HomeMy WebLinkAbout7/30/2008 - STAFF REPORTS - 2.D. • idential Fee Deferral
DevelopmentCommunity ..
Effective May 1,2008-December 31,2008
Option ": Pay portion at issuance Opti®iT 2: Pay a portion at issuance with
of permit and balance prior Lo final balance paid out of escrow
Submit application for plan check Submit application for plan check along
with application for deferral to close
along with application for fee of escrow. Requires submittal of a
deferral until final. preliminary title report for each lot that
is requesting a Fee deferral.
City prepares documents for recordation
Pay fees not controlled by and forwards documents to applicant.
the City at issuance.
Applicant returns executed recording
documents with notarized signature
and proof of title insurance.
Permit issued.
Pay fees not controlled by the
City at issuance.
Prior to final inspection, pay balance
of the building permit fee.
Permit issued.
Building Permit released to allow City records first deed of trust
request for final inspection.
Building inspection and final can
typically be issued the day after During escrow title company forwards
the balance is paid6 demand for payment to City. City
responds with preparation of a
reconveyance and a demand statement.
Title Company distributes funds to City.
yD
crrvor
ROSLYILLE
a
Comparison of Residential Fee Deferral Payment Options
Opt= x Option 2
Payment process Pay portion at issuance of permit Pay a portion at the issuance with
and balance prior to building final the balance paid out of escrow
Application yrt f
Fee for processing 0 $258
Additional submittal materials none Preliminary title report
Customer contact Permit Center Permit Center and
Housing Division
Processing Materials Required none signed and notarized recording
documents
New Departments involved in Housing Division
permit issuance none City Attorney
City Clerk
. r
Com
munity Development Department ` —
31 1 Vernon St. - Roseville,CA 95678
916-774-5334 • www rosevdle ca.us
k
CITYOF ���
R�SELLE Single Family Residential
c A t I F o li N l p Development Impact Fee Deferral Program
Staff Use Only
Permit# BD-
Project Information Date:
PT Initials:
Lot Address
Specific Plan Area Lot#and APN•
Property Owner/Builder Information
Builder
Mailing Address,
Contact Person Phone Number
Owner Signature Email
Fee Deferral Options (please check one):
❑ Final Occupancy (FPM) ❑ Escrow (EPM)
❑ Program Fee $258.00, per lot
❑ Preliminary Title Report, current w/in 6 mo.
❑ Corporate Information
2 Officers Names and Titles
Name, Title
Name, Title
Standard Building Submittal Package:
❑ Planning Plan Check Fee $48.00
❑ Residential Comment Farm
❑ Building - Universal Permit Application
❑ School Forms
713 Plot Plans
Comments:
Note To Applicant:
when completed,please return form to: Forpro4ram questions call:
City of Roseville Laura Conti, Community Development Coordinator
Permit Center City of Roseville Community Development Dept
311 Vernon Street 311 Vernon Street
(916)746-1276 Roseville, CA 95678
(910)774-5334
Permit Center/50rm$/SFo deferral Appiioation-Da.doc Rev 4/29/2008
�OIt
'2
u
I
*CqL/F0`RN�P xx CITY COUNCIL STAFF REPORT
DATE: JULY 30, 2008 CONSENT CALENDAR
SUBJECT: REQUESTS OF THE BUILDING INDUSTRY OF AMERICA, DESERT
CHAPTER, WITH RESPECT TO LOCAL CONSTRUCTION INDUSTRY
RECOVERY MEASURES
FROM. David H. Ready, City Manager
BY: James Thompson, City Clerk
SUMMARY
The City Council will receive a `menu' of requests from the BIA, and provide appropriate
direction to staff.
RECOMMENDATION:
Receive and direct staff as appropriate, and/or direct staff to schedule a discussion of
the requests at a future Study Session.
STAFF ANALYSIS:
At the request of Councilmember Mills, staff met with the Building Industry Association,
to discuss the potential of a deferral of Development Impact Fees (such as Quimby,
Public Arts, etc). Staff met with the BIA who provided the attached requests for
discussion, to provide relief for the residential building industry being affected by the
current credit crunch and housing market declines.
FISCAL IMPACT:
None.
MS THOMPSON, CITY CLERK DAVIDH READYCI
hm ANAGER
Attac BIA Request
Item No. 2 • D •
City of Palm Springs A
Local Construction Industry Recovery Measures: Bill
• Reduce and/or waive current DIF fees for 24 months;
• Defer all user fee to C.O.O. permanently;
Desert Chapter
Building tlnduylry Association
• Freeze all a new fee proposals for 24 months; or tiruclhern Gdiforuin
• Tie existing DIF fees to density rather than one size fee per SFR v. 77-5706prinnfield hang
Suite E
MFR; Palm Down,Galilornia 92211
160 360.2476
• Review all DIF Nexus studies as to present legal validity and ftu 760 772 3372
www.Desut LGLuptur.com
appropriateness, E Nlwl:B1A@DesenGhaptercorn
• Discontinue use of Cost Index inflators to DIF fees;
• Eliminate false nexus between review cost and cost of construction;
• Create a County wide Master CFD that all developers could annex
into in order to pay for infrastructure development and fees (i.e. vastly
expand SCIP Program).
• Extend the legal life of Tentative Tract Maps with consideration of
reducing condition load;
• Extend the legal life of Grading & Building Permits;
• Reduce the infra-structure finance gap between new homebuyers and
the existing community;
• Reform Permit & Entitlement Process in terms of streamlining, cost &
time cuts, accountability checks and condition of approval review;
• Consolidate agency review (i.e. should County Flood Control resort
under TLMA?);
• Dramatically increase land use densities (i.e. increase housing
options) and provide greater zoning flexibility;
• Review Bonding policies;
• Standardize infrastructure improvement requirements throughout the
region;
• Simplify and standardize fee credit, fee reimbursement process;
• Publish and regularly update complete development standards online;
An Artliaie of dic National Association ur Home E5Lci1dc1'5 and thr California Building dnduMry A4epcialinn