Date: January 19, 2011 CONSENT CALENDAR
Subject: AWARD OF CONTRACT FOR THE 2010/2011 ANNUAL SLURRY SEAL,
CITY PROJECT 10-09
From: David H. Ready, City Manager
Initiated by: Public Works and Engineering Department
SUMMARY
The Public Works and Engineering Department schedules an annual slurry seal of
various City streets. It is intended that every City street receive a slurry seal
approximately every 5 to 7 years. Award of this contract will allow staff to proceed with
this annual street maintenance program.
RECOMMENDATION:
1) Approve Agreement No. in the amount of $423,313.20 with Bond
Blacktop, Inc., for the 2010/2011 Annual Slurry Seal, City Project 10-09; and
2) Authorize the City Manager to execute all necessary documents.
STAFF ANALYSIS:
The Public Works Department oversees the maintenance of the City's street system.
Each year, the Department assembles a capital project to continue its Slurry Seal
Program on various City streets. The intention of the Slurry Seal Program is to provide
a slurry seal within 5 to 7 years on every City street. This year's slurry seal program is
scheduled to generally include the residential streets within Section 11 (the residential
area between N. Indian Canyon Dr. and Sunrise Way, from Vista Chino to Alejo Road),
and other selected streets based on their overall pavement condition index. A complete
listing of streets and maps of these areas are included in Attachment 1.
The plans and specifications were prepared by Department staff, and on December 1,
2010, the City Council approved the plans and specifications and authorized
construction bidding. On December 4 and 11, 2010, the project was advertised for bids,
and at 3:00 p.m. on January 11, 2011, the Procurement and Contracting Division
received construction bids from the following contractors:
ITEM NO.
City Council Staff Report
January 19, 2011 - Page 2
2010/2011 Annual Slurry Seal (CP 10-09)
1. Bond Blacktop, Inc.; Union City, CA; Bid: $423,313.20
2. Intermountain Slurry Seal, Inc.; Watsonville, CA; Bid: 443,138.20
3. American Asphalt South, Inc.; Fontana, CA; Bid: $444,099.38
4. Pavement Coatings Co.; Mira Loma, CA; Bid: $485,015.90
5. Roy Allen Slurry Seal, Inc.; Santa Fe Springs, CA; Bid: $501,076.40
6. Valley Slurry Seal Co.; West Sacramento, CA; Bid: $593,455.16
Local Business Preference Compliance
Section 7.09.030 of the Palm Springs Municipal Code, "Local Business Preference
Program," requires prime contractors to use good faith efforts to sub-contract the supply
of materials and equipment to local business enterprises and to sub-contract services to
businesses whose work force resides within the Coachella Valley; submission of good
faith efforts is required. Of the 6 bids received, none are from a prime contractor
located within the Coachella Valley. Generally, the work sub-contracted in this project
consisted of two trades: crack-sealing repairs and traffic striping work, and none of the
listed sub-contractors in any of the 6 submitted bids are local firms. All bidders
completed the City's Local Business Preference Program Good Faith Efforts bid form
included in the Bid Documents. As this project is funded with local Measure A funds
which must be used to their greatest advantage, staff recommends that the City Council
waive any informality of compliance with the Local Business Preference Program, and
authorize award to the lowest, responsive bid received from a non-local business
enterprise.
The Engineer's estimate for this project was $450,000. The company is a California
corporation, and its principal officer is Edward Dillon, President/Secretary/Treasurer.
FISCAL IMPACT:
Funding for this project is made available through local Measure A funds in account
134-4498-50100. No local miscellaneous General Funds are being used for this
project.
City Council Staff Report
January 19, 2011 - Page 3
2010/2011 Annual Slurry Seal (CP 10-09)
SUBMITTED:
Prepared by: Recommended by:
Marcus L. Fuller David J. Barakian
Assistant Director of Public Works Director of Public Works/City Engineer
Approved by:
Thomas J. Wil n, Asst. City Manager David H. Ready, QA
yJX6ff5ger
Attachments:
1. Street Listing and Maps
2. Agreement
d
Al 1
... ,. �.
01441G'', H! WATE C FA1i
LUi DR Ri»I.L O Gate 124 4, 6 $qFt
1144005 VIA MlRALESTE VISTA CHINO 135'S.OF THE PALMS 32 1,295 52,146 t
Sqf
114401p VIA MiRALESTE 185'$;OF THE PALMS PASEO EL MIRADOR 61 517 30,906 SF
114401,5 VIA MIRALESTE PASII':4R EL MIRAbOR TACHEVAH OR 49 774 37,926 SF.
11440ZO VIA MIRALESTE TACiNIsVA11 ` 318'S'.d-F TACHPVAH 60 318 19,080 Sit
1144625 VIAMIRALESTE 3�8"S.OFTAOOIvECHEVAHDRIVE TAMARISK ROAD 46 955 43,930 SF
1144030 VIA MIRALESTE TAMARISK ROAD ALOO ROAD 36 1,300 46,800 SF
1144040 TAOHEVAH DR INDIAN'CANYON DR VIA MIRALESTE 48 1,253 63,747 SF
1144045 TACHEVAH OR VIA Vf % 9 65,079 SF
1A
114400,TAMAR#SKR'UAD AVENII17dICa4EIALLEROS VIAMRR�l65Ir 37 1,304 49,248 SF
114408p CHUCKWALLA ROAD VIA IV�CI IL STE.' AVENIDACAEIALLEROS 37 1,275 46,1$8 SF
11441185 OPUNTIA.ROAD GIi1A If D 'D tl 100,WALLA ROAD 33 622 20,526 SF
114400 VAQUERO ROAD CHU , * ROAl7 CWIA'R13At� 83 626 20,658 SF
114f109S'RQdEQFi A11 CHIA:IOA0' CHUCKWALLAROAD 2S 623 20,55'9 SF
1144100 FItsTA ROAD 9pt,0 A�t�A ROAD CHIA Rfi0 33 626 70,658 5F
1144105 THE PALMS VIA 1�k Lt0E WEND 25 $12 14,895 SF
1144110 CHiA ROAD, V1A1010, 5Tt AVE�NIOACASALLEROS 32 1,2$7 40,224 $F
1144115 COl`TdNWOODROAb Ah I f1 8ALLtRQS VIAMIRAVeSTE 83 1,278 42,174 SF
1144120 GOT4'C1N'' 4 d I RdAD VIA , GHAPA�II AL I f9A1) 83 822 27,126 SF
1144125 CHA,1A111A1,ROAD. V1 �tdM 13 I"911L700 ROAD 3 479 13,032 SF
11aax4r� MELAVEIuI� {PARrIAU VIA m°��. t1+I1AI1ANv[�N.CIR 25, 1,25Y' 29,718 5F
1VE5R A '"'ROAD 696
1991 SF11441$0S' I � ".xCN V
1144175 IASp0E0Y1 ADbR VIA AV 1+1I4iA CAIIALLE;RO$ 37 1,108 46,916 SF.
1144245 RA'i0 i E ANZA P No 04.1 lA6 �$, 529 13,644 SF
114422$LlN"DAV'i''A` OAO I ROAD 904, 29,0$2 SF
114423b 1dIA�211A P t i6Aa 30,6i>D 5F
114423$a Wip**'Q: ! ,v 3 ' SQ$' 23,220 SO
114040 Dwo CIi'4 VRA' A V. S'6 214 10;314 5F
1144249 CFROJiT,10� WAY A °� 36 587: 23,733 SF
1144 11fI 4` 04'4 C100LE 41410", #4 wo 90" 120 6,6E+1 SF.
11a4255 t 1 IVE V ;�i4ot WAY 32 652 21,3117 $F
1144264 fvlA &HAIL IhrAY AEIVE YI£idil( A� A•:6r114 L1ER05 3 6 6 21,434 Sf
10 0'N6R+%kipR Uiw1A�RC9gb 37' 1,29a a4'964 S
1144285 f
TW.AI' f 1311A0 A�.I�R01 Cr 39 1,279, 471912 SF
11443mf1 111d8NA VISrA t R Alf R> �1 6RQ5 AI1� ,10A6 87 612 22,644 SF
114430a euE►NAw+sTrR 618; 2286E SF
1144814 R3% A VI$uA°I7R �A 1 1 + 3'7 Oi4 221. SF
1144515 e1EtNA V3TA da' PA� � $��yJRlf 3" 61(9 22 5.7I SF
1i4z�► ANAIa1N� av SI1I!IRI � W�t38'A►t1A S"� 614 22,718 SF
1144124 SAW! vliAr PAS[? A ,A: 37 616• 22,792 SF
11a4330 511L;►IACINT '�AIAy H6$KtIC ^13 11RAG1 37 622 23,014 SF
1144335 9i61JACI11iAY AR�UkRA13AD; ?A° 1I1' 4ALifRO$ 37 605 z2,385 SE
1144860 V61TSENA'D11 SWI�BIS'.6` d FA E II3E N2A 37 612 12,644 $F
i1443,65'v0R$ENADR PA5;k Pt,AI A If [ A;CiR 37`. 616 22,792 SF
1.1444G AVE1�R101(rl 'OS TACHEVAH 60, PA �'PL;l1111RAI1,DR a6' 84.5 35,051 SF
1144405 AVENIDA P4sAitROS PASEQ E1 I•CRIfA1Rt A cIlO 60 970 58,290 5F
1144�i1D•v1A AItAMil r AVE311i64 lI13AaoOS Aft'lRI"Ali0AD 9,pr 615 22,140 SF
44445 VIA ALTAMIR 4 AA la1LlA lt(1AD'` r MD A;OR 3'6 615 2.2,14D SF
1.144420 VIA.COLUSA H6RMO .OR A$W,IC4, ROAD 36 615 22,1411 SF
1144#25 VIA COLUSA ARQUILIRA RL'IAD AiII�h6A',CAiALLEROS 3' 615' 22,140 SF
1144430 RLAi,AMIGO AL140'9;�AD 0"A wthVALMt)NfE 36 618 22,248 SF
1144435 PLAZA AIJ1lCd (R/INVIA VrALAQDNTE TAI0IAA199,1 AD 36 62;1 22,356 SF
1144440 PASEO DE ANZA TAMARISK R0Aa ,. CIRA`EiVIA VALMbNTE 36 620 22,320 SF
1.144445 PASEO DE ANZA GRANVIA VALNIONTE AIL
06 ROAD 36` 616 22,176 5F
1144450 CAI.LE ROLPH AtF$O R;pAO G'lUkNV1A 1!ALMONTE 36 616 22,176 SF
11a445S MtE ROLM GRANVIA VALMOINTE TAt ARISK'ROAD 36 026 22,320 SF
1144460 CALLS MARCU5` TAMARISK R&D GRANVIA VALMONT 36 620 22,320 SF
1144465 CALLE MARCU$ GRANVIA VAIM'ONT€; AL ROAD. 36 OiA 22,176 SF
114,4470 GRANVIA VALM'O NTE SUNRISE WAY HERMOSA DR 37 1,271 47,027 SF
114.475 4 GR4NVIA VALMDNYE HERMOSA\OR A0t�U1LLA ROAD 37 615 22,755 SF
a44480 GRANVIA VA,LMONTE ARQUILLA ROAD AVEI+YIDA doALLEROS 37 615 22,691 $F
1144400 (OS NIETOS ROAD ALFJ0 ROAD GRANVIA VALMONTE 32 62.5 20,060 SF
1144540 AVENIDA OUVOS TAMARISK ROAD
` 320'S.OF TACHEVAH DR 25 959 21,984 $F
1344056 6ARI$TO ROAD 243'E,OF CL FARRELL DR CIVIC DR 5p 1,288 64,400 SF
1344205 ANDREAS ROAD AIRLANE OR LOUELLA'ROAD 36 480 17,910 SE
1344210 ANOREAS'ROAD LOELLA ItOAD FARRELL DR 36 946 34,;164 $F
CITY OF PALM SPRINGS
SECTION 1-T4 -'R4E
r
#
ja
_ ,.,. P�L(� SPRING
F COUNTRY
} rr AD 1
8:jr
F 1 � ROAD
/
..,, .,........ HtWY LANE,A.
....�
iw.
, L. R
RO)AD,
/
DE
VMT
lz
.. .. ��.
RQ� II E, ROAti
3 I.... �.
LH q
t�
t
HuWSO €RO 4k " A111 ... 'ROM''
g
VIA : SS A " ELA
....._ 4- t
SAN
blk Ra'
SFRT PARK., ;EVE
RD
S ARA
on ,
nv
M jua� RbAa
f
h
Y
+ r.
CITY OF PALM SPRINGS
,
YIHOND CREE
...;: ,. MlDbl H00
s DL
f
y.
1. t
D
I
4
PAS
t
j h,.
V ... ' ' 1 Lo
,
I I ,.
A' #
E ... I,.,LLNESS ...
d
K-A,.... ... �.... 11MJJ �'
S
f
,
I RUTH %
A _...
r F ..
�. fit- ALAMA
HARDY
E f
F
PAR� q
^ T�
�'
ISK
t �
VIA AL4 M A
}.. ~ ..
2;W VALE.:.aR N
,
WE ��
460
CITY OF PALM SPRINGS
SECTION 1344SA41E
Ao
AL,
pig
r .
r
A
,
i
..
E.
{
...... ... i .. ...
E
�IATiO111,.1C1�.
�. E ...
j....
77.7
VK
Tw
,
AN
Jobs
,
, H LITZ
t
n >•
E �" � ..CABLE ��1 3 m✓✓..�
E ,CA
'krill
1
Re
Z q �� ) Y
f ✓$
" E
.. -RD.
PS P �
S
T , [
j/ { ...�
PUBLIC ' TAQIUNI _ . - . ...
LIBRARY r PALL SPRINGS
C SUNRISE E VIA-, VAQUERO R'D
, ,
R �,- PS HIG IICHO;OL
PARK �....:.,•
F SENIOR j;' '; REC R �{tR
CTR L
RAMpN I Rp RAMM I RO 4 .0
�r
AGREEMENT
THIS AGREEMENT made this day of , 20 , by and between
the City of Palm Springs, a charter city, organized and existing in the County of Riverside,
under and by virtue of the laws of the State of California, hereinafter designated as the
City, and Bond Blacktop, Inc. a California corporation, hereinafter designated as the
Contractor.
The City and the Contractor, in consideration of the mutual covenants hereinafter set
forth, agree as follows:
ARTICLE 1 --THE WORK
The Contractor shall complete the Work as specified or indicated under the Bid
Schedule(s) of the City's Contract Documents entitled:
2010/2011 ANNUAL SLURRY SEAL
CITY PROJECT NO. 10-09
The Work is generally described as follows:
Installation of hot asphalt-rubber sealant material in designated pavement cracks on
various streets; installation of asphalt concrete in designated pavement cracks on various
streets; construction of Rubber Polymer Modified Slurry (RPMS) on various City streets in
Sections 1, 11 and 13, Township 4 South, Range 4 East (as listed in the Appendix); traffic
striping; and all appurtenant work
ARTICLE 2 -- COMMENCEMENT AND COMPLETION
The Work to be performed under this Contract shall commence on the date specified in
the Notice to Proceed by the City, and the Work shall be fully completed within the time
specified in the Notice to Proceed.
The City and the Contractor recognize that time is of the essence of this Agreement, and
that the City will suffer financial loss if the Work is not completed within the time specified
in Article 2, herein, plus any extensions thereof allowed in accordance with applicable
provisions of the Standard Specifications, as modified herein. They also recognize the
delays, expense, and difficulties involved in proving in a legal proceeding the actual loss
suffered by the City if the Work is not completed on time. Accordingly, instead of
requiring any such proof, the City and the Contractor agree that as liquidated damages or
delay (but not as a penalty), the Contractor shall pay the City the sum of $790 for each
calendar day that expires after the time specified in Article 2, herein. In executing the
Agreement, the Contractor acknowledges it has reviewed the provisions of the Standard
Specifications, as modified herein, related to liquidated damages, and has made itself
aware of the actual loss incurred by the City due to the inability to complete the Work
within the time specified in the Notice to Proceed.
2010/2011 SLURRY SEAL AGREEMENT FORM
CITY PROJECT NO. 10-09 AGREEMENT AND BONDS-PAGE 1
ARTICLE 3 -- CONTRACT PRICE $423,313.20
The City shall pay the Contractor for the completion of the Work, in accordance with the
Contract Documents, in current funds the Contract Price(s) named in the Contractor's Bid
and Bid Schedule(s).
ARTICLE 4 -- THE CONTRACT DOCUMENTS
The Contract Documents consist of the Notice Inviting Bids, Instructions to Bidders, the
prevailing rate of per diem wages as determined by the Director of the California
Department of Industrial Relations, the accepted Bid and Bid Schedule(s), List of
Subcontractors, Non-collusion Affidavit, Bidder's General Information, Bid Security or Bid
Bond, this Agreement, Worker's Compensation Certificate, Performance Bond, Payment
Bond, Standard Specifications, Special Provisions, the Drawings, Addenda numbers 00
to 00, inclusive, and all Change Orders and Work Change Directives which may be
delivered or issued after the Effective Date of the Agreement and are not attached hereto.
ARTICLE 5 -- PAYMENT PROCEDURES
The Contractor shall submit Applications for Payment in accordance with the Standard
Specifications as amended by the Special Provisions. Applications for Payment will be
processed by the Engineer or the City as provided in the Contract Documents.
ARTICLE 6 -- NOTICES
Whenever any provision of the Contract Documents requires the giving of a written
Notice, it shall be deemed to have been validly given if delivered in person to the
individual or to a member of the firm or to an officer of the corporation for whom it is
intended, or if delivered at or sent by registered or certified mail, postage prepaid, to the
last business address known to the giver of the Notice.
ARTICLE 7 -- MISCELLANEOUS
Terms used in this Agreement which are defined in the Standard Specifications and the
Special Provisions will have the meanings indicated in said Standard Specifications and
the Special Provisions. No assignment by a party hereto of any rights under or interests
in the Contract Documents will be binding on another party hereto without the written
consent of the party sought to be bound; and specifically, but without limitation, monies
that may become due and monies that are due may not be assigned without such
consent (except to the extent that the effect of this restriction may be limited by law), and
unless specifically stated to the contrary in any written consent to an assignment, no
assignment will release or discharge the assignor from any duty or responsibility under
the Contract Documents.
The City and the Contractor each binds itself, its partners, successors, assigns, and legal
representatives, to the other party hereto, its partners, successors, assigns, and legal
representatives, in respect of all covenants, agreements, and obligations contained in the
Contract Documents.
2010/2011 SLURRY SEAL AGREEMENT FORM
CITY PROJECT NO. 10-09 AGREEMENT AND BONDS-PAGE 2
nss..,tio.1 Orlin
IN WITNESS WHEREOF, the City and the Contractor have caused this Agreement to be
executed the day and year first above written.
ATTEST: APPROVED BY THE CITY COUNCIL:
CITY OF PALM SPRINGS,
CALIFORNIA
Date
By
City Clerk Agreement No.
APPROVED AS TO FORM:
By
City Attorney
Date
CONTENTS APPROVED:
By
City Engineer
Date
By
City Manager
Date
2010/2011 SLURRY SEAL AGREEMENT FORM 10
CITY PROJECT NO. 10-09 AGREEMENT AND BONDS-PAGE 3
Corporations require two notarized signatures: One signature must be from Chairman of Board, President, or any
Vice President. The second signature must be from the Secretary, Assistant Secretary, Treasurer, Assistant
Treasurer,or Chief Financial Officer.
CONTRACTOR: Name: Bond Blacktop, Inc. Check one:_Individual_Partnership X Corporation
Address: 2828 Faber Street
Union City, CA 94587
By: By:
Signature (notarized) Signature (notarized)
Name: Name:
Title: Title:
(This Agreement must be signed in the above This Agreement must be signed in the above
space by one of the following: Chairman of the space by one of the following: Secretary, Chief
Board, President or any Vice President) Financial Officer or any Assistant Treasurer)
State of L State of n
County of r iss County of I.Jss
On On
before me, before me,
personally appeared personally appeared
who proved to me on the basis of satisfactory who proved to me on the basis of satisfactory
evidence to be the person(s) whose name(s) evidence to be the person(s) whose name(s)
is/are subscribed to the within instrument and is/are subscribed to the within instrument and
acknowledged to me that he/she/they executed acknowledged to me that he/she/they executed
the same in his/her/their authorized capacity(ies), the same in his/her/their authorized capacity(ies),
and that by his/her/their signatures(s) on the and that by his/her/their signatures(s) on the
instrument the person(s), or the entity upon behalf instrument the person(s), or the entity upon behalf
of which the person(s) acted, executed the of which the person(s) acted, executed the
instrument. instrument.
I certify under PENALTY OF PERJURY under the I certify under PENALTY OF PERJURY under the
laws of the State of California that the foregoing laws of the State of California that the foregoing
paragraph is true and correct. paragraph is true and correct.
WITNESS my hand and official seal. WITNESS my hand and official seal.
Notary Signature: Notary Signature:
Notary Seal: Notary Seal:
2010/2011 SLURRY SEAL AGREEMENT FORM {
CITY PROJECT NO. 10-09 AGREEMENT AND BONDS-PAGE 4 1
December 1,2010