CITY COUNCIL STAFF REPORT
DATE: April 15, 2009 CONSENT CALENDAR
SUBJECT: Approve Amendment No. 2 to Architect Services Agreement A5672 with
George Miers & Associates to adjust redesign at Architect's cost threshold
from 2.5% to 5% and to establish the project "Master Budget" at
$6,000,000.
FROM: David H. Ready, City Manager
BY: City Manager
SUMMARY
This action would approve a second amendment to the Animal Shelter Architect's
Agreement to adjust the redesign at Architect's cost threshold from 2.5% to 5% and to
establish a Master Budget of $6,000,000 .
RECOMMENDATION:
1. Approve Amendment No 2 to the Animal Shelter Agreement for Architect
Services, A5672, adjusting the redesign at Architect's cost threshold from
2.5% to 5%, and establishing a Master Budget of $6,000,000.
2. Authorize the City Manager to execute all necessary documents.
STAFF ANALYSIS:
At the April 8, 2009 meeting the City Council took action to approve the Animal Shelter
Schematic Design and established a Master Budget for construction of $6,000,000.
Official follow-up action is necessary to amend the Animal Shelter architectural design
contract to reflect the Master Budget of$6,000,000.
In addition the City Council Animal Shelter subcommittee recommends that the redesign
at Architect's cost threshold that is in the agreement be amended from 2.5% to 5%.
This clause would require the architect to redesign the project at his/her cost if the low
bid exceeded the Master Budget by more than 2.5%. The subcommittee felt that the
2.5% is to small compared to an AIA industry standard of 10%, and recommends a level
of 5% for this project.
E T FM NO. Z F.
City Council Staff Report
April 15, 2009— Page 2
Animal Shelter Architect Agreement Amendment No. 2
Amendment No. 2 to Agreement No A5672 is attached for City Council consideration.
FISCAL IMPACT:
This action will have no fiscal impact as the result of the action will only allow the design
team to proceed further with the design which is already funded through an existing
Pu caseorder
Allen F. Smoo , Owners'Representative
David H. Ready, City�er
Attachment. Amendment No. 2
SECOND AMENDMENT TO
AGREEMENT FOR ARCHITECT SERVICES
A5672
THIS SECOND AMENDMENT TO ARCIIITECT SERVICES AGREEMENT, NO.
A5672 between the CITY OF PALM SPRINGS and GERORGE MIERS &
ASSOCIATES, INC. is made and entered into, to be effective the _ day of
2009, as follows:1
RECITALS
A. The City of Palm Springs ("City") has retained George Miers & Associates
("Architect") to perform architectural services related to the design, construction,
and operation of an Animal Shelter pursuant to an Agreement for Architect
Services dated June 13, 2008 ("Agreement").
B. The Agreement calls for the establishment of a"Master Budget" as an estimate of
all components of the construction work related to the Project.
C. The City and the Architect have agreed that $6,000,000 is the appropriate dollar
amount for the Master Budget for the Animal Shelter Project and have further
agreed that the redesign at architect's cost for a bid project in excess of the
Master Budget threshold, shall be increased from 2.5%to 5%.
AMENDMENT
NOW, THEREFORE, in consideration of the promises and mutual covenants contained
herein, the Agreement is amended in the following respects:
1. Article 1, Section B.8. "Changes in Plans and Specifications" is hereby amended
by adjusting the percentage listed in the section fi•om "2.5%"to "5%".
2. Exhibit"F", Master Schedule is hereby amended by adding the following:
"Based on the approved Schematic Design of the Animal Shelter, dated 2/17/2009
and as further modified by Staff Recommendations Sheet dated March 27, 2009
attached as Exhibit "A" to this amendment, the project Master Budget is hereby
established at $6,000,000."
All provisions of the Agreement not effected herein shall remain in full force and effect.
yr u
IN WITNESS WHEROF, the parties hereto have executed this First Amendment to the
Agreement for Architect Services for the Palm Springs Animal Shelter Project.
CITY OF PALM SPRINGS GEORGE MIERS & ASSOCIATES, INC.
By: By:
City Manager Its:
ATTEST: Approved as to Form:
By: By:
City Clerk City Attomey
EXIBBIT "A"
TO SECOND AMENDMENT TO
AGREEMENT FOR ARCHITECT SERVICES a5672
(3 pages)
ANIMAL SHELTER SCHEMATIC DESIGN
STAFF RECOMMENDATIONS SHEET
March 27,2009
Design Changes/Bid Alternates;
1. Change the floor drains to trench drains, savings of $62,120. Staff does not
recommend accepting this change and it is not a good candidate for a bid
alternate.
2. Delete the recycled water system, savings $5,083. Staff does not recommend
this change as it would adversely effect long term operating costs.
3. Delete south planter and replace with wall, savings $50,735. Design as
alternate.
4. Delete Wards 4 & 5, savings $123,493. Staff believes that these wards are
needed, however, recommends that this item be designed as a bid alternate in the
project.
5. Delete get acquainted yard 6, savings $27,276. Staff recommends that this be
deleted from the project_
6. Delete piped oxygen, savings of$5,647. This item is also tied to a change in the
sally port. Staff recommends that this be deleted from the project.
7. Delete glazed masonry units, $114,075. Staff recommends this be deleted fiom
the project.
8. Stained concrete to VCT, savings of $3,513. Staff believes the long term
additional maintenance cost renders this as something not to include.
9. Change northern exercise fencing from Omega fencing to vinyl chain link,
savings $95,523. Omega fencing should be used on the east end of the large
exercise courtyard. Further discussion on this item will follow in Program
adjustments discussion.
10. Emergency generator as a bid alternate, savings of $134,405 less $1,800 extra
design cost. Staff recommends that this be designed into the project as a bid
alternate, and that the design team be instructed to cover the extra cost in
savings they should have in the LEED contract work as the City Council has
decided not to submit the project for certification.
11. Delete west fencing, savings $70,540. Design as an altercate.
12. Additional Omega fence to vinyl covered chain link fence, savings $68,310; (1n
areas that can not be seen from the exterior public ways.)
13. Reduced socialization area, savings $69,222. Staff agrees with this reduction in
the building.
1 k.�
14. Reduced special exhibit area, savings $21,367. Staff agrees with this reduction
in the building.
15. Reduced small animal area, savings $15,270. Staff agrees with this reduction in
the building.
16. Reduced retail area, savings $17,678. Staff agrees with this reduction in the
building.
17. Reduced volunteer area, savings $15,940. Staff agrees with this reduction in the
building.
18. Reduced community cat area, savings $15,407. Staff agrees with this reduction
in the building.
19. Reduced classroom, savings $5,952. Staff agrees with this reduction in the
building.
20. Delete maintenance/recycle/oxygen in sally port, savings $32,973. Staff agrees
with this reduction in the building.
21. Major architectural design change, savings $415,661. City Council
subcommittee did not find the architectural change as acceptable. It does
believe that the remaining concrete planters in the project should be carried as
bid alternates. This should allow for some $150,000 in savings.
Project "Program" Changes:
1. Delete the staff courtyard.
2. Delete the euthanasia courtyard.
3. Delete the euthanasia holding (Rm 358) and euthanasia room (Rrn 359) and
hallway 357.
4. Delete the artificial turf in northerly exercise area, dirt is fine (artificial turf burns
feet in summer heat). Also limit the fencing to where there are two large exercise
areas.
5. Delete Socialization room (RM 136). This area should be incorporated into the
northerly exterior exercise yard.
6. Delete classroom entrance (Rm 116). Note this would be an outside area under
the high roof. The restrooms would have key locked doors. The security grill
would change to and exterior wall/door and move to where it lined up with the
south wall of the Volunteer room (Rrn 112 door would move from west wall to
south wall.).
7. Furtber reduce the size of the community cat room to a single room. The room
should be moved further into the lobby area. (See attached sketch).
S. Delete the entry vestibule (Rm 100). Two exterior doors will work just fine.
Note: For Project Program Change items 5, 6, 7 & 8 the City Council subcommittee
would like to work with the design team to maintain some of these areas as alternates if at
all possible-
2u
- 1 r
g 9.; ------
�r 9 � l
€ li
Y pop
� Lk
i � •
i
i
=
,{Ili "wAb� F tl h R S!— - fl, �• �5� __j DI
rLcy v
wl
CITY OF PALM SPRINGS
r� � I y b� I•� E IJ __ -/ � .:�i��Y• F�lx• ..Jr � _9 �.5� �
�y �rn•.rw,�� a r 3 y �i1B SIN �Inr � 4 �;� �%
alp •i •' ` �� '� V
Ql
ANIMAL CARE FACILITY x `