HomeMy WebLinkAbout6/2/2004 - STAFF REPORTS (17) DATE: June 2, 2004 TO: City Council FROM: Director of Aviation U.S. CUSTOMS AND BORDER PROTECTION - GENERAL AVIATION PROCESSING FACILITY RECOMMENDATION: It is recommended that the City Council award a contract for the United States Customs & Border Protection (USCBP) General Aviation Processing (GAP)facility at the Palm Springs International Airport (City Project 2004-02) to B.E. McMurray Construction, Inc in the amount of$396,000. SUMMARY: This project will remodel approximately 3,000 s.f. of interior space in the Signature Flight Support Facility into a General Aviation Processing (GAP) facility, which is required based on newfacility requirements from the United States Customs& Border Protection (USCBP) agency, who oversees the Airport's User Fee Program. BACKGROUND: In 1994, the Airport applied for and was granted status as a "User Fee" airport by the United States Customs & Border Protection (USCBP), which allowed overseas business flights to enter the United States at Palm Springs. The program continues to be an important service provided to the aviation community. While this program is primarily supported bythe corporate aviation community, USCBP also provides landing rights to commercial service operators serving Palm Springs International Airport (PSP). In response to the events of September 11", the Airport undertook a modification to the entrance roadway system and constructed a centralized Vehicle Inspection Plaza (VIP). As a result of this project, the USCBP office, which was housed in a highly modified trailer, was temporarily relocated. During the design of this project, USCBP personnel indicated their willingness to return to their trailer and the Airport agreed to provide upgraded carpeting, painting and other office equipment. Midway through the Airport's project,the Los Angeles Port Director for USCBP advised the Airport that USCBP personnel would not utilize the trailer and that furthermore, unless a new facility was built in accordance with new USCBP GAP standards, the Airport would lose its "User Fee" status. As a result of numerous discussions with the USCBP Port Director and her staff, an acceptable alternative was agreed to by utilizing the Signature Flight Support facility. A modification to the lease agreement between Signature Flight Support and the City was agreed to reflecting these changes. Plans and specifications were adopted by the City Council on February 4, 2004. W USCBP General Aviation Processing Facility June 2, 2004 Page 2 Bids for the USCBP General Aviation Processing (GAP)facility(City Project 2004-02) were received on May 6, 2004: BIDDER DBE TOTAL BID PARTICIPATION BE McMurray 0.0% $396,000 Doug Wall Construction 10.0% $410,000 After reviewing all of the bids and the DBE (Disadvantaged Business Enterprise) commitment,the lowest responsive,responsible bidder is B.E.McMurray Construction, Inc at a bid price of $396,000 and a DBE commitment of 0%. Documentation was provided with the bid indicating a "Good Faith Effort" was made to solicit DBE participation. The DBE minimum participation level for this project is 0%. This project is included in the Airport's pending Airport Improvement Program (AIP) grant from the Federal Aviation Administration (FAA) and if funded, the FAA would reimburse 95%of the construction cost, however, no commitment on funding from the FAA has been made. As a result of the discussion with the USCBP Port Director and her staff, it is necessary to move forward with this project as quickly as possible to avoid the Airport losing its User Fee status. Funds are available in account no. 415-6400-56061, Customs Remodel, which is funded by Airport Revenues. No General Fund monies will be used. RICHARD S WALSH, A.A.E Director Of Aviation APPROVE, City Manage ATTACHMENTS: 1. Minute Order 2. Exhibit"B" - Layout Sketch REVIEWED BY DEFT.OF FINANCE N:\WordPerfect\City_Council\Engineering_Construction\USCBP_GAP Facility 6-2-2004.wpd �� 6ECOME5 PRIMARY LANI75117E ENTRANCE . PROJECT FOR 51GNATLIT FI,IGkf 5J V?ORT 13 Q� ®. k0i OFFICE J� ROOM IA X IO � FROM OFFICE ANG ROOM ii 5X7,5 10 2O X COPY CAI l o ROOM LJ uI OFFICE 5FARCH 20 X 10 51"A OM® I 9,5 6,5 u�,ele pROCE551NG AAAFOR �-� 19 X 26 SIGNAiL 1 vl WP1tING AAA L6 CU5f0M5 IIMMIGp.AA1110OFF 25 X II —^Tcr � COMPLETION DATE IOX1220 Not to 5cale F511MATEI7 � 7ECEM6ER 30,2003 " 5'W7EI7 AREA 25655Q F( SHEETTITLE 0 we zrnncN GAP FLOOR`LAN lr�5TROOM X w5TRDOM DATE COVERFI7 AJGW6,2003 ENIp a POWWAY KPILIC ALCE55 VE51'161A.E e PIPACYNF9INJ MC 1EI,FN17rE 11L ' m CLI525 OFFICE rta,ElmGu: ® 20X20 4 Palm Springs Springs Intern)Airport W��NG AFRA Pcu�nercKum 51GNATLM W.wr�s. amxsr wanNULO,NIEk VE593ILE Palm EastTsiquit,Canyon Way U irport 3400 East Springs, California Canyon Way Palm Springs,CaFAX731& 760 318 3800—FAX 760 318.3815 SHEETNO.�AOAAGCE55 Exhibit LLB" MINUTE ORDER NO. APPROVING AN AGREEMENT WITH B.E. MCMURRAY CONSTRUCTION, INC FOR THE CONSTRUCTION OF A GENERAL AVIATION PROCESSING (GAP) FACILITY AT THE PALM SPRINGS INTERNATIONAL AIRPORT IN THE AMOUNT Of$396,000. I HEREBY CERTIFY that this Minute Order, approving an agreement with B.E. McMurray Construction, Inc for the construction of a General Aviation Processing (GAP) facility at the Palm Springs International Airport in the amount of $396,000, was adopted by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 2n1 day of June, 2004. PATRICIA A SANDERS City Clerk 9�3