Loading...
HomeMy WebLinkAbout2/6/2008 - STAFF REPORTS - 2.E. pgLM g V N k C4�oxYOYnrto`��V ^x 44FpRN�P CITY COUNCIL STAFF REPORT DATE: February 6, 2008 CONSENT CALENDAR SUBJECT: VSA AIRPORTS AMENDMENT 12 TO AGREEMENT NO. 4487 FOR AIRPORT ENGINEERING SERVICES FROM: David H. Ready, City Manager BY: Department of Aviation SUMMARY The requested action would result in City Council approval of Amendment No. 12 to Agreement No. 4487 with VSA Airports for Airport Engineering Services, to provide an updated capacity analysis of the Airport electrical distribution system and related record drawings for Palm Springs International Airport. RECOMMENDATION: 1. Approve Amendment No. 12 to Agreement No. 4487, with VSA Airports, Inc. to provide an updated Airport electrical distribution analysis and related drawings, in the amount of$17,250; and 2. Authorize the City Manager to execute all necessary documents. STAFF ANALYSIS: The Airport facility has expanded significantly since the last electrical distribution system analysis which was performed in 1908. Included in this development are the Airport security checkpoint expansion, new concourse, TSA baggage screening building modifications, vehicle inspection plaza, employee parking lot and the current rental car lot expansion. Collectively these improvements represent a significant increase in electrical consumption and a corresponding reduction in available capacity. In order to plan properly for future facility expansion a new baseline measure must be established. VSA Airports, having performed Airport electrical distribution design work for many years, is well versed and qualified to complete an accurate analysis and provide the necessary updated electrical system drawings. The cost to provide all engineering services specified in Amendment No. 12 is $17,250,00, ITEM NO._ J�-- City COUnd Staff Report February 6, 2008 -- Page 2 VSA Airports Amendment 12 FISCAL_ IMPACT: Funds for the specified engineering services are budgeted in FY 2008 and are available in Account#415-6050-43200. Thomas Nolan, Executive Director of Aviation David H. Ready anager Attachments: Amendment 412 000002 AMENDMENT#12 AGREEMENT NO. 4487, AIRPORT ENGINEERING SERVICES THIS TWELTH AMENDMENT TO AGREEMENT NO. 4487 FOR CONTRACT SERVICES, (herein "Amendment") is made and entered into on the _day of 2008, by and between the CITY OF PALM SPRINGS (herein "City") and VSA AIRPORTS, Inc. (herein "Contractor"). (The term Contractor includes professionals performing in a consulting capacity.), is hereby effective 2008 as follows: RECITALS A. The City and Contractor entered into that certain Contract Services Agreement No. 4487 for Airport Engineering Services ("Agreement'), as duly amended from time to time. B. The parties wish to amend the Agreement pursuant to the terms of this Amendment to add additional services to be performed by Contractor and increase the Contract Sum to authorize payment for such additional services. NOW, THEREFORE, the parties hereto agree as follows: Section 1: Section 2.1 of the Agreement entitled "Contract Sum" shall be amended as to the reference to the Contract Sum to include the fees added with this Amendment, as described in the revision to Exhibit "C" below (for $17,250.00), so that the revised Contract Sum shall read "Three Million Seven Hundred Eighty Six Thousand Two Hundred Fifty and 00/100 Dollars ($3,786,250.00)", with all other provisions of Section 2.1 remaining unmodified and in full force and effect. Section 3: Exhibit "A" Scope of Services, Part V -- Project Specific Scopes, is hereby amended by adding Project No.13a with all other provisions of Exhibit "A" remaining unmodified and in full force and effect: Project# Project Title%Description Task Assignments* 13. Airport Power& Electrical Systems a. Primary Electrical Distribution System — Record Drawing Update K and Capacity Analysis "tasks as defined in the original contract Section 4: Exhibit "C" Schedule of Compensation, Part II — Project Specific Compensations is hereby amended by adding Project No. 13a, with all other provisions of Exhibit"C" remaining unmodified and in full force and effect: Project#, .Project Title%Description Compensation.(Not To Exceed) . 13. Airport Power & Electrical Systems a. Primary Electrical Distribution System— Record Drawing Update $17,250,00 and Capacity Analysis Section 5: Exhibit "D" Schedule of Performance is hereby amended by adding the dates for Project No.13a, with all other provisions of Exhibit"D" remaining unmodified and in full force and effect: VSA AIRPORTS,Inc.,Agreement 4487,Amendment#12 (1 UQ�J ®l9u Project# . Project Title/Descriptio'n Commence 'Complete 13. Airport Power& Electrical Systems a. Primary Electrical Distribution System— February 1, 2008 March 25, 2008 Record Drawing Update and Capacity Analysis Section 6: Full Force and Effect. Except as expressly modified herein all other provisions of the Agreement shall remain unmodified and in full force and effect. Section 7: Corporate Authority. The persons executing this Amendment on behalf of the parties hereto warrant that (i) such party is duly organized and existing, (ii) they are duly authorized to execute and deliver this Amendment on behalf of said part, (iii) by so executing this Amendment, such party is formally bound to the provisions of this Amendment, and (iv) the entering into this Amendment does not violate any provision of any other agreement to which said party is bound. (Signature Page Follows) VSA AIRPORTS,Inc.,Agreement 4487,Amendment#12 2 N WITNESS WHEREOF,the parties have executed and entered into this Agreement as of the date first written above. ATTEST: CITY OF PALM SPRING a municipal corporation By: By: City Clerk City Manager APPROVED AS TO FORM: By: City Attorney CONTRACTOR: Check one: Individual Partnership_Corporation Corporations require two notarized signatures: One from each of the following: A. Chairman of Board, President,or any Vice President:AND B. Secretary,Assistant Secretary,Treasurer,Assistant Treasurer, or Chief Financial Officer, By: By Signature (notarized) Signature (notarized) Name: Name. Title: Title: State of State of County of County of On before me, On before me, personally appeared personally appeared who proved to me on the basis of satisfactory who proved to me on basis of satisfactory evidence to be the person(s)whose name(s) evidence to be the person(s)whose names) is/are subscribed to the within instrument Ware subscribed to the within instrument and acknowledged to me that he/she/they and acknowledged to me that he/she/they executed the same in his/her/their authorized executed the same in his/her/their authorized capacity(ias),and that by his/her/their capacity(ies),and that by his/her/their signature(s)on the instrument the person(s), signatures(s)on the instrument the person(s) or the entity upon behalf of which the or the entity upon behalf of which the person(s) acted, executed the instrument. persons)acted, executed the instrument. I certify under PENALTY OF PERJURY I certify under PENALTY OF PERJURY under the laws of the State of California that under the laws of the State of California that the foregoing paragraph is true and correct the foregoing paragraph is true and correct. WITNESS my hand and official seal. WITNESS my hand and official seal. Notary Signature: Notary Signature: Notary Seal: Notary Seal: 000065