HomeMy WebLinkAbout10/19/2005 - STAFF REPORTS (29) A.O�pALMSp4 �2 c U N ♦ CpRIO�FiE0 93 i cq<11:0 City Council Staff Report DATE: October 19, 2005 CONSENT CALENDAR SUBJECT: SECURITY ACCESS CONTROL AND PUBLIC INFORMATION DISPLAY SYSTEMS REHABILATION — CHANGE ORDER NO. 2, ADDITIONAL UPDGRADES AND ENHANCEMENTS EXPANSION/HOLDROOM — SECURITY CHECKPOINT PHASE III (PART 2) — SECURITY CHECKPOINT CONSTRUCTION - CHANGE ORDER NO. 1, ADDITIONAL CONSTRUCTION WORK EXPANSION/HOLDROOM — SECURITY CHECKPOINT PHASE III (PART 2) — SECURITY CHECKPOINT CONSTRUCTION - REGIONAL HOLDROOM - ARCHITECTURAL SERVICES - CHANGE ORDER NO. 1, DESIGN AND ENGINEERING CHANGES EXPANSION/HOLDROOM — SECURITY CHECKPOINT PHASE III (PART 2) — SECURITY CHECKPOINT CONSTRUCTION — CHANGE ORDER NO. 1 -ADDITIONAL SPECIAL TESTING, INSPECTION AND LAB SERVICES BUDGET AMENDMENT—AIRPORT CAPITAL PROJECTS FROM: David H. Ready, City Manager BY: Department of Aviation SUMMARY The Expansion/Hold room — Security Checkpoint Phase III (Part 2) project requires four change orders to be implemented to enhance security, increase the scope of construction services, for redesign and reengineering work and additional construction inspection and testing services. These four change orders fall within the work covered under AIP Grant No. 37. However, the funding required to effect these changes are beyond the value of the grant. The City is authorized to overspend the value of AIP 37 up to 15% of the grant amount after having first funded the changes. Therefore, a budget amendment of $750,855.47, representing the total amount of the four change orders is requested to be transferred from the Airport Fund's Retained Earnings Account to Airport account No. Item No. 2 . V . City Council Staff Report (October 19, 2005) -- Page 2 Change Orders/Budget Amendment—Airport Capital Projects 56-062 to allow the grant overspend to occur. AIP Grant No. 37 is a 95% grant, requiring a 5% local match, or $37,542.77. When FAA reimburses 95% of these four change orders ($713,312.70) those funds will then be transferred back into the Airport Fund's Retained Earnings Account. RECOMMENDATION: 1. Approve Minute Order No. authorizing Change Order No. 2 to Agreement No. A-4925 with AntarCom/Systems Integration, Inc. to provide additional upgrades and enhancements to the Airport's Security and Access and Public Information Display Systems in the amount of $285,168.47. 2. Approve Minute Order No. authorizing Change Order No. 1 to Agreement No. A-5094 with AMD Construction Group, Inc. to perform additional work on the Security Checkpoint Project in the amount of$304,147. 3. Approve Minute Order No. authorizing Change Order No. 1 to Agreement No. A-4382, Amendment 11 with Gensler Architectural Services for additional design work for the Expansion/H old room-Security Checkpoint Phase III (Part 2) in the amount of$150,000. 4. Approve Minute Order No. authorizing Change Order No. 1 to Agreement No. A-5167, with Southern California Soils & Testing, Inc to provide additional construction material testing for the Expansion/Holdroom-Security Checkpoint Phase III (Part 2) project in the amount of$11,540. 5. Approve Resolution No. authorizing the Finance Director to record inter- fund cash transfers as required in accordance with this Resolution. STAFF ANALYSIS: Antar/Com Systems Integration, Inc will complete their primary security access control and public information display contract for the City in the next couple of months. Change Order No. 2 for Antar/Com Systems Integration, Inc. totals $285,168.47 and consists of the following: 1. TSA Security Screening Area — Security System improvements are required to integrate the new TSA Security Screening Area including access control, CCTV coverage and passenger information displays. 2. Time Clock—This feature will integrate the airport employee time reporting into the SACS computer system. 3. Camera Replacements — Over time the CCTV cameras fail; this item replaces and upgrades (with night vision) the failed passenger terminal cameras. City Council Staff Report (October 19, 2005) -- Page 3 Change Orders/Budget Amendment—Airport Capital Projects 4. Employee Parking Lot — Two new cameras (day/night) will be added to the new employee parking lot to monitor the lot day and night for employee safety and security. 5. Perimeter Gate 16 — Incorporate Gate 16 (Atlantic FBO) into the Security Access Control System enhancing airport perimeter security. A,MD Construction has completed approximately 50% of the Security Checkpoint construction. Additional concrete pedestrian paving has been identified, demolition of the closest temporary holdroom and construction of a security wall as requirements to enhance the operation of the security checkpoint upon opening as well as ensuring optimum passenger conveyance. The additional concrete work was left out of the scope of work for the security checkpoint and p y p this change order will correct this. The demolition and security wall was scheduled to be included in the next phase of construction, but it is now recognized that the new security checkpoint will operate more efficiently if this temporary holdroom is removed now and security wall is constructed now, rather than later. It will be advantageous to the city and the airport to include this work under the current AIP grant (AIP-37). Change order No. 1 for AMD Construction, Inc. totals $304,147 and consists of the following: 1. Demolition/Site Preparation: Single story building &foundation Canopy, post & foundation Planter wall and footing Concrete paving Lawn/planting/Irrigation Wall & fences & Bollards Miscellaneous demolition Remove & salvage existing site furniture, pre-cast planter box, etc Remove & replant existing palm trees Debris hauling Minor Grading to required level 2. Site Improvements: Concrete paving, flat work Airfield security wall (courtyard) Custom paving pavers New gates to airfield Soil preparation & irrigation Courtyard lighting Storm drainage Sanitary sewer drainage Domestic water City Council Staff Report (October 19, 2005) -- Page 4 Change Orders/Budget Amendment—Airport Capital Projects Gas service Chilled & hot water piping from Central Plant Electrical The new passenger holdroom project required both Architectural Advisory Committee and Planning Commission approval. After the third review, the Architectural Advisory Committee approved the project. This approval process required design and engineering changes, changes to the construction documents and additional coordination by the Airport's Architect, Gensler. Change Order No. 1 to Agreement A- 4382, Amendment 11 for Gensler totals $150,000 and consists of the following: 1. Change fagade of New Regional Jet Terminal Holdroom. 2. Relocate mechanical services of New Regional Jet Terminal Holdroom. 3. Provide views of the security walls, elevations from all views. 4. Re-issue design and construction drawings with new changes to bid documents. The City contracted with Southern California Soil and Testing, Inc. to provide special testing and lab services for the construction of the terminal expansion for the security checkpoint and office space. As the project got underway, unknown underground utilities were discovered and re-engineering of footings to accommodate these unknown utilities as well as the changes to the construction contractor's means and methods resulted in additional inspection and testing work. The Contractor will provide all special testing and inspection services as required by the plans and specifications prepared for this project by Gensler Architects (dated March 7, 2005, as amended) and as otherwise directed by the Project Engineer of the construction management firm employed by the City to manage this project (Parsons Transportation Group, Inc.). Change Order No. 1 to Agreement A-5167 for Southern California Soil and Testing, Inc. totals $11,540 and consists of construction testing and inspection services. AIP Grant No. 37 amount is $6,529,094. This amount has been encumbered to the existing contractors to complete the scope or work in their original contracts. The $750,855.47 that these four change orders represent is an overrun to the AIP grant, thereby requiring the Airport to overspend AIP No. 37 by 11.5%. The FAA requires that the Sponsor first fund the overspent portion of the grant and then request the 95% reimbursement through a final pay request. At that point in time, the FAA will evaluate the request and then allocate funding when available. FAA advised this may take three to six months. Therefore, a budget adjustment is required to transfer $750,855.47 into the Airport's AIP-37 Development account from the Airport's Retained Earnings Account to fund these change orders. The Airport will receive a 95% reimbursement from the FAA, funding only 5% with local matching funds or $37,542.77. Upon receiving the 95% reimbursement from the FAA, the entire amount will be transferred back into the Airport's Retained Earnings Account. City Council Staff Report (October 19, 2005)-- Page 5 Change Orders/Budget Amendment—Airport Capital Projects FISCAL IMPACT: There are sufficient funds in the Airport Fund's Retain Earnings Account 29302 to cover this transfer. Craig Graves — Finance Director Richard S. Walsh, A.A(E , Director of Aviation Troy�'Butzlaf k,AJsi tant City Manager David H. Ready, Cit Hager Attachment: Minute Orders (Four) Resolution MINUTE ORDER NO. AUTHORIZING CHANGE ORDER NO. 2 TO AGREEMENT NO. A-4925 WITH ANTAR/COM SYSTEMS INTEGRATION, INC. TO PROVIDE ADDITIONAL UPGRADES AND ENHANCEMENTS TO THE PALM SPRINGS INTERNATIONAL AIRPORT'S SECURITY AND ACCESS AND PUBLIC INFORMATION DISPLAY SYSTEMS IN THE AMOUNT OF $285,168.47. I HEREBY CERTIFY that this Minute Order, authorizing Change Order No. 2 to Agreement No. A-4925 with Antar/Com Systems Integration, Inc. to provide additional upgrades and enhancements to the Palm Springs International Airport's Security and Access and Public Information Display Systems in the amount of$285,168.47, was approved by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 19th day of October, 2005. JAMES THOMPSON City Clerk MINUTE ORDER NO. AUTHORIZING CHANGE ORDER NO. 1 TO AGREEMENT NO. A-5094 WITH AMD CONSTRUCTION, INC. TO PROVIDE ADDITIONAL WORK ON THE EXPANSION/HOLDROOM-SECURITY CHECKPOINT PHASE III (PART 2) IN THE AMOUNT OF $304.147. I HEREBY CERTIFY that this Minute Order, authorizing Change Order No. 1 to Agreement No. A-5094 with AMD Construction Group, Inc. to perform additional work on the Security Checkpoint Project in the amount of $304,147 was approved by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 19th day of October, 2005. JAMES THOMPSON City Clerk MINUTE ORDER NO. AUTHORIZING CHANGE ORDER NO. 1 TO AGREEMENT NO. A-4382, AMENDMENT 11 WITH GENSLER ARCHITECTURAL SERVICES FOR ADDITIONAL DESIGN WORK FOR THE EXPANSION/HOLDROOM-SECURITY CHECKPOINT PHASE III (PART 2) IN THE AMOUNT OF $150,000. I HEREBY CERTIFY that this Minute Order, authorizing Change Order No. 1 to Agreement No. A-4382, Amendment 11 with Gensler Architectural Services for additional design work for the Expansion/Holdroom-Security Checkpoint Phase III (Part 2) in the amount of$150,000, was approved by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 19th day of October, 2005. JAMES THOMPSON City Clerk MINUTE ORDER NO. AUTHORIZING CHANGE ORDER NO. 1 TO AGREEMENT NO. A-5167, WITH SOUTHERN CALIFORNIA SOILS & TESTING, INC. TO PROVIDE ADDITIONAL CONSTRUCTION MATERIAL TESTING FOR THE EXPANSION/HOLDROOM- SECURITY CHECKPOINT PHASE III (PART 2) PROJECT IN THE AMOUNT OF $11,540. I HEREBY CERTIFY that this Minute Order, authorizing Change Order No. 1 to Agreement No. A-5167, with Southern California Soils & Testing, Inc. to provide additional construction material testing for the Expansion/Holdroom-Security Checkpoint Phase III (Part 2) project in the amount of $11,540, was approved by the City Council of the City of Palm Springs, California, in a meeting thereof held on the 1gth day of October, 2005. JAMES THOMPSON City Clerk RESOLUTION NO. A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF PALM SPRINGS WHEREAS, Resolution 21283 approving the budget for the fiscal year 2005-06 was adopted on June 8, 2005; and WHEREAS the City Manager has recommended, and the City Council desires to approve, certain amendments to said budget. THE CITY COUNCIL OF THE CITY OF PALM SPRINGS DOES HEREBY RESOLVE AS FOLLOWS: SECTION 1. ADDITIONS Fund Activity Account Amount 415 Airport 6400 Airport 56-062 AIP 37 $750,855.47 Development Purpose: To amend FY 2005-06 budget SECTION 2. SOURCE Fund Activity Account Amount 415 Airport N/A 29302 Retained $750,855.47 Earnings ADOPTED THIS 19th day of October 2005. David H. Ready, City Manager ATTEST: James Thompson, City Clerk Resolution No. Page 2 CERTIFICATION STATE OF CALIFORNIA ) COUNTY OF RIVERSIDE ) ss. CITY OF PALM SPRINGS ) I, JAMES THOMPSON, City Clerk of the City of Palm Springs, hereby certify that Resolution No. is a full, true and correct copy, and was duly adopted at a regular meeting of the City Council of the City of Palm Springs on October 19, 2005, by the following vote: AYES: NOES: ABSENT: ABSTAIN: James Thompson, City Clerk City of Palm Springs, California CHANGE ORDER No.2 Security Access Control and Public Information Display Systems Rehabilitation AIP No, 3-06-0181-36,-37 CITY PROJECT NO. 2003-17 CONTRACT NO. A4925 CONTRACT DATE: September 20,2004 CONTRACTOR: Antar-Com/Systems Integration,Inc. The following changes are hereby made to the Contract Documents: Item No. 1 through 7: see detail on spreadsheet Exhibit"A"attached. (All work under this change order shall be accomplished in accordance with the terms and conditions of the contract.) Justification: Items 1,2 and 3. Improvements are required to integrate and secure the new TSA Security Screening Area. Item 4.Time Clock-This feature will integrate the airport employee time reporting into the SACS system. Item 5.Existing Cameras—Over time the CCTV cameras fail;this item replaces and upgrades the failed cameras. Item 6.Employee Parking Lot—Two new cameras will be added to the new employee parking lot to monitor the lot day and night for employee safety and security. Item 7.Incorporate Gate 16(Atlantic FBO)into the SACS system enhancing airport perimeter security. CHANGE TO CONTRACT PRICE Original Contract Price: $2,496,500.00 Current contract price, as adjusted by previous Change Orders: $2,590,115.24 The Contract Price due to this Change Order will be [increased][deef eased]by$285,168.47. The new Contract Price due to this Change Order will be: $2,875,293.71 CHANGE TO CONTRACT TIME The Contract Time will be [increased)[deereased]by 30 calendar days. The date for completion of all work under the contract will be December 16, 2005, Approvals Required: To be effective,this order must be approved by the Owner if it changes the scope of the objective of the project,or as may otherwise be required under the terms of the Supplementary General Conditions of the Contract. Requested by date Recommended by Rodger Sheraton,VSA AIRPORTS,Inc. date Ordered by / date Accepted by ���^ f�d.�ri� date Antar-Com/Systems Integration,Inc. /! FAA Approval: EXHIBIT A EXHIBIT A SACS Change Order No. 2 Item I I Labor I Equipment I [Sub Contracts No. Description Hours Rate Cost Hours Rate Cost Materials /Systems AMOUNT 1 TSA Security Screening Area-Access control changes and 165.00 70.00 11,550.00 16,077.00 27,627.00 adds per plan Add 2 M8 Hirsch panels, 3 scramble prox readers and move 2 scramble prox readers. Relocate controller for Chiller ped gate 2 TSA Security Screening Area-CCTV changes and adds 146.00 70.00 10,220.00 33,828.00 44,048.00 Add 10 dome cameras and 2 fixed cameras, power supplies and associated connections to existing system. 3 TSA Security Screening Area-PIDS adds (COM-NET) 11,152.00 11,152.00 4 Time Clock-Add reader and terminal for Time clock access 8.00 70.00 560.00 4,320.00 7,200.00 12,080.00 To include enrollment reader, computer, display and software 5 Existing Cameras- Replace and upgrade 8 domes to be replaced 2 PTZ and 20 modems each end 140.00 70.00 9,800.00 38,895.50 48,695.50 6 Employee Parking Lot-Add 2 PTZ cameras 56.00 70.00 3,920.00 11,784.50 15,704.50 7 Perimeter Security Gates- East FBO-Add Security Access Control at Gate 16 82.00 70.00 5,740.00 4,838.00 45,000.00 55,578.00 includes 1,000' directional bore or 1,000' conduit/trench comp. Includes 5,000'fiber optic complete Engineering (Design/Submittals) 3,100.00 4,200.00 7,300.00 Engineering (Record Drawings) 2,240.00 3,200.00 5,440.00 5 Year Extended Warranty 4,620.00 4,620.00 Item Notes: 47,130.00 109,743.00 1,2,3 a. Excludes conduit installation. SSTx @ 7.75 8,505.08 8,505.08 b. Excludes door locking hardware and its installation. c. Includes wire,wire pull,terminations,testing and integration with Sub Total 240,750,08 the existing system. 1 d. Conduit shall be added from the Chiller gate to the electrical closet Overhead and Profit @ 15% 362112.51 where the M8 panel will reside as the existing controller is located at Gate 12 which is to be removed Total 276,862.59 6 e. Includes optical fiber from VIP to EPL power supplies etc. and excludes any trenching or underground conduit. Bond and Insurance 3% 8,305.88 7 f. Includes trenching and underground conduit, includes optical fiber eta], excludes gate controller, controller programming and Total 285,168.47 concrete work CITY OF PALM SPRINGS SECURITY CHECKPOINT PHASE III CHANGE ORDER To: AMD Construction Group,Inc. Date: 19 October 2005 1403 N.Batavia,Suite 101 Project No. CP05-01 Orange,CA 92867 Project Name: Expansion/Holdroom-Security Checkpoint Phase III-Construction Change Order No. 1 Contract Purchase No.A-5094 Attn: Mr.All F.Navi,President Account No. Description of Chanqe: This change order confirms the additional construction work needed to optimize the courtyard area surrounding the new security checkpoint.The work will include the demolition of one of the temporary holdrooms,portions of the new permanent security wall separating the courtyard from aircraft apron, and portions of the landscaping and sidewalks for passengers. Allowance amounts were determined using engineers estimates of costs.Actual costs will be based on negotiated Jump sum amounts following receipt of contractor's proposals. (See attached'Exhibit N for specific additional scope of work and cost breakout): Summary of Cost/Time Original Contract Price $2,780,000.00 Total of all Previous Change Orders $ 00,000.00 Total of this Change Order $ 304,147.00 Total Contract Price $3,084,147.00 This Change Order(increases)(decreases)(unchanged)the contract time by,(OLworking days.(Will be determined from actual work completed and negotiated at later date. I have received a copy of this Change Order Construction Manager: and the above AGREED PRICES are acceptable Approval: Date: to the contractor. Parsons t Aviation Department Approval: By: 6 Reviewed By: Date; Title: President Assistant Aviation Director 12 D5 Approved by: Date: Date: � � Aviation Director City Approval: Date: City Clerk Date: City Manager Distribution: Original Conformed Copies Conformed-File Copv City Clerk (1) Aviation Director (1) Contractor (1) Procurement&Contracting (1) Finance (1) Attachment 1 (Cost Breakout) Parsons (1) EXHIBIT'A' ADDITIONAL SCOPE OF WORK SITE PREPARATION/DEMOLITION (Temporary Holdroom B) $124,010 Demolition Single story building &foundation Canopy, post&foundation Planter wall and footing Concrete paving Lawn/planting/Irrigation Wall &fences Bollards Miscellaneous demolition Remove &salvage existing site furniture,precast planter box, etc Remove & replant existing palm trees Debris hauling Minor Grading to required level SITE REFURBISHMENT(Following Demolition) $180,137 Concrete paving, flat work Airfield security wall (courtyard) Custom paving pavers New gates to airfield Soil preparation & irrigation Courtyard lighting Storm drainage Sanitary sewer drainage Domestic water Gas service Chilled & hot water piping from Central Plant Electrical TOTAL: $304,147 CITY OF PALM SPRINGS Expand Terminal/Expand Holdroom-CheckPoint Phase III (Part 2) CHANGE ORDER To: Gensler Date: 3 October 2005 2500 Broadway Project No.CP05-10 Suite 300 Project Name: Expansion/Holdroom-Security Checkpoint Phase Santa Monica, CA. 90404 III (Part2) Change Order No. 1 Attn: Mr.Andrew P. Cohen, FAIA Contract Purchase No.A-4382 (Amendment No. 11) Account No. Description of Change: This change order confirms the additional architectural and engineering fees for re-design effort. These costs are for the additional labor and materials for the re-design and submittals to the Architectural Review Board, construction document revisions and consultant coordination from May 9 to July 12, 2005. Design Development: $ 53,980.00 Construction Doc's: $ 88,000.00 Coordination: $ 8,020.00 Total $150,000.00 AUTHORIZATION FOR CHANGE: Summary of CostfTime Original Contract Price $828,795.08 Total of all Previous Change Orders $0 Total of this Change Order $ 150,000.00 Total Contract Price $ 928,795.08 This Change Order(increases) (decreases)(unchanged)the contract time by zero 0 working days. I have received a copy of this Change Order Construction Manager: and the above AGREED PRICES are acceptable Approval: Date: to the contractor. Parsons Aviation Department Approval: By:_ Reviewed By: Date: E✓w3 Assistant Aviation Director- Operations& Planning Title: it 'Pk,h C a U Approved by: Date: Date: 9 I l JU- Aviation Director City Approval: Date: City Clerk Date: City Manager Distribution: Oriqinal Conformed Copies Conformed-File Copy City Clerk (1) Aviation Director (1) Contractor (1) Procurement&Contracting (1) Finance (1) Parsons (1) City of Palm Springs: Palm Springs International Airport EXHIBIT A Phase 3,Part 2:H6ldroom,Plaza,Walkway Design 05 0201.022,Amendment 11 Additional Service Re-Design Fee Summary Hours Totals Architectunal Goo Mechanical/ElectricaLlPlumbing 120 $ 116,000 $ , 03 24 Structural 166 $ 24,400 Total Fees 1,106 $ 141,020 Exp enses penses ' Total Additional"services $ 00 $ 150,0,000 Gensler 10Ifi2005 City of Palm"Springs: Palm Spring's International Airport EXHIBIT A Phase 3,Part 2:Holdroorm Plaza,Walkway Design 05 D201 022,Amendment 1 i Architectural Description of Work Avg. Hours Rate Fee Totals Redesign,Submittals to Architectural Review Board Re-Desire,Rendering and Presen[ahon 220 $ 13O $ 28,600 $ 28,600 Consultant Coordination Re-Gooidma[ a e anti Renal;ce ArchrtecWral,Shuctural;h4Elr'Chenges>^nN ConsuPong Fnglne rs,incfudino6ird Air for Walkway Canoe;Rerislons 96 $ 130 $ 12;460 S 12,480 Construction Document Revisions Sheets: AG01 Cover $ 125 $ AG02 Drawing Index,Vicinity Map,Protectlnformation New Sheets Added for Addihonel(Symmetrnd)Fabrim Structure at North End a Main Ccurcrard 4 $ 125 $ 500 AA00.01 Graphic Symbols&Materials Legend $ 125 $ AA00.10 General Notes - $ 125 $ AA00.30 Door Schedule Revise Door Heighleand Lacahonsn Ceuaverd&Hold Room.affected A,new Momwj,allocahons 8 $ 125 $ 1,000 AAOO.31 Finish Schedule Revise Rmshes,New Meten9 Research(nofdrricceing,noumcfas;da) 12 $ 125 $ 1,500 AAOO.40 Accessibility Requirements $ 125 $ AA00.41 Accessibility Requirements $ 125 $ _ AA00.50 Overall Site Plan AA01.00 Overall Demolition Plan 8 $ 125 $ 1,000$ 125 $ AA01.00A Overall onarrriDemolition Plan Zone 00 $ 125 $ AA02.00 Overall Construction Zone Plan Reconfigurabon of Courtyard one norm Med,e,ncal embers,re-outfnezenes 8 $ 126 $ 1.000 AA02.00A Site Section Courtyard M.difl ns 8 $ 125 $ 1,000 AA02.00fi ns Exiting Courtyard Mcdffl ac 8 $ 125 $ 1,000" AA02.01 Flow Plan-Zone 1 $ AA02.02 Flow Plan-Zbne2 125 $ - $ AA02.03 Floor one 3 Courtyard Motlm 125 $cahons 8 $ 125 $ 1,000 AA02.0 Enlargedged Toilet Rolm Plan Impactfrom C0ureard and Covered Wdkway Modihcahons 12 $ 126 $ 1,500 AA0204 Flow Plan-Zone 4 $ 126 $ AA03.Q0 Overall Roof Plan New Scheme.Reused Zone Area to Include Additional(Symmetrical)Fcre Shuclure wNonM1 end of Main Courtyard 10 $ 125 $ 1,250 AA03.01 Roof Plan-Zones Additional(Symmomeal)Fabric Structure at North end of Maio Courtysd,Need to add another sheet 8 $ 125 $ 1,000 AA03.02 Roof Plan-Zone 2 Covered Aslawre Modireahons 12 $ 125 $ 1,600 AA03.03 Roof Plan-Zone 3 Covered Woik trj Modihcanons 12 $ 125 $ 1.600 AA03.04 Roof Plan-Hold Room New.Scheme AA03.04A Roof Plan 2-Hold Roam New Scheme 16 $ 125 $ 2,000 12 $ 125 $ 1,600 AA04.02 Reflected Ceiling Plan-Zone 2 8 $ 125 $ 1,000 Gensler 2 10ffi2005 City of Palm Springs: Palm Springs International Airport EXHIBIT A Phase 3,Part 2.Haldroom,Plaza,Walkway Design 05.0201,022,Amendment 11 Architectural(cool Avg. Description or Work Hours Rate Fee Totals AA04.03 Reflected Coling Plan-Toilet Rooms 6 $ 125 $ 750 AAO4.04 Reflected Ceiling Plan-Hold Room New Schane, 16 $ 125 $ 2,000 AA05.04 Finish Plan-Hold Room New Design of Facade and Entry Plan(Gr,llge Dl) 8 $ 125 $ 1,000 AAD6.04 Payer and Communications Plan-Hold Room Newfksign of Facade and Entry Plan(Gr, line Di) 8 y. 125 S 1,000 AA07.04,Flow Finish Plan-Hold Room New Design ofFaSade andEohy Plan(Gridlme DI) 12 $ 126 S 1,600 AAO9.01 Exterior Elevations-Security Checkpoint Adddl(Symmatriorg Fabric Sruclure at Noun and of plan Ccohyad,Need to addanolhe,sheet 12 $ 125 S 1,500 AA09.02 Exterior Elevatlons-Hold Room New Design of Fal and Entry Plan(Gndllne Dl),New Materials,New MIE Locations 16 $ 125 $ 2,000 AA09.03 Exterior Elevations-Toilet Room Building Impoagero Ceuftyard and Covered Walivedy Modifications.recumitt tocomp'y with new Hold Room Roof Profile 12 $ 125 $ 1,500 AA09.04 Courtyard Elevations Impactfmm Courtyard and Covered Wakwie,Modffdelgcvs 16 $ 125 $ 2,000 AA09.11 Building Section-Hold Room New Deal Fa-,adaandEntry Plan(Gndlme D1),Nax Madras,Nex NJELacaons 16 $ 125 $ 2,000 AA09.12 Building Section-Toilet Rooms Impactfrom Courtyard and CrearalWalveay Modir¢adus.regoeS to comply man new Had Room Roof Profile 16 $ 125 S 2,000, AA09.19 Building Sections Walkway Canopy New Deal as reficaned(flat) 16 $ 125 $ 2,000 AA09A9 Building Sections-Walkway Canopy New Design asrequesred(flat) 16 $ 126 $ 21000 AA0921 Wall Sections New De=_Ign ofRooflClerestory,Facile antl Entry Plan(Grand Our New Materials,New MJE Locations 24 S 125 $ 3,000 AA09.22 Wall Sections New Design of Roollades[ary,Facde and Entry Ran(Gnrdme Di),New Matenue New NJELorallons 16 $ 125 $ 2,000 AA09.25 Wall Sections Impact from Coudyand and Coverd Walkway Modiffi ors,request to comaywds new Had Room Roof Profile 8 $ 125 $ 1,090 AA11-Di Interior Elevations No%v Imfife based an New RdadClerestory,Entry desgn,mew materialsDwumn enclosure details),new WE locations 16 $ 125 S 2,000 AA11.02 Infeiio Elevations Request to comply wi h new Hold Room Roof Prdie 16 $ 125 $ 2,000 AA12.00 Wall Types Material Chances,Wall profffs.R.4aggng mRans Were Ran'Needicailons 8 $ 125 $ 1,000 AA12.01 Wall Types Revise Exlsling and Prwme New r-ous rd Wall Types 8 $ 125 $ 1,000 AA12.02,Wall Details - $ 125 $ - AA12.03 Door Details - $ 125 $ - AA12.04 Misc.Details - $ 125 $ - AA12.05 Flow&Bass Details New Design of Facde and Envy Plan(Grilloe DI),New IvJELcotions 16 $ 125 $ 2,000 AA12D8 6cterior Details New Design of Facade,Roofasesrory Profile antl Wal Section Mocticapons regwrenewil is 16 $ 125 $ 2,000 AA12.10 Precast Details New Facade and Roof Desfgn rendered exiding deals obsolete,requites new tstalls 16 S 125 $ 2,000 AA12.15 Ceiling Details Momficmions bacedon new Ceeeloly Desgn 16 $ 125 $ 2,000 AA12.20Millwork Details - $ 125 $ - AAPH03 Phasing Plan-Phase 3 - $ 125 $ - AAPH04 Phasing Plan-Phase 4 - $ 125 $ - AAPHO5. Phasing Plan-Phase 5 - $ 125 $ - AAPHO6 Phasing Plan-Phase,6 _ $ 125 $ _ AAPH07 Phasing Plan-Phase? - $ 126 $ - 484 $ 60,500 $ 60,600 Total Architectural 800 $ 101,580 Gensler 3 10/6l2005 I City of Palm Springs: Palm Springs International Airport EXHIBIT A Phase 3,Part 2:Holdroom,Plaza,Walkway Design 05.0201.022,Amendment 11 Mechanical, Electrical, Plumbing Engineering Services Avg. Description of Work Hours Rate Fee Totals Consultant Coordination Coordmateand ooyzenlrlP changes xmh sronecoval&struaura 14 $ 143 $ $000 $ 2,000 M/E/P Engineering of Revisions- Don.erlsolcul.n.aaanalyse)new Mechanical losaums on ground,new eleclnczl room l.caaal 30 $ 150 $ 4,500 $ 4,500 Construction Document Revisions Sheets: M0.01 Revise ffihenute Sheet 4 $ 125 $ 500 M0206 vile - $ 125 $ M0207 Revise Air Codmburon/Lewis Units m Floor and Route Ducowcrl5 24 $ 125 $ 3,000 M0.02 Revise Decal Sheet 2 $ 125 $ 250 P0.01 Revise Legend Sheet 3 $ 125 $ 375 P2201 Rev7sed Rret Hoa_Plens 9 $ 125 $ 1,125 E00.01 Revise Dramngs 2 $ 125 $ 250 E01.01 Revise Ske Wm 4 $ 125 $ 500 E02.07L Revise Elacricd Llghitng Plan 10 $ 125 $ 1,250 E02.07P Revise Pcwar Plan per new Ejearcal Room Location 13 $ 125 $ 1,625 E02.07S Revs.Secunty Plan 3 $ 125 $ 375 E02.07R Revise Roof Plan per N.Design 2 $ 125 $ 250 76 $ 9,500 $ 9.500 Total lV@P 120 $ 16,000 Gensler 4 1016/2005 City of Palm Springs: Palm Springs International Airport EXHIBIT A Phase 3,Part 2:Holdmom,Plaza,Walkway Design 05 0201,022,Amendment 11 Structural Engineering Services- Avg. Description of Work Hours Rate Fee Totals Consultant Coordination Coordinate and analyze stmcWral changes wo architecture&MEP 12 $ 158 $ 1900 -$ 1goo Structu ral Engineering of Revisions 3D Building reanalyss 32 $ 141 $ 4,500 S 4,500 Construction Document Revisions sheets:. sol.01 Revtse Gain...I Notes&Details 6 $ 125 $ 688 SOi_02 Revise Fran g and Grads Baam Detains 8 $ 125 S 1,000 501.03 Revise Sections and Details 8 $ 125 $ 1,000 801.04 Fennel an Details lCalopy Mcherage)for AddiYonal Commerce)Fabric Structure,NoRh End Main Courtyard 16 $ 125 $ 2,000 S01.05 Revise Sectons and Details 8 .$ 125 S 1,000 S02.00 Courtyard Fandedan Plan for Addihonal(SimmeVicd)Fall Svucmre,all End Man Courtyard 8 $ 125 $ 1,000 W2.03 Revise Ground Floor and Foudnation Plan 8 $ 125 5 1,000 S02.04 Revise Roof Fraisning Plan-Hold Room 10 $ 125 $ 1,250 S02.05 Revise Building SeNon and Orthogonal View 8 $ 125 $ 1,000 S02.05 Tolet Roan Framing&Foundaiion Plans,Elevamns and Onhogana View 8 $ 125 S 1,000 S03.02 Revise Moment Frame awstsns 6 $ 125 S 750 S03.03 Revise Maman[Frame El evzbons 6 $ 125 S 750 $03.04 Revise Building Section and Orthogonal New 6 $ 125 S 750 SO4.01 Revise Wall Sechans 16 $ 133 $ 2,133 SO4.02 Ranss T all at Room Wall Secnon&Dstals 8 $ 125 5 1,000 505.01 Revise Walkwey Sooners and Details 12 $ 140 5 1,680 142 S 18,000 $ 18,000 Total Structural 186 $ 24,400 Gensler 5 1 OIG2005 CITY OF PALM SPRINGS SPECIAL TESTING& INSPECTION SERVICES CHANGE ORDER To: Southern California Soil&Testing Inc. date: 19 October 2005 33740 Citrus Avenue, Suite G Project No. CP05-01 Indio, CA 92201-3438 Project Name: Expansion/Holdroom-Security Checkpoint Phase lit (Part 2) - Special Testing & Inspection Change Ordei No. 1 Contract Purchase No.A-5167 Attn: Gordon T.M.Woodard, R.C.E.Vice President Accourit No. [7iescriptitn of Chansao: This change order confirms the additional Testing and Inspection work needed to support the construction of the terminal expansion/checkpoint as described in the scope of work from the agreement, Testing and inspection services will include, but not be limited to, soils compaction and density tests, structural concrete, site concrete, mortar, masonry, grout, structural steel, steel joists, metal decking, cold formed metal framing, metal fabrications, reinforcing steel, welding, fireproofing, roofing, bolts and imbeds, and mechanical connectors. Inspections will occur on and off site, (See attachment `Exhibit N for details): AUTHORgATION FOR CHANCE; Summary of Cost)Time Original Contract Price $23,500.00 Total of all Previous Change Orders $00,000.00 Total of this Change Order $ 11,540.00 Total Contract Price $35,040,00 This Change Order(increases) (decreases) (unchanged)the contract time by 9-working days. I have received a copy of this Change Order Construction Manager: and the above AGREED PRICES are acceptable Approval: Date: to the contractor, Parsons Aviation Department Approval: B . 440FX&YP1 Reviewed By: Date: Assistant Aviation Director— y Operations&Planning Title; Gd'B+�'�' / �8 ��! Approved by: Date: Date: ea, VS— Aviation Director City Approval: Date: City Clerk Date: City Manager Distribution: _Original Conioned Copies Conformed-File Copy City Clerk (1) Aviation Director (1) Contractor (1) Procurement&Contracting (1) Finance (1) Attachment 1 (Cost Breakout) Parsons (1) EXHIBIT A — SCS&T CHANGE ORDER NO. 1 Special Inspection by SCS&T (Includes $75 per hour 108 hours inspection of the following items): reinforcing steel; structural and site concrete placement; reinforced masonry, mortar and grout placement; structural steel, steel joists, metal decking, clod formed metal framing, metal fabrications, and field welding, high-strength bolting; fireproofing; bolts and embeds; and mechanical connectors . Special Inspection by Simon and Wong: Bolts in concrete (Drilled anchors, i.e. Epoxy ad Expansion Anchors) Geotechnical Services $75 per hour 20 hours Compressive Strength of Concrete $21 per cylinder 20 cylinders Compressive Strength of Grout $21 per cylinder 20 cylinders Interim Verification of Special Inspection Report $500 1 added Report (for COO) Project Engineer/ Project Manager $150 per hour 4 hours Added Costs for Special Inspection and Materials Testing $11,540.00