HomeMy WebLinkAbout3/16/2005 - STAFF REPORTS (15) CITY COUNCIL MARCH 16, 2005
CONSENT CALENDAR
Subject: GENSLER AMENDMENT #11 - AIRPORT ARCHITECTURAL
SERVICES
Initiated by: Director of Aviation
SUMMARY:
It is recommended that the City Council approve Amendment 911 to Agreement 44382
with Gensler for architectural services related to the passenger screening checkpoint and
hold room modifications at the Airport, in the amount of$828,795 for a revised
agreement total of$2,535,268.40.
RECOMMENDATION:
Approve Minute Order No. concerning the amendment for Airport Architectural
Services at an additional price of$828,795.
STAFF ANALYSIS:
This action will allow for the preparation of design and construction documents and the
necessary approval documentation related to the proposed expansion/modification of the
passenger boarding hold rooms at the Airport. Attached is a preliminary schematic design
of the new passenger `D' holdroom.
As has been done on the recent security projects for the Airport and in accordance with
Council direction, design progress meetings will be held with the Airport Commission
and the City Council. Included in these progress meetings is a sub-committee consisting
of the Airport Commission Operations Sub-Committee,two (2) representatives from the
Planning Commission and one (1) City Council member. This sub-committee proved
invaluable in moving the design along quickly and helped address the numerous design
elements and user concerns for the security checkpoint element of the overall capital
program.
The attached amendment will provide for the necessary design preparation and
construction documentation related to the modification of the passenger boarding hold
rooms at the Airport.
This amendment will allow Gensler,the Airport's architect to proceed with developing
the necessary project design and construction documentation to allow the project to
continue with an anticipated bid date by the end of the calendar year. Actual construction
��Q 001
is anticipated to begin in October of 2005 and be complete by the summer of calendar
year 2006.
FISCAL IMPACT
The work referenced within this amendment is eligible for reimbursement via Airport
Improvement Program(AIP) grant 37 and 38 from the Federal Aviation Administration
(FAA), which will cover 95% of the cost.
Sufficient finds are available in account no 415-6600-56062 AIP 37.
A Minute Order is attached for City Council consideration.
Richard S. Walsh, A.A.E. David H. Ready
Director of Aviation City Manager °s
Attachments: 1.) Minute Order
2.) Amendment#11 for Gensler Architectural Services
00dz
03-07-05 10:08am From-GENSLER + T-275 P 02/06 F-821
Mr.Richard Walsh Gensler
March 7, 2005
Page 2
The revised drawings for the large-scale tension fabric structure over the northwest exit
and the extended overhang on the New Security Fxpansion will be an addendum to The
Phase I package due to construction phasing per the advisement of Mr. Howard on
February 8,2005. The Landscape drawings will be included in the Phase 2 package.
• .!Told Room`D' Graphics and Wayfinduig that includes:
o Hold Room Entrance Identification
o TSA Regulatory Signage
o Wayfinding signage in Hold Room and along Walkway
o FIDS Housing and Identification
a Integrated Courtyard wayfinding signage based on the re-design
o Non-public room identification
o Resiroom and other public areas identification
o Related infortitational storage in the Hold Room and Walkway
o One temporary "coning soon"sign design and production of 2-3 signs
o Temporary wayfinding signs in and to construction walkways
• Cost Estimates to be submitted at the end of Design Development and at pas%
Construction Documentation.Additional cost estimating and pricing exercises based on
any Value Engineering is not included in this proposal and would be an additional
service if needed.
• Construction Administration for Phase I Expansion Terminal I Holdrooms Add
Checkpoint Phase 3,and for Phase 2 Hold Room D and Courtyard_
• Final As-Built,Record Drawing Set for Phase 1 &2
Civil work,new apron,pavement to die building and apron related lighting for the new hold
room is not included in this proposal(We understand this will be a separate contract with VSA
Airports)
BUDGET
We understand the construction budget is yet to be established by the Airport and Program
Manager. Until such time as a project budget is prapared,we will be working with order-of-
magnitude cost assumptions as suggested by our expertise in similar building type, scale and
Palm Springs project history as influenced by current marker conditions.The aforemenuonud
±SoD Bruslway
Sul. ;c0
.)!Lend /V�(.YlF((i �.ilit�Cllu 90}D}
5600
�741VSAX. 310 ti� J�$O
03-07-05 10:095m From-GENSLER + T-275 P.03/06 F-621
Mr, Richard Walsh Gensler
March 7,2005
Page 3
variables considered,we assume the construction budget To be$4.5 million. This construction
budget includes FF&E,PIPS and security equipment and excludes jet bridges,if any.
SCHEDULE
We understand your goal is to have the documents complete and ready for bidding by June 1,
2005. Our proposed schedule is as follows:
Concept Design completed
.Resign Developmenr complete by March 11, 2005 (AtL and SMEP)
85% Construction Documents& specs April 15,2005 to PSP for review and comment
85%Comments to Design Team April 25,2005
Revised Docurents&specs ready To submit to City for permit May 6,2005
Agency Approval May 6 duu May 16
Plan Check comments to Design Team May 16,2005
100%Bid Set Delivered May 27, 2005
Bidding To Tender June 01 to July 01
Review and Award By July 5,2005
Construction Stan May 2 2005 thru May 31, 20M
Record Set Delivered By June 16, 2006
ARCIRTECTURAL AND ENGINEERING FEFS
Compensation to Gensler for Basic Services, Additional Services,and Reimbursable
Expenses shall be as described below:
Basic Services.
Compensation for basic services for Phase 2 shall be a lump sum as follows, as per the fee
matrix in attachment A:
censler(Arehitecture) $430,218
Gensler(Signage and Graphics) $ 22,775
Hanseomb(cost estimate) $ 12,350
Brandow &Jobaston (Structural) $ 70,912
Levine Scegcl (MEP) $ 118,059
=too IIruilwey
]ic= tno
VOOS I'rI. 310 1-p) i6co
F,, 310,
03-07-05 10:09am From-GENSLER + T-275 P.04/06 F-821
Mr.Richard Walsh Gensler
March 7, 2005
Page 4
Micheal Buccino(Landscape) $ 79AS0
Total $733,794*
*Fees do not include standard reimbursable expenses
Consultants.
Consultant's fees shall be compensated based on amounts invoiced to Gensler,plus seven
percent(7%)to cover project coordination,project administration,taxes and insurance costs_
Coordination fee $ 19,656
Qualifications.
The design fee excludes separate bidding and permitting packages,and permit fees. The design
fee excludes extensive coaeeptual redesign for major structural elertients beyond viable, initial
options as presented and agreed upon with the client at the 100%DD milestone.
Additional Services.
Compensation for Additioaal Services(if not agreed upon as a lump sum amount) shall be
based on Crensler's Standard Hourly Billing Rates.
Rehmbursable Expenses.
Reimbursable expenses are in addition to compensation for Basic and Additional Services,and
include expenses such as plotunb and printing,postage and delivery,and travel. Reimbursables
exclude printing and plotting of multiple bid sets for contractor distribution. Compensation for
Reimbursable expenses incurred by Gensler in connection with the Project shall be based oa
amounts invoiced to Gensler,plus ten percent(10%) Reimbursable expenses for this project
are estimated to be approximately 10% of the fees,or$75,345-
t'6✓broldwly
Sui[c }u«
0006 yy�(�':�..r?�et Nlur�dot Citituaiu goq.u{
'Q.MI. 06 lcl' PO 449. 5600
Fax. 310 i+9. 59io
03-07-05 10:09am From-OENSLER + T-275 P 05/06 F-821
Mr. Richard Walsh Gensler
March 7, 2005
Page 5
Progress Payments.
Progress payments shall be made monthly based on the percentage of services provided during
the previous month.
Amendment#11
The total compensation for Phase 2,comprised of the basic services fee plus the consultant
coordination fee listed above,is$753,450($733,794 t$ 19,656),excluding reimbursables.
Please see the atruched matrix indicating the fee splits between various elements of Phase 2 and
Construction Administration.
Working for you has been a true pleasure for Gensler We look forward to the continued
progress and efforrs on this endeavor. After you have had the chance to review this proposal,
please call me if you have any questions. My direct line is 310,927.9409
Sincerely,
Jessica Hueruiekens,! ?ED
Gensler,
Architecture,Design&Planning Worldwide
cc: Andy Cohen
Ed Howard—Parsons
3500 13 rU1lwny
JUlrc 300
510 449 56"0
03-07-05 02:01pm From-GENSLER + T-284 P 02/02 F-831
Gensler
Palro Sprinxi International Airport
R.vIsna 3104r20os
Fee Matrix REVISED
Pease II.non Roam'P'Reconrigurapon
Pnttw I CA
Arcli SRuct — '� MEP I LAnnsc4pa I Cost Rsemale Total
now Room D
PP $95,4p700 $13,00460 $:5,89940 $000 $5,20000 S129,00120
CD $14224500 $2165000 $35.427 GO sow $7,15O00 $204,580.aO
CA $51,24420 $8.BB320 $18.52200 $0 Go $0 UO $78.42940
$264,680.00 $43,310.00 577,B40.20 5000 $12.350.00 $41261140
WAgt.ar Carinoallan a canopy
pD $6,585.60 $1,528.80 $3,528.00 S6,e80.W S18.502.40
CD $10,97600 ^a2,54a 00 $5,88000 S11,700.00 $11,164.00
CA S4,330.40 $1,01920 $2,362.00 $6,860.00 $14.62180
$21 952 W $5 Mb 00 $11 760 W $25.480 W $64.25a W
nclq Rcam o Grapnlcs
OD $6.83P 56 $0 on 5000 $o 00 $6.032 55
CD $11,387.50 sow 50,00 so 00 $11,387.60
CA $o 00 $0 00 $0 00 $0 00 $0 00
$22.775 20 $0 OP $0 00 $0 00 _ $18,220.16
cawriFAr0
DP R,Desi9n $20 000 W $1.040 OD $4.000 00 $11.000 00 $39,040 00
CD $30,00000 $1.560.00 SB,DW 00 525,000.00 $62,56000
CA s10,475.00 $3,300.D0 $0.00 $18,000.00 $31,775 00
$50,000 W $2.6W 00 $1 o,Wa W W.QQO W $127,97500
s6cuny Ctla 4omt&TSA Onloas
CA $61 350 W $10.600 00 $8 980 00 $0 00 $e0.900 00
Rewra Drawing Sur $12,00OW $6 am 0n $10,Woo0 $3.OW00 s31000W
Summary
Op $118 825 16 $15.563 60 $33.527 40 $14.860 00 55200 00 $187 SM 18
CD $194,70860 $25,7W.00 S45,30730 $36,760.00 $7,150.00 $308,692.90
CA(aciuoaa rocora arawin8s) $139,458 60 $20.582 40 $38 224 00 $27,550 DO $a 00 SM.I W
Subtoral ._.., $462 eg3 36 $70.912 00 $178 059 20 $78 480 Do S12,350 00 $739 73a 58
Caarainaiion 7! $4,065.84 $8,204,14 $5,58300 $56450 $19 W608
(Tour Fees _. ... ... 5753.450.641
Rmmbursabb5 10% $75.345 0e
Taral Fees plus F«imbursables $028,785.71
CA porws aaaaa ro rns amonomenr as iaquasrap(In amarenrproposal proviapslr)
UGOS
® III
s
oo n
- "OD \
• 1
0 0o I
�� i� Ary r��r rllj A
151000
BUI I G '. jrjw
hib ✓�
"lrjrni u
•-- --" i
_ rt-- r,--t-- ------- /f
a --
f WALKING
•\ DISTANCE
590'
F.
LO
o °m® to Existing Groul
Taxiway
f _
Palm Springs Airport Larger Building wit
Commuter Holdroom Study 05.0201.019 Scale:
Existing Group IV
Taxiway \
\ •ill I
ill I
\ la
I
it
I {
I
/ i I
0009
estrooms - Phase 1 Scheme 4a-1
100` ,anua726 2005 Gensler
MINUTE ORDER NO, 7645
APPROVING AMENDMENT 11 TO AGREEMENT
4382 WITH GENSLER FOR ARCHITECTURAL
SERVICES RELATING TO PASSENGER
SCREENING CHECKPOINT AND HOLD ROOM
MODIFICATIONS AT THE PALM SPRINGS
INTERNATIONAL AIRPORT FOR AN
ADDITIONAL AMOUNT OF $828,795, TOTAL
CONTRACT PRICE OF $2,535,268.40, A04382
I HEREBY CERTIFY that this Minute Order, approving Amendment 11 to
Agreement 4382 with Gensler for architectural services relating to passenger
screening checkpoint and hold room modifications at the Palm Springs
International Airport for an additional amount of $828,795, total contract price
of$2,535,268.40, was adopted by the City Council of the City of Palm Springs,
California, in a meeting thereof held on the 16`h day of March, 2005.
JAMES THOMPSON
City Clerk