Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
1/20/2010 - STAFF REPORTS
Page 1 of 1 Subj: Statement for City Council Date: 1/20/2010 425:55 P-M_ Pacific Standard Time From: psccactus o.aol Corn To: DolfCastillogaol.com I have asked Dolf(or Darren) to read my statement for you tonight as I cannot be here. The Cocky Cactus has been in Palm Springs for almost 25 years and we are in favor of and understand the need for the Business Improvement District_ As a small business we could never afford the advertising that has been provided by the BID. The BID allows the downtown merchants to pool their resources and accomplish things most of us could not do alone. We feel the fairest and most sensible is for the fees to be based on the business license fees. We also hope that the city would see fit to show their support of the downtown merchants by matching the amount collected. As the stronger the downtown is, the stronger the city is. Laura Walsh and David Cyr of The Cocky Cactus support the Business Improvement District 100%! Thank you_ at /z'o /zo10 ,L�u,��r- vJFr tsN Svc ui77e� aY�a�oc�=o cAsrrccv Wednesday, January 20,2010 ACL: DolfCastillo Tammy Perewhica From: Beatiiz Terry Ibumblbee4 c@dc.rr.com] Sent: Friday, November 06,200911:06 AM To: Tammy Perezchica Subject: Townhall Meetings Attendance Attachments: GreenSubbles.jpg; 10-1-2009 Mainstreet Townhall BID session form.docx; 10-5-2009 Mainstreet Townhall BID session.docx; 10-6-2009 Mainstreet Townhall BID session.docx, 10-6-2009 Mainstreet Townhall BID session.docx; 10-14-2009 Mainstreet Townhall BID session.docx; 10-19-2009 Mainstreet Townhall BID session.doc Attached is each meeting separated, all merchants and"visitors"are included in each sheet. Over all you had 34 merchants offend the meetings,with the exception of 2 ( Richard Foster, Antique Fine Consignments&David Allen, Chochkeys,that submitted their form directly to you) This brings the count to 36 merchants overall. Attended but not included in the number above are: Barbara Abraham, Resident John Pavinski, Chamber Bons Rose, Landlord John rmeon Please let me know if you need me to re-organize the list, Bea No virus found in this incoming message. Checked by AVG-www.avg.com Version: 8.5.425/Virus Database:270.14.52/2484-Release Date: 11/06/09 07:38:00 Ol/ZO/ZO /U �TgG6� S. A• t �SL)YPL LM 9 ,J 774, C-- i 10/1/2009 MainStreet Town hall meeting Location: Eat At lakes Facilitator:Tony Larcombe Attendees that received BID Session form: Name Business Name Joy Meredith Crystal Fantasy Courtney Newman Modern Way Joel Wolfgang Trend House Michael Kern Savage PS Laura Walsh The Cocky Cactus Sam Heaton/on Behalf of Michael Lord Michael Lord Gallery Paula Walters DIGS MarkVanlaanen Trio Restaurant Shawn Elmora Asylum Linda Smith L Smith Home _ Terra Laza Cheeky's James Lassak A Cut Above Christopher Malm lakes 10/5%2009 MainStreet Town hall meeting Location:Crystal Fantasy Facilitator:Joy Meredith Attendees that received BID Session form: Name Business Name - Jesse Danner Snip Snip Nicole Anesko Nicki A's Tony Larcombe Laura Walsh Cocky Cactus Aimee Lockwood Palm Springs General Store Judy Sailors Yogurt on Tap Roxi Mishler PS Carriages Rides 10/6/2009 MainStreet Town hall meeting Location: IHOP Facilitator. Paul Mediano Attendees that received BID Session form: Name Business Name Steve Ahajanian Steves Coin Shop Mike McLean McLean Co Rentals Jesse Danner - Snip Snip Kristen Olsen Urban Yoga Center Mindy Reed An Bistro Nicole Anesko Nicki Xs Rodolfo Castillo Cactus Berry Yogurt Kathleen Bennett Johnny Costas Tony Larcombe Joy Meredith Crystal Fantasy Cathleen Bennett Johnny Costas 10/14/2009 MainStreet Town hall meeting Location:Chamber Facilitator.Clark Elliott Attendees: Name Business Name Jesse Danner Snip Snip Buzz Judy Sailors Yogurt on Tap Dorothy Milauskas Plaza Eye Fashions Barbara Abraham Resident Phyllis Silver Tony's Pasta Mia Joy Meredith Crystal Fantasy Luciano Ramirez Latino Books John Pavinski John Timean Steve Ahajanian Steve's Coin Shop 10/19/2009 MainStreet Town hall meeting Location: Downtown Experience Office Facilitator:IC Constant(Pomme Fritte) Attendees: Name Business Name Joy Meredith Crystal Fantasy Bonnie Reiss Sensuality Boris Rose LandLord Tracy Heller Heausso Gallery Roxi Mishler Palm Springs Carriages John Marine momento p-1 BID Input Session Form Pfease fill vut theIlowing form completely with signature. Please circle one option for each ection or provide written note of yo (r recommendation. These forms will be Forwarded with the summary repo tathe council as requested bythe C�ty Council Palm Springs on July 15,2009. if you choose to forward at a I ter date(no later mber than Nove 1, � 09) Please fax to Tammy Perezchica at 760-262-3107 or email Ta m mvP canvonCOMM ERCIAIkervices.com. Nleetine Date: is 3a Business Name: Name: I Title: Business Address-, 1) phone:C-A70 { ` .9 Email: S h'yt I Si ature: I ' PS BID Fee Structure I 1) the same structure as we currently use i 2) By zone �alm Canyon Drive Baristo to Alejo 100%, Palm Canyon Drive Alej- to Tachevah and Palm i anyon Drive Baristo to Damon SM, Indian, Belardo, side streets 60%) 3) By gross sales i 4) By gross sales with jone percentages as in #2 5) Other funding mech nisms- ex: possible request to city-. 6) By multiple of business license Other I I I I I p.2 I'� lCdl�Ct_ •C�, l�l:l? .�'l'2�`Tr P�Cr� � _ PS BID Boundary 1) Keep on final boundaries. Divide into four zones: Uptown Design District, alm Canyon, Indian CInyon and f elardo. We would hope fees would represent the zoo s proximity to the down own corel(Tahquitz and Palm Canyon). Monies collect would he jsecll overall for marketing, special vents would be zone specific. 2) Increase 11D boundaries:Tachevah (north) to Mesquite (south) and the mc untains'(west) to Caballeros (east)Residences would not he included. The area would b divided into zones;fees would represent the zones proximity to the downtown core (Ta iquitz and Palm Canyon). urger Ho lowerfees. We envision starting at a $50-00 for mo t outlying areas. " The larger area tomto consideration future development in the Mesqu a/Palm Canyon area. Marketing wId cover all areas; special events would be zone specif c. 3) Charge every busin sin Palm Springs a Business Improvement Fee thereb lowering the fee for everyone. Other I PS 8 1 D Pra ram�Su estio I s The BID, when fi lly funded, has approximately a $130K budget. How do you bell ve these funds should be spent? Prior to meeting please review BID program information at City of Palm Springs website at http ff(www.pal Ilmsprines-ca.&oylindex.aspx?page=710. I PA i BID Input Session Form Please fill out the floIllowing fnri completely with signature. Please circle one option for each ection or provide written note of yoJr recommepdation. These Forms will be forwarded with the summary repo tothe council as requested by the City Council�If Palm Springs on July 15,20M If you choose to forward at a I ter date(no later than November 1, I Oi791 pleas II fax to Tammy Perezchica at 760-262-3107 or email Tamm can onCOMMERCIALIservices.com. Meetine Date: l p/3�T - Business Name: Lau GAALeE221 Name- Title- Business Address: , Phane: _71&0 (Oqq 91� j Email: AM L,Lcryyrl - Si ature: i PS BID Fee structure I - 1) the same structure as we currently use 2) By zone (Balm Canyon Drive Baristo to Alejo 1D0%, Palm Canyon Drive Alej to Tachevah and Palm i anyon Drive Baristo to Ramon 80%, Indian, Belardo, side streets 60%) 3) By gross sales ; 4) By gross Tales with jone percentages as in 42 5) Other funelling mechanisms-ex:-passible request to city 6) By multiple of business license Other ' - I r Oct 15 09 10:4),a Palm Sps Chmbr ?GO-325-21GUS P• 2� �`�P/viNlki PS BID Boundary 1} -ep original boundaries. Divide into four zones: Uptown Design District, Palm Canyon, Indian Canyon and Belardo. We would hope fees would represent the zones-proximity to the downtown core (Tahquitz and Palm Canyon). Monies collect would be used overall for marketing, special events would be zone specific. 2) Increase BID boundaries:Tachevah (north) to Mesquite (south) and the mountains (west) to Caballeros (east). Residences would not be included. The area would be divided into zones;fees would represent the zones proximity to the downtown-core (Tahquitz and Palm Canyon). Larger area =lower fees, We envision starting at a $50.00 for most outlying areas. The larger area takes into consideration,future development in the Mesquite/Palm Canyon area. Marketing would cover all areas; special events would be zone specific_ 3) Charge every business in Palm Springs a Business Improvement Fee thereby lowering the fee for everyone. Other PS BID Program Suggestions The BID,when fully funded, has approximately a $130K budget. Now do you believe these funds should be spent? Prior to meeting please review BID program information at City of Palm Springs website at http://www.paimspriings-ca.govhlindex.aspx?page=710. ROV-02-2009 04 :46 PM THE COCKY CACTUS '760 864 9902 P-01 BID Input Session Form Please fill out the following form completely with signature. Please circle one option for each section or provide written note of your recommendation. These forms will be forwarded with the summary report to the council as requested by the City Council of Palm Springs on July 15, 2009. If you choose to forward at a later date(no later than November 1,2009)please fax to Tammy Perexchica at 760-262-3107 ar email Tammy@canyonCOMMEFtCfAL$ervices.com. Alieefloy Date 8 si e: Name. � 1�1rtA i � 5�' Title: OV-kTW6,y Business Addr : T Phone: Email: Si r IDS BID Fee Structure 1) the same structure as we currently use 2) By zone (Palm Canyon Drive Baristo to Alejo 100%, Palm Canyon Drive Alejo to Tachevah and Palm Canyon Drive Baristo to Ramon So%, Indian, Belardo, side streets 60%) B) By gross sales 4) By gross sales with zone percentages as in #2 5) other funding mechanisms - ex: possible request to city 6) By multiple of business license r NOW-02-2009 04-47 PM THE COCKY CACTUS 760 864 9902 P_ O2 PS BID Boundary 1) Keep original boundaries. Divide into four zones: Uptown Design district, Palm Canyon, Indian Canyon and Belardo. We would hope fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Monies collect would be us4d overall for marketing, special events would be zone specific. 2) Increase BID boundaries:Tachevah (north) to Mesquite (south) and the mountains (west) to Caballeros (east). Residences would not be included. The area would be divided into zones; fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). larger area = lower fees.We envision starting at a $50.00 for most outlying areas. The larger area takes into consideration future development in the Mesquite,/Palm Canyon area. Marketing would cover all areas; special events would be zone specific. 3) Charge every business in Palm Springs a Business Improvement Fee thereby (lowering the fee for everyone. Lather l M--�t'lVl) Al) �i '�'�i�°. Gt 7�Yl�� Y r� air G't�im as PCPCAIf A fN &LNLd PS BID Program Supnestions The BID, when fully funded, has approximately a $130K budget. How do you believe these funds should be spent? Prior to meeting please review BID program information at City of Palm Springs website at http;//www.paimsprings-ca.gov/iq-Oex.aspx?page=71Q. �Vc� In ct.wcar�. �1�I��S vw 9�1rV►n11' .hl� BID Input Session Form Piease Fill outthe following farm com'pfetely withsignature. Please circle one option for each section,or provide wrltt�n note of your recommendation. These form's wilt he forwarded with the summary,iejrart to tW&,:bunciI-As requested by the City Council of Palm Springs on July 1%2004. if you choose to forward at a later date{na lax�r' iharifJaveiiibpir3;�db3}'°please°'fhYltis'T'arYi'i�i�k'P°ereii;File'�'C7lh-�Z'�"3- tl�7drema9l'"". .. � . 7ar�tirr( k[anganCG9lvli6l� l�[s'cYti+ s"cdm - :«:r ' . , ..= �, -'';;.—: 41--. 1� ..: �. rdn.u. 'nC±i'i'" j.'G,ei�._.v1 :Mc'iSy">'�.. ,tq � r a.-•• �.� i .. r ^• Fµp r.'h .,!.r 'C t•��,.�'y'•' �, j,•./.li. ��]1 : my j3y�lYlEf59"14ar�le. � �Y r� ���.f�:�:ry. . � 3' �'/��IN �I•yr ._ �' ..� .. ' ,,./cif .� Pliidne: _ (-760.. 673 - 5Z' () tLf - rt,14- Si ature PS BID Fee StructureY 1} the Barrie structure"as we curredtly use 2} By zone (Palm Canyon Drive Rari'sto to Alejo 100%, Palm Canyan,D,riv".lejo to,.Tachevah - and Palm Canyon Drive Bar'isto to Ramon 80%, Indian, Belardo,side streets 60%) I T. I , lo ",Bygrgssr'sa►es,".. 4) By gross sales with zone percentages as in ##2 5) -Other funding mechanisms-ex: possible request to city MU tip 0f'l5usiriess license Ps'ei'QI�r Undarir „•, . - ;e9. - -:„ 1 :s �`,:::'^• ::: r.u`i,:'x 1? w:`e"., "' �.: • ..:,., ..,;.i..r'::n tzt..iK, .:•. ... :- : -:, i-. .,: .- -- •_ ; -i. . 9 ) Keep original bounda[rii's.,TJfui4f��ka1pur Ypri s; #)C,q l ,:) 5„igf.,D,i$tti ,;,parrr�:Ca>�y .n,,.. {J.. Wit, ..9i, •. ( to - 1u i : }+Y- Indian Canyon and,Belardo. We would hope,fees would rep'tespiit t]7�_zcaarl�s.pr ixy_t�l. the downtown core(Tah'g0ita. nd Palm CarwyunJ• Monies c©t'l'ecti'�iraufil be us �f aveall' faC marketing,special events would be zone specific. l 4 r 2) Increase 131D boundaries:,Tacheva'h (north) to 11 es aite-1ii ' rthfry�rnd`tge'^tno'diitains'(vrrestj to Caballeros(east). gesidenc oyW.6 09t li'oo", ed.- T'g/ �;wduld Ixe_divided into, :� ._ zones-,tees woura�o—rie9enC the ziin'es proximltytti the-dpw'MbWn ceiW(Ta;quitz"an'd Palm Canyo,n)."Larger area :fi aia ' TL , il�le nvia in,startin D;47U fdPirk t' irnggmM. The largerarea takes into consid'e6OOR futu developmerit.i.n the Mesquite/Paiin Canyon area. Marketfnowld'rcvver,°a� 'speriievir�ti•vaotd'fatkt�`B=5pBGI 'C: .h,16^'� ' mti h` rSw- Nhwt -1>TT.r i`:y .., w •..a.V:.S i; .i "{ ^ ....._-,• 3) Charge every Nislfii'Ss in; a)'rYf'Sphlhg5 a"Bi751n Ss"'li prCYv i F if'tfifereby Co ef7ng"th' fee for everyorK . Other I�� -�:�,. .�"ions" ,. , . • . The ID, when fully funded, has approxiMafely a $130K budget. How do you believe these fund's should be spent? Prior to meeting please review BID program information at-City,of Patm•spring3 website at http://www.palmsprings-ca.goyindex.aspx7R2ge=T10. Nov 01 09 01 : 02p Haosso Gallery 1 7603222212 p_ 1 BID Input Session Form Please fill out the following farm completely with signature. Please circle one option for each section or provide written note of your recommendation. These forms will be forwarded with the summary report to the council as requested by the City council of Palm Springs on July 15,2009. if you choose to forward at a later date (no later than November 1, 2009) please fax to Tammy Perezchica at 760-262-3107 or email Ta rnmV @canyon COM M ERCIALservices.com. Meefine Mate, Business Name:•GWOrIO C r � Name: '�'i L�-I lAr' - ((n Title: Business Address: 107 _ Phone: Si nature• PS BID Fee Structure 1) the same structure as we currently use 0 By zone (Palm Canyon drive Baristo to Alejo 100%, Palm Canyon Drive Alejo to Tachevah and Palm Canyon Drive Baristo to Ramon 80%, Indian, Belardo, side streets 60%) 3)' By gross sales 4) By gross sales with zone percentages as in #2 5) Other funding mechanisms-ex: possible request to city 5) By multiple of businesslicense , f therin_—I }:et t fsr%� -tea,.-�A�� :r3 s T1. C�h �� t__• �-�-�i� -�I�te-r`. _ r�P+F'-►C� C'c�� -�vc.t _ �vc�rs -ice GnW' r.• Cz Pss c� zf ice Nov 01 09 01:04p Heusso Gallery 1 7603222212 p. l - PS BID Boundary 1) Keep original boundaries. Divide into four zones: Uptown Design District, Palm Canyon, Indian Canyon and Bela rdo. We would hope fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon)_ Monies collect would be used overall for. marketing, special events would be zone specific. 2) Increase BID boundaries:Tachevah (north)to Mesquite (south) and the mountains (west) to Caballeros (east). Residences would not be included. The area would be divided into zones;fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Larger area = lower fees. We envision starting at a $50.00 for most outlying areas_ The larger area takes into consideration future development in the Mesquite/Palm Canyon area. Marketing would cover all areas; special events would be zone specific. 3) Charge every business in Palm Springs a Business Improvement Fee thereby lowering the fee for everyone. Other PS BID Program Suggestions The BID, when fully funded, has approximately a $130K budget_ Mow do you believe these funds should be spent? Prior to meeting please review BID program information at City of Palm Springs website at http://www,paimsprings-ca.gov/index.aspx?page=710. rsa c,>e� 1�4 -6 �G L'�c:� �-1:.,• I�►,r�*-� � rt , fors �•- i]CT-31-2009 M31 FIMM:DAHLE C7601 318-1031 T0.1760c- 23107 P.3 cirto BID Input Session Form Please fill out the following form completely with signature. Please circle one option for each section or provide written note of your recommendation. These forms will be forwarded with the summary report to the council as requested by the City Council of Palm Springs on July 15,2009. If you choose to forward at a later date(no later than November 1,2009)please fax to Tammy Perexchica at 760-262-3101 or email Tamm can anCOMMERCIALservices.com. Meeting dahe:_ d 0o q ftsiess Name: Name: �Arl«�7 Title: Cd.,=Qk��E� Business Address: _116 LA PLAzA.AlA ORiU( Phene:_ 760 2 —3))8 Email: ,d Q�� �0�• C d PS 8I0 Fee Structure 1) the same structure as we currently use 2) By zone (Palm Canyon Drive Baristo to Alejo 100%, Palm Canyon Drive Alejo to Tachevah and Palm Canyon Drive Baristo to Ramon 80%, Indian, Belardo,side streets 60%) 3) By gross sales A) By gross sales with zone percentages as-in#2 5) Other funding mechanisms-ex: possible request to city 6) By multiple of business license t er OCT-31-2009 17:31 FROM:DAHLE (760) 318-1031 TO:17602623107 P.4 PS BID Boundary 1) Keep original boundaries. Divide into four zones: Uptown Design District, Palm Canyon, Indian Canyon and Belardo. We would hope fees would represent the zones Proximity to the downtown core (Tahquitz and Palm Canyon). Monies collect would be used overall for marketing,special events would be zone specific. 2) Increase BID boundaries:Tachevah (north) to Mesquite (south)and the mountains (west) to Caballeros (east). Residences would not be included. The area would be divided into zones;fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon).Larger area = lower fees. We envision starting at a$50.00 for most outlying areas. The larger area takes into consideration future development in the Mesquite/Palm Canyon area. Marketing would cover all areas; special events would be zone specific. 3) Charge every business in Palm Springs a Business Improvement Fee thereby lowering the fee for everyone. Other 15�,kS 77 - OhfA )T AA-:1�5137V _PA-6*z PS BID Program Suggestions The BID,when fully funded, has approximately a $130K budget. Mow do you believe these funds should be spent? Prior to meeting please review BID program information at City of palm Springs website at htto://www.t)almsprings-ca.gov/index.aspx?page=710. 44- 5RZJ1'1%- ao ka�5 S Jk s 6T ' cc %4- t'ALA& CAU- !J 'aCT-31-2009 17.30 FROM:DRFILE (760) 316-1031 TO:17602623107 - P:1 fQ T BID Input Session Form Please fill out the following form completely with signature. Please circle one option for each section or provide, written note of your recommendation. These forms will be forwarded with the summary report to the council as requested by the City Council of Palm Springs on July 15,2009. If you choose to forward at a later date Ino later. than November 1,2009)please fax to Tammy Perezchica at 760-262-3107 or email Tammv@canyonCOMMERCIALservices.com. IUeClIng 2gte: _QC& Ju lness Name ti Name: S !{ I Title: t/\� usil�ess Address: ^ Lpk Phe 0 ZZ g Email- L. 5 % L-LO 1Q0 L •tan p5 BID Fee 5tr tture 1) the same structure as we currently use 2) By zone (Palm Canyon Drive Baristo to Alejo 100%, Palm Canyon Drive Alejo to Tachevah and Palm Canyon Drive Baristo to Ramon 80%, Indian, Belardo, side streets 60%) 3) By gross sales 4) By gross sales with zone percentages as in#2 5) Other funding mechanisms- ex_ possible request to city Q6) By multiple of business license Y er �JI�d.i73s�JL>knr 0CT-31-2009 17:30 FROM:DAHLE C760] 31B-103i TO:17602623107 P.2 /7 Ile PS BID Boundary 1) Keep original boundaries. Divide into four zones: Uptown Design District, Palm Canyon, Indian Canyon and Belardo. We would hope fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Monies collect would be used overall for marketing, special events would be zone specific. 2) Increase BID boundaries:Tachevah (north)to Mesquite (south) and the mountains(west) to Caballeros (east). Residences would not be included. The area would be divided into zones;fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Larger area = lower fees. We envision starting at a $50,00 for most outlying areas. The larger area takes into consideration future development in the Mesquite/Palm Canyon area. Marketing would cover all areas;special events would be zone specific. 3) ) Charge every business in Palm Springs a Business Improvement Fee thereby lowering the. fee for everyone. �l Other i ij ^4r7 S d PS BID Pro Sgrxestions The BID, when fully funded, has approximately a $130K budget. How do you believe these funds should be spent? Prior to meeting please review BID program information at City of Palm Springs website at btie-JLwww.paimsprinm-ca.gov/index.aspx?page=710. BID Input Session Form Please fill out the following form completely with signature. Please circle one option for each Section or provide written note of your recommendation. These forms will be forwarded with the summary report to the council as requested by the City Council of Palm Springs an July 15,2009. If you choose to forward at a later date(no later than November 1,2005),please fax to Tammy Perezchica at 760-262-3107 or email Tammy@canyonCOMMERCIALse.ndr,qs.com. w Meeting Date: 00/— L'5— e p Business Nam jq//L A-reSJ�ij� Name: T"$' & 9�, j fl-."Uo Title- D1e)0j dg/Z Business Address: �.+— Phone: Email- a AOL ,Ca z'�, S ature- PS BID Fee Structure- -- - -- - 1) the same structure as we currently use 2) By zone (Palm Canyon Drive Baristo to Alejo 100%, Palm Canyon Drive Alejo to Tachevah and Palm Canyon Drive Baristo to Ramon 80%, Indian, Belardo, side streets 60%) B) By grass sales 4) By gross sales with zone percentages as in #2 S) Other funding mechanisms- ex: possible request to city 5 By multiple of business license Other TO 3.`1Ylci do-SaV3H 6981179809LG 61:01 600Z/T6/O1 PS BID Bounda (- Keep original boundaries. Divide into four zones: Uptown Design District, Palm Canyon,dian Canyon and Belardo. We would hope fees would represent the zones proximity toe downtown core (Tahquitz and Palm Canyon). Monies collect would-be-used overallfaarketing, special events would be zone specific. 2) Increase BID boundaries: Tachevah (north) to Mesquite (south) and the mountains (west) to Caballeros (east). Residences would not be included. The area would be divided into zones; fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Larger area = lower fees. We envision starting at a $50.00 for most outlying areas. The larger area takes into consideration future development in the Mesquite/Palm Canyon + area. Marketin would coverall areas; special events would be zone specific. 3) Charge every business in Palm Springs a Business Improvement Fee thereby lowering the fee for everyone. Other PS BID Program Suggestiong The BID, when fully funded, has approximately a $130K budget. How do you believe these funds should be spent? Prior to meeting please review BID program information at City of Palm Springs website at htt : www. alms rin s-ca. ov index.as x? a e=710, Ag L0 3 Vd dfrSQtl3H 890TV9809LG 6T:07 600ZIIE/0T FROM . FRX NO. ; Oct_ 12 2009 g11:39PM P1 BID Input Session Form Please fill out the following form completely with signature. Please circle one option for each section or provide written note of your 'recommendation. These forms will be forwarded with the summary report to the council as requested by the City Council of Palm springs on July 15,2009. If you choose to forward at a later date(no later. than November 1,2009)please fax to Tammy Perexchica at 760-262-3107 or email TarhniyOohyonCOMrtMEROALservices.com_ Meeting Date: 65019! M 41 , ZWq %6slnes Naiire: IOW[g -lT . POWN Nome:_ 16MV. LARC,0W%BiLs-. Title• C31r0Vfelf Business Address: '?S6 N0117 VrL(VA !g NAMOV\ Dq �ho e: (160 31S 72Z7 Email iLARGC)IM . �i A01 COM ftnature• U ► 1AdA-0.1pr, PS BID Fee Structure 1) 'the sarne'structure as we currently use 2) By zone (Palm Canyon Drive Baristo to Alejo 100%, Palm Canyon Drive Alejo to Tachevah and balm Canyon Drive Baristo to Ramon 80%, Indian, Belardo,side streets 609I 3) By gross sales 4) By gross sales with zone percentages as in 42 S) Other funding mechanisms- ex_ possible request to city 6) By multiple of business license Other FROM FAX NO. Oct. 12 2009 01:30PM P2 P5 i31U 8munda , - . 11 Keep original boundaries. Divide into four zones: Uptown Design district, palm Canyon, Indian canyon and Belardo.We would hope fees would represent the zones proximity to the downtown core (Thhquitz and Palm Canyon). Monies collect would be used overall for marketing, special events would be zone specific. 2) Increase BID boundaries:Tachevah (north) to Mesquite(south) and the mountains(west) to Caballeros(east), Residences would not be included. .The area would be divided into zones, fees would represent the zones proximity to the downtown core(Tahquitz and Palm Canyon), Larger area e- lower fees. We envision starting at a $50.00 for most outlying areas. The larger,area takes into consideration future development in the Mesquite/Palm Canyon area, Marketing would cover all areas,special events would be zone specific„ 3) Charge every business In Palm Springs a Business improvement Fee thereby lowering the fee for everyone, Other GReAT2. AN (APTOWIq 1'1.eSiq" DtST tli4CT S#D StDe 5T0.15STS TO TINDIAN no, P5'B#D Pc eral».Su i rts . The BID, when fully funded, has approximately a $130K budget. How do you believe these funds should be spent? Prior to meeting please review BID program information at City of Palm Springs website at httpa)www.palmsprings-ca.gov/index.aspx?page=710. sw- rnz 5e$s4ce W1-ro CATY qu%6N.. I rAwe r� �t.�0�`� Anvtawrce.vv►6?v>. s�� OMATS Rai.tNl FROM FAX No. Oct. 05 2009 04:0aPM Pt BID Input Session Form Please fill out the following form completely with signature. Please circle one option for each section or provide written note of your recommendation. These forms will be Forwarded with the summary report to the council as requested by the City Council of Palm Springs on July 15, 2009. if you choose to forward at a later date(no later than November 1,2009)please fax to Tammy Perezchica at 76(1-262.3107 or email TommyPcanyonCOMMERCIALservices.com. Meeting Date: . . ' tininess Nat}�ei, � � �'_�'l 4�r'1 r J� �2 1�. .' •.. - - ... . . Na e: L .h,C YM i Trtl u) h'e,.v.. -: T 11 r� 1 (� iBusine dd ens: m d wt - t7 lO �0;; V4,V.w+.� +QK Phone, Em I: Q 2 5i t A PS Bltif Fee Structure 1) 'the`same structure as we currently use 2) By zone (Palm Canyon Drive Baristo to Alejo 100%, Palm Canyon Drive Alejo to 7achevah and Palm Canyon Drive Baristo to Ramon 80%, Indian, Belardo, side streets 50%) gobs.sales 4) By gross sales with zone percentages as in#2 5} Other funding'mechartisms- ex: possible request to city 15). By multiple of business licen (� O herjD &C VAL . 4� orta or 05 2009 04:O8PM F2 F•FIX NO. = PS 6la BQunda�r 1) Keep original boundaries. Divide into four zones., Uptown Diisign District, Palm Canyon, . Indian Carryon and Belardo. We would hope fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Monies collect would be used overall for marketing, special events would be zone specific. 2) Increase BID boundaries:Tachevah (north) to Mesquite (�o 11146" a rrroi3Mis to Caballeros (east), Residences would not be included. The area would be divided into zones; fees would represent the zones proximity to the downtown-core (Tahquitz and P,aim Canyon):"Larger areia= lovrer'fees.We envision starting at a $Sa.tlo-for most otitiyirig'areas. The larger area tale into consideration future development in the Mesqulte/Palm Canyon area. Marketing would cover all areas, special events would be zone specific:. 3) Charge every business in Palm Springs a Business improvement Fee thereby lowering the fee'for everyone. tether PS H10 pros<r+t►t ceinr� . .; The BID,when fully funded,has approximately a $130K budget. How do You.beiieve these funds _ sf r tdi�e spent'? •prior to meeting Please review BID program infarmatian at Citiy of Patn►5prings website at htt 1/www.nalmsprin s-ta ovfir+dex.as e ax2aa 1 e DIGS [760] 325-6688 P- 1 BID Input Session Form Please fill out the following form completely with signature. Please circle one option for each section or provide written note of your recommendation. These forms will be forwarded with the summary report to the council as requested by the City Council of Palm Springs on July 15, 2009. If you choose to forward at a later date(no later than November 1, 2009)please fax to Tammy Perezchica at 760-262-31-07 or email Tammy@canyonCQMMERCIAtservices.com. Meeting Date: Business Name: I GJ(�,� Name: . (L.C� �� J� �G( `CjC�' �J Title: ( �,14}f=- - Business Address: ,J /L�_ INtlllltrt Im n / Phone: Email: W ( �t � Si mature: PS BID ee tructure 1) the same structure as we currently use 2.) By zone (Palm Canyon Drive Baristo to Alejo 100%, Palm Canyon Drive Alejo to Tachevah and Palm Canyon Drive Baristo to Ramon 80%, Indian, Belardo, side streets 607c) 3) By gross sales 4) By gross sales with zone percentages as in #2 5) other funding mechanisms - ex: possible request to city... By multiple of busine license other ct DIGS f7601325-6689 p. i P5 BID Boundary 1) Keep original boundaries. Divide into four zones: Uptown Design District, Palm Canyon, Indian Canyon and Belardo. We would hope fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Monies collect would be used overall for marketing, special events would be zone specific, z) Increase BID boundaries:Tachevah (north) to Mesquite (south) and the mountains (west) to Caballeros (east). Residences would not be included. The area would be divided into zones; fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Larger area = lower fees. We envision starting at a $50.00 for most outlying areas. The larger area takes into consideration future development in the Mesquite/Palm Canyon area. Marketing would cover all areas; special events would be zone specific. 311 Charge every business in Palm Springs a Business improvement Fee thereby lowering the fee for everyone. Other 6( �ILf_SP1 Ih�{�-C1ltil���t r�S r PS BID Program suggestions The BID, when fully funded, has approximately a $130K budget. How do you believe these funds should be spent? Prior to meeting please review BID program information at City of Palm Springs website at http://www.paimsorines-ca goy/index aspx?page=710. Jddu n r- tl ` S FROM FAX NO. : Oct, 91 2009 12:54PM Pi BID Input Session Form Please fill out the following form completely with signature. Please circle one option for each section or provide written note of your recommendation. These forms will be forwarded with the summary report to the couricl as requested by the City Council of Palm Springs on July 15, 2009. if you choose to f rd at a later date (no later than November 1, 2009) please fax to Tammy Perezchica 760�email Tammy@canyonCOMMERCIALservices.com: Meet: ate: Business Name: j / Name �3�(� �I = Ti11e: ( .O^Q(/fial _ Business Aoress .�? ' Phone, Ema l: Signature: ES BID Fee Structure , ') the same structure as we currently use ( Q1 (j 14 4 i r J t ,<:2) By zone (Palm Canyon Drive Baristo to Alejo 100%, Palm Canyon Drive Alejo to Tachevah and Palm Canyon Drive Ba��rri�ist��o to Raman %, Indian, Belardo, side streets 60%) ?I/M 11 �� Tla � L�JI� d77 ! Alahl;)3� ,,l`c ,3) By gross sales �p a U1 14 be 01 1 )e4) By gross sates AMth zone percentages as in #2 USSa"' 0144 GJIl S) then funding mechanisms - ex: possibl re uest to c) 6) By multiple of business license MW Wo 011Q r boar gcj7 Mo Other r f FROM : FAX NO. : Oct. 01 2009 12:55PM P2 PS BID Boundary 1) Keep original boundaries_ Divide into four zones: Uptown Design District, Palm Canyon, Indian Canyon and Belardo. We would hope fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Monies collect would be used overall for marketing, special events would be zone specific. 2) Increase BID boundaries_ Tachevah (north) to Mesquite (south) and the mountains (west) to Caballeros (east)_ Residences would not be included. The area would be divided into zones; fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Larger area lower fees. We envision starting at a $50.00 for most outlying areas. The larger area takes into consideration future development in the Mesquite/Palm Canyon area. Marketing would cover all areas; special events would be zone specific. 0 Charge every business in Palm Springs a Business Improvement Fee thereby lowering the fee for everyone. TAIR An^ Other • i PS BID Psogram Saggestions The BID,when fully funded, has approximately a $130K budget. How do you believe these funds should be spent? Prior to meeting please review BID program Information at City of Palm Springs website at http://www,pC11 .s�g2— c"oyLndex_aspx?page`710. w FROM : FRX NO. : Qct. 01 2005, 12:55PM P3 it wo M pal Pat HOW 60 4 r D vo a4J 49 � 10/21/2009 14:09 7GO9641253 I DISTINCTIVE HOME PAGE 01/02 Input Session Form i Please fill out the folloyAl form comple tel r ith signature. Please circle one option for each section or provide written note of your recon imendation. s forms will be forwarded with the summary report to the council as requested by the City Cou ril of palm S n July IS, 2009. if you choose to forward at a later date(no later than November 1,2009)pease fax to Ta n ir i erezchica at 760-262-3107 or email TammyecanXo COMMr R IALservices.c I i I satin Date_ 10 009 Business Name: CLA K ELLI T C 1 PTS Name: CLARK ELLIOT Title OWNS PRESIDENT Business Address: 3 1 N. PALM 1144 N N DR VE# 03 Phone 323 251-JUJO Email: I" rk Llliot verizon.n i 5i nature i PS BID Fee Structur 1) the same structu a as we curii ritill use i 2) By zone (Palm Ca 1yon Drive to Alejo 100%, Palm Canyon Drive Alejo to Tachevah and Palm Canyon Drive Barist ic 11amon 80%, Indian, Beiardo,side streets 60%) I 3) By gross sales i I 4) By gross sales with zone perc a n t 1,yes as in #2 lissible 5) Other funding m hanisms- request to city I I 6} By multiple of bu iness livens ; i I SUPPORT MATCHING THE BUSIP 1114 1 i ICENSE FEE, BUT NOT BEYOND THAT. I 10/24/2009 00:54 7604169192 KATHLEEN BENNETT PAGE 61 BID Input Session Form Please fill out the following form completely with signature. Please circle one option for each section or provide written note of your recommendation. These forms will be forwarded with the summary report to the council as requested by the City Council of Palm Springs on July 15, 2009, If you choose to forward at a later date(no later than November 1,2009)please fax to Tammy Perezchica at 760-262-3107 or email. T?rrmygecanyonCOMMERCIALservices.cam. Meetin date• , � �'� r Susines Na ea r )) � W Name:,,... ,LIhGQ, - , Title: _ Busi r. r 1 W� P Email: Signatures Zdr ri -- PS BID Fee Structure 1) the some structure as we currently use 2 By zone (Palm Canyon Drive Baristo to Aiejo 100%, Palm Canyon Drive Alejo to Tachevah and Palm Canyon Drive Baristo to Ramon 80%, Indian, Belardo, side streets 60%) 3) By gross sales 4) By gross sales with zone percentages as in#2 5) Other funding mechanisms - ex: possible request to city 6) By multiple of business license y Other &=.% Il ) _`i't k4 Al� �OZ4 4d :il� Z OY l hrw &&&U4A.0f ::OMJ ..M_ YYtPctzA�r}k - V— *-L 13a-� - Yta♦- a- ' YJ:i,r� �VWAAC.r.r��•1-dt__�y�,_,_ 10/21/2009 14:09 7808941253 DISTINCTIVE HOME PAGE 02/02 I I I i PS 131D Boundary 1) Keep original bo andaries. Di rito four zones: Uptown Design District, Palm Canyon, Indian Canyon aid Belardo. V le I�ould hope fees would represent zones proximity to the downtown re (Tahqui z d Palm Canyon). Monies collect would be used overall for marketing, spec al events w I e zone specific. i i I 2) Increase BID bo ndaries:Ta h (north)to Mesquite (south)and the mountains (west) to Caballeros (e st). Reside ould not be included. The area would be divided into zones;fees woulakes represent Iiones proximity to the downtown core (Tahquitz and Palm Canyon). Largerrea = lowe II-We envision starting at a $50.00 for most outlying.areas. The larger area into a Iration future development in the Mesquite/Palm Canyon area. Marketing would cove I CJ, reas;special events would be zone specific. I 3) Charge every b iness in Pa 'rings a Business Improvement Fee thereby lowering the fee for everyon . I I Other , i PS BID Praeram Sue tions The BID,when fully fu ded, has a r I mately a $130K budget. How do you believe these funds should be spent? TO OPULATE 1011 gTowN/uPTowN PALM SPRINGS WITH SHOPPERS VIA SPECIAL EVENTS, PROI OTIONS, L EFFECTS, PERILS, PERSONAL APPEARANCES, ETC. BID E KPENDITURES SHOULD BE LIMIT E X ONLY THINGS THAT PROMOTE ALL AREAS OF DOWNTOWN/UPTO N, (9e:TH NER PROGRAM) NOT JUST CENTRAL DOWNTOWN AREA(TAHQUITZ). I DO NUT BELIEVF IN ONING DOA It 11WN TO DECIDE BID FEES AS 1 DON'T FEEL IT CAN BE FAIRLY DIVIDED OR ALLIRATELY 19 1 IINGED BY EVENT. 10/24/2009 00:55 7604169192 KATHLEEN SENNETT PAGE 01 PS BID Boundary 9l) Keep original boundaries, Divide into four zones: Uptown Design District, Palm Canyon, Indian Canyon and Belardo. We would hope.fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Monies collect would.be used overall for marketing, special events would be zone specific. Z) Increase BID boundaries.Tachevah (north) to Mesquite (south) and the mountains (west) to Caballeros (east). Residences would not be included. The area would be divided into zones; fees would represent the zones proximity to the downtown core.(Tahquitz and Palm Canyon). Larger area= lower fees. We envision starting at a $50.00 for most outlying areas. The larger area takes into consideration future development in the Mesquite/Palm Canyon area. Marketing would cover all areas; special events would be zone specific. 3) Charge every business in Palm Springs a Business Improvement Fee thereby lowering the, fee for everyone. Other PS 010 PrpMm SuF.eestions The BID, when fully funded, has approximately a $130K budget. How do you believe these funds should be spent? Prior to meeting please review BID program information at City of Palm Springs website at htto://wwwpalmsgrings-ca.gov/index.asox?page=71D. '� r►vim s FROM FAX NO. Oot. 24 2009 Q4:50PM P1 BID Input Session Form Please fill out the following form completely with signature. Please circle one option For each section or provide written note of your recommendation. These forms will be forwarded with the summary report to the council as requested by the My Council of Palm Springs an July 15,2009. If you choose to forward at a later date (no later than November 1,2009)please fax to Tammy Perezchica at 760-262-3107 or email TammyLTcanyonCOMMERaABeryic s.com. Mgalgg Date' Busineg NiMe: SLAM._ _=1� �]z LG✓y+• WI-0-4L -10 Name: L c. [;Title: 6 tAY� _ Business Addres ; '�� 041 • diri t�i. �. ,�ifLr�+ / .r�• �j' ,�1,..�� Pho11e. � 0� 3- `� Erlail: .f .�eir C/ o L'�jplL, Signature: 9 L(C AA PS BID Fee Structure 1j,• the same structure as we currently use By zone (Palm Canyon Drive Baristo to Alejo 100%, Palm Canyon,Drive Alejo to Tachevah and Palm Carryon Drive Baristo to Ramon 80%, Indian, Belardo, side streets 60%) 31, By gross sales 41I By gross gales with zone percentages as in f#2 5) Other funding mechanisms -ex: possible request to city By multiple of business license Other Oct 27 09 12:53p OMS Construction 760-322-9272 p.1 IBID Input Session Form PI I ase fill out the following form completely with signature. Please circle one option For each section or provide wlitten note of your recommendation. These forms will be forwarded with the summary report to the council as re uested by the City Council of palm Springs on July 15, 2009. If you choose to forward at a later date(no later th n November 1,2009)please fax to Tammy Perezchica at 760-262-3107 or email T rmmv(@canvoriCOMMERCIALservices.com. i �eetins Date: 11 ,sinessName: N me �fL�/J G �i/�i).0 1r�icGf j Title: L21 131isinessAddress: P one: . �7���� ?7—7�'S'kl' Email: I c , �c�S �7 Clr�r'rxzil/2`7 Signature: LTG Z k 131D Fee Structure I 1j the same structure as we currently use I 2) 6y zone (Palm Canyon Drive Baristo to Alejo 100%, Palm Canyon Drive Alejo to Tachevah Ii and Palm Canyon Drive Baristo to Ramon 80%, Indian, Belardo, side streets 60%) 3 By gross sales 4 By gross sales with zone percentages as in #2 5 Other funding mechanisms - ex: possible request to city 6 By multiple of business license �ther I I i i FROM : Fax NO.• Oct. 24 2069 &1:51PM P2 � ) Keep original boundaries. Divide into four zones: Uptown Design District, Palm Canyon, Indian Canyon and Beiardo. We would hope fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Monies collect would be used overall for marketing, special events would be zone specific. Z) Increase BID boundaries:Tachevah (north) to Mesquite (south)and the mountains(west) to Caballeros(east). Residences would not be included. The area would be divided into zones:fees would represent the zones proximity to the downtown care (Tahquitz and PRIM Canyon).Larger area = lower fees, We envision starting at a $50.00 for.most outlying areas. The larger area takes into consideration future development in the Mesquite/Palm Canyon area. Marketing would cover all areas, special events would be zone specific 3) Charge'every business in Palm springs a Business Improvement Fee thereby lowering the fee for everyone. _. Other PS 11ID Pr6mm%&g9sEions The BID,when fully funded, has approximately a $130K budget. Wow do you believe these funds should be spent? Prior to meeting please review BID program information at City of Palm Springs website at httP:Itl+v°. W nalmsnrines-ca Gov/index asrx?oaPQ -710. i V'Zviivvr Tun L%: 20 YA- IOU ear *ain nilauaaas Bye InB=Lute IQJOP2lv93 BID Input Session Form Please fill out the following form completely with signature. Please circle one option for each section or provide . written note of your recommendation. These forms will be forwarded with the summary report to the council as requested by the City Council of Palm Springs on July-15,2009_ If you choose to forward at a later date(no later than November 1,2009)please fax to Tammy Perezehica at 760.262-3107 or email TammvcmranyonCOMMERCLIALservices.com. Meetir¢Date: OUT / r� v�a0, Business Name: j�,�hzZ E � E' SL'f XJS Name: t A///-/ C)(A .Titee: Business Address: Phone: 74 d—.J a s Email:_0�L�uSr� �� *yc 44'SK/5'S , ColF� I Signature- PS BID Fee Structure 1) the same structure as we currently use �— i j 2) By zone (Palm Canyon Drive Baristo to Alejo 10056, Palm Canyon Drive Alejo to Tachevah and Palm Canyon Drive Baristo to Ramon 80%, Indian, Belardo,side streets 60%) 1 3) By gross sales i4) By gross sates with zone percentages_as in.#2 5) Other funding mechanisms_ex: possible request to�city 6) By multiple of business license At&_,La Other 72 Oct 27 09 01A1p DMS Construction 76M22-9272 p.2 it PS BID Boundary 1 Keep original boundaries.'Divide into four zones. Uptown Design Distri Palm Canyon, Indian Canyon and Belardo. We would hope fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Monies collect would be used overall for marketing, special events would be zone specific. I 21 Increase BID boundaries:Tachevah (north) to Mesquite (south) and the mountains (west) to Caballeros (east). Residences would not be included. The area would be divided into zones;fees would represent the zones proximity to the'downtown (ore�Tahquitz and Palm Canyon). Larger area = lower fees. We envision starting at a $50.00 for ost outlying areas. The larger area takes into consideration future development in the Mesquite/Palm Canyon area. Marketing would cover all areas; special events would be zone spe�ific. 31 Charge every business in Palm Springs a Business Improvement Fee ther'rby lowering the fee for everyone. I ther I I I I PS BID Program Suggestions T e BID, when fully funded, has approximately a $130K budget. How do you believe these funds s iould be spent? Prior to meeting please review BID program information at Cily of Palm Springs ebsite at http://www.paimsi2rings-ca.gov/index.aspx?page=710. I I I I I JI -__ oat 15 09 10: 41a Palm Sprgs Chmbr 7SU-325-3608 p. 1 BID Input Session Form Please fill out the following form completely with signature- Please circle one option for each section or provide written note of your recommendation. These forms will be forwarded with the summary report to the council as requested by the City Council of Palm Springs on July 15,2009. If you choose to forward at a later date(no later than November 1,2009)please fax to Tammy Perezchica at 760-262-3107 or email Tammy(Mcanyo nCQMMERCIALservices.com. Meeting" Date: G��/#0 Business Name: ( 1r Erne Olr-rC p,--- &-)V''7rrJ4,Ur( Namg: -JAM G)16,1tidkf Title: C7�6: Business,Address: Gg! &J% Zliz, D Phone: prod - �� - 5'Sr� Email: �U�i.v �r�r.L✓c�c- Gam! Signature: PS BID Fee Structure I) the same structure as we currently_use .......... 21 By zone (Palm Canyon Drive Baristo to Alejo 100%, Palm Canyon Drive Alejo to Tachevah and Palm Canyon Drive Baristo to Ramon 80%, Indian, Belardo, side streets 60%) 3) By gross sales 4) By gross sales with tone percentages as in ff2 5) Other funding mechanisms-ex: possible request to city 6) By multiple of business license ,�7l�sT `2 77r07eJ ther lU/LY/FVYT 1'Va 1Y!'JQ FHd (OY DL( YJ1J II11}Ild 6�y aY0 44CtiYCucO VV]/YYO i PS_BID Boundary ,(9 1) Keep original boundaries. Divide into four zones: Uptow' n Design District, Palm Canyon, Indian Canyon and Belardo.We would hope fees would represent the zones proximity.to the downtown core (Tahquitz and Palm Canyon). Monies collect would be used overall for marketing,special events would be zone specific. 2) Increase BID boundaries;Tachevah (north)to Mesquite(south)and the mountains (wrest) to Caballeros(east). Residences would not be included. The area would be divided into zones;fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon)_ Larger area= lower fees.We envision starting at a $50.00 for most outlying areas_ The larger area takes into consideration future development in the Mesquite/Palm Canyon area. Marketing would cover all areas;special events would be zone specific: 3) Charge every business in Palm Springs a Business Improvement Fee thereby lowering the fee for everyone. � Cai (� rc�v �til�dti �ji , (G�Zt ether PS Bid Fmgmm 5ugimstions The BID, when fully funded, has approximately a$130K budget. Mow do you believe these funds should be spent? Prior to meeting please review BID program information at City of Palm Springs website at htt : www. alms rin s-ca. ov index.as x? a e=710. 10/20/2009 02:23 FAX 0 001/002 BID Input Session Form Please fill out the following form completely with signature. Please circle one option for each section or provide written note of your recommendation. These forms will be forwarded with the summary report to the council as requested by the City Council of palm Springs on July 15,2009. If you choose to forward at a later date(no later" than November 1, 2009)please fax to Tammy Perezchica at 760-262-3107 or email lmmmygRcanvonCDNIMERCIAI_bervices.com. µ Meeting Date �"` v0 Business Name: G LOA) ra/3'AI1 IdeIA4 Name: J"I�144104 r l.: ��M O&MA" Business Address: '11.7 fU^1 CA06A60 Phone: 2 - 2 $'&d Email: es Siena ur PS BID Fee Structure 1). the-same structure as we currently use By zone (Palm Canyon Drive Baristo to Alejo 100%, Palm Canyon Drive Aleja,to Tachevah and Palm Canyon Drive Baristo to Ramon 80%, Indian, Belardo, side streets 60%) 3) By gross sales 4) By gross sales with zone percentages as in #2 5) - ---Other funding mechanisms -ex: possible request to city 6) By multiple of business license Other 10f80f2009 02:23 FAX �002f002 s I , PS BID Boundary i f 11) Keep original boundaries. Divide into four zones: Uptown Design District, Palm Canyon, I Indian Canyon and Belardo. We would hope fees would represent the zones proximity to the downtown core (Tahquitz and Palen Canyon). Monies collect would be used overall for marketing, special events would be zone specific. 2) increase BID boundaries:Tachevah (north)to Mesquite (south) and the mountains (west) to caballeros(east). Residences would not be Included. The area would be divided into zones; fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon), larger area= lower fees. We envision starting at a $50.00 for most outlying areas. The larger area takes into consideration future development in the Mesquite/Palm Canyon area, Marketing would cover all areas; special events would be zone specific, 3) Charge every business in Palm Springs a Business Improvement Fee thereby lowering the fee for everyone, Other PS BID Prggmm Suggestions � The BID, when fully funded, has approximately a $130K budget. How do you believe these funds should be spent? Prior to meeting please review BID program information at City of Palm Springs website at htto://www.oalmsorings-ca.eov/index,asax?EiAge=710. BID Input Session Form Please fill out the following farm completely with signature. Please circle one option for each section or provide written note of your recommendation- These forms will be forwarded with the summary report to-the council as requested by the City Council of Palm Springs on July 15, 2009. If you choose to forward at a later date (no later than November 1, 2009) please fax to Tammy Perezchica at 760-262-3107 or email Tat-nmv@canyonCOMMERCIALservices.com. Meeting Date: Business Name: �Efl) )I U " W ' 5 Name: J-a-_-L W oL h1 Ln Title: O WN E?-/Pk2>=a. Business Address: �v7 � 1 r)M Cgt'l\1 0q 2LIZ, 79-2262- Phone: 7Loa' ! -R�, Finail: LC. , e0it f Sig nature: PS BID Fee Structure /1} the same structure as we currently use 2) By zone (Palm Canyon Drive Baristo to Alejo 100%, Palm Canyon Drive Alej,o to Tachevah and Palm Canyon Drive Baristo to Ramon 80%, Indian, Belardo, side streets 60%) 3) By gross sales 4) By gross sales with zone percentages as in #2 5) Other funding mechanisms - ex: possible request to city 6) By multiple of business license Other PS BID Boundary 1) Keep original boundaries. Qivide into four zones: Uptown Design District, Palm Canyon, Indian Canyon and Belardo. We would hope fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Monies collect would be used overall for marketing, special events would be zone specific. 2) Increase BID boundaries: Tachevah (north) to Mesquite (south) and the mountains (west) to Caballeros (east). Residences would not be included. The area would be divided into zones;fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Larger area = lower fees. We envision starting at a $50.60 for most outlying areas. The larger area takes into consideration future development in the Mesquite/Palm Canyon area. Marketing would coverall areas;special events would be zone specific. 3) Charge every business in Palm Springs a-Business Improvement Fee thereby lowering the fee for everyone. Other YYIIIIP, Nd N;ilr '��k► S u U'21 4 11)C k�:,rjz( PS BID Program Suggestions The BID, when fully funded, has approximately a $130K budget. How do you believe these funds should be.spent? Prior to meeting please review BID program information at City of Palm Springs website at http://www.palmsprings-ca.gov/index.aspx?page=710. BID Input Session Form Please fill out the following form completely with signature. Please circle one option for each section or provide written note of your recommendation. These forms will be forwarded with the summary report to the council as requested by the City Council of Palm Springs on July 15, 2009. If you choose to forward at a later date (no later than November 1, 2009) please fax to Tammy Perezchica at 760-262-3107 or email Tammy canyonCOMMERCIALservices.com. Meeting Date: Business Name: �Name: y__J�t' a5 L ediss fifth Title: + .1_U`AI If/? Business Address: 3 'All L/'A7 jirJ �� .02 Phone:_7. .� a '3 9-S/ 00 o Email: !'m � �� © y0& 60/". Signature• PS BID Fee Structure 1) the same structure as we currently use 2) By zone (Palm Canyon Drive Baristo to Alejo 100%, Palm Canyon Drive Alejo to Tachevah and Palm Canyon Drive Baristo to Ramon 80%, Indian, Belardo, side streets 60%) 3) By gross sales 4) By gross sales with zone percentages as in #2 5) Other funding mechanisms - ex: possible request to city 6) By multiple of business license ther PS BID Boundary, 1) Keep original boundaries. Divide into four zones: Uptown Design District, Palm Canyon, Indian Canyon and Belardo: We would hope fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Monies collect would be used overall-for marketing, special events would be zone specific. 2) Increase BID boundaries: Tachevah (north) to Mesquite (south) and the mountains (west) to Caballeros (east). Residences would not be included. The area would be divided into zones; fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Larger area = lower fees. We envision starting at a $50.00 for most outlying areas._ The larger area takes into consideration future development in the Mesquite/'Palm Canyon area. Marketing would cover all areas; special events would be zone specific. 3) Charge every business in Palm Springs a Business Improvement Fee thereby lowering the fee for everyone. / y� Other � 106Z pf,frrls /Jr. c � �s�<, 6. S p-p V'l�—tT — �sI _ PS BID Program Suggestions The BID, when fully funded, has approximately a $130K budget. How do you believe these funds should be spent? Prior'to meeting please review BID program information at City of Palm Springs website at http1(www.paimsprings-ca.gov/index.aspx?page=710. !AJa /4 C �BG(JILfi dr � �hAr BID Input Session Form Please fill out the following form completely with signature. Please circle one option for each section or provide written note of your recommendation. These forms will be forwarded with the summary report to the council as requested by the City Council of Palm. Springs on July 15, 2009. If you choose to forward at a later date (no later than November 1, 2009)please fax to Tammy Perezchica at 760-262-3107 or email Tammy(McanyonCOMMERCIALservices.com. Meeting Date- Business Name: G C) �r n �.A Name: ( _cr raves- L�e-.�Mcen �7Title: = �f Business Address: 47 L 141"L rG vi `/C" a Phone: 60 3) ' SS Email: C ( CC) <0— 11/1 Signature: PS BID Fee Structure 1) the same structure as we currently use 2) By zone (Palm Canyon Drive Baristo to Alejo 100%, Palm Canyon Drive Alejo to,Tachevah- and Palm Canyon Drive Baristo to Ramon 80%, Indian, Belardo, side streets 60%) l 3) By gross sales 4) By gross sales with zone percentages as in #2 5) Other funding mechanisms - ex: possible request to city 5) By multiple of business license f Other �D.1 n. �2' + ��d PS BID Boundary 1) Keep original boundarie . Divide i four zones: Uptown Design District, Palm Canyon, Indian Canyon and Belardo. We would hope fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Monies collect would be used overall for marketing, special events would be zone specific. 2) Increase BID boundaries: Tachevah (north) to Mesquite (south) and the mountains (west) to Caballeros (east). Residences would not be included. The area would be divided into zones; fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Larger area = lower fees. We envision starting at a $50.00 for most outlying areas. The larger area takes into consideration future development in the Mesquite/Palm Canyon area. Marketing would cover all areas; special events would be zone specific. 3) " Charge every business in Palm Springs a Business Improvement Fee thereby lowering the fee for everyone. Other PS BID Program Suggestions . The BID, when fully funded, has approximately a $130K budget. How do you believe these funds should be spent? Prior to meeting please review BID program information at City of.Paim Springs website at http://www.palmsprings-ca.gov/index.aspx?page=710. BID Input Session Form Please fill out the following form completely with signature. Please circle one option for each section or provide- _. written note of your recommendation. These forms will be forwarded with the summary report to the council as requested by the City Council of Palm Springs on July 15, 2009. If you choose to forward at a later date (no later than November 1, 2009) please fax to Tammy Perezchica at 760-262-3107 or email Tam M&Canyon COMMERCIALservices.com. - Meeting Date: Ld Business Name: Name.: 1� .- - � Title: Business Address: (022 ' M CAt\j-1.�tj s Phone �7af5• Z 5 °T Email �i1�� S 5. �• � Signature: PS BID Fee Structure 1) the same structure as we currently use 2) By zone (Palm Canyon Drive Baristo to Alejo 100%, Palm Canyon Drive Alejo to Tachevah and Palm Canyon Drive Baristo to Ramon 80%, Indian, Belardo, side streets 60%) 3) By gross sales - 4) By gross sales with zone percentages as in #2 F Other funding mechanisms - ex: possible request to city 6) By multiple of business license Other PS BID Boundary 1) Keep original boundaries. Divide into four zones: Uptown Design District, Palm Canyon, Indian Canyon and Belardo. We would hope fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Monies collect would be used overall for marketing, special events would be zone specific. 2) Increase BID boundaries: Tachevah (north) to Mesquite (south) and the mountains (west) to Caballeros(east). Residences would not be included._ The area would be divided into zones; fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Larger area = lower fees. We envision starting at a $50.00 for most outlying areas. The larger area takes into consideration future development in the Mesquite,/Palm Canyon area. Marketing would cover all areas; special events would be zone specific. 3) Charge every business in Palm Springs a Business Improvement Fee thereby lowering the . fee for everyone. Other PS BID Proeram Suggestions The BID, when fully funded, has approximately a $130K budget. How do you believe these funds should be spent? Prior to meeting please review BID program information at City of Palm Springs website at http://www.palms(2rings-ca.gov/index.aspx?page=710. BID Input Session Form Please fill out the following form completely with signature. Please circle one option for each section or provide wHtten note of your recommendation. These forms will be forwarded with the summary report to the council as requested by the City Council of Palm Springs on July 15, 2009. If you choose to forward at a later date (no later than November 1, 2009)please fax to Tammy Perezchica at 760-262-3107 or email Tammy@canyonCOMMERCIAL5ervices.com. Meeting Date: Business Name:CrT5 I^ i Name: .AK� 12J k eC tg01VV\, ' Title: Business Address: (0to Phone: 2 C'� Email: Signature- PS BID Fee Structure 1) the same structure as we currently use 2) By zone (Palm Canyon Drive Baristo to Alejo 100%, Palm Canyon Drive Alejo to Tachevah and Palm Canyon Drive Baristo to Ramon 80%, Indian, Belardo, side streets 60%) 3) By gross sales 4) By gross sales with zone percentages as in #2 5) Other funding mechanisms - ex: possible request to city .,,, (_ 6) By multiple of business license Other-- PS BID Boundary 1) Keep original boundaries. Divide into four zones: Uptown Design District,Palm Canyon, Indian Canyon and Belardo. We would hope fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Monies collect would be used overall for marketing, special events would be zone specific. 2) Increase BID boundaries: Tachevah (north) to Mesquite (south) and the mountains (west) to Caballeros (east):Residences would not be included. The area wpm-[d be divided into zones; fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Larger area = lower fees. We envision starting at a $50.00 for Jt outlying areas. The larger area takes into consideration future development in the Mesquite,/Palm Canyon. area. Marketing would cover all areas; special events would be zone specific. 3) Charge every business in Palm Springs a Business Improvement Fee thereby lowering the fee for everyone. other C.Fe_C� Utrt� PS BID Program Suggestions The BID, when fully funded, has approximately a $130K budget. How do you believe these funds should be spent? Prior to meeting please review BID program information at City of Palm Springs website at tt www. alms rin s-ca. ov index.as x? a e=710. ) ANAL SS -- . - Ct-e �AtQ5 5YkQ cn wit BID Input Session Form Please fill out the following form completely with signature. Please circle one option for each section or provide whtten note of your recommendation. These forms will be forwarded with the summary report to the council as requested by the City Council of Palm Springs on July 15, 2009. If you choose to forward at a later date(no later than November 1, 2009)please fax to Tammy Perezchica at 760-262-3107 or email Tammy@canyonCOMMERCIALservices.com. Meeting Date: Business Name: r ZZ , C7 M Name: l4el Tiittl /e: Business Address: 0 461 1 PC ✓t-r w o.r Phone ��� `��v `' � g �Email• d �aa� �r f .Cps Signature: PS BID Fee Structure 1) the same structure as we currently use 2) By zone (Palm Canyon Drive Baristo to Alejo 100%, Palm Canyon Drive Alejo to Tachevah and Palm Canyon Drive Baristo to Ramon 80%, Indian, Belardo, side streets 60%) 3) By gross sales' 4) By gross sales with zone percentages as in #2 5) Other funding mechanisms - ex.: possible request to city 6) By multiple of business license Other 1A I - 0 O PS BID Boundary 1) Keep original boundaries. Divide into four zones: Uptown Design District, Palm,Canyon, Indian Canyon and Belardo. We would hope fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Monies collect would be used overall for marketing, special events would be zone specific. 2) Increase BID boundaries: Tachevah (north) to Mesquite (south) and the mountains (west) to Caballeros (east). Residences would not be included., The area would be divided into zones; fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Larger area = lower fees. We envision starting at a $50.00 for most outlying areas. The larger area takes into consideration future development in the Mesqute/Palm Canyon area. (Marketing would cover all'oreas; special events would be zone specific. 3) Charge every business-in Palm Springs a Business Improvement Fee thereby loweringthe- fee for everyone. Other PS BID Program Suggestions The BID, when fully funded, has approximately a $130K budget. How do you believe these funds should be spent? Prior to meeting please review BID program information at City of Palm Springs website at http://www.paimsprings-ca.gov/index.aspx?page=710. BID Input Session Form Please fill out the following form completely with signature. Please circle one option for each section or provide written note of your recommendation. These forms will be forwarded with the summary report to the council as requested by the City Council of Palm Springs on July 15, 2009. If you choose to forward at a later date (no later than November 1, 2009) please fax to'Tammy Perezchica at 760-262-3107 or email TammyocanyonCOMMERCIALservices.com. Meeting Date' 0 cJ ,V Business Name: Name• s'o 0) Ti le• Business Address: Phone: '2,—Email: Signature: PS BID Fee Structure �1) the same structure as we currently use 2�J By zone (Palm Canyon Drive Baristo to Alejo 100%, Palm Canyon Drive Alejoo to Tachevah and Palm Canyon Drive Baristo to Ramon 80%, Indian, Belardo, side streets 60%) 3) By gross sales 4) By gross sales with zone percentages as in ##2 5) Other funding mechanisms - ex: possible request to city 6) By multiple of business license, a Ot er �T to �w E {[ PS BID Boundary 1) Keep original boundaries. Divide into four zones: Upt'0,'.,,' esign District,,Palm Canyon, Indian Canyon and Belardo. We would hope fees wool represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Monies collect would be used overall for marketing, special events would be zone specific. Z) Increase BID boundaries:Tachevah (north) to Mesquite (south) and the mountains (west) to Caballeros(east). Residences would not be included. The area would be divided into zones; fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Larger area = lower fees. We envision starting at a $50.00 for most outlying areas. The larger area takes into consideration future development in the Mesquite/Palm Canyon area. Marketing would cover all areas; special events would be zone specific. 3) Charge every business in Palm Springs a Business Improvement Fee thereby lowering the fee for everyone. Other PS BID Program Suggestions The BID, when fully funded, has approximately a $130K budget. Mow do you believe these funds should be spent? Prior to meeting please review BID program information at City of Palm Springs website at http://www.palmsRrings-ca.gov/index.aspx?page=710. BID Input Session Form Please fill out the following form completely with signature. Please circle one option for each section or provide written note of your recommendation. These forms will be forwarded with the summary report to the council-as ' requested by the City Council of Palm Springs on July 15, 2009. If you choose to forward at a later date (no later than November 1, 2009) please fax to Tammy Perezchica at 760-262-3107 or email Tammy@canVbnCOMNI ERCIALservices.com. Meeting Date: {'('�nl/�J O Business Name: Name• 1 , _ Title: Business Address: 7 L 7� .I Phone: (J Email: i�CS / e � ( �JI Signature: PS BID Fee Structure 1) the same structure as we currently use 2) By zone (Palm Canyon Drive Baristo to Alejo 100%, Palm Canyon Drive Alejo to Tachevah. and Palm Canyon Drive Baristo to Ramon SO%, Indian, Belardo, side streets 60%) =3) BYss sales 4) By gross sales with zone percentages as in #2 5) Other funding mechanisms - ex: possible request to city 6) - By By multiple of business license Other c PS BID Boundary 1) Keep original boundaries. Divide into four-zones: Uptown Design District, Palm Canyon, Indian Canyon and Belardo. We would hope fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Monies collect would be used overall for marketing, special events would be zone specific. 2) Increase BID boundaries: Tachevah (north) to Mesquite (south) and the mountains (west) to Caballeros (east). Residences would not be included. The area would be divided into zones; fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Larger area = lower fees. We envision starting at-a $50.00 for most outlying areas. The larger area takes.into consideration future development in the Mesquite,/Palm Canyon . area. Marketing would cover all areas; special events would be zone specific. 3) Charge every business in Palm Springs a Business Improvement Fee thereby lowering the fee for everyone. Other PS BID Program Suggestions The BID, when fully funded, has approximately a $130K budget. How do you believe these funds should be spent? Prior to meeting please review BID program information at City of Palm Spring_ s website at http://www.qalmsprings-ca.gov/index.aspx?page=710. �._.-- BID Input Session Form Please fill out the following form completely with signature. Please circle one option for each section or'provide written note of your recommendation. These forms will be forwarded with the summary report to the council as requested by the City Council,of Palm Springs on July 15, 2009. If you choose to forward at a later date(no later than November 1, 2009) please fax to Tammy Perezchica at 760-262-3107 or email Tammy(@canyonCOMMERCIALseNices.com. Meeting Date: , 10-1 Business Name Name: / Title: Business Address: �rro k7 l%D7IV�d�'" Phone 3 7 Z Email: - Signature: PS BID Fee Structure 1) the same structure as we currently use 2) By zone (Palm Canyon Drive Baristo to Alejo 100%, Palm Canyon Drive Alejo to Tachevah and Palm Canyon Drive Baristo to Ramon 80%, Indian, Belardo, side streets 60%) 3) By gross sales 4) By gross sales with zone percentages as in #2 j5) Other fun echanisms - ex: possible request to city y multiple of business license PS BID Boundary 1) Keep original boundaries. Divide into four zones: Uptown Design District, Palm Canyon, Indian Canyon and Belardo. We would hope fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Monies collect would be used overall for marketing, special events would be zone specific. 2) Increase BID boundaries: Tachevah (north) to Mesquite (south) and the mountains (west) to Caballeros (east). Residences would not be included. The area would be divided into zones; fees would represent the zones Proximity to the downtown core (Tahquitz and Palm Canyon). Larger area = lower fees. We envision starting at a $50.00-for most outlying areas. The larger area'takes into consideration future development in the Mesquite/Palm Canyon area. Marketing would cover all areas; special events would be zone specific. 3) Charge every business in Palm Springs a Business Improvement Fee thereby lowering the fee for everyone". Other /" /\f 2cqv� - PS BID Program Suggestions The BID, when fully funded, has approximately a $130K budget. How do you believe these funds should be spent? Prior to meeting please review BID program information at City of Palm Springs- website at http://www.palmsprings-ca.gov/index.aspx?page=710. Q � "L " _ . BID Input Session Fo Q Please fill out the following form completely with signature. Please circle one option for each section or provide written note of your recommendation. These forms will be forwarded with the summary report to the council as requested by the City Council of Palm Springs on July 15, 2009. If you choose to forward at a later date (no later than November 1, 2009) please fax to Tammy Perezchica at 760-262-3107 or email Tai-nmy(@canyonCOMMERCIALservices.com. Meetin Date: Business Name: 1Z l A(� Name: Title: Business Address: v lU ��UV y Phone: Email: � Signature: PS BID Fee Structure 1) the same structure as we currently use 2) By zone (Palm Canyon Drive Baristo to Alejo 100%, Palm Canyon Drive Alejo to Tachevah and Palm Canyon Drive Baristo to Ramon 80%, Indian, Belardo, side streets 60%) 3) By gross sales 4) By gross sales with zgne percentages as in 42 Other funding mechanisms - ex: possible request to city By mu ip e o usmess license her PS BID Boundary 1) Keep original boundaries. Divide into four zones: Uptown Design District, Palm Canyon, Indian Canyon and Belardo- We would hope fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Monies collect would be used overall for marketing, special events would be zone specific. 2) Increase BID boundaries: Tachevah (north) to Mesquite (south) and the mountains (west) to Caballeros (east). Residences would not be included. The area would be divided into zones; fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Larger area = lower fees. We envision starting at a $50.00 for most outlying areas. The larger area takes into consideration future development in the Mesquite/Palm Canyon area. Marketing would cover all areas; special events would be zone specific. 3) Charge every business in Palm Springs a Business Improvement Fee thereby lowering the fee for everyone. _4 �� 1- 7 they_ sC�f� ,, �e ... �S1C�1'P --- •`)� Yln � 0 5 � BID Program Suggestions The BID, when fully funded, has approximately a $130K budget. How do you believe these funds should be spent? Prior to meeting please review BID program information at City of Palm Springs tt www- alms rin s-ca. ov index.as x? a e=710. f � 1 F _.. - - -� - - BID Input Session Form Please fill out the following form completely with signature. Please circle one option for each section or provide written note of your recommendation. These forms will be forwarded with the summary report to the council as requested by the City Council of Palm Springs on July 15, 2009. If you choose to forward at a later date(no later than November 1, 2009) please fax to Tammy Perezchica at 760-262-3107 or email Tarhmy@canVonCOMMERCIALservices.com. - Meeting Date: Business Name: -Tea's u'R l �� d7 -'-tyre JP41- Name:_ non.11(2 „ Title: ©M'7er Business Address: Phone: Em I: 22 C-LZEZT, CO,-'A Signature: 'PS Wb"Fee Structure 1) the same structure as we currently use 2) By zone (Palm Canyon Drive Baristo to Alejo 100%, Palm Canyon Drive Alejo to Tachevah and Palm Canyon Drive Baristo to Ramon 80%, Indian, Belardo, side streets 60%) 3) By gross sales 4) By gross sales with zone percentages as in #2 sr ' ch o e ... Q SJ Other funding mechanisms - ex: possible request to city -� dne2 ;t/c 7 Uq 4ls <73 06)• By multiple of business license — � Other ✓e ��/� lam Cc24 74/'' c,;, ,AID _ r 7e le / G° l/ r /lPS S' Y' PS BID Boundary 1) Keep original boundaries. Divide into four zones: Uptown Design District, Palm Canyon, Indian Canyon and Belardo. We would hope fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Monies collect would be used overall for marketing, special events would be zone specific. 2) Increase BID boundaries: Tachevah (north) to Mesquite (south) and the mountains (west), to Caballeros(east). Residences would not be included. The area would be divided into , zones; fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Larger area = lower fees. We envision starting at a $50.00 for most outlying areas. The larger area takes into consideration future development in the Mesquite/Palm Canyon area. Marketing would cover all areas; special events would be zone specific. 3) Charge every business in Palm Springs a Business Improvement Fee thereby lowering the fee for everyone. Other PS BID Program Suggestions The BID, when fully funded, has approximately a $130K budget. How do you believe these funds should be spent? Prior to meeting please review BID program information at City of Palm Springs website at http://www.palmsprings-ca.gov/index.aspx?page=710. Le / of ! /Jd� 5 lr� E en ,qdtle,'_ S Oaf 0e e A& MAIN STREET PALM SPRINGS As requested at the July 15, 2009 Palm Springs City Council meeting, the Palm Springs Main Street Association will be conducting meetings as outlined below to obtain Downtown Business INPUT. You are invited to attend any of the following Business Improvement District INPUT Meetings to offer your INPUT on the Main Street recommendations also outlined below. The summary of these collective input meetings and Main Streets recommendations will be submitted in December to the City Council. Your participation is encouraged and requested. MEETING DATES Main Street Palm Springs Representative/Facilitator Tony Larcombe Thursday October 1 @ 9:00am Jakes Ready to Eat 664 N. Palm Canyon Drive Paul Mediano Monday October 5 @ 9:00am IHOP 471 S.Indian Canyon Drive Laura Walsh/Joy Meredith Wednesday October 7 @ 8:30am Crystal Fantasy 268 N. Palm Canyon Drive Clark Elliott/Phyllis Silver Wednesday October 14 @ 5:00pm Chamber of Commerce Office 190 W.Amado JC Constant/John Shay Monday October 19 @ 9t00am Downtown Experience Office 105 S. Indian Canyon Drive Keith McCormick/Gerard Noonan Tuesday October 20 @ 5:00pm Palm Springs Exotic Cars Cheryl Hudson 244 N.Indian Canyon Drive PS BID Fee Structure 1) The same structure as we currently use 2) By zone (Palm Canyon Drive Baristo to Alejo 100%, Palm Canyon Drive Alejo to Tachevah and Palm Canyon Drive Baristo to Ramon 80%, Indian, Belardo, side streets 60%) 3) By gross sales 4) By gross sales with zone percentages as in #2 5) Other funding mechanisms - ex: possible request to city PS BID Boundary Suggestions 1.) Keep original boundaries. Divide into four zones: Uptown Design District, Palm Canyon, Indian Canyon and Belardo. We would hope fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Monies collect would be used overall for marketing, special events would be zone specific. 2.) Increase BID boundaries: Tachevah (north) to Mesquite (south) and the mountains (west) to Caballeros (east). Residences would not be included.The area would be divided into zones; fees would represent the zones proximity to the downtown core (Tahquitz and Palm Canyon). Larger area = lower fees. We envision starting at a $50.00 for most outlying areas. The larger area takes into consideration future development in the Mesquite/Palm Canyon area. Marketing would cover all areas; special events would be zone specific. 3.) Charge every business in Palm Springs a Business Improvement Fee thereby lowering the fee for everyone. PS BID Program Suggestions The BID,when fully funded, has approximately a $130K budget. How do you believe these funds should be spent? Prior to meeting please review BID program information at City of Palm Springs website at http://www.palmsprings- ca.gov/index.aspx?page=710.