HomeMy WebLinkAbout5/5/2004 - STAFF REPORTS (9) DATE: May 5, 2004
TO: City Council
FROM: Convention Center Project Administrator
SUPPLEMENTAL REPORT - ITEMS 6 & 7 - CONVENTION CENTER
RECOMMENDATION:
It is recommended that City Council select either Stone or Synthetic Stone for Trade No. 9,
award Trade Contracts 9 & 12 for the Convention Center Project to the lowest responsive
bidders, and approve a deductive Change order for Trade 12.
SUMMARY:
These actions will complete the awards of the major Trade Contracts for the Convention
Center Expansion Project.
BUDGET UPDATE:
At the last reporting to City Council the project construction cost was estimated to be
$32.28M plus a $3.584M contingency (11.1% contingency). Now with all the major Trade
bids complete the construction cost is$33.09M,which assumes the use of actual stone, and
the contingency has been reduced to$2.745M (8.3% contingency). A project of this size an
complexity will utilize every dollar of a 10% contingency. Staff is already working on further
value engineering to try and save dollars, however, previous efforts have really cut the
project to the bare minimums. Other alternatives to raise the contingency up to at least the
10% level include adjusting the bond issuance size at the last possible minute to maximize
the dollar production based on actual interest rates without increasing the annual debt
service or agree to take on some additional debt to raise the necessary funds.
BACKGROUND:
The Convention Center Expansion project is being developed via a Construction
Management form of contracting and individual Trade bids have been sought on 36 separate
trades. The last two major Trade bids ,Trade No. 9 Stone/ Masonry and Trade No. 12
Drywall/Stucco/Steel Studs, were received on May 4, 2004. Trade No. 9 was bid with three
alternatives: Ashler Stone or Slate Stone or Synthetic Stone. The bids received were as
follows: (Please note that the type of product selected will result in a different low contractor.)
Trade No. 9 Stone/Masonry (3:OOpm bid) (Budget $1,600,000)
Bidders Base Bid Slate Alt. Synthetic Alt.
No. 1 $2,093,436 $1,863,306 $2,004,310
No .2 $2,209,900 $2,297,800 $1,530,980
So as to protect the City from any possible question of bias based on who the bidders were
(note all were pre-qualified as firms),the City Council is requested to select a stone type first
by Minute Order and then staff will provide the appropriate Resolution for contract award.
Staff recommends utilizing the Slate Stone as the appropriate material as it is the lowest
priced real stone alternative. The stone will be in high traffic areas and Synthetic stone can
be damaged easily, thus making its life cycle cost higher than real stone.
PWs l �ken 6 � is
Trade No. 12 Drywall/Stucco/Steel Studs (3:30 pm bid) (Budget$5,420,000)
Bidders Bid
Martin Corp. $6,875,000
Standard $6,163,000
Berger Bros $6,557,000
John Jory $6,338,000
The low bidderwas Standard Drywall, Inc. At$6,163,000 which is$743,000 overthe budget.
During this rebidding process the project was substantially changed to try and achieve
budget. The low bid last time was a million dollars higher than this latest result. Even with
the major design changes in the project the cost escalation of steel studs consumed some
of the expected savings during the rebid process. The closely grouped bid results supports
the fact that we have a good low bid and staff recommends City Council proceed with an
award of contract to Standard Drywall.
Staff has negotiated with Standard Drywall to reduce the overall cost and has achieved a
deductive Change Order in the amount of($192,260) . The reductions are primarily change
in paymentterms, such as pay within ten days results in a$123,000 deduct, and some minor
material changes.
A Minute Order selecting the Stone alternative,two Resolutions awarding the Trade contracts
and a Resolution approving Change Order No.1 to Trade 12 are attached for City Council
c - s'deraf
A)len F. Smoot Harold E. Good
Convention Center Project Administrator Director, Procurement & Contracting
Approved: r!7/'c �
City Manage
ATTACHMENTS:
1. Minute Order
2. Resolutions Awarding Contracts (2)
3. Resolution Approving Change Order No. 1, Trade 12
4. Budget Data, Attachments 1 & 2
�1
m 6 a, a
No.7769
CITY OF PALM SPRINGS, CALIE'ORE`IIA
52010 t Tahqultz, Canyon Way
Springs, Cahforuia
PALh1 uGS CCNVENTION CENTER
EXPANSION PHASE II
Cltyy Project No. 02-27
. NOTICE TO,PR D E-QUALIFIE
TRADE CONTRACTORS
TRADE RID PACKAGE '12 (RE-UIiD)
Dins for Line Following Trades:
Metal Stud Framing, Drywall, Factor,
GFRG, Stucco, Insulation and
Pureproofsng
NOTE: ALL EFTS HAS BEEN RrMOVEPJ FROM
THE REVISED SCOPE OF WORK COVERED IN
THIS RE-BID
N-1 NOTICE IS I lLnEBV GIVEN that sealed Bids
will he received from Trade Conti actors who have
successfully completed the trade specific pre-
q uallfscauon prooess(es) set forth by the eIty.
Said Bids will be accepted at the Office of the Di-
rector of Procurement & Contracllng at 3200 E.
PROOF OF PUBLICATION Tah%lZ,Canyon Way in the City of Palm Springs
The Wod<is to be performed In sti let accordance
(20I5.5.C.C.P) with the contiact documents and Is descrlbed in
four(4) Individual Tiads Bid Packages (by Trade)
for the Palm Spprings Convention Center Expan-
sion Phase II, Cuy Project 4M2-27 The City has
contracted with Turner Construction Companyto
be the Construction Manager foi Ore Project. the
City and Turner Conch action Company have one-
son to develop the project's trade contracts via a
pre- tracts
will attendedqbe an held by the City lication pd The iant cof Palm
Springs
N-2 The list of pre-quallfied trade contractais is
STATE OF CALIFORNIA Pod idedsup lllersw for he benefit of sub-contractors
County of Riverside - '-
Bening Johnson Company
Berger Bros, Inc.
Gypsum Enterprises
John Jory Corpporation
Performance CCng
Sierra Lathing Company
Standard Di yorpo Ino,T-Mar Construction, Inc.
dba MaKin Ciron
N-3 DATES AN!) TIMES OF OPENING BEDS:
orpor¢
I alb a citizen of the United States and a resident of Bids for Trade Bid Package 12 gRe-Bid) Metal
the County aforesaid;I am over the age of eighteen Stud Framing, Drywall, plaster, "FtaG, Stucco,
ears,and not a par to or interested in the Insulation and Fireproofing will be ieceived in I
the Y party he Olty of Palm Procurement
Calliornlar,t from gthe
above-entitled matter.I am the principal clerk of a above listed Trade Contractors until 3;30 P.M.,
printer of the,DESERT SUN PUBLISHING local time,April 27,20(1
COMPANY a newspaper of general circulation, Immediately after the times established as the
deadline foi' iecelpt of bids, bids will confined
printed and published in the city of Palm Springs, and lead aloud. It is the responsibility of the Bid-
Count of Riverside,and which newspaper has been der to sea that any Bid sent through the mail, by
Ydelivery service or hand-delivered shall have suffi-
adjudged a newspaper of general circulation by the clout time to be ieceived Uy the Director in the
Department of Procurement&Contracting prior to
Superior Court of the County of Riverside,State of the Bid Opening Time. Late Bids will be lammed
to the Bidder unopened
Number 1 under the take of March 24, h the
CflSC N-4 LOCATION OF THE WORK:The Work to be
Number I9I23(;That the notice,of which the constructed hereunder is located at the Palm
annexed is a I'Inked CO a❑Of smaller Springs Convention Center, 277 N. Avenida Ca-
printed PySet In( tyP bulems in the City of Palm Springs, California.
than non parcel,has been published in each regular Iv-6 DESCRIPTION OF THE WORK: The Palm
ant entire issue of said newspaper and not in any springs Convention Center is awned and operm-
supplement thereof on the following dates,to wit: mooted h of Constrruction company to
serve as Construction Manager for the or act. In-
dividual trade contracts will be bid, awar ed and
April 3i6,I011' held by the City. The project Is an expansion to L�
the exist rig Palm Springs Convention Center. Q
__________________ _Work includes approximately 117,000 of of new 5
construction for total budding area ofapprod- h,
mately 265,000 at The e, ans,on includes ap I
proximately 35,000 of of exhlhlt hall space,
" !�
-- '-----------'- 20,000 sf of meeting loom specs, plus various s
All in the year 2004 support and ancillary spaces.The site is bounded
Y by Calle Alvarado,Amado Road,and Avenida Ca-
I certify(or declare)under penalty of perjury that the balleme and Andreas Road.The existing Conven-
tion Center and Wyndham Hotel will remain open
foregoing is true and Correct. and operational during the construction period It I
is anticipated that approximately 60 individual
trade contracts will be developed for construction
Dated at Palm Springs,California this-----28o'----day of the project, separate Bid Documents identify r
y the woik to be performed according to trade. I
I COMPLETION OF THE NfORU: Time is of
of----------April-----------------------------2004 the essences The Work must be performed ac-
cording to time linos Identified in each trade bid-
ding document.The start of construction is antici-
�= "yr�) ,) fated to be Ar i ll 19,2004,and the overall project
/��i�•��.�' �" A: n, completion ate Is scheduled to be April 30,
-/L- f:r:_�r:.^� 2005 The start site for each trade will be
coordi—nated with the overall project time hoes and will
Signature be communicated by issuance of a "Notice to
Proceed" "Liquidated Damages" clauses will he
! included in Bidding Documents and resultant
f
Contracts oI selected trades. '--
N-7 AWARD OF CONTRACT: (al The City re-
serves the right after opening bids o ieject any or
all bids,to wave any imouppality(non-responsive-
ness) in a bid, or to make awaid to the lowest
responsive,responsible bidder and re�cct all other
bids,as rt may best serve the interns of the City.
(b)As a condition of award,the successful Bidder
will be required to submit payment and perfor-
mance bonds and insurance.
H-3 BID Sr2UR6u V:Each Bid shall be accompa-
nied by a certified or cashier's checl(or Bid Bond
In the amount of al least 10 percent of the total
Bid price,payable to the City of Palm Springs,as
`tV- " it — Bid Is accepted,
?dirig'd'ocument,The start of consirucnon is aou..,-
«gated to be April 19,2004,and the overall project
e cdm letlon date Is scheduled to he April 30,
2000�.'The start date for each trade will be coordl-
'hated with the overall project time lines and will
Signature I be communicated by Issuance of a-"Notice to
'Pmcieed". i'Liguldated Damages" clauses will be
�-Included do doing Documents aruLresultant
Gontrabts=for aillebted'tmcles: -
N-7 AWARD OF CONTRACT: (a)) The City re-
serves the right after opening bids fo reject any,or
all bids,to waive any informality(non-responslve-
ness) In a bid, or to make award to the lowest
responsive,responsible bidder and reject all other
bids, as It may best serve the Interest of the City.
(b Asa condition of award,the successful Bidder
w�ll be required to submit payment and perfor-
'gtznce ponds and Insurance.
WS BID SECURITY:Each Bid shall be accompa-
Bled by a certified or cashier's check or Bid Bond
In the amount of at least 10 percent of the total
Bid price, payable to the City of Palm Springs,as
z gguarantee that the Bidder,if Its Bid Is accepted,
wlll promptly obtain the required Bonds and In-
surancb, and will prepare the required submittal
documents and execute the Agreement.
N-9 BIDS TO REMAIN OPEN: The ppBidder shall
guacalerndar days from)thece for Id d date of the 6 lop of 30
ening,
N-10 CONTRACTOR'S LICENSE CLASSIFICA-
TION: In accordance with the Provisions of Call-
fornla Public Contract Code Section 3300, the
City has determined that the Contractor shall pos-
sess a valid California State Contractor's License.
The Bidder shall ppossess a valid license In a
sppeclfled classiflcafwn: either C-2 C-9 C-26 or
I' " at the time that the Bid Is su6mlti:4 as re-
'Gulred under California Business and Profession
'Code Section 7028.16,unless exempt thereunder.
Failure to ppossess a specified license at the time
of suhmitting.a Bid shall render the Bid as non-
responsive and must be
N-11 PREVAILING WAGE RATES NOT APPI-k
CABLE: Funding for this project is derived solely
from local revenue sources and, as provided in
Section 7.06,030 of the City's Murlclpal Code,
the work shall not be subject to prevailing wage
law.
N-12 RETAINAGE FROM PAYMENTS:The Con-
tractor may elect to receive 100 percent of pay-
I.ments due under the Contract from tlme-to-time,
without retention of any portion of the payment
by the Clty, by depositing securities of equivalent
value with the City In accordance with the provl-
slons of Section 22300 of the Public Contract
.'Code. The value of such securities, If deposited
by the Contractor, shall be as determined by the
City,whose decision on valuation of the&counties
shall be final Securities eligible for investment
hereunder shallethose e on 16430ooheGovernmentCode, or bank or
savings and loan certificates of deposit.
N-13 OBTAINING OR INSPECTING CONTRACT
'DOCUMENTS: (a) A full set of Contract Docu-
ments Is available for inspection without charge at
the Office of the Procurement&Contracting,City
of Palm Springs, 3200 East Tahqudz Canyon
j Way, Palm Springs, California.
(b) Complete sets of said Contract Documents
may be ppurchased for$150,00 for the first set
and$300.00 for each additional set. If overnight
mailing is requested, an additional$50.00 fee will
be required. Documents are obtainable from:
J. P. REPROGRAPHICS
224 PPNort9h Indian Canyon
Palm Ofc(760) 32 5-California371 7 92262
N-14 ADDRESS AND MARKING OF BIDS: The
envelope enclosmgg the Bid shall be sealed and
addressed to the Clty of Palm Springs, and shall
be delivered to:
City of Palm Springa
Department o Procurement Can Contracting
Contrracting
an We
Palm Springs,uCalfornla 92262
\The envelope shall be plalnly,marked In the upper
left hand corner with the name and address of
the Bidder and shall bear the words Trade Bid
for Palm Springs PALM SPRINGS CdNVENTION
CENTER EXPANSION PHASE II and the date and
`hour of opening Bids.The name of the trade and I
the Bid Package Number shall also be clearlyy,
,marked on the outside of the envelope.The certl-
;fied or cashier's check or Bid Band shall be en-
closed In the same envelope with the Bid.
N-15 PROJECT ADMINISTRATION: All commu-
nications relative to this Work shall be directed to
David Living&ton,Turner Construction Company,
73-960 Highway 111, Suite 5, Palm Desert, CA
92260, PHONE (760 340-6161, FAX (750)
340-6411, prior to opening of Bids. All questtions
relating to interpretation of the Contract Docu-
ments or',products must be in writing, and re-
sponses will be In the form of addenda to the
Documents.
BY ORDER OF THE CITY OF PALM SPRINGS, 1
CALIFORNIA
HAROLD'E.GOOD, CPPO
Director of Procurement&
Contracting
IDATeMPUBS pill 3, 10, 2004�f ,1:
N..7770 -
CITV OF PALM SPRINGS, GALIFOE :IA
3.2.00 r- 1'ahquiI- -any.n v'talr
• ,;.rings, &.itornia
PAaIVd GF- ....,�US t)l1NVEN UCENu@P
E],y Projects PHASE.. 02 a
City Project Bfo. 02-27
fdC1'Il's 94D P'Flr-ACID" IS iWr1fT.4
C0D) MASONI-1G
9 A(17MASO) MASONRY/St'OM:_
MASONRY VEYtEcZ
` S7i^,NE M.45f3NR1'VENEER
Sid. or the Followinq T.arias: q-A !:C—E10Pb
Stone Vencer (rnasoiuy stem wall acGoofe,ied
with pylon)and 9-B REBID Stone Veneer(j.yin
tricks :Ohone l7enesr uachodes nossontLv stern
vvaas asyocisted with P91on).
N-I MOIDCE IS IFREI 13Dl-[1 that sealed Bids
will be received from Trade Connectors who have
successfully completed Ito trade specific pre-
,V yuelification process(es) set forth by the CRy
OF PUBLICATION— r Said Bads will he accepted of the Office or the
rector of PrOwill be
e C t the ong al the Di-
PROOF - E.
Tah%z Canyon Way In the City of Palm Springs
(201 G G C C P\ The lark Is w be pen.un.d m start accordance
VB 1J J 1. 1. / with the contract documents and is described in
individual Tiede Bid Packages (by Trade) for the
Palm Spi ings Convention Center Expansion
Phase II, City.Project 1,,02,-27. -Fite City has. con-
tracted wdh turner Conenuction Company to be
the Construction Manager ;or the Project. The
City and Tamer CGuSiIUGi.ioil Company have cho-
sen to dovelop the project's trade contracts via a
pre-qualification process. The resultant contracts
will be awarded and held by the City of Palm
Springs.
G9-2 The list of pre-quallhed trade contractors is
STATE Or CALIFORNIA _ _ - provided below for the benefit of sub-contractors
County of Riverside and supplaas: --- -- - — -
Broken Mn irry, Inc
Columbia Stone Inc.
Cleveland Marble Mosaic
DBM/Hatch, Inc.
EMS Construction, Inc.
Kretachemar& Smith Inc -
Do sonrp Technology
Persall IVlasomy, Inc.
- Wmegalilner Masonry, Inc
I am a citizen of the United States and a resident of
N-IS II.Ae i',i9 AND'FINES OF L'1PENIiQ13 BOfJt9:
the County aforesaid;I am over the age of eighteen
1. Bids for Trade Rid Schedule will
(Re-Bid) and
t➢years,an not a party to or interested in the Tr¢d¢ Bid Schedule 9-B (Re Bid)
win be received
above-entitled matter.I am the clerk of a in Inc Dopanmenf of Prdaaremenl & Contracling
principal of tho City of Palm Springs, Calidina, from the
printer of the,DESERT SUN PUBLISHING cal above
liistedrTrade Contractars untll s:00 F.IVI.,lo-
COMPANY anewspaper of general circulation, Immediate) er me times established as the
printed and published in the city of Palm Springs, deadline for restart of bids, bids will be opened
Count of Riverside,and which newspaper has been and read bland. It Is tits responsibility of the Bid-
der to sea that any Bid sent through the mail, by
adjudged a newspaper of general circulation by the delivery service or hand-ca ivered Sidi have auffl-
clent tune to b. ocaved by the Dlrectai in the
Superior Court of the County of Riverside,State of Department of Procurement&Contracting prior to
the Bid Opening Time. Late Bids will be returned
California under the date of March 24,1988.Case to me Bider unopened.
Number 191236; that the notice,of which the H-4 LOCn1101,1 OF TPE WI`!P-,ua The work to be
annexed is a printed co set in type not smaller aonatimated hereunder is located at the Palm
P PY YP Springs Convention Center, 277 N. Avenida La-
than non pariel,has been published in each regular baloney in the City of Palm Springs, California
and entire issue of said newspaper and not in any iV-5 0ESnCRIP`H01N OF 177E WORK: The Palm
su lement thereof on the following dates,to wit: Springs e City of
canter ra owned and a can-'
pp g ed n the City oP Palm Springs The an has con-
tracted mnlh Turner Construction Company to
serve as Consnucflon Manager far the price[. In-
April4n',11rh dividual trade contracts will be bid, swat�ad and
held by the City. The project is an expansion to
_______________________________________________________________ dre-existingy Pain Springs Conventon-Genta
`Wank Mainers apprm,irmuelyy 117,000-Sf of new
construction for a total building area of approx,-
mately 265,000 sf. The expansion includes so- _.
-------------------------- ------ proximately 35,000 of of exhibit hall spat=_, "
All In the year 2004 20,000 Of of meeting roam space, plus various
Y support and ancillary spaces. I he site IS bounded
I certify(or declare)under penalty of perjury that the by Galle Alvaraclo,Amado Road,and Avenida Ca-
halleros and Andreas Road.The existing Convert-
foregoing is true and correct. tion Center and Wyndham Hotel will remain open
and operational dwmg the constmction period. It
is anticipated that approximately 00 individual
d, trade connects wall be developed for constaucton
Dated at Palm Springs,California this-----27 ----day of the proj.ot. Sapai ate did Documents idenufy
the world to be performer) ascending to trade.
Of-____ _A ill-- P"- /Il�� r�.-._. comdlt iia oAdate lisp scheduled h:i'. .n 4il Litt Time nt r-
p -[ List be performed ac-
g tied in each trade led-
', ding document.The start of constvction is an'her
p and the overall project
________________=_____________ p to be April 30,
2005.The start date for each tied.will be coardr-
Signature noted with the overall project time lines and will
be communicated by issuance of a "Notice to
Proceed". "Llquadated Damages" clauses will be
Included in Bidding Documents and resultant
Contracts for selected trades
N-7 DID SCHISDULES: Far this trade the want is
set forth in two separate Bid Schedules. Bidders
are requested to bid an boll-Bid Schedules
N-S AVVAPID OF 6Ui i FIAC"r: (a The Work here-
under is sat forth in two separa�0 Bid Schedules
9-A(Re-Bid) and Bid Schedule 9-B (Re-Bid). Bid-
data are vested to submit, bids on both Bid
Schedule 9-A(Re-Bld)and Bid Schedule 9-B(Re-
Bid). Only one schedule will he awarded, howev-
er,and the City reserves the right to award to the
lowest responsive, responsible bidder on auL9ra'
Schedule 9-A (Re-Bitl) or Schedule 9-B (Re-Bid)
and rarest all other bids, as it may best serve the
"(bbi As a condition of award the sycceesful 6;dder
W II be required to submit bonds and Insurance
pprior to execution of the Agreement by the City.
Fallure to meet this requirement shall constitute
abandonment of the Bid by the Bidder and forfei-
ture of the.Bld,Bond.Award will then be made to
"-
the'next lowest Bidder.
',N=9 BID SECURITY: Each Bid shall be accompa-
bed by a certified or cashier's check or Bid Bond
"Iin�the amount of at least 10 percent of the high-
z list total Bid pprice.(Bid;Schedule 9-A Re-Bid or
Bid Schedule 9-B Re-Bld) , payable to the City of
SFallen springs, as a guarantee that the Bidder, if
9Ys Bid Is acceppted, will promptly obtain the re-
quired Bonds and Insurance,� and will prepare the x required submittal'documents'and execute the
Agreement.
N-10 BIDS TO REMAIN OPEN:The Bidder shall
guarantee the Total Bid Price for a period of 30
calendar days from the date of the Bid,opening.
i N-11 CONTRACTOR'&LICENSE CLASSIFICA-
TION:,In accordance with the provisions of Call-
'of61mia Public Contract Code Section 3300, the
City has determined that the Contractor shall pos-
coos a valid California State Contractor's License.
;The Bidder shall possess a valid C-29 license at
�Ihe time that the Id Is submitted,as required un-
4er California Business and Profession Code Sec-
f"tion 7028.15,unless exempt thereunder. Failure to
possess the specified license at the time of sub-
emitting a Bid shall render the Bid as non-respon-
,sive and must be rejected.
N-12 PREVAILING WAGE RATES NOT APPLI-
CABLE: Funding for this project is derived solely
^;ftdm local revenue sources and, as provided in
Sectlan 7.06.030 of the City=s Municipal Cade,
,.the work shall not be sublect to prevailing wage
law.
N'13 RETAINAGE FROM PAYMENTS:The Con-
'^teactor may elect to receive 100 percent of pay-
-neents due under theContract from time-to-time,
i`�Without retention of any portion of the payment
by the City, by depositing securities of equivalent
,value with the City In accordance with the provi-
.;stone of Section 22300 of the Public Contract
':`Code. The value of such securities, if deposited
i by.the Contractor, shall be as determined by the
+Cny,whose decision on valuation of the securities
1.sh'af be final. Securities eligible for investment
:hereunder shall be limited to those listed in Sec-
fare 16430•of the Government Code, or bank or
savings and loan certificates of deposit.
,.
NOC OBTAINING OR INSPECTING CONTRACT
DOCUMENTS: e A full set of Contract charge
at
Docu-
i'm.nts is available for inspection without charge at
the Office of the Procurement&Contracting, City
of Palm Springs, 3200 East Tahquitahqultz Canyon
" Way, Palm Springs, California.
_(b) Complete sets of said Contract Documents
ma be ppurchased for$150.00 for the first set
r'an�$30o.00 forleach additional set. If overnight
-`rijailing Is requested, an additional$50.00 fee will
-6e required. Documents are obtainable'from:
^,I J. P. REPROGRAPHICS
224 North Indian Canyyon
Palm Vent( 0) 325o 371 922620
,-15 ADDRESS AND MARKING OF BIDS: The
.'envelope enclosing the Bid shall be sealed and
-.addressed to the ity of Palm Springs, and shall
,be delivered to:
City of Palm Springs
Department of Procurement &Contracting
w' 3200 E.Tahqurtz Canycn Wayy
Palm Springs, California 92262
-jhe envelope shall he plainly marked In the upper
;left hand corner with the name and address of
..the Bidder and shall bear the words, Trade Bid
°for Palm Springs PALM SPRINGS'CONVENTION
;CENTER EXPANSION PHASE It and the date and
hour of oppening Bids The name of the trade and
the Bid Package Number shall also be clearly
>;marked on the outside of the envelope.The certi-
fled of cashier's check or Bid Bond shall be an-
,;closed In the same envelope with the Bid,
N-16 PROJECT ADMINISTRATION: All commu-
nications relative to this Work shall be directed to
David'Livin stop,Turner Construction Ccmpany,
R3-960'Higghwayy 111,19uite 5, Palm Desert, CA
'102260, PHONh (760 340-6161,; (760)
i840-6411, prior to opening of Bids. All questions
I„Y.aI tln9 to interpretation of the Contract Docu-
ments or products must be in writing, and re-
spouses will be In the form of addenda to the
Documents. . _
:�CALOIFOR R OF THE CITY OF PALM SPRINGS,
HAROLD E. GOOD, CPPO
Director of'Procurement&
''Contracting
DATE:M'tch 30, 2004
�PBB: Apr74, 11, 2004
MINUTE ORDER NO.
APPROVING THE USE OF REAL STONE, A SLATE
PRODUCT, FOR THE PALM SPRINGS CONVENTION
CENTER PROJECT 02-27.
1 HEREBY CERTIFY that this Minute Order approving the use of real stone, a slate product,for the
Palm Springs Convention Center Project 02-27 was adopted by the City Council of the City of Palm
Springs, California in a meeting thereof held on the 5 th day of May, 2004.
PATRICIA A. SANDERS
City Clerk
em b �
DATE: May 5, 2004
TO: City Council
FROM: Convention Center Project Administrator
CONSTRUCTION CONTRACT AWARDS - STONE AND DRYWALL/STUCCO
RECOMMENDATION:
It is recommended that City Council Award Trade contracts for Stone and for
Drywall/Steel Studs/Stucco for the Convention Center Project.
SUMMARY:
This action will complete the contract awards of the major Trades for the Convention
Center Project
BACKGROUND:
Two of the major Trades original bids were rejected by City Council and a rebid was
authorized. The rebid will take place on May 4, 2004 and a complete update will be
brought to City Council on May 5, 2004 for award of contract. A summary of the trades
are as follows:
Trade # Trade Name Allowance
9 Stone $1,600,000
12 Drywall/Stucco/Steel Studs $5,420,000
Resolutions will be provided at the meeting for City Council consideration.
Allen F. Smoot
Convention Center Project Administrator
APPR ED-��' mac ~ ^��rz .• , .��
City Manager
ATTACHMENTS:
1. Resolutions (At Meeting)
2. Bid Tabulations (At Meeting)
7)9