Loading...
HomeMy WebLinkAbout4/20/2005 - STAFF REPORTS (11) CITY COUNCIL APRIL20,2005 CONSENT CALENDAR SUBJECT: CONSTRUCTION CHANGE ORDER NO. 3 TO AGREEMENT NO. 4863 WITH CONTRERAS CONSTRUCTION, INC., FOR CITY PROJECT NO. 02- 27, AMADO/ALVARADO PARKING LOT AND STREET IMPROVEMENTS. FROM: David H. Ready, City Manager BY: Director of Public Works/City Engineer SUMMARY: Approval of this Change Orderwill result in an increase to the City's contract with Contreras Construction, Inc. for the construction of the Amado/Alvarado Parking Lot and Street Improvements, City Project No. 02-27. The total increase to the project per this change order is $20,292.79. RECOMMENDATION: That the City Council approve Minute Order No. approving Construction Change Order No. 3 to Agreement No. 4863 with Contreras Construction, Inc., for Amado/Alvarado Parking Lot and Street Improvements, in the amount of$20,292.79, for a total contract price of$770,659.54. City Project No. 02-27. Authorize the City Manager to execute all necessary documents. STAFF ANALYSIS: City Council awarded Contreras Construction, the contract to construct the Amado/Alvarado Parking Lot, (City Project# 02-27), on March 31, 2004. The original contract amount was $730,356.25. Construction of the parking lot began on June 14, 2004. Shortly after construction began, it was determined that a necessary SCE service would not be available within the original project time frame. At that time, work on the project was suspended and Change Order No. 1 was issued in the amount of$2,225.00 which compensated the Contractor for maintaining dust control measures during the delay. Work resumed on November 81h, and the lot was declared substantially complete on December 17th. As the construction neared completion, Change Order No. 2 was issued. This Change Order compensated the contractor for the construction of various items which had been omitted from the contract bid schedules. Change Order No. 2 increased the contract by $17,785.50. Following the completion of construction, it was realized that there was a sufficient amount of curb and gutter dollars remaining in the contract to complete the missing section along Alvarado Rd. adjacent to the future North Parking Lot. The majority of Change Order No. 3 will provide for additional funds to pave this unimproved portion of Alvarado Rd. Cumulatively, Change Orders 1, 2 and 3 represent an increase to the original contract of 5.5%. This change order will increase the final contract amount to $770,659.54. Funds for the additional work are available in the following accounts: REM NO. •� - CCO#3 — Contreras Construction April 20, 2005 Page 2 261-4283-50003-Convention Center Phase 2 (Building & Equipment) $ 4,071.79 134-4498-50227-Local IMeasure A, Amado/Alvarado Street Improvements $16,221.00 0-1�1— David J. Barakian Director of Public Works/City Engineer APPROVED: ` -- City Manager ATTACHMENTS: 1. Minute Order 2. Change Order No. 3 CITY OF PALM SPRINGS CONTRACT CHANGE ORDER To: Contreras Construction Co. Date: April 27 ,2005 P.O.Box 1808 Project No.: 02-27 Indio,CA 92201 Project:Amado/Alvarado Parking lot Imp. Change Order No.: Three (3) Contract Purchase No.: 416500 Account Numbers: 4498.50227 4371-50227 4283.50003 Agreement No.: 4863 CHANGES IN WORK/COST: DECREASE TO CONTRACT QUANTITIES Alternative Schedule A Bid Item No. 16. A2-6 Curb/Gutter -37 LF @ $18.00/SF ($666.00) 18. PCC Sidewalk -150 SF @ $3.10/SF ($465.00) 22. 4' PCC Cross Gutter -4 LF @ $32.00/LF ($128.00) 23. 6' PCC Cross Gutter -70 SF @ $8.00/SF ($560.00) INCREASE TO CONTRACT QUANTITIES New Items A. Additional Irrigation agreed price/lump sum $2,141.79 B. Dust Suppressant agreed price/lump sum $1,480.00 C. Re-Mobilization agreed price/lump sum $2,890.00 Alternate Schedule A Bid Item No. 12. 3" AC Pavement 8000 SF @ $1.10/SF $8,800.00 15. 6" Misc. Base 8000 SF @ $0.85/SF $6,800.00 TOTAL NET CHANGE ORDER INCREASE AMOUNT $20,292.79 REASONS FOR CHANGES: Bid Items 16, 18, and 23: Decreases to these items are due to the actual constructed quantities (Decrease Amounts) being less than the original estimate. Item A: Portions of the newly constructed landscape areas did not have proper irrigation to support planned plantings. This item represents the lump sum/agreed price to provide additional irrigation for these areas. I Item B: Additional grading was performed on the Northern portion of the parking lot. In order to comply with dust control standards, application of dust suppressant is required. Bid Items 12, 15 and Item C These items are required in order to complete the construction of curb (Increase Amounts) and gutter and street paving on Alvarado Rd. North of the Project site. This additional work is being completed at the request of Remodel staff. It is the section adjacent to the North half of the lot which was not originally awarded by Council. Due to savings in various areas of the project, sufficient funds exist to complete this additional work. Working time on this project has stopped. The contract currently remains open for the landscape maintenance period. Actual time for construction of this additional work is not to exceed 10 working days. * Note: No additional mark ups will be added to any item on this Change Order.All cost per each item are final. SOURCE OF FUNDS The following accounts will be utilized or credited as indicated: Account No. 261-4283-50003 Conv. Center Phase 2 (Building & Equipment) Items A, B, 22 and 20% of Item C- $4,071.79 Account No. 134-4498-50227 Local Measure A, Atnado/Alvarado St. Itnprovemnts Items 12, 15, 18, 23, and 80% of Item C-$16,221.00 Summary of Costs Contract Time Original Contract Amount: $730,356.25 Original Completion Date: September 8,2004 This Change Order: $20,292.79 Days Added for this C.C.O.: 0- Previous Change Order(s): $20,010.50 Previous Days Added: 69- Revised Contract Amount: $770,659.54 Revised Completion Date: December 17,2004 I have received a copy of this Change City Approval: Order and the above AGREED PRICES are acceptable to the contractor. Submitted by Date Street Maintenance Manager By Approved by Date City-Engineer Date Approved by Date City-Manager 2 MINUTE ORDER NO. �'6 ✓'7 APPRPOVING CONSTRUCTION CHANGE ORDER NO. 3 TO AGREEMENT •N9: 4863 WITH CONTRERAS CONSTRUCTION, INC., ,FOR ICITY PROJECT NO. 02-27 AMADO/ALVARADO PARKING LOT AND STREET IMPROVEMENTS, IN THE AMOUNT OF$20,292.79, FOR A TOTAL CONTRACT PRICE OF $770,659.54./ I, James Thompson, City Clerk of the City of Palm Springs, hereby certify that this Minute Order approving Construction Change Order No. 3 to Agreement No. 4863 with Contreras Construction, Inc., for City Project No, 02-27, Amado/Alvarado Parking Lot and Street Improvements, in the amount of$20,292.79, for a total contract price of$770,659,54, was adopted bX the City Council of the City of Palm Springs, California, in a meeting thereof held on the 20' day of April, 2005. James Thompson, City Clerk