HomeMy WebLinkAbout9/7/2005 - STAFF REPORTS (8) UT,:OV
Community Redevelopment Agency Staff Report
DATE: SEPTEMBER 7, 2005 NEW BUSINESS
SUBJECT: APPROVAL OF AN EXCLUSIVE AGREEMENT TO NEGOTIATE WITH
THE OASI GROUP, LLC OF LOS ANGELES, CALIFORNIA FOR A 5.7
ACRE AGENCY-OWNED PARCEL AT THE SOUTHEAST CORNER OF
ANDREAS ROAD AND CALLE EL SEGUNDO FOR THE PURPOSE OF
DEVELOPING A 210-ROOM FOUR-STAR GROUP MEETING HOTEL
j AND UP TO 120 CONDOMINIUMS, MERGED REDEVELOPMENT
PROJECT AREA#2
i
FROM: David H. Ready, Executive Director
BY: Community & Economic Development Department
SUMMARY:
This Exclusive Agreement to Negotiate with the Oasi Group, LLC, for a 5.7+ acre parcel
adjacent to the new front door of the Convention Center, commonly known as the
Prairie Schooner Parcel, sets in motion the process of developing a four-star group
meeting hotel to serve the Convention Center under the "Luxury Collection of Starwood
Hotels" brand. The business points are that the Developer would pay the Agency fair
market value for the parcel, and could negotiate on their own, without Agency
participation, for the two parcels fronting on Tahquitz Canyon Way to develop a project
with commercial frontage that connects better to downtown. The term of the Agreement
is for 18 months, though staff expects to develop the draft DDA within 4-6 months and,
under the "focused entitlement process," potentially be able to bring a DDA to the
Agency prior to the completion of the project's entitlement. New to the Agency, the
Agency and developer will undertake the "focused entitlement process" together
whereby the developer funds the environmental and planning contracts for the project,
with those contracts managed by the Agency rather than Planning. The project will still
undergo the normal planning approval process including review by the Architectural
Advisory Committee, Indian Planning Commission, Planning Commission, and City
Council, as well as the Agency.
RECOMMENDATION:
COMMUNITY REDEVELOPMENT AGENCY RECOMMENDATION: /�
Item No. 1Q A20
Community Redevelopment Agency
September 7,2005
Page 2
1. Adopt Resolution No. , "A RESOLUTION OF THE COMMUNITY
REDEVELOPMENT AGENCY OF THE CITY OF PALM SPRINGS,
CALIFORNIA, APPROVING AN EXCLUSIVE AGREEMENT TO NEGOTIATE
WITH THE OAS] GROUP, LLC FOR THE DISPOSITION OF A 5.7+ ACRE
AGENCY OWNED PARCEL FOR THE DEVELOPMENT OF A FOUR-STAR
GROUP MEETING HOTEL ADJACENT TO THE CONVENTION CENTER AT
THE SOUTHEAST CORNER OF CALLE EL SEGUNDO AND ANDREAS ROAD,
MERGED PROJECT AREA#2;
2. AUTHORIZE THE EXECUTIVE DIRECTOR TO EXECUTE THE AGREEMENT
IN A FORM ACCEPTABLE TO THE AGENCY COUNSEL AND ENTER INTO
DEVELOPER-FUNDED CONTRACTS FOR THE PURPOSE OF APPRAISALS,
ENVIRONMENTAL REVIEW AND PROJECT PLANNING REVIEW ON BEHALF
OF THE AGENCY FOR THE PURPOSE OF THIS PROJECT
STAFF ANALYSIS:
In January, 2005 staff met with representatives of Pele Development who were
considering the development of a four-star group meeting hotel in on Tahquitz Canyon
'Nay in Section 14. Staff suggested that, if they were looking at a hotel of such high
quality, they consider the Prairie Schooner site near the Convention Center, since the
:success of such a high quality hotel would depend on the hotel's ability to book group
meeting business. The Agency acquired the Prairie Schooner site in the 1980's as a
potential hotel site, and the City certainly has an interest in developing more hotel
rooms near the Convention Center to support its recent $34 million investment in the
Center's expansion. Additionally, even the Tribe has expressed interest in seeing a
four-star property developed in Section 14, even if they are not the developer.
Based on negotiations with the Developer, staff prepared an Exclusive Agreement to
Negotiate to go to the Agency in April, 2005. The Developer worked aggressively
through the Spring on lining up the hotel brand, the hotel architect, engineer, landscape
architect, equity partner, hotel asset manager, hotel operations company, and other
members of the team to try to be in an Agreement with the Agency before June, 2005 in
order to be open in this hotel development "window." Meanwhile, staff received two
other proposals for similar hotels (four star luxury hotels) from other developers on the
same site. In May the Agency instructed staff to prepare a Request for
Qualifications/Proposals; the RFQ/RFP went out with a deadline of June 30, 2005. The
RFQ went to all of the parties that had expressed an interest in the site, as well as a
wider distribution to dozens of hotel developers.
The Agency received two proposals. The Oasi Group, LLC, created by Pe]e
Development, submitted a proposal, as did Nexus Companies of Santa Ana. As with
Community Redevelopment Agency
September 7,2005
Page 3
previous RFQs undertaken by the Agency, an evaluation committee was formed to
review the two proposals and, based on the criteria developed in the RFQ/RFP and the
strength of submission, strongly recommended the Oasi proposal over the Nexus
proposal. A copy of the RFQ/RFP is attached.
Aside from its attention to what the RFQ/RFP asked the proposer to do, the strength of
the Oasi proposal is its commitment from Starwood for its premium brand. Starwood
Hotels & Resorts Worldwide, Inc. is one of the leading hotel and leisure companies in
the world with more than 750 properties in more than 80 countries and 110,000
employees at its owned and managed properties. With internationally renowned brands,
Starwood is a fully integrated owner, operator and franchisor of hotels and resorts
including St. Regis, The Luxury Collection, Sheraton, Westin, Four Points by Sheraton,
W brands, as well as Starwood Vacation Ownership, Inc., one of the premier developers
and operators of high quality vacation interval ownership resorts.
The Luxury Collection of Starwood Hotels & Resorts is an elite group of distinctive
handpicked hotels, most of them independently branded, from imperial palaces,
romantic hideaways, and historical landmarks to tropical resorts and golf destinations
that are recognized as some of the finest hotels in the world. With 76 hotels and resorts
in 28 countries, each hotel has its own unique qualities which reflect the essence of the
destination and offers grandeur paired with unrivalled personal service and attention to
detail. Starwood's Luxury Collection is known for impeccable service and the kind of
personal attention guests expect from a world-class hotel. The brand promise for the
Luxury Collection in Palm Springs is that travelers would enjoy a level of comfort that
exceeds their expectations, and the hotel will offer affluent travelers the rare opportunity
to experience the ultimate in luxury in downtown Palm Springs. Other hotels in The
Luxury Collection include The Phoenician in Scottsdale, The Princeville Resort in Kauai,
The Palace Hotel in San Francisco, The Ballantyne Resort in Charlotte, The El
Tamarindo Resort in Mexico, The San Cristobal Hotel in Santiago, Chile, The Park
Tower in Buenos Aires, The Vedama Resort on the Greek Island of Santorini, The Hotel
Pulitzer in Amsterdam, The Hotel Gritti Palace in Venice, The Mardavall Hotel & Spa in
Palma de Mallorca, The Hotel Imperial in Vienna, The Grand Hotel in Florence, The
Hotel Prince de Galles in Paris and the Bora Bora Nui Resort & Spa in French
Polynesia. Several of the more opulent Westins and Sheratons are also members of
the Luxury Collection, especially in Europe and Southeast Asia, as well as all eight St.
Regis hotels.
Starwood is also the owner of the "W" brand, and originally analyzed the Palm Springs
market on the basis of a request from the Developer to consider a "W" property at the
site. They concluded that with the City's investment in a first-class Convention Center
Palm Springs warranted a higher, more timeless luxury brand with a stronger group
meeting component for higher-end travelers than a niche leisure-oriented property.
Community Redevelopment Agency
September 7, 2005
Page 4
An additional consideration in evaluating the two proposals was the nature of the
conceptual design: Oasi proposed a scalable project based on their success in
negotiating the acquisition of the two adjacent parcels: the Tribe's offices as well as the
Anderson Travel buildings. They also kept the building height and mass to five stories,
keeping within the City's 60' height standards for non-Indian parcels (though using the
1:1 setback granted in the Section 14 Master Plan). Nexus only proposed a 10 acre
site, and featured a block-long nine story tower along Andreas Road across from the
Plaza Villas condominiums, which would require the City to approve the project under
the 100' Indian land height standards in the Section 14 Master Plan, if the project could
even make the 1:1 setbacks allowed in Section 14.
Since staff received direction from the Agency on July 20, Oasi has moved forward in
finalizing its architectural and engineering contracts and has begun to compile the
i information for the project's Initial Study in order to keep to an aggressive timetable.
Gensler, the project architect, has begun to refine the conceptual studies presented in
the proposal, and will be "turned loose" on September 8. In addition, Oasi has had
further negotiations discussions with the Tribe and the other property owner about
potential land acquisition in order to assemble the entire site.
Additionally, staff has continued to work with Nexus on locating their proposed project
on another site in the City and hopes to be able to present an Agreement to the Agency
to help facilitate that project as well. The fact that the project was not recommended for
the Prairie Schooner site and its unique proximity to the Convention Center doesn't
mean it was not an exciting concept for Palm Springs.
Under the terms of the Agreement with Oasi, the Agency will also commission the
Environmental Assessment as well as the appropriate environmental studies, using the
developer contribution. Additionally, the project will use the City's Focused Entitlement
Process for planning services. Agency staff, rather than the City's Planning Services
Department will manage these contracts, though the project will still undergo the normal
planning approval process including review by the Architectural Advisory Committee,
Indian Planning Commission, Planning Commission, and City Council, as well as the
Agency.
Community Redevelopment Agency
September 7,2005
Page 5
FISCAL IMPACT:
The terms of the DDA will be that the Developer pays fair market value for the Agency's
parcel, which is estimated at this time to be approximately $3,000,000 though it could
be somewhat higher. Any negotiations between the Developer and the Tribe or the
private property owner are the responsibility of the Developer. Finally, the Developer
i shall fund all of the planning and environmental work, as well as the appraisal, as part of
this Agreement.
i
J n S. aym nd Director of David H. Ready, EXecuOe Director
Cc unity & conomic Development
Attachments:
1. Resolution
2. Exclusive Agreement to Negotiate
3. Request for Qualifications/Conceptual Proposals
4. Summary of Proposals
Community Redevelopment Agency
September 7,2005
Page 6
RESOLUTION NO.
A RESOLUTION OF THE COMMUNITY
REDEVELOPMENT AGENCY OF THE CITY OF
PALM SPRINGS, CALIFORNIA, APPROVING AN
EXCLUSIVE AGREEMENT TO NEGOTIATE WITH
THE OASI GROUP, LLC FOR THE DISPOSITION OF
I A 5.7+ ACRE AGENCY OWNED PARCEL FOR THE
DEVELOPMENT OF A FOUR-STAR GROUP
MEETING HOTEL ADJACENT TO THE
CONVENTION CENTER AT THE SOUTHEAST
CORNER OF CALLE EL SEGUNDO AND ANDREAS
ROAD, MERGED PROJECT AREA #2; AND
AUTHORIZING THE EXECUTIVE DIRECTOR TO
ENTER INTO DEVELOPER-FUNDED CONTRACTS
FOR THE PURPOSE OF APPRAISALS,
ENVIRONMENTAL REVIEW AND PROJECT
PLANNING REVIEW ON BEHALF OF THE AGENCY
FOR THE PURPOSE OF THIS PROJECT
-------------------
WHEREAS, the Community Redevelopment Agency of the City of Palm Springs,
California ("Agency") is constituted under the Community Redevelopment Law
(California Health and Safety Code Section 33000 et. seq.) to carry out the purpose as
the redevelopment in the City of Palm Springs ("the City"); and
WHEREAS, the Oasi Group, LLC ("Developer") made a proposal to developer a four-
star group meeting hotel on a 5.7 acre Agency-owned site under the terms of a Request
for Qualifications/Conceptual Proposals dated June 8, 2005; and
WHEREAS, expansion of the hotel inventory in proximity to the City's Convention
Center, especially in the four-star category, is an objective of the City and Agency to
increase the vitality of the downtown area, the Convention Center, and the tourism
industry; and
WHEREAS, Section 33430 of the Community Redevelopment Law allows that an
agency may, "for purposes of redevelopment, sell, lease, for a period not to exceed 99
years, exchange, subdivide, transfer, assign, pledge, encumber by mortgage, deed of
trust, or otherwise, or otherwise dispose of any real or personal property or any interest
in property;" and
Community Redevelopment Agency
September 7,2005
Page 7
WHEREAS, the Agency and Developer are processing a Disposition and Development
agreement ("DDA") relative to the development of the four star hotel on the site; and
NOW, THEREFORE, BE IT RESOLVED by the Community Redevelopment Agency of
the City of Palm Springs, California that an Exclusive Agreement to Negotiate with The
I Oasi Group, LLC of Los Angeles, for a period of 18 months for an Agency-owned
property located at the southeast corner of Calle El Segundo and Andreas Road, is
j hereby approved and the Executive Director is hereby authorized to execute the
,Agreement and all related documents in a form acceptable to the Agency Counsel and
enter Developer-funded contracts for the purpose of appraisals, environmental review
and project planning on behalf of the Agency for the purpose of this project,
ADOPTED this day of 2005
AYES;
NOES:
ABSENT:
ATTEST: COMMUNITY REDEVELOPMENT AGENCY
OF THE CITY OF PALM SPRINGS,
CALIFORNIA
By; By:
Assistant Secretary Chairman
REVIEWED & APPROVED AS TO FORM:
Community Redevelopment Agency
September 7, 2005
Page 8
Summary of Proposals
Developer Oasi Group Nexus Communities
Project Details 210 Hotel Rooms 250 Hotel Rooms
j 90-120 Condos (depending on 254 Condos
acreage)
4,000 sf restaurant
800 sf specialty coffee bar
10,000 sf meeting space
12,000 sf spa
1,200 sf fitness center
50,000 sf pool, sun deck and
gardens
4,000 sf outdoor banquet space
Acres 5.7 Acres (main parcel) plus Assumed 10 acres was
1.6 Acres Tribal offices; could available; did not submit a
design up to 10 acres to include basic 5.7 acre plan
other parcel
Height 5 Stories Mix of 4 stories up to 9 stories
along Andreas Road
Brand / Have a commitment from Luxury Propose a "music themed"
Commitment Collection of Starwood hotel (probably Hard Rock)
including term sheet but do not have a commitment
Brand's Starwood has more than 750 hotels N/A
international in 77 countries worldwide;
presence worldwide sales organization with
32 offices with over 120 sales
professionals; Customer Contact
Centers handle more than 15
million calls each year; Starwood
Preferred Guest (SPG) program
has over 19 million members; 2004
SPG revenue was 46% of total
room revenue
Examples of The Phoenician (Scottsdale) N/A
signature The Palace Hotel (San Francisco)
properties Hotel Denali (Venice)
worldwide
Community Redevelopment Agency
September 7,2005
Page 9
Developer Oasi Group Nexus Communities
Brand's local Westin Mission Hills N/A
presence (Rancho Mirage)
Financial / Conventionally financed hotel with Conventionally financed hotel
Ownership condo profits reducing debt with condo profits reducing
debt
Lender/ Harbert Capital is equity partner; Nexus is equity partner; Bank
Equity Partner lender to be competitively bid of America is lender
Architect Gensler IBI Group
Architect's Cameros Inn (Napa) Shadowrock, in design (Palm
Hospitality The Beverly Hilton (Beverly Hills) Springs)
Practice: Beverly Hills Hotel & Bungalows Sundial Lodge, Park City
Selected Conference Center at Whistler Fairmont Hotel at YVR,
Projects Four Seasons (NY, Newport Beach) Vancouver
Fairmont Chateau Whistler
Park City Beverly Hotel,
Malaysia
Construction N/A R.D. Olson
Company
Feasibility Oxford Lodging PKF
Study
Assumed Year 1: $177 ADR; 61% Occ. Year 1: $170 ADR; 59% Occ.
Year 1 and Year 5: $209 ADR; 71% Occ. Year 5: $191 ADR; 72% Occ.
Year 5 ADR
and
Occupancy
Rate
Amount of None None, except for off-site
Financial improvements
Assistance
Requested
Offer Price for Fair Market Value Fair Market Value
Agency Parcel
Community Redevelopment Agency of
the City of Palm Springs, California
i FQALMS,.
~ c
V N
* ��enaueo.4'�
c44/FORN�P.
Convention Center/Resort Hotel
Request for Qualifications and
Conceptual Proposals
1. Introduction
1.1 Objective
The Community Redevelopment Agency of the City of Palm Springs ("Agency') is seeking
qualifications and conceptual proposals from experienced resort hotel developers
("Developers") interested in constructing and managing a four star group meeting hotel on a 5.7
acre, Agency-owned parcel adjacent to the newly expanded Palm Springs Convention Center
("Project Site"). The Agency's objectives in the project are to develop a quality destination
resort that would capitalize on the Palm Springs name as well as proximity to the Convention
Center, downtown and the Spa Resort Casino; increase hotel room nights in the city, thereby
increasing Transient Occupancy Tax (TOT) revenues; and, bring additional marketing
opportunities to the 250,000 s.f. Convention Center to help maximize its usage.
The Agency has had a long-term relationship with the Agua Caliente Band of Cahuilla Indians
("Tribe"), which is an adjacent properly owner(Tribal offices as well as the Spa Resort Casino)
and has had a long-standing interest in the Project Site. A previous agreement between the
Agency and Tribe in 2003 resulted in the construction of a 475-space parking lot on the Project
Site. The Agency and Tribe propose to work together with the selected Developer to develop a
hotel of the highest quality possible on the Project Site.
Community Redevelopment Agency of the City of Palm Springs
Convention Center/Resort Hotel RFQ 1 June 6,2005
The Agency chose to use the RFQ-Negotiate process to increase the quality of proposals it
receives and so it can select its development partner as quickly as possible, to keep the project
within the current hotel development cycle. It is also felt that the RFQ-Negotiate process allows
the developer maximum flexibility and creativity in putting together a response to the solicitation.
1.1.1 Type of Hotel
The Agency desires to negotiate with a developer to construct a four-star hotel with a
iparticular focus on the group meeting business in order to benefit and be helped by the
Project Site's unique access to the main entryway to the expanded Palm Springs
Convention Center. The brand proposed by the developer should have a significant
world-wide sales and reservation system geared to developing group meeting business
but should also provide a high quality resort experience for leisure travelers. The
Agency's further objective is that the hotel be a "signature" property for Palm Springs
that would establish its own world-wide reputation For quality and luxury.
1.1.2 Size of Hotel
i The minimum acceptable size of hotel on the Agency's 5.7 acres would be 200 rooms,
as well as spa and restaurant amenities and parking necessary to serve the hotel
project. However, the Agency's preference would be that the Developer work with the
Tribe and other landowners of the adjacent properly in order to acquire the additional
four acres along Tahquitz Canyon Way, yielding an expanded Project Site of nearly 10
acres. Should the Developer and Agency be successful acquiring the additional
acreage, the Agency would prefer a minimum of 300 units be developed on the larger
site.
1.2 Proposed Project Site
The proposed Project Site is approximately 5.7 acres of fee simple land owned by the
Community Redevelopment Agency (two parcels, 508 055 007 and 505 055 008, 1.44
and 5.17 acres, respectively) and is located in the center of the City of Palm Springs, in
an area known as Section 14, the historic heart of the Agua Caliente Indian
Reservation. The Project Site is in close proximity to the central business district of the
City and along a major corridor of transportation between the airport and the core of the
retail shopping areas. (See Map of Project Site in Attachment"1", which also includes
the surrounding properties).
A 410-room Wyndham hotel is located immediately to the east, the Convention Center
is to the northeast, Plaza Villas condominiums is to the north, the Spa Resort Casino is
to the northwest, the Hilton Palm Springs Resort is to the west, and the Courtyard
mixed use project (which features the 9-screen Regal Theaters) is to the south. The
current land use of the Project Site is as a parking lot for the Convention Center(upon
the development of a hotel, such parking would be relocated to an underdeveloped lot
north of the Convention Center) and provides some overflow valet parking spaces for
the Spa Casino.
Community Redevelopment Agency of the City of Palm Springs
Convention Center/Resort Hotel RFQ 2 June 6,2005
In addition, there is some possibility that the Tribe would be willing to contribute its
adjacent property, which currently houses its administrative offices, to the project, and
there is another parcel of approximately 2 + acres that might be able to be acquired to
be added to the project. The latter property currently contains office uses and, when
combined with the Tribe's property, would bring the total potential Project Site to nearly
10 acres.
The larger 10 acre project site would provide access to and frontage on Tahquitz
Canyon Way, which is the main east-west corridor from the Palm Springs International
Airport to downtown Palm Springs.
1.3 Palm Springs Convention Center and Spa Resort Casino
I
1.3.1 Palm Springs Convention Center
The City is currently undertaking a $43.6 million expansion of its Convention
Center facilities, which are adjacent to the Project Site as well the Wyndham
Hotel. The Wyndham was formally opened in November 1987 and is currently
fully operational, offering food and beverage facilities, meetings and banquet
facilities and recreational amenities. The convention center was completed and
dedicated December 31, 1987 and originally contained approximately 110,000
square feet.
In 1992, the City completed a 47,000 square foot expansion to the convention
center. Currently, approximately 66,000 square feet is exhibit and convention
space, approximately 16,000 square feet is utilized for meeting and function
rooms, approximately 20,000 square feet is service and support space,
approximately 7,500 square feet is used for food service and the remaining
approximately 32,000 square feet provides building circulation. In addition,
there is approximately 20,000 square feet of outdoor function area.
Phase 1 of the expansion, completed in May of 2003, converted the former
Springs Lecture Hall and sales offices to six additional meeting rooms for a total
of 15 possible meeting rooms, plus the board room. The site of the convention
center contains approximately 9.26 acres of land and provides parking for 491
cars.
The City's objective in building the convention center was to support and
enhance the tourist and convention business,which is the City's most important
industry. The hotel, retail, entertainment and other businesses which serve the
needs of tourists and convention center attendees generate significant
revenues to the City in the form of transient occupancy taxes, sales taxes and
property taxes. There are over 160 hotels and 6,500 hotel rooms in the City of
Palm Springs.
Community Redevelopment Agency of the City of Palm Springs
Convention Center/Resort Hotel RFQ 3 June 6,2005
In 2001, the City commissioned a study to determine what opportunities existed
to compete more effectively for conventions and meetings. The study
concluded that if the City could expand certain aspects of the existing facility
(primarily exhibit hall space and meeting rooms), that the Convention Center
could accommodate 73%of all groups that bring their meetings to California, as
opposed to the 43% of all groups that the space was then able to
accommodate. Based on this study the City determined that an expansion of
the convention center was feasible. In November 2001 and again in November
2003, voters in Palm Springs approved ballot measures to increase the City's
transient occupancy tax rate for the purpose of generating funds to pay for the
expansion. These ballot measures were supported by the hotel owners.
I
jThe Convention Center Expansion was designed by Fentress Bradburn
Architects, Ltd, Denver, Colorado, and will add an additional 115,000 square
feet of space to the existing Convention center, for a total building area of
250,000 square feet. The City estimates that the total cost to construct the
Project will be $43.6 million. Primary construction commenced in April 2004
and the City expects construction to be complete by September 2005. The
existing Convention Center and parking have remained open during
construction. The space in the Convention Center before and after the
expansion is summarized as follows.
Existing After Expansion
Exhibit/Convention Space 64,000 sf 100,000 sf
Meeting/Function Rooms 16,000 sf 31,000 sf
Food Service 8,000 sf 10,000 sf
Support/Circulation 69,000 sf 109,000 sf
Total (excluding outdoor 157,000 sf 250,000 sf
function area)
The convention center is managed by SMG, a professional facilities
management and operating company. SMG specializes in the management of
convention centers and currently operates 98% of the publicly owned exhibition
space in North America operated by private companies.
The 48 convention and exhibition facilities currently managed by SMG include
more than 9 million square feet of space and range in size from 30,000 square
foot exhibit halls, with adjacent active sports arenas, to the 1,000,000 plus
square feet of Reliant Astrohall in Houston and The National Trade Center in
Toronto.
Over 16 million people attended more than 4,500 convention and exhibition
events at SMG managed facilities in North America last year. These included
Community Redevelopment Agency of the City of Palm Springs
Convention Center/Resort Hotel RFQ 4 June 6,2005
consumer shows, trade shows, conventions, corporate meetings, product
launches and other special events.
' In 2002, the convention center was booked for 90 events with over 133,000
attendees. In 2003, the Convention center was booked for 86 events with over
101,000 attendees. The largest bookings included:
j • Galifomia Teachers of English (5,100)
• Palm Springs Exotic Car Auction (5,000)
j • Valleywide Employment Expo(5,000)
I
• California Mathematics Council
iAircraft Owners & Pilots Association (11,700)
Actual and tentative bookings though the end of the year for 2004 (during the
construction period) are estimated to total 81,000 attendees over 49 events. Largest
bookings include:
• Palm Springs Modern Show(3,000),
• Computer Using Educators(4,000)
• Palm Springs Home Show(5,000)
• JS Enterprise (5,000)
• Valleywide Employment Expo(5,000).
In 2003 and 2004, the Convention Center also hosted the Miss Teen USA Pageant,
part of the Miss Universe Organization (owned by Donald Trump and NBC Universal)
which reached a worldwide television audience of several million with its live broadcast.
In 2004, there were 38 events already booked for 2005 (with construction scheduled
through September of 2005) with estimated attendees of 55,975; 32 events in 2006
and 22 events in 2007. Many future bookings are a result of repeat visitors. However,
the City expects that bookings as a result of the completed expansion will increase
average annual attendees figures to exceed 186,000 as soon as 2007.
1.3.2 Spa Resort Casino
Owned and operated by the Agua Caliente Band of Cahuilla Indians, the Spa Resort
Casino is the only Indian casino located in a downtown in the State of California and will
likely retain that competitive advantage under new limitations proposed by the State of
California and supported by the U.S. Department of the Interior, which will limit the
expansion of Indian gaming on non-Indian parcels located in urban areas. Few Indian
reservations in California encroach into urban areas, as is the case in Palm Springs.
(Or, conversely,few cities have developed on Indian reservations like in Palm Springs.)
Opened in November, 2003, the casino boasts 119,000 square feet of gaming, support
and restaurant space. It was designed by the architectural firm of Wimberly Allison
Tong &Goo of Newport Beach, California and constructed by Penta Construction. The
casino features a Stage Deli and a Rappongi Restaurant, among other eateries, and is
Community Redevelopment Agency of the City of Palm Springs
Convention Center/Resort Hotel RFQ 5 June 6,2005
affiliated with the Spa Hotel, a 237-room hotel located at the corner of Indian Canyon
Drive and Tahquitz Canyon Way.
iThe casino is located across the street from the proposed Project Site.
I
1.4 Other amenities
Unique in the Coachella Valley, the Project Site has significant potential as a high-end group
meeting and downtown leisure destination. As noted above, the Convention Center drives a
significant share of the group meeting business in Palm Springs and the Coachella Valley and
the Project Site is located immediately outside the new front door. The Spa Resort Casino is
located across the street to the northwest of the site. Currently a Regal Theaters 9-screen
stadium-style multiplex cinema is located across Tahquitz Canyon Way to the south.
Aside from the numerous attractions of downtown Palm Springs, with dozens of restaurants
and shopping opportunities, the community also features the Palm Springs Air Museum and
the Palm Springs Aerial Tramway (open year round) and Knott's Soak City Water Park, which
is open from March through November and provides a major regional attraction through the
summer months for Southern Californians.
1.4.1 Palm Springs Art Museum
Other amenities within walking distance of the Project Site include the Palm Springs Art
Museum, the most significant art museum between Los Angeles and Phoenix. The
Palm Springs Art Museum (formerly the Palm Springs Desert Museum) is
approximately % mile from the Project Site to the west, at the base of Mt. San Jacinto.
Founded in 1938, the Palm Springs Art Museum is an educational institution that
promotes a greater understanding of art and performing arts through collections,
exhibitions and programs. The Museum's permanent art collection features 19th, 20th,
and 21st century works focusing on contemporary California art, classic western
American art, Native American art; Precolumbian art, Mexican art, and European
modern art; glass studio art, American mid-twentieth century architecture, and
American photography. In addition, the Museum's 400-seat Annenberg Theater keeps
an eclectic calendar from ballet to modern dance, opera to jazz, and comedy to drama.
1.4.2 Agua Caliente Cultural Museum
The new Agua Caliente Cultural Museum will be located on Tahquitz Canyon Way
about Y2 mile from the Project Site to the east. The new museum, which has not yet
been built, is being designed by the architectural firm of Jones & Jones, one of the
principal architects for the Smithsonian Institution's new National Museum of the
American Indian in Washington, D.C. The Museum will also be a Smithsonian Affiliate,
which will allow it to bring world-acclaimed exhibitions from the vast Smithsonian
Collection to Palm Springs. The groundbreaking ceremony for the museum was held
in March,2005.
Community Redevelopment Agency of the City of Palm Springs
Convention Center/Resort Hotel RFQ 6 June 6,2005
t
' 1.4.3 Fabulous Palm Springs Follies
i Also located within walking distance from the Project Site is the Fabulous Palm Springs
Follies, which sells out the 800-seat Plaza Theatre eight shows a week from early
November to Memorial Day. The Follies, which features Las Vegas-style showgirls in
full costume (all over the age of 55) in a 1940's-style revue, has been featured on
ABC's 20120, The New York Times, and other national and international publications
since its founding 15 years ago. It was also the subject of an Oscar®-nominated short
film.
1.5 Entitlements
The necessary entitlements to develop the project include development permits, environmental
documents.The Developer will be responsible for processing all permit applications.
1.5.1 General Plan Designation
The Project Site is described as hotel use in the Section 14 master Plan"Master Vision
Plan." It land use designation is ResortiAttraction, a designation created to facilitate the
development of hotel projects.
1.5.2 Zoning Designation
The City of Palm Springs adopted the Section 14 master Plan in April, 2004; the Master
Plan replaces the City's previous zoning designations in favor of new development
standards. The designation for the project site is appropriate for hotel use. In the City's
other areas, and R-3 designation allows for up to 43 hotel rooms per acre, given other
site development standards.
1.5.3 Environmental Analysis
A developer would need to commission the numerous special studies necessary to
analyze the environmental impacts of the project, including but not limited to a traffic
study. However, the Tribe did adopt a Program EIS/EIR for the Section 14 Master
Plan, which analyzed the environmental impacts of the maximum development
potential of the area; it is possible that a hotel on the Project Site would not require a
separate EIR but could "tier' off the existing one. A final determination of that would
only occur after an Initial Study of an actual development project, though.
2. Proposal Format/Contents
2.1 Informal RFQ-Negotiate process.
Community Redevelopment Agency of the City of Palm Springs
Convention Center/Resort Hotel RFQ 7 June 6,2005
i
I
I
! For the purposes of this proposal, Developers are not required to prepare detailed site plans or
jelevations, but rather present their firm's qualifications as well as a conceptual design and
business development proposal encompassing the features of the proposal. The Agency could
choose to negotiate with the successful developer based on the firm's qualifications, the
conceptual proposal, or a combination of the two. The following list describes the required
elements of the proposal:
2.1.1 Cover Letter
Include a cover letter indicating the nature of the developer team: joint venture,
corporate developer, limited liability corporation,franchisee, etc. The letter must include
the company name, address, and name(s) and telephone and fax number(s) of the
person(s)authorized to represent the development team.
2.1.2 Table of Contents
A Table of Contents for all the material contained in the response.
2.1.3 Development Team
Indicate past experience (including level of involvement) within the past five years for
this specific type of project. The project team could include principals and employees of
the development company; other LLC partners or members, if identified; the hotel
operating company, if identified; the hotel brand partner, if identified; the hotel architect,
if identified; and, the project general contractor, if identified:
2.1.3.1 Company Principals
• Development company's or principals'project experience, especially
with hotel projects
• Specific individuals from the development company assigned to this
project; i.e. specific responsibilities and duties, etc.
• Projects completed by the development company with name and
telephone number of contact
• Availability of the team and the percentage of their current workload
that would be assigned to the project.
Significant development experience, specifically hotel development
experience, is desirable from the project principals.
2.1.3.2 Other Development Team Members
• Other development partners' (such as limited-or equity partners or LLC
members)experience, especially with hotel projects
• Specific individuals from the other partners assigned to this project; i.e.
specific responsibilities and duties, etc.
Community Redevelopment Agency of the City of Palm Springs
Convention Center/Resort Hotel RFQ 8 June 6,2005
i
I
I
• Projects completed by the other partners with name and telephone
number of contact
Availability of the team member and the percentage of their current
i
workload that would be assigned to the project.
I
Significant development experience, specifically hotel development experience,
is desirable from the other development partners, especially if the development
company principals lack specific hotel development experience.
2.1.3.3 Hotel Operating Company(if known)
• If available, please include commitment letter or letter of interest from
Hotel Operating Company in the RFQ response
• Hotel Operating Company's experience, including number of years in
operation
• Number of hotel rooms worldwide operated by Hotel Operating
Company, listed by hotel brand
• Hotel brand manager references with name and telephone number of
contact
• Specific individuals from the Hotel Operating Company assigned to this
project during the development process
Additional consideration will be given to proposals that include an experienced
hotel operator as part of the proposal, whether the operator is in-house or a
third party operator. The operating company's experience should match the
proposed project's in terms of size and quality as well, and the operator should
be well-regarded by both luxury and group meeting brands.
2.1.3.4 Proposed Hotel Brand (if known)
• If available, please include commitment letter or letter of interest from
Hotel Brand Company in the RFQ response
• Number of hotels and rooms worldwide owned or operated by Hotel
Brand Company, listed by brand
• Name of brands operated by Hotel Brand Company
• Name of several signature properties worldwide
• Name and number of hotel rooms in the Coachella Valley operated by
Hotel Brand Company, listed by brand
• Description of worldwide sales and reservation system operated by the
Hotel Brand Company
Additional consideration will be given to proposals that include a strong brand
concept and a commitment from an experienced hotel brand with a strong
international sales and reservation system. The brand concept proposed by
the Developer and brand should match the Agency's objective of creating a
signature, four-star group meeting hotel. Extra points would be awarded for a
Community Redevelopment Agency of the City of Palm Springs
Convention Center/Resort Hotel RFQ 9 June 6,2005
I
I
i
I
hotel brand with a proven ability to help related properties in the same
area a the Coachella Valle increase each others'sales.
geographic ( •9� Y) �
I
j 2.1.3.5 Project Architecture Firm(if known)
I
If available, please include commitment letter or letter of interest from
• the proposed Project Architecture Firm in the RFQ response
• Project Architecture Firm's experience, including number of years in
operation, number of architects worldwide, number of architects
dedicated to hospitality sector
• Representative hospitality projects designed by proposed Project
Architecture Firm
• Proposed Project Architecture Firm contact name and telephone
number
• Specific individuals from the Architecture Firm assigned to this project
during the development process
2.1.3.6 Project General Contractor(if known)
• If available, please include commitment letter or letter of interest from
the proposed Project General Contractor in the RFQ response
• Project General Contractor's experience, including number of years in
operation, dollar value of projects worldwide, number of projects
currently under development in the hospitality sector
• Representative hospitality projects completed by proposed Project
General Contractor
• Proposed Project General Contractor contact name and telephone
number
Specific individuals from the General Contractor assigned to this project
during the development process
2.1.4 Conceptual Design Concept
While the "proposal" portion of this RFQ need only be conceptual, the Agency is
interested in the Developer's understanding of the Palm Springs hotel market and
approach to the project, such as whether a high rise (6 stories or above) is need, the
brand concept, and what the proposed amenity package would be. Also, the issue of
hotel financing is key as the Agency is not prepared to provide public financing to the
project. Of particular interest, too, are developers with positive relationships with four
star brands. Therefore, please propose a four star group meeting resort hotel.
Describe:
• How many total hotel rooms
• The type of hotel rooms (singles vs. suites)
• Other elements of the hotel, including restaurants, retail, spas, other
sporting/recreational facilities, and banquet/meeting space.
Community Redevelopment Agency of the City of Palm Springs
Convention Center/Resort Hotel RFQ 10 June 6,2005
i
• What brand is the proposed hotel?
• At what market is the developer aiming? Business travelers, leisure
travelers, etc.?
Describe the building envelope.
• Is the hotel a single structure or multiple buildings? If so, how many
units per building and what type of unit or uses would be in which
building?
• Describe and show exterior amenities, such as outdoor
meeting/gathering space, other public areas, and other proposed
recreation facilities, such as swimming pools and other potential
commercial uses such as retail shops and restaurants.
• How many floors would be necessary to yield the number of required
rooms and provide the amenities described above?
2.1.5 Financing and Ownership Concept
Please describe the ownership/financing structure of the hotel project, including:
• Estimated total project cost
• Estimated construction debt
• Estimated amount of equity contributed to project
• Estimated amount of permanent debt on project
What would the permanent financing structure of the hotel be?
• Conventional financing?
• Condominium financing?
• Bond financing?
• A mix of financing types?
2.1.6 Brand Concept
Please identify or describe the hotel brand proposed or selected by the Developer for
the Project Site:
• Show how the hotel brand would support the Convention Center in developing
group meeting business in Palm Springs
• Please describe the hotel brand's worldwide sales and reservation system and
its international and domestic marketing reach
• Please identify the number of hotel rooms in the Coachella Valley operated by
the hotel brand or its family of brands, and how the affiliated hotel(s)and the
proposed hotel would work together in developing new business for the Project
Site
City of Palm Springs
Convention Center Hotel RFQ 11 June 3,2005
• How does the quality of the proposed hotel brand fit with the existing hotels
within proximity of the Project Site, such as the Wyndham, the Hilton, or the
Spa Resort? Is the brand a higher quality brand?Or is it equivalent?
i
2.1.7 Relationship with the Tribe
i Given the Tribe's interest in the Project Site, developing a relationship with them will be
a key element of a successful project. While it is not expected that every Developer will
have met with the Tribe prior to submitting a response to this RFQ, if you have, please
describe any discussions the Developer has had with the Tribe on project participation,
i including any written correspondence from the Tribe supporting your development
project.
Please describe the development concept for the Tribal parcel.
Please describe an acquisition and development concept for the
adjacent office parcel on Tahquitz.
2.1.8 Business Points
The Agency anticipates that the Developer would seek to acquire a fee interest in the
Project Site from the Agency. While the Agency does not have a recent appraisal on
the site, given recent comparable sales in the immediate area, it estimates that the 5.7
acre site would be valued at approximately $3,000,000. Because of California's
prevailing wage requirements if a project were to receive financial assistance (including
land write-downs) from the Agency, it is currently assumed the Developer would pay
fair market value for the land and not seek financial assistance from the Agency.
Additionally, California Redevelopment Law will preclude the Agency from transferring
fee title to the land until the project's environmental action (EIR or a Negative
Declaration) is ready to be adopted. This is normally at the end of the entitlement
process.
2.1.9 Hotel Feasibility
Please demonstrate the feasibility of the proposed hotel concept, including the
proposed brand, located on the Project Site. Because of the quality level of the
hotel, the comparable set for analyzing the average daily rate for this hotel may
be the higher-quality hotels located in the Valley, such as the La Quinta Resort,
the Esmeralda, Marriott Rancho Las Palmas, and the Westin Mission Hills, rather
than other hotels in Palm Springs. The Agency's economic consultant has
opined that a supported ADR reflected a 20% premium over comparable hotels
here in the Valley could be achievable if the hotel attracts a significant amount of
conference/meeting business and the quality of the hotel far exceeds others in
the region.
Community Redevelopment Agency of the City of Palm Springs
Convention Center/Resort Hotel RFQ 12 June 6,2005
i
• Please provide a basic operating pro forma that includes projections for
average daily rate, occupancy rates, and operating costs including debt
service.
i Please include a copy of a feasibility study developed for a hotel at the
i Project Site.
• Please identify a proposed "opening date" for the hotel and provide a
reasonable timetable for the development of the project.
Given the ADR and occupancy rate of hotels here in Palm Springs and the Coachella
i Valley, additional consideration will be given to proposals that have already analyzed
the feasibility of the downtown or Section 14 hotel market and are proposing a project
within the feasibility study parameters, but that also meets the Agency's objective of
developing a four-star group meeting hotel.
2.2 Response Requirements
The total response package is not to exceed thirty (30) typewritten pages, excluding maps,
brochures, and other exhibits which may be included with the package. The extra materials,
provided they are not part of the submission package, do not count against the page limit total.
2.2.1 Due Date
All proposals are due in the City of Palm Springs' Procurement Division Office by 4:00
p.m. on Thursday, June 30. Postmarks will not be accepted. Please include one
original and three (3)copies.
2.2.2 Submissions
All proposals are to be mailed or hand-delivered to:
Via U.S. Mail Hand Delivered or Packaqe Service
Bruce Johnson Bruce Johnson
Procurement Manager Procurement Manager
City of Palm Springs City of Palm Springs
P.O. Box 2743 3200 Tahquitz Canyon Way
Palm Springs, CA 92263-2743 Palm Springs, CA 92262
2.2.3 Submissions are Final
No corrections or modifications to the proposal may be made after the due date.
Community Redevelopment Agency of the City of Palm Springs
Convention Center/Resort Hotel RFQ 13 June 6,2005
I
j 2.2.4 Confidentiality of Submissions
While the City shall endeavor to keep any confidential information private, it reserves
the right to release the name of all proposers, as well as a summary of their proposals,
to the media, the public, or any party that requests it.
i
2.3 Primary Agency Contacts
In order to streamline the flow of information to interested developers, the Agency has
designated Primary Department Contacts in each of the affected departments. Please use only
these contacts to receive additional information for your application.
If you have a question about... Contact/Title Telephone
This application process, hotel John Raymond, 760-323-8228
occupancy rates, average daily rate, or Director of Community&
other nearby land and development Economic Development
i
opportunities.
The Section 14 Master Plan, Ms. Jing Yeo or Mr. Alex 760-323-8245
development permits, environmental Meyerhoff, Principal
j approvals, or development standards. Planners
The Tribal Property,the Section 14 Tom Davis, Chief Planning 760-325-3400
Master Plan, the Spa Casino,other Officer or Todd Hooks,
Tribal Questions Economic Development
Director,Agua Caliente
Band of Cahuilla Indians
The Palm Springs Convention Center Jim Dunn, General 760-322-8400
Manager
3. RFQ Evaluation Process
Processing of the RFQ responses will be handled in the following manner:
3.1 Initial Evaluation
All responses will be evaluated to develop a list of interested hotel developers. The Agency
may choose a single proposer for further negotiation based on its proposal, or to choose 2 to 3
proposers and have them refine their proposals with more detailed architecture, site planning,
or business terms.
Community Redevelopment Agency of the City of Palm Springs
Convention Center/Resort Hotel RFQ 14 June 6,2005
3.2 Interviews
The Agency reserves the right to hold interviews or select a preferred developer without
interviews. The recommendation for selection will be made on the basis of qualifications, the
soundness of the development proposal, the team's demonstrated experience in the group
meeting hotel market, and response to the RFQ.
3.3 Agreements to Develop the Property
Upon conclusion of negotiations, the Agency anticipates that it will negotiate a series of
agreements with the Developer that will document the contractual terms of the deal. The first
agreement would be an Exclusive Agreement to Negotiate for a minimum of twelve months
during which the Developer would take the project through the entitlement process; the final
agreement would be a Disposition and Development Agreement would provide for the
disposition of the parcel to the Developer and create any Agency-imposed covenants on the
land.
Community Redevelopment Agency of the City of Palm Springs
Convention Center/Resort Hotel RFQ 15 June 6,2005
EXCLUSIVE AGREEMENT TO NEGOTIATE
The Oasi Group, LLC
THIS EXCLUSIVE AGREEMENT TO NEGOTIATE("AGREEMENT") , is made this day of
, 2005, by and between the PALM SPRINGS COMMUNITY
REDEVELOPMENT AGENCY("AGENCY"), and THE OASI GROUP, LLC ("DEVELOPER").
RECITALS
The parties entered into this Agreement on the basis of the following facts, understandings,
and intentions:
A. The Agency is a public body, corporate and politic,exercising governmental functions
and powers and organized and existing under the Community Redevelopment Law of the State of
California (Health and Safety Code Sections 33000, et seq.).
B. The Agency desires to effectuate the Amended and Restated Redevelopment Plan
for Merged Project Area # 2, formerly the Tahquitz Andreas Redevelopment Project Area, by
providing for the development of a Hotel property(the "Hotel") at the southeast corner of Calle El
Segundo and Andreas Road, commonly known as the Prairie Schooner Parcel ("the Site").
C. The Developer desires to construct a Hotel and condominium project(the "Project")
at the Site using a mix of conventional hotel-and condominium financing. The term "Developer"as
used herein includes the principals, partners, and joint venturers of Developer and all obligations of
Developer herein shall be the joint and several obligations of such principals, partners, and joint
venturers.
D. The Agency and Developer desire, for the period set forth herein, to negotiate
diligently and in good faith to prepare an agreement whereby the Developer would develop such a
hotel and residential project on the site,
NOW,THEREFORE, and in consideration of the mutual covenants hereinafter contained, it
is mutually agreed upon by the parties as follows:
SECTION 1. NATURE OF NEGOTIATIONS.
A. Good Faith. The Agency and the Developer agree that for the period set forth in
Section 2 herein they will negotiate diligently and in good faith to prepare and enter into an
agreement(the "DDA") consistent with the provisions of this Agreement for the development of a
Hotel on the Site specified herein. The development will be subject to all rules, regulations,
.standards, and criteria set forth in the Redevelopment Plan, the City's General Plan and Section 14
Master Plan, applicable specific plans and zoning regulations, and with this Agreement.
B. Site. The Project shall be located upon the following real property, as shown in the
"Site Map," attached hereto as Exhibit "A" and incorporated herein by this reference. The Site is
currently owned by the Community Redevelopment Agency.
C. Construction and Ownership Concept. The Developer's interest shall be fee and
unencumbered by any prior agreement by the Agency. The design shall be consistent with the
Agency's and the City's design approval process (Architectural Advisory Committee and Planning
Commision approvals). Developer's architect shall work with the City's design guidelines to create a
harmonious and attractive Hotel project with a distinct identity. The Developer is responsible for
financing and constructing all improvements upon the Site. The hotel shall be of a size and quality
adequate to achieve the mutual vision of the property. There shall also be a minimum of 10,000
square feet of restaurant,spa, and group meeting space. The Site will be subject to a declaration of
covenants, conditions, and restrictions to govern the continued operation of the commercial space
and hotel.
D. Financial Provisions. The Developer is responsible for acquisition of the site,
including any adjacent parcels, and financing and constructing all improvements upon the Site.
` Developer shall pay for all necessary public improvements and pay all City's fees for processing the
Project, without assistance from the Agency.
E. Schedule. The Developer's goal is to complete the entitlement and design of the
Project by December 31, 2006. The DDA shall contain a Schedule of Performance. The Agency
and Developer shall agree on a proposed itemized project schedule through the DDA process;
attached hereto as Exhibit C. Agency and Developer shall meet semi-monthly in order to review
Developer's progress and to allow the Agency to comment upon the acceptabilityof the Developer's
efforts to date.
In the event that during the course of Development, Agency and Developer agree that for
reasons out of the Developer's control the schedule per Exhibit C, needs to be adjusted in order to
allow more time then the Agency, in good faith, agrees to adjust the schedule to provide a
reasonable opportunity for Developer to complete the development process.
The above time requirements may be adjusted up to a cumulative 180 days at the discretion
of the Executive Director where Developer is proceeding in good faith to perform under this
,Agreement.
F. Use and Transfer Restrictions. The DDA will generally be subject to restrictions on
use and transfer during construction and for a specified period thereafter through recorded
restrictions (i) to assure that the use will be consistent with and promote the hotel project, (ii) to
prevent speculation, (iii)to assure that any transferee has the resources, capability and experience
to successfully develop the project, (iv) to assure long-term maintenance of the hotel project in
,attractive condition, and (tv)to provide an adequate financial return to the Agency.
G. Propertv Acquisition. The adjacent properties to the south are owned by the Agua
Caliente Band of Cahuilla Indians and a private business owner. During the period of this
Agreement, the Developer may discuss an expanded project that could include residential, hotel,
retail, or entertainment uses on the additional land along Tahquitz Canyon Way. The Developer is
responsible for conducting the negotiations with the other property owners.
H. Exclusivity. The Agency agrees for the period set forth in Section 2 that it will not
negotiate with or enter into any agreement with any other entity for development or sale of the Site,
and the Developer agrees not to negotiate with any other person or entity regarding the development
of a hotel project within the territorial jurisdiction of Palm Springs or within 3 miles of the boundary
thereof without the approval of Agency.
SECTION 2. PERIOD OF NEGOTIATIONS,
a
The intent of this period of negotiation shall be for both parties to proceed with the drafting of
the Disposition and Development Agreement,which shall require a CEQA action by the Agency. An
Initial Study for CEQA purposes shall be undertaken for the purpose of determining the appropriate
CEQA action.. Once the appropriate action is determined, a more precise environmental timeline
can be developed. Therefore, this Agreement shall be for up to eighteen months from the date this
Agreement is signed by the Agency or until the DDA is approved by the Agency with the appropriate
CEQA findings. This Agreement shall terminate after the expiration of such period unless extended
as follows:
A. For sixty(60)days if a Disposition and Development Agreement has been prepared
by the Agency and executed by the Developer, and has been submitted to the Agency but has not
yet been approved by the Agency Board; or
B. For thirty (30) days if the major business terms have been agreed to and the
Executive Director determines that further negotiations are likely to result in a written agreement; or
C. By mutual agreement of the parties.
D. Or the cumulative days of extension granted by the Executive Director per Section
1.E above.
Developer understands and acknowledges that if negotiations culminate in an agreement,
such agreement shall be effective only after and if the Agreement has been considered and
approved by the Agency Board after public hearing thereon as required by law.
SECTION 3. DEVELOPER'S RESPONSIBILITIES.
During the period of negotiation, Developer will prepare such studies, reports, and analysis
as shall be necessary to permit Developer to determine the feasibility of the hotel project. The
Developer shall fully cooperate in the development of the Project design and financing plan. During
the period of negotiation and as requested by the Agency,the Developer shall submit to the Agency
the following:
A. Full disclosure of Developer's principals, partners, joint venturers, negotiators,
consultants, professional employees, or other associates of the Developer who are participants or
principals of the Project, and all other relevant information concerning the above.
B. Statement of financial condition in sufficient detail to demonstrate Developer's
financial capabilities, those of its principals, partners, joint venturers, and those of its prospective
Developers to satisfy the commitments necessitated by the Project. To the extent Developer wants
such financial statements to remain confidential, they shall be supplied to the Agency only if the
confidentiality of the statements can be maintained.
C. All information necessary for the design of the Project to meet the Developer's
reasonable requirements.
The Developer shall negotiate exclusively with the Agency's negotiating team and with no
other persons unless expressly authorized to do so by the Agency's negotiating team. During the
period of negotiations, Developer and Agency shall coordinate community and neighborhood
outreach efforts; no statements will be made by the Developer to the media without the approval of
the Agency's negotiating team. No prepared statements shall be released to the media without the
mutual consent of the respective negotiating teams.
The Developer shall also cooperate with Agency, which will manage the environmental
review of the project, as well as the project planning contract through the City' Focused Entitlement
Process. Developer's responsibility shall be to provide the funding for the Agency's project
consultants in a form of a deposit made to Agency in the amount of each contract.
SECTION 4. AGENCY'S RESPONSIBILITIES,
A. Preparation of Agreement. If agreement is reached on the business terms for
inclusion in the agreement, the Agency shall prepare such agreement for consideration by the
Developer. Agency's legal and appraisal expenses shall be chargeable against the Good Faith
Deposit Agency shall notify Developer of the amount of the appraiser contract and provide monthly
notification of the legal costs of preparing the DDA.
Planninq Approvals. The Agency will undertake all acts necessary to assist Developer in
securing necessary permits as may be necessary to permit the commercial/residential development
at the Site, including hiring the environmental review firm and planning firm and assisting with the
presentations and staff reports made to the City's review boards.
C. Contract Authority. By resolution approving this Agreement,Agency shall have also
granted Executive Director authority to enter contracts on behalf of the Agency for the purposes of
planning, environmental review, and appraisals in excess of Executive Director's limit of$25,000,
provided such contracts have been funded by Developer and the contract amount has been
deposited with Agency by Developer under the same terms and conditions described in Section 5
below.
SECTION 5. GOOD FAITH DEPOSIT.
Concurrently with the execution of this Agreement, Developer shall submit to the Agency a
good faith deposit in the sum of Twenty-Five Thousand Dollars ($25,000.00) in the form of a cash
deposit, cashiers' check, irrevocable letter of credit, or other form of security acceptable to the
Agencyto insure that the Developer will proceed diligently and in good faith to negotiate and perform
all of the Developer's obligations under this Agreement. If the deposit is in cash or a certified
cashiers'check, it shall be deposited in an interest-bearing account of the City. Interest, if any,shall
be added to the deposit and held as additional security for the Developer's obligations hereunder.
Upon termination of this Agreement the balance, less charges deducted from the deposit pursuant
to section 4(A), shall be returned to the Developer provided that the Developer has negotiated
diligently and in good faith and carried out its obligations hereunder. If Developer has failed to do
so, in as much as the actual damages which would result from a breach by Developer of its
obligations under this Agreement are uncertain and would be impractical or extremely difficult to
determine, Agency shall be entitled to retain the entire amount of said deposit, as liquidated and
agreed damages. It is further understood that the DDA will require an increase in the good faith
upon execution of the DDA. The aggregate good faith deposit then required shall be at least Forty
Thousand Dollars ($40,000.00).
SECTION 6. MISCELLANEOUS.
A. Brokeraqe commission. No brokerage has been retained during the negotiation of
this agreement.
B. Appraisal of Properties. The Developer has offered and the Agency has preliminarily
determined that a price of$3,000,000 is reasonable for the property, based on a recent appraisal of
an adjacent property. It is the opinion of both parties that this amount likely represents a fair market
price for the parcels. Upon the successful negotiation of a Disposition and Development Agreement
between Agency and Developer, however, all properties shall be conveyed at fair market value
based on an MAI appraisal. Agency shall commission such appraisal,which shall be paid from the
Good Faith Deposit described in Section 5. Should the appraised value exceed the offering price,
Developer shall have the right to withdraw from this Agreement without penalty.
C. Ownership of Documents. If the Developer fails to perform under the terms of this
agreement and the process contemplated hereunder is terminated or abandoned then, Developer
shall transfer to Agency copies of any reports, studies,analysis, site plan layouts,development cost
estimates, engineering studies,regarding the proposed development and prepared during the period
of negotiations, which copies shall become the property of Agency. Such transfer shall be made
without any representation or warranty by the Developer as to the accuracy or sufficiency of the
contents of such documents and shall be made subject to the rights of the preparers of such `;,;;„;,__';;'� �I
documents including, without limitation, the copyright(if any) associated with such documents.
D. Purpose of Contract. It is expressly understood and agreed by the parties hereto that
this is an Agreement regarding the conduct of contract negotiations only and does not convey any
interest in the property whatsoever. It is further agreed and understood that this Agreement does not
imply any obligation on the part of the Agency to enter into any agreement that may result in
negotiations contemplated herein. Nevertheless, the Agency would not have entered the
Agreement if the Developer's proposal did not fulfill Agency's objectives under the Redevelopment
Plan and have merit, as represented.
E. Amendment. This Agreement may only be amended by a document in writing signed
by the parties hereto.
F. Time for Acceptance. This Agreement, when executed by the Developer and
delivered to the Agency, shall constitute a binding offer which cannot be withdrawn prior to
September 30, 2005, so that the Agreement may be presented to the Agency Board.
Notwithstanding any other provision herein to the contrary,Agency shall not be obligated hereunder
unless and until the Agency Board authorizes the Chairman to execute this Agreement.
G. Corporate Authority. The persons executing this Agreement on behalf of the parties
hereto warrant that (i) such party is duly organized and existing, (ii) they are duly authorized to
execute and deliver this Agreement on behalf of said party, (iii) by so executing this Agreement,
such party is formally bound to the provisions of this Agreement, and (iv) the entering into this
Agreement does not violate any provision of any other Agreement to which said party is bound.
IN WITNESS WHEREOF, the parties have executed this Agreement as of the day first
above written.
"AGENCY'
COMMUNITY REDEVELOPMENT AGENCY OF
THE CITY OF PALM SPRINGS, a public body,
corporate and politic
I
I
Chairman
ATTEST:
Agency Secretary
.APPROVED AS TO FORM:
Agency Counsel
[SIGNATURES CONTINUED ON NEXT PAGE]
"DEVELOPER"
THE OASI GROUP, LLC
(Check One: _individual, _partnership, _corporation)
[NOTARIZED]
Signature
Print Name:
Print Title:
[NOTARIZED]
Signature
Print Name:
Print Title:
Mailing Address:
(Corporations require two signatures; one from each of the following: (A) Chairman of Board,
President, any Vice President; AND (B) Secretary, Assistant Secretary, Treasurer, Assistant
Treasurer, or Chief Financial Officer.)
[END OF SIGNATURES /NOTARY JURAT(S) FOLLOW]
STATE OF CALIFORNIA )
) ss.
COUNTY OF )
ON before me, Notary Public,
personally appeared_
i personally known to me(or proved to me on the basis of satisfactory evidence)to be the person(s)
whose name(s)is/are subscribed to the within instrument and acknowledged to me that he/she/they
executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s)on
the instrument the person(s), or the entity upon behalf of which the person(s)acted, executed the
instrument.
Witness my hand and official seal. [SEAL]
Signature
STATE OF CALIFORNIA )
) ss.
COUNTY OF )
ON before me, Notary Public,
personally appeared
personally known to me(or proved to me on the basis of satisfactory evidence)to be the person(s)
whose name(s)is/are subscribed to the within instrument and acknowledged to me that he/she/they
executed the same in his/her/their authorized capacity(ies), and that by his/her/their signature(s)on
the instrument the person(s), or the entity upon behalf of which the person(s)acted, executed the
instrument.
Witness my hand and official seal. [SEAL]
Signature
EXHIBIT"A"
TO EXCLUSIVE AGREEMENT TO NEGOTIATE
LEGAL DESCRIPTION OF THE PROPERTY
The parcel is located in the City of Palm Springs, County of Riverside, bearing APN
Numbers 508-055-008, 508-055-009, and 508-055-007.
l
EXHIBIT"B"
TO EXCLUSIVE AGREEMENT TO NEGOTIATE
MAP OF THE PROPERTY
I
Jn