HomeMy WebLinkAbout7/7/2010 - STAFF REPORTS - 4.A. �°*P A`M sA�
c+
,k 1IC0e1 n�
C oRaTE� V.
f4`'�QPN, CITY COUNCIL STAFF REPORT
DATE: July 7, 2010 UNFINISHED BUSINESS
SUBJECT: APPROVE THE LANDSCAPING AND LIGHTING SITE PLAN FOR THE
SCULPTURE "RED ECHO" ON PRIVATE PROPERTY AT THE
SPRINGS SHOPPING CENTER LOCATED AT THE NORTHEAST
CORNER OF GENE AUTRY TRAIL AND RAMON ROAD.
FROM: David H. Ready, City Manager
BY: Community & Economic Development
SUMMARY
This action is to approve the landscaping and lighting site plan for the sculpture "Red
Echo" on private property at the Springs Shopping Center located at the northeast corner of
Gene Autry Trail and Ramon Road.
RECOMMENDATION:
1) Approve site plan for the sculpture "Red Echo' at the Springs Shopping Center;
and
2) Authorize the City Manager to execute all necessary documents.
STAFF ANALYSIS:
On June 4, 2008, the City Council approved the purchase of the sculpture "Red Echo"
by Konstantin Dimopoulos for $44,790 plus shipping and installation costs. The Public
Arts Commission made the recommendation to install the sculpture in the median
located at the intersection of South Palm Canyon Drive and Indian Canyon Drive.
However, the City Council deferred selecting a site and did not designate placement of
the sculpture at that time.
On February 17, 2010 City Council approved the conceptual placement of "Red Echo'
at the Springs Shopping Center and directed staff to return with detailed placement,
landscape and lighting plans for the sculpture. Staff procured the services of TKD
Associates to develop a landscape and lighting plan for the site and provide a complete
set of construction drawings.
The proposed landscaping and lighting elements are consistent with the requirements
approved by the Planning Department on May 29, 2007 for this project. Upon
completion of the landscaping installation the property owner agrees to maintain the
City Council Staff Report
July 7, 2010 -- Page 2
Approve Site Plan for"Red Echo"on Private Property at The Springs Shopping Center
access paths, landscaping and other improvements to the site. Ownership and
maintenance of the artwork will remain with the City of Palm Springs.
The public art fee collected from the Springs Shopping Center project was $83,773.
The cost incurred by the City to acquire and install the sculpture will be approximately
$59,000. The public art fees collected from this project will be applied towards the
acquisition and installation costs. The remaining balance of $24,664 will stay in the
public art fund.
In accordance with the Public Arts Ordinance No. 1479 Chapter 3.37 the site meets the
criteria under Section 3.37080 (a) Art Site Acceptability.
FISCAL IMPACT:
There is no impact to the General Fund. The cost of installation and maintenance shall
be made from the Public Arts Account#150-30-4408-50015.
p
7
Jennifer He'nlnin6 Thomas J. Wil
Arts and Special Projec rdinator Assistant City Manager
David H. Ready, E
City Manager
Attachments:
Site Plan
Project Cost Estimate
rx c rel
T K D ASS00AiE5,INC
i
A40HAVE GOLD FRACTUIM GRAN'TE PEBBLES i MOW STW
. J
RED ECHO SCULPTURE
PEBBLES
_ �-
- - - -_.- r Pw srtizx rxs CALVO
�'-24'LOW WALL - �`� ) - � r—ACCENT PLANT (r
WITH STONE VENEER �'�
TO MATCH BLZ-DNVG
iII
iV } try
- 42aOSGdF�_
N F3f
aA-A SECTION VIEW
SCALE 31?6`=1'Q` uaa�ctaxi a a p a '
V 3 LLxGE C.P.1C. FE
-
+ �--
1 4 DmA.x33lES
} T� 4 D A"ICti vE�'LpLD i.J Ex x e�to be relacatea
az4YIFE. :-- _ Lenune'tsem Gore; ff
) FS�s sit.LGW LL
-
O — ave ' DE' CQETE — —
`i-4d1
} .- O RAMON ROAD
o PLAN VIEW _
Q SCAM'1'=i0'-0' PLAN ING a�w
$ - _ (6)x 7OW METAL HALLS tt-GROLPM
�BY ARTIST ACCENT PLANT
ali t2'YME CONCRETE Mow STRP
tom' 16'-24'HT LOW WALL ! _J
/ WITH STORE VENEER
TO MATCH 8lALDMMXi e
Tau wa TnE e
• = - - 3'-4'DIA.PEBBLES
i- 4'Dtk FR AACTLNED GRANTEnoa�.yavart a ,�.�
-' P 4fai LEtaE*D
NOTE
-x':a£. 9utu uptale Fedp pain __ Ex - m.�r.braeed-ii ng [b.' lE 11^'lets.•ia r th m-4 pi f=gF3e GIGCeB _
_ -L - } } - s r sops nei a t�d�wrarier r na>. Eu.- m ee.a�oueee[ in a c-.c:a 5i—1 tam edge of? s.-u ptwe.
r:�gre..�a�pxrrca:o,�u:u�,�p:�eo by et,e aa;sc.
maa
,._ �.-� I r rer,agv...a rypr d 'a�x a --- Q•ur sl.n,.aa f
\ j 3� w gam:Nelo,a t In �.uera egaw �!- '
1 I, �leN Nate Gald' -- Iiea Gam IentMa 9-! -
TAIL PLAN - � w 2'd.pn+c«p.c ad Qacwpaead G ao a W-k h a.wtxg 1 µ�
SCALE.-3116'=1'-0' :5 L-dsc a.l w w er� pw,t--w.�v.esui:.-"
RED ECHO SCULPTURE
COST ESTIMATE
04-15-10
DESCRIPTION QUANTITY UNIT UNIT COST EXTENSION
HARSCAPE
Color concrete base 200 sq.ft. $8.00 $1,600.00
18"-24"Wall with Stone Veneer 26 Lf. $85.00 $2,210.00
Mow Strip 50 Lf. $8.00 $400.00
Fractured Granite 240 sq.ft. 3 t. $185.00 $555.00
Pebbles 200 sq.ft. 2 t. $200.00 $400.00
$5,165.00
PLANTING
Relocate Butia and Chamaerops 5 ea. $100.00 $500.00
Washingtonia Hybrid 12 I.f. $65.00 $780.00
Agave @ 5-Gal 37 ea_ $30.00 $1,110.00
Groundcovers @ 5-Gal 13 ea. $25.00 $325.00__
$2,715.00
IRRIGATION
Irrigation 1 I.S. $1,500.00
$1,500.00
TOTAL $9,380.00
TOTAL ESTIMATE $9,380.00
'FIGURES ARE FOR ESTIMATE PURPOSES ONLY. ACTUAL CONSTRUCTION COST MAY VARY.