HomeMy WebLinkAbout2/20/2008 - STAFF REPORTS - 2.E. A. F A LM BAR i2 u v w A<,F°R104, City Council Staff Repo February 20, 2008 CONSENT CALENDAR Subject: INDIAN CANYON DRIVE / INTERSTATE 10 INTERCHANGE PROJECT (CITY PROJECT 00-14), AGREEMENT AMENDMENTS From: David H. Ready, City Manager Initiated by: Public Works and Engineering Department SUMMARY Approval of Amendment No. 6 to the City-CVAG Reimbursement Agreement (Agreement No. 4317) increases the total authorized Regional Measure A amount by $385,000 to $17,078,563 for Design Engineering, Environmental and Construction of the Indian Avenue (now Indian Canyon Drive) / Interstate-10 Interchange Project, City Project No. 00-14. Approval of Amendment No. 3 to the Dokken Engineering Agreement (Agreement No. 4318) revises the total contract amount for professional environmental, design, and construction administration services to $1,719,562, an increase of $385,000 for new engineering tasks and a prolonged project schedule in the project approval, design, and construction phases of the Indian Avenue (now Indian Canyon Drive) / Interstate-10 Interchange Project, City Project No, 00-14. RECOMMENDATION: 1) Approve Amendment No. 5 to the CVAG/City Agreement No. 4317, for allocating an additional $385,000 in Regional Measure A funds and amending the total project cost to $17,078,563 for the Indian Avenue (now Indian Canyon Drive) / Interstate-10 Interchange Project, City Project No. 00-14. 2) Approve Amendment No. 3 to Agreement No. 4318 with Dokken Engineering in an amount of $385,000 for a revised total contract amount of $1,719,562 for the Indian Avenue (now Indian Canyon Drive) / Interstate-10 Interchange Project, City Project No. 00-14. 3) Authorize the City Manager to execute all necessary documents. Item 2 . E . City Council Staff Report February 20, 2008 - Page 2 Indian Canyon Drive/Interstate 10 Interchange Project (CP 00-14) STAFF ANALYSIS: On December 6, 2000, City Council originally approved the initial Master Reimbursement Agreement with CVAG (Agreement No. 4317) for the Indian Avenue (now Indian Canyon Drive) / Interstate-10 Interchange Project, City Project No. 00-14 (the 1-10 Project") and CVAG designated the City of Palm Springs as the Lead Agency for the 1-10 Project. Over the years, several amendments have been approved increasing the total reimbursement amount to cover expected costs, as the schedule for this project continues to be delayed as a result of the environmental, design, and right- of-way processes coordinated through Caltrans. Also, on December 6, 2000, City Council originally approved Agreement No. 4318 with Dokken Engineering for environmental, engineering design, and construction engineering services for the 1-10 Project. Two prior amendments were approved by City Council to address additional services required as the environmental and design process moved its way through Caltrans. A third amendment is recommended to further address additional services, a result of new Caltrans requirements imposed on the City, and changing Caltrans design standards. The City's consultant, Dokken Engineering, continues to provide excellent service to the City despite a project that has had its original schedule delayed by many years due to unforeseen Caltrans obstacles. It is staffs recommendation that Dokken Engineering's costs resulting from these on-going and continuous delays, and changes with Caltrans requirements and standards, be compensated. City staff has coordinated with CVAG to cover these additional project costs with Regional Measure A funding. Amendment No. 6 to the City-CVAG Reimbursement Agreement was approved by the CVAG Technical Advisory Committee on January 11, by the CVAG Transportation Committee on January 14, and ultimately by the CVAG Executive Committee on January 28, 2008. FISCAL IMPACT: Amendment No. 6 to the City-CVAG Reimbursement Agreement will increase the total Regional Measure A funding for the 1-10 Project by $385,000 to offset costs associated with a corresponding increase of $385,000 by Amendment No. 3 to the Dokken Engineering Agreement. City Council Staff Report February 20, 2008 - Page 3 Indian Canyon Drive/Interstate 10 Interchange Project(CP 00-14) SUBMITTED: David J. Barakian Thomas J. W4 n Director of Public Works/City Engineer Assistant City Manager David H. Ready, City Manager Attachments: 1. Amendment No. 6 to City-CVAG Reimbursement Agreement 2. Amendment No. 3 to Dokken Engineering Agreement �o0gg4 AMENDMENT NUMBER SIX to the CITY OF PALM SPRINGS-COUNTY OF RIVERSIDE-CVAG REIMBURSEMENT AGREEMENT INDIAN AVENUE INTERSTATE 10 INTERCHANGE DESIGN ENGINEERING, ENVIRONMENTAL AND CONSTRUCTION THIS AMENDMENT NUMBER SIX is made and entered into this Day of , 2008, by and between the City of Palm Springs (Lead Agency), the County of Riverside (Agency), and the Coachella Valley Association of Governments, a California joint powers agency, (CVAG), and is made with reference to the following background facts and circumstances: This Amendment Number Six obligates and authorizes for expenditure,funds not previously authorized under the terms of the existing Reimbursement Agreement for the " Indian Avenue Interstate 10 Interchange Design Engineering and Environmental" (the Project), dated December 6, 2000; Amendment Number One, dated November 14, 2001; Amendment Number Two, dated May 1, 2002; Amendment Number Three, dated December 8, 2003; Amendment Number Four, dated May 21, 2003, and Amendment Number Five. All other provisions are considered to remain in force. This Amendment Number Six shall authorize additional design engineering funds in the amount not to exceed $386,000. The Lead Agency is requesting additional funds for the Design Consultant due to the revised environmental document standards, final Project Report extra work, and additional right of way work. Sum Previously obligated and authorized for expenditure (Original Agreement) $ 943,843 Previously obligated under Amendment#1 $ 9,000 Previously obligated under Amendment#2 $15,300,000 Previously obligated under Amendment#3 $ 50,000 Previously obligated under Amendment#4 $ 50,000 Previously obligated under Amendment#5 $ 340,720 New obligations under this Amendment#6 $ 385.000 Total amount, after Amendment#6 is authorized for expenditure $17,078,663 Indian Avenue 1-10 interchange/Amendment number six PS/County of Riverside/CVAG January 2008 Pagel 090904 IN WITNESS WHEREOF,the parties hereto have caused this Amendment Number Six agreement to be executed by their duly authorized representatives on this date: ATTEST: CITY OF PALM SPRINGS By: By: City Clerk COUNTY OF RIVERSIDE ATTEST: By: By: Clerk of the Chairman of the Board of Supervisors Board of Supervisors CVAG ATTEST: By: By: John Wohlmuth CVAG Chair Executive Director Indian Avenue I-10 Interchange/Amendment number six PS/County of Riverside/CVAG January 2008 Page2 000001. 5 AMENDMENT NO. 3 TO CONTRACT SERVICES AGREEMENT NO. 4318 WITH DOKKEN ENGINEERING INDIAN AVENUE/1-10 INTERCHANGE, CP#00-14 The fallowing articles of Agreement No. 4318 are hereby amended to read as follows: SECTION 2.1 Maximum contract amount is amended to One Million Seven Hundred Nineteen Thousand Five Hundred Sixty-Two Dollars ($1,719,562.00). SCOPE OF SERVICES (Exhibit"A")- Please see attached sheet for additional services. SCHEDULE OF COMPENSATION Exhibit "C - Please see attached sheet. Purchase Order Number(s): 116346 Agreement Number: 4318 Original City Council Approval: December 6, 2000 Original Minute Order Number: 6761 Original Contract Amount: $ 943,842 Amount of Previous Increase(s) $ 390,720 Amount of This Increase $ 385,000 Amended Total: $1,719,562 Account Number(s): 134-4497-50185 SIGNATURES ON LAST PAGE EXHIBIT A is amended as follows: Add the following services: Task4.5(a),Design Exception Fact Sheets. Contractorshall prepare all documentation required to request deviations from the Caltrans advisory design standard with regard to restricted access on 20th Avenue opposite the westbound freeway ramps, as necessary to avoid potential conflicts with an existing SCE vault and gas station monument sign. Task 4.5(b), Construction CPM Schedule. Contractor shall prepare a construction CPM schedule to determine impacts during construction, and to assist in development of the TMP. Task4.5(c), Utility Potholing. Contractor shall coordinate and provide required utility potholing as necessary to identify conflicts with existing utilities within the project area. Task 6.01, Roadway Design Construction Support. Contractor shall be available to attend construction meetings and shall be available to visit the jobsite for on-site review of construction, and other visits to the jobsite as requested by the City to resolve interpretation of the contract documents. Contractor shall respond to Requests for Information (RFIs) from the construction general contractor and subcontractor(s) on an as-needed basis. If resolution of the RFI requires re-design work,a memo summarizing the RFI,and the resolution of the work shall be prepared and submitted to the City's Resident Engineer for review and approval. Drawings shall be submitted to the City's Resident Engineer for duplication and distribution. Task 6.OZ Structures Design Construction Support. Contractor shall respond to structures related RFIs from the construction general contractor and subcontractor(s)on an as-needed basis. If resolution of the RFI requires re-design work, a memo summarizing the RFI, and the resolution of the work shall be prepared and submitted to the City's Resident Engineer for review and approval. Drawings shall be submitted to the City's Resident Engineer for duplication and distribution. Task 6.03, Shop Drawing Review. Contractor shall be available to review and approve shop plan drawings submitted by the construction general contractor and subcontractor(s). Contractor shall complete shop plan reviews within 1 week of receipt. Task 6.04, Geotechnical Design Support. Contractor shall be available to clarify geotechnical information and answer questions during the construction of the project. Additional field investigation and analysis is not assumed as part of this task. Task 6.05, Electrical Design Support. Contractor shall be available to clarify electrical design information and answer questions during the construction of the project. Significant re-design of traffic electrical facilities is not assumed as part of this task. Goo raj EXHIBIT C is replaced with the following exhibit: SCHEDULE OF COMPENSATION Tasks listed below are identical to tasks identified in Exhibit A of this Agreement. Payments to Contractor shall be made no more frequently than monthly. Lump sum payments shall be made to Contractor based upon completion of tasks, or pro-rats portions thereof noted below, Sub-Task Total Task Total Lump Sum Lump Sum Task 1.0 Project Administration $126 705.00 Task 2.0, Planning and Project Development --- $636,221.29 Task 2.1, Research and Data Gathering $1,083.00 --- Task 2.2, Project Development Team Meetings $66,333.00 --- Task 2.3, Survey $40.297.00 --- Task 2A, Preliminary Hydrology Report $26,819.00 --- Task 2.5, Preliminary Geotechnical Report 36.066.00 --- Task 2.6, Traffic Operations Analysis $41.026,00 --- Task 2.7, Environmental Approval $171.334.00 --- Task 2.8, value Engineering $5.633.00 --- Task 2.9, Project Report and Project Approval Report $112.185.00 --- Task 2.10, Geometric Approval Drawings 365.136.00 --- Task 2.11, Geotechnical Design Report $29,834.00 --- Task 2.12, Right of Way Engineering $55.74329 --- Task 2.13, Agreements $2.925,00 --- Task 2.14, UINN Coordination/Relocations 311 807.00 Task 3.0,Structures --- $157,520,00 Task 3.1. Preliminary Structure Design $5,015.00 --- Task 3.2. Geotechnical Coordination and Foundation Report $31,988,00 --- Task 3.3. Structural Design and Calculations $41,441.00 --- Task 3.4, Demolition of Existing Bridge $5,000.00 --- Task 3.5, Structural Special Provisions 518,440.00 --- Task 3.5. Estimate $9,600.00 --- Task 3.7, Independent Check Review and Quality Control $19.146.00 --- Task 3.8, Draft PS&E 522,590.00 --- Task 3.9, Final PS&E _ S3,400.00 Task 4.0, Roadway --- $602,833.71 Task 4.1, Basic Roadway Plans $191,470,00 --- Task 4.2. Drainage Plans $115,570,00 --- Task 4.3. Traffic Plans $120,490.00 --- Task 4.4. Miscellaneous Plans $39,920.00 --- Task 4.5, Specifications and Estimate $41,230.00 --- Task 4.5(a), Design Exception Fact Sheets 53,550.00 --- Task 4.5(b), Construction CPM Schedule $11,590.00 --- Task 4.5 (c), Utility Potholing 534,543.71 --- Task 4.6, Roadway Deliverables Task 4.6.1, Submittals $2,000.00 --- Task 4.6.2. Draft PS&E (95% Complete) $19,000,00 --- Task 4.6.3, Final PS&E (100% Complete) $5,000.00 --- Task 4.6.4, Project Files and Resident Engineer's File $6,800.00 --- Task 4.6.5, Slope Stake Notes 525 670.00 Task 5.0 Construction Bidding Plans 10 008.00 Task 6.0, Construction Support Phase --- $186,274,00 Task 6.0, General Construction Support 326,874600 --- Task 6.01, Roadway Design Construction Support $41.350.00 --- Task 6.02, Structures Design Construction Support 537,550.00 --- Task 6.03, Shop Drawing Review $16,700.00 --- Task 6,04, Geotechnical Design Support $15,550.00 --- Task 6.05, Electrical Design Support $15,350.00 --- Task 8.1 "As-Built" Plans $32,900.00 Total of all Tasks of this Contract --- $1,719,562.00 a0 Except as specifically amended by this Amendment No. 3, all terms and provisions of Agreement No. 4318 remain in full force and effect. ATTEST: CITY OF PALM SPRINGS, a California charter city By: By: City Clerk City Manager APPROVED AS TO FORM: By: City Attorney CONTRACTOR: Check one:_Individual_Partnership_Corporation Corporatlons require two notarized signatures. One signature must be from the Chairman of Board,President,or any Vice President The second signature must be from the Secretary Assistant Secretary,Treasurer Assistant Treasurer,or Chief Financial Officer). By: By: Notarized Signature of Chairman of Board, Notarized Signature Secretary,Asst Secretary, President or any vice President Treasurer,Asst treasurer or Chief Financial Officer Name: Name: Title: Title: State of I State of County or Iss County of ISs On before me, On before me, pa=riallyappeared personally appeared who proved to me on the basis of satisfactory evidence)to be who proved to me on the basis of satisfactory evidence)to be the person(s)whose name(s) is/are subscribed to the within the person(s)whose name(s) Ware subscribed to the within instrument and acknowledged to me that he/she/they executed instrument and acknowledged to me that helshelthey executed the same in Ns/her/their authorized capacity(es), and that by the same in his/her/their authorized capacity(ies), and that by hislherltheirsignature(s)on the instrument the person(s),or the hislherltheirsignature(s)on the instrument the person(s) orthe entity upon behalf of which the person(s)acted, executed the entity upon behalf of which the person(s)acted, executed the instrument. instrument. I certify under PENALTY OF PERJURY under the laws of the I certify under PENALTY OF PERJURY under the laws of the State of California that the foregoing paragraph Is true and State of California that the foregoing paragraph Is true and correct. correct. WITNESS my hand and official seal. WITNESS my hand and official seal. Notary Signature: Notary Signature: Notary Seal: Notary Seal: 00a009