Loading...
HomeMy WebLinkAbout22063 - RESOLUTIONS - 11/7/2007 RESOLUTION NO. 22063 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PALM SPRINGS, CALIFORNIA, CERTIFYING A FINAL ENVIRONMENTAL IMPACT REPORT (FEIR), ADOPTING A STATEMENT OF OVERRIDING CONSIDERATIONS, AND APPROVING TENTATIVE TRACT MAP 31095 (TTM 31095), FOR THE SUBDIVISION OF APPROXIMATELY 30.4-ACRE SITE INTO 45 SINGLE-FAMILY RESIDENTIAL LOTS AND THREE LETTERED LOTS FOR THE PROPERTY LOCATED ALONG WEST VIA ESCUELA, SOUTH OF RACQUET CLUB ROAD AND NORTH OF CHINO CANYON ROAD, ZONE R-1-A, SECTION 3. WHEREAS, on June 13, 2003, Wessman Development Company, (the applicant) has filed an application with the City pursuant to Section 9.62.00 of the Municipal Code for Tentative Tract Map 31095 for the subdivision of approximately 30.4-acre parcel into 45 single-family residential lots and three lettered lots, for the property located along West Via Escuela, south of Racquet Club Road and north of Chino Canyon Road; and WHEREAS, notice of a public hearing of the City Council of the City of Palm Springs to consider an application for Tentative Tract Map 31095 was issued in accordance with applicable law; and WHEREAS, said Tentative Tract Map were submitted to appropriate agencies as required by the subdivision requirements or the Palm Springs Municipal Code, with the request for their review, comments and requirements; and WHEREAS, the project site can be considered an in-fill development as it is surrounded by existing development on all four sides; and WHEREAS, the project site has all utility services available at or close to the project site; and WHEREAS, the proposed project is considered a "project' pursuant to the terms of the California Environmental Quality Act ("CEQA"), and a Final Environmental Impact Report (FEIR) has been prepared for this project and has been distributed for public review and comment in accordance with CEQA; and WHEREAS, pursuant to Section 66412.3 of the Subdivision Map Act, the City Council has considered the effect of the proposed project on the housing needs of the region, and has balanced these needs against the public service needs of residents and available fiscal and environmental resources; and WHEREAS, on September 26, 2007, a public hearing on the application was held by the Planning Commission in accordance with applicable law; and Resolution 22063 Page 2 WHEREAS, on October 17, 2007, a public hearing on the application was held by the City Council in accordance with applicable law; and WHEREAS, the City Council has carefully reviewed and considered all of the evidence presented in connection with the meeting on the project, including but not limited to the staff report, and all written and oral testimony presented; and WHEREAS, the project will bring additional residents, visitors and activities to the community that will potentially impact the needs for public safety services beyond the City's ability to provide such services; and because such services, including police protection, criminal justice, fire protection and suppression, ambulance, paramedic and other safety services, and recreation, library, cultural services are near capacity, the City has established a Community Facilities District to which this project shall be annexed, subject to conditions of approval. THE CITY COUNCIL OF THE CITY OF PALM SPRINGS DOES HEREBY RESOLVE AS FOLLOWS: Section 1: A Final Environmental Impact Report (FEIR) has been completed in compliance with CEQA, the State CEQA Guidelines, and the City's CEQA Guidelines. The City Council found that the project will not have significant impacts in the areas of land use, population and housing, geology and soils, recreation, utilities and services, agriculture and mineral resources. The City Council further finds that with the incorporation of proposed mitigation measures, potentially significant environmental impacts resulting from this project in the areas of transportation and traffic, cultural resources, noise, biology, hydrology and water quality and public services will be reduced to a level of less than significance. The City Council further finds that, even after mitigation, the project may still have a significant environmental impact with regard to cumulative loss of native desert habitat, air quality, and short term adverse cumulative impacts related to NOx and possibly PM-10 emissions. The City Council independently reviewed and considered the information contained in the FEIR prior to its review of this Project and the FEIR reflects the City Council's independent judgment and analysis. Section 2: The City Council has considered the environmental effects of the project that are analyzed in the FEIR and adopts the Findings of Fact attached as Exhibit A, and Statement of Overriding Considerations, attached as Exhibit B. Section 3: Pursuant to Section 66474 of the Subdivision Map Act, the City Council makes the following findings: Resolution 22063 Page 3 a. The proposed Tentative Tract Map is consistent with all applicable general and specific plans. Tentative Tract Map 31095 is for the subdivision of approximately 30.4 acres into 45 single-family residential lots and three lettered lots. The proposed subdivision is consistent with the General Plan designations of L-2; the overall density of the new subdivision is approximately 1.5 units per acre, this is well within the threshold of 2 units per acre allowed within the district. The proposed map has been reviewed by City staff and other outside agencies for comments; the map is consistent with the general plan designation of the subject site. b. The design and improvements of the proposed Tentative Tract Map are consistent with the zone in which the property is located. The proposed subdivision layout, design and improvements are consistent with the R-1-A zone in which the property is located. Furthermore, the design of the Map is consistent with the allowable uses under zoning designation. The future residential development standards, street improvements, internal circulation, proposed drainage and overall site development are in conformity with City standards. C. The site is physically suited for this type of development. Majority of the site area is rugged terrain full of loose cobbles, boulders and vegetation with slopes from east to the west. The site is surrounded by existing development and City streets. The construction of residential buildings on the site is appropriate at this location when constructed according to the condition and EIR mitigation measures (see discussion below). Also, there are existing urban services and utilities in the immediate surroundings of the location. d. The design of the subdivision is not likely to cause environmental damage or substantially and avoidably injure fish, wildlife, or their habitats. The Tentative Tract Map has been reviewed under the California Environmental Quality Act, and a Final Environmental Impact Report (FEIR) is proposed. Mitigation measures have been included which will reduce potential impacts to less than significant levels. There are no bodies of water on the subject property and therefore will not damage or injure fish, wildlife or their habitats. e. The design of the subdivision or type of improvements is not likely to cause serious public health problems. The proposed subdivision is designed to meet or exceed City standards. The proposed custom lots and streets will be required to meet or exceed City Resolution 22063 Page 4 development codes. The circulation system within the subdivision provides for an orderly system of internal driveways; therefore, the project will not cause public health problems. f. The design of the subdivision or type of improvements will not conflict with easements, acquired by the public at large, for access through or use of the property within the proposed subdivision. There are no known public easements or existing access across the subject property, therefore the design of the subdivision will not conflict with easements for access through or use of the property. Any utility easements can be accommodated within the project design. Section 4: The City Council certifies the Final Environmental Impact Report, adopts the Mitigation, Monitoring and Reporting Program attached as exhibit C, and directs staff to file the associated Notice of Determination. Section 5: The City Council approves Tentative Tract Map 31095 for the proposed subdivision of 45 single-family residential lots and three lettered lots subject to the Conditions of Approval contained in Exhibit D, which is attached hereto and made a part of this resolution. ADOPTED this 7th day of November, 2007. David H. Ready, CI ger ATTEST: ?meFho�mpson, City Clerk Resolution 22063 Page 5 CERTIFICATION STATE OF CALIFORNIA ) COUNTY OF RIVERSIDE ) ss. CITY OF PALM SPRINGS ) I, JAMES THOMPSON, City Clerk of the City of Palm Springs, hereby certify that Resolution No. 22063 is a full, true and correct copy, and was duly adopted at a regular meeting of the City Council of the City of Palm Springs on the 7u' day of November, 2007, by the following vote: AYES: Councilmember McCulloch, Councilmember Mills, and Mayor Oden. NOES: Councilmember Foat, and Mayor Pro Tern Pougnet. ABSENT: None. ABSTAIN: None. mes Thompson, City Clerk I City of Palm Springs, California �/ d `i V 200-7 _ City Council Resolution No. 22063 Exhibit A BOULDERS PROJECT: FINDINGS OF FACT I. INTRODUCTION AND PURPOSE The City Council of the City of Palm Springs ("City Council") as the decision- making body of the Lead Agency for the Boulders project ("Project") hereby adopts and makes the following findings of fact ("Findings") in connection with its certification of the Final Environmental Impact Report ("FEIR") for the Project. The FEIR is a Project EIR, as defined by Guideline 15161 of the State Guidelines for the California Environmental Quality Act ("CEQA Guidelines"), and it serves as an informational document for the general public, the City and other government agencies. The City Council makes these Findings after reviewing and analyzing the environmental effects examined in the FEIR. These Findings are adopted in compliance with the California Environmental Quality Act, California Public Resources Code §§ 21000 et seq. ("CEQA"). The FEIR identifies certain potentially significant effects that may occur as a result of the proposed Project, or that may occur on a cumulative basis in conjunction with the development of the Project and other past, present or reasonably foreseeable future projects. In addition to reviewing the Project's potential environmental impacts, these Findings also provide the City Council's analysis and conclusions regarding the applicability of possible alternatives and mitigation measures to reduce any significant environmental effects. At the Planning Commission meeting of September 12, 2007, the applicant withdrew his application for the production homes on the site, and changed the proposed project to be the Custom Lot Alternative, which the FEIR had identified as environmentally superior to the proposed project. As such, the proposed project identified in these findings is the Custom Lot Alternative. IL THE ADMINISTRATIVE RECORD A. Contents of the Record The following information is incorporated by reference and made part of the record of proceedings to support the City Council's findings of fact regarding the environmental effects of the Project: 1. The Draft Environmental Impact Report (DEIR) and related technical appendices, all other documents relied upon or incorporated by reference into the DEIR, the FEIR and all documents relied upon or incorporated by 5495161 City Council Resolution No. 22063 Page 2 of 44 Exhibit A— Findings of Facts reference in the FEIR and Mitigation, Monitoring and Reporting Program (collectively the "EIR"). 2. All testimony, documentary evidence and all correspondence submitted to or delivered to the City in connection with the meetings and public hearings at which City decision-making bodies considered the EIR. 3. All staff reports, memoranda, maps, slides, letters, minutes of meetings and other documents that City staff and/or its consultants relied upon or prepared in conjunction with the Project. 4. Any other documents specified by Public Resources Code section 21167.6(e). B. Location of Administrative Record The City is the custodian of the administrative record, including all CEQA documents and the other background documents and materials, which constitute the record of the proceedings upon which the City's decisions to certify the Final EIR and approve the Project are based. The administrative record is located at the Palm Springs City Hall, Planning Services Department, 2300 East Tahquitz Canyon Way, Palm Springs, California 92262. III. PURPOSE OF FINDINGS The Final EIR evaluates the potentially significant adverse environmental impacts that could result from the Project. Public Resources Code section 21081 and CEQA Guideline 15091 require that the public agency approving or carrying out the project(s) shall make written findings for each significant impact identified in the EIR, accompanied by a brief explanation of the rationale for each finding. These findings include one of the following: 1. Changes or alterations have been required in, or incorporated into, the project(s) that avoid or substantially lessen the significant environmental effect as defined in the EIR. 2. Such changes or alterations are within the responsibility and jurisdiction of another public agency and not the agency making the finding. Such changes have been adapted by such other agency or can and should be adopted by such other agency. 3. Specific economic, legal, social, technological, or other considerations, including provision of employment opportunities for highly trained workers, make infeasible the mitigation measures or project alternatives identified in the final EIR. City Council Resolution No. 22063 Page 3 of 44 Exhibit A— Findings of Facts These findings accomplish the following: 1. They address the significant environmental effects identified in the EIR for the approved project(s). 2. They incorporate all mitigation measures associated with these significant impacts identified in the EIR. 3_ They explain whether a significant effect is avoided or reduced by the adopted mitigation measures to a less than significant level or remain significant and unavoidable, either because there are no feasible mitigation measures or because, even with implementation of mitigation measures, an impact would remain significant. The conclusions presented in these findings are based on the EIR and other evidence in the record of proceedings. IV. THE BOULDERS PROJECT A. Project Description The Boulders Project ("Project") proposes development of 45 single-family residences on approximately 30.7 acres. The City of Palm Springs General Plan and the Palm Springs Municipal Code will govern the Project's land use and development components, including the type and density of allowable land use, design standards, architecture, landscaping, circulation, infrastructure, and other planning and design components. The project site is an in-fill site located on undeveloped open desert land associated with the Chino Canyon alluvial cone (also referred to as the Chino Cone or the Cone), a large alluvial feature that emanates from Chino Canyon at the base of the San Jacinto Mountains and spreads east onto the floor of the Coachella Valley. Existing manmade features in the China Cone include (a) Tramway Road, which provides access from State Highway 111 (Highway) to the Palm Springs Aerial Tramway, (b) a United States Army Corps of Engineers levee that provides flood protection to the northern part of the City including a large part of the Chino Cone, and (c) parts of the Chino Canyon neighborhood, a hillside residential community south of Tramway Road and extending west from Highway 111. The existing Little Tuscany Estates neighborhood lies at the south edge of the alluvial cone. Currently, most of the Chino Cone north of Tramway Road is undeveloped. In the undeveloped areas, the native ground surface is characterized by loose cobbles and boulders, and desert vegetation including cactus that blooms in the cooler parts of the year_ Undeveloped lands are also present south of Tramway Road. City Council Resolution No. 2.2063 Page 4 of 44 Exhibit A— Findings of Facts The majority of these are within the Agua Caliente Reservation (Section 4) but also include vacant lands proposed for development by the Boulders project. Both project sites currently are designated R-1-A under the City of Palm Springs General Plan. B. Project Objectives The Project's objectives are rooted in four key goals: 1. Create new residential development that reflects and complements the overall pattern and character of existing surrounding uses 2. Connect the Little Tuscany and Chino Canyon neighborhoods while preserving the character of the area 3. Contribute to the revitalization of downtown Palm Springs by providing quality upscale housing that will attract residents and second-residence owners who will support and become the market for businesses located in the City 4. Provide luxury custom residences that take advantage of the unique physical features and viewscapes offered only in Palm Springs. The project site has long been zoned for residential development. The Project aims to create high quality in-fill development within an area that has already undergone substantial development without intruding into undeveloped areas of the Chino Cone. Such in-fill development is likewise one of the objectives set forth in the City of Palm Springs' General Plan (see Objective 3.2, p. 1-19).The Project achieves the objective of creating in-fill development because the site is among the last remaining substantial areas of vacant land within the otherwise developed area. The existing Little Tuscany neighborhood lies directly south of the Boulders project. This neighborhood, developed at a density of approximately two units per acre, is a self-contained eclectic neighborhood of one-story and split-level single- family residences. Its streets are narrow and winding, with lots terraced to accommodate elevation changes throughout the neighborhood. V. THE EIR PROCESS In accordance with the requirements of the California Environmental Quality Act ("CEQA") to solicit comments on the proposed content of the Boulders and Crescendo Combined EIR, the City circulated a Notice of Preparation ("NOP") on City Council Resolution No, 22063 Page 5 of 44 Exhibit A— Findings of Facts July 5, 2005, and Revised NOPs for the proposed Project on July 28 and August 1, 2005, On September 8, 2005, the City held a scoping meeting to elicit further comments from governmental agencies and interested parties regarding the scope and content of environmental issues germane to the EIR. All NOP responses relating to the EIR were reviewed and the issues raised in those comments were addressed, to the extent feasible, in the DEIR. The NOP appears as Appendix A to the FEIR; letters received during the NOP comment period comprise Appendix B. In October 2005, the City held a meeting with key local stakeholders in order to define project alternatives for consideration in the EIR (see Appendix C). In November 2005, The City held a Public Meeting to describe alternatives developed based on the input from the Scoping Meeting and the stakeholder meeting. The DEIR was formally circulated for a 45-day review period, between May 22, 2006, and July 6, 2006. Comments were accepted through July 6, 2006. In October 2006, a Supplement to the DEIR was circulated, also for a 45-day review period. Comments were accepted through December 20, 2006_ The City received 11 letters from agencies, organizations, and individual parties commenting on the DEIR and its Supplement. The written comments and the City's responses to them appear in FEIR Volume 2: Comments and Responses. The Planning Commission reviewed the project and the FEIR at its meetings of July 11, 2007, September 12, 2007, and September 26, 2007. At the meeting of September 26, 2007, the Commission recommended certification of the FEIR for the project. VI. THE CITY COUNCIL'S CERTIFICATION OF THE FEIR Pursuant to section 21082.1(c) of the Public Resources Code, the City Council hereby FINDS and CERTIFIES that: 1. The FEIR has been completed in compliance with CEQA. 2. The FEIR has been presented to the City Council, and the City Council has independently reviewed and analyzed the information contained in the FEIR prior to acting on the Project. 3. The FEIR reflects the City's independent judgment and analysis. VII. EFFECT OF FINDINGS To the extent that these Findings conclude that various proposed mitigation measures outlined in the FEIR are feasible and have not been modified, superseded, or withdrawn, the City Council hereby adopts these measures. The City Council Resolution No. 22063 Page 6 of 44 Exhibit A— Findings of Facts mitigation measures are express conditions of approval of the Project. The City Council will adopt a Mitigation Monitoring and Reporting Program ("MMRP") concurrently with these Findings to ensure that the responsible party actually implements the mitigation measures. The MMRP developed for the Project includes applicable mitigation measures from the FEIR and new measures that the City developed in conjunction with the EIR process. Vlll. POTENTIAL ENVIRONMENTAL IMPACTS ANALYZED IN THE EIR These Findings address the potentially significant environmental effects examined in the FEIR, which analyzed the environmental impacts at a project-specific level and on a "cumulative" impact basis. A cumulative impact is defined by CEQA Guidelines 15130 and 15355 as an impact created as a result of the combination of impacts of the project evaluated in the EIR and closely related past, present and reasonably foreseeable probable future projects (commonly known as "related projects"). The FEIR addressed reasonably foreseeable impacts by assuming the build-out of the City of Palm Springs General Plan. The FEIR also identified 24 reasonably foreseeable related projects in the relevant geographic area. The analysis of the EIR buildout resulted in a conservative analysis because the City is currently reviewing a General Plan update that would reduce overall densities near the proposed project. A. Summary of Impact Analysis The EIR analyzes all potentially significant impacts of the Project for the environmental topics identified during the public scoping process, including responses to the NOP, a public scoping meeting, and consultation with interested agencies and individuals. In summary, the City Council finds that the following environmental impacts are less than significant on a project-specific basis in light of the EIR and the whole record before it, including the imposition of appropriate mitigation measures: (1) biological resources, (2) cultural resources, (3) hazardous materials, (4) population and housing, (5) noise, (6) public services, (7) recreation, (8) transportation and traffic, (0) utilities and service systems, (10) land use, (11) hydrology and water quality, (12) geology and soils, (13) agriculture, and (14) mineral resources. The City Council has incorporated the referenced mitigation measures into the Project pursuant to its concurrent adoption of the Mitigation Monitoring and Reporting Program. On the other hand, on a project-specific basis, the Project was determined to have a significant and unavoidable impact on the aesthetics of its site, which may be considered adverse by some observers. During grading, the project may exceed the SCAQMD thresholds for NO. and PM,o. In addition, the project will contribute to cumulative loss of native desert habitat that may be considered adverse. During City Council Resolution No. 22063 Page 7 of 44 Exhibit A— Findings of Facts the construction period, the Project may contribute to short-term adverse cumulative impacts relative to NO,and PM10emissions. The EIR analyzed growth-inducing, unavoidable adverse and irreversible impacts, and consistency with Southern California Association of Governments ("SCAG") policies. Pursuant to CEQA Guideline 15126.6, the EIR also evaluated several project alternatives. IX. FINDINGS ON IMPACTS ANALYZED IN THE EIR A. Aesthetics 1. Potential Impacts The Project may cause a significant impact on aesthetics if it does any of the following: a) has a substantial adverse effect on a scenic vista b) substantially damages scenic resources including, but not limited to, trees, rock outcroppings, and historic buildings within a state scenic highway c) substantially degrades the existing visual character or quality of the sites and their surroundings d) creates a new source of substantial light or glare that would adversely affect day or nighttime views in the area 2. Findinas Due to the fundamental change in the site from undeveloped to developed, the Project will have significant effects on aesthetics that cannot be mitigated and may be perceived by some as adverse. The City Council makes the following findings for these impacts: a) All feasible measures, changes and alterations have been required in, or incorporated into, the Project, which will lessen such significant environmental effects. b) For the reasons set forth below in the Statement of Overriding Considerations, adopted concurrently by the City Council, the City Council finds that the significant impact identified in this Section IX(C) is acceptable in light of the Project's overall benefits. City Council Resolution No. 22063 Page 8 of 44 Exhibit A— Findings of Facts 3. Supportive Rationale Section 6.5 of the EIR analyzes the Project's potential impacts on aesthetics and visual resources. For the following reasons, these impacts are found to be significant and cannot be mitigated: a) The primary aesthetic effect of the Project will be the fundamental change of the site from undeveloped to developed. However, the site has long been designated for development of the kind proposed by the Project. The City of Palm Springs General Plan Policy 3.2.3 specifies "high-end residential" as a "target land use" for the Project's area, zoned R-1-A. b) The Project is not located near a designated scenic highway, so it will not affect scenic highway resources. Trees are limited, and there are no historic buildings on the sites. The boulders on the sites are not considered a significant scenic resource. c) As a residential project, Boulders will meet the requirements of the local building code with respect to lighting. The Project's residential streets are not proposed to have street lighting thereby limiting the visual impact of the Project on the surrounding area. B. Agricultural Resources 1. Potential Impacts The Project would have a significant impact on agricultural resources if it would do any of the following: a) convert Prime Farmland, Unique Farmland, or Farmland of Statewide Importance to non-agricultural use b) conflict with existing zoning for agricultural use, or a Williamson Act contract c) involve other changes in the existing environment which, due to their location or nature, would result in conversion of farmland to non- agricultural uses 2. Findings The Project will not have a significant impact on agricultural resources. 3. Supportive Rationale City Council Resolution No. 22063 Page 9 of 44 Exhibit A— Findings of Facts Potential impacts to agricultural resources are evaluated in EIR Section 6.15. There are no agricultural uses present on the site, and the site is considered for agricultural uses. Impacts to agriculture are determined to be less than significant for the following reasons: a) The Project will not result in a significant adverse impact related to the conversion of prime farmland and farmland of local importance to non-agricultural uses. b) The Project will not conflict with existing agricultural zoning or Williamson Act contract lands. c) The Project will not result in changes to the existing environment that would result in conversion of farmland to non-agricultural uses. C. Air Quality—Construction 1. Potential Impacts The Project may cause a significant and unavoidable air quality impact if, during construction or operation, they do any of the following: a) conflict with or obstruct implementation of the applicable air quality plan b) violate any air quality standard or contribute substantially to an existing or protected air quality violation c) result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable national or State ambient air quality standard (including releasing emissions that exceed quantitative thresholds for ozone precursors) d) expose sensitive receptors to substantial pollutant concentrations e) create objectionable odors affecting a substantial number of people 2. Findings Potential impacts to Air Quality are evaluated in EIR Section 6.6. The construction (grading phase) of the Project may create a significant and unavoidable air quality impact on a project-specific basis during construction. This impact results from the potential to contribute to existing or projected air quality violation. The City Council makes the following findings for these impacts: City Council Resolution No. 22063 Page 10 of 44 Exhibit A— Findings of Facts a) All feasible measures, changes and alterations have been required in, or incorporated into, the Project, which will lessen such significant environmental effects. b) MM Air-1(4) from the EIR has been deleted in its entirety and replaced with the following mitigation that prohibits rock crushing on the project site. The applicant is no longer proposing to crush rock on the project site. c) MM Air-1(5) from the EIR has been modified to reflect the prohibition on rock crushing. d) For the reasons set forth below in the Statement of Overriding Considerations, adopted concurrently by the City Council, the City Council finds that the significant impact identified in this Section IX(C) is acceptable in light of the Project's overall benefits. Although the following mitigation measures aimed at reducing these significant and unavoidable air quality impacts during the Project's construction have been adopted, they may not reduce the impacts to a level of insignificance (The term "may" is used in this discussion because the modeling indicates that emissions will be slightly less than the thresholds of significance recommended by the South Coast Air Quality Management District; however, due to the uncertainty in the modeling procedures, there is some possibility that emissions could exceed the thresholds) : MM AIR-1 Prior to the approval of a final grading plan by the City, the project proponent shall submit a detailed Grading and Rock Management Plan for review and approval by the Planning Commission. This plan shall specify the following: 1. Final estimates for grading volumes, including cut and fill, off-site export of unsuitable material, and import of appropriate material. Refined estimates for emissions of import/export trips will be provided. 2. Final estimates of on-site rock that can be incorporated into the site for fill, landscaping elements, or use in the decorative walls of residences, including rock that may be reduced in size, using the Nonex process. 3. Active grading shall be limited to 2.5 acres of disturbed areas. 4. Rock crushing will not be allowed on the project site. 5. An updated emissions analysis shall be provided based upon the relocation plan for rocks that cannot be used on-site and the final length of the trip to any rock disposal site. An updated analysis shall be submitted to the City demonstrating that PM10 emissions shall not exceed the SCAQMD daily limits. If the City overrides the potential NOx emission exceedance when the project is approved, then the Grading and Rock Management Plan shall City Council Resolution No, 22063 Page 11 of 44 Exhibit A— Findings of Facts demonstrate how the NO, emissions will be limited to within 25% of the SCAQMD construction threshold for NOx. 6. Prior to the commencement of grading, the City of Palm Springs shall retain, at the applicant's expense, an air quality monitor who shall be present on site at least three hours per day during grading operations. The monitor shall have the ability to "stop work" if visible dust is seen escaping from the site, or if other measures specified in the Grading and Rock Management Plan are not observed. 7. The plan shall demonstrate how the City's standard mitigation measures, listed in Section $.50 of the Palm Springs Municipal Code, shall be incorporated into project construction. MM AIR-2 Grading of the Boulders and Crescendo sites shall not occur simultaneously. Accordingly, all graded areas of the first site shall be stabilized prior to the issuance of a grading permit for the second site. MM AIR-3 The applicant shall require the construction contractor to use construction equipment with low emission factors and high energy efficiency to the extent feasible. Prior to issuance of grading and building permits, the City shall verify that grading and construction plans include a prominently displayed statement that all construction equipment must (1) be tuned and maintained in accordance with manufacturers' specifications and (2) meet or exceed Tier 2 standards, including the use of emulsified diesel fuels and oxidation catalysts particulate traps or other verified/certified technologies as feasible. Note: Such equipment and fuels may not yet be available in the Palm Springs area; therefore, the note "as feasible" applies. No mitigation credit was taken in this analysis for such mitigation. MM AIR-4 All residential fireplaces will be fueled by natural gas. MM AIR-5 Exterior electrical outlets will be provided in fronts and backs of residential units to facilitate use of electric landscape equipment_ 3. Supportive Rationale Sections 6.6.3 of the FEIR analyzes air quality impacts during grading and construction of the Project. a) Conflict with Air Quality Plan The applicable Air Quality Plan is [the 2004 State Implementation Plan (SIP) approved by the South Coast Air Quality Monitoring District and Certified by the Federal Environmental Protection Agency]. The SIP demonstrates that the region will be brought into compliance with State and federal air quality standards over City Council Resolution No. 22063 Page 12 of 44 Exhibit A— Findings of Facts time. The SIP is based upon the development of the General Plans of the various Cities and Counties in the Region, and projects that are consistent with such general plans are consistent with the SIP. The project is consistent with the City of Palm Springs General Plan and therefore consistent with the SIP. b) and c) Contribute to any existing or projected air quality violation; or result in a cumulative increase in any criteria pollutant. Air quality impacts during the Project's construction cannot be mitigated below a significant level for the reasons set forth below. a) The EIR estimated air quality impacts during grading according to modeling results from LSA Associates Inc. (LSA) as contained in the EIR. These estimated emission levels were compared against regional and localized significance thresholds adopted by the SCAQMD. The estimates for emissions of Reactive Organic Gases, Carbon Monoxide and Sulfur Dioxide were all well below (more than 60% below) the specified significance criteria. The estimates for emissions of Nitrogen Oxides (NOx) and particulates (PM10) were below the threshold of significance, but less than 10% below the threshold, even after the application of all applicable mitigation measures. b) The City recognizes that all modeling efforts contain a certain amount of inherent uncertainty. Therefore, in an abundance of caution, the City notes that emissions of NOx and PM10 could exceed the thresholds. Even with implementation of all feasible mitigation measures as listed above, project emissions during construction might exceed the thresholds set by SCAQMD for NO. and PM,o D. Air Quality - Operation 1. Potentiate The operation of the Project may cause a significant and unavoidable air quality impact if it would do any of the following: a) conflict with or obstruct implementation of the applicable air quality plan b) violate any air quality standard or contribute substantially to an existing or protected air quality violation c) result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non attainment under an City Council Resolution No. 22063 Page 13 of 44 Exhibit A— Findings of Facts applicable national or state ambient air quality standard (including releasing emissions which exceed quantitative thresholds for ozone precursors) d) expose sensitive receptors to substantial pollutant concentrations e) create objectionable odors affecting a substantial number of people 2. Findings The operation of the Project will not create significant or unavoidable air quality impacts on a project-specific basis. 3. Supportive Rationale Section 6.6.3 of the FEIR analyzes air quality impacts during operation of the Project. Air quality impacts during the Project's operation will not rise to a level of significance for the following reasons: a) The Project's operation will not conflict with or obstruct implementation of the 2004 State Implementation Plan (SIP) approved by the South Coast Air Quality Monitoring district and Certified by the Federal Environmental Protection Agency. b) The Project's operations will not violate any air quality standard or contribute substantially to an existing or protected air quality violation. c) The Project's operation will not result in a cumulatively considerable net increase of any criteria pollutant for which the project region is non-attainment under an applicable national or state ambient air quality standard (including releasing emissions which exceed quantitative thresholds for ozone precursors)_ EIR Table 6.6-E show that projected project-specific emissions at build-out will fall well below the thresholds of significance established by SCAQMD. d) The Project will not expose sensitive receptors to substantial pollutant concentrations. e) The Project's operation will not create objectionable odors affecting a substantial number of people. None of the uses proposed for the sites are normally associated with the creation of objectionable odors. City Council Resolution No. 22063 Page 14 of 44 Exhibit A— Findings of Facts E. Biological Resources 1. Potentiate The Project would have a significant impact on biological resources if it were to do any of the following: a) have a substantial adverse effect, either directly or through habitat modifications, on any species identified as a candidate, sensitive, or special status species in local or regional plans, policies, or regulations, or by the California Department of Fish and Game ("CDFG") or United States Fish and Wildlife Service ("USFWS") b) have a substantial adverse effect on any riparian habitat or other sensitive natural community identified in local or regional plans, policies, regulations, or by the CDFG or USFWS c) have a substantial adverse effect on federally protected wetlands as defined by Section 404 of the Clean Water Act (including, but not limited to, marsh, vernal pool, coastal, etc.) through direct removal, filling, hydrological interruption, or other means d) interfere substantially with the movement of any native resident or migratory fish or wildlife species or with established native, resident, or migratory wildlife corridors or impede the use of native wildlife nursery sites e) conflict with any local policies or ordinances protecting biological resources, such as a tree preservation policy or ordinance f) conflict with the provisions of an adopted Habitat Conservation Plan, Natural Community Conservation Plan, or other approved local, regional, or state habitat conservation plan 2. Findings The Project is not anticipated to significantly affect biological resources on its site unless it was to introduce non-native plant species in their landscaping designs. As a result, the City Council makes the following findings for this impact: a) All feasible measures, changes and alterations have been required in, or incorporated into, the Project, which will lessen such significant environmental effects. b) With implementation of the following mitigation measures, the Project's impacts will be less than significant. City Council Resolution No. 22063 Page 15 of 44 Exhibit A— Findings of Facts MM BIO — 1 The following plants will not be utilized in the project landscaping: BOTANICAL. NAME COMMON NAME Acacia spp. (all species except Acacia (all species except native A. regagn) catclaw acacia Arundo donax(x) Giant reed or arundo grass ,triplex se7nibaccata (x) Australian saltbush Avena barbata Slender wild oat Avena falua Wild oat Brassica four?G'fortii xx African or Saharan mustard Bromus niadritensis ssp. mbens Red bromc x _ Bromus tectorum (xx) Cheat grass or downX brome Cortaderia jubata [syn-C. Jubata grass or Andean pampas atacaniensisl grass Corladeria dioica [syn. C- Pampas grass selloanal Descurainia.Sophia Tansy mustard Fichhornia crossi es Water hyacinth L7aegnus angustifolia Russian olive Foeniculum vulgare Sweet fennel .Flirschfeldia incana Mediterranean or short-pod mustard Lepidium ladfolium _Perennial pepperweed Lolium nudtifloruni Italian ryegrass Lollium erenne Perennial ryegrass Nertum oleander Oleander Nicotiana glauca (x) Tree tobacco Oenothera berlandieri(#) Mexican evening primrose Olea euro ea European olive tree Parkinsonia aculeala (x) Mexican palo verde Pennisetum clandeshnum Kikuyu grass Pennisetuni setaceinn (xx) Fountain mass Phoenix canariensis (#) Canary Island date palm Phoenix dactylrfera (#) Date palm Ricinus comntunis (x) Castorbean Salsola tragus (x) Russian thistle .Schinus niolle Penivian pepper tree or California pepper Schinus terebinthifolius Brazilian pepper tree Schismus arabicus Mediterranean grass Schismus barbatur (xx) Saharan mass, abu maslu Stipa ca ensis (xx) No common name Taniarix spp. (all species) (xx) Tamarisk or salt cedar Taenlatheruni ca ut-medusae Medusa-head City Council Resolution No. 22083 Page 16 of 44 Exhibit A-- Findings of Facts Tribulus terrertri.r Putacturevine Vinea major Periwinkle Yucca glorlosa (#) S anish dagger Sources: CVAG MSIICP; California Exotic Pest Plant Council, United States Department of Agriculture- Division of Plant Idealth and Pest Prevention Services, California Native Plant Society,Fremunda Vol. 26 No. 4, October 1998, The Jepson Manual; Higher Plants of California, and County of San Diego Department of Agriculture. Key to Table # indicates species not on CaIEPPC October 1999 "Exotic Pest Plants of Greatest Ecological Concern in California"list X indicates species known to be invasive in the MSHCP Plan Area XX indicates particularly troublesome invasive species 3. Supportive Rationale Potential impacts to biological resources are discussed in Sections 6.8 of the EIR, which rely on reports in Appendix 1-1. For the reasons set forth below, the identified impacts can be mitigated below a level of significance. a) No officially listed animal or plant species were found on the Project site. Although the Project's development can be expected to eliminate approximately 31 acres of creosote scrub habitat; that loss cannot be said to constitute a significant adverse impact because the habitat is so widespread generally throughout the Southwest and specifically in the areas surrounding the Project. b) The Project site does not contain or abut any riparian community. c) The Project site does not contain or abut any federally protected wetlands as defined by Section 404 of the Clean Water Act. The Project site is not used by animal species as a migratory corridor or wildlife nursery. The Boulders site is surrounded on three sides by existing residential uses and on the fourth side by the existing DWA facilities. d) The Project is consistent with the City's goals and policies relative to biological resources as articulated in the City of Palm Springs General Plan. e) No adopted Habitat Conservation Plan, Natural Community Conversation Plan, or other approved local, regional, or state habitat conservation plan affects the project site. City Council Resolution No. 22063 Page 17 of 44 Exhibit A— Findings of Facts F. Cultural Resources 1. Potential III The Project would have a significant impact on cultural resources if it would do any of the following: a) cause a substantial adverse change in the significance of a historical or an archeological resource as defined in CFQA Guideline 15064.5 b) cause a substantial adverse change in the significance of an archaeological resource pursuant to CFQA Guideline 15064.5 c) directly or indirectly destroy a unique paleontological resource or site or unique geologic feature d) disturb any human remains, including those interred outside of formal cemeteries 2, Findings The Project is not expected to impact cultural resources on a project-specific basis. However, it is not impossible that they might do so inadvertently by uncovering hitherto unknown historical or cultural resources. As a result, the City Council makes the following findings for this impact: a) All feasible measures, changes and alterations have been required in, or incorporated into, the Project, which will lessen such significant environmental effects. b) With implementation of the following mitigation measures, the Project's impacts will be less than significant. MM CULT-1: Prior to the approval of any grading plan, the Director of Community Development of the City of Palm Springs will ensure that the following specification is included with grading requirements: In the event of the accidental discovery or recognition of any human remains in any location on the project site other than a dedicated cemetery, the following steps will be taken: 1. There will be no further excavation or disturbance of the site or any nearby area reasonably suspected to overlie adjacent human remains until: City Council Resolution No. 22063 Page 18 of 44 Exhibit A— Findings of Facts (a) The Riverside County Coroner is contacted to determine that no investigation of the cause of death is required, and (b) If the Coroner determines the remains to be Native American: • The Coroner will contact the Native American Heritage Commission (NAHC) within 24 hours. • The NAHC will identify the person or persons it believes to be the most likely descended from the deceased Native American. • The most likely descendant (MLD) may make recommendations to the landowner or the person responsible for the excavation work, for means of treating or disposing of, with appropriate dignity, the human remains and any associated grave goods as provided in Public Resources Code Section 5097.98, or 2. Where the following conditions occur, the landowner or his authorized representative will rebury the Native American human remains and associated grave goods with appropriate dignity on the property in a location not subject to further subsurface disturbance: • The NAHC is unable to identify an MILD. • The MILD identified failed to make a recommendation within 24 hours after being notified by the NAHC. • The landowner or his authorized representative rejects the recommendation of the MILD, and the mediation by the NAHC fails to provide measures acceptable to the landowner. 3. Supportive Rationale Section 6.4 of the FEIR analyzes potential impacts on cultural resources based on studies contained in Appendix F-1. These studies identified no significant cultural or historical resources, so the Project's impacts on such resources are not expected to be significant. Should human remains be located during development, Mitigation Measure CULT-1 is in place to ensure their proper handling and disposition. G. Geology and Soils 1. Potential Impacts The Project would have a significant impact with respect to geology and/or soils if they were to do any of the following: City Council Resolution No. 22063 Page 19 of 44 Exhibit A-- Findings of Facts a) expose people or structures to potential substantial adverse effects, including the risk of loss, injury, or death involving any of the following: • rupture of a known earthquake fault, as delineated on the most recent Alquist-Priolo Earthquake Fault Zoning Map issued by the State Geologist for the area or based on the substantial evidence of a known fault • strong seismic ground shaking • seismic-related ground failure, including liquefaction • landslides b) result in substantial soil erosion or the loss of topsoil c) be located on a geologic unit or soil that is unstable, or that would become unstable as a result of the project, and potentially result in an on or off-site landslide, lateral spreading, subsidence, liquefaction or collapse d) be located on expansive soil, as defined in Table 18-1-B of the Uniform Building Code (1994), creating substantial risks to life or property e) have soils incapable of adequately supporting the use of septic tanks or alternative waste water disposal systems where sewers are not available for the disposal of waste water 2. Findings With the implementation of the City's standard conditions, the Project will have no adverse effects on geology or soils. As a result, no mitigation will be required. 3. Supportive Rationale Section 6.9 of the FEIR analyzes the Project's potential impacts with respect to geology and/or soils. This analysis is based on studies conducted by Earth Systems Southwest, including geotechnical feasibility reports and fault/seismic investigations; these studies appear as Appendix J-1 of the EIR. For the reasons below, the Project will not result in adverse impacts to geology and/or soils. a) The site is not located in an Alquist-Priolo Earthquake Fault Zone. b) Existing City of Palm Springs General Plan policies and programs, including strict adherence to the Uniform Building Code (UBC) and other applicable building standards are expected to result in project City Council Resolution No. 22063 Page 20 of 44 ' Exhibit A— Findings of Facts design and construction that mitigate the impact associated with strong ground motion and other seismic hazards. c) The site is not at risk of landslides, liquefaction, lateral spreading or collapse- d) The Project is not located on unstable soils; furthermore, development of the site will result in the stabilization of soils underneath structures, roadways and landscaping, so upon project completion, soil erosion will be reduced. e) Soils below the site are anticipated to possess a very low expansion potential. f) The Project does not propose the use of septic tanks or other alternative wastewater disposal systems. g) The Project is consistent with the City of Palm Springs General Plan. H. Hazardous Materials 1. Potential Impacts The Project would have a significant impact related to the potential presence of hazardous materials, recognized environmental concerns or potential hazards if it to do any of the following: a) result in a safety hazard for people residing, working or otherwise congregating in the Project area; or b) create a significant hazard to the public or the environment through reasonably foreseeable upset and accident conditions involving the release of hazardous materials into the environment. 2. Findings The Project is not anticipated to have significant impacts relative to hazardous materials. 3. Supportive Rationale a) Section 6.10 of the FFIR analyzes the potential for contamination arising out of hazardous materials present on or near the Property. These analyses are based on the following documents: City Council Resolution No. 22063 Page 21 of 44 Exhibit A— Findings of Facts • A safety assessment by Earth Consultants International • A summary of available information on the disease known as valley fever (coccidioidomycosis) [Appendix G] • DWA commentary by David Luker [Appendix L] Although project development is unlikely to release valley fever fungus, the possibility cannot be eliminated. The risk of such release is further lessened by implementation of the mitigation measures contained in the Air Quality section. However, in an abundance of caution, the following mitigation measure has been incorporated into the EIR: MM HAZ-1 Prior to the commencement of grading activities, the applicant shall Inform all residents within 1,000 feet. b) The proposed Project does not involve the use of hazardous materials or substances. c) The Project is not located within the boundaries of an airport land use plan or within two miles of a public or private airport or airstrip. d) The Project is consistent with the City of Palm Springs General Plan- e) The Project site is not located on a list of hazardous materials sites compiled pursuant to Government Cade Section 65962.5. f) The Project will not impair or interfere with implementation of any emergency response plan. (In fact, the project would improve emergency response times and provide additional options for emergency evacuation.) I. Hydrology and Water Quality 1. Potential Impacts The Project would have a significant impact on hydrology and/or water quality if it would do any of the following: a) violate any water quality standards or waste discharge requirements b) substantially deplete groundwater supplies or interfere substantially with groundwater recharge such that there would be a net deficit in City Council Resolution No. 22063 Page 22 of 44 Exhibit A— Findings of Facts aquifer volume or a lowering of the local groundwater table level (e.g., the production rate of pre-existing nearby wells would drop to a level which would not support existing land uses or planned uses for which permits have been granted) c) substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, in a manner which would result in substantial erosion or siltation on or offsite d) substantially alter the existing drainage pattern of the site or area, including through the alteration of the course of a stream or river, or substantially increase the rate or amount of surface runoff in a manner which would result in flooding on or offsite e) create or contribute runoff water which would exceed the capacity of existing or planned storm water drainage systems or provide substantial additional sources of polluted runoff f) otherwise substantially degrade water quality g) place housing within a 100-year flood hazard area as mapped on a federal Flood Hazard Boundary or Flood Insurance Rate Maps ("FIRM") or other flood hazard delineation map h) expose people or structures to a significant risk of loss, injury or death involving flooding, including flooding as a result of the failure of a levee or dam i) result in inundation by seiche, tsunami, or mudflow 2. Findings The Project will impact hydrology and water quality on a project-specific basis. The City Council makes the following findings for this impact: a) All feasible measures, changes and alterations have been required in, or incorporated into, the Project, which will lessen such significant environmental effects. b) With implementation of the following mitigation measures, the Project' impacts to hydrology and water quality will be less than significant. MM HY-1 Prior to the approval of a grading permit, the project proponent will submit, for approval by the City Director of Public Works, a final drainage plan based on a final hydrology study City Council Resolution No. 22063 Page 23 of 44 Exhibit A— Findings of Facts implementing the following local and regional requirements, policies and programs. a) The plan shall demonstrate that off-site storm flows will not be increased, and that all structures in the project are protected from 100-year storm flows. b) All proposed facilities will be privately owned and maintained by the proposed Boulders project Homeowners Association. The CC&Rs for the association shall clearly specify the requirements to maintain the drainage system in an effective manner. c) The plan will include specific pollution control measures and/or designs that meet the requirements of the National Pollution Discharge Elimination System and keep pollutants, including sediment, herbicides, pesticides and oils, out of surface and ground waters. d) The plan will address the use of on-site stormwater retention basins, to the greatest extent practical, to enhance opportunities for groundwater recharge, provide additional open space and wildlife habitat value, and reduce the necessity for and costs associated with off-site stormwater conveyance facilities. e) Prior to formation of the Homeowners Association, the City Engineer shall review the proposed CC&Rs to ensure that language requiring effective maintenance of the drainage system is acceptable to the City. MM HY-2 Prior to the approval of any building permit, the City Director of Planning will review plans to ensure the following: a) The use of drought-tolerant landscaping and water-efficient irrigation systems for all yard areas as a means of reducing water consumption. b) The applicant will install low-flush toilets, low-flow showerheads and faucets in all new construction, in conformance with Section 17921.3 of the Health and Safety Code, Title 20, California Administrative Code Section 1601(b), and applicable sections of Title 24 of the State Code. c) The project will connect to the City"s sewer system. Use of septic tanks will not be permitted. MM HY-3 Prior to the issuance of grading permits for any lots where adequate water supplies and fire flows would require pumping from the existing reservoirs, the applicant shall provide the City with written confirmation from the DWA that adequate water pressure is City Council Resolution No. 22063 Rage 24 of 44 Exhibit A-- Findings of Facts available to serve these lots. This condition may be satisfied in one of three ways: 1. DWA agrees that the existing pump is adequate to serve the project. 2. DWA accepts the applicant's offer to increase the capacity of the existing pumping system, 3. DWA obtains separate environmental approval for its own additional reservoirs. 3. Supportive Rationale The Project's potential impacts on hydrology and water quality are analyzed in Sections 6.11 of the FEIR. These analyses are based on the hydrology reports (FEIR Appendix F) conducted for the Project by MSA Associates, Inc. For the reasons below, these impacts will be mitigated to less-than-significant levels. a) During final design, the applicant will be required to specify the BMPs that will ensure compliance with the City's NPDES requirements. b) The Project is unlikely to affect groundwater recharge on a project level. They will follow water conservation guidelines in the Palm Springs General Plan Update EIR (p. 5-100) and in the Palm Springs General Plan (pp.11-63, 64), as well as the Water Efficient Landscape Ordinance to mitigate the impacts to public water supplies. The project is consistent with the Urban Water Management Plan adopted by the Desert Water Agency. c) There are no streams or rivers on the Project site, and the Project will adhere to all City drainage requirements so as not to cause erosion or siltation off site. d) The Project's adherence to City drainage requirements will ensure that the surface runoff caused by increased impermeable Project surfaces will be accommodated without flooding offsite. e) The Project's runoff, after development of the Project drainage system, will not exceed the capacity of existing drainage systems or provide substantial sources of polluted runoff f) The project runoff, after implementation of the above mitigation measures, will not substantially degrade water quality. g) The Project site is not located within a 100-year flood hazard area. City Council Resolution No. 22063 Page 25 of 44 Exhibit A— Findings of Facts h) There is no dam or levee near the project sites. i) The Project area is not subject to seiches, tsunami or mudflow. J. Land Use and Planning 1. Potential Impacts The Project would have a significant impact on land use and planning if they were to do any of the following: a) physically divide an established community b) conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including, but not limited to the general plan, specific plan, local coastal program, or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect c) conflict with any applicable habitat conservation plan or natural community conservation plan. 2. Findings The Project will not impact land use and planning on a project-specific basis, so no mitigation is required. 3. Supportive Rationale The EIR analyzes the Project's potential land use and planning impacts in Section 6.1. For the reasons below, the Project is found to have no potential significant impacts on land use or planning. a) The Project is consistent with the City's land use goals and policies. b) The Project does not conflict with any applicable land use plan, policy, or regulation of an agency with jurisdiction over the project (including, but not limited to the general plan, specific plan, local coastal program, or zoning ordinance) adopted for the purpose of avoiding or mitigating an environmental effect. c) The project does not conflict with any applicable habitat conservation plan or natural community conservation plan. City Council Resolution No. 22063 Page 26 of 44 Exhibit A— Findings of Facts K. Noise 1. Potential Impacts The Project would have a significant noise impact if it were to do any of the following: a) expose persons to or generated noise levels in excess of standards established in the local general plan or noise ordinance, or applicable standards of other agencies b) expose persons to or generated excessive ground borne vibration or ground borne noise levels c) create a substantial permanent increase in ambient noise levels in the project vicinity above levels existing without the project d) create a substantial temporary or periodic increase in ambient noise levels in the project vicinity above levels existing without the project e) were located within an airport land use plan or, where such a plan has not been adopted, within two miles of a public airport or public use airport, which would expose people residing or working in the project area to excessive noise levels f) were located in the vicinity of a private airstrip, which would expose people residing or working in the project area to excessive noise levels 2. Findings The Draft EIR concluded that the Project will have noise impacts on a project- specific basis, chiefly in relation to construction activities, including the potential temporary installation of a mechanical device to crush rocks on the project site. However, the applicant is no longer proposing to conduct rock crushing on the project site. Therefore, this impact would no longer occur. The City Council makes the following findings for this impact: a) All feasible measures, changes and alterations have been required in, or incorporated into, the Project, which will lessen such significant environmental effects. b) MM NO[ — 1 from the Draft EIR has been deleted in its entirety as it relates to the Boulders project and replaced with the following mitigation measure that prohibits rock crushing on the project site consist with the applicant's latest proposal: City Council Resolution No. 22063 Page 27 of 44 Exhibit A-- Findings of Facts MM NOI — 1 Rock crushing will not be allowed on the project site. c) MM NO] — 2 from the Draft EIR, which related solely to the installation of rock crushing equipment on the Boulders site has been deleted. Because no rock crushing is allowed on the project site, this mitigation is unnecessary. 3. Supportive Rationale The Project's noise impacts are analyzed in Section 6.7 of the FEIR. For the reasons below, noise impacts can be mitigated to less-than-significant levels. a) Implementation of Mitigation Measures NOI-1 and NOI-2 will ensure that noise levels generated by the project operation and noise levels within the project do not exceed the standards contained in the City of Palm Springs General Plan or the City's Noise Ordinance. b) Proposed uses within the Project do not generate excessive ground-borne vibration. Vibration during construction will be controlled through application of the City's Noise Ordinance. c) The Project will be constructed in accordance with the City's General Plan and its Noise Ordinance, so no substantial permanent increase in ambient noise levels will result. d) Implementation of Mitigation Measures NOI-1 and NOI-2 will ensure that temporary noise levels generated by Project construction, and noise levels within the Project, do not exceed the standards contained in the City of Palm Springs General Plan or the City's Noise Ordinance. e) The proposed Project is not in the influence area for any public-use airport, so the aircraft noise levels at the Project site will be less than significant. f) The proposed Project site is not located in the vicinity of any private airstrip. L. Population and Housing 1. Potential Impacts The Project would have a significant impact on population and housing if it were to do any of the following: City Council Resolution No. 22063 Page 28 of 44 Exhibit A— Findings of Facts a) induce substantial population growth into an area, either directly or indirectly b) displace substantial numbers of existing housing, necessitating the construction of replacement housing elsewhere c) displace substantial numbers of existing people, necessitating the construction of replacement housing elsewhere 2_ Findings The Project will have no significant impact on population or housing. Accordingly, the City Council finds that no mitigation measures are required with respect to population and housing. 3. Supportive Rationale The Project's potential impacts on population and housing are analyzed in Sections 6.2 of the FEIR. For the reasons below, these impacts are determined to be less than significant. a) The Project will be constructed consistent with the requirements of the City's General Plan, which specifies only low-density residential development in the Project area. b) The Project will not displace any housing as the site is currently undeveloped and uninhabited. c) The Project will not displace any existing people or necessitate construction of replacement housing elsewhere because the site is currently undeveloped and uninhabited- M. PUBLIC SERVICES 1. Potential Impacts The Project would have a significant impact on public services if they were to do any of the following: a) result in substantial adverse physical impacts associated with the provision of new or physically altered fire protection facilities or the need for new or physically altered fire protection facilities (the construction of which could cause significant environmental impacts), in order to maintain acceptable service ratios, response times, or other performance objectives for fire protective services City Council Resolution No. 22063 Page 29 of 44 Exhibit A— Findings of Facts b) result in substantial adverse physical impacts associated with the provision of new or physically altered police protection facilities or the need for new or physically altered police protection facilities (the construction of which could cause significant environmental impacts), in order to maintain acceptable service ratios, response times, or other performance objectives c) result in substantial adverse physical impacts associated with the provision of new or physically altered school facilities or the need for new or physically altered school facilities (the construction of which could cause significant environmental impacts), in order to maintain acceptable student/teacher ratios 2. Findings The Project will not impact public services on a project-specific basis. The City Council makes the following findings for this impact: a) All feasible measures, changes and alterations have been required in, or incorporated into, the Project, which will lessen such significant environmental effects. b) With implementation of the following mitigation measures, the Project's impacts to public services are less than significant. MM PS-1 Prior to the issuance of any building permit, the project proponent shall annex to CFD 2005-1 to pay for increased police and fire services- 3- Supportive Rationale The FEIR analyzes potential impacts on public services in Section 6.12. The analyses were based on information gathered from local public agencies and City departments. For the reasons specified below, these impacts have been determined to be below a level of significance. a) Per Mitigation Measure PS-1, prior to the issuance of any building permit, the Project will annex to Community Facilities District (CFD) 2005-1, which funds necessary police and fire services for new development. b) Although the Project will increase demands on Palm Springs Unified School District, the project will pay the required school impact fee (currently $2.14 per sf) to reduce the potential impact of additional City Council Resolution No. 22063 Page 30 of 44 Exhibit A— Findings of Facts student population; under State law, such payment fully mitigates project impacts to schools. N. Recreation 1. Potential Impacts The Project would have a significant impact on recreation if it were to do any of the following: a) increase the use of existing neighborhood and regional parks or other recreational facilities such that substantial physical deterioration of the facilities would occur or be accelerated b) include recreational facilities or required the construction or expansion of recreational facilities that might have an adverse physical effect on the environment 2. Findings The Project will impact recreation on a project-specific basis. The City Council makes the following findings for this impact: a) All feasible measures, changes and alterations have been required in, or incorporated into, the Project, which will lessen such significant environmental effects. b) The Project's proponent will mitigate impacts to recreation below a level of significance by the payment of in-lieu fees. 3. Supportive Rationale The Project's potential impacts on recreation are discussed in Section 6.13 of the FEIR. These impacts can be mitigated to less than significant levels for the reasons below. a) The proposed Project does not include recreational facilities or require the expansion of facilities that might have an adverse effect on the environment. b) The Project's proponents will pay in-lieu fees consistent with the City's Quimby Act Ordinance 1632. City Council Resolution No. 22063 Page 31 of 44 Exhibit A— Findings of Facts O. Transportation and Traffic 1. Potential Impacts The Project would have a significant impact on transportation and traffic if it were to do any of the following: a) cause an increase in traffic which is substantial in relation to the existing traffic load and capacity of the street system (i.e., result in a substantial increase in either the number of vehicle trips, the volume to capacity ratio on roads, or congestion at intersections) b) exceed, either individually or cumulatively, a LOS standard established by the county congestion management agency for designated roads or highways c) result in a change in traffic patterns, including either an increase in traffic levels or a change in location that results in substantial safety risks d) substantially increase hazards due to a design feature (e.g., sharp curves or dangerous intersections) or incompatible use (e.g., farm equipment) e) result in inadequate emergency access f) result in inadequate parking capacity g) conflict with adopted policies, plans, or programs supporting alternative transportation (e.g., bus turnouts, bicycle racks). 2. Findings The Project will impact traffic and circulation on a project-specific basis. The City Council makes the following findings for this impact: a) All feasible measures, changes and alterations have been required in, or incorporated into, the Project, which will lessen such significant environmental effects. b) With implementation of the following mitigation measures, the Project's Impacts to traffic and circulation are less than significant. MM TRA The Project's proponent will prepare plans for approval by the California Department of Transportation (Caltrans) for the extension of the northbound left-turn lane on North Palm Canyon ❑rive at Via Escuela. The applicant shall ensure that the extension City Council Resolution No. 22063 Page 32 of 44 Exhibit A— Findings of Facts is implemented prior to the issuance of building permits for the Boulders project. MM TR-2 The Project's proponent will contribute its fair share of the construction cost of a traffic signal at the intersection of Via Escuela and North Palm Canyon Drive. The amount of the contribution will be determined by the City Engineer and segregated into a special account. MM TR-3: Upon completion of grading of the Boulders site, the applicant shall repair all existing city streets providing construction access to the site_ The streets will be restored to a level of quality equal to or greater than that preexisting at the start of construction. Any deterioration of pavement condition, including but not limited to potholes and cracking shall be corrected to the satisfaction of the City Engineer. All traffic control devices shall be restored to their preexisting condition, including all pavement markings. The following streets shall be subject to this condition: 1. Via Escuela west of North Palm Canyon Drive 2. Chino Canyon Road west of Via Norte 3. Milo Road, Janis Drive, Palermo Drive and Racquet Club Drive west of North Palm Canyon Drive 4. Any other streets used for construction access. Upon completion of construction of the proposed residences, the same assessment of street conditions will be made. In addition, all such streets used for construction access shall be slurry sealed and restriped. 3. Supportive Rationale The FEIR analyzes the Project's traffic impacts in Sections 6.3. The analysis relies on traffic studies included as Appendix E. The key conclusions include the following: a) The traffic generated by the project can be accommodated at an acceptable level of service on the local street system except at the intersections specified in the Mitigation Measures. At those locations, the additional capacity provided by the mitigation measures will ensure that the intersections operate at an acceptable level of service. City Council Resolution No- 22063 Page 33 of 44 Exhibit A— Findings of Facts b) Project roadways will be designed to meet City of Palm Springs standards, including standards for emergency access, design features, incompatible uses, and parking. c) The Project will conform to the City of Palm Springs General Plan with respect to alternative forms of transportation. . P. Utilities 1. Potential Impacts The Project would have a significant impact on utilities if it were to do any of the following: a) exceed wastewater treatment requirements of the applicable Regional Water Quality Control Board b) require or result in the construction of new water or wastewater treatment facilities or expansion of existing facilities, the construction of which could cause significant environmental effects c) require or result in the construction of new storm water drainage facilities or expansion of existing facilities, the construction of which could cause significant effects d) not have sufficient water supplies available to serve the project from existing entitlements and resources e) result in a determination by the wastewater treatment provider which serves or may serve the Project that it has inadequate capacity to serve the Project's projected demand in addition to the provider's existing commitments f) not be served by a landfill with sufficient permitted capacity to accommodate the project's solid waste disposal needs g) not comply with federal, state and local statutes and regulations related to solid waste 2. Findings The Project will have a less than significant impact on utilities City Council Resolution No. 22063 Page 34 of 44 Exhibit A— Findings of Facts 3. Supportive Rationale Sections 6.14 of the FEIR analyze the Project's impacts on utilities, including utility improvements necessary for the Project. This analysis was based in part on the Comprehensive General Plan for the City of Palm Springs, the City of Palm Springs Wastewater Master Plan, and correspondence with the Desert Water Agency (contained in EIR Appendix Q. a) Water: The Desert Water Agency has indicated that it has in place facilities adequate to serve the Project long term. b) Sewer: Sanitary sewer facilities for the Project will be provided by the City of Palm Springs from sewer mains located nearby. c) Electricity: Southern California Edison (SCE) provides electricity to the City of Palm Springs and will connect to existing SCE lines located at the Project's boundaries. d) Natural Gas: The Southern California Gas Company has confirmed adequate service capacity and has agreed to provide service to the Project via adjacent existent lines. e) Solid Waste: Palm Springs Waste Disposal Service will provide waste disposal services to the Project. f) Telephone: Telephone service to the Project will be provided by Verizon. g) All utility improvements constructed as part of the Project will comply with applicable County and uniform codes. Project design features incorporate appropriate water and energy conservation measures recommended by the California Department of Water Resources and required by the California Code of Regulations. In addition, the Project's utility impacts would be further mitigated by payment of applicable utility impact fees charged by the various service providers identified above- Q. Mineral Resources 1. Potential Impacts The Project would have significant impact on mineral resources if they were to do any of the following: City Council Resolution No. 22063 Page 35 of 44 Exhibit A— Findings of Facts a) result in the loss of availability of a known mineral resource that would be of future value to the region and the residents of the State b) result in the loss of availability of a locally important mineral resource recovery site delineated in a local general plan, specific plan, or other land use plan 2. Findings The Project will not have significant impact on mineral resources, so no mitigation is required. 3. Supportive Rationale The EIR analyzes the Project's impacts on mineral resources in Section 6.16 and finds those impacts to be below a level of significance for the following reasons: a) The Project site has not been determined to contain important mineral resources. b) The Project site has not been designated as an important mineral resource site by the City of Palm Springs General Plan or any specific plan or other land use plan. R. Cumulative Impacts 1. Potentiate CEQA Guideline 15130 requires the identification of public and private projects that, when taken together with the proposed Project, could have cumulative impacts on the environment. The City identified 24 reasonably foreseeable development projects in the relevant geographic area. The inclusion of those 24 reasonably foreseeable projects in the cumulative impact analysis resulted in a conservative analysis because it is uncertain whether all of those projects will be developed. 2. Findings The Project will contribute to significant and unavoidable cumulative impacts on aesthetics, short-term air quality during construction, and native desert habitat. The Draft EIR originally concluded that the Project would have a potentially significant and unavoidable cumulative water supply impact. However, based on subsequent information and analysis provided in the supplement to the Draft EIR and in light of the whole record, the Project would not have a significant and unavoidable cumulative water supply impact. The City Council makes the following findings for these impacts: City Council Resolution No. 22063 Page 36 of 44 Exhibit A— Findings of Facts a) As discussed above, all feasible measures, changes and alterations have been required in, or incorporated into, the Project, which will lessen such significant cumulative environmental effects. b) No other feasible measures exist to mitigate these significant and unavoidable cumulative impacts. c) For the reasons set forth below in the Statement of Overriding Considerations, adopted concurrently by the City Council, the City Council finds that the significant cumulative impacts identified in this Section IX(R) are acceptable in light of the Project's overall benefits 3. Supportive Rationale The cumulative impacts of the proposed Project and identified related projects are evaluated in Section 8 of the EIR, which reviews the potential cumulative impacts for each environmental issue analyzed. By complying with local land use and planning standards, the Project will not substantially contribute to cumulative impacts with respect to cultural resources, hazardous materials, population and housing, noise, public services, recreation, transportation and traffic, utilities and service systems, land use, hydrology and water quality, geology and soils, agriculture, or mineral resources. The Project's contribution to these potential cumulative impacts will be minimized by adhering to the proposed mitigation measures and project requirements discussed above. The analysis results in the following conclusions with respect to significant cumulative impacts: a) The Project will transform the site from undeveloped desert to low- density residential development, necessarily altering the aesthetic character of the sites permanently. This alteration may be perceived by some as a significant impact. Full mitigation of this impact is not feasible because it would not achieve even the most basic project objective, which is to establish new residential development on this site that complements the surrounding development. b) The Project will contribute to a cumulative loss of native desert habitat that may be considered adverse. Full mitigation of this impact is not feasible because it would not achieve even the most basic project objective, which is to establish new residential development on this site that complements the surrounding development. City Council Resolution No. 22063 Page 37 of 44 Exhibit A— Findings of Facts C) During the 18- to 24-month construction period, the Project may contribute to short-term adverse cumulative impacts related to NQX and PM,o emissions. Mitigation measures have been incorporated which limit the amount of land that can be disturbed at any one time, and that require that operations be shut down in high wind events. To further mitigate this impact would require reduction of the allowable area of grading at any one time, which would make the project economically infeasible and would result in the neighborhood being subject to construction disturbance for a longer period of time. S. 1. Discussion CEQA Guideline 15126 requires the evaluation of growth-inducing impacts, including whether a project will encourage economic and population growth or the construction of additional housing in the area. 2. Findings The Project represents a feature of planned growth in the City of Palm Springs and is not considered growth inducing. 3. Supportive Rationale Section 10.3 of the FEIR analyzes growth-inducing impacts. That section also evaluates the Project's consistency with related regional policies of the Southern California Association of Governments ("SCAG"), including policies relating to population growth, housing, transportation and air quality. The FEIR makes the following conclusions: 1. The Project is consistent with the SCAG policies relating to population growth, housing, transportation and air quality. 2. The Project is not considered growth-inducing. X. FINDINGS CONCERNING PROJECT ALTERNATIVES CEQA Guideline 15126.6 requires an EIR to (1) describe a range of reasonable alternatives to the proposed project, or to the location of the project, that would feasibly attain most of the basic objectives of the project but would avoid or substantially lessen any of the significant effects of the project; and (2) evaluate the comparative merits of the alternatives. In analyzing the feasibility of an alternative, the CEQA Guidelines list the following factors: site suitability; economic viability, infrastructure viability; social, legal and technological issues and City Council Resolution No. 22063 Page 38 of 44 Exhibit A— Findings of Facts jurisdictional boundaries. The purpose of the consideration and discussion of alternatives to the proposed project is to identify ways to mitigate or avoid the significant effects that a project may have on the environment. In doing so, CEQA Guideline 15126.6 also directs that the analysis of alternatives be limited to alternatives to the project or its location that are capable of avoiding or substantially lessening any significant effects of the project, even if these alternatives would impede to some degree the attainment of project objectives, or would be more costly. The selection and discussion of alternatives to the project is intended to foster meaningful public participation and informed decision-making. An EIR need not consider an alternative whose effect cannot be reasonably ascertained and whose implementation is remote or speculative. CEQA Guideline 15126.6 also requires the analysis of a "No Project" alternative and the identification of an "Environmentally Superior Alternative." If the environmentally superior alternative is the No Project Alternative, then the EIR is required to identify an environmentally superior alternative among the remaining alternatives. Finally, CEQA Guideline 15126.6 requires an EIR to identify any alternatives that were considered by the lead agency but were rejected as infeasible during the scoping process and briefly explain the reasons underlying the lead agency's determination of such infeasibility. A. Identification of Preferred Alternative Custom Lot Alternative 1. The custom lot alternative would develop the same number of units in the same layout as the proposed project, but all the lots would be sold as custom lots, and individually developed. 2. As compared to the proposed project, the impacts of the Custom Lot Alternative would be less than the proposed project, but still potentially significant in the following categories: • Aesthetics • Air Quality 3. Because the Custom Lot Alternative would reduce development-related environmental impacts, it is considered "Environmentally Superior" to the project. 4. After review, the applicant has determined that the Custom Lot Alternative, which is environmentally superior to the proposed project, is financially viable in this location, and, therefore, the proposed project is now the Custom Lot Alternative. City Council Resolution No. 22063 Page 39 of 44 Exhibit A— Findings of Facts 5. Findings The Custom Lot Alternative was considered as an alternative in the FEIR, and the FEIR noted that the environmental impacts of the Custom Lot Alternative were the same or less than the originally proposed project. The Custom Lot Alternative does not contain any design features that would require additional analysis. The FEIR has therefore considered the effects of the Custom Lot Alternative, and no additional environmental analysis is necessary. B. Alternatives Considered But Rejected Several alternatives were considered that did not warrant further review in the EIR. Alternatives Analyzed in the EIR. These included: • Public purchase of the site • Off-site development alternatives C. Alternatives Analyzed in the Final EIR The City Council has considered the following alternatives for the Boulders Project identified in the EIR: • No Project Alternative • Reduced Grading Alternative • Custom Lot Alternative (See discussion above) ■ Reduced Density Alternative The City has rejected the No Project Alternative, the Reduced Grading Alternative and the Reduced Density Alternative as infeasible or contrary to the project objectives for the reasons hereinafter stated: No Project Alternative 1, The No Project Alternative, as required by CEQA, assumes that the project site would remain in its existing undeveloped condition. 2. The No Project Alternative would eliminate all impacts associated with the construction of structures and introduction of residents to the site, including significant and unavoidable adverse effects to: • air quality ■ aesthetics • cumulative impacts City Council Resolution No. 22063 Page 40 of 44 Exhibit A— Findings of Facts • adjacent residents during construction 3. Because the No Project Alternative would eliminate or reduce development- related environmental impacts, it is considered "Environmentally Superior" to the project. 4. The No Project Alternative fails to meet the following project objectives (See Section 3.3 of the Final EIR): • To create high quality in-fill development in an area that has already undergone substantial development, without intruding into undeveloped areas of the Chino Cone. The Boulders project achieves the objective of creating in-fill development because the site is among the last remaining substantial areas of vacant land within the otherwise developed area bounded by Highway 111 on the east, Tramway Road on the north, the Agua Caliente Indian Reservation lands to the west, and Vista Chino to the south. • In designing the Boulders project, one of the applicant's objectives was to create new residential development that reflects and complements the overall pattern and character of existing surrounding uses. The existing Little Tuscany neighborhood lies directly south of the Boulders project. Developed at a density of approximately two units per acre, Little Tuscany is a self-contained eclectic neighborhood containing one-story and split-level single- family residences. Streets are narrow and winding, with lots terraced to account for elevation changes throughout the neighborhood. • The design objective for the Boulders project, which abuts Little Tuscany at Chino Canyon Road, is to provide a transition from the development style of Little Tuscany on the south to the existing slightly denser development to the east and north of the Boulders project site. The project achieves this objective by providing larger custom lots along its southern border on Chino Canyon Road, none of which will be mass-graded. This then permits development of these lots in an eclectic style similar to that of Little Tuscany. Further, these lots abutting Chino Canyon Road are designed to be larger than all but two of the lots in the Little Tuscany neighborhood, thereby assuring a compatible interface between the Boulders project and Little Tuscany. • The interior streets within the Boulders project, like those of Little Tuscany, are similarly designed with the objective of avoiding a linear grid pattern, thereby preserving the unique character of the area. The interior lots within the Boulders project site, while generally smaller City Council Resolution No. 22063 Page 41 of 44 Exhibit A— Findings of Facts than the lots that front on Chino Canyon Road, are nonetheless similar to or slightly larger than the lots found in the existing neighborhoods to the east and north of the Boulders project site. The Boulders project design, therefore, meets the objective of providing a complementary transition from Little Tuscany to the Chino Canyon neighborhoods. • Because the Boulders project is an in-fill project between the Little Tuscany and Chino Canyon neighborhoods, one of the objectives of the project is to connect the two existing neighborhoods while still preserving the character of the area. As such, the applicant proposes to gate only the entrance at Via Escuela. This will allow the public to exit the Boulders and Little Tuscany areas through this gate, but only residents will have access for entry through the gate. This system increases safety to Little Tuscany in that it not only limits the introduction of new traffic into the Little Tuscany neighborhood but also provides an additional means of exiting the area and an additional means for emergency vehicles to access the area, thereby providing greater connectivity for residents of Little Tuscany. • The City of Palm Springs has worked for many years toward the revitalization of its downtown area and overall commercial base. A critical component in such an effort is assuring that the City can provide quality housing to attract residents and second residence owners who become the market for and support the businesses located in Palm Springs. In recent years, more and more luxury residential development has occurred in down-valley cities, following and feeding commercial development in those same communities. It is critical to assure that Palm Springs can offer similar quality housing opportunities if the City is to maintain the residential base needed to support the local economy and assure the City's place as a world- class resort. The Boulders project, therefore, aims to create luxury custom residences that take advantage of Palm Springs' unique physical features. • Due to its location and elevation in an in-fill area adjacent to the Chino Cone, the project offers the exceptional views available only in this area of Palm Springs, thereby achieving the objective of using the City's unique physical features to create high-quality residences. The high-quality development standards provide numerous variations for residence design and create luxury semi-custom and custom residence opportunities, resulting in residence values within both projects that will meet or exceed the values of the housing in the surrounding neighborhoods. City Council Resolution No. 22063 Page 42 of 44 Exhibit A— Findings of Facts • At present, during major storm events, flooding conditions exist along certain areas in the Little Tuscany neighborhood. An objective of the Boulders project, therefore, is to improve drainage conditions in the general area by a combination of drainage channels, retention basins, and grading in conformity with current City standards that require lots be developed so as to avoid drainage onto adjacent property. In addition, the project will be designed to take care of existing runoff water that currently floods Panorama Street and surrounding residences. This is not required by the City or existing ordinance and will be achieved via the construction of a new storm drain along Chino Canyon Road and diverting existing overflows from the western DWA site through the Boulders project site rather than the Little Tuscany neighborhood. 5. The No Project Alternative would eliminate public benefits associated with the project including the roadway improvements, improved drainage and development associated fees to the City. 6. It is uneconomical to maintain the project site in its current state over the long-term, given its location within a developing area. Pressure to develop the land for higher economic uses will continue. Therefore, the No Project Alternative may postpone rather than preclude development. 7. The No Project alternative is inconsistent with the General Plan and current City zoning. Reduced Grading Alternative 1. The No Project Alternative seeks to reduce overall grading at the project site by reorienting street system to minimize lot-to-lot grade differences. 2. As compared to the proposed project, the impacts of the Reduced Grading Alternative would be less than the proposed project, but still significant in the following categories. • Aesthetics • Air Quality While impacts in these categories would be slightly less than the proposed project, the following significant impacts would remain the same. • Emissions of criteria pollutants on the "worst case" daily basis, which is the criteria for significance recommended by the South Coast Air Quality Management District City Council Resolution No. 22063 Page 43 of 44 Exhibit A— Findings of Facts • The primary aesthetic impact is the change of the site from undeveloped to developed, which will be the same with the proposed project. 3. Impacts in other environmental categories are the same as the proposed project, or else the impacts of the proposed project are less than significant. 4. The Reduced Grading Alternative fails to meet the following project objectives (See Section 4.3 of the Final EIR): • To take advantages of the views from the project site, views from the proposed project are oriented in an east-west direction, and new residents will have primary views of Mount San Jacinto to the west, and downtown Palm Springs to the northwest. The Reduced Grading Alternative would shift such primary views east/west to north/south. Based on information and data provided by the applicant and by real estate agents in the City, views of Mount San Jacinto are a primary factor in establishing the value of properties in the area. Reduced Density Alternative 1. The reduced density alternative would develop fewer units than the proposed project. 2. As compared to the proposed project, the impacts of the Reduced Density Alternative would be less than the proposed project, but still significant in the following categories: • Aesthetics • Air Quality While impacts in these categories would be slightly less than the proposed project, the following significant impacts would remain the same: • Emissions of criteria pollutants on the "worst case" daily basis, which is the criteria for significance recommended by the South Coast Air Quality Management District • The primary aesthetic impact is the change of the site from undeveloped to developed, which will be the same with the proposed project. 3. The Reduced Density alternative has greater adverse impacts to land use, since the size of the proposed lots would be inconsistent with the lot sizes in the adjacent neighborhoods (See Table 6.1-B of the Final EIR). Reduced City Council Resolution No. 22063 Page 44 of 44 Exhibit A— Findings of Facts density would mean further increasing the lot sizes, which would increase the incompatibility. Findings a) The EIR considered a reasonable range of alternatives to the Project. b) The City Council finds that the Custom Lot Alternative is environmentally superior to the originally proposed project because impacts to air quality and aesthetics are reduced although they remain significant. XI. RECIRCULATION As described in Section 1 of the FEIR, several minor changes were made in response to comments on the DEIR that clarify, amplify or make insignificant modifications to the DEIR. The information added to the FEIR has not deprived the public of a meaningful opportunity to comment upon any significant environmental effect of the Project or any feasible way to mitigate or avoid such an effect. Accordingly, the City Council finds that no "new significant information" (as that term is defined in CEQA Guideline 15088.5[aj) was added to the EIR since the release of the DEIR that would warrant recirculation as provided in CEQA Guideline 15088.5. XII. GENERAL CONSIDERATIONS Each and all of the Findings and determinations contained herein are based on the competent and substantial evidence, both oral and written, contained in the entire record relating to the EIR. All of the language included in these Findings constitutes Findings by the City Council, whether or not any particular sentence or clause includes a statement to that effect. All summaries of information in these Findings are based on the entire record of the proceedings, and the absence of any particular fact from any such summary herein is not an indication that a particular finding is not based, in part, on that fact. The City Council's analysis and evaluation of the EIR and the Project is based on the best information currently available. This practical limitation is acknowledged in CEQA Guideline 15151, which provides that "the sufficiency of an EIR is to be reviewed in light of what is feasible." City Council Resolution No. 22063 Exhibit B BOULDERS PROJECT: STATEMENT OF OVERRIDING CONSIDERATIONS The California Environmental Quality Act (CEQA) requires the City Council to balance the benefits of a proposed project against its unavoidable environmental risks in determining whether to approve the project (Public Resources Code §21081[b]; 14 Cal. Code Regs §§15043, 15093[aj). As documented in the EIR and the Findings of Fact for the Project, the Project will result in significant and unavoidable direct and/or cumulative environmental effects relating to aesthetics, short-term air quality, and the loss of native desert habitat. Although not considered an adverse effect under the CEQA Guidelines, the construction of the Boulders (and Crescendo) projects will create a temporary cumulative neighborhood disruption for the existing residents during the estimated 18 to 24 months of major construction for both projects. Having reduced the adverse significant environmental effects of the Project to the extent feasible by adopting the proposed mitigation measures, having considered the entire administrative record on the Project, and having weighed the benefits of the Project against its unavoidable adverse impacts after mitigation, the City Council has determined that social, economic, and environmental benefits of the Project outweigh the potential unavoidable adverse environmental impacts and render those potential unavoidable adverse environmental impacts acceptable. Each of the following benefits constitutes an overriding consideration warranting approval of the project independent of the other benefits despite the significant and unavoidable environmental effects: 1. The project will result in the construction of 45 high-end residences in the City of Palm Springs. According to economic data provided to the City Council, the following economic benefits would accrue from both the Boulders and Crescendo projects (combined): • One-time benefits to government agencies in the amount of $4 million from school fees, public park fees, building permit fees, TUMF fees, flood control fees and other fees. • Ongoing annual payments to government agencies in the amount of $2.86 million/year. • Increase in the disposable income of Palm Springs residents of$8.5 million annually. 2. Residents of the proposed development will, by necessity have high incomes, which will increase the demand for high-end retail in the City of Palm Springs. City Council Resolution No. 22063 Page 2 of 2 Exhibit B--Statement of Overriding Considerations 3. The project will improve emergency access to the Little Tuscany neighborhood by widening Chino Canyon Road to minimum standards and by providing an alternate access route to and from the area during emergency conditions. The ability to protect existing residents from fires will be improved. It is acknowledged that some residents would prefer to keep Chino Canyon Road at a substandard width; however, this does adversely affect emergency response times. 4. The project will improve drainage conditions in the Little Tuscany Estates area by taking the following measures: a) Redirecting overflows from the Desert Water Agency (DWA) tanks west of the site through the Boulders project area rather than Chino Canyon Road and Panorama Road. b) Installing a 24-inch underground storm drain along Chino Canyon Road. In view of the foregoing, the City Council adopts this Statement of Overriding Considerations, finding that the benefits of the Boulders project outweigh its significant and unavoidable direct and cumulative impacts. Resolution No. 22063 Exhibit C Boulders Project Environmental Impact Report Mitigation Monitoring Program November 7, 2007 Responsible Party Monitoring Method of Sanctions Frequency Verification DPS-Director of Planning A-Prior to Issuance of A-On-site inspection I-Withhold grading or building Services or designee Grading Permit pennir CE-City Engineer or B- Prior to Issuance of B- Other Agency 2-Stop work order designee Building Permit Permit/A roval CT-California Department of C-Prior to Construction C-Plan Check 3-Withhold approval of Transportation or designee ading plan PC-Planning Commission or D-Throughout D-Separate Submittal 4-Withhold design review desi ee Construction (Reports/Studies/Plans) approval NC-City designated noise E-Prior to the Approval E- Planning 5-Withhold of occupancy consultant or designee of Grading Plan Commission Approval Permits DPW-Director of Planning F-Prior to Start of Rock F-Payment of fees Services Crushing BM-Biological Monitor or G-Throughout Grading designee H-Prior to Design Review Approval I-Upon completion of construction 1 Project File Name: Applicant: Prepared Sy: LSA Associates Date: November 7 2007 Mitigation Measures NoAmplemeuting Action Responsible Monitoring Timing of Verification Method of Verified Sanctions for for Frequency Verification Date/Initials Non- MonItorin Compliance Mitigation from LnAronmental lm act Re ort Trans ortation and Traffic MM-TR-t:The project proponent will prnpam plans for CT B Prior to issuance of B/C 1 approval by the California Dcpartmont of Transportanon building permits (Caltrans)for die extension of the northbound left-turn lane on North Palm Canyon Drive al Via Ewucla.The applicant shall ensure that the extension is implemented prior to the issuance of building permits for the Boulders project. MM-TR-2t The project proponent will contribute CE B Prior to issuance of F 1 the project's fair share of the construction cost of a building permits traffic signal at the intersection of Via Escucla and North Palm Canyon Drive.The amount of the contribution will be determined by the City Engineer and se re gated into a special account. MM TR-3:Upon completion of mass grading of the CE C/D/I Prior to issuance of A 1/2/5 Boulders site,the developer shall repair all existing building city streets providing construction access to the site. permits/Throughout The streets will be restored to a level of quality equal construction/Upon to or greater than that preexisting at the start of Completion of construction.Any deterioration of pavement Construction condition,including but not limited to potholes and cracking shall be corrected to the satisfaction of the City Engineer.All traffic control devices shall be restored to their preexisting condition,including all pavement markings.The following streets shall be subject to this condition: 1. Via; scuela west of North Palm Canyon 2 Mitigation Measures No./implementing Action Responsible Monitorin'g', Timing of Verification Method of Verified Sanctions for for Frequency Verification Date/initials Non- Monitorin Compliance Drive 2. Chino Canyon Road west of Via None 3, Milo Road,Jams Drive,Palermo Drive and Racquet Club Drive west of North Palm Canyon Drive 4. Any other streets used for construction access Upon completion of construction of the proposed residences,the same assessment of street conditions will be made. In addition,all such streets used for construction access shall be slurry sealed and restriped. Cultural Resources MM CULT-1:Prior to the approval of any grading DPS E Prior to approval of C 3 plan,the Director of Community Development of the grading plan City of Palm Springs will ensure that the following specification is included with grading requirements: In the event of the accidental discovery or recognition of any human remains in any location on the project site other than a dedicated cemetery, the following steps will be taken: 1. There will be no further excavation or disturbance of the site or any nearby area reasonably suspected to overlie adjacent human remains until: (a)The Riverside County Coroner is contacted to determine that no investigation of the cause of death is required, and (b)If the Coroner determines the remains to be Native American: • The Coroner will contact the Native American Heritage Commission AHC Mitigation Measures No./Implementing Action Responsible ;'.Monitoring Timing of Verification Method of Verified Sanctions for for, Frequency Verification Date/Initials Non- Monitoring,' Cum Rance within 24 hours. • The NAHC will identify the person or persons it believes to be the most likely descended from the deceased Native American. • The most likely descendent (MLD)may make recommendations to the landowner or the person responsible for the excavation work, for means of treating or disposing of, with appropriate dignity, the human remains and any associated grave goods as provided in Public Resources Code Section 5097.98, Or 2. Where the following conditions occur, the landowner or his authorized representative will rebury the Native American human remains and associated grave goods with appropriate dignity on the properry in a location not Subject to further subsurface disturbance: (a) The NAIIC is unable to identify an MLD, (b)The MLD identified failed to make a recommendation within 24 hours after being notified by the NAHC- (c)The landowner or his authorized representative rejects the recommendation of the MLI), and the mediation by the NAHC fails to provide measures acceptable to the landowner. Aesthetics MM AES-1: The project shall incorporate as many DPS E Prior to approval of C 3 of the existing boulders as possible into project grading plan landscaping,residential landscaping,slopes,and drainage courses. MM AES-2: The proposed pTojoct will not use two- DPS H Prior to Design Review C 4 4 Mitigation Measures No./lmpletnenting Action ResponsnTile'. 'Monitoring Timing of Verificatlon Method of Verified Sanctions for for Frequency Verification Date/Initials Non. Monitoring Cam fiance story elements adiacent to any existing structures. A pToval Air Quality MM AIR-1: DPS/PC F Prior to approval of D/E 3 Prior to the approval of a final grading plan by the grading plan City,the project proponent shall submit a detailed Grading and Rock Management Plan for review and approval by the Planning Commission. This plan shall specify the following: 1. Final estimates for grading volumes, including cut and fill,off-site export of unsuitable material,and import of appropriate material. Refined estimates for emissions of import/export trips will be provided. 2. Final estimates of on-site rock that can be incorporated into the site for fill, landscaping elements,or use in the decorative walls of residents, including rock that may be reduced in size, using the Nonex process. 3 Active grading shall be limited to 2.5 acres of disturbed areas. 4. If on-site rock crushing is proposed and approved by the City when the project is approved,then the location and emission factors of the exact equipment proposed to be used will be provided.An updated analysis shall be submitted to the City demonstrating that PMip and NOh emissions shall not exceed the SCAQMD daily limits, and that rock-crushing PM, emissions are equivalent to those listed in AP-42,Fifth Edition,Volume 1,hinted States Environmental Protection Agency, 5 Mitigation Measures No./lmplementing Action Responsible Monitoring "riming of Verificatloh Method of Verified Sanctions for for wre uency Verification hate/lnitials Non- ,,q ring Compliance January 1995 for"controlled emission;." 5. If on-site rock-crushing is not proposed,or is disallowed by the City when the project is approved, then an updated emissions analysis shall be provided based upon the relocation plan for rocks that cannot be used on-site and the final length of the trip to the rock disposal site. An updated analysis shall be submitted to the City demonstrating that PM,o emissions shall not exceed tlxe SCAQMD daily limits. If the City overrides the potential NO,emission exceedance when the project is approved, then the Grading and Rock Management Plan shall demonstrate how the N0, emissions will be limited io within 25%of the SCAQMD construction threshold for NO, 6. Prior to the commencement of grading,the City of Palm Springs shall retain,at the developer's expense,an air quality monitor who shall be present on site at least three hours per day during grading operations. The monitor shall have the ability to"stop work"if visible dust is seen escaping from the site,or if other measures specified in the Grading and Rock Management Plan are not observed. 7. The plan shall demonstrate how the Cuy's standard mitigation measures,listed in Section 8.50 of the Palm Springs Municipal Code,shall be incorporated into project construction- 6 Mitigation Measures No./Implementing Action Responsible Monitoring , "Pining of Verification Method of Verified Sanctions for for Frequency Verification Date/Initlal5 Non-' Monitorlity. Coru Clanee MM AIR-2: Mass grading of the Boulders and the CE A Prior to the issuance of a A l Crescendo sites shall not occur simultaneously. grading permit Accordingly,all graded areas of the first site shall be stabilized prior to the issuance of a grading permit for the second site. MM AIR-3: The applicant shall require the CF A/B Prior to issuance of C 1 construction contractor to use construction grading/building permit equipment with low emission factors and high energy efficiency to the extent feasible.Prior to issuance of grading and budding permits,the City shall verify that grading and construction plans include a prominently displayed statement that all construction equipment must(1)be tuned and maintained in accordance with manufacturers' specifications and(2)meet or exceed Tier 2 standards,including the use of emulsified diesel fuels and oxidation catalysts particulate traps or other verified/certified technologies as feasible. Note: Such equipment and fuels may not yet be available in the Palm Springs area-,therefore,the note"as feasible"applies.No mitigation credit was taken in this analysis for such mitigation. MM AJR-4:All residential fireplaces will be fueled DPS B Prior to issuance of C 1 by natural gas, building permit Mitigation Measures NoAmplem,enting Action Responsible Monitoring Timing of Verification Method of Verified Sanctions for for ,'Frequency Verification, Date/hdtials Non- , ' Monitoring Compliance MM AIR-5:Exterior electrical outlets will be OPS B Prior to issuance of C 1 provided in fronts and backs of residential units to building permit facilitate use of electric landscape equipment. Noise NOI-1: Upon completion of the noise mitigation NC F Prior to the start of rock A 2 structure around the rock crusher,the applicant shall crushing retain a noise specialist to conduct the following tests before the crusher goes into regular operation: The noise performance of the crusher and the noise attenuation structure will be measured at the property line of two residences closest to the structure(one north of the site and one south). Other construction activities will be shut down during this test.The noise levels at these locations will be measured when the crusher is operating nortually. If the noise levels exceed those specified in the City's Zoning Ordinance Section 11 74.031 Noise Level Limit and Section 11.74.032,then crusher operations will cease until additional attenuation can be added,or crasher operations modified,and The system retested. If the system cannot be brought into compliance with the cited requirements,then no rock further rock crushing activities will be allowed,and other means to address oversized rocks will be required. The results of the test will require certification by a City selected noise consultant. 8 Mitigation Measures NoAmplementing Action Responsible Monitoring' 'Timing of Verification Method of Verified Sanctions for for„ Frequency Verification Aate/lnitlals Non- Monitorin Compliance This test will be repeated at least every two montbs during the construction period. If the crusher is found to be out of compliance,then regular operations will be shut down until the crushing system can be brought into compliance. This measure requires actual"in-the-field" com liance with the City's requirements. MM NOT-2:Prior to the issuance of grading CE A Prior to the issuance of C/D 1 permit's,the project proponent shall prepare,and the grading permits City shall review and approve,a technical study that demonstrates the required temporary structure provides sufficient noise reduction for the crusher to meet City Requirements as determined in the City's Zoning Ordinance Sections 11.74.031 and 11.74.032. $11olo lcal,Resources ' ' MM BI0-1:The following non-native,exotic plant DPS B Prior to the issuance of C 1 species shall not be utilized in the project building permit landscaping or included in the plant palene that may be submitted or included on landscape plans prepared for the rolect: BOTANICAL NAME Acacia spp, (all species except A.greggii) Arundo donax(x) Atriplex semibaccata(x) Avena barbaia Avena fatua Brassica tournefortii(xx) Bromus madritensis ssp. rubens(x) Bromus tectomm (xx) Cortaderia fubata [syn.C. atacamensis] 9 Mitigation Measures No./Impiemeating Action Rciponsibie Monitoring',, ;Timing of Verification ]Method of Verified Sanctions for for h'req'uency Verification Aate%Initinls Non- ', ,monitoring Compliance Cortaderia dioica [syn. C selloana] Pescuminia sophia Eichhornia crassipes Elaegnus angusiifolia Foeniculum v 1gare Hirschfeldia incana Lepidium latifolium Lolium multi}lorum Lollium perenne Nerium oleander Nicodanaglauca (x) Oenothera berlandierl(#) Olea europea Parkinsonia aculeata(x) Pennisetum clandestinum Pelmisetum setaceum (xx) Phoenix canariensis (#) Phoen r dactylifera (#) Ricinus communis(x) Salsola tragus (x) Schinus molle Schinus terebinthifolius Schismus arabicus Schismus barbatus (xx) Stipa capensis (xx) Tamarix s'pp. (all species) (xx) Taeniathemn?caput-medusae Tribulus terrestris Vinca major Yucca gloriosa(#) 10 Mitigation Measures NoJImplementing Action ' Responsible" ' Monitoring; .. Tinning of Verification Method of Verified Sanctions for for Frequency' Verification Date/Initials Non- Monitorin __Compliance Sources: CVAG MSHCP;California Exotic Pest Plant Council,United States Department of Agriculture-Division of Plant Health and Pest Prevention Services, California Native Plant Society,Fremontia Vol. 26 No.4, October 1999, The Jepson Manual;PIigher Plants of California,and County of San Diego Department of Agriculture. Key to Table #indicates species not on CaIEPPC October 1999"Exotic Pest Plants of Greatest Ecological Concern in California"list X indicates species known to be invasive in the MSHCP Plan Area XX indicates particularly troublesome invasive species MM BIO-2:A biological monitor shall be located BM G Throughout Grading A 2 onsite during grading operations to remove and relocate any specimens of red diamond rattlesnake That are encountered. Hazards and Hazardous Materials MM HAZ-1:Prior to the commencement of grading DPS A Prior to the issuance of D 1 activities,the developer shall inform all residents grading permit within 1,000 feet. Hydrology and Water uali MM HY-1 Prior to the approval of a grading permit, DPW A Prior to issuance of C/D 1 the project proponent will submit, for approval by gradune permit the City Director of Public Works,a final drainage plan based on a final hydrology study implementing the following local and regional requirements, policies and programs. a) The plan will demonstrate that off-site storm flows will not be increased,and that all structures in the 2Lojert are protected from 100- ear storm I1 Mitigation Measures Nodlmplementing Action Responsible ,Monitoring Timing'of Verification Method of Verified Sanctions for for Frequency Verification Date/Initials Non- Monitoring Compliance flows, b) All proposed facilities will be privately owned and maintained by the proposed Boulders project I•Iomeowners Association.The CC&Rs for the association shall clearly specify the requirements to maintain the drainage system in an effective manner. e) The plan will include specific pollution control measures and/or designs that meet the requirements of the National Pollution Discharge Elimination System and keep pollutants, including sediment,herbicides,pesticides and oils,out of surface and ground waters, d) The plan will address the use of on-site stormwater retention basins,to the greatest extent practical,to enhance opportunities for groundwater recharge,provide additional open space and wildlife habitat value,and reduce the necessity for and costs associated with off-site stormwater conveyance facilities, e)Prior to formation of the Homeowners Association,the City Engineer shall review the proposed CC&Rs to ensure that language requiring effective maintenance of the drainage system is acts table to the City. MM HY-2 Prior to the approval of any building DPS B Prior to the issuance of C 1 permit,the City Director of Planning will building permit review plans to ensure the following: a) Drought-tolerant landscaping and water- efficient irrigation systems will be used as a means of reducing water consumption in all yard areas, consistent with the City of Palm Springs Efficient Landscape Ordinance. Conditions in the ordinance that apply to 12 Mitigation Measures Nn./implementing kotion Responsible, "'Monitoring '.Timing of.Verificatinn Method of Verified Sanctions for for F"re�uency Verification Date/Initials Non- MonitoringCompliance multi-family residences will be applied to this project. b) The project developer will install low-flush toilets, low-flow showerheads and faucets in all new construction,in conformance with Section 17921.3 of the Flcalth and Safety Code,Title 20, California Administrative Code Section 1601(b),and applicable sections of Title 24 of the State Code. c) The project will connect to the City's sewer system.Use of septic tanks will not be permitted. MM FIX-3 Prior to the issuance of grading permits DPS A Prior to the issuance of D i for any lots where adequate water supplies and fire grading permit flows would require pumping from the existing reservoirs,the applicant shall provide the City with written confirmation from the DWA that adequate water pressure is available to serve these lots. This condition may be satisfied in one of three manners: 1. DWA agrees that the existing pump is adequate to serve the project. 2. DWA accepts the developers offer to increase the capacity of the existing pumping system, 3. DWA obtains separate environmental 2RUioval for its own additional reservoirs. Public Services MM PS-1:Prior to the issuance of any building permit, DPS $ Prior to the issuance of P 1 the project proponent shall annex to CFD 2005. to pay building permits for increased police and fire services. 13 City Council Resolution No. 22063 Exhibit D BOULDERS PROJECT: CONDITIONS OF APPROVAL November 7, 2007 Before final acceptance of the project, all conditions listed below shall be completed to the satisfaction of the City Engineer, the Director of Planning Services, the Chief of Police, the Fire Chief or their designee, depending on which department recommended the condition. Any agreements, easements or covenants required to be entered into shall be in a form approved by the City Attorney. PLANNING DEPARTMENT: Project Specific Condition: 1. In addition to the Hillside Development Review process, the applicant shall be required to submit Administrative Minor Modification (AMM) applications for lots (Lot 5, 7— 13, 23, 25, 26, 33, 34 and 44) that do not meet the required minimum lot dimensions (depth or width). Administrative: 1. The proposed development of the premises shall conform to all applicable regulations of the Palm Springs Zoning Ordinance, Municipal Code, or any other City Codes, ordinances and resolutions which supplement the zoning district regulations. 2. The owner shall defend, indemnify, and hold harmless the City of Palm Springs, its agents, officers, and employees from any claim, action, or proceeding against the City of Palm Springs or its agents, officers or employees to attach, set aside, void or annul, an approval of the City of Palm Springs, its legislative body, advisory agencies, or administrative officers concerning Tentative Tract Map 31095. The City of Palm Springs will promptly notify the applicant of any such claim, action, or proceeding against the City of Palm Springs and the applicant will either undertake defense of the matter and pay the City's associated legal costs or will advance funds to pay for defense of the matter by the City Attorney. If the City of Palm Springs fails to promptly notify the applicant of any such claim, action or proceeding or fails to cooperate fully in the defense, the applicant shall not, thereafter, be responsible to defend, indemnify, or hold harmless the City of Palm Springs. Notwithstanding the foregoing, the City retains the right to settle or City Council Resolution No. 22063 Page 2 of 22 Exhibit D — Conditions of Approval abandon the matter without the applicant's consent but should it do so, the City shall waive the indemnification herein, except, the City's decision to settle or abandon a matter following an adverse judgment or failure to appeal, shall not cause a waiver of the indemnification rights herein- 3- That the property owner(s) and successors and assignees in interest shall maintain and repair the improvements including and without limitation sidewalks, bikeways, parking areas, landscape, irrigation, lighting, signs, walls, and fences between the curb and property line, including sidewalk or bikeway easement areas that extend onto private property, in a first class condition, free from waste and debris, and in accordance with all applicable law, rules, ordinances and regulations of all federal, state, and local bodies and agencies having jurisdiction at the property owner's sole expense. This condition shall be included in the recorded covenant agreement for the property if required by the City. 4. Prior to recordation of the final map or, at the City's option, prior to issuance of certificate of occupancy, the developer agree to support formation of or annexation into a Community Facilities District (CFD) to include the project site. Developer further agrees to waive any right of protest or contest such formation or annexation, provided that the amount of any assessment for any single family dwelling unit (or the equivalency thereof when applied to multiple family, commercial or industrial) as established through appropriate study shall not exceed $500 annually per dwelling unit or dwelling unit equivalency unit, subject to an annual consumer price index escalator. Prior to sale of any lots, or prior to the issuance of any certificate of occupancy, or prior to any approval of the Building Official that will allow the premises to be occupied, the CFD shall be formed, the annexation thereto shall occur, or at the option of the City Manager and Building Official, a covenant agreement may be recorded against any affected parcel(s) with the project, evidencing the Owner's binding consent, approval, and waiver of rights as provided in this condition of approval. 5. The applicant, prior to issuance of building permits, shall submit a draft declaration of covenants, conditions and restrictions ("CC&R's") to the Director of Planning Services for approval in a form to be approved by the City Attorney, to be recorded prior to certificate of occupancy. The CC&R's shall be enforceable by the City, shall not be amended without City approval, and shall require maintenance of all property in a good condition and in accordance with all ordinances. 6. The applicant shall submit to the City of Palm Springs, a deposit in the amount of $3,500, for the review of the CC&R's by the City Attorney. A $631 filing fee, or the fee in effect at the time of submission, shall also be paid to the City Planning Department for administrative review purposes. 2 City Council Resolution No. 22063 Page 3 of 22 Exhibit D — Conditions of Approval 7. Pursuant to Park Fee Ordinance No. 1632 and in accordance with Government Code Section 66477 (Quimby Act), all residential development shall be required to contribute to mitigate park and recreation impacts such that, prior to issuance of residential building permits, a parkland fee or dedication shall be made. Accordingly, all residential development shall be subject to parkland dedication requirements and/or park improvement fees. The parkland mitigation amount shall be based upon the cost to acquire and fully improve parkland. 8. This project shall be subject to Chapters 2.24 and 3.37 of the Municipal Code regarding public art. The project shall either provide public art or payment of an in lieu fee. In the case of the in-lieu fee, the fee shall be based upon the total building permit valuation as calculated pursuant to the valuation table in the Uniform Building Code, the fee being 1.2% for commercial projects or '/% for residential projects with the first $100,000 of total building permit valuation for individual single-family units exempt. Should the public art be based on the project site, said location shall be reviewed and approved by the Director of Planning and Zoning and the Public Arts Commission, and the property owner shall enter into a recorded agreement to maintain the art work and protect the public rights of access and viewing. 9. The Project will bring a significant number of additional residents to the community. The City's existing public safety and recreation services, including police protection, criminal justice, fire protection and suppression, ambulance, paramedic, and other safety services and recreation, library and cultural services are near capacity. Accordingly, the City may determine to form a Community Services District under authority of Government Code Section 53311 et seq, or other appropriate statutory or municipal authority. Developer agrees to support the formation of such assessment district and shall waive any right of protest, provided that the amount of such assessment shall be established through appropriate study and shall not exceed $500 annually with a consumer price index escalator. The district shall be formed prior to sale of any lots or a covenant agreement shall be recorded against each parcel. Environmental Assessment: 10.The mitigation measures of the final environmental impact report shall apply. The applicant shall submit a signed agreement that the mitigation measures outlined as part of the final environmental impact report will be included in the plans prior to Planning Commission consideration of the environmental assessment. 11.The design, height, texture and color of fences and walls shall be submitted for review and approval prior to issuance of building permits. Details of walls and fencing (materials and color) submitted with final landscape plan. All walls shall be 3 City Council Resolution No. 22063 Page 4 of 22 Exhibit D —Conditions of Approval located back from the top of the slope to permit screening by landscaping and stacked boulders. Walls and fences shall be adequately and entirely screened by stacked boulders. 12.Front yards shall be fully landscaped prior to issuance of a certificate of occupancy. The landscape palate shall utilize drought tolerant species. Planting of turf shall be prohibited in front yards_ Turf shall otherwise be limited to active recreation areas in rear yards only (including private yards). The utilization of desert vegetation shall be incorporated throughout the project site. The developer shall be responsible for installation of front and rear yard landscape, irrigation and exterior lighting. The HOA will be responsible for enforcement of these requirements. 13.Hillside related conditions: a) Disturbed areas not proposed for development shall be re-naturalized and re- vegetated. b) Utilize low lighting levels to avoid glare c) All utilities shall be located underground. d) Plant species native to the immediate region shall be used in all non- recreational landscaping located in or adjacent to open space areas. e) Special attention shall be undertaken to re-naturalize slopes and areas adjacent to slopes, retention areas and project perimeters with boulders and heavy landscaping to the satisfaction of the Director of Planning Services. f) Rock crushing — All sizes of rocks and boulders shall be retained for use in re- naturalizing slopes, which represent existing natural diversity of rock sizes. g) Retaining walls visible from the public right of way shall be softened and screened by stacked boulders. h) Split level pads are desirable, and shall be required for two story residences. i) The site shall be integrated into the existing neighborhood with pedestrian trails and bike paths- General/Grading: 14..Maximum pad heights are specified on TTM 31095 for each lot as part of the subdivision. The proposed retaining wall on the east side of lot #31 shall be replaced by a landscaped and re-naturalized slope, which does not exceed a 2:1. No additional walls shall be allowed on the east side of this lot. Reduce wall heights where practical to the satisfaction of the Director of Planning Services. 4 City Council Resolution No. 22063 Page 5 of 22 Exhibit D— Conditions of Approval 15.Prior to the issuance of a grading permit, a Fugitive Dust and Erosion Control Plan shall be submitted and approved by the Building Official. Refer to Chapter 8.60 of the Municipal Code for specific requirements. 16_The grading plan shall show the disposition of all cut and fill materials. Limits of site disturbance shall be shown and all disturbed areas shall be fully restored or landscaped. 17.Drainage swales shall be provided adjacent to all curbs and sidewalks — 3' wide and 6" deep. The irrigation system shall be tested prior to final approval of the project. Section 14.24.020 of the Municipal Code prohibits nuisance water from entering the public streets, roadways or gutters. 18.The site shall be re-naturalized following grading operations. 19.Retaining walls in excess of six feet shall be discouraged. Retaining walls shall be moved away from the rear yard property lines, and softened with the use of stacked boulders and landscaping. These rear yard slopes should then be re- naturalized. 20.The developer shall reimburse the City for the City's costs incurred in monitoring the developer's compliance with the conditions of approval and mitigation monitoring program, including, but not limited to inspections and review of developers operations and activities for compliance with all applicable dust and noise operations, and cultural resource mitigation. This condition of approval is supplemental and in addition to normal building permit and public improvement permits that may be required pursuant to the Palm Springs Municipal Code. POLICE DEPARTMENT: 21.Developer shall comply with Section II of Chapter 8.04 of the Palm Springs Municipal Code. BUILDING DEPARTMENT: 22.Prior to any construction on—site, all appropriate permits must be secured. FIRE DEPARTMENT: 23.Fire apparatus access roads shall be designed and constructed as all weather capable and able to support a fire truck weighing 73,000 pounds GVW. (902.2.2.2 CFC) 5 City Council Resolution No. 22063 Page 6 of 22 Exhibit D— Conditions of Approval 24.Palm Springs Fire Apparatus require an unobstructed vertical clearance of not less than 13' 6". 25.Locked gate(s) shall be equipped with a KNOX key switch device or Key box. Contact the Fire Department at 323-8186 for a KNOX application form. (902.4 CFC) 26.Project is beyond five-minute response time from the closest fire station and therefore automatic Fire Sprinkler System is required. 27.Approved numbers or addresses shall be provided for all new and existing buildings in such a position as to be plainly visible and legible from the street or road fronting the property. (901.4.4 CFC) Show location of address on plan elevation view. Show requirement and dimensions of numbers in plan notes. Numbers shall be a minimum 4 inches, and of contrasting color to the background. 28.Access for fire fighting equipment shall be provided to the immediate job site at the start of construction and maintained until all construction is complete. Fire apparatus access roads shall have an unobstructed width of not less than 20 feet and an unobstructed vertical clearance of not less than 13' 6 Fire Department access roads shall have an all weather driving surface and support a minimum weight of 73,000 lbs. (Sec. 902 CFC) 29.An operational fire hydrant or hydrants shall be installed within 250' of all combustible construction. No landscape planting, walls, or fencing shall be permitted within 3 feet of fire hydrants, except groundcover plantings. 30. Residential fire hydrants shall be installed in accordance with DWA or Mission Springs Water District specifications and standards. No landscape planting, walls, or fencing shall be permitted within 3 feet of fire hydrants. ENGINEERING DEPARTMENT: The Engineering Department recommends that if this application is approved, such approval is subject to the following conditions being completed in compliance with City standards and ordinances: STREETS 1_ Any improvements within the public right-of-way require a City of Palm Springs Encroachment Permit- 6 City Council Resolution No. 22063 Page 7 of 22 Exhibit D— Conditions of Approval 2. Submit street improvement plans prepared by a registered California civil engineer to the Engineering Division. The plans shall be approved by the City Engineer prior to issuance of any building permits. 3. The applicant shall be required to construct asphalt concrete paving for streets in two separate lifts. The final lift of asphalt concrete pavement shall be postponed until such time that on-site construction activities are complete, as may be determined by the City Engineer. Paving of streets in one lift prior to completion of on-site construction will not be allowed, unless prior authorization has been obtained from the City Engineer. Completion of asphalt concrete paving for streets prior to completion of on-site construction activities, if authorized by the City Engineer, will require additional paving requirements prior to acceptance of the street improvements, including, but not limited to: removal and replacement of damaged asphalt concrete pavement, overlay, slurry seal, or other repairs, as required by the City Engineer, SANBORN WAY 4. Dedicate an additional 20 feet to provide the ultimate street right-of-way width of 50 feet along the entire frontage between Milo Drive and Janis Drive. 5. Construct a 6 inch curb and gutter, 18 feet south of centerline along the entire frontage, with a 25 feet radius curb return at the southwest corner of the intersection of Sanborn Way and Janis Drive in accordance with City of Palm Springs Standard Drawing No. 200. 6. Construct pavement with a minimum pavement section of 2'Y2 inches asphalt concrete pavement over 4 inches crushed miscellaneous base with a minimum subgrade of 24 inches at 95% relative compaction, or equal, from edge of proposed gutter to clean sawcut edge of pavement along the entire frontage from Milo Drive to Janis Drive in accordance with City of Palm Springs Standard Drawing No. 110 and 300. If an alternative pavement section is proposed, the proposed pavement section shall be designed by a California registered Geotechnical Engineer using "R" values from the project site and submitted to the City Engineer for approval. VIA ESCUELA 7. Construct full width pavement, a minimum of 24 feet wide, from the edge of the existing paved travel way east of Leonard Road, to the project entrance. Construct pavement with a minimum pavement section of 2'Y2 inches asphalt concrete pavement over 4 inches crushed miscellaneous base with a minimum subgrade of 24 inches at 95% relative compaction, or equal. If an alternative City Council Resolution No. 22063 Page 8 of 22 Exhibit D — Conditions of Approval pavement section is proposed, the proposed pavement section shall be designed by a California registered Geotechnical Engineer using "R" values from the project site and submitted to the City Engineer for approval. 8. Provisions for conveyance of concentrated stormwater runoff from the project site onto Via Escuela shall be made to the satisfaction of the City Engineer, and may require construction of concrete curbs, gutters, or other approved methods whereby stormwater runoff is directed easterly towards existing drainage carriers with the capacity to contain the concentrated stormwater runoff. Analysis and recommendations to satisfy this issue shall be included in the final hydrology study to be prepared for this development. 9. Provisions for the interception of nuisance water and other low flow runoff shall be provided on-site to prevent drainage water from entering directly onto Via Escuela from the project site, through the use of a minor storm drain system that collects and conveys the nuisance water or runoff to landscape or parkway areas, and in only a stormwater runoff condition, pass runoff directly to the streets through methods approved by the City Engineer. Provisions for intercepting nuisance water and other low flow runoff shall be made to the satisfaction of the City Engineer. CHINO CANYON ROAD 10. Dedicate an additional 20 feet to provide the ultimate street right-of-way width of 50 feet along the entire frontage where required. 11. Construct a concrete wedge curb or other approved drainage carrier along the northerly edge of the widened street section. Provisions for the conveyance of stormwater runoff tributary to and falling on Chino Canyon Road shall be made to the satisfaction of the City Engineer. Analysis and recommendations to satisfy this issue shall be included in the final hydrology study to be prepared for this development. 12. Construct pavement widening to provide a minimum 24 feet wide paved travel way along the entire frontage. Asphalt pavement coring and sampling of the existing paved travel way shall be performed to determine the condition of the existing pavement. If warranted, the existing pavement shall be removed and replaced with new asphalt concrete pavement, or, an asphalt pavement overlay or other improvements consistent with the findings of a geotechnical report shall be constructed to the satisfaction of the City Engineer. Construct pavement with a minimum pavement section of 2'/z inches asphalt concrete pavement over 4 inches crushed miscellaneous base with a minimum subgrade of 24 inches at 95% relative compaction, or equal. If an alternative pavement section is 8 City Council Resolution No. 22063 Page 9 of 22 Exhibit D —Conditions of Approval proposed, the proposed pavement section shall be designed by a California registered Geotechnical Engineer using "R" values from the project site and submitted to the City Engineer for approval. 13. In coordination with the Planning Department, provisions for on-street parking areas shall be made where possible, along the frontage of the subject property. All parking or shoulder areas shall be constructed of compacted material that meets the requirements of the City's PM10 Dust Control Ordinance. 14. Provisions for interception of stormwater runoff from the on-site streets onto Chino Canyon Road shall be made to the satisfaction of the City Engineer, and may require construction of concrete curbs, gutters, or other approved methods whereby stormwater runoff is directed into the proposed drainage system for the development. Analysis and recommendations to satisfy this issue shall be included in the final hydrology study to be prepared for this development. PALERMO DRIVE 15. Appropriate removals and reconstruction of the existing southerly end of Palermo Drive shall be made to the satisfaction of the City Engineer, as necessary to extend and connect to Palermo Drive as shown on the revised Tentative Tract Map 31095 (dated February 16, 2005). LEONARD ROAD 16. Construct half-width street improvements to provide a minimum 24 feet wide paved travelway along the frontage of the property (adjacent to Lot "A"), extending to the existing edge of pavement at the southerly end of Leonard Road, to the satisfaction of the City Engineer. The minimum 24 feet wide travelway shall be constructed, extending Leonard Road to Via Escuela. Construct pavement with a minimum pavement section of 2'/z inches asphalt concrete pavement over 4 inches crushed miscellaneous base with a minimum subgrade of 24 inches at 95% relative compaction, or equal. If an alternative pavement section is proposed, the proposed pavement section shall be designed by a California registered Geotechnical Engineer using "R" values from the project site and submitted to the City Engineer for approval. VISTA DRIVE 17. The applicant shall recommend and install appropriate end of road regulatory signs, striping, markings or other improvements at the southerly end of Vista Drive, subject to the review and approval by the City Engineer. 9 City Council Resolution No. 22063 Page 10 of 22 Exhibit D— Conditions of Approval ON-SITE. (PRIVATE) STREETS 18. Dedicate easements for public utility purposes, including sewers, with the right of ingress and egress for service and emergency vehicles and personnel over the proposed private streets. 19. All centerline radii shall be a minimum of 130 feet. 20. On-site streets shall be constructed with an inverted cross-section, using a 3 feet wide concrete ribbon or "valley" gutter along the centerlines of all streets. Provisions for interception of all stormwater runoff from the on-site streets to off- site public streets shall be made to the satisfaction of the City Engineer, and may require construction of concrete curbs, gutters, or other approved methods whereby stormwater runoff is directed into the proposed drainage system for the development or to existing drainage carriers with the capacity to contain the concentrated stormwater runoff. Analysis and recommendations to satisfy this issue shall be included in the final hydrology study to be prepared for this development. 21. All on-site private streets shall be two-way with a minimum 24 feet wide travelway (as measured from edge of pavement) where no on-street parking is proposed. Construction of a concrete mow strip or other permanent edge treatment acceptable to the City Engineer shall be provided. Construct pavement with a minimum pavement section of 2'/2 inches asphalt concrete pavement over 4 inches crushed miscellaneous base with a minimum subgrade of 24 inches at 95% relative compaction, or equal. If an alternative pavement section is proposed, the proposed pavement section shall be designed by a California registered Geotechnical Engineer using "R" values from the project site and submitted to the City Engineer for approval. 22. In coordination with the Planning Department, provisions for on-street parking areas shall be made where possible, along the frontage of the on-site streets. All parking or shoulder areas shall be constructed of compacted material that meets the requirements of the City's PM10 Dust Control Ordinance. 23. On-street parking shall be prohibited along all on-site private streets except for specific pull-out or parking areas that are provided in designated locations. Provisions for restrictions of on-street parking within the private streets and for maintaining clear two-way 24 feet wide access for service and emergency vehicles shall be included in Covenants, Conditions, and Restrictions (CC&R's) for this project. The CC&R's shall be provided to the City Attorney for review and approval prior to approval of the final map. 10 City Council Resolution No. 22063 Page 11 of 22 Exhibit D — Conditions of Approval 24. Regulatory signs restricting parking to off-pavement locations only shall be installed at all tract entrances, as approved by the City Engineer and Fire Marshall. A Home Owners Association shall be responsible for regulating and maintaining required no parking restrictions, which shall be included in Covenants, Conditions, and Restrictions required for the development. (modified by the City Council on 10/17/07) 25. The ends of the on-site streets shall have a hammerhead or other turn-around configuration approved by the Fire Marshall, 26. Palermo Drive shall terminate in a cul-de-sac, constructed in accordance with City of Palm Springs Standard Drawing No. 101, unless a hammer-head or other approved emergency vehicle turn-around is approved by the Fire Marshall. 27. Gated or restricted access to the on-site private streets is prohibited, except for the main access at Via Escuela, SANITARY SEWER 28. All sanitary facilities shall be connected to the public sewer system. New laterals shall not be connected at manholes. 29. Existing sewer plans for the construction of public sewer main within Via Escuela are approved and on file (see File 1D-1-28 approved March 23, 1977). Existing sewer plans for the construction of public sewer main within Chino Canyon Road are approved and on file (see Files 1D-1-102, 106, and 107 approved July 7, 1983). If used for construction, the approved sewer plans shall be revised to reflect current "as-built" or record conditions adjacent to and on-site, as well as to include construction of current City standards, and submitted to the Engineering Division for review and approval. Otherwise, new sewer improvement plans prepared by a California registered Civil Engineer shall be submitted to the Engineering Division for review and approval. The new or revised sewer improvement plans shall be approved by the City Engineer prior to issuance of any grading or building permits. 30. Submit sewer improvement plans prepared by a California registered civil engineer to the Engineering Division_ The plan(s) shall be approved by the City Engineer prior to issuance of sewer construction permits. 31. Construct an off-site extension of the existing 8 inch V.C_P_ public sewer main within Via Escuela from its current terminus near Tuscan Road. 11 City Council Resolution No. 22063 Page 12 of 22 Exhibit D— Conditions of Approval 32. Construct an 8 inch V.C.P. public sewer main within Chino Canyon Road from the west property line to the east property line (across the entire frontage). Provisions for future extension of sewer service to adjacent properties, including installation of sewer laterals, shall be included in sewer plans prepared for Chino Canyon Road. New sewer laterals shall be extended to property line along both sides of Chino Canyon Road. 33. Construct an 8 inch V.C.P. sewer main within all on-site private streets and connect to the extended public sewer main in Via Escuela. 34. All sewer mains constructed by the applicant and to become part of the public sewer system shall be digitally video recorded prior to acceptance of the sewer system for maintenance by the City. A computer disc of the video recording shall be provided to the City Engineer for review. Any defects of the sewer main shall be removed, replaced, or repaired to the satisfaction of the City Engineer prior to acceptance. 35. Dedicate a 30 feet wide easement to the City of Palm Springs over the retention basin (Lot "C), and Lots 35, 36 and 37 for sewer purposes, with the right of ingress and egress for service vehicles and personnel, as necessary to extend sewer service from Chino Canyon Road. The proposed 30 feet wide combination water and sewer easement shown on the revised Tentative Tract Map 31095 (dated February 16, 2006) shall be relocated, and not equally divided over Lot "C and Lots 35, 36, and 37. A separate lettered lot shall be created for this easement. Lot "C, and Lots 35, 36, and 37 shall be adjusted to provide for the separate lettered lot. The easement shall be graded and constructed with permanent and stable material, subject to the approval of the City Engineer, passable by heavy trucks and equipment. 36. The 30 feet wide sewer easement shall be kept clear and free of any and all obstructions to allow for the continued operation and maintenance of the public sewer main within the easement. Access to the public sewer easement from Chino Canyon Road to the south end of Palermo Drive shall be maintained, including, if necessary, 15 feet wide gates with lock and access provided to the City of Palm Springs. 37. The applicant shall provide sewer service to Lots 19 and 20 by constructing an extension of the proposed on-site 8 inch V.C.P. public sewer main in Janis Drive to Sanborn Way, and in Sanborn Way across the frontage of Lots 19 through 21, as necessary to provide sewer service in accordance with standard sewer design guidelines. The sewer main in Sanborn Way shall be designed at sufficient depth to provide sewer service to the lower pad elevations of Lots 19 and 20. 12 City Council Resolution No. 22063 Page 13 of 22 Exhibit D — Conditions of Approval 38. Costs associated with construction of off-site sewer laterals (extending to the south side of Chino Canyon Road) may be reimbursed, pursuant to a Sewer Reimbursement Agreement approved by the City Council, in accordance with the policies established by Resolution 13773, and amended by Resolution 15975. Following completion and acceptance of the off-site sewer laterals by the City Engineer, if reimbursement is requested in writing by the applicant, the applicant shall submit a formal request for preparation of a Sewer Reimbursement Agreement and a $2,500 deposit for City staff time associated with the preparation of the Sewer Reimbursement Agreement, including City Attorney fees. The applicant shall be responsible for payment of all associated staff time and expenses necessary in the preparation and processing of the Sewer Reimbursement Agreement with the City Council, and shall submit additional deposits as necessary when requested by the City, which are included in the amount that may be reimbursed to the applicant through the Sewer Reimbursement Agreement. The Sewer Reimbursement Agreement is subject to the City Council's review and approval at a Public Hearing, and its approval is not guaranteed nor implied by this condition. GRADING 39. Mass grading of the site is prohibited. Rough grading shall be restricted to only that grading necessary to construct infrastructure, and to achieve finish grade of the on-site and adjacent off-site streets. Rough grading of residential pads shall require separate approval of grading plans for individual custom homes, in accordance with Section 93.13.00 "Hillside Developments" of the Palm Springs Zoning Code. 40. The active area of rough grading shall be restricted to an area no greater than 2.5 acres in size at any one time. The Grading Plan shall clearly show the limits (daylight line) of grading for rough grading to construct infrastructure, and to achieve finish grade of the on-site and adjacent off-site streets, and shall show sequencing and phasing of rough grading necessary to limit active grading areas to no greater than 2.5 acres in size at any one time. 41. Submit a Rough Grading Plan prepared by a California registered civil engineer to the Engineering Division for review and approval. A Fugitive Dust Control Plan shall be prepared by the applicant and/or its grading contractor and submitted to the Engineering Division for review and approval. The applicant and/or its grading contractor shall be required to comply with Chapter 8.50 of the City of Palm Springs Municipal Code, and shall be required to utilize one or more "Coachella Valley Best Available Control Measures" as identified in the Coachella Valley Fugitive Dust Control Handbook for each fugitive dust source such that the applicable performance standards are met. The applicant's or its contractor's 13 City Council Resolution No. 22063 Page 14 of 22 Exhibit D —Conditions of Approval Fugitive Dust Control Plan shall be prepared by staff that has completed the South Coast Air Quality Management District (AQMD) Coachella Valley Fugitive Dust Control Class. The applicant and/or its grading contractor shall provide the Engineering Division with current and valid Certificate(s) of Completion from AQMD for staff that have completed the required training. For information on attending a Fugitive Dust Control Class and information on the Coachella Valley Fugitive Dust Control Handbook and related "PM10° Dust Control issues, please contact AQMD at (909) 396-3752, or at www.AQMD.gov. A Fugitive Dust Control Plan, in conformance with the Coachella Valley Fugitive Dust Control Handbook, shall be submitted to and approved by the Engineering Division prior to approval of the Grading plan. The Grading Plan shall be approved by the City Engineer prior to issuance of grading permit. a. The first submittal of the Rough Grading Plan shall include the following information: a copy of final approved conformed copy of Conditions of Approval; a copy of a final approved conformed copy of the Tentative Tract Map; a copy of current Title Report; a copy of Soils Report; and a copy of the associated Hydrology Study/Report. 39. Contact Whitewater Mutual Water Company to determine impacts to any existing water lines and other facilities that may be located within the property if any. Make appropriate arrangements to protect in place or relocate any existing Whitewater Mutual Water Company facilities that are impacted by the development. A letter of approval for relocated or adjusted facilities from Whitewater Mutual Water Company shall be submitted to the Engineering Division prior to approval of the Grading Plan. 40. Prior to approval of a Grading Plan, the applicant shall obtain written approval to proceed with construction from the Agua Caliente Band of Cahuilla Indians, Tribal Historic Preservation Officer or Tribal Archaeologist. The applicant shall contact the Tribal Historic Preservation Officer, Richard Begay (760-883-1940), or the Tribal Archaeologist, Patty Tuck (760-883-1926), to determine their requirements, if any, associated with grading or other construction. The applicant is advised to contact the Tribal Historic Preservation Officer or Tribal Archaeologist as early as possible. If required, it is the responsibility of the applicant to coordinate scheduling of Tribal monitors during grading or other construction, and to arrange payment of any required fees associated with Tribal monitoring. 41. The applicant shall obtain approvals to perform any off-site grading from the record owner(s) of adjacent properties as may be necessary. The rough grading plan shall clearly show the limits of grading around the project perimeter. Required approvals shall include, but not be limited to: a right-of-entry and 14 City Council Resolution No. 22063 Page 15 of 22 Exhibit D— Conditions of Approval construction easement, a maintenance and joint use agreement, or other legally recognized approvals, subject to the review and approval by the City Engineer and/or the City Attorney. Off-site approvals by the adjacent property owners shall be required prior to approval of the Grading Plan. 42. A National Pollutant Discharge Elimination System (NPDES) stormwater permit, issued from the California Regional Water Quality Control Board (Phone No. 760- 346-7491) is required for the proposed development. A copy of the executed permit shall be provided to the City Engineer prior to issuance of a grading permit. 43. In accordance with City of Palm Springs Municipal Code, Section 8.50.025 (c), the applicant shall post with the City a cash bond of two thousand dollars ($2,000.00) per disturbed acre for mitigation measures for erosion/blowsand relating to this property and development. 44. A Geotechnical/Soils Report prepared by a California registered Geotechnical Engineer shall be required for and incorporated as an integral part of the grading plan for the proposed development. A copy of the Geotechnical/Soils Report shall be submitted to the Engineering Division with the first submittal of a grading plan. Evaluation of and recommended improvements for existing asphalt concrete pavement along the Chino Canyon Road frontage shall be addressed by the Geotechnical/Soils Report prepared for this development. 45. In cooperation with the Riverside County Agricultural Commissioner and the California Department of Food and Agriculture Red Imported Fire Ant Project, applicants for grading permits involving a grading plan and involving the export of soil will be required to present a clearance document from a Department of Food and Agriculture representative in the form of an approved "Notification of Intent To Move Soil From or Within Quarantined Areas of Orange, Riverside, and Los Angeles Counties" (RIFA Form CA-1) prior to approval of the Grading Plan (if required). The California Department of Food and Agriculture office is located at 73-710 Fred Waring Drive, Palm Desert (Phone: 760-776-8208). 46. Rock crushing operations shall be prohibited. 47. Prior to approval of a Grading Plan, the City of Palm Springs shall retain, at the developer's expense, a grading and dust control monitor who shall be present on site at least three hours per day, or as required by the City Engineer, during grading operations. The monitor shall have the ability to stop work if visible dust is seen escaping from the site, or if other measures specified in the Grading and Rock Management Plan are not observed. 15 City Council Resolution No. 22063 Page 16 of 22 Exhibit D — Conditions of Approval DRAINAGE 48. All stormwater runoff passing through and falling onto the site shall be accepted and conveyed to a new drainage system to be constructed as part of the development. On-site retention and other storm drainage facilities approved by the City Engineer shall be required. 49. The Preliminary Hydrology Study entitled "The Boulders Tentative Tract Map No. 31095," prepared by Mainiero, Smith, & Associates (revised October 1, 2004), shall be amended as necessary to reflect the revised site plan and preliminary grading plan as shown on the revised Tentative Tract Map 31095 (dated February 16, 2005). The Final Hydrology Study shall be reviewed and approved by the City Engineer prior to approval of a grading plan. 50. Stormwater runoff generated off-site that historically outlets onto Chino Canyon Road near Panorama Road shall be accepted and conveyed through a new drainage system to be constructed as part of this development. The on-site retention basin (Lot "C") shall be adequately sized to accept the off-site stormwater runoff. Design standards, landscaping, aesthetic treatment, and other improvements to on-site retention basins shall be made acceptable to the Director of Planning Services. 51. The applicant shall install a drywell, or series of drywells, within each retention or detention basin proposed in the development as necessary to collect and percolate stormwater runoff, including nuisance water, from the tributary area within the development that has drainage directed to the basin. The drywell(s) shall be appropriately sized to accommodate the expected daily nuisance water, as well as runoff from ordinary storm events (2-year storm events), unless otherwise approved by the City Engineer. Provisions shall be included in the Covenants, Conditions and Restrictions (CC&R's) for this development that require the routine maintenance of the drywells by the Home Owners Association (HOA), including the right of the City to inspect and require the HOA to remove and replace the drywells if they fail to function, causing stagnant water to accumulate above ground within the basin. The City shall be given the right, in the interest of the public's health, safety, and welfare, to order the removal and replacement of drywells in the event the HOA is non-responsive to the City's written notice, with costs to be recovered against the HOA by the City in accordance with state and local laws and regulations. 52. Reserve private drainage easements across Lots within the map as necessary to accept and convey off-site stormwater runoff through the development, as required by the Final Hydrology Study reviewed and approved by the City Engineer. 16 City Council Resolution No. 22063 Page 17 of 22 Exhibit D— Conditions of Approval 53. The applicant shall be responsible for construction of drainage improvements, including but not limited to retention basins, catch basins, storm drain lines, inlet and outlet structures, for conveyance of off-site stormwater runoff and management of on-site stormwater runoff, as described in a Final Hydrology Study for the development, as approved by the City Engineer. The Preliminary Hydrology Study for the development shall be amended to include catch basin sizing, storm drain pipe sizing, inlet structure sizing, outlet structure sizing, and retention basin sizing calculations and other specifications for construction of required on-site storm drainage improvements. 54. Provisions for acceptance and conveyance of runoff of domestic water resulting from maintenance operations or as a result of rupture or other failure of the Desert Water Agency water storage tanks and facilities shall be made to protect the proposed development from flood hazards to the satisfaction of the City Engineer. 55. All on-site storm drain systems, including the off-site storm drain improvements constructed in Chino Canyon Road, shall be privately maintained by a Homeowners Association (HOA)_ Provisions for maintenance of the on-site storm drain systems acceptable to the City Engineer shall be included in Covenants, Conditions and Restrictions (CC&R's) required for this project. 56. The project is subject to flood control and drainage implementation fees. The acreage drainage fee at the present time is $6,511.00 per acre per Resolution No. 15189. Fees shall be paid prior to issuance of a building permit. 57. This project may be required to install measures in accordance with applicable National Pollution Discharge Elimination System (NPDES) Best Management Practices (BMP's) included as part of the NPDES Permit issued for the Whitewater River Region from the Colorado River Basin Regional Water Quality Control Board (RWQCB). The applicant is advised that installation of BMP's, including mechanical or other means for pre-treating stormwater runoff, may be required by regulations imposed by the RWQCB. It shall be the applicant's responsibility to design and install appropriate BMP's, in accordance with the NPDES Permit, that effectively intercept and pre-treat stormwater runoff from the project site, prior to release to the City's municipal separate storm sewer system ("MS4"), to the satisfaction of the City Engineer and the RWQCB. If required, such measures shall be designed and installed on-site; and provisions for perpetual maintenance of the measures shall be provided to the satisfaction of the City Engineer, including provisions in Covenants, Conditions, and Restrictions (CC&R's) required for the development. 17 City Council Resolution No. 22063 Page 18 of 22 Exhibit D— Conditions of Approval GENERAL 58. All on-site and off-site street improvements, and all perimeter landscaping and parkway improvements shall be completed prior to issuance of the first certificate of occupancy 59. Any utility trenches or other excavations within existing asphalt concrete pavement of off-site streets required by the proposed development shall be backfilled and repaired in accordance with City of Palm Springs Standard Drawing No. 115. The developer shall be responsible for removing, grinding, paving and/or overlaying existing asphalt concrete pavement of off-site streets as required by and at the discretion of the City Engineer, including additional pavement repairs to pavement repairs made by utility companies for utilities installed for the benefit of the proposed development (i.e. Desert Water Agency, Southern California Edison, Southern California Gas Company, Time Warner, Verizon, etc.). Multiple excavations, trenches, and other street cuts within existing asphalt concrete pavement of off-site streets required by the proposed development may require complete grinding and asphalt concrete overlay of the affected off-site streets, at the discretion of the City Engineer. The pavement condition of the existing off-site streets shall be returned to a condition equal to or better than existed prior to construction of the proposed development. 60. On phases or elements of construction following initial site grading (e.g., sewer, storm drain, or other utility work requiring trenching) associated with this project, the applicant shall be responsible for coordinating the scheduled construction with the Agua Caliente Band of Cahuilla Indians, Tribal Historic Preservation Officer or Tribal Archaeologist. Unless the project site has previously been waived from any requirements for Tribal monitoring, it is the applicant's responsibility to notify the Tribal Historic Preservation Officer, Richard Begay (760-883-1940), or the Tribal Archaeologist, Patty Tuck (760-883-1926) for any subsequent phases or elements of construction that might require Tribal monitoring. If required, it is the responsibility of the applicant to coordinate scheduling of Tribal monitors during construction, and to arrange payment of any required fees associated with Tribal monitoring. Tribal monitoring requirements may extend to off-site construction performed by utility companies on behalf of the applicant (e.g. utility line extensions in off-site streets), which shall be the responsibility of the applicant to coordinate and arrange payment of any required fees for the utility companies. 61. All proposed utility lines shall be installed underground. 18 City Council Resolution No. 22063 Page 19 of 22 Exhibit D— Conditions of Approval 62. In accordance with Chapter 8.04.401 of the City of Palm Springs Municipal Code, all existing and proposed electrical lines of thirty-five thousand volts or less and overhead service drop conductors, and all gas, telephone, television cable service, and similar service wires or lines, which are on-site, abutting, and/or transecting, shall be installed underground unless specific restrictions are shown in General Orders 95 and 128 of the California Public Utilities Commission, and service requirements published by the utilities. The existing overhead utilities across the northerly and southerly property lines meet the requirement to be installed underground. A letter from the owners of the affected utilities shall be submitted to the Engineering Division prior to approval of a grading plan, informing the City that they have been notified of the City's utility undergrounding requirement and their intent to commence design of utility undergrounding plans. When available, the utility undergrounding plan shall be submitted to the Engineering Division identifying all above ground facilities in the area of the project to be undergrounded. Undergrounding of existing overhead utility lines shall be completed prior to issuance of a certificate of occupancy. 63. All existing utilities shall be shown on the grading and street plans. The existing and proposed service laterals shall be shown from the main line to the property line. 64. Upon approval of any improvement plan by the City Engineer, the improvement plan shall be provided to the City in digital format, consisting of a DWG (AutoCAD 2004 drawing file), DXF (AutoCAD ASCII drawing exchange file), and PDF (Adobe Acrobat 6.0 or greater) formats. Variation of the type and format of the digital data to be submitted to the City may be authorized, upon prior approval of the City Engineer. 65. The original improvement plans prepared for the proposed development and approved by the City Engineer shall be documented with record drawing "as- built" information and returned to the Engineering Division prior to issuance of a final certificate of occupancy. Any modifications or changes to approved improvement plans shall be submitted to the City Engineer for approval prior to construction. 66. Nothing shall be constructed or planted in the corner cut-off area of any (intersection or) driveway which does or will exceed the height required to maintain an appropriate sight distance per City of Palm Springs Zoning Code Section 93.02.00, D. 67. All proposed trees within the public right-of-way and within 10 feet of the public sidewalk and/or curb shall have City approved deep root barriers installed per City of Palm Springs Standard Drawing No. 904. 19 City Council Resolution No. 22063 Page 20 of 22 Exhibit D — Conditions of Approval MAP 68. A Final Map shall be prepared by a California registered Land Surveyor or qualified Civil Engineer and submitted to the Engineering Division for review and approval. A Title Report prepared for subdivision guarantee for the subject property, the traverse closures for the existing parcel and all lots created therefrom, and copies of record documents shall be submitted with the Final Map to the Engineering Division as part of the review of the Map. The Final Map shall be approved by the City Council prior to issuance of building permits. 69. A copy of draft Covenants, Conditions and Restrictions (CC&R's) shall be submitted to the City Attorney for review and approval for any restrictions related to the Engineering Division's recommendations. The CC&R's shall be approved by the City Attorney prior to approval of a Final Map. 70. Upon approval of a final map, the final map shall be provided to the City in G.I.S. digital format, consistent with the "Guidelines for G.LS. Digital Submission" from the Riverside County Transportation and Land Management Agency." G.I.S. digital information shall consist of the following data: California Coordinate System, CCS83 Zone 6 (in U.S. feet); monuments (ASCII drawing exchange file); lot lines, rights-of-way, and centerlines shown as continuous lines; full map annotation consistent with annotation shown on the map; map number; and map file name. G.I.S. data format shall be provided on a CDROM/DVD containing the following: ArcGIS Geodatabase, ArcView Shapefile, Arclnfo Coverage or Exchange file (e00), DWG (AutoCAD 2004 drawing file), DGN (Microstation drawing file), DXF (AutoCAD ASCII drawing exchange file) ), and PDF (Adobe Acrobat 6.0 or greater) formats. Variations of the type and format of G.I.S. digital data to be submitted to the City may be authorized, upon prior approval of the City Engineer. 71. Relocation or abandonment of record easements across the property shall be performed in conjunction with or prior to approval of a final map. The easements shall be extinguished, quit-claimed, relocated or abandoned to facilitate development of the subject property. Without evidence of the extinguishment, quit-claim, relocation or abandonment of the record easement(s), building permits for proposed buildings encumbered by the existing record easement(s) will be withheld until such time as this easement is removed of record and are not an encumbrance to the affected lots. 20 City Council Resolution No. 22063 Page 21 of 22 Exhibit D— Conditions of Approval TRAFFIC 72. As determined by the Traffic Study by George Dunn Engineering for this development (as revised February 16, 2005), the following mitigation measure will be required: a. Pay a fair share contribution determined as $3000 for the installation of a future traffic signal at the intersection of N. Palm Canyon Drive and Via Escuela. The fair share contribution of $3000 shall be paid to the City of Palm Springs prior to approval of a final map. 73. Traffic striping and signage plans prepared by a California registered civil engineer shall be submitted to Caltrans for review and approval, to provide for northbound and southbound left turn pockets with 40 feet of storage on North Palm Canyon Drive and Via Escuela, in accordance with the traffic study prepared by George Dunn Engineering (as revised December 11, 2003). Final striping and traffic signage shall be installed and accepted by Caltrans and the City Engineer prior to issuance of a certificate of occupancy. 74. Street name signs shall be required at each on-site street intersection, as required by the City Engineer, in accordance with City of Palm Springs Standard Drawing Nos. 620 through 625. Developer shall create a street name sign system reflective of special neighborhood standards. 75. Install a 24 inch stop sign, stop bar, and "STOP" legend for traffic at the following locations in accordance with City of Palm Springs Standard Drawing Nos. 620- 625. a. Northwest corner of Panorama Road and Chino Canyon Road b_ Northwest corner of Vista Drive and Chino Canyon Road c. Northwest corner of Leonard Road and Via Escuela d. Southwest corner of Sanborn Way and Janis Drive e. Northeast corner of Lot 10 (for eastbound traffic) f. Southeast corner of Lot 30 (for southbound traffic) g_ Northeast corner of Lot 13 (for eastbound traffic) h. Northwest corner of Lot 32 (for northbound traffic) 76. Construction signing, lighting and barricading shall be provided for on all projects as required by City Standards or as directed by the City Engineer. As a minimum, all construction signing, lighting and barricading shall be in accordance with State of California, Department of Transportation, "Manual of Traffic Controls for 21 City Council Resolution No. 22063 Page 22 of 22 Exhibit D — Conditions of Approval Construction and Maintenance Work Zones" dated 1996, or subsequent additions in force at the time of construction. 77. This property is subject to the Transportation Uniform Mitigation Fee which shall be paid prior to issuance of building permit. END OF CONDITIONS 22