HomeMy WebLinkAbout6/18/2008 - STAFF REPORTS - RA.2. OF PALM S A�'a F � u � CRA Staff Report A CgC1F0 RH�P DATE: June 18, 2008 SUBJECT: CONSTRUCTION CHANGE ORDER NO. 3 TO AGREEMENT NO. 0517C WITH DATELAND CONSTRUCTION COMPANY, INCORPORATED FOR VISTA CHINO AT SUNRISE WAY STREET IMPROVEMENTS PROJECT, CITY PROJECT 06-06. FROM: David H. Ready, Executive Director BY: Public Works & Engineering Department SUMMARY This Change Order allows for an increase to the contract with Dateland Construction Company, Inc., as a part of City Project No. 06-06 (Vista Chino at Sunrise Way Street Improvements Project), for the installation of traffic signal loop detectors. RECOMMENDATION: 1) APPROVING CONSTRUCTION CHANGE ORDER NO. 3TOAGREEMENT NO. 0517C WITH DATELAND CONSTRUCTION COMPANY, INCORPORATED, IN THE AMOUNT OF $4,350.00 FOR A TOTAL REVISED CONTRACT AMOUNT OF$425,150.55 FOR THE VISTA CHINO AT SUNRISE WAY STREET IMPROVEMENTS PROJECT, CITY PROJECT NO. 06-06." 2) Authorize the Executive Director to execute all necessary documents. STAFF ANALYSIS: ❑ateland Construction Company, Inc. was awarded City Project 06-06, Vista Chino at Sunrise Way Street Improvements in the amount of $344,044.50 and construction began in December 2007. The project consisted of street street improvements of the South side of Vista Chino at Sunrise Way. Prior to construction, Change Order No. 1, was presented to Community Redevelopment Agency by the Community& Economic Development Department and approved in an amount not to exceed $90,000.00. This consisted of mechanical screening and landscaping along the Vista Chino frontage adjacent to the Rick Weiss Apartments. Ultimately, the Change Order was issued at a cost of $81,000.00. Change Order NO. 2 was a balancing change orderwhich credited $4,243.95 backto the Contract following construction and was approved by the Executive Director on April 17, 2008. ITEM I`IO. CRA Staff Report June 18, 2008 - Page 2 Vista China at Sunrise Way Street Improvements, CP#06-06, CCO#3 Following construction, the traffic signal at this intersection was not functioning properly. It was later determined that during construction some of the existing traffic signal loop detectors on the Northbound approach of Sunrise Way and Vista Chino had been damaged. The loops were not detected at the time of the work due to past slurry applications, and had been shown in a different location on the plans. Currently Caltrans will not sign off on the encroachment permit until these repairs are made. This change order allows for the construction of (8) loop detectors in order to restore the traffic signal to proper function. The price indicated above is inclusive of all labor, equipment, materials and traffic control to complete the detector loop construction. FISCAL IMPACT: The recommended Construction Change Order No. 3 amount is $4,350.00. Sufficient funds are available in Account No. 811-8191-65146 (Vista Chino at Sunrise Way Street Improvements). David J. Barakian Tom Wilso ;Assistant City Manager Director of Public Works/City Engineer Development Services Jen - Ram nd, Director of ❑avid H. Ready Cnity Economic Development Executive Direc or Attachments: 1. Construction Change Order oa®o�w CITY OF PALM SPRINGS CONTRACT CHANGE ORDER To: Dateland Construction Company, Inc Date: ,tune 3,2008 50-305 Highway l I I ProNct No.: 06--06 Coachella,CA 92236 Project: Vista Cl-ino/Sunrise Widening Change Order No.: Three (3) Conrracr Purchase No.: 0000475 :0 Account Numbers: 811.8191.65146 882-8382-65146 Resolution No.: 1329 Agreement No.: 0517C CHANGES IN WORK/COST Increases to Contract Quantities New Item A- Install 8 traffic Loops Lump Sum $4,350,00 Total-Change Order Increase Amount $4,350.00 REASONS FOR CHANGES. Project design limits required that existing traffic signal loop detectors on the Northbound approach of Sunrise and Vista Chino be removed. This change order allows for the construction of loop detectors in order to return the traffic signal to proper function. The lump sum/agreed price indicated above is inclusive of all labor,equipment and traffic control as necessary to the complete the loop installation. Note: The prices above are inclusive of all allowable mark ups. No additional mark ups will be added to any item on this Change Order. SOURCE OF FUNDS The following account will be utilized: 811-8191-65146 1 I Summary of Costs Contract Time — s Change dew-- -- ,350.0�0...... - =- ps a a for �c o. N _ ... . - Previous Change Order(sY-176,756.05 T§evious Days Added: - - - - 55-- _ Revised Contract Amount: $425,150.55 Revised Completion Date: February 2008 I have received a copy of this Change MT Dare Order and the above AGREED.PRICES are acceptable to the contractor. Submitted by Senior Public Works Inspector Approved by g ` Date Cantracror:Dateland Construction City-Engineer Date G Approved by Date City-Manager Attesred by Danz — City Clerk Distriburion: Qdi final xviceuted Comes C.p rmed•Fffe Copy Contractor (1) Engineering File (1) City Cleric (1) Senior Public Works Inspector (1) Economic Devcloptonnr (1) Finance (1) 1 I i f Approved by 44 -411/' D con&ity&Economic Development 1 ti 2