HomeMy WebLinkAbout3/31/2004 - STAFF REPORTS (5) 31
DATE: March 2004
TO: City Council
FROM: Director of Public Works/City Engineer
PALM SPRINGS CONVENTION CENTER EXPANSION PARKING LOT .& STREET
IMPROVEMENTS
RECOMMENDATION:
It is recommend that the City Council award contract to Contreras Construction Co., in
the amount of $730,356.25, for Alternative Bid Schedule A, Alternative Deductive Bid
Schedule C, Additive Bid Schedule D, and Additive Bid Schedule E for the Palm Springs
Convention Center Expansion Parking Lot & Street Improvements, City Project 02-27,
subject to the City Council's approval of bond documents.
SUMMARY:
Award of this contract will construct a new parking lot at the northeast corner of Amado
Road and Calle Alvarado, as well as adjacent street improvements, in conjunction with
the expansion of the Palm Springs Convention Center.
BACKGROUND:
On May 7, 2003, the City Council approved the Convention Center Expansion project,
which included construction of a new parking lot on vacant City land located at the
northeast corner of Amado Road and Calle Alvarado, and adjacent street improvements.
Engineering Division staff was initially responsible for the preparation of the parking lot
and street improvement plans, which was included in the original Bid Package solicited
by Turner Construction in October and November. On November 19, 2003, the City
Council rejected all of the construction bids and directed staff to re-design the
convention center expansion plans such that the project costs would be lowered to an
amount allowed by the project budget.
Additionally, Engineering Division staff was directed to proceed with preparation of a
separate Bid Package for the parking lot and street improvements, including landscaping
and irrigation for the parking lot. The landscaping and irrigation plans were prepared by
Michael Buccino. Therefore, Engineering Division staff assembled project specifications
and a Bid Package for this project, consisting of several Bid Schedules to give City
Council options for awarding components of the project in the event construction bids
are higher than the budget allocated for the parking lot and street improvement
construction.
The Bid Package includes eight Bid Schedules. Bid Schedule A includes a scope of
work that is all inclusive and will construct the entire "North Parking Lot", and adjacent
street improvements, as well as associated parking lot landscaping, irrigation, and
parking lot lighting and electrical system. Alternative Bid Schedule A includes a scope of
work that will construct only the south half of the "North Parking Lot", and adjacent street
improvements. Companions to these two Bid Schedules are options related to the
decorative meandering sidewalk, and the size of the "Southern Live Oak" trees to be
installed.
4y)q
Palm Springs Convention Center Expansion Parking Lot&Street Improvements
March 24,2004
Page 2
Another separate component to the project is the requirement to install storm drain
improvements at the northwest corner of Amado Road and Avenida Caballeros. A
standard requirement associated with construction of parking lots is to accommodate the
increased storm water runoff resulting from the conversion of vacant land to an
impervious paved surface. The increase in runoff is somewhat substantial, and
measures are necessary to collect this runoff so that downstream properties are not
affected. Most areas of the City do not have storm drain facilities with which to use to
direct this increased runoff, however, in this case, the City has a large storm drain facility
within Avenida Caballeros maintained by Riverside County Flood Control District into
which the increased runoff may be directed. Additive Bid Schedule D includes the scope
of work to install a catch basin, storm drain lateral and related improvements to facilitate
this issue. This scope of work is necessary without regard to what portion of the parking
lot is awarded by Council, and was a mitigation measure associated with the approval of
the Convention Center project.
The last component of the project is the proposal to construct a decorative meandering
colored concrete pedestrian walkway across the east leg of Amado Road. This
improvement would provide for a clearly delineated crossing point, with curb "pop-outs"
on the northeast and southeast corners of the intersection to allow for a narrowed and
safer pedestrian crossing point from the parking lot to the Convention Center. Additive
Bid Schedule E includes the scope of work to remove existing improvements at the
Amado Road and Calle Alvarado intersection and to construct the decorative pedestrian
walkway. The project was advertised for bids, and at 4:00 P.M. on March 12, 2004, the
Department of Procurement and Contracting received bids from the following contractors
(see Attachment 1 for bid results):
Contractor:
1. Contreras Construction Co.; Indio, CA
2. Vance Corporation; Rialto, CA
3. Granite Construction Company; Watsonville, CA
4. Matich Corporation; San Bernardino, CA
The Engineer's Estimate was $962,000 for Bid Schedule A; $628,000 for Alternative Bid
Schedule A; $28,000 for Additive Bid Schedule D; and $60,000 for Additive Bid
Schedule E. Estimates for the Deductive Bid Schedules were unknown. The basis of
award is the total sum of Bid Schedule A, Additive Bid Schedule D, and Additive Bid
Schedule E. The low bidder is Contreras Construction Co., from Indio, CA. The
company is a California partnership whose partners are Enrique Contreras and Ruben
Contreras.
Funds for this project are available from a number of sources. Of the total contract
amount of $730,356.25, $148,215.90 represents the total cost of associated street
improvements for Amado Road and Calle Alvarado, as well as the entire cost of Additive
Bid Schedule E ($52,045.00) for the decorative pedestrian cross-walk and related street
improvements that will be funded through local Measure A revenue funds budgeted in
account number 134-4498-50227 (Amado/Alvarado St Improv). Funding for the storm
drain improvements for this project, Additive Bid Schedule D, ($28,962.50) will be funded
from unallocated drainage fund revenues budgeted in account number 135-4371-50227
(Tachevah Outlet Drain Connector).
q#2,--
Palm Springs Convention Center Expansion Parking Lot&Street Improvements
March 24, 2004
Page 3
The balance of the total contract amount, $553,177.85, includes the cost of constructing
the south-half of the "North Parking Lot", including all associated parking lot
improvements, landscaping, irrigation, lighting and electrical system improvements
(Alternative Bid Schedule A) and is scheduled to be funded from future revenue
generated by the Convention Center Expansion Bond issue. The award of this contract
is subject to City Council's approval of those bond documents.
SUBMITTED:
I
DAVID J. BARAKIAN
Director of Public Works/City Engineer
APPROVED:
DAVID READY
City Manager
ATTACHMENTS:
1. Bid Results
2. Minute Order
VA3
PALM SPRINGS CONVENTION CENTER EXPANSION PARKING LOT& STREET IMPROVEMENTS
BID RESULTS
Contractor Bid Sch. A Alt. Bid Sch. Ded. Bid Alt. Ded. Bid Ded. Bid Alt. Ded. Bid Additive Bid Additive Bid Basis of
A Sch. B Sch. B. Sch. C Sch. C Sch. D Sch. E Award
Contreras
Construction $1,048,322.50 $653,848.75 $52,200.00 $40,950.00 $11,700.00 $4,500.00 $28,962.50 $52,045.00 $1,129,330.00
Company
Vance $1,112,528.00 $923,683.00 $4,640.00 $3,640.00 $9,360.00 $3,600.00 $35,525.00 $54,035.00 $1,202,088.00
Corporation
Granite
Construction $1,150,515.00 $795,367.50 $0.00 $0.00 $9,360.00 $3,600.00 $28,255.00 $58,617.50 $1,237,387.50
Company
Matich $1,374,374.00 $1,029,029.00 $116.00 $91.00 $7,800.00 $3,000.00 $37,915.00 $91,437.50 $1,503,726.50
Corporation
MINUTE ORDER NO.
AWARDING CONTRACT TO CONTRERAS
CONSTRUCTION CO., IN THE AMOUNT OF
$730,356.25, FOR ALTERNATIVE BID
SCHEDULE A, ALTERNATIVE DEDUCTIVE BID
SCHEDULE C, ADDITIVE BID SCHEDULE D, AND
ADDITIVE BID SCHEDULE E FOR THE PALM
SPRINGS CONVENTION CENTER EXPANSION
PARKING LOT & STREET IMPROVEMENTS,
CITY PROJECT 02-27, SUBJECT TO THE CITY
COUNCIL'S APPROVAL OF BOND DOCUMENTS
I HEREBY CERTIFY that this Minute Order, awarding contract to Contreras Construction
Co., in the amount of $730,356.25, for Alternative Bid Schedule A, Alternative Deductive
Bid Schedule C, Additive Bid Schedule D, and Additive Bid Schedule E for the Palm
Springs Convention Center Expansion Parking Lot & Street Improvements, City Project
02-27, subject to the City Council's approval of bond documents, was adopted by the
City Council of the City of Palm Springs, California, in a meeting thereof held on the 241"
day of March, 2004.
PATRICIA A. SANDERS
City Clerk
q5