HomeMy WebLinkAbout12/19/2007 - STAFF REPORTS - 2.K. �FALMSn
-� Rey
U y
H aen S
x r9[/FORN�P+ City Council, Staff Report
DECEMBER 19, 2007 CONSENT CALENDAR
Subject: PALM SPRINGS STORM DRAIN LINES 6A, 8, 20C, AND 20CA, CITY
PROJECT NO 05-20
From: David H. Ready, City Manager
Initiated by: Public Works and Engineering Department
SUMMARY
Agreement No. 5275 with Engineering Resources of Southern California, Inc., approved
by City Council on May 3, 2006, provides the City with engineering design services for
the construction of various master-planned storm drain facilities in the City. Additional
design work is necessary to complete the final design. A Contract Services Agreement
Amendment has been prepared to facilitate the additional scope of work as part of this
project.
RECOMMENDATION:
1) Approve Amendment No. Two (2) to Agreement No. 5275 with Engineering
Resources of Southern California, Inc., in the amount of $19,035 for a total
revised contract amount of $361,445 for the Palm Springs Storm Drain Line 6A,
8, 20C and 20CA, City Project No. 05-20; and
2) Authorize the City Manager to execute all necessary documents.
STAFF ANALYSIS:
On May 3, 2006, City Council awarded a contract services agreement to Engineering
Resources of Southern California, Inc., for the design of several master-planned storm
drain facilities in the City: Line 6A (located in Sunrise Way extending from Vista Chino to
Via Escuela), Line 8 (in Sunrise Way extending from Baristo Channel to Tahquitz
Canyon Way), Line 20C (in El Cielo Road extending from Ramon Road to Baristo
Road), and Line 20CA (in Baristo Road extending from El Cielo Road to Compadre
Road).
The plans for these storm drain facilities are being reviewed by Riverside County Flood
Control District (RCFC), as RCFC will ultimately operate and maintain them. During the
Item No. n . K .
City Council Staff Report
December 19, 2007- Page 2
Palm Springs Storm Drain Lines 6A, 8, 20C, 20CA(CP 05-20)—Contract Amendment No. 2
review of plans for Line 8, RCFC required alternative design analysis, including
preparation of various plans showing different horizontal and vertical alignments for the
storm drain in Sunrise Way. This additional design work required topographic surveying
of the Baristo Channel, all of which is not included in the original scope of work.
A contract services agreement Amendment has been prepared to add the additional
topographic surveying and Line 8 design work, with an agreed fee of$19,035.
FISCAL IMPACT:
Sufficient funds are available in account 135-4371-55010.
David J. Barakian Thomas J. sson
Director of Public Works/City Engineer Assistant Ci Manager
David H. Ready, City n
ATTACHMENTS:
1. Contract Services Agreement, Amendment No. 2
000002
AMENDMENT NO. 2 TO CONTRACT SERVICES AGREEMENT NO. 5275
WITH ENGINEERING RESOURCES OF SOUTHERN CALIFORNIA, INC.
PALM SPRINGS STORM DRAIN LINE 6A, 8, LATERAL 20C, AND LATERAL 20CA
CITY PROJECT NO. 05-20
the following articles of Agreement No 5275 are hereby amended to read as follows.-
SECTION 2.1 Maximum contract amount is amended to Three Hundred Sixty-One Thousand Four
Hundred Forty-Five Dollars ($361,445.00).
SCOPE OF SERVICES (Exhibit "A") - Please see attached sheets for additional work.
SCHEDULE OF COMPENSATION (Exhibit "C") - Please see attached sheet.
Purchase Order Number(s): 616349
Agreement Number: 5275
Original MO Number: 7852
City Council Approval: May 3, 2006
Original Contract Amount: $ 295,480.00
Amount of Prior Increases: $ 46,930.00
Amount of This Increase: $ 19,035.00
Amended Total: $ 361,445.00
Account No. for this Increase: 135-4371-55010; $19,035,00
SIGNATURES ON LAST PAGE
Agreement No,5275
Amendment No.2
Page 2
EXHIBIT A is amended as follows.-
Ad d the following.-
Task 1.2A - Baristo Channel Survey
Provide topographic survey and mapping of the Baristo Channel from the proposed Line 8 outlet
downstream as necessary to provide hydraulic analysis of the Baristo Channel for RCFC evaluation
of the Line 8 design.
Add the following to Task 1.4, Preliminary Design:
Contractor shall prepare alternative horizontal and vertical designs forthe proposed Line 8 flood control
improvements from Baristo Channel to Ramon Road for RCFC evaluation.
Add the following.-
Task 1.5A, Engineering Report(Line 8 Alternatives)
Contractor shall prepare a report outlining the outcome and recommendations of the proposed analysis
of alternative horizontal and vertical designs for the proposed Line 8 flood control improvements from
Baristo Channel to Ramon Road for RCFC evaluation. The report will provide written dialog on the
intent of the study, including methods, criteria, existing facilities' descriptions, hydrology calculations,
hydrology map, preliminary hydraulic calculations, preliminary plan and profile for the proposed flood
control improvements, design mitigation and a description of any necessary rights-of-way.
Add the following to Task 2.3, Plans, Specifications and Estimates:
Line 8 Alternatives (Baristo Channel to Ramon Road)
Agreement No,5275
Am codmenl No.2
Page3
E)CHIBIT C is amended as follows:
Thelirst paragraph of Exhibit C is incorporated herein by reference and shall remain in full force and effect.
Thelump sum task items and amounts are revised as indicated below.
Task Total
Lump Sum
PHASE 1 - PRELIMINARY ENGINEERING
Task 1.1, Record Data $2,540.00
Task 1.2, Mapping $52,060.00
Task 1.2A, Baristo Channel Survey $1,700.00
Task 1.3, Hydrology $5,460.00
Task 1.4, Preliminary Design
Line 6A $6,560.00
Line 8 (Baristo Channel to Tahquitz Canyon Way) $12,440.00
Line 8 (Tahquitz Canyon Way to Andreas Road) $2,720.00
Line 8 Alternatives (Baristo Channel to Ramon Road) $5,620.00
Lateral 20C $8,350.00
Lateral 20CA $5,020.00
Task 1.5. Engineering Report $7,680.00
Task 1.5A, Engineering Report (Line 8 Alternatives) $1,980.00
Task 1.6, Processing $2,900.00
Task 1.7, Agency Coordination $2,260.00
Phase 1 Subtotal $117,920.00
PHASE 2 - FINAL ENGINEERING
Task 2.1, Geotechnical Engineering $19,940.00
Task 2.2, Potholing
Coordination & Survey $13,770.00
Saf-R-Dig Potholes $81,750.00
Task 2.3, Plans, Specifications and Estimates
Line 6A $15,040.00
Line 8 (Baristo Channel to Tahquitz Canyon Way) $29,720.00
Line 8 (Tahquitz Canyon Way to Andreas Road) $4,000,00
Line 8 Alternatives (Baristo Channel to Ramon Road) $9,735,00
Lateral 20C $20,140.00
Lateral 20CA $11,220.00
Specifications $6,000.00
Estimates $3,820.00
Task 2.4, Storm Water Pollution Prevention Plan $6,000.00
Task 2.5, Fugitive Dust(PM-10) Control Plan $5,400.00
Task 2.6, Processing $2,260.00
Task 2.7. Agency Coordination $3,980.00
Phase 2 Subtotal $232,775.00
PHASE 3 - POST DESIGN SERVICES
Task 3.1. Construction Phase Support $7,380.00
Phase 3 Subtotal $7,380.00
Reimburseables (not to exceed) $4,000.00
Grand Total of Contract $361,445.00 . • Q Q a(]
Except as specifically amended by this Amendment No. 2, all terms and provisions of Agreement
No. 5275 remain in full force and effect.
ATTEST: CITY OF PALM SPRINGS,
a municipal corporation
By: By.
City Clerk City Manager
APPROVED AS TO FORM:
By:
City Attorney
CONTRACTOR: Check one: _Individual_Partnership x Corporation
Corporations require two otarized signatures One signature must he from the Chaum,in of Board, President,or any Vlcc President. The
secund signature must h from th eeretary,Assistant Secretary,Treasurer,Asyisram Ti eaaurer,or Chief Financial Officer).
By:_ I1y: u
Notarize Signature of Chairman of Board, Nnt2ri7ed Signamr ecre[ary, A55[Secretary,
Pr sident or any Vice President Treasurer, Asst treasurer or Chief Financial Officer
Name: Sohn M. Brudin, P.E. Name: Michael J. Stearns, P.E.
"fide: President Title: Secretary
sw[eof Californiai Slateof Californial
County of $iyerside Iss County of Riverside Iss
on 11/16/dl7oreme,Brenda Sue Visser 041116/07 before me,Brenda Sue visser ,
personally appeared John M. Brudin, P.E. personally appeared Michael J. Stearns, P.,E-
personally known to me(or proved to me on the basis of satisfactory personally known to me(or proved to me on the basis of%Hwfactory
evidence)to be the personN)whose name(il5 Is/afc subscribed to the evidence)to be the person4)whose namc(19 Is/a&:subscribed to the
within imtrumem acid acknowledged to me that he/Ap xexccuted within insrmmcnt and acknowledged to me that he/aheffihegcxccuied
the yams in his/la�authorized capaciiy(ivt and that by the same in Iu9tl=tda inaudiorized capaciiy(bML and that by
his/hcrlehr4x signamrc(s3 on the instrument the person(O, or die his1bvkI1e ixxgtatuft&on the instrument the person(;¢), or the
entity upon behalf of which die person(sg acted, executed die entity upon behalf of which the persorX4 acted, executed the
instrument. instrument.
WITNESS.ruyl<nd ai official Seal. WITNESS my hand and-offieia seat. i
fv
,/Notary Sl" tutu N.I-LcG � Notary Signa[u[eti� •,Q� -�_h�
Notary Seal! Notary Seal:
W&4DA su6 V129W ARFKA sue Yom
_ Camrtlwlcn 116� wtj
10 = n*
YeY 1666622A9 1'�V"ne t:-Cawontio i pets_CCi9ldria
Mwrrwr Coo* Rlwdd@ Courtly —
Nh'Calrn.BIRNMiMvyl, Mlrcom 120