HomeMy WebLinkAbout1/5/2005 - STAFF REPORTS (12) DATE: January 5, 2005 TO: City Council FROM: Director of Public Works/City Engineer CAMINO AMAPOLA AND CAMINO PRIMROSE STREET IMPROVEMENTS RECOMMENDATION: It is recommended that the City Council approve and adopt the plans, specifications and working details, and authorize advertisement for construction bids for Camino Amapola and Camino Primrose Street Improvements, City Project No. 04-11. SUMMARY: Section 7.03.040 of the Procurement and Contracting Title of the Municipal Code requires that Council approve and adopt plans, specifications and working details, and authorize the bid request for all public projects in excess of $100,000. Approval of this project will allow staff to proceed with this public project, with an estimated cost of $209,600. BACKGROUND: On April 7, 2004, the City Council approved the 2004-2005 Community Development Block Grant (CDBG) Program, which included the Public Works and Engineering Department's application for construction of Camino Amapola and Camino Primrose Street Improvements. These streets between Calle Amigos and Thornhill Road lack improvements on both sides, and are in general disrepair. The project is a continuation of the Calle Amigos Street Improvement project which was completed in September 2004. The original scope of work funded by CDBG included street widening, construction of curb and gutter, standard driveway approaches and sidewalk on the unimproved section of Camino Amapola and Camino Primrose, from Calle Amigos to 160 feet east of Thornhill Road. These improvements have been detailed in plans and specifications prepared by engineering staff for two Bid Schedules: Bid Schedule A - Camino Amapola from Calle Amigos to 160 feet east of Thornhill Road Bid Schedule B - Camino Primrose from Calle Amigos to 160 feet east of Thornhill Road Further assessment of existing pavement condition and storm-water surface drainage from the unimproved pavement area of each street to the respective intersection at Thornhill Road warranted supplemental improvements, included in two Additive Bid Schedules: Additive Bid Schedule C - Camino Amapola Extension to Thornhill Rd. Additive Bid Schedule D - Camino Primrose Extension to Thornhill Rd. These added schedules would complete the cross-gutter section at each intersection, improve existing pavement and storm-water surface drainage (by 1.5" asphalt concrete overlay) and eliminate stagnant water. The inclusion of the additive bid schedules will allow staff flexibility in recommending the award of the extra work dependent upon the bids received and the allowable project budget. . r , Camino Amapola and Camino Primrose Street Improvements January 5,2005 Page 2 Section 7.03.040 of the Municipal Code requires that for public projects in excess of $100,000 Council approve and adopt the plans, specifications and working details, and authorize staff to advertise for construction bids. The Engineer's Construction Estimate for Bid Schedules A, B, C and D is approximately $209,600. Funding for this project will be available through the CDBG revenue funds ($172,158) appropriated for this project as part of the 2004/2005 CDBG Program and from Unscheduled Capital Projects ($37,442). Funds are established in account 137-4805-63547 and 137-4805-5000 respectively. This action is being brought before Council to be in compliance with the Municipal Code. Following Council's approval of the plans and specifications, and authorization to advertise for construction bids, staff will schedule bid advertisements with a tentative bid opening date of February 8, 2005. The plans and specifications are available in the City Clerk's Office during regular business hours for public review. SUBMITTED: DAVID J. BARAKIAN Director of Public Works/City Engineer APPROVED: DAVID H. READY City Managers ATTACHMENT: 1. Minute Order REVIEWED BY DEPI OF FINANCE MINUTE ORDER NO. APPROVING AND ADOPTING THE PLANS, SPECIFICATIONS AND WORKING DETAILS, AND AUTHORIZING ADVERTISEMENT FOR CONSTRUCTION BIDS FOR CAMINO AMAPOLA AND CAMINO PRIMROSE STREET IMPROVEMENTS PROJECT, CITY PROJECT NO. 04-11 I HEREBY CERTIFY that this Minute Order, approving and adopting the plans, specifications and working details, and authorizing advertisement for construction bids for the Camino Amapola and Camino Primrose Street Improvements Project, City Project No. 04-11, was adopted by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 51h day of January, 2005. Kathleen D. Hart Acting City Clerk