Loading...
HomeMy WebLinkAbout7/7/2004 - STAFF REPORTS (10) DATE: July 7, 2004 TO: City Council FROM: Director of Public Works/City Engineer Director of Community & Economic Development CONTRACT CHANGE ORDER NO. 3 FOR DESERT FASHION PLAZA STREET IMPROVEMENTS, CITY PROJECT NO. 03-05 RECOMMENDATION: That the City Council approve Contract Change Order No. 3 to G&M Construction for the Desert Fashion Plaza Street Improvements, City Project No. 03-05. For an increase of $13,000, for a total contract amount of$346,141. SUMMARY: Approval of this Change Order will result in an increase of the Desert Fashion Plaza Street Improvements Contract of $13,000 to pay to place pavers and a retaining wall in the parkway area in front of the ramp to the Desert Fashion Plaza underground parking structure on Palm Canyon Drive. This area was initially to be landscaped with grass under the original terms of the contract. BACKGROUND: On July 30, 2003 City Council awarded a contract to G&M Construction to construct the Desert Fashion Plaza Street Improvements, the original contract amount was $331,512. Subsequent to the award of the contract, there have been two approved change orders for a total increase of $1,629. All construction work authorized had been completed in December 2003,with the exception of the parkway area on Palm Canyon Drive in front of the entrance ramp to the Desert Fashion Plaza parking structure, adjacent to the Hyatt Hotel. This area was shown on the plans to be landscaped with trees and grass. However, it has been observed that pedestrians regularly walk across this area, ratherthan taking the walkway and ramp to the west, as provided in the original design and as constructed. At the request of John Wessman, Desert Fashion Plaza owner, the Downtown Development Director and the General Manager of the Hyatt Hotel, Sanborn A/E the original project engineers have prepared a supplemental drawing to the project which continues the placement of concrete pavers and retaining walls and tree wells along this area in lieu of the grass landscaping. The new plan has been presented to the contractor, G&M Construction, and an agreed price including a credit to the City for landscaping that was not completed totals a $13,000 lump sum cost increase. The final contract amount including this change order is revised to $346,141. CCO#3 for G&M Construction July 7, 2004 Page 2 Sufficient funds exist in General Fund Parking Fund Account Number 132-4462-50222 (DFP Parking Improvements), AIL DAVID J. BARAKIAN Director of Public Works/City Engineer JOF{N RA�YMOND Dire for Comm ity & Economic Development APPROVED City Manager ATTACHMENTS: 1. Minute Order 2. Contract Change Order#3 CITY OF PALM SPRINGS CONTRACT CHANGE ORDER To: G&M Construction Date: April 27, 2004 211 W. Mesquite Ave. Project No. 03-05 Palm Springs, CA 92264 Project Name: Fashion Plaza Street Imp. Change Order No. Three (3) Attn: George Marantz Contract Purchase No: 416333 Account Number: 4462-50222 Agr.# 4747 M.O.# 7354 A./B. CHANGES IN WORK/COSTS Increases to Contract New Item a. Construct Walkway Revisions Per Plan Lump Sum/Agreed Price $13,000.00 TOTAL NET CHANGE ORDER AMOUNT $13,000.00 C. REASONS FOR CHANGES: a. An area near the North end of the project limits and adjacent to the Fashion Plaza parking garage entrance was to be landscaped with grass on the original plans. After construction of the improvements on Palm Canyon, it was realized that pedestrians regularly walk across this area rather than taking the walkway to the West as originally designed. At the request of John Wessman (the Fashion Plaza owner), Sanborn A&E (the original project designer), prepared a supplemental drawing to the project which continues the placement of concrete pavers and retaining walls and tree wells along this area. John Wessman and Jerry Ogburn (Downtown Redevelpment), presented the plan to the City Manager and asked that the additional improvements be installed utilizing additional funds that were not spent as part of the original construction. At the City Managers request, a price for this additional work was obtained. G&M Construction has agreed to construct the additional improvements for the lump sum cost of $13,000.00. This agreed price is includes the a credit to the City for the landscaping that was not completed in this area. 15 additional working days are being allowed for the completion of this work. This time will be tracked beginning on a future date mutually agreed upon by the City and G&M Construction Construction on this project was considered substantially complete on December 51 2003. Project time has been suspended from that date to the date referenced above that is to be determined. This suspension has been agreed to by G&M Construction. NOTE: No additional markup will be added to any items in this Contract Change Order. All costs Per each item are final. D. SOURCE OF FUNDS: The required funds are available in the following account: Page 1 of 2 VP1 Acct# 4462-50222 Desert Fashion Plaza Street Improvements Summary of Costs Contract Time Original Contract Amount: $331,512.00 Original Completion Date: November 7, 2003 This Change Order: $ 13,000.00 Days Added for this C.C.O.: 15 Previous Change Order(s): $ 1,629.00 Previous Days Added: 16 Revised Contract Amount: $346,141.00 Revised Completion Date: T.B.D. I have received a copy of this Change ity Approval: Order and the above totals are acceptabl t the cont ctor Submitted by Date Street Maintenance Manager By Approved bye^" Date 7Cirac rCity Engineer Date fi G t Approved by Date City Manager Distribution: Original Conformed Copies Conformed-File Copy Engineering (1) Engineering File 11) Finance (1) Engineering Field Inspector (1) Contractor (1) Engineering Field Supervisor (1) City Clerk (1) Purchasing Agent (1) Page 2 of 2 MINUTE ORDER NO. / `0 APPROVING CONTRACT CHANGE ORDER NO. 3 TO G&M CONSTRUCTION, FOR THE DESERT FASHION PLAZA STREET IMPROVEMENTS, CITY PROJECT NO. 03-05 FOR AN INCREASE OF $13,000 FOR A FINAL TOTAL CONTRACT AMOUNT OF $346,141. I HEREBY CERTIFY that this Minute Order, approving Contract Change Order No.3 to G&M Construction,forthe Desert Fashion Plaza Street Improvements, City Project No.03- 05 for an increase of$13,000 for a final total contract amount of$346,141, was adopted by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 7"' day of July, 2004. PATRICIA A. SANDERS City Clerk