Loading...
HomeMy WebLinkAbout5/5/2004 - STAFF REPORTS (10) DATE: May 5, 2004 TO: City Council FROM: Convention Center Project Administrator CONSTRUCTION CONTRACT AWARDS - STONE AND DRYWALL/STUCCO RECOMMENDATION: It is recommended that City Council Award Trade contracts for Stone and for Drywall/Steel Studs/Stucco for the Convention Center Project. SUMMARY: This action will complete the contract awards of the major Trades for the Convention Center Project BACKGROUND: Two of the major Trades original bids were rejected by City Council and a rebid was authorized. The rebid will take place on May 4, 2004 and a complete update will be brought to City Council on May 5, 2004 for award of contract. A summary of the trades are as follows: Trade# Trade Name Allowance 9 Stone $1,600,000 12 Drywall/Stucco/Steel Studs $5,420,000 Resolutions will be provided at the meeting for City Council consideration. 1 Allen F. Smoot Convention Center Project Administrator APPROVE.pD — �- � City Manager ATTACHMENTS: 1. Resolutions (At Meeting) 2. Bid Tabulations (At Meeting) 7)q RESOLUTION NO. OF THE CITY COUNCIL OF THE CITY OF PALM SPRINGS,CALIFORNIA, AWARDING CONTRACT FOR THE PALM SPRINGS CONVENTION CENTER PHASE II EXPANSION, CITY PROJECT NO. 02-27, TRADE CONTRACT NO. 12, DRYWALL/STUCCO/STEEL STUDS,TO STANDARD DRYWALL, INC., IN THE AMOUNT OF $6,163,000. WHEREAS, on January 21, 2004, the City Council approved the plans and specifications for the Convention Center Phase II expansion and authorized solicitation of trade bids; and WHEREAS, on May 4, 2004, two (2) of the project trades submitted bids; and WHEREAS,the project construction management team and the office of Procurement and Contracting have evaluated all bids received and are prepared to recommend contract awards to the lowest, responsive, responsible trade bidders; and NOW THEREFORE BE IT RESOLVED by the City Council of the City of Palm Springs,that the Palm Springs Convention Center Phase II expansion, City Project No. 02-27, Trade Contract No.12, Drywall/Stucco/Steel Studs is hereby awarded to Standard Drywall, Inc., in the amount of$6,163,000. ADOPTED this day of May , 2004. AYES: NOES: ABSENT: ATTEST: CITY OF PALM SPRINGS, CALIFORNIA By City Clerk City Manager REVIEWED & APPROVED AS TO FORM tl RESOLUTION NO. OF THE CITY COUNCIL OF THE CITY OF PALM SPRINGS,CALIFORNIA, APPROVING CHANGE ORDER NO. 1 TO TRADE PACKAGE 12,PALM SPRINGS CONVENTION CENTER PROJECT 02-27, WITH STANDARD DRYWALL, INC. FOR A DEDUCT OF ($192,260). WHEREAS, on May 4, 2004 bids were received for Trade Package#12 on the Convention Center Project and the lowest responsive bidder was in excess of the budget, and WHEREAS the bidder has offered value engineered reductions in the project costs, NOW THEREFORE BE IT RESOLVED by the City Council of the City of Palm Springs,that for the Palm Springs Convention Center Phase II expansion, City Project No, 02-27, Trade Contract No.12, Drywall/Stucco/Steel Studs, a deductive change order No. 1 is hereby approved in the amount of($192,260). ADOPTED this day of May , 2004. AYES: NOES: ABSENT: ATTEST: CITY OF PALM SPRINGS, CALIFORNIA By City Clerk City Manager REVIEWED & APPROVED AS TO FORM VM z ATTACHMENT PALM SPRINGS CONVENTION CENTER EXPANSION PROJECT Construction Cost-Estimate vs Actual Bids Revised 4/28 Adjusted Final Trade# Description Estimate Bid Variance Deducts Bid Variance 1 Demolition 1,012,203 369,233 -642,970 0 369,233 -642,970 2 Dry Utilities 136,000 114,406 -21,594 0 114,406 -21,594 3 Site Demolition 325,000 325,000 0 0 325,000 0 3A Site Grading 400,000 400,000 0 0 400,000 0 3B Shoring 22,154 22,154 0 allowance 22,154 0 4 Drilled Caissons 108,899 153,000 44,101 0 153,000 44,101 6 Site Concrete 367,456 352,276 -15,180 0 352,276 -15,180 7 Landscape & Irrig. 403,600 381,800 -21,800 0 381,800 -21,800 8 Conc. & Reinforcing 1,702,204 1,897,000 194,796 -40,000 1,857,000 154,796 9 Stone/Masonry 1,446,201 1,650,000 203,799 1,863,306 417,105 10 Structural Steel 5,614,424 8,765,000 3,150,576 -225,000 8,540,000 2,925,576 12 Drywall/Stucco/Stud: 2,951,912 7,148,000 4,196,088 5,970,740 3,018,828 13 Roofing 719,010 688,900 -30,110 -115,770 573,130 -145,880 14 Flash/Sheet Metal 339,070 348,095 9,025 9 348,095 9,025 15 Doors,Frames,Hardwe 186,200 179,200 -7,000 0 179,200 -7,000 16 Glass&Glazing 825,190 598,700 -226,490 -13,000 585,700 -239,490 17 Acoustical Ceilings 1,145,900 1,530,777 384,877 0 1,530,777 384,877 18 Tile 57,320 119,000 61,680 0 119,000 61,680 19 Carpet 557,886 251,350 -306,536 0 251,350 -306,536 20 Painting 298,669 298,669 0 allowance 298,669 0 21 Plumbing 723,121 700,000 -23,121 0 700,000 -23,121 22 HVAC 2,375,000 2,648,743 273,743 -22,000 2,626,743 251,743 23 Fire Sprinklers 315,740 269,000 -46,740 0 269,000 -46,740 24 Electrical 2,121,207 1,511,000 -610,207 0 1,511,000 -610,207 25 Wet Utilities 328,469 732,480 404,011 -1o3,soo 623,880 295,411 26 Mill Work 117,330 117,330 0 allowance 117,330 0 27 Waterproofing 34,620 34,620 0 allowance 34,620 0 29 Special Doors 24,500 24,500 0 allowance 24,500 0 30 Asphalt 82,000 82,000 0 allowance 82,000 0 31 Misc. Concrete 45,000 45,000 0 allowance 45,000 0 32 Toilet Compartments 20,605 20,605 0 allowance 20,605 0 33 Misc. Specialties 62,550 62,550 0 allowance 62,550 0 34 Signage 94,000 94,000 0 allowance 94,000 0 35 Operable Walls 501,200 549,000 47,800 -49,370 499,630 -1,570 38 Direct Purchase Equip 1,695,994 1,648,676 -47,318 -50,556 1,598,120 -97,874 40 Parking Lot 500,000 553,178 53,178 0 553,178 53,178 TOTALS 27,660,634 34,685,242 7,024,608 -624296 33,096,992 5,436,358 1 L a kem Ib 3 ATTACHMENT II Palm Springs Convention Center Expansion Project Project Costs: Revised 515 Architectural Design $2,564,043 2,564,043 Special Studies 93,000 93,000 Arch Fee Increase ( $25.6M) 394,720 394,720 Arch Adjustment (SD-DD) 13,320 13,320 Arch Adjustment (DD-CD) 119,889 119,889 Environmental Docs. 58,000 58,000 Topo Survey 18,000 18,000 Pre-Contt CM 174,502 174,502 CM Services 1,806,597 1,806,597 Turner Fee Increase ($25.6M) 162,400 162,400 City Representative 304,600 304,600 Plan Check(Fast Track) 68,000 21,601 Testing & Inspection 200,000 180,000 Blueprinting 85,000 200,000 City Administration 160,000 160,000 Builders Risk Insurance 30,500 40,757 SubTotal Soft Costs $6,252,571 6,311,429 Pre-Opening Marketing $350,000 350,000 FF&E Set Aside 400,000 400,000 Utility Relocations 0 100,000 General Requirements 741,025 641,025 Construction Contigency 3,584,000 2,745,950 Construction Cost 32,282,946 33,096,992 Sub Total Hard Costs $37,357,971 37,333,967 TOTAL PROJECT COSTS $43,610,542 43,645,396 Land Set Aside $1,250,000 0 Needed Bond Proceeds $44,860,542 43,645,396 Proceeds Available $44,861,183 43,642,393 Addtl. Proceeds/cuts Needed 641 .3,003