HomeMy WebLinkAbout04958 - ALBERT WEBB ASSESSMENT DISTRICT AD 164 MOUNTAIN GATE II TRACT 32028 Page t of 1
Kathie Hart
From: Marcus Fuller
Sent: April 03, 2009 11:22 AM
To: Kathie Hart
Cc: Carrie Rovney
Subject: RE: A4958 -Albert A Webb Assoc-Assessment Engineering Services Ad 164 S25,000
r
Ok to close
Sincerely, �� \
Marcus L.Fuller,P.E.,P.L.S.
Assistant Director of Public Works/
Assistant City Engineer 1�City of Palm Springs
(760)323-8253, ext. 8744
vw w.nalmsprines-ca.gov 1
Marcun.Fu11er�PalmsPUr^s-ca.^ov
From: Kathie Hart
Sent, Friday, April 03, 2009 11:14 AM
To: Marcus Fuller; carrie.rovney@palmsprings-ca.gov
Cc: Jay Thompson
Subject: A4958 -Albert A Webb Assoc-Assessment Engineering Services Ad 164 $25,000
This was approved Sept. 2004. Completed? OK to close?
Thx!
Kathie Hart, CMC
Chief Deputy City Clerk
City of Palm 5prings
3200 E. Tahquitz Canyon Way
Palm Springs,CA 92262
��' (760)323-8206 1 �2-1 (760) 322-8332
Z Kathie.Hart@Palm$prmg$CA.gov
04/03/09
Albert A. Webb Associates
Assessment Eng. Services for AD#164
AGREEMENT#4958
CITY OF PALM SPRINGS CM signed 9-9-04
Public Works and Engineering Department
CONTRACT SERVICES AGREEMENT FOR----
ASSESSMENT ENGINEER SERVICES FOR ASSESSMENT DISTRICT NO. 164
"MOUNTAIN GATE II"TRACT 32028
THIS CONTRACT SERVICES AGREEMENT (herein "Agreement"), is made and entered into this
� I day of ' p}1'� 2004, by and between the CITY OF PALM SPRINGS, a municipal
corporation, (herei "City")ty") and Albert A. Webb Associates, (herein "Contractor'). The term Contractor
includes professionals performing in a consulting capacity. The parties hereto agree as follows:
1.0 SERVICES OF CONTRACTOR
1.1 Scope of Services. In compliance with all terms and conditions of this Agreement,
the Contractor shall provide those services specified in the"Scope of Services"attached hereto as Exhibit"A"
and incorporated herein by this reference,which services may be referred to herein as the"services"or"work"
hereunder. As a material inducement to the City entering into this Agreement, Contractor represents and
warrants that Contractor is a provider of first class work and services and Contractor is experienced in
performing the work and services contemplated herein and,in light of such status and experience,Contractor
covenants that it shall follow the highest professional standards in performing the work and services required
hereunder and that all materials will be of good quality, fit for the purpose intended. For purposes of this
Agreement, the phrase "highest professional standards"shall mean those standards of practice recognized
by one or more first-class firms performing similar work under similar circumstances.
1.2 Contractor's Proposal. The Scope of Service shall include the Contractor's proposal
or bid which shall be incorporated herein by this reference as though fully set forth herein. In the event of any
inconsistency between the terms of such proposal and this Agreement, the terms of this Agreement shall
govern.
1.3 Compliance with Law. All services rendered hereunder shall be provided
in accordance with all ordinances, resolutions, statutes, rules and regulations of the City and any Federal,
State or local governmental agency having jurisdiction in effect at the time service is rendered.
1.4 Licenses, Permits Fees and Assessments. Contractor shall obtain at its
sole cost and expense such licenses, permits and approvals as may be required by law for the performance
of the services required by this Agreement. Contractor shall have the sole obligation to pay for any fees,
assessments and taxes, plus applicable penalties and interest, which may be imposed by law and arise from
or are necessary for the Contractor's performance of the services required by this Agreement, and shall
indemnify, defend and hold harmless City against any such fees, assessments, taxes, penalties or interest
levied, assessed or imposed against City hereunder.
1.5 Familiarity with Work. By executing this Contract, Contractor warrants that
Contractor (a) has thoroughly investigated and considered the scope of services to be performed, (b) has
carefully considered how the services should be performed and(c)fully understands the facilities, difficulties
and restrictions attending performance of the services under this Agreement. If the services involve work
upon any site, Contractor warrants that Contractor has, or will, investigate the site and is or will be fully
acquainted with the conditions there existing, prior to commencement of services hereunder. Should the
Contractor discover any latent or unknown conditions, which will materially affect the performance of the
services hereunder, Contractor shall immediately inform the City of such fact and shall not proceed except
at Contractor's risk until written instructions are received from the Contract Officer.
1.6 Care of Work. The Contractor shall adopt reasonable methods during the
life of the Agreement to furnish continuous protection to the work, and the equipment, materials, papers,
documents, plans, studies and/or other components thereof to prevent losses or damages, and shall be
responsible for all such damages, to persons or property, until acceptance of the work by City, except such
losses or damages as may be caused by City's own negligence.
1.7 Further Responsibilities of Parties. Both parties agree to use reasonable care and
-1-
diligence to perform their respective obligations under this Agreement. Both parties agree to act in good faith
to execute all instruments, prepare all documents and take all actions as may be reasonably necessary to
carry out the purposes of this Agreement. Unless hereafter specified, neither party shall be responsible for
the service of the other.
1.8 Additional Services. City shall have the right at any time during the performance of the
services, without invalidating this Agreement, to order extra work beyond that specified in the Scope of
Services or make changes by altering, adding to or deducting from said work. No such extra work may be
undertaken unless a written order is first given by the Contract Officer to the Contractor, incorporating therein
any adjustment in(i)the Contract Sum,and/or(ii)the time to perform this Agreement,which said adjustments
are subject to the written approval of the Contractor. Any increase in compensation of up to five percent(5%)
of the Contract Sum or$25,000;whichever is less, or in the time to perform of up to one hundred eighty(180)
days maybe approved by the Contract Officer. Any greater increases,taken either separately or cumulatively
must be approved by the City Council. It is expressly understood by Contractor that the provisions of this
Section shall not apply to services specifically set forth in the Scope of Services or reasonably contemplated
therein. Contractor hereby acknowledges that it accepts the risk that the services to be provided pursuant
to the Scope of Services may be more costly or time consuming than Contractor anticipates and that
Contractor shall not be entitled to additional compensation therefore.
1.9 Special Requirements. Additional terms and conditions of this Agreement,
if any, which are made a part hereof are set forth in the "Special Requirements' attached hereto as Exhibit
"B"and incorporated herein by this reference. In the event of a conflict between the provisions of Exhibit"B"
and any other provisions of this Agreement, the provisions in Exhibit"B" shall govern.
2.0 COMPENSATION
2.1 Contract Sum. For the services rendered pursuant to this Agreement, the
Contractor shall be compensated in accordance with the "Schedule of Compensation" attached hereto as
Exhibit"C"and incorporated herein bythis reference, but not exceeding the contract amount of Twenty-Four
Thousand Eight Hundred Dollars($24,800.00), plus incidental expenses(costs for reproduction, postage,
mileage, fax, and telephone charges) of Two Hundred Dollars ($200.00) for a total maximum contract
amount not to exceed Twenty-Five Thousand Dollars ($25,000.00) (herein "Contract Sum"), except as
provided in Section 1.8. The method of compensation may include(i)a lump sum payment upon completion,
(ii) payment in accordance with the percentage of completion of the services, (iii) payment for time and
materials based upon the Contractor's rates as specified in the Schedule of Compensation,but not exceeding
the Contract Sum or (iv) such other methods as may be specified in the Schedule of Compensation.
Compensation may include reimbursement for actual and necessary expenditures for reproduction costs,
telephone expense, transportation expense approved by the Contract Officer in advance, and no other
expenses and only if specified in the Schedule of Compensation. The Contract Sum shall include the
attendance of Contractor at all project meetings reasonably deemed necessary by the City; Contractor shall
not be entitled to any additional compensation for attending said meetings.
2.2 Method of Payment. Unless some other method of payment is specified in
the Schedule of Compensation, in any month in which Contractor wishes to receive payment, no later than
the first(1'1)working day of such month, Contractor shall submit to the City in the form approved by the City's
Director of Finance, an invoice for services rendered prior to the date of the invoice. Except as provided in
Section 7.3, City shall pay Contractor for all expenses stated thereon which are approved by City pursuant
to this Agreement no later than the last working day of the month.
3.0 PERFORMANCE SCHEDULE
3.1 Time of Essence. Time is of the essence in the performance of this Agreement.
3.2 Schedule of Performance. Contractor shall commence the services pursuant to this
Agreement upon receipt of a written notice to proceed and shall perform all services within the time period(s)
established in the"Schedule of Performance"attached hereto as Exhibit"D", if any, and incorporated herein
by this reference. When requested by the Contractor, extensions to the time period(s) specified in the
Schedule of Performance may be approved in writing by the Contract Officer but not exceeding one hundred
-2-
eighty(180)days cumulatively.
3.3 Force Majeure. The time period(s) specified in the Schedule of Performance for
performance of the services rendered pursuant to this Agreement shall be extended because of any delays
due to unforeseeable causes beyond the control and without the fault or negligence of the Contractor,
including, but not restricted to, acts of God or of the public enemy, unusually severe weather, fires,
earthquakes, floods, epidemics, quarantine restrictions, riots, strikes, freight embargoes, wars, litigation,
and/or acts of any governmental agency, including the City, if the Contractor shall within ten (10)days of the
commencement of such delay notify the Contract Officer in writing of the causes of the delay. The Contract
Officer shall ascertain the facts and the extent of delay, and extend the time for performing the services for
the period of the enforced delay when and if in the judgment of the Contract Officer such delay is justified.
The Contract Officer's determination shall be final and conclusive upon the parties to this Agreement. In no
event shall Contractor be entitled to recover damages against the Cityfor any delay in the performance of this
Agreement, however caused, Contractor's sole remedy being extension of the Agreement pursuant to this
Section.
3.4 Term. Unless earlier terminated in accordance with Section 7.8 of this Agreement,
this Agreement shall continue in full force and effect until completion of the services but not exceeding one
(1)year from the date hereof, except as otherwise provided in the Schedule of Performance (Exhibit"D").
4.0 COORDINATION OF WORK
4.1 Representative of Contractor. The following principals of Contractor are hereby
designated as being the principals and representatives of Contractor authorized to act in its behalf with respect
to the work specified herein and make all decisions in connection therewith:
Paul Thompson, Director of Assessment/Special Tax Services
It is expressly understood that the experience, knowledge, capability and reputation of the foregoing
principals were a substantial inducement for City to enter into this Agreement. Therefore, the foregoing
principals shall be responsible during the term of this Agreement for directing all activities of Contractor and
devoting sufficient time to personally supervise the services hereunder. For purposes of this Agreement,the
foregoing principals may not be replaced nor may their responsibilities be substantially reduced by Contractor
without the express written approval of City.
4.2 Contract Officer. The Contract Officer shall be such person as may be designated
by the City Manager of City. It shall be the Contractor's responsibility to assure that the Contract Officer is
kept informed of the progress of the performance of the services and the Contractor shall refer any decisions
which must be made by City to the Contract Officer. Unless otherwise specified herein, any approval of City
required hereunder shall mean the approval of the Contract Officer. The Contract Officer shall have authority
to sign all documents on behalf of the City required hereunder to carry out the terms of this Agreement.
4.3 Prohibition Against Subcontractina or Assignment. The experience, knowledge,
capability and reputation of Contractor, its principals and employees were a substantial inducement for the
City to enter into this Agreement. Therefore, Contractor shall not contract with any other entity to perform in
whole or in part the services required hereunder without the express written approval of the City. In addition,
neither this Agreement nor any interest herein may be transferred, assigned, conveyed, hypothecated or
encumbered voluntarily or by operation of law, whether for the benefit of creditors or otherwise, without the
prior written approval of City. Transfers restricted hereunder shall include the transfer to any person or group
of persons acting in concert of more than twenty five percent(25%)of the present ownership and/or control
of Contractor, taking all transfers into account on a cumulative basis. In the event of any such unapproved
transfer, including any bankruptcy proceeding, this Agreement shall be void. No approved transfer shall
release the Contractor or any surety of Contractor of any liability hereunder without the express consent of
City.
The City's policy is to encourage the awarding of subcontracts to persons or entities with offices
located within the jurisdictional boundaries of the City of Palm Springs and, if none are available, to persons
or entities with offices located in the Coachella Valley("Local Subcontractors"). Contractor hereby agrees to
-3-
use good faith efforts to award subcontracts to Local Subcontractors, if Local Subcontractors are qualified to
perform the work required. In requesting for the City to consent to a subcontract with a person or entity that
is not a Local Subcontractor,the Contractor shall submit evidence to the Citythat such good faith efforts have
been made or that no Local Subcontractors are qualified to perform the work. Said good faith efforts may be
evidenced by placing advertisements inviting proposals or by sending requests for proposals to selected Local
Subcontractors. The City may consider Contractor's efforts in determining whether it will consent to a
particular subcontractor. Contractor shall keep evidence of such good faith efforts and copies of all contracts
and subcontracts hereunder for the period specified in Section 6.2.
4.4 Independent Contractor. Neither the City nor any of its employees shall have any
control over the manner, mode or means by which Contractor, its agents or employees, perform the services
required herein, except as otherwise set forth herein. City shall have no voice in the selection, discharge,
supervision or control of Contractor's employees,servants,representatives or agents,or infixing their number,
compensation or hours of service. Contractor shall perform all services required herein as an independent
contractor of City and shall remain at all times as to City a wholly independent contractor with only such
obligations as are consistent with that role. Contractor shall not at any time or in any manner represent that
it or any of its agents or employees are agents or employees of City. City shall not in anyway or for any
purpose become or be deemed to be a partner of Contractor in its business or otherwise or a joint venturer
or a member of any joint enterprise with Contractor.
5.0 INSURANCE, INDEMNIFICATION AND BONDS
5.1 Insurance. The Contractor shall procure and maintain, at its sole cost and
expense, in a form and content satisfactory to City, during the entire term of this Agreement including any
extension thereof, the following policies of insurance:
(a) Commercial General LiabilitvInsurance. A policy of commercial general liability insurance
written on a per occurrence basis with a combined single limit of at least$1,000,000 bodily injury and property
damage including coverages for contractual liability, personal injury, independent contractors, broad form
property dam age,products and completed operations.The Commercial General Liability Policy shall name the
City of Palm Springs as additional insured in accordance with standard ISO additional insured endorsement
form CG2010(1185)or equivalent language.
(b) Worker's Compensation Insurance. A policy of worker's compensation insurance in an
amount which fully complies with the statutory requirements of the State of California and which includes
$1,000,000 employer's liability.
(c)Business Automobile Insurance.A policy of business automobile liability insurance written
on a per occurrence basis with a single limit liability in the amount of$1,000,000 bodily and property damage.
Said policy shall include coverage for owned, non-owned, leased and hired cars.
(d)Additional Insurance.Additional limits and coverages,which may include professional liability
insurance, will be specified in Exhibit"B".
All of the above policies of insurance shall be primary insurance and issued bycompanies whose rating
satisfies the requirements in Section 5.4 of this agreement. The insurer shall waive all rights of subrogation and
contribution it may have against the City, its officers, employees and agents, and their respective insurers. In
the event any of said policies of insurance are canceled, the Contractor shall, prior to the cancellation date,
submit new evidence of insurance in conformance with this Section 5.1 to the Contract Officer. No work or
services under this Agreement shall commence until the Contractor has provided the City with Certificates of
Insurance,endorsements or appropriate insurance binders evidencing the above insurance coverages and said
Certificates of Insurance, endorsements, or binders are approved by the City.
The contractor agrees that the provisions of this Section 5.1 shall not be construed as limiting in any
way the extent to which the Contractor may be held responsible for the payment of damages to any persons or
property resulting from the Contractor's activities or the activities of any person or person for which the
Contractor is otherwise responsible.
-4-
In the event the Contractor subcontracts any portion of the work in compliance with Section 4.3 of this
Agreement the contract between the Contractor and such subcontractor shall require the subcontractor to
maintain the same polices of insurance that the Contractor is required to maintain pursuant to this Section.
5.2 Indemnification. Contractor agrees to indemnify the City, its officers, agents and
employees against, and will hold and save them, and each of them, harmless from any and all actions, suits,
claims, damages to persons or property, losses, costs, penalties, obligations, errors, omissions or liabilities,
(herein "claims or liabilities")that may be asserted or claimed by any person, firm or entity arising out of or in
connection with the negligent performance of the work, operations or activities of Contractor, its agents,
employees, subcontractors, or invitees, provided for herein, or arising from the negligent acts or omissions of
Contractor hereunder, or arising from Contractor's negligent performance of or failure to perform any term,
provision, covenant or condition of this Agreement, whether or not there is concurrent passive or active
negligence on the part of the City,its officers,agents or employees but excluding such claims or liabilities arising
from the sole negligence or willful misconduct of the City, its officers, agents or employees, who are directly
responsible to the City, and in connection therewith:
(a) Contractor will defend any action or actions filed in connection with any of said claims
or liabilities and will pay all costs and expenses, including legal costs and attorneys'fees incurred in connection
therewith;
(b) Contractorwill promptly payanyjudgment rendered againstthe City,its officers,agents
or employees for any such claims or liabilities arising out of or in connection with the negligent performance of
or failure to perform such work,operations or activities of Contractor hereunder;and Contractor agrees to save
and hold the City, its officers, agents, and employees harmless therefrom;
(c) In the event the City, its officers, agents or employees are made a party to any action
or proceeding filed or prosecuted against Contractor for such damages or other claims arising out of or in
connection with the negligent performance of or failure to perform the work,operation or activities of Contractor
hereunder, Contractor agrees to pay to the City, its officers, agents or employees, any and all costs and
expenses incurred by the City, its officers, agents or employees in such action or proceeding, including but not
limited to, legal costs and attorneys'fees.
5.3 Performance Bond. Concurrently with execution of this Agreement, Contractor shall
deliver to City a performance bond in the sum of the amount of this Agreement, in the form provided by the City,
which secures the faithful performance of this Agreement, unless such requirement is waived by the Contract
Officer. The bond shall contain the original, notarized signature of an authorized officer of the surety and affixed
thereto shall be a certified and current copy of his power of attorney. The bond shall be unconditional and
remain in force during the entire term of the Agreement and shall be null and void only if the Contractor promptly
and faithfully performs all terms and conditions of this Agreement. (Not applicable).
5.4 Sufficiency of Insurer or Surety. Insurance or bonds required by this Agreement shall
be satisfactory only if issued by companies qualified to do business in California, rated"A"or better in the most
recent edition of Best's Key Rating Guide or in the Federal Register, unless such requirements are waived by
the City Manager or designee of the City Manager due to unique circumstances. In the event the City Manager
determines that the work or services to be performed under this Agreement create an increased or decreased
risk of loss to the City, the Contractor agrees that the minimum limits of the insurance policies and the
performance bond required by this Section 5 may be changed accordingly upon receipt of written notice from
the City Manager or designee; provided that the Contractor shall have the right to appeal a determination of
increased coverage by the City Manager to the City Council of City within ten(10)days of receipt of notice from
the City Manager.
6.0 REPORTS AND RECORDS
6.1 Reports. Contractor shall periodically prepare and submit to the Contract Officer such
reports concerning the performance of the services required by this Agreement as the Contract Officer shall
require. Contractor hereby acknowledges that the City is greatly concerned about the cost of work and services
to be performed pursuant to this Agreement. For this reason, Contractor agrees that if Contractor becomes
aware of any facts, circumstances, techniques, or events that may or will materially increase or decrease the
-5-
cost of the work or services contemplated herein or, if Contractor is providing design services, the cost of the
project being designed, Contractor shall promptly notify the Contract Officer of said fact, circumstance,
technique or event and the estimated increased or decreased cost related thereto and, if Contractor is providing
design services, the estimated increased or decreased cost estimate for the project being designed.
6.2 Records. Contractor shall keep, and require subcontractors to keep, such books and
records as shall be necessary to perform the services required by this Agreement and enable the Contract
Officer to evaluate the performance of such services. The Contract Officer shall have full and free access to
such books and records at all times during normal business hours of City, including the right to inspect, copy,
audit and make records and transcripts from such records. Such records shall be maintained for a period of
three(3)years following completion of the services hereunder, and the City shall have access to such records
in the event any audit is required
6.3 Ownership of Documents. All drawings, specifications, reports, records, documents
and other materials prepared by Contractor, its employees, subcontractors and agents in the performance of
this Agreement shall be the property of City and shall be delivered to City upon request of the Contract Officer
or upon the termination of this Agreement. Contractor shall have no claim for further employment or additional
compensation as a result of the exercise by City of its full rights of ownership of the documents and materials
hereunder. Any use of such completed documents for other projects and/or use of uncompleted documents
without specific written authorization by the Contractor will be at the City's sole risk and without liability to
Contractor, and the City shall indemnify the Contractor for all damages resulting therefrom. Contractor may
retain copies of such documents for its own use. Contractor shall have an unrestricted right to use the concepts
embodied therein. All subcontractors shall provide for assignment to City any documents or materials prepared
by them, and in the event Contractor fails to secure such assignment, Contractor shall indemnify City for all
damages resulting therefrom.
6.4 Release of Documents. The drawings,specifications,reports,records,documents and
other materials prepared by Contractor in the performance of services under this Agreement shall not be
released publicly without the prior written approval of the Contract Officer.
7.0 ENFORCEMENT OF AGREEMENT
7.1 California Law. This Agreement shall be construed and interpreted both as to validity
and to performance of the parties in accordance with the laws of the State of California. Legal actions
concerning any dispute, claim or matter arising out of or in relation to this Agreement shall be instituted in the
Superior Court of the County of Riverside, State of California, or any other appropriate court in such county.
Contractor covenants and agrees to submit to the personal jurisdiction of such court in the event of such action.
7.2 Disputes. In the event of any dispute arising under this Agreement, the injured party
shall notifythe injuring party, in writing, of its contentions by submitting a claim therefor. The injured party shall
continue performing its obligations hereunder so long as the injuring party commences to cure such default
within ten (10)days of service of such notice and completes the cure of such default within forty-five(45)days
after service of the notice, or such longer period as may be permitted by the injured party; provided that if the
default is an immediate danger to the health, safety and general welfare, such immediate action may be
necessary. Compliance with the provisions of this Section shall be a condition precedent to termination of this
Agreement for cause and to any legal action, and such compliance shall not be a waiver of any party's right to
take legal action in the event that the dispute is not cured, provided that nothing herein shall limit City's or the
Contractor's right to terminate this Agreement without cause pursuant to Section 7.8.
7.3 Retention of Funds. Contractor hereby authorizes City to deduct from any amount
payable to Contractor(whether or not arising out of this Agreement)(1)any amounts the payment of which may
be in dispute hereunder orwhich are necessary to compensate Cityfor any losses,costs,liabilities,or damages
suffered by City, and (ii)all amounts for which City may be liable to third parties, by reason of Contractor's acts
or omissions in performing or failing to perform Contractor's obligation under this Agreement. In the event that
any claim is made by a third party,the amount or validity of which is disputed by Contractor,or any indebtedness
shall exist which shall appear to be the basis for a claim of lien,City maywithhold from any payment due,without
liability for interest because of such withholding, an amount sufficient to cover such claim. The failure of City
to exercise such right to deduct or to withhold shall not, however, affect the obligations of the Contractor to
-6-
insure, indemnify, and protect City as elsewhere provided herein.
7.4 Waiver. No delay or omission in the exercise of any right or remedy by a non-defaulting
party on any default shall impair such right or remedy or be construed as a waiver. A party's consent to or
approval of any act by the other party requiring the party's consent or approval shall not be deemed to waive
or render unnecessary the other party's consent to or approval of any subsequent act. Any waiver by either
party of any default must be in writing and shall not be a waiver of any other default concerning the same or any
other provision of this Agreement.
7.5 Rights and Remedies are Cumulative. Except with respect to rights and remedies
expressly declared to be exclusive in this Agreement,the rights and remedies of the parties are cumulative and
the exercise by either party of one or more of such rights or remedies shall not preclude the exercise by it, at
the same or different times, of any other rights or remedies for the same default or any other default bythe other
party.
7.6 Legal Action. In addition to any other rights or remedies, either party may take legal
action, in law or in equity, to cure,correct or remedy any default, to recover damages for any default,to compel
specific performance of this Agreement,to obtain declaratory or injunctive relief, or to obtain any other remedy
consistent with the purposes of this Agreement.
7.7 Liquidated Damages. Since the determination of actual damages for any delay in
performance of this Agreement would be extremely difficult or impractical to determine in the event of a breach
of this Agreement, the Contractor and its sureties shall be liable for and shall pay to the City the sum of Zero
Dollars($0.00)as liquidated damages for each working day of delay in the performance of any service required
hereunder, as specified in the Schedule of Performance(Exhibit"D"). The City may withhold from any monies
payable on account of services performed by the Contractor any accrued liquidated damages.
7.8 Termination Prior to Expiration Of Term. This Section shall govern any termination of
this Agreement except as specifically provided in the following Section for termination for cause. The City
reserves the right to terminate this Agreement at any time, with or without cause, upon thirty(30)days written
notice to Contractor, except that where termination is due to the fault of the Contractor,the period of notice may
be such shorter time as may be determined by the Contract Officer. In addition, the Contractor reserves the
right to terminate this Agreement at any time,with or without cause, upon sixty(60)days written notice to City,
except that where termination is due to the fault of the City, the period of notice may be such shorter time as
the Contractor may determine. Upon receipt of any notice of termination, Contractor shall immediately cease
all services hereunder except as may be specifically approved by the Contract Officer. Except where the
Contractor has initiated termination, the Contractor shall be entitled to compensation for all services rendered
prior to the effective date of the notice of termination and for any services authorized by the Contract Officer
thereafter in accordance with the Schedule of Compensation or as may be approved by the Contract Officer,
except as provided in Section 7.3. In the event the Contractor has initiated termination, the Contractor shall be
entitled to compensation only for the reasonable value of the work product actually produced hereunder. In the
event of termination without cause pursuant to this Section, the terminating party need not provide the non-
terminating party with the opportunity to cure pursuant to Section 7.2.
7.9 Termination for Default of Contractor. If termination is due to the failure of the
Contractor to fulfill its obligations under this Agreement,City may,after compliance with the provisions of Section
7.2,takeover the work and prosecute the same to completion by contractor otherwise,and the Contractor shall
be liable to the extent that the total cost for completion of the services required hereunder exceeds the
compensation herein stipulated (provided that the City shall use reasonable efforts to mitigate such damages),
and City may withhold any payments to the Contractor for the purpose of set-off or partial payment of the
amounts owed the City as previously stated.
7.10 Attorneys' Fees. If either party to this Agreement is required to initiate or defend or
made a party to any action or proceeding in anyway connected with this Agreement,the prevailing party in such
action or proceeding, in addition to any other relief which may be granted, whether legal or equitable, shall be
entitled to reasonable attorney's fees. Attorney's fees shall include attorney's fees on anyappeal,and in addition
a party entitled to attorney's fees shall be entitled to all other reasonable costs for investigating such action,
taking depositions and discovery and all other necessary costs the court allows which are incurred in such
-7-
litigation. All such fees shall be deemed to have accrued on commencement of such action and shall be
enforceable whether or not such action is prosecuted to judgment.
8.0 CITY OFFICERS AND EMPLOYEES: NON-DISCRIMINATION
8.1 Non-liability of City Officers and Emoloyees. No officer or employee of the City shall
be personally liable to the Contractor, or any successor in interest, in the event of any default or breach by the
City or for any amount which may become due to the Contractor or to its successor, or for breach of any
obligation of the terms of this Agreement.
8.2 Conflict of Interest. No officer or employee of the City shall have any financial interest,
direct or indirect, in this Agreement nor shall any such officer or employee participate in any decision relating
to the Agreement which effects his financial interest or the financial interest of any corporation, partnership or
association in which he is, directly or indirectly, interested, in violation of any State statute or regulation. The
Contractor warrants that it has not paid or given and will not pay or give any third party any money or other
consideration for obtaining this Agreement.
8.3 CovenantAaainstDiscrimination. Contractor covenants that,by and for itself,its heirs,
executors,assigns,and all persons claiming under or through them,that there shall be no discrimination against
or segregation of, any person or group of persons on account of race,color, creed, religion, sex, marital status,
national origin, or ancestry in the performance of this Agreement. Contractor shall take affirmative action to
insure that applicants are employed and that employees are treated during employment without regard to their
race, color, creed, religion, sex, marital status, national origin, or ancestry.
9.0 MISCELLANEOUS PROVISIONS
9.1 Notice. Anynotice,demand,request,document,consent,approval,orcommunication
either party desires or is required to give to the other party or any other person shall be in writing and either
served personally or sent by prepaid, first-class mail, in the case of the City, to the City Manager and to the
attention of the Contract Officer, CITY OF PALM SPRINGS, P.O. Box 2743, Palm Springs, California 92263.
In the case of the Contractor, it should be addressed to the person at the address designated on the execution
page of this Agreement. Either party may change its address by notifying the other party of the change of
address in writing. Notice shall be deemed communicated at the time personally delivered or in seventy-two
(72) hours from the time of mailing if mailed as provided in this Section.
9.2 Interpretation. The terms of this Agreement shall be construed in accordance with the
meaning of the language used and shall not be construed for or against either party by reason of the authorship
of this Agreement or any other rule of construction which might otherwise apply.
9.3 Integration:Amendment. It is understood that there are no oral agreements between
the parties hereto affecting this Agreement and this Agreement supersedes and cancels any and all previous
negotiations, arrangements, agreements and understandings, if any, between the parties, and none shall be
used to interpret this Agreement. This Agreement may be amended at any time by the mutual consent of the
parties by an instrument in writing.
9.4 Severability. In the event that any one or more of the phrases, sentences, clauses,
paragraphs, or sections contained in this Agreement shall be declared invalid or unenforceable by a valid
judgment or decree of a court of competent jurisdiction, such invalidity or unenforceability shall not affect any
of the remaining phrases, sentences, clauses, paragraphs, or sections of this Agreement which are hereby
declared as severable and shall be interpreted to carry out the intent of the parties hereunder unless the invalid
provision is so material that its invalidity deprives either party of the basic benefit of their bargain or renders this
Agreement meaningless.
9.5 Corporate Authority. The persons executing this Agreement on behalf of the parties
hereto warrant that (i) such party is duly organized and existing, (ii) they are duly authorized to execute and
deliver this Agreement on behalf of said party,(iii)by so executing this Agreement,such party is formally bound
to the provisions of this Agreement, and (iv)the entering into this Agreement does not violate any provision of
any other Agreement to which said party is bound.
-8-
IN WITNESS WHEREOF,the parties have executed and entered into this Agreement as of the date first written
above.
CITY OF PALM SPRINGS,
a municipal corporation
ATTE
y Clerk City Manager
111FRMHP� Amount �dSvv0 �.
ZT'H''(')Vx'o L ��I H l IUI�^a�e�� �
"big
Clad l"lin iii(7,��
I��
A b�AA' Ebb Associat '�4 /
(Check one: Individual_ Par`triers-hip'.—=Corporation)
41
By: I/ )-,�v � 1, C�L l By:
Signature(notarized) Signature(notarized)
Name: Matthew E. Webb Name: A. Hubert Webb
Title: {{President Title: C.E.O.
State of P-MkTv State of ��Rautt�9r
County of 4��i�r cvtir,�c Iss County oft �u:-nsw]C Iss
On___before me,Yll�Rtr Nta<-.Z iu��vG On S� � OV- before me, �� Vwj i° �[J Rc� �v•� V\j
'�t� _ �I 4 f� g
personally appeared @ g tI mi�-'w �. �l 6z, ' personally appeared f;\ - d-� Mbttiti `'U uh e'
personally known to me (or—proved_to_me-en-the-basis-ef personally known to me (or—proved-to—me-on-the-basis-o.[
satfsfaetoryevidersce)to be the person(s)whose name(s)is/are satisfactory-evidence)to be the person(s)whose name(s)is/are
subscribed to the within instrumentand acknowledged to me that subscribed to the within instrument and acknowledged to me that
he/shefthey executed the same in his/herftheir authorized he/she/they executed the same in his/herltheir authorized
capacity(ies), and that by his/her/their signature(s) on the capacity(ies), and that by his/herltheir signature(s•) on the
instrument the person(s)-or the entity upon behalf of which the instrument-the person('s), or the entity upon behalf of which the
person(s-)-actsrd, executed the instrument. person(syacted, gxecuted-th instrument.
WITNESS my hand and offic al seal. WITNESS rr`y/hand and officia seal.
a
v
�_
Notary Signature: ����,�„�% ��,�t�:� Notary Signature: 1a,.,. r✓u� _ ��---�
Notary Seal: � Notary Seal:
Et
NftfiRt�F Rf7 a?h9r"
I RIGA 'r EITV dr
Cemrrn Lion 613SM3
f'
rSatn:rv,�Publicer�li6�'amis > y,t,' t'crnm�s ir,nz 9Jar rz3 �.
fr''lwir.:ide Ouunty �1 i '7 r
�'S ! • Rnrarai s,.C"nentj^
r u V',fiy C.rpmm.F'. atrEim Vyhay31 2t?t," I:)1 iti2,i
r p,�^ l48C. rerC �um+ro� y* i2E':fwr
-
-9-
EXHIBIT "A"
SCOPE OF SERVICES
The intent of this contract is to provide Assessment Engineer services for the creation of the City of Palm
Springs Assessment District No. 164 ("Mountain Gate II", Tract 32028) and shall provide all services and
resources necessary therefor. Contractor shall provide"Preliminary' and "Final" Engineers Reports to City to
assist in the Resolution of Intention and Municipal Bond Sale. The following scope of services shall be provided:
I. Initial Assessment Engineering
A. Initial Scoping Meeting - Contractor shall meet with City staff and members of the financing team to
establish the assessment district schedule of events, procedural and financial considerations, discuss
the proposed improvements, eligibility of those improvements and any limitations on the funding of
those improvements (i.e. public utilities). Contractor shall discuss and identify the boundaries of the
proposed assessment district, identify the scope of responsibilities and develop a program for public
notification and involvement.
B. Research Property Information-Contractor shall obtain the latest assessor maps and equalized tax roll
on computer tape from the Riverside County Assessor's Office for all parcels within the proposed
assessment district. In addition, obtain information on existing liens and assessments in order to
determine overlapping debt.
C. Computer Database Preparation-Contractor shall prepare a database showing the assessor's parcel
numbers of each parcel within the proposed assessment district,the land use code,the area,the status
of development and assessed values. From this database, a mailing list shall be prepared.
D. Prepare Assessment District Study - Using information gathered for the database preparation,
preliminary cost estimates for the project shall be prepared. The project cost shall be based on the
preliminary engineering design,and will result in an estimate for the total amount to bond forthe project.
The total amount to bond for the project shall include construction, any acquisition costs, construction
contingencies, incidental expenses including assessment engineering costs, bond counsel costs,
construction surveying and staking,plan checking,construction inspection,design engineering,and any
other costs eligible and incidental to the construction of the project.Also included will be any financing
costs associated with the bond discount.Consultation shall occurwith the bond counsel and underwriter
for recommendations on the assessment district from a legal and financial perspective.
E. Prepare Boundary Map-A boundary map shall be prepared for the assessment district depicting the
boundary that includes all parcels that benefit from the proposed improvements.
II. Assessment District Formation
A. Coordination of the Adoption of Resolutions Initiating the Proceedings-Coordination with Citystaff shall
occur to implement the following actions by the City Council after Bond Counsel prepared the necessary
Resolution. These will include the following: declaration of intent to construct the improvements;
appointment of the engineer of work, Bond Counsel, Underwriter,and any other necessary consultants
for the formation of the district; authorize Assessment Engineer (Contractor) to prepare Engineer's
Report.
B. Prepare Preliminary Engineer's Report - A preliminary Engineer's Report shall be prepared which
contains all items as required by code, including a description of the proposed improvements, and an
engineer's estimate of the construction costs and incidental expenses. These costs will be based on
the preliminary cost information provided by the City and developer/land owner. Also included will be
a narrative description of the spread methodology including assumptions behind the determination of
benefits, the assessment roll including the assessor's parcel number, owner's name, and total
assessment amount, occurring after the confirmation of the assessment district.
-10-
EXHIBIT "A"
SCOPE OF SERVICES
C. Coordinate City Review Process-The Assessment Engineer(Contractor)shall submit the Preliminary
Engineer's Report to the City Clerk prior to the adoption of the Resolution of Intention(ROI)and conduct
workshop meetings with City staff and developer/land owner to discuss possible report revisions after
staff review.
D. Coordination of the Adoption of the Resolution of Intention -The Assessment Engineer (Contractor)
shall coordinate the approval of the Preliminary Engineer's Report as submitted or with any
recommended staff modifications and help establish a time and place for the Public Meeting and Public
Hearing to be conducted by the City Council as required by code.
E. Coordination of Disclosure Period - After the City Council adopts the Resolution of Intention, the
Assessment Engineer (Contractor) shall prepare and mail ballots pursuant to Proposition 218 to all
property owners within the proposed assessment district byfirst class mail. The ballots will contain the
assessor's parcel number,the owner's name, mailing address,site address,breakdown of assessment
by type of improvement, proposed assessment(lien amount), and the explanation of benefit required
by Proposition 218. The City shall be provided with a bound copy of all required notices to be mailed
and assistance shall be provided to the City for the correction of any wrong addresses and changed
owners to maximize the disclosure process. The Assessment Engineer (Contractor) shall also
coordinate with City staff to arrange for the publication of the Resolution of Intention in the local
newspaper. After the Resolution of Intention is adopted, the Assessment Engineer(Contractor) shall
record the boundary map with the Riverside County Recorder. The Assessment Engineer(Contractor)
shall prepare and submit the final Engineer's Report to the City with any revisions as directed by the City
Council.
F. Participate in Public Hearings-The Assessment Engineer(Contractor)shall attend all Public Hearings
and shall be prepared to give a presentation on the contents of the Engineer's Report describing the
proposed improvements,explaining the assessment spread methodology and answering any questions
asked by the City Council or public at large. At the second Public Hearing, the Assessment Engineer
(Contractor) shall also tabulate all oral and written protests and report the percentage of protests
received by the City Council. The Assessment Engineer(Contractor)shall also address the inclusion
of any amendments ordered by the City Council as a result of the Public Hearing.
III. Post Formation Proceedings
A. Record Assessment Diagrams - The Assessment Engineer (Contractor) shall coordinate the
recordation of the Assessment Diagrams,Assessment Roll,and Notice of Assessment with the County
Recorder as prescribed by code.
B. Mail Pre-Payment Notices-The Assessment Engineer(Contractor)shall mail the Pre-Payment Notices
to the property owners with the pre-payment terms and amounts stipulated as part of the 30 day cash
collection period. The Assessment Engineer (Contractor) shall also be available to answer any
questions from property owners during the 30 day cash collection period. The Assessment Engineer
(Contractor) shall also be available to answer any questions from property owners during the 30 day
cash collection period.The Assessment Engineer(Contractor)shall also keep a log of all pre-payments
received by the City,with the City providing that information to the Assessment Engineer(Contractor).
At the end of the 30 day cash collection period, a paid/unpaid list shall be prepared by the Assessment
Engineer(Contractor) and submitted to the City Treasurer.
C. Review Preliminary Official Statement - The Assessment Engineer (Contractor) shall assist in the
preparation and review of the Official Statement Document prepared by the underwriter for accuracy
of content as it relates to the assessment district properties, spread methodology, and as it relates to
the total amount of bond and the engineer's estimate of cost and expenses included in the final
Engineer's Report.
-11-
EXHIBIT"B"
SPECIAL REQUIREMENTS
Section 5.1(d),a policyof Professional Errors and Omissions insurance in the amount of$1,000,000 is required.
Section 5.3, Performance Bond, is waived.
-12-
EXHIBIT"C
SCHEDULE OF COMPENSATION
Full compensation for required services included in this contract shall be made on a time and material basis,
in accordance with the following hourly Fee Schedule as shown on Exhibit"C-1", for an amount not to exceed
$24,800.00. Contractor shall submit invoices, no more than once monthly, providing the City with a summary
of services provided, personnel associated with the services provided, the associated hourly compensation in
accordance with the attached Fee Schedule, and the total invoice amount.
In addition to compensation for required services, Contractor shall be entitled to reimbursement for incidental
expenses at the Contractor's cost plus 15%for a total reimbursable amount not to exceed $200.00. Invoices
for reimbursement of incidental expenses shall included copies of receipts or other documentation evidencing
payment of incidental expenses related to services required by this contract.
Compensation for services and reimbursable expenses shall not exceed the total contract amount of
$25,000.00.
-13-
EXHIBIT"C-1"
SCHEDULE OF COMPENSATION
FEE SCHEDULE
RATES
CLASSIFICATION 521912,E
Engineering-Srrvi 9
PrincipalEngineer................................................................... ................................................ 142,00
Senior Engineer ..........................._...............,..,....................................................................... 130,00
ProjectManager....................................................................................................................... 115."
Assistant Project Manager......:...................................--........................................................... $8.00
Engineer.. .................«.......................... .................«.............................................. 103.00
AssociateEngineer...................................................................................................................... 66.00
SeniorDesigner.......................................................................................................................... 82,00
Designer.................................................................................................................................... 75;00
Senior CARD Operator.......................................... ««...... ..«.....,.«............... 65.00
CARDOperator—...................... ......................................................................................... 5100
Fnvironulental Somices
Principal navirenmental Specialist«.««....««......,............................«...................................... •120.00
Senior Envircmunco l Specialist......................«_.,......................«........««.............................. 106.00
FAVironmenral Specialist......................................_.................................................................... 94.00
Associate EnviroomenW Spedialst..............._.......................................................................... $2.00
EnvirottmtslCoordiilatcr__..................................................................................................... 66.00
Asseasa=YSaecial Tax Servccs „
PriraelAwociate.............................................................................. .................................... 134.00
S6ior'Araoeiatc........................._.................._............._..................................._...._........... 118.00
Associate ............................. .. 100.00
Analyst........,.... . ............................................................................... .......................................... 84.W
AmismntAnalyar_................«..........,.............................,.............................................,............. 75.00
symo amsetion Services
3-Man Survey Patty and F.quipmcet..................................................._................................... 211A0
2•Mm Survey,Pattyand Equipment .................................................................................... 185,00
I-Man Survey Party and Equipment ..................................................................................... 113.00
ConstructionManager...................................................................... ........................................ 125,00
Inspector..........................................._.........................................................................
............ 90.00
Survey/Inspector Vehicle.............................................................._...............,.........,...,,,..... .60 Per Mile
Stmaort Services
infotwatioaSystems Canwitant._:_._......._............................._..... ................ .................. 78.00
Project Coordinator.. ..... ...................................................................................:................... 7S.00
Administrative Ascictam ............................._........................................................................... 60,00
WordProcessor.........................................._............................................................................... 40.00
Clerical ...................................................................................................................................... 28.00
Antaide Services
r
Special Consultants and Purchased Services...................................................................... Cost Plus I S,/# .
Miscellaneous
IncidentalExpenses.....................................................................................................,.,........... Cost
Postageand Telaphone.. ............................................................... ' ..............................,.. Cost
Prints,Copies.Delivery Charges ................................................................................................ Cost
Travel&Subsistc.tee ................................................................................................................. cosp
Mileage...........................................................................................................................«......... .50 Per Mile
Computer Time...................................................................................«.................. « ...... 16.00IHour
015 License Fee..........«......_.................................................................................................... 30.00/Nour
Expert Witness Testimony and Preparation.................................................. 325.00/Hour
'AFlUtICE CHARGE afseeaol one&Tpvrarn ti-l;riN parmdbttt%We )s Wb..a a asyoWW days
laradac ofnspiee. AusckamcY tiro nnybeama rwaain�o;sr�toa mpa:aaaeraurrfwlasjs korodattof"novice.
-14-
EXHIBIT"D"
SCHEDULE OF PERFORMANCE
Contractor shall complete the"Preliminary Engineers Report"within 30 calendar days of Notice to Proceed from
City and prior to the submittal of the Resolution of Intention to City Council to form Assessment District No. 164.
(Resolution of Intention is estimated for September 15,2004), Contractor shall submit"Final Engineers Report"
to City upon completion of Final Reports from the Real Estate Appraiser and Market Absorption Analyst(no later
than October 20, 2004) and prior to Municipal Bond Sale tentatively scheduled for December 2004.
-15-
CONTRACT ABSTRACT
Contract
Company Name: Albert A. Webb & Associates
Company Contact: Merle Schulze
Summary of Services: Assessment Engineering Services for AD#164
Contract Price: $25,000
Funding Source: 160-4507-43200
Contract Term: One Year
Contract Administration
Lead Department: Public Works & Engineering
Contract Administrator: David Barakian/Marcus Fuller
Contract Approvals
Agency Approval Date: To be Approved by City Manager
n/a
Agreement Number: TBA by Clerk
Contract Compliance
Exhibits:
Signatures:
Insurance:
Bonds:
Contract prepared by:
Submitted on: By: