Loading...
HomeMy WebLinkAbout2/16/2005 - STAFF REPORTS (36) CITY COUNCIL FEBRUARY 16, 2005 NEW BUSINESS Subject: ADOPTION OF PLANS AND SPECIFICATIONS FOR PROJECT #2005-01, EXPANSION TERMINAL/HOLDROOMS —ADD CHECKPOINT PHASE 3,AT PALM SPRINGS INTERNATIONAL AIRPORT Initiated by: Director of Aviation SUMMARY: The City Comicil will consider approval of the plans and specifications for Project #2005-01, Expansion Terminal/Holdrooms—Add Security Checkpoint Phase 3, at Palm Springs International Airport. RECOMMENDATION: 1. Approve Minute Order No. adopting the plans and specifications for Project 42005-01, Expansion Terminal/Holcirooms—Add Security Checkpoint Phase 3, at Palm Springs International Airport. 2. Allow Airport to proceed with the solicitation of bids for Project#2005-01. STAFF ANALYSIS: Following the events of September llth, the Transportation Security Administration (TSA) completed a minor modification of the passenger screening checkpoint at the Airport to provide a higher level of security screening, as well as improving the efficiency. Since that time, TSA has continued to increase the amount of space required to provide the necessary level of passenger screening. Additionally, the passenger traffic for the Airport has continued to grow and currently exceeds pre-September I Ith levels and is expected to continue for the foreseeable future. In order to provide reduced waiting time for passengers, staff worked with TSA and the airlines over the past year to gather passenger data expected in the short and long term so as to understand the necessary capacity requirements for passenger screening, as well as continual changes in space requirements from the TSA. The checkpoint capacity analysis which was conducted indicated the peak passenger capacity necessary to meet the short term needs of the Airport is four (4) lanes. With passenger growth continuing to increase year after year, it is anticipated that six (6) lanes will be needed within the next two (2) to five (5) years. All Plans and Specifications are on file in the Office of the City Clerk. -7 r E" s. . To meet the Airport's security needs it was determined that an expansion of the terminal was necessary to allow for a larger checkpoint and that portions of the existing holdrooms would require relocation. This Airport's architect has developed the necessary project design and construction documentation to allow the project to continue with an anticipated bid date in March of 2005. Actual construction is anticipated to begin in May of 2005 and be complete by the end of calendar year 2005. FISCAL IMPACT The work referenced within these documents is eligible for reimbursement via Airport Improvement Program (AIP) grants 37 and 38 from the Federal Aviation Administration (FAA), which will cover 95% of the cost. Richard S. Walsh, A.A.E. David H. Ready Director of Aviation City Manager Attachments: 1.) Minute Order 2.) Plans & Specifications MINUTE ORDER NO. APPROVING ADOPTION OF PLANS AND SPECIFICATIONS FOR PROJECT #2005-01, EXPANSION OF THE TERMINAL/HOLDROOMS - ADD CHECKPOINT PHASE 3 CONSTRUCTION AT THE PALM SPRINGS INTERNATIONAL AIRPORT. I HEREBY CERTIFY that this Minute Order, approving adoption of plans and specifications for project #2005-01, expansion of the Terminal/Holdrooms — add Checkpoint Phase 3 Construction at the Palm Springs International Airport, was adopted by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 161h day of February, 2005. JAMES THOMPSON City Clerk