HomeMy WebLinkAbout9/8/2010 - STAFF REPORTS - 2.J. �y IL LM u � gatlRATk� tloh City Council Staff Report Date: September 8, 2010 CONSENT CALENDAR Subject: APPROVAL OF PLANS, SPECIFICATIONS, AND ESTIMATE (PS&E) AND AUTHORIZATION TO BID THE PALM SPRINGS MAIN LIBRARY ROOFING PROJECT, CITY PROJECT NO. 10-04. From: David H. Ready, City Manager Initiated by: Public Works and Engineering Department SUMMARY This fiscal year, the Library Services Department has budgeted funds to re-roof the Palm Springs Main Library Building. The construction documents (Plans, Specifications, and Estimate) are completed and, in accordance with 7.03.040 of the Procurement and Contracting Code the Council is required to approve and adopt plans, specifications and working details, and authorize the bid request for all public projects in excess of $100,000. Approval of this item will allow staff to proceed with this project which has an estimated cost of$240,000. RECOMMENDATION: 1) Approve the plans, specifications, and working details for the Palm Springs Main Library Roofing Project, City Project No. 10-04 and authorize the bid process. STAFF ANALYSIS: The Palm Springs Main Library Roofing Project was initiated by the Palm Springs Library Services, to repair the damaged roof of the existing building. The project specifications were prepared by the Public Works and Engineering Department staff, and specified the installation of new ethylene inter-polymer (EIP) single ply roofing system on both upper and lower roof. This type of roofing was successfully used on several City facilities, including the Leisure Center, Police Department Training Center, Pavilion Building and James 0. Jessie Desert Highland Unity Center. The project also includes replacement of the existing skylight glass panels with dual pane energy efficient panels, replacement of the exterior lighting system on ITEM NO. the lower roof, and drainage improvements at three exterior library doors with historical drainage problems due to reverse grade. The Engineer's Estimate for the project is $240,000. Approval of the recommended action will allow staff to proceed with bidding of this project. FISCAL IMPACT: This project is funded from Trust Fund for urgent building work. Sufficient funds are available in account No. 151-2752-43880. Submitted: David J. Barakian Thomas J. Wili& Director of Public Works/City Engineer Assistant City Manager David H. Ready, Bar ara Rob s m City Manager 0'-I,Director of Library Services