Date: November 3, 2010 CONSENT CALENDAR
Subject: APPROVAL OF CONTRACT CHANGE ORDER NO. 3 TO THE
2008/2009 & 2009/2010 ANNUAL ASPHALT OVERLAY, CITY PROJECT
08-28
From: David H. Ready, City Manager
Initiated by: Public Works and Engineering Department
SUMMARY
On March 3, 2010, the City Council awarded a construction contract to Hardy & Harper,
Inc., for the 2008/2009 & 2009/2010 Annual Overlay Project. This project has now been
completed, and approval of Change Order.No. 3 makes additions and deductions to the
contract to reflect actual quantities of work completed during construction.
RECOMMENDATION:
1) Approve Contract Change Order No. 3 to Agreement No. 5943 with Hardy &
Harper, Inc. in the amount of$17,740.93 for a final total amount of $1,819,389.40
for the 2008/2009 & 2009/2010 Annual Overlay, City Project 08-28; and
2) Authorize the City Manager to execute all necessary documents.
STAFF ANALYSIS:
The Public Works Department oversees the maintenance of the City's street system.
Each year, the Department assembles a capital project to continue its asphalt overlay
program on various City streets as needed. The 2008/2009 overlay program included
the following arterial streets:
• Indian Canyon Drive (between San Rafael Drive and Vista Chino)
• Racquet Club Road (between N. Palm Canyon Dr. and Avenida Caballeros)
• Baristo Road (just east of Farrell Drive adjacent to the AAA building)
Overlay of these streets was funded through the Proposition 1 B Local Streets and
Roads Funding Program through the state.
ITEM NO.��---
City Council Staff Report
November 3, 2010 - Page 2
2008/2009 &2009/2010 Annual Overlay(CP 08-28)
The 2009/2010 annual overlay program included an overlay of the following arterial
street:
N. Indian Canyon Dr. (19th Avenue to 20th Avenue —west half)
The 2009/2010 annual overlay program also included an overlay of the worst local
residential streets within the Sunmor neighborhood located immediately west of City
Hall, and the residential area located between Amado Road and Tahquitz Canyon Way,
from Sunrise Way to Sunset Way.
Also included was Paseo El Mirador, from Avenida Caballeros to Paseo De Anza in the
El Mirador neighborhood; and an overlay of Hermosa Drive between Mesquite Avenue
and S. Riverside Dr. in the Tahquitz River Estates neighborhood, both of which are in
poor condition. The City receives frequent calls from residents requesting repair of
these streets, and prior asphalt overlay projects lacked sufficient funds to continue the
overlay of Paseo El Mirador, or to include Hermosa Drive.
Change Order No. 1 was approved by Council on March 17, 2010, and added the
following streets to the project:
• Calle El Segundo from Tahquitz Canyon Way to Amado Road.
• Avenida Caballeros from Tamarisk Road to Tachevah Drive.
• Avenida Palos Verdes from Via Eytel to Tamarisk Road, and Via Eytel from Avenida
Palmas to Avenida Palos Verdes.
• Merito Place from Mission Road to Patencio Road, Camino Del Corto from Verada
Sur to Via Lola, Camino Centro from N. Via Las Palmas to S. Via Las Palmas, Via
Las Palmas from Via Monte Vista to N/S Via Las Palmas, and Regal Drive from
Rose Avenue to Via Monte Vista.
• Palo Verde Avenue from S. Palm Canyon Dr. to Ocotillo Avenue and Ocotillo
Avenue from S. Palm Canyon Dr. to Camino Real.
• Palm Tree Drive from Sagebrush Road — north end to Sagebrush Road — south end
Change Order No. 2 added the Northern half of East Palm Canyon between Farrell
Drive and Cerritos Drive, and also allowed for the removal and replacement of
deteriorated asphalt paving at the City's Wastewater Treatment Plant.
Change Order No. 3 is comprised of adjustments to the original project estimates.
During construction, measurements of the actual quantities required to complete the
work were compiled on a daily basis. At the end of the project, the actual quantities of
work were compared to the original bid estimates, and adjustments were made (both
additions and subtractions), in order to balance the contract. Change Order No. 3
results in an increase to the contract of $17,740.93, an increase to the original
estimates of less than 1%.
2
City Council Staff Report
November 3, 2010- Page 3
2008/2009 &2009/2010 Annual Overlay (CP 08-28)
FISCAL IMPACT:
Sufficient funds are available in local Measure A account 134-4498-50278. No local
miscellaneous General Funds are being used for this project.
SUBMITTED:
Prepared by: Recommended by:
Marcus L. Fuller David J. Barakian
Assistant Director of Public Works Director of Public Works/City Engineer
Approved by:
Thomas J. Wil n, Asst. City Manager David H. Ready, Ci r
Attachments:
1. Contract Change Order No. 3
I
CITY OF PALM SPRINGS
CONTRACT CHANGE ORDER
To: Hardy&Harper Date: August 25,2010
1312 E.Warner Ave. Project No:: 08-28
Santa Ana,Ca.92705 Project: 2008C2009 6r 2009/20010 Overlay
Change Order No.: Three(3)
Contract Purchase No.:
Account Numbers. 134.4498.50225
Agreement No.: 5943
CHANGES IN WORKICOST
Bid Schedule A
Item No.
Item 3 Cold Mill AC +1,456 @$.15 SF +$218.40
Item 6 Adjust Manhole - 11 @$393.00 EA - $4,323.00
Item 7 Adjust Water Valve + 14 @ $414.00 EA +$5,796.00
Item 8 Adjust Monument -3 @$373.00 EA -$ 1,119.00
Item 9 Type E Loop - 10 @$233.00 EA - $2,330.00
Total Decrease Amount $1757.60
Bid Schedule B
Item No.
Item 3 Cold Mill AC 3,010 @$.15 SF -$451.50
Item 4 Pavement Fabric +3,747 @$.26 SF +$974.22
Item 5 1.5"AC Overlay +3,747 @$.66 SF +$2,473.02
Item 6 Adjust Manhole + 1 @$393.00 EA. +$393.00
Item 7 Adjust Water Valve +7 @$414.00 EA +$2,898.00
Itexxm 8 Adjust Monument +5 @$373.00 EA +$1,865.00
Total Increase Amount $8,151.74
Bid Schedule C
Item No.
Item 3 Cold Mill AC +784 @$.15 SF +$117.60
Total Increase Amount $117.60
Bid Schedule D
Item No.
Item 3 Cold Mill AC +64 @$.15 SF. +$9.60
Item 4 Pavement Fabric +2,000 @$.26 SF +$520.00
Item 5 1.5"AC Overlay +2,000 @ $.66 SF +$1,320.00
Item 7 Adjust Monument A @$373.00 EA -$373.00
Total Increase Amount $1,476.60
1 .
Bid Schedule E
Item No.
Item 3 Cold Mill AC +8,772 @$.15 SF +$1,315.80
Item 4 Pavement Fabric +8,391 @$.26 SF +$2,181.66
Item 5 1.5"AC overlay +8,391 @$.66 SF +$5,538.06
Item 6 Adjust Manhole -8 @$393.00 EA -$3,144.00
Item 7 Adjust Water Valve -14 @$414.00 EA -$5,796.00
Item 8 Adjust Monument +13 @$373.00 +$4,849.00
Total Increase Amount $4,944.52
Change Order#1
Item No.
Item C. Cold Mill AC +21,299 @$.15 SF +$3,194.85
Item D. Pavement Fabric +299 @$.26 SF +$77.74
Item E. 1.5"AC Overlay +299 @$.66 SF +$197.34
Item F Adjust Manhole +5 @$393.00 EA +$1965.00
Item G Adjust Water Valve -8 @$414.00 EA -$3,312.00
Item H Adjust Monument +2 @$373.00 EA +$746.00
Total Increase Amount $2,868.93
Chan a Order#3
Item No.
New Item Striping Removal Lump Sum $1,939.14
Total Chan a Order#3 Increase Amount $17,740.93
REASONS FOR CHANGES:
This is a final balancing change order.Increases and decreases indicated above are due to the actual
quantities required to complete the work being more or less tan the original estimate.
Note: No additional mark ups will be added to any item on this Change Order.
2
5
SOURCE OF FUNDS
The following account will be utilized:
1344498-50278
Summa of Costs Contract Time
Original Contract Amount: $1,234,000.00 Original Completion Date: July 10,2010
This Change Order: $17,740.93 Days Added for this C.C.O. --0---
Previous Change Order(s):$0.00 $567,648.50 Previous Days Added:-24-
Revised Contract Amount: $1,819,389.40 Revised Completion Date: August 18,2010
I have received a copy of this Change City Approval:
Order and the above AGREED PRICES
are acceptable to the contractor. Submitted by Date
Senior Public Works Inspector
Approved by Date
Contr tor:Hardy and Harper City-Engineer
. Date �,2 rl� Approved by Date
City-Manager
Attested by Date
City Clerk
Distribution:
Executed Copies QQnlormed-File Copy
Contractor (1) Engineering File (1)
City Clerk (1) Senior Public Works Inspector (1)
Finance (1)
3