All Altefatidns MARLTON''SCHOOI:SAFETY &TECHNOLOGY_,_ 2/1912004,Y,$2,033,726? 'I$3,280;000 '.'6.1.3% ,Alt,- s.� PASADENA INDOOR/OUTDOOR SHOOTING RANGE 2/18/2004 $1,000,000 $1,940,000 94.0% New KAREN/LAMB,MIDDL`E'SCH90L(Las Vega§)V148i000 Bggard Meek 4 sidry',1, 2/18/2004- $20,000 000; -$21,558,700 7,13% _ New buildin ,16 acres;sit,area' - - 6---�)P SIMI VALLEY CITY HALL SENIOR CENTER&CIVIC CENTER 2/17/2004 $15,000,000 $24,678,000 64.5% Add/Alt Banning'Hih'School Gymnasium-34,000's ;itG'rn&'Athletic-Bld "2/12/2004 -,($5;900,000 1$61,418;125 8.8%J ',New7, 7 OXNARD WWTP HEADWORKS PROJECT Oxnard Wastewater Treatment Plant 2/11/2004 $30,219,200 $39,040,000 29.2% New DOWNTOWN RIVERSIDE PARKING STRUCTURE 6 241,330 square feet,6 stories, 2/11/2004 $10,700,000 $12,740,000 19.1% New 1 buildin ,558 parking spaces UC;gAV1S'YE7,MF,D CONSUI�I_REDUC PAV�QQN' VetoOnary C)irno Unl�ersity ' ` I �' 1' g )q 76946 1T`�/i r , 1211�(20041 $�j17000tlDII iy WWI GotisumerlErliicalion'P,e 'I t-„'d. --t`il 1 N11 �. 'I, Ih" ° I- BENCHLEY--WEINBERGER ELEMENTARY SCHOOL,San-Die o_Modernization- 2/1,0/2004 $2,000,000 $2,695,477 �3,L8% Alt HUMBOLDT COUNTY ANIMAL SHELTER 13,537 square feet,1 story,1 building 24 2/3/2004 $2,500,000 $3,089,590 23.6% New parking spaces a Cultural Center 2 1 04 i'�$3,OI000r00q?r,$32 000 Oo0 45 5/ New U09DPha" `-�- - °' -" Rancho Cucamon -rmaoeiYtieel$'clenpespLalldlla'I, - - ` C2C14200; ' '7„'J0gO,0O0`3'233/ :Nei", LEXINGTON JUNIOR'HIGH SCHOOL,Cypress-10,000 square'feet,1,stary,'I building-.Scope Junior High School,Classrooms]Adrninislrative,Classroomisj, 1129/2Q04 $6,800,000 $7;643,000 12A% Add/Alt OfNce s Restroorn " - - Tes'oraD'elValleR,ebidFSanta'Clarita(Iat'iFltlate,No'-,2003)They'sabedmoney on 1/19I2004 $,10,648,280� $12,56,3,503 �180% tjlew' OBIT Pro ram 604,437-s .tr.y stories,3 buildings,10 acres site area Lucille Elementar School-95;600's.ft uildih's 12/9/2003 $7,139,300 $8,301,500 16.3% New - Manhattan Beach Police&Fire Facility 11/31/2003 $22,845,000 $28,647,000 25.4% Add/Alt 9 -� Anaheim-Police Satellite Station 11/15/2003 $3,800,000 $5,100,000 34.2% New Hermosa Beach Life Guard Station&Pier Entrance 11/15/2003 $3,400,000 $4,450,000 30.9% New Jefferson Elemehta - Sch'ool,-LAUSD 1171/2003"'$20,000;000 $3,1;200Og0 "56.00/,i ,New. U,CSB PSY'HOL'OGY1BEDG)Santa'�Barfiarar Ori Inel,Bjii`i'�, �l,1191/2003",r$4,0'u2gp 000;,312,200r00tl11; ;A,,bd(Alt Senior Community Center,Rancho Cucamonga 111112003 $17,000,000 $17,600,000 3.5% New )0 p DWP Headquarters,Los Angeles 10/15/2003 $20,000,000 $26,000,000 30.0% New Virginia Park Rehab,Santa Monica 10/1/2003 $8.000,000 $8,900,000 11.3% New Palmdale Sheriffs Station 9/1/2003 $12,000,000 $17,000,000 41.7% New Transit Admin and Maintenance,Santa Clarke 9/1/2003 $14,600,000 $16,200,000 11.0% New DOT DISTRICT 11 OFFICE BUILDING San Diego-301,000 square feet,5 buildings, 8/12/2003 $56,200,000 $66,537,000 18.4% New 12 acres site area Schools and Community Colleges UC System Projects= Ounlrai ReyrslIM of Prdwt ads UCI Design and Construction Services Richard Gonser AIA CSI Page 1 of 1 3/18/2004 The above Projects are from various public sources including Reed Construction Bulletin as of 3/19/2D04. RESOLUTION NO. OF THE CITY COUNCIL OF THE CITY OF PALM SPRINGS, CALIFORNIA,ACCEPTING THE CLERICAL ERROR,ALLOWING THE WITHDRAWAL OF BID AND RETURN OF BID BOND TO JOHN BARAJAS MASONRY FOR THE PALM SPRINGS CONVENTION CENTER EXPANSION,CITY PROJECT NO.02-27, TRADE CONTRACT NO,9 MASONRY/STONE,AND REJECT ALL REMAINING BIDS AND AUTHORIZE STAFF TO IMMEDIATELY REBID THE TRADE. WHEREAS,on March 16,2004 Trade Bid No.9 forthe Convention Center Expansion project, City Project No. 02-27, was opened with a pre-bid estimate/budget of$1,446,201; and WHEREAS, bids were received from John Barajas ($1,164,452), Winegardner Masonry ($2,100,000), DBM/Hatch ($2,228,841) and Kretschmer& Smith ($2,568,000); and WHEREAS, shortly after the bid opening the city was advised by the low bidder that he had discovered a large clerical error in his bid and was requesting a withdrawal of his bid; and WHEREAS, upon receipt of official correspondence from Mr Barajas outlining the specifics of the clerical error, staff conducted a review of the evidence submitted and concurs that a clerical error did occur; and WHEREAS, the remaining three bids are all well in excess of the established budget, NOW THEREFORE BE IT RESOLVED by the City Council of the City of Palm Springs as follows: Section 1. That the City finds that the low bidder John Barajas Masonry,submitted a bid with a clerical error and hereby allows the bids withdrawal and release of the bid bond ; and Section 2. That all other bids received for Trade Bid No. 9, Masonry/Stone, were in excess of the established budget and that they are all hereby rejected and staff is authorized to immediately rebid the Trade. ADOPTED this?fl t i` Day of March, 2004 AYES: NOES: ABSENT: ATTEST: CITY OF PALM SPRINGS , CALIFORNIA By City Clerk City Manager REVIEWED & APPROVED AS TO FORM J