HomeMy WebLinkAbout6/18/2008 - STAFF REPORTS - 2.K. OF PALM S P� ti� y V a � City Council Staff Report CqC 1 FO RN�P DATE: June 18, 2008 CONSENT CALENDAR SUBJECT: CONSTRUCTION CHANGE ORDER NO. 3 TO AGREEMENT NO. 5401 WITH STEINY & COMPANY, INCORPORATED FOR THE PROTECTED PERMISSIVE PROJECT, CITY PROJECT NO. 05-07 FROM: David H. Ready, City Manager BY: Public Works & Engineering Department SUMMARY This Change Order allows for an increase to the contract with Steiny & Company, Inc., as a part of City Project No. 05-07 (Protected Permissive Signal Conversion Project). RECOMMENDATION: 1) 'APPROVE CONSTRUCTION CHANGE ORDER NO. 3 TO AGREEMENT NO. 5401 WITH STEINY & COMPANY, INCORPORATED, IN THE AMOUNT OF$407.19 FOR A TOTAL REVISED CONTRACT AMOUNT OF $335,974.33 FOR THE PROTECTIVE PERMISSIVE SIGNAL CONVERSION PROJECT, CITY PROJECT NO. 05-07." 2) Authorize the City Manager to execute all necessary documents. STAFF ANALYSIS: The Public Works Department oversees the maintenance and construction of the City's traffic signals. In an effort to reduce congestion and enhance public convenience, the Protective Permissive Signal Conversion Project was awarded to Steiny&Company and construction began on July 11, 2007. The project consisted of the removal of existing protected left turn arrow equipment from various intersections, and replacing them with new signal heads that would allow protected/permissive for left turning when traffic allowed_ These conversions took place at six intersections including Raman Rd. at Paseo Dorotea, Sunrise Way at Tachevah Dr., Sunrise Way at Amado Rd., East Palm Canyon at Cherokee Way, Ramon Rd. at Crossley Rd. and Tahquitz Canyon Way at Farrell Drive ITEM NOAoK* Change Order No. 1 in the amount of$19,512.14, was approved by the City Manager on June 29, 2007, and consisted of the relocation of existing signal equipment and environmental testing of new signal controllers. The relocation involved moving the existing signal equipment from the Southwest corner to the Southeast corner at the intersection of East Palm Canyon and Cherokee Way, and was performed at the request of VIP Motors in order to accommodate their future expansion. This relocation work totaled $16,234.64 and funds were provided by VIP motors in that amount. The remaining $3,377.60, was required to perform environmental/functional testing on new signal controller equipment. While performing the conversion at Tahquitz Canyon Way and Farrell Drive, it was discovered that the existing wiring and conductors were in a severely dilapidated condition. Change order No. 2 allowed for the rewiring of the signal and was to be completed on a time and materials basis in accordance with procedures established in the Standard Specifications. Staff was to monitor the actual time, labor, materials and equipment required to complete the work and modify Change Order No. 2 accordingly at completion. The actual cost to complete the re-wiring exceeded the estimate by $407.19. Change Order No. 3 allows for an adjustment to Change Order No. 2 in that amount FISCAL IMPACT: The recommended Construction Change Order No.3 amount is$407.19. Sufficient funds are available in Account No. 133-4298-50204 (Traffic Signal Flow Improvements). David J. Barakian Thomas J_ W son Director of Public Works/City Engineer Assistant City Manager Development Services David H. Ready City Manager Attachments: 1. Construction Change Order CITY OF PALM SPRINGS CONTRACT CHANGE ORDER To: Steiny&Company Date: May 12,2008 12907 E.Garvey Ave. Project No.: 05.07 Baldwin Park,CA 91706 Project: Signal Conversion Project Change Order No.: Three (3) Contract Purchase No.: 716668 Minute Order No.: 7978 Ag eemen t No.: 5401 CHANGES IN WORK/COST Increase to Contract Quantities New Items: Correction to Change Order No. 2 Lump Sum $407.19 CHANGE ORDER INCREASE AMOUNT $407.19 REASONS FOR CHANGES: Change Order No. 2 allowed for the complete re-wiring of the traffic signal at Farrell Drive and Tahquitz Canyon. The work was to be completed ou a time and materials basis and the cost was estimated at $20,500. The actual time and materials required to complete the work were monitored and the final price including all applicable mark ups was determined to be$20, 907.19. This change order,in the amount of $407.19,will compensate the Contractor for the difference between the estimated cost and the actual cost to complete the work- D. SOURCE OF FUNDS Account number 133-4298.50204 will be utilized_ 1 Summary of Costs Contract Time Original Contract Amount: $295,555.00 Original Completion Date: July 11,2007 This Change Order: $ 407.19 Days Added for this C.C.O.: --0--- Previous Change Order(s): $40,012.14 PreN ieus Days Added --as required— Revised Concract Amount: $335,974.33 Revised Completion Date: Jan. 11,2008 I have received a copy of this Change Ci ppr l: Order and the above AGREED PRICES $ ��� O are acceptable to Elie contractor. Subm tted by Datc Senior Public Works Inspector L By Approved by Datc 4 di Con ad or: Stemy&Company City-Erigineer Date s �� Approved by Dace City-Manager Arrested by Date City Clerk Distribution: Ori¢inal Executed Copies Conformed-File Copy Contractor (1) Engineering Pile (1) City Clerk (1) Senior Public Works Inspector (1) Finance (1) 2