Loading...
HomeMy WebLinkAbout1/7/2009 - STAFF REPORTS - 5.A. T„ City of Palm Springs Local Construction Industry Recovery Measures: Bill • Reduce andfor waive current DIF fees for 24 months; • Defer all user fee to C.Q.O. permanently; Desert Chapter • Freeze all a new fee proposals for 24 months; Ruildin,7ndlo,,lry,4ssociation nrtimghem Gdi fomin • Tie existing DIF fees to density rather than one size fee per SFR V. 77.570 Springfield Line Swle E MFR; Palm D7 rn,cxlilomis 9'l7'I 760 560-2-176 • Review all DIF Nexus studies as to present legal validity and Gu7607725372 wl wDewl lCllaplertUm appropriateness; C Mwl;B1A@➢menChapter corn • Discontinue use of Cost Index inflators to DIF fees; • Eliminate false nexus between review cost and cost of construction; • Create a County wide Master CF❑ that all developers could annex into in order to pay for infrastructure development and fees (i.e, vastly expand SCIP Program), • Extend the legal life of Tentative Tract Maps with consideration of reducing condition load; • Extend the legal life of Grading & Building Permits; • Reduce the infra-structure finance gap between new homebuyers and the existing community, • Reform Permit & Entitlement Process in terms of streamlining, cost & time cuts, accountability checks and condition of approval review; • Consolidate agency review (i.e. should County Flood Control resort under TLMA?); • Dramatically increase land use densities (i.e. increase housing options) and provide greater zoning flexibility; • Review Bonding policies; • Standardize infrastructure improvement requirements throughout the region; • Simplify and standardize fee credit, fee reimbursement process; • Publish and regularly update complete development standards online; An Araliadr,nr ihu Nulnunal Assoeiali000 ur 11ume 031.1i1(JCN and i1w Gili I'ornia Ruildine 4nr0u;dry Residential Fee Deferral Community Development Department Effective May 1,2008-December 31,2008 0'3t of : Pay portion at issuance Option 2: Pay a portion,at issuance with of pernnit and balance prior to final balance paid out of escrow Submit application for plan check Submit application for plan check along with application for deferral to close along with application for fee of escrow. Requires submittal of a deferral until final- preliminary title report for each lot that is requesting a Fee deferral. City prepares documents for recordation Pay fees not controlled by and forwards documents to applicant. Lthe City at issuance. Applicant returns executed recording documents with notarized signature and proof of title insurance. Permit issued. Payfees not controlled by the City at issuance. Prior to final inspection,pay balance of the building permit fee. Permit issued. Building Permit released to allow City records first deed of trust request for final inspection. Building inspection and final can typically be issued the day after During escrow title company forwards the balance is paid. demand for payment to City. City responds with preparation of a reconveyance and a demand statement. Title Company distributes funds to City. cITYOF RIDS LE C A L I r a R N 1 A Sv,6ArF7vzz, G-I Comparison of Residential Pee Deferral Payment Options Option i Option 2 Payment process Pay portion ar issuance of permit Pay a portlon ar the issuance with and balance prior to building final the balance paid out of escrow Application Fee for processing 0 $258 Additional submittal materials none Preliminary title report Customer contact Permit Center Permit Center and Housing Division Processing Materials Required none signed and notarized recording documents New departments involved in Housing Division permiYissuance none City Attorney City Clerl< I� I Community Development Department 31 1 Vernon St. • Roseville,CA 9567E 916-774-5334 • www rosevilie ca.us k CITt'OF Single Family Residential C A L I F 0 K N I A Development Impact Fee Deferral Program c ,", � IFo � r� l .a P P 9 Staff Use Only Permit9 BD- Project Information Date: PT Initials: Lot Addre� Spoclfc Plan Area Lot#and APN• Property Owner/Builder Information Builder Mailing Address, Contact Person Phone Number Owner Signature Email Fee Deferral Options (please check one)- ❑ Final Occupancy(FPM) ❑ Escrow (EPM) ❑ Program Fee$258.00, per lot ❑ Preliminary Title Report, current Win 6 mo. ❑ Corporate Information 2 Officers Names and Titles Name, Title Name, Title Standard Building Submittal Package: ❑ Planning Plan Check Fee $48.00 ❑ Residential Comment Form ❑ Building - Universal Permit Application ❑ School Forms ❑ 3 Plot Plans Comments: Fln inh rn" efl i. !rd•5 •• s } i•h• •�•5 e N i v ,• ki•s Note To Applicant! when completed,please return form to: Forprogram questions call: City of Roseville Laura Conti, Community D�veloprrlent Goordinatvr Permit Center City of Roseville Community Development Dept 311 Vernon Street 311 Vernon Street (916)146-1276 Roseville,CA 95678 (916)774.5334 Permil Centcr/FnrmsISFP dCferral Application-08-doc Rev 4/2 912 0 0 8