HomeMy WebLinkAbout6/16/2010 - STAFF REPORTS - 2.N. {oF p A LM$A �y U y .S Cg4'IFORH�P. CITY COUNCIL STAFF REPORT DATE: JUNE 16, 2010 CONSENT CALENDAR SUBJECT: SPECIAL TESTING AND INSPECTION SERVICES AGREEMENT -- NEW ANIMAL CARE FACILITY PROJECT FROM: David H. Ready, City Manager BY: Owner's Representative SUMMARY The proposed action would result in the hiring of a consultant to perform Special Testing and Inspection Services, as required by the Building Code, for the new Animal Care Facility Project. RECOMMENDATION: 1) Approve a professional services agreement for special testing and inspection services, in a form approved by the City Attorney, with Southern California Soils & Testing, Inc., of Indio, CA in the amount of $78,000 for the Palm Springs Animal Care Facility Project. 2) Authorize the City Manager to sign and execute all necessary documents. STAFF ANALYSIS: For the construction of the Palm Springs Animal Care Facility the building code requires the use of a special material testing and inspection firm. The Procurement and Contracting Division prepared, posted, advertised and distributed RFP 08-10 for these services with proposals due on March 2, 2010. A pre-proposal estimate for the work was established at $110,000, The City received thirteen (13) responsive proposals complying with the requirements of the RFP document. A three member staff review panel evaluated and ranked the proposals from the firms and Southern California Soils & Testing, Inc. (SCS&T) was ranked number one; a local Indio firm. MF. M ^10. ct. N City Council Staff Report June 16, 2010- Page 2 Animal Shelter Special Testing & Inspection Contract Baseline cost proposals were provided under separate cover by the proposers, and with those numbers as well as the various firms commitments on the use of minimum hours per inspection, staff has been able to negotiate a contract with hourly rates down from the proposed $95 to $78 for inspection services. SCS&T stated in their proposal that no minimums shall apply. The proposed long form professional services agreement is on file in the Office of the City Clerk. Attached to this staff report is the Budget Estimate Summary prepared by Southern California Soils & Testing, Inc. FISCAL IMPACT. The project budget has allocated $130,000 for this work in account 8191-65213. Allen Smoot Craig GI dd�rs Owner's Representative Procurement & Contracting David H. Ready City Manager Attachment: 1. Budget Estimate Summary n BUDGET ESTIMATE SUMMARY FOR PALM SPRINGS ANIMAL CARE FACILITY TESTING AND INSPECTION Estimated Hours/Unit RatelUnit Total Cost FIELD INSPECTORITECHNICIAN Technician-Earthwork 80 hours Q $78.00 !hour $6,240.00 Tedhnlclan.Vtrliry Trench 83ckFll I38 hours @ $78,00 fhour $9.984.00 Technician•RaadlPatking Subgrade 40 hours (q $78.00 (hour $3,120.00 Technician-Base Course 8 hours Q $78.00 lhour $624.00 Technician-Asphalt Concrete 4hours $78.00 !hour $312.00 Technician-Permeable Pavers 8 hours Q $78.00 lhour $624.00 Field Inspector-Steel 120 hours @ $78.00 /hour $9,360.00 Technician,Shop Ulvasonic Testing of welds 12 hours Q $78.00 /Hour $936,00 Technician,Field Ulvasonic Testing of Welds 12 lours @ $78.00 lhour $936.00 Field Inspe" •Fireproofing 16 hours @ $78.00 /hov' $1,240.00 Field Inspector-Wood diaphragms 60 hours @ $78.00 lhour $4.680.00 Field Inspector.CQncrece 144 hours @ $78.00 lhour $I1,232.00 Field Inspector•Masonry Wall 60 hours 9 $78.00 lhour $6,240.00 $55,536.00 PROFESSIONAL STAFF Preconstruccion Meeting I hours @ $167.00 /lour $167.00 Office end Field Support 24 hours @ $167,00 /hour $4.0% Geologist•Footing Observations 32 hours. a $140,00 /hour $4,480.00 $8,655.00 REPORTS Final Report-Geotechnicel I report Q $2,250.00 /report $4250, $2,250.00 LABORATORY TESTING Maximum Density Test 4 tests @ $212.00 /test $848,00 Asphalt Conformance Testing I test (9 $447.00 /teat $447.00 Sieve Analysis 4 tests @ $71.00 /test $284.00 Resisrance-Value 1 test @ $26S.00 !test $265.00 Sand Equivalent 4 tests ® $85,00 ltesE $340,00 Cortoslvlty I set @ $180.00 /set $180.00 Conn'eEe Cylinders 80 each @ $26.00 leach $2,080.00 Grout Prism Compression Tests 21 each 0 $26.00 leach $546.06 Morcar Cylinder Compressirn II each a $26.00 leach $546.00 Masonry Prism Compression 6 each @ $143.00 leach $858.00 Masonry Block Absorption 6 each 0 $37.00 leach $222.0-0 Masonry Black Compression Test(Regular) 6 each @ $48.00 reach $288.00 Masonry Shrinkage Test 6each @ $242.00 leach $1,45200 Fireproofing Density Testa 6 each Q $66.00 leach $396,00 Bolt Assembly-Harness and Tensile Tests 20 each @ $11200 leach $2,240.00 ;10,992.00 TOTAL FOR OBSERVATION AND TESTING SERVICES $77,433,00 NOTE:We assume 0QL the testing and inspection will be required on an on-call,as-needed basis as scheduled by the Owner's Representative.SCS&T will work with the City's Reproseniauve co schedule site visits,tests and personnel in the most e8ieiem manner to minimize costs.The actual mxnber and duration of site visits will depend on will depcml on die canvactoes schedule and race of progress,the weather, and other factors beyond SCS&Ts control. Consequently,copl charges Could be more or less than the eatimate.