DATE: September 7, 2005 CONSENT CALENDAR
SUBJECT: AWARD TO G&M CONSTRUCTION, THE CONSTRUCTION CONTRACT
FOR THE NON-REVENUE TERMINAL PARKING AT THE PALM
SPRINGS INTERNATIONAL AIRPORT, CITY PROJECT NO. CP2004-07,
IN THE AMOUNT OF $549,948
FROM: David H. Ready, City Manager
BY: Department of Aviation
SUMMARY
That the City Council award to G&M Construction, the construction contract for the Non-
Revenue Terminal Parking at the Palm Springs International Airport, City Project No.
CP2004-07, in the amount of$549,948 as the lowest, responsive bidder.
RECOMMENDATION:
1. Adopt Minute Order No. , awarding to G&M Construction, the construction
contract for the NON-REVENUE TERMINAL PARKING, City Project No.
CP2004-07, in the amount of $549,948; and
2. Authorize the City Manager to execute all the necessary documents in a form
acceptable to the City Attorney. A
STAFF ANALYSIS:
The project for construction of Non-Revenue Terminal Parking was advertised July 28,
2005. The bids were due on August 19 2005. Staff solicited bids and two (2) bidders
responded. The lowest responsive bid was G&M Construction at $549,948. The other
bid received was from Matich Corporation in the amount of$756,756.
After an extensive review of the bids, staff recommends that the City Council award to
G&M Construction, the construction contract for the Non-Revenue Terminal Parking,
City Project No. CP2004-07, in the amount of$549,948, and authorize the City Manager
to execute all the necessary documents in a form acceptable to the City Attorney.
Item No. 2 . V .
City Council Staff Report
(September 7, 2005) -- Page 2
(Non-Revenue Terminal Parking)
(FISCAL IMPACT:
The cost of construction will be funded from the Airport's general fund.
Richard S. Walsh, A.A.E., Director of Aviation David H. Ready, Cify ,anager•
Attachments:
Minute Order
Bid Tabulation
MINUTE ORDER NO.
AWARDING TO G&M CONSTRUCTION, THE
CONSTRUCTION CONTRACT FOR THE NON-REVENUE
TERMINAL PARKING, CITY PROJECT NO. CP2004-07, IN
THE AMOUNT OF $549,948, AND AUTHORIZE THE CITY
MANAGER TO EXECUTE ALL THE NECESSARY
DOCUMENTS IN A FORM ACCEPTABLE TO THE CITY
ATTORNEY
I HEREBY CERTIFY that this Minute Order, awarding the construction contract
to G&M Construction, 211 W. Mesquite Avenue Palm Springs, CA, for the NON-
REVENUE TERMINAL PARKING, City Project No. CP2004-07, in the amount of
$549,948, and authorizing the City Manager to execute all the necessary
documents in a form acceptable to the City Attorney, was approved by the City
Council of the City of Palm Springs, California, in a meeting thereof held on the
7th day of September, 2005.
JAMES THOMPSON
City Clerk
TABULATION OF BID
i
PALM SPRINGS INTERNATIONAL AIRPORT
PALM SPRINGS, CALIFORNIA
August 19, 2005
E M P L O Y E E P A R K I N G L O T
SCHEDULEI
Including Demolition, Grading, Drainage, Curbs, and
Gutter, Paving, Striping, Lighting, Signage and Landscaping
Engineer's Estimate G &M Construction Matich Corporation
-- -- --------- -- - - - ------------- - -- -- ---- -- - -- --
SCHEDULE I $580,000.00 549,948.00 756,756.00
Page 1 of 3
EMPLOYEE PARKING LOT - - - -
SCHEDULE) - Including Demolition,Grading,Dminiage,Cut6s,and Gutter,Paving,Striping,: _ _G$ M COOStTUCffon 'M0tjC11'GiOtpofatFUfi -
Lighting
Aignage and Landscaping -
h Item-No `- - -. D_escription__ ____ " __-Umtt " Est _Unit Cost " ___ Total-Cost" Unit_Coat i _-TotaP Cost
P-100 Mobilization L.S. E 1 27,498-00 27,498.00 - 25,000-00 `. 25,000-00
P-140a Asphalt Pavement Removal Complete S.Y. 1,500 9.00 13,500.00 7.00 ; 10,500.00
P-140b Curb, Curb and Gutter Removal s L.F. 30 15.00 I 450.00 70.00 2,100.00
P-140c I Concrete Barrier Relocation Ea. 2 100.00 200.00 700.00 1,400.00
P-140d Asphalt Pavement Removal Partial(for Taper Joint) S.Y. _ 500 r 10.00 ; 5,000.00 14.001 7,000.00
P-151 Clearing and Grubbing L.S. 1 1,000.00 j 1,000.00 151,280 151,280.00
P-152 Unclassified Excavation I C.Y. 1,000 50.00 50,000.00 39.00 39,000.00
P-199 Excavation,Trenches, and Earthwork Protection - L.S. E 1 5,000.00 5,000.00 1.00 1.06
P-209 I Crushed Aggregate Base Course C.Y. i 450 50.00 x 22,500.00 I 54.00 24,300.00
P-217 Soil Sterilization S.Y. 4,000 .20 800.00 - .50E 2,000.00
' P-401a Plant Mix Bituminous Pavement Ton 750 80.00 60,000.00 59.00 44,250.00
P-401b Bituminous Material (AR-8000) Ton 50 1 150.00 7,500.00 700.00 35,000,00
P-601 - Crack Seal Lb. 500 15.00 7,500.00 3.25 1,62500
P 602 Bituminous Prime Coat - Gal. - 1,300 10.00 13,000.00 2.50 3,250.00 -
-- -� ------- '-------=--------- `------------ ---=----- ------
P-603a Bituminous Tack Coat - Gal. 100 ' 15.00 1,500.00 18.00 1,800.00
P-603b = Polymer Modified Fog Seal Gal. 500 j 5.00 2,500.00 9.50 4,750.00
P-610a Install A1-6 Vertical Curb L.F. 1,200 30.00 36,000.00 : 39,00 46,800.00
---- ------------- ------ ---- -------_
P-610b - Install A2-6 Curb and Gutter L.F. 600 : 35.00 '. 21,000.00 36.00 21,600.00
P-610c Install Concrete Sidewalk with Handicap Ramp - S.Y. 80 : 50.00 4,000.00 : 100.00 8,000.00
----------------- - ---"----------- ----------- - ---- --- -----=
P-613a = Install New Roadway Sign Posts Ea. 5 200.00 1,000.00 155.00 775.00
P-613b Install New Roadway Sign Panels S.F. 25 40.00 : 1,000.00 25.00 625.00 E
- P-620 Install Pavement Markings S.F. 2'000 2.50 - 5,000.00 2.50 5,000.00
D-701 Install 18" RCP, Class III L.F. 8 300.00 2,400.00 i 550.00 : 4,400.00
Page 2 of 3
':-EMPLOYEE PARKING LOT- - - - - - - - - - - - -
SCHEDULE L--Including Demolition,Grading;Drainage,Curbs,and Gutter,Paving,Striping, = G&M-Construction - Matich Corporation -
Lightin ,Siyna9e_and Landscaping - - `, - - -
--
ItemNo. - Description_. - - Unit Est - -Unit Cost _,_-Total Cost-- 'Umt.Cost TotarCost
D-751 Install Curb Inlet C.P.S.Type A(700) Ea. 1 - 7,50D.00 : 7,500.00 15,000 00 15,000.00 It
T-902 Dust Palliative Ac. - 2 2,000.00 4,000.00 1,800.00 3,600.00
LS-100 Landscape and Irrigation Complete L.S. T 1 55,000.00 55,000.00 88,000.00 88,000.00
L-101 Saw Cutting, Removal, Disposal and Replacement of ; L.F. 250 30.001 7,500.00 60.00 15,000.00
Pavement for Trench
L-103 Trenching with CLSM Backfill to Finish Sub Grade in L.F. 1,200 ' 20.00 24,000.00 - 15.00 18,000.00 ;
Pavement Areas
L-104a Install Type "1" New 17" x 24" x 3 Deep Pre-Cast Ea. 8 { 1,000.00 ; 8,000.00 550.00 4,400.00
Concrete Pull Box with Steel Frame and Cover
- -- ---- - -- - ------------------ ---- =-- - --
L-104b Install Type "2" New 12" x 22" x 24" Deep Pre-Cast : Ea. 1 1,000.00 1,000.00 500.00 - 500.00
Concrete Pull Box
L-105a Install One%"PC Conduit L.F. 200 : 5.00 1,000.00E 12.00 2,400.00
i L-105b Install One'/,"EMT Conduit L.F. 100 10.00 1,000.00 13.00 1,300.00
L-105c all One 2" PVC Conduit L.F. 2,400 5.00 12,000.00 13.00 : 31,200.00
I L-105d Install One 4" PVC Conduit L.F. 100 6.00 600.00 20.00 2,000.00
L-106 Install 3#4 Wires L.F. 2,000 6.00 - 12,000.00 3.50 - 7,000.00
L-108a Install Concrete Base Extending 30"Above Grade Ea. 12 1,250.00 - 15,000.00 1,000.00 12,000.00
L-108b Install Concrete Base Flush with Grade with Pull Box Ea. 2 1,500.00 - 3,000.00 ; 400.00 800.00
and Surrounding Concrete
=- - ------------------------------=-----------------------------------
-=-----=- - --------=
L-109a Install New Luminarie on Existing Type 15 Ea. 1 3,000.00 3,000.00 1,900—.00 - 1,900.00
L-109b Install Parking Lot Light Pole with 2 Luminaries 180 Ea. 12 3,000 36,000.00 3,800.00 : 45,600.00
! Degrees Apart_on Elevated Concrete Base,_Type 28
i L-109c Install Roadway Light Pole with One Luminarie on 3,000.00 : 6,000.00 3,800.00 7,600.00
Flush Concrete Base with Pull Box and Surrounding Ea. 2
Concrete,Type 30
L-110 Install Wireless Lighted Crosswalk Warning System L.S. 1 55,000.00 55,000.00 55,000.00 - 55,000.00
- L-111 - Miscellaneous Electrical Work L.S. - 1 10,000.00 10,000.00 ' 5,000.00 5,000.00
TOTAL ESTIMATED COST—SCHEDULE I $549,948.00 $756,755.00