Loading...
HomeMy WebLinkAbout12/19/2007 - STAFF REPORTS - 2.K. �FALMSn -� Rey U y H aen S x r9[/FORN�P+ City Council, Staff Report DECEMBER 19, 2007 CONSENT CALENDAR Subject: PALM SPRINGS STORM DRAIN LINES 6A, 8, 20C, AND 20CA, CITY PROJECT NO 05-20 From: David H. Ready, City Manager Initiated by: Public Works and Engineering Department SUMMARY Agreement No. 5275 with Engineering Resources of Southern California, Inc., approved by City Council on May 3, 2006, provides the City with engineering design services for the construction of various master-planned storm drain facilities in the City. Additional design work is necessary to complete the final design. A Contract Services Agreement Amendment has been prepared to facilitate the additional scope of work as part of this project. RECOMMENDATION: 1) Approve Amendment No. Two (2) to Agreement No. 5275 with Engineering Resources of Southern California, Inc., in the amount of $19,035 for a total revised contract amount of $361,445 for the Palm Springs Storm Drain Line 6A, 8, 20C and 20CA, City Project No. 05-20; and 2) Authorize the City Manager to execute all necessary documents. STAFF ANALYSIS: On May 3, 2006, City Council awarded a contract services agreement to Engineering Resources of Southern California, Inc., for the design of several master-planned storm drain facilities in the City: Line 6A (located in Sunrise Way extending from Vista Chino to Via Escuela), Line 8 (in Sunrise Way extending from Baristo Channel to Tahquitz Canyon Way), Line 20C (in El Cielo Road extending from Ramon Road to Baristo Road), and Line 20CA (in Baristo Road extending from El Cielo Road to Compadre Road). The plans for these storm drain facilities are being reviewed by Riverside County Flood Control District (RCFC), as RCFC will ultimately operate and maintain them. During the Item No. n . K . City Council Staff Report December 19, 2007- Page 2 Palm Springs Storm Drain Lines 6A, 8, 20C, 20CA(CP 05-20)—Contract Amendment No. 2 review of plans for Line 8, RCFC required alternative design analysis, including preparation of various plans showing different horizontal and vertical alignments for the storm drain in Sunrise Way. This additional design work required topographic surveying of the Baristo Channel, all of which is not included in the original scope of work. A contract services agreement Amendment has been prepared to add the additional topographic surveying and Line 8 design work, with an agreed fee of$19,035. FISCAL IMPACT: Sufficient funds are available in account 135-4371-55010. David J. Barakian Thomas J. sson Director of Public Works/City Engineer Assistant Ci Manager David H. Ready, City n ATTACHMENTS: 1. Contract Services Agreement, Amendment No. 2 000002 AMENDMENT NO. 2 TO CONTRACT SERVICES AGREEMENT NO. 5275 WITH ENGINEERING RESOURCES OF SOUTHERN CALIFORNIA, INC. PALM SPRINGS STORM DRAIN LINE 6A, 8, LATERAL 20C, AND LATERAL 20CA CITY PROJECT NO. 05-20 the following articles of Agreement No 5275 are hereby amended to read as follows.- SECTION 2.1 Maximum contract amount is amended to Three Hundred Sixty-One Thousand Four Hundred Forty-Five Dollars ($361,445.00). SCOPE OF SERVICES (Exhibit "A") - Please see attached sheets for additional work. SCHEDULE OF COMPENSATION (Exhibit "C") - Please see attached sheet. Purchase Order Number(s): 616349 Agreement Number: 5275 Original MO Number: 7852 City Council Approval: May 3, 2006 Original Contract Amount: $ 295,480.00 Amount of Prior Increases: $ 46,930.00 Amount of This Increase: $ 19,035.00 Amended Total: $ 361,445.00 Account No. for this Increase: 135-4371-55010; $19,035,00 SIGNATURES ON LAST PAGE Agreement No,5275 Amendment No.2 Page 2 EXHIBIT A is amended as follows.- Ad d the following.- Task 1.2A - Baristo Channel Survey Provide topographic survey and mapping of the Baristo Channel from the proposed Line 8 outlet downstream as necessary to provide hydraulic analysis of the Baristo Channel for RCFC evaluation of the Line 8 design. Add the following to Task 1.4, Preliminary Design: Contractor shall prepare alternative horizontal and vertical designs forthe proposed Line 8 flood control improvements from Baristo Channel to Ramon Road for RCFC evaluation. Add the following.- Task 1.5A, Engineering Report(Line 8 Alternatives) Contractor shall prepare a report outlining the outcome and recommendations of the proposed analysis of alternative horizontal and vertical designs for the proposed Line 8 flood control improvements from Baristo Channel to Ramon Road for RCFC evaluation. The report will provide written dialog on the intent of the study, including methods, criteria, existing facilities' descriptions, hydrology calculations, hydrology map, preliminary hydraulic calculations, preliminary plan and profile for the proposed flood control improvements, design mitigation and a description of any necessary rights-of-way. Add the following to Task 2.3, Plans, Specifications and Estimates: Line 8 Alternatives (Baristo Channel to Ramon Road) Agreement No,5275 Am codmenl No.2 Page3 E)CHIBIT C is amended as follows: Thelirst paragraph of Exhibit C is incorporated herein by reference and shall remain in full force and effect. Thelump sum task items and amounts are revised as indicated below. Task Total Lump Sum PHASE 1 - PRELIMINARY ENGINEERING Task 1.1, Record Data $2,540.00 Task 1.2, Mapping $52,060.00 Task 1.2A, Baristo Channel Survey $1,700.00 Task 1.3, Hydrology $5,460.00 Task 1.4, Preliminary Design Line 6A $6,560.00 Line 8 (Baristo Channel to Tahquitz Canyon Way) $12,440.00 Line 8 (Tahquitz Canyon Way to Andreas Road) $2,720.00 Line 8 Alternatives (Baristo Channel to Ramon Road) $5,620.00 Lateral 20C $8,350.00 Lateral 20CA $5,020.00 Task 1.5. Engineering Report $7,680.00 Task 1.5A, Engineering Report (Line 8 Alternatives) $1,980.00 Task 1.6, Processing $2,900.00 Task 1.7, Agency Coordination $2,260.00 Phase 1 Subtotal $117,920.00 PHASE 2 - FINAL ENGINEERING Task 2.1, Geotechnical Engineering $19,940.00 Task 2.2, Potholing Coordination & Survey $13,770.00 Saf-R-Dig Potholes $81,750.00 Task 2.3, Plans, Specifications and Estimates Line 6A $15,040.00 Line 8 (Baristo Channel to Tahquitz Canyon Way) $29,720.00 Line 8 (Tahquitz Canyon Way to Andreas Road) $4,000,00 Line 8 Alternatives (Baristo Channel to Ramon Road) $9,735,00 Lateral 20C $20,140.00 Lateral 20CA $11,220.00 Specifications $6,000.00 Estimates $3,820.00 Task 2.4, Storm Water Pollution Prevention Plan $6,000.00 Task 2.5, Fugitive Dust(PM-10) Control Plan $5,400.00 Task 2.6, Processing $2,260.00 Task 2.7. Agency Coordination $3,980.00 Phase 2 Subtotal $232,775.00 PHASE 3 - POST DESIGN SERVICES Task 3.1. Construction Phase Support $7,380.00 Phase 3 Subtotal $7,380.00 Reimburseables (not to exceed) $4,000.00 Grand Total of Contract $361,445.00 . • Q Q a(] Except as specifically amended by this Amendment No. 2, all terms and provisions of Agreement No. 5275 remain in full force and effect. ATTEST: CITY OF PALM SPRINGS, a municipal corporation By: By. City Clerk City Manager APPROVED AS TO FORM: By: City Attorney CONTRACTOR: Check one: _Individual_Partnership x Corporation Corporations require two otarized signatures One signature must he from the Chaum,in of Board, President,or any Vlcc President. The secund signature must h from th eeretary,Assistant Secretary,Treasurer,Asyisram Ti eaaurer,or Chief Financial Officer). By:_ I1y: u Notarize Signature of Chairman of Board, Nnt2ri7ed Signamr ecre[ary, A55[Secretary, Pr sident or any Vice President Treasurer, Asst treasurer or Chief Financial Officer Name: Sohn M. Brudin, P.E. Name: Michael J. Stearns, P.E. "fide: President Title: Secretary sw[eof Californiai Slateof Californial County of $iyerside Iss County of Riverside Iss on 11/16/dl7oreme,Brenda Sue Visser 041116/07 before me,Brenda Sue visser , personally appeared John M. Brudin, P.E. personally appeared Michael J. Stearns, P.,E- personally known to me(or proved to me on the basis of satisfactory personally known to me(or proved to me on the basis of%Hwfactory evidence)to be the personN)whose name(il5 Is/afc subscribed to the evidence)to be the person4)whose namc(19 Is/a&:subscribed to the within imtrumem acid acknowledged to me that he/Ap xexccuted within insrmmcnt and acknowledged to me that he/aheffihegcxccuied the yams in his/la�authorized capaciiy(ivt and that by the same in Iu9tl=tda inaudiorized capaciiy(bML and that by his/hcrlehr4x signamrc(s3 on the instrument the person(O, or die his1bvkI1e ixxgtatuft&on the instrument the person(;¢), or the entity upon behalf of which die person(sg acted, executed die entity upon behalf of which the persorX4 acted, executed the instrument. instrument. WITNESS.ruyl<nd ai official Seal. WITNESS my hand and-offieia seat. i fv ,/Notary Sl" tutu N.I-LcG � Notary Signa[u[eti� •,Q� -�_h� Notary Seal! Notary Seal: W&4DA su6 V129W ARFKA sue Yom _ Camrtlwlcn 116� wtj 10 = n* YeY 1666622A9 1'�V"ne t:-Cawontio i pets_CCi9ldria Mwrrwr Coo* Rlwdd@ Courtly — Nh'Calrn.BIRNMiMvyl, Mlrcom 120